Loading...
HomeMy WebLinkAbout2024 SB9891 Jennifer Pruitt Subject:SA002, AT&T Triennial SB989 Testing Notification (BKFDCA01), Bakersfield Location:1520 20TH ST, BAKERSFIELD, CA 93301-4406 Start:Wed 5/22/2024 9:00 AM End:Wed 5/22/2024 11:00 AM Recurrence:(none) Meeting Status:Meeting organizer Organizer:Simplex Communication Required Attendees:AGUILAR, ADOLFO; ROJAS, JENNIFER; 'FLORES, CECILIA'; 'HAYN, CINDY H (ATTSI)' (ch1921@att.com) ; Carlos Cardenas; Jennifer Pruitt; Maria Figueroa; Krystine Gossett; Eric Durham; Steven Robles Categories:Triennial SB989 Testing, Legacy T Site There is an AT&T Triennial SB989 Test scheduled for this location on the date and time indicated. SA002 1520 20TH ST BAKERSFIELD 93301-4406     TEST DUE DATE 5/21/2024    PERMIT REQUIRED for TESTING  1. BILLING & PERMIT STATEMENT - FEE SCHEDULE (PDF) 2. UST TESTING APPLICATION (PDF)  Please contact the Compliance Manager with any questions and/or comments at:  simplexcommunication@tait.com    714.560.8200    Environmental Health/CUPA Contact Information:   Bakersfield City Fire Department  2101 H Street  Bakersfield, CA 93301  Method of Notification: Email  Contact (Once Permit is Approved):  https://www.bakersfieldcity.us/1048/Inspection‐Request    Test Results Submittal: USTResults@bakersfieldfire.us    1 Jennifer Pruitt From:Luke Preece <lpreece@bakersfieldfire.us> Sent:Wednesday, April 10, 2024 10:01 AM To:Carlos Cardenas Subject:FW: New Fire Inspection Request Importance:Low External Email. Carlos, I am confirming the inspection at 1520 20th St on 5/22/2024 @9am. Thank you, Luke Preece Fire Prevention/Environmental Officer Bakersfield Fire Department email: lpreece@bakersfieldfire.us web: www.bakersfieldfire.us phone: 661-326-3659 From: WebMaster <WebMaster@bakersfieldcity.us> Sent: Tuesday, April 2, 2024 4:37 PM To: InspectionRequest <InspectionRequest@bakersfieldfire.us> Subject: New Fire Inspection Request Importance: Low There is a new Fire Inspection Request. Carlos E. Cardenas (909) 230-8256 ccardenas@tait.com 1520 20th St, Bakersfield, CA, 93301, USA 24-10000226 Underground_Storage_Tank 2 ***CORRECTION***Please disregard the previous request. We would like to schedule the triennial SB989 testing for 5/22/2024 9:00 AM. Appendix VII Underground Storage Tank Secondary Containment Testing Report Form CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 6 Month ܆ 36 Month CERS ID Test Date Facility Name Facility Address City ZIP Code Company Performing the Test Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date Manufacturer and Test Equipment Training Certifications Expiration Date Test Procedures Used Components Tested I hereby certify that the secondary containment was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date Total # of Pages 1. FACILITY INFORMATION 2. SERVICE TECHNICIAN INFORMATION 3. TRAINING AND CERTIFICATIONS 4. TEST PROCEDURE INFORMATION 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST SA002 ✔ 10029370 05/22/2024 PACIFIC BELL TELEPHONE CO. DBA AT&T CALIFORNIA 1520 20TH ST.BAKERSFIELD 93301 TAIT Environmental Services, Inc. (714) 560-8222 701 N. Parkcenter Dr., Santa Ana, CA 92705 Eric Durham 588098 10275565 5/1/2025 Incon STS 4 7/19/2025 Western Fiberglass 7/20/2025 PEI RP 1200 SA002U001 Tank Annular Space, Supply Sec. Line, Return Sec. Line, Vent Sec. Line, PEI RP 1200 Fill Sump, Piping Sump, Transition Piping Sump Eric Durham Digitally signed by Eric Durham DN: cn=Eric Durham, email=edurham@TAIT.com, c=US Date: 2024.05.22 13:21:04 -07'00'05/22/2024 Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 2 of 5 Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic Test Equipment Used: Tank ID Tank Manufacturer Tank Capacity Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic Test Equipment Used: Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Pipe Run ID Pipe Manufacturer Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Additional copies of this page may be attached. 