HomeMy WebLinkAbout2024 REPAIR 3Appendix VI
Underground Storage Tank
Monitoring System Certification Form
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification,
ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-
Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank,
VPH = Vacuum/Pressure/Hydrostatic
Page 1 of 6
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month
1. FACILITY INFORMATION
CERS ID Certification Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code
of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting
documentation is attached; and all information contained herein is accurate.
Service Technician Signature Date Total # of Pages
10155793 6-20-24
Jaco #7705 Fastrip #641
1200 Coffee Road Bakersfield 93308
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Rockland Kirk
1073967
10241356 9-29-24
VMI #5255 10-3-24
6-20-24 2
Underground Storage Tank
Monitoring System Certification Form
Page 4 of 6
7. LINE LEAK DETECTOR TESTING
܆܆ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.)
Simulated release rate verified: (Check all that apply.)
܆܆ 3 GPH ܆܆ 0.1 GPH ܆܆ 0.2 GPH Yes No NA
Has the testing apparatus been properly calibrated? ܆܆ ܆܆ ܆܆
For emergency generator tank systems, does the LLD create an audible and visual
alarm when a leak is detected? ܆܆ ܆܆ ܆܆
For mechanical LLDs, does the LLD restrict the flow through the pipe when a
release is detected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off when a release is
detected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system is disabled or disconnected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system malfunctions or fails a tightness test? ܆܆ ܆܆ ܆܆
For electronic LLDs, have all accessible wiring connections been visually inspected
for kinks and breaks? ܆܆ ܆܆ ܆܆
Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆
Were all LLDs confirmed operational within regulatory requirements? ܆܆ ܆܆ ܆܆
LLD ID LLD Model Lines Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
T3 FX1DV Diesel