Loading...
HomeMy WebLinkAboutJBI Oaks - Workplan revised for UDCsWorkplan for Jeffries Bros. Brookside at the Oaks Facility: Jeffries Bros. Brookside at the Oaks 8803 Camino Media Bakersfield, CA. 93311 Contractor: Cal Valley Equipment 7608 Fruitvale Avenue Bakersfield, CA. 93308 License: 998733 A, Haz Contact: Jerry Rangel Office: (661) 327-9341 Cell: (661) 979-0953 Email: jerryr@calvalley.com Scope of work: Remove and replace all dispensers, UDCs, product piping, vapor return piping, and conduit from dispensing area under canopy to UST piping sumps. Replace the existing Veeder Root TLS-350 with a new TLS-450. Permit number: Bakersfield Fire Department: 23-10000909 Proposed timeline: *Based on new UDC shipping date of 05/20/24 from manufacturer June 3rd: Close site, remove fuel island equipment, and blow back lines to the USTs. June 3rd – 7th: Sawcut, breakout, and remove concrete. June 10th – 14th: Excavate and remove existing UDCs and piping. Conduct soil sampling as required. June 17th – 21st: Set UDCs, run conduit, and install TLS. June 24th – July 5th: Install UDC fittings, run Brugg piping, connect to existing turbines. Perform primary and secondary backfill inspections and testing. July 8th – 19th: Backfill, concrete, and concrete cure time. July 22nd – 26th: Set dispensers, purge, and calibrate. July 29th – August 2nd: Perform final testing with BFD and SJVAPCD Sign: _____________________________________ Date: ______________ 04/30/24