Loading...
HomeMy WebLinkAboutParcel Map 12271 Drainage StudyCommercial Development - Drainage Study 542-08 1 Purpose: Calculate the runoff volume of the surrounding streets on the commercial development site located in the southeast corner of Panama Lane and Gosford Road in the City of Bakersfield to determine the volume required for each of the two on-site temporary retention basins. Order of Work: The existing condition of the site is undeveloped. There are no on-site improvements proposed at this time. Privately maintained temporary sumps are proposed to retain the runoff from Gosford and Panama as part of the Street Improvement Plans. Approach: The following assumptions will be used to determine the required volumes of the temporary retention basins. a. Volume of runoff for areas shown in Figure 1. b. Retention required for the runoff. c. Design of temporary retention basins. Assumptions: The following information was assumed to apply to this study: a. Areas for the temporary retention calculations are shown in Figure 1 and based on the off-site street plans for Panama Lane and Gosford Road. b. The runoff coefficient used is as follows:  0.95 asphalt pavement (Based on City of Bakersfield Design Manual) Calculations: V=0.15*SUM(C*A) (From the City of Bakersfield Department of Public Works Subdivision and Engineering Design Policy Manual) Conclusion: Total volume required for the two temporary retention basins is 8,039 cubic feet (0.19 acre-feet) for “A1” and 1,639 cubic feet (0.04 acre-feet) for “A2” per Table 1. The designed temporary retention basins will provide approximately 17,773 cubic feet (0.41 acre-feet) for “A1” and 1,757 cubic feet (0.04 acre-feet) for “A2” as shown in Figure 1. Therefore, the capacities of the designed temporary retention basins are adequate to retain the required runoff. The runoff shown in drainage area 4 will drain to a nearby catch basin that connects to a storm drain system that outflows everything to an on-site sump designed in the previously Commercial Development - Drainage Study 542-08 2 approved storm drain plans for Tract 7261 (sheet 9 of storm drain plans are attached at the end of this study). Table 2 shows the volume calculations based on the Tract 7261 Master Drainage Study/Drainage Exhibit (attached to the end of this study) assuming that all of the commercial site and adjacent streets will drain to the Tract 7261 on-site sump. Table 3 shows the impact that Drainage Area 4 has on the Tract 7261 on-site sump. Drainage Area 4 will merge with Area 2 from the Tract 7261 Master study as shown in Table 3. Since the volume required calculated in Table 3 is less than the volume required calculated in Table 2, Tract 7261 on-site sump will handle the runoff from the drainage areas shown in Figure 1. The calculated sump volume required value from Table 3 has to do with Drainage Areas 1, 2, and 3 being retained in the two on-site temporary retention basins separate from the Tract 7261 approved storm drain system that had incorporated them in Table 2. The curb capacity calculations for a 5 year event on Wynnfield Lakes in Table 4 shows that the drainage will not reach over the top of curb and onto the sidewalk. Commercial Development - Drainage Study 542-08 3 Table 1 Temporary Retention Basin A1   Land Type