HomeMy WebLinkAboutSB989 2024Appendix VII
Underground Storage Tank
Secondary Containment Testing Report Form
CERS = California Environmental Reporting System, ICC = International Code Council,
ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment,
Page 1 of 5
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 6 Month ܆ 36 Month
CERS ID
Test Date
Facility Name
Facility Address
City
ZIP Code
Company Performing the Test
Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number
ICC Expiration Date
Manufacturer and Test Equipment Training Certifications Expiration Date
Test Procedures Used Components Tested
I hereby certify that the secondary containment was tested in accordance with California
Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date
Total # of Pages
1. FACILITY INFORMATION
2. SERVICE TECHNICIAN INFORMATION
3. TRAINING AND CERTIFICATIONS
4. TEST PROCEDURE INFORMATION
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
10159083 04/10/2024
Jaco #7725 Fastrip #19 (South)
4901 S Union Ave Bakersfield 93307
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Billy Lane
1073967
10281488 03/15/2025
INCON 1022163714 11/08/2024
Incon Sumps and UDC’s
Precision mechanical test gauge Tank annular’s and line secondaries
04/10/2024 5Billy Lane
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 2 of 5
Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer
Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic
Test Equipment Used:
Tank ID
Tank Manufacturer
Tank Capacity
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail
Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer
Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic
Test Equipment Used:
Pipe Run ID
Pipe Manufacturer
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail
Pipe Run ID
Pipe Manufacturer
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail
Additional copies of this page may be attached.
6. TANK SECONDARY CONTAINMENT TEST
7. PIPE SECONDARY CONTAINMENT TEST
87 ANN
UNKNOWN
12,000
0900
-10.00" HG
1000
-10.00" HG
0.00" HG
0.00" HG
87 SECONDARY
SMITH
0915
5.00 PSI
1015
5.00 PSI
0.00 PSI
0.00 PSI
91 ANN
UNKNOWN
12,000
0900
-10.00" HG
1000
-10.00" HG
0.00" HG
0.00" HG
DSL ANN
UNKNOWN
12,000
1015
-10.00" HG
1115
-10.00" HG
0.00" HG
0.00" HG
91 SECONDARY
SMITH
0930
5.00 PSI
1030
5.00 PSI
0.00 PSI
0.00 PSI
DSL SECONDARY
SMITH
1030
5.00 PSI
1130
5.00 PSI
0.00 PSI
0.00 PSI
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 3 of 5
Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer
Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic
Test Equipment Used:
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail
Additional copies of this page may be attached.
8. SUMP/UDC TEST
87 STP
UNKNOWN
55.00"
22.00"
SEE
INCON
RESULTS
UDC 11-12
GVR
33.00"
13.00"
SEE
INCON
RESULTS
91 STP
UNKNOWN
55.00"
22.00"
SEE
INCON
RESULTS
DSL STP
UNKNOWN
55.00"
22.00"
SEE
INCON
RESULTS
UDC 9-10
GVR
33.00"
13.00"
SEE
INCON
RESULTS
UDC 13-14
GVR
33.00"
13.00"
SEE
INCON
RESULTS
UDC 15-16
GVR
33.00"
13.00"
SEE
INCON
RESULTS
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 4 of 5
Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer
Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic
Test Equipment Used:
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail
Additional copies of this page may be attached.
8. SUMP/UDC TEST (continued)
܆ Pass ܆ Fail
Underground Storage Tank
Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 5 of 5
9. COMMENTS