Loading...
HomeMy WebLinkAbout2024 ELD (INSTALLATION)Providers for MDleak® MSleak® DPleak®, MCleak® and PHDleak® Testing Technologies Page 1 of 2 Test Type: Job #: 5335 Facility Name: PO #: Prepared For: Site Address: City: State and Zip: CA 93311 Start Date:End Date: SYSTEM Test MDL TK-1 87 TK-2 91 TK-3 DSL VR Product Primary MDleak:0.005 GPH PASS PASS PASS Vent Primary MDleak:0.005 GPH PASS PASS PASS VR Primary MDleak:0.005 GPH PASS PASS NA MDleak Tank:0.005 GPH PASS PASS PASS Turbine Sump Fittings:0.005 GPH PASS PASS PASS Fill/Vapor Sump Fittings:0.005 GPH PASS PASS PASS UDC Fittings:0.005 GPH PASS PASS PASS Fill Bucket:0.005 GPH PASS PASS PASS Vapor Bucket:0.005 GPH PASS PASS NA Vent Box Fittings 0.005 GPH PASS PASS PASS Fill Spill Bucket Hydro:0.1 GPH PASS PASS PASS Vapor Bucket Hydro:0.1 GPH PASS PASS NA 16101 Stockdale Highway Bakersfield 5/9/20245/8/2024 Sunset Mechanical Facility Certification CONFIDENTIAL California ELD New Construction Test w/out Fuel Sully's Providers for MDleak® MSleak® DPleak®, MCleak® and PHDleak® Testing Technologies Page 2 of 2 Test Type: Facility Name: Job #: 5335 Prepared For: PO #: Site Address: City: State and Zip: CA 93311 Start Date:End Date: SYSTEM TK-1 87 TK-2 91 TK-3 DSL VR 20000 12000 8000 Modern Modern Modern Dry Dry Dry 63"63"65" 10 ft 10 ft 10 ft No Fuel No Fuel No Fuel Tank Sump Boots Turbine Bravo Bravo 8.00 0 0 0 Manufacture EVR: Certifying Field Technician: State Lic. # : Certification Leak Rate: 0.005.gph Certifying Technician Signature: Date: Statement Confirmed by: Date: 16101 Stockdale Highway Bakersfield 5/8/2024 5/9/2024 Ricardo Gonzalez Tank Volume in Gallons: UST Manufacture: Type of Interstice: Depth To Top Tank: Tank Diameter: OPW Bravo Smith Smith Unisource Spill Buckets: Healgy Gilbarco Office use only 5/16/2024 Depth to Ground Water: Component Manufacture: UDC/Dispensers Information Number of Dispensers: Manufacture: Shear Valve Manufacture: Containment Boots: Piping Information Product Lines: Vapor Return / Vent: Depth of Liquid Within Tank: 5/9/2024 Facility Certification CONFIDENTIAL California ELD New Construction Test w/out Fuel Sully's Sunset Mechanical Flex: If you have any questions on the testing please do not hesitate to call. @ 855-255-5325. I declare under penalty of perjury that I am a licensed tester in one of the above methods listed by the National Workgroup on Leak Detection Evaluations (NWGLDE)organization and that the information contained in this report is true and correct to the best of my knowledge. This is a statement to confirm that the components listed above,at the time of testing,have been tested to a leak sensitivity listed above by using one or more of the following DPleak®,MDleak®,MCleak and PHDleak®EPA aproved Methods.These Methods are the most versatile and comprehensive testing procedures offered to the petroleum industry.All petroleum owners and contractors which utilize the DPleak®,MDleak®,MCleak,and PHDleak®Method can be assured that their facility has passed the Nation's highest standard in preventative leak detection. 04-1695 PhilTite