HomeMy WebLinkAboutSB989 2024 REPAIRAppendix VII Underground Storage Tank Secondary Containment Testing Report Form
CERS = California Environmental Reporting System, ICC = International Code Council, ID = Identification, NA = Not Applicable, UDC = Under-Dispenser Containment, Page 1 of 5
TYPE OF ACTION ☐Installation ☒Repair ☐6 Month ☐36 Month
CERS ID
10123837
Test Date
7/1/2024
Facility Name
4010 ARCO AM/PM
Facility Address
4010 Wible Rd
City
Bakersfield
ZIP Code
Company Performing the Test
B&T Service Station Contractors
Phone
805-929-8944
Mailing Address
630 S. Frontage Rd Nipomo Service Technician Performing Test
Rick Binger Contractor/Tank Tester License Number
902034
ICC Number
8452629
ICC Expiration Date
03/16/2025
Manufacturer and Test Equipment Training Certifications Expiration Date
Franklin Fueling Level 4 1018163709 02/15/2025
Test Procedures Used Components Tested
RP1200
I hereby certify that the secondary containment was tested in accordance with California
Code of Regulations, title 23, division 3, chapter 16, section 2637; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date
7/1/2024
Total # of Pages
1. FACILITY INFORMATION
2. SERVICE TECHNICIAN INFORMATION
3. TRAINING AND CERTIFICATIONS
4.TEST PROCEDURE INFORMATION
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
93309
Underground Storage Tank Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 2 of 5
Test Method Developed by ☐ Manufacturer ☐ Industry Standard ☐ Professional Engineer
Test Type ☐ Pressure ☐ Vacuum ☐ Hydrostatic
Test Equipment Used:
Tank ID
Tank Manufacturer
Tank Capacity
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Test Method Developed by ☐ Manufacturer ☐ Industry Standard ☐ Professional Engineer
Test Type ☐ Pressure ☐ Vacuum ☐ Hydrostatic
Test Equipment Used:
Pipe Run ID
Pipe Manufacturer
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Pipe Run ID
Pipe Manufacturer
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Additional copies of this page may be attached.
6. TANK SECONDARY CONTAINMENT TEST
7. PIPE SECONDARY CONTAINMENT TEST
Underground Storage Tank Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 3 of 5
Test Method Developed by ☐ Manufacturer ☐ Industry Standard ☐ Professional Engineer
Test Type ☐Pressure ☐Vacuum ☐Hydrostatic
Test Equipment Used: Icon and Probes
Sump/UDC ID UDC 1-2
Sump Manufacturer
Sump Depth (inches) 10"
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
0
Test Start Time 12:43 pm
Initial Reading 2.4247
Test End Time 12:58 pm
Final Reading 2.4242
Change in Reading 0.0005
Pass/Fail Criteria 0.002
Tightness Test Results ☒Pass ☐ Fail ☐Pass ☐ Fail ☐Pass ☐ Fail ☐Pass ☐ Fail
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ☐Pass ☐ Fail ☐Pass ☐ Fail ☐Pass ☐ Fail ☐Pass ☐ Fail
Additional copies of this page may be attached.
8. SUMP/UDC TEST
Underground Storage Tank Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 4 of 5
Test Method Developed by ☐ Manufacturer ☐ Industry Standard ☐ Professional Engineer
Test Type ☐ Pressure ☐ Vacuum ☐ Hydrostatic
Test Equipment Used:
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Sump/UDC ID
Sump Manufacturer
Sump Depth (inches)
Sump Bottom to Top of
Highest Pipe Penetration
(inches)
Test Start Time
Initial Reading
Test End Time
Final Reading
Change in Reading
Pass/Fail Criteria
Tightness Test Results ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail
Additional copies of this page may be attached.
8. SUMP/UDC TEST (continued)
Underground Storage Tank Secondary Containment Testing Report Form
All tests marked “Fail” and any repairs made before or during the tightness test must be described in
the COMMENTS section.
Page 5 of 5
Test UDC 1-2 after repair with inspector Luke Preece Passed test
9. COMMENTS