Loading...
HomeMy WebLinkAbout2024 REPAIR 3Appendix VI Underground Storage Tank Monitoring System Certification Form CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification, ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single- Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank, VPH = Vacuum/Pressure/Hydrostatic Page 1 of 6 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month 1. FACILITY INFORMATION CERS ID Certification Date Facility Name Facility Address City ZIP Code 2. SERVICE TECHNICIAN INFORMATION Company Performing the Certification Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date 3. TRAINING AND CERTIFICATIONS Manufacturer and Test Equipment Training Certifications Expiration Date 4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST I hereby certify that the monitoring system is operational in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting documentation is attached; and all information contained herein is accurate. Service Technician Signature Date Total # of Pages 10155793 6-20-24 Jaco #7705 Fastrip #641 1200 Coffee Road Bakersfield 93308 Nwestco LLC (800) 339-9930 2209 Zeus Court, Bakersfield, CA 93308 Rockland Kirk 1073967 10241356 9-29-24 VMI #5255 10-3-24 6-20-24 2 Underground Storage Tank Monitoring System Certification Form Page 4 of 6 7. LINE LEAK DETECTOR TESTING ܆܆ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) Simulated release rate verified: (Check all that apply.) ܆܆ 3 GPH ܆܆ 0.1 GPH ܆܆ 0.2 GPH Yes No NA Has the testing apparatus been properly calibrated? ܆܆ ܆܆ ܆܆ For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ܆܆ ܆܆ ܆܆ For mechanical LLDs, does the LLD restrict the flow through the pipe when a release is detected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off when a release is detected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a tightness test? ܆܆ ܆܆ ܆܆ For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ܆܆ ܆܆ ܆܆ Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆ Were all LLDs confirmed operational within regulatory requirements? ܆܆ ܆܆ ܆܆ LLD ID LLD Model Lines Monitored Pass Fail ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. List all monitoring equipment either replaced or repaired in Section 9 T3 FX1DV Diesel