HomeMy WebLinkAboutSB-989 2024 (PARTIAL TEST)Appendix VII
Underground Storage Tank
Secondary Containment Testing Report Form
CERS = California Environmental Reporting System, ICC = International Code Council,
ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment,
Page 1 of 5
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 6 Month ܆ 36 Month
CERS ID
Test Date
Facility Name
Facility Address
City
ZIP Code
Company Performing the Test
Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number
ICC Expiration Date
Manufacturer and Test Equipment Training Certifications Expiration Date
Test Procedures Used Components Tested
I hereby certify that the secondary containment was tested in accordance with California
Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date
Total # of Pages
1. FACILITY INFORMATION
2. SERVICE TECHNICIAN INFORMATION
3. TRAINING AND CERTIFICATIONS
4. TEST PROCEDURE INFORMATION
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
10122025 04/11/2024
SamCo #13 (Rosedale)
3605 Rosedale Highway Bakersfield 93308
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Billy Lane
1073967
10281488 03/15/2025
INCON 1022163714 11/08/2024
Incon Sumps and UDC’s
Precision mechanical test gauge Tank annular’s and line secondaries
04/11/2024 5Billy Lane
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 2 of 5
Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer
Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic
Test Equipment Used:
Tank ID
Tank Manufacturer
Tank Capacity
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail
Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer
Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic
Test Equipment Used:
Pipe Run ID
Pipe Manufacturer
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail
Pipe Run ID
Pipe Manufacturer
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail
Additional copies of this page may be attached.
6. TANK SECONDARY CONTAINMENT TEST
7. PIPE SECONDARY CONTAINMENT TEST
91 EAST
SMITH
0900
5.00 PSI
1000
5.00 PSI
0.00 PSI
0.00 PSI
91 VENT
SMITH
0900
5.00 PSI
1000
5.00 PSI
0.00 PSI
0.00 PSI
DSL EAST
SMITH
0945
5.00 PSI
1045
5.00 PSI
0.00 PSI
0.00 PSI
91 WEST
SMITH
0900
5.00 PSI
1000
5.00 PSI
0.00 PSI
0.00 PSI
DSL WEST
SMITH
0945
5.00 PSI
1045
5.00 PSI
0.00 PSI
0.00 PSI
DSL VENT
SMITH
0945
5.00 PSI
1045
5.00 PSI
0.00 PSI
0.00 PSI
VAPOR
SMITH
1200
5.00 psi
1300
5.00 PSI
0.00 PSI
0.00 PSI
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 3 of 5
Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer
Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic
Test Equipment Used:
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail
Additional copies of this page may be attached.
8. SUMP/UDC TEST
91 STP
UNKNOWN
50.00"
32.00"
SEE
INCON
RESULTS
3-4
WAYNE
33.00"
13.00"
SEE
INCON
RESULTS
DSL STP
UNKNOWN
50.00"
32.00"
SEE
INCON
RESULTS
VENTBOX
UNKNOWN
32.00":
13.00"
SEE
INCON
RESULTS
1-2
WAYNE
33.00"
13.00"
SEE
INCON
RESULTS
5-6
WAYNE
33.00"
13.00"
NOT
TESTED
7-8
WAYNE
33.00"
13.00"
SEE
INCON
RESULTS
9-10
WAYNE
33.00"
13.00"
SEE
INCON
RESULTS
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 4 of 5
Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer
Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic
Test Equipment Used:
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail
Additional copies of this page may be attached.
8. SUMP/UDC TEST (continued)
܆ Pass ܆ Fail
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 5 of 5
9. COMMENTS
Dispenser 5– 6 had been hit by a car no test performed on the dispenser for neither 989 or monitor
cert. STP 87 not tested due to not being able to put boots on, all other sumps and UDCs past 989 testing.