Loading...
HomeMy WebLinkAboutPM 12212 Drainage StudySeptember 16th, 2021 Project No. 16-760 Prepared for: Submitted by: ___________________________________________________________________ Matthew K. VoVilla, R.C.E. 43130 Date LAV//Pinnacle Engineering, Inc. 12418 Rosedale Hwy., Suite A Bakersfield, CA 93312 (661) 869-0184 Drainage Study for Tentative Parcel Map No. 12212 2201 Taft Highway Bakersfield, California 24 9/20/2022 “On-Site” Drainage Study for Tentative Parcel Map No. 12212 – 9/16/2022 LAV//Pinnacle Engineering Page i Table of Contents 1.0 BACKGROUND ......................................................................................................................1 2.0 GRADING AND DRAINAGE CONCEPT ...........................................................................2 3.0 METHODS, CALCULATIONS, AND FINDINGS ..............................................................3 3.1 Hydrology ...............................................................................................................................4 3.2 Terminal Sump Design ...........................................................................................................5 3.3 Pipe Hydraulics, Pipe Sizing and Hydraulic Grade Line .......................................................6 3.4 “On-Site” Inlet Capacity ........................................................................................................6 4.0 CONCLUSIONS AND RECOMMENDATIONS .................................................................7 Appendix “A”: Improvement Plans • Grading Plan for Tentative Parcel Map No. 12212, 2201 Taft Highway Appendix “B”: Exhibits • Exhibit “A” – Aerial Photo • Exhibit “B” – USGS Map • Exhibit “C” – Drainage Areas • FEMA FIRMette Map 06029C2300E Appendix “C”: Calculations • Table 1 – Runoff Volume Calculation • Table 2 – Required Sump Volume • Table 3 – Sub-Area Flow Calculations • Table 4 – Hydraulic Grade Line (HGL) Calculations • Catch Basin Inlet Capacity Calculations • Curb and Gutter Capacity Calculations • Intensity vs Duration Curves Sheet D-1 Appendix “D”: Supplemental Documents • PM 10717 Drainage Study dated 12/08/2006 • Soil Report by Krazan and Associates dated 09/16/2022 “On-Site” Drainage Study for Tentative Parcel Map No. 12212 – 9/16/2022 LAV//Pinnacle Engineering Page 1 of 7 1.0 Introduction This report has been prepared as a master drainage study for the development of a 16-acre commercial development located in the city of Bakersfield, California, and sometimes referred to in this report as “Project”. Tentative Parcel Map 12212 has been approved by the City of Bakersfield. The purpose of this report is to show the basis of design for a stormwater collection and disposal within the Project. Additionally, the Project will be responsible for connecting to an existing storm drain system located in Compagnoni Road to the east and routing the existing flow to the proposed terminal sump. The Project is located on the south side of Taft Highway in Bakersfield, California, ¼ mile west of State Route 99. The addresses for the site are 2201 Taft Highway and 2311 Taft Highway, Bakersfield, and APNs 184-160-13 and 184-160-14. The proposed Project contains two internal roads which runs south from Taft Highway and west from Compagnoni Road, sometimes referred to in this report as “Grewal Street” and “Bhullar Street” respectively. Grewal Street and Bhullar Street intersect at a knuckle located at the southern boundary of the Project. The project is to be constructed in three phases; the first phase will consist of the construction of Grewal Street, Bhullar Street, a combination gas station, convenience store, and fast-food restaurant, a fuel farm, and a terminal sump. Subsequent phases will be for a truck fueling station, a truck wash, tire repair shop, a freight broker office, a truck sales building, and additional vehicle parking areas. Exhibit “A” herein shows the Project location and the surrounding area. Exhibit “C” shows the site layout for Grewal Street, including drainage improvements, for parcel map 12212. The current site condition is predominantly an undeveloped lot with exposed natural soil and grassy shrubs. Three pre-existing buildings are on site which will be removed. A concrete lined irrigation canal owned by Kern Delta runs through the Project site, which historically provides irrigation water to the nearby areas. The canal will be “undergrounded” as part of the Project site improvements. “On-Site” Drainage Study for Tentative Parcel Map No. 12212 – 9/16/2022 LAV//Pinnacle Engineering Page 2 of 7 A commercial site and a Highway Patrol building abuts the Project to the east. Currently, adjacent developments drain stormwater internally or to Taft Highway, which is then conveyed to an existing sump west of Compagnoni Road. As previously mentioned, the Project will connect with the existing storm drain system in Compagnoni Road and route the stormwater to the proposed terminal sump. The existing sump on Compagnoni Road will be backfilled in order to construct Bhullar Street. Runoff on Taft Highway and Compagnoni Road will follow its historic drainage path. Included in Appendix B is an enlarged excerpt from the Federal Emergency Management Agency’s (FEMA) Flood Insurance Rate Maps (FIRM). The FIRM map is number 06029C2300E dated September 26, 2008. The FIRM map shows the project site is within zone “X” which is classified as “Areas of 0.2% annual chance flood; areas of 1% annual chance flood with average depths of less than 1 foot or with drainage areas less than 1 square mile.” No portion of the