Loading...
HomeMy WebLinkAboutSB989 2024 Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ☐ Installation ☐ Repair ☐ 6 Month X 36 Month CERS ID 10123837 Test Date 5/23/2024 Facility Name 4010 ARCO Facility Address 4010 Wible Rd City Bakersfield ZIP Code 93309 Company Performing the Test Advanced Compliance Phone 6617064321 Mailing Address 4007 Brae Burn Dr Bakersfield Ca 93306 Service Technician Performing Test Bradley Hinsley Contractor/Tank Tester License Number 971259 ICC Number 8835007 ICC Expiration Date 8/8/2025 Manufacturer and Test Equipment Training Certifications Expiration Date ICC Service Techican 8/8/2025 INCON STS 10/20/2025 Test Procedures Used Components Tested PEI/RP1200-19 Sect. 4. Tank Annular PEI/RP1200-19 Sect. 5. Line Secondary PEI/RP1200-19 Sect. 6. Containment Sump I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date 5/23/2024 Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure X Vacuum ☐ Hydrostatic Test Equipment Used: Annular Testing Set-Up Tank ID 87S 87M 91 Diesel Tank Manufacturer Unknown Unknown Unknown Unknown Tank Capacity 9,684 9,684 9,684 9,684 Test Start Time 10:10 10:55 11:50 12:45 Initial Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Test End Time 11:10 11:55 12:50 13:45 Final Reading -10.00 InHg -10.00 InHg -10.00 InHg -10.00 InHg Change in Reading 0.0 InHg 0.0 InHg 0.0 InHg 0.0 InHg Pass/Fail Criteria +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg +/- 0.0 InHg Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type X Pressure ☐ Vacuum ☐ Hydrostatic Test Equipment Used: Product Line Testing Set-Up Pipe Run ID 87S 87M 91 Diesel Pipe Manufacturer Unknown Unknown Unknown Unknown Test Start Time 09:15 09:20 09:55 09:25 Initial Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI Test End Time 10:15 10:20 10:55 10:25 Final Reading 5.0 PSI 5.0 PSI 5.0 PSI 5.0 PSI Change in Reading 0.0 PSI 0.0 PSI 0.0 PSI 0.0 PSI Pass/Fail Criteria +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI +/- 0.0 PSI Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID 87MFS 87MSTP 87SFS 87SSTP Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 79 79 79 79 Sump Bottom to Top of Highest Pipe Penetration (inches) 19 43 18 37 Test Start Time 15:06 13:47 15:41 14:38 Initial Reading 4.8178 2.9802 5.6550 5.4875 Test End Time 15:21 14:02 15:56 14:53 Final Reading 4.8188 2.9783 5.6556 5.4876 Change in Reading 0.0010 0.0019 0.0006 0.0001 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID 91FS 91STP Diesel FS Diesel STP Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 79 79 79 79 Sump Bottom to Top of Highest Pipe Penetration (inches) 19 45 19 43 Test Start Time 15:23 12:38 15:41 12:00 Initial Reading 6.1040 2.5940 6.8078 4.2935 Test End Time 15:38 12:53 15:56 12:15 Final Reading 6.1045 2.5922 6.8081 4.2950 Change in Reading 0.0005 0.0018 0.0003 0.0015 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ☐ Manufacturer ☐ Industry Standard X Professional Engineer Test Type ☐ Pressure ☐ Vacuum X Hydrostatic Test Equipment Used: INCON STS Sump/UDC ID Disp 1/2 Disp 3/4 Disp 5/6 Disp 7/8 Sump Manufacturer Unknown Unknown Unknown Unknown Sump Depth (inches) 10 10 10 10 Sump Bottom to Top of Highest Pipe Penetration (inches) 8 8 8 8 Test Start Time 16:31 16:31 17:28 16:50 Initial Reading 0.3828 0.1662 2.0255 4.6707 Test End Time 16:46 16:46 17:43 17:05 Final Reading 0.3702 0.1667 2.0263 4.6703 Change in Reading 0.0126 0.0005 0.0008 0.0004 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 +/- 0.0020 +/- 0.0020 Tightness Test Results ☐ Pass X Fail X Pass ☐ Fail X Pass ☐ Fail X Pass ☐ Fail Sump/UDC ID Disp 9/10 Disp 11/12 Sump Manufacturer Unknown Unknown Sump Depth (inches) 10 10 Sump Bottom to Top of Highest Pipe Penetration (inches) 8 8 Test Start Time 18:18 18:36 Initial Reading 0.9317 1.0773 Test End Time 18:33 18:51 Final Reading 0.9321 1.0784 Change in Reading 0.0004 0.0011 Pass/Fail Criteria +/- 0.0020 +/- 0.0020 Tightness Test Results X Pass ☐ Fail X Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 Disp 1/2 failed. Must be repaired and retested. 9. COMMENTS