HomeMy WebLinkAboutRES NO 074-2024RESOLUTION NO. ®i 4_ 2 0 2 4
A RESOLUTION ADOPTING A LIST OF PROJECTS FOR
FISCAL YEAR 2024-25 FUNDED BY THE ROAD
REPAIR AND ACCOUNTABILITY ACT OF 2017 (SB 1)
AND AUTHORIZE THE PUBLIC WORKS DIRECTOR TO
SUBMIT THE PROJECT LIST TO THE CALIFORNIA
TRANSPORTATION COMMISSION
WHEREAS, Senate Bill 1 (SB 1) the Road Repair and Accountability Act of
2017 (Chapter 5, Statues of 2017) was passed by the California Legislature and
signed into law by the Governor in April 2017 to address the significant multi -
modal transportation funding shortfalls statewide; and
WHEREAS, SB 1 includes accountability and transparency provisions that will
ensure the residents of Bakersfield are aware of the projects proposed for funding
in our community and which projects have been completed each fiscal year;
and
WHEREAS, the City must adopt by resolution a list of projects proposed to
receive fiscal year funding from the Road Maintenance and Rehabilitation
Account (RMRA), created by SB 1 which must include a description and the
location of each proposed project, a proposed schedule for the project's
completion and the estimated useful life of the improvement; and
WHEREAS, the City will receive an estimated $10.4 million in RMRA funding
in Fiscal Year 2024-25 from SB 1 which will allow the City of Bakersfield to advance
City Council Goal no. 6 -''Enhance Infrastructure'' and to rehabilitate, repair, and
resurface roads to improve driving experience, safety and have less wear and
tear on vehicles; and
WHEREAS, this is the eighth year in which the City is receiving SB 1 funding
which enables the City to continue essential road maintenance and
rehabilitation projects that would not otherwise have been possible without SB 1;
and
WHEREAS, a 2021 study of the City's roadway pavement condition assigned
a score of 65 out of 100 to; and
WHEREAS, this revenue will help to increase the overall quality of our local
road system and over the next decade will bring the streets and roads to a target
pavement condition index (PCI) of 80; and
G'\GROUPDAT\Fs<,I Old Admi, S,n Mgr\F.ld 152\Fv24.25\Res, - SB 12CM.d—
Page 1 of 3 Pages
'ORIGINP.I '
WHEREAS, the City used a quantitative method Pavement Management
System to develop the SB 1 project list to ensure revenues are being used on the
most high -priority and cost-effective projects that also meet the City's priorities for
transportation investment; and
WHEREAS, a list of proposed SB 1 projects is hereby incorporated as Exhibit
A; and
WHERAS, SB 1 funds enable the City to invest in our local streets and roads
infrastructure with a focus on basic maintenance and safety, complete streets
infrastructure and use of cutting -edge technology, materials and practice, which
will have significant positive impact by continuing to enhance the road
resurfacing program; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield
as follows:
The City Council finds and declares that the foregoing recitals are
true and correct and are hereby incorporated fully as a material part
of this Resolution and based upon such matters, the City Council
makes the additional findings set forth herein below.
2. The City Council adopts the list of projects contained in Exhibit A.
3. The City Council authorizes the Public Works Director to submit the list
of projects included in Exhibit A to the California Transportation
Commission.
•11
U
G\GROUPDAT\Fiscala dAdm Sery Mg\F�d152\FY2A.25\Res,-S612a.25,do
Page 2 of 3 Pages
'ORIGINAL."
HEREBY CERTIFY that the foregoing Resolution was passed and adopted
by the Council of the City of Bakersfield at a regular meeting thereof held on
JUN 12 2024 , by the following vote:
...
AYES: COUNCILMEMBER ARIAS, GONZALES;-YlEfR-SMITH, FREEMAN, GRAY, KAUR
cNbts-% COUNCILMEMBERWC i0_
ABSTAIN: COUNCILMEMBER
ABSENT: COUNCILMEMBER
KAREN GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
CITY ATTORNEY
ASHLEY ZAMBRANO
Deputy City Attorney
GAGROUPDAT\F dantl Atlmin ServMg\Fvntl 152\F24.25\R--SBI2425.d—
J LIE DRIMAKIS, MMC
City Clerk and Ex Officio Clerk of the
Council of the City of Bakersfield
Page 3 of 3 Pages
Q�g�KEu^
� M
r— in
�OPIGINAL
EXHIBIT A
Project #
Name/ Location
PCI
SB1
Funding
FY 24/25
Description
Est.
Construction
Dates
Estimated
Useful Life
25PWDE03
Pavement
47
$5,000,000
The existing pavement on University Avenue between River Boulevard
June 2025-
20-25yrs
Rehabilitation: University
and Columbus Street is in disrepair. This project will
Sept 2025
Avenue from River
rehabilitate/reconstruct the existing pavement on University Avenue
Boulevard to Columbus
by removing up to 6" of pavement and replacing it with pavement
Street
consisting of HMA and R-HMA overlay cap. This will improve the overall
rideability of the road for both passenger cars and commercial
Ward 3
vehicles.
25PWDE04
Pavement
38
$5,000,000
The existing pavement on S H Street from White Lane to SR 58 is in
June 2025-
20-25yrs
Rehabilitation: South H
disrepair. This project will rehabilitate/reconstruct the existing
Sept 2025
Street from White Lane
pavement on S H Street from White Lane to SR 58 by removing up to
to SR58
6" of pavement and replacing it with pavement consisting of HMA
and R-HMA overlay caps and make the project an ADA Accessible
Pathway. This will improve the overall rideability of the road for both
Ward 1,2
passenger cars and commercial vehicles.