Project is within Flood Zone “A.” 2.0 Grading and Drainage Concept The Grading Plan for the Project are included herein in Appendix A. These plans have not yet been approved by the City of Bakersfield, pending approval of this report. The Grading Plan and Exhibit “C” herein show the locations of the drainage area boundaries, the drainage design concept, drainage disposal area (terminal sump), storm drain inlet locations, and pipes. The general concept for the Project is for parcels to either drain internally and connect to the drainage system backbone via storm drain laterals or sheet flow to the internal streets and get conveyed via curb and gutter to catch basins. Given the size of each parcel, 18” laterals have been planned to each parcel. Additionally, the design can accommodate the parcel’s runoff as sheet flow to the internal streets, which can be adequately conveyed and captured without overtopping the curb, as shown in the following sections. Surface drainage will be facilitated by street curbs and gutters which will route storm water to storm drain inlets on Grewal Street, Bhullar Street, and Taft Highway. The proposed storm drain “On-Site” Drainage Study for Tentative Parcel Map No. 12212 – 9/16/2022 LAV//Pinnacle Engineering Page 3 of 7 improvements for Grewal Street includes four storm drain inlets, four storm drain manholes, and RCP pipes ranging between 18” and 30”. The proposed storm drain improvements for Taft Highway includes two storm drain inlet, three storm drain manhole, and 18” RCP pipe. The proposed storm drain improvements for Bhullar Street includes three storm drain inlets, three storm drain manholes and RCP pipes ranging between 36” and 42”. Currently, there is a private terminal sump located within the proposed alignment for Bhullar street. The terminal sump serves as storage and disposal of stormwater from Compagnoni Road. In order to construct Bhullar Street, the existing sump will be backfilled, in accordance with a soils report by Krazan and Associates dated 09/16/2022. As previously discussed, the proposed improvements on Bhullar Street will tie into an existing manhole on Compagnoni Road. The storm drain system will route the existing flow from Compagnoni Road to the proposed terminal sump. The flow rates on Compagnoni Road have been recalculated using the City of Bakersfield Standards, and compared to the original drainage study, which is discussed further below. All storm water is routed to the terminal sump at the southwest corner of the property. The terminal drainage sump volume has been sized as per the City of Bakersfield Standards, which is described in the following section 3.2. 3.0 Methods, Calculations, and Findings In accordance with the City of Bakersfield Standards for Subdivision Development, calculations for the stormwater runoff are computed using the Rational Method. The Rational Method is an equation used in order to estimate the stormwater runoff from small watersheds. The Rational Method is based on a formula that equates stormwater runoff to the average rainfall intensity (at a time the watershed is producing the maximum instantaneous runoff, the time of concentration), the watershed drainage area, and the permeability of the natural soil or developed conditions. The formula is: “On-Site” Drainage Study for Tentative Parcel Map No. 12212 – 9/16/2022 LAV//Pinnacle Engineering Page 4 of 7 Q = CiA where: Q = design discharge (cfs), C = runoff coefficient (dimensionless), i = design rainfall intensity (in/hr), and A = watershed drainage area (acre). 3.1 Hydrology As shown in Exhibit “C” herein, the Project site has been divided into subareas tributary to the on-site drainage inlets, sub-areas “A” thru “K.” Compagnoni Road has also been divided into subareas tributary to the existing drainage inlets, sub-areas “L” thru “O.” It should be noted that while the Project will be phased, all parcels have been included in hydrology calculations. Using the City of Bakersfield’s Rational Method, the storm water design discharge has been calculated for the 5-year and 10-year events. In accordance with the City of Bakersfield Standards, a runoff coefficient of 0.9 (the standard coefficient for commercial areas) was used for the entirety of the Project site and “off-site.” Per the City of Bakersfield Standards, a minimum time of concentration used for all sub-areas was 10 minutes. Storm flows were not “routed,” instead sub-areas were added “peak-to-peak.” Using an intensity-duration curve from the City of Bakersfield standards and the 10-minute time of concentration, a rainfall intensity of 1.5 in/hr and 1.8 in/hr was calculated for the 5-year and 10-year storm events, respectively. The flows for the 5-year and 10-year events are shown in Table 4, located in Appendix C herein. As previously discussed, the flows for the 5-year and 10-year storm events on Compagnoni Road were recalculated and compared to the original study. In the original drainage study, each sub- area, with the exception of “Parcel C,” used a time of concentration greater than 10-minutes. Additionally, in the original drainage study flows for each sub-area were “routed.” On average, the flow rates shown in this report are approximately 14% greater compared to the original “On-Site” Drainage Study for Tentative Parcel Map No. 12212 – 9/16/2022 LAV//Pinnacle Engineering Page 5 of 7 drainage study flow rates. Therefore, the calculations presented in this study can be considered conservative. The original drainage study has been included in Appendix “D” herein. As required by the City of Bakersfield Standards, the 5-year storm event does not overtop the 6- inch curb, as shown by the curb diagram located in Appendix “C” herein. 