6. TANK SECONDARY CONTAINMENT TEST 7. PIPE SECONDARY CONTAINMENT TEST ✔ ✔ 4" Liquid Filled Dial Gauge / 0-30 HG SA002U001 Annular Joor 8,000 Gallons 9:00am -10.00 HG 10:00am -10.00 HG 0 0 ✔ ✔ ✔ 4" Liquid Filled Dial Gauge / 0-15 PSI SA002U001 Supply SA002U001 Return SA002U001 Vent Wester Fiberglass Wester Fiberglass Ameron 10:00am 10:00am 10:00am 5 PSI 5 PSI 5 PSI 11:00am 11:00am 11:00am 5 PSI 5 PSI 5 PSI 000 000 ✔✔✔ Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 3 of 5 Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic Test Equipment Used: Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST ✔ ✔ Incon TS-STS Unit (Accelerated Test) SA002U001 Fill SA002U001 Piping SA002U001 Transition Generic Fiberglass Generic Fiberglass Western Fiberglass 35" 34" 33" 24" Elec. / N-A Piping 20" Elec. / 17" Piping N-A Elec. / 20" Piping 10:44am 11:11am 12:09pm 5.9031 5.8719 3.7189 10:59am 11:26am 12:24pm 5.9031 5.8726 3.7181 0 .0007 .0008 .002" .002" .002" ✔✔✔ Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 4 of 5 Test Method Developed by ܆܆ Manufacturer ܆ Industry Standard ܆ Professional Engineer Test Type ܆ Pressure ܆ Vacuum ܆ Hydrostatic Test Equipment Used: Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Sump/UDC ID Sump Manufacturer Sump Depth (inches) Sump Bottom to Top of Highest Pipe Penetration (inches) Test Start Time Initial Reading Test End Time Final Reading Change in Reading Pass/Fail Criteria Tightness Test Results ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail ܆ Pass ܆܆ Fail Additional copies of this page may be attached. 8. SUMP/UDC TEST (continued) Underground Storage Tank Secondary Containment Testing Report Form All tests marked “Fail” and any repairs made before or during the tightness test must be described in the COMMENTS section. Page 5 of 5 9. COMMENTS TEST DATE: 5/22/2024 CLIENT: AT&T GEOPAR: SA002 PAGE __1__ OF __2__ TEST DATE: 5/22/2024 CLIENT: AT&T GEOPAR: SA002 PAGE __2__ OF __2__         Identification of Test Procedures for Secondary Containment Testing      To Whom It May Concern:     Tait Environmental Services, Inc., utilizes the following procedures when conducting Secondary  Containment Testing:  1) Containment Sumps, Transition Sumps, UDCs – Tait follows PEI‐RP1200‐17 Section 6.6 for the  accelerated test method. Tait uses the Incon TS‐1000 hydrostatic test equipment following the  attached procedures.  2) Spill Buckets; Direct Bury & Contained in Sumps – Spill buckets contained in sumps are tested  per PEI‐1200‐17, Section 6.2, however Tait Pass/Fail threshold is 0” drop in one hour. Direct Bury  Spill Buckets are test the same as containment sumps per PEI‐1200‐17, Section 6.6.  3) Tank Annular Space – testing is conducted per PEI‐1200‐17, Section 4.2  4) Piping Secondary Containment – Testing is conducted per PEI‐RP1200‐17, Section 5.3    Please consider this letter as our Test Procedure utilized when conducting Secondary Containment  Testing in lieu of either parts or the whole RP1200 document due to copyright infringement.     TS-STS Sump Test SystemQuick Start GuideTS-STS OverviewThe TS-STS system includes a TS-STS console within a convenientportable case, leak testing probes with 50 feet of cable, and probehanging hardware (slip rings and chain).After all fittings within the sump are sealed, the sump is filled with awater-based test solution that covers all sump penetration holes. Theprobe is installed so the float is floating on the surface of the test solution.The TS-STS console is quickly programmed with the site name andaddress, number of sumps, the 7-digit code-names for each sump, andthe correct Time/Day/Date before leak testing.Pressing the Testkey at the console keypad starts sump leak tests forall sumps. The test time is 15 minutes and tests for a level changegreater than 0.002 inches. If the level of a sump drops more than theleak limit during the test, the Sump Leak Test Report will show a