Area  (sf)  Area  (Acres)  Runoff  Coefficient  (C)  CxA  (sf)    Area 1 13,216 0.30 0.95 12,555   Area 2 43,359 1.00 0.95 41,191   Cumulative CxA 53,746         Total Volume Required (CF) V=0.15*CUM(CxA) 8,062   Total Volume Required (AC FT) 0.19       Temporary Retention Basin A2   Land Type Area  (sf)  Area  (Acres)  Runoff  Coefficient  (C)  CxA  (sf)    Area 3 11,500 0.26 0.95 10,925  Cumulative CxA 10,925   Total Volume Required (CF) V=0.15*CUM(CxA) 1,639   Total Volume Required (AC FT) 0.04   Commercial Development - Drainage Study 542-08 4 Table 2 Sewer and Storm Drain Plans for Tract 7261 Phase 1 to 4 Calculated Values (See attached drainage exhibit)   Area C A (acres) C*A   Area C A (acres) C*A 1 0.4 1.99 0.80   A 0.62 4.94 3.06 2 0.4 1.76 0.70   B 0.52 1.87 0.97 3 0.59 3.13 1.85   C 0.38 5.28 2.01 4 0.4 2.32 0.93   D 0.38 2.51 0.95 5 0.4 4.63 1.85   E 0.38 3.58 1.36 6 0.4 3.66 1.46   F 0.38 3.47 1.32 7 0.4 3.37 1.35   G 0.38 3.58 1.36 8 0.4 2.06 0.82   H 0.38 3.38 1.28 COMMERCIAL 0.91 9.61 8.75   I 0.38 2.39 0.91 R‐3/R‐4 0.8 7.87 6.30   J 0.38 2.15 0.82      0.15*SUM(CA) 3.72   K 0.53 1.53 0.81               L 0.65 2 1.30                     0.15*SUM(CA) 2.42         Volume Required Total (AC‐FT) 6.14                     Commercial Development - Drainage Study 542-08 5 Table 3 Sewer and Storm Drain Plans for Tract 7261 Phase 1 to 4 Modified Commercial Area Values   Area C A (acres) C*A   Area C A (acres) C*A 1 0.4 1.99 0.80   A 0.62 4.94 3.06 M (Area 2+DA 4) 0.59* 2.66 1.56   B 0.52 1.87 0.97 3 0.59 3.13 1.85   C 0.38 5.28 2.01 4 0.4 2.32 0.93   D 0.38 2.51 0.95 5 0.4 4.63 1.85   E 0.38 3.58 1.36 6 0.4 3.66 1.46   F 0.38 3.47 1.32 7 0.4 3.37 1.35   G 0.38 3.58 1.36 8 0.4 2.06 0.82   H 0.38 3.38 1.28 R‐3/R‐4 0.8 7.87 6.30   I 0.38 2.39 0.91      0.15*SUM(CA) 2.54   J 0.38 2.15 0.82               K 0.53 1.53 0.81 DA 4 (From Figure 1)   0.90      L 0.65 2 1.30         Volume Required Total (AC‐FT) 4.96      0.15*SUM(CA) 2.42  Note: * Weighted coefficient Commercial Development - Drainage Study 542-08 6 Table 4       Source: FHWA Hydraulic Engineering Circular No. 22, Second Edition   Q = CIA (0.95)*(1.5)*(0.90) = 1.28   Q 1.28     A (Area of DA 4)  = 0.90 acres  C  = 0.95  I = 1.5   n 0.016  (based on 5 year intensity vs duration   Sx 0.02 curve from City Standard Detail D‐1 at  SL 0.006 10 minutes duration)   T 8.75                T 8.75   Sx 0.02   d 0.175   d (depth [in]) 2.10   Commercial Development - Drainage Study 542-08 7 Table 5 Tract 7261 Catch Basin 10 year Event Calculations Cw 2.3   C 0.95 (Based on City of Bakersfield Design Manual for Asphalt) L 3.5   I 1.8 (Based on 10 year intensity bs duraction curve from City Standard Detail D‐1 at 10 minutes duration) W 2   A 0.9 (From Area "DA 4" from Figure 1 of Drainage Study) d 0.67   Q =CIA   Q = Cw(L+1.8W)d1.5                    1.54  cfs           8.89  cfs   50% clogged 0.5Q =          4.44  cfs   Flow rate of 1.54 cfs at 10 year‐10 minute duration is less    than the  capacity of the curb opening inlet of 4.44 cfs at    50% clogged which indicates that the inlet has enough   capacity to hold at a 10 year storm event.   Equation from website: https://learn.hydrologystudio.com/stormwater‐studio/knowledge‐base/inlets‐in‐sags/  Commercial Development - Drainage Study 542-08 8 Figure 1