failresult when the test is finished. Leak tests can also be programmed(scheduled) to start at desired times.When finished, leak test reports will automatically print out at the consoleprinter. Extra copies of this report can be printed using the report key. Anewly completed Sump Leak Test will overwrite the previous resultsstored in memory. Save sump leak test reports and provide copies asevidence of compliance with regulations.Recommendation: Use a computer and the Tech version ofSystem Sentinel™ to record site data, sump code-names, and testresults. Test results can also be extracted from Comm Port 1 atthe bottom of the TS-STS console (also see Section 4).Reference Federal and State regulations for leak limit and testtime requirements. Recommendations for locating the TS-STSconsole outside of the (Class I, Division 1, Group D) Hazardous Areasduring testing, are based on NFPA 30, NFPA 30A and NFPA 70 (NEC).TS-STS Sump Test SystemQuick Start GuideINCON P/N 000-3004 Rev.D Feb. 2009 © www.fraklinfueling.comThis document may change without prior notice. INCON® is a Registered Trademark of Franklin Fueling SystemsTS-STS Installation1Pg 1NOTE1.)Required Materials:a.) Tape to secure the probe cable b.)Safety cones & signsc.)Grounded, 3-pronged extension cordd.)Flat pieces of metal to suspend leak testing probe over sumps2.) Work safely — install Safety Cones and Signs at the site3.)The probes are precision instruments — handle with care!4.)The STS probes are shipped with cables attached, do not removethe cable from the probe end... remove at the console case only.5.)Inspect probes for proper float movement before use, then installprobes as shown in Section 16.)Connect the yellow probe cables to the receptacles at the TS-STScase. Make sure to line up keyways before inserting cable andtightening the screw-on connector.7.)Locate the TS-STS case outside of the Hazardous Area and tapethe cable down to prevent probe movement during the test and toreduce tripping hazards8.)Setup / Program the TS-STS console per Section 29.)Start sump leak test(s) on sumps that are ready10.)Always clean, dry, and store probes in the probe carrying case aftereach use11.) Test each of the probes on a monthly basis to ensure its ability todetect leaks. Install the probe in a test container and initiate a test.After 5 minutes, remove about 0.12 inches of water. When the testcompletes, the test report should show a Failed result if the probeis working properly. Figure 1.1 Typical Leak Detection Probe – Dispenser Sump InstallationOverviewFigure 1.2 Leak Detection Probe InstallationDispenser SumpTS-STSSUMP TEST SYSTEMBUILDINGSUMP TEST SYSTEMTS-STS14SUMP3220 Feet - Min. DistancePer NFPA 30ADISPENSER1 / 2DISPENSER3 / 4INCON RECOMMENDSTESTING DISPENSORSUMPS IN GROUPSSO OTHER DISPENSORSARE LEFT IN SERVICEDURING TESTINGGROUNDED3 PRONGEXTENSIONCORD REQ'DSAFETYCONESDISPENSER7 / 8DISPENSER5 / 6Pg 2SPLIT RINGTS-STSSUMP TEST SYSTEMSUMP TEST SYSTEMFLAT METAL / ANGLE IRONREQUIREDTO SUSPENDPROBE(SIDE VIEW)TS-STSSTS-PRB-12LEAK TESTINGPROBE WITH:TSP-SSP STAINLESS STEEL FLOATDISPENSER SUMPWITH TEST SOLUTION(Side View)RECEPTACLESFOR FOURSCREW-IN, PROBE CABLE PLUGS321POWER CORDWITH A GROUNDED3-PRONGEDPLUG4SUMP Figure 1.3 Typical Leak Detection Probe – Turbine Sump InstallationOverviewFigure 1.4 Leak Detection Probe InstallationTurbine Sump—❖—Pg 3STPSPLIT RINGTS-STSSUMP TEST SYSTEMSUMP TEST SYSTEMFLAT METAL / ANGLE IRONREQUIREDTO SUSPENDPROBE(SIDE VIEW)TS-STSSTS-PRB-12LEAK TESTINGPROBE WITH:TSP-SSP STAINLESS STEEL FLOATTURBINE SUMPWITH TEST SOLUTION(Side View)POWER CORDWITH A GROUNDED3-PRONGEDPLUG3RECEPTACLESFOR FOURSCREW-IN, PROBE CABLE PLUGS124SUMPTAPE / WEIGHT DOWNCABLE TO PREVENTACCIDENTALMOVEMENT DURINGLEAK TESTING(PROBE CABLE PN: 600-0200= 50 FEET)TurbineSump2TS-STSSUMP TEST SYSTEMGROUNDED3 PRONGEXTENSIONCORD REQ'DSAFETYCONESBUILDINGSUMP TEST SYSTEMTS-STS14SUMP32Tank PadTurbineSump110 Feet - Min. DistancePer NFPA 30ATurbineSump3