3.2 Terminal Sump In accordance with the City of Bakersfield Standards, the required stormwater retention volume was calculated using the formula for the 100-year storm event: V = 0.15 x C x A where: V = Runoff Volume (acre-feet) C = runoff coefficient A = Drainage area (acre) 0.15 = Conversion Factor to acre-feet Table 1 included in Appendix C of this report indicates 5.66 acre-feet of retention is required. A terminal sump with capacity of 6.55 acre-feet has been proposed; calculations are shown on Table 2 in Appendix C herein. A soils report by Krazan and Associates dated 09/16/2022 provides two borings at the location of the sump with depths of fifty feet. The report classifies the soil as Sandy Silt and Silty Sand. The soils have a permeability ranging from 5.6 x 10-3 to 4.2 x10-2 cm/sec. Based on the sump’s dimensions and the soil permeability, the soils report concludes that the terminal drainage sump is expected to fully drain within 7 days, as required by the City of Bakersfield Standards. No groundwater is encountered within either boring. Calculations for sump capacity and stormwater runoff are included on Tables 1 and 2 in Appendix C herein. “On-Site” Drainage Study for Tentative Parcel Map No. 12212 – 9/16/2022 LAV//Pinnacle Engineering Page 6 of 7 3.3 Pipe Hydraulics, Inlet and Pipe Sizing, and Hydraulic Grade Line (HGL): The proposed storm drain piping system has been shown on Exhibit “C” herein. The volume of flow in each pipe is based on the 10-year storm flow for each sub-area. The flow calculations are shown on Table 3 herein. For every drainage inlet or confluence point, Table 4 shows flows, calculated pipe velocity, friction slope, minor and friction losses, minor loss coefficients, and resultant Hydraulic Grade Line (HGL). In accordance with City of Bakersfield Standards, the HGL was computed assuming outlet control as one-half design water surface of the terminal sump. Along with the HGL, Table 4 also provides the inlet or node elevation for comparison. The computed HGL show at least one foot of freeboard is available for all manholes and catch basins. 3.4 “On-Site” Inlet Capacity The locations of the “on-site” drainage inlets are shown on Exhibit “C” herein. All drainage inlets are Type “A” catch basins, in accordance with the City of Bakersfield Standards S-12. The City of Bakersfield standards require that the 5-year storm event flow does not overtop the curb. Conservatively, the 10-year storm event was modeled, and does not overtop the curb. A curb diagram is located in Appendix C herein. Inlet capacity calculations area included in Appendix C of this report. The calculations assume a clogging factor and indicate inlets with a width of 4.0-feet are adequate to fully capture the 10- year flow. Using the Orifice equation, a maximum of 5.2-inches of headwater was determined for the inlet to fully capture the largest flow of any “on-site” drainage area. Again, a clogging factor of 50% was assumed. It should be noted that all catch basins are located in a sag; therefore, there will be no “pass-by” for any inlet. “On-Site” Drainage Study for Tentative Parcel Map No. 12212 – 9/16/2022 LAV//Pinnacle Engineering Page 7 of 7 4.0 Conclusions and Recommendations This study has shown that the proposed storm drain system and grading plan is adequate to collect, convey, and dispose of storm water for the entire project. As stated throughout the study, the calculations for sizing pipes and the basins are all conservative, erring towards larger sizes. To reiterate from Section 2.0, the general concept is for a drainage system backbone in the internal streets with 18” laterals provided to each parcel. The provided laterals allow for private on-site drainage. However, it has been shown that each parcel could sheet flow storm water to the internal streets, which would be collected by inlets without overtopping the curb. APPENDIX “A” GRADING & SITE IMPROVEMENT PLANTENTATIVE PARCEL MAP NO. 12212 PHASE 1BAKERSFIELD, CALIFORNIACONDITIONAL USE PERMIT NO. #20-0379GRADING PERMIT NO. #20-40000028DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV112COVER SHEET SITE IMPROVEMENT & GRADING PLAN TENTATIVE PARCEL MAP NO. 12212 PHASE 1 BAKERSFIELD, CALIFORNIA .. .. .. ..PROPOSEDBUILDING9-7-22SEE SHEET 9SEE SHEET 6SEE SHEET 7SEE SHEET 8 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV212GENERAL NOTES & SPECIFICATIONS SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV312DETAILS & TYPICAL SECTIONS SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22PARKINGONLYACCESSIBLEVANMINIMUMFINE $250AA DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV412DETAILS & TYPICAL SECTIONS SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV512DETAILS & TYPICAL SECTIONS SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV612SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV712SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV812SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV912SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 THIS SHEET SHOWN FORINFORMATION ONLY DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV1012EROSION CONTROL DETAILS SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV1112EROSION CONTROL DETAILS SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 DATE RCE 43130 EXP. 3/31/24JOB No.:DATE:CHECKED BY:SHEETDWG NO.:SHEETSREVISIONS MATTHEW K. VOVILLADRAWN BY:OFLAV // 12418 Rosedale Hwy., Suite B, Bakersfield, CA 93312 Phone: (661) 869-0184 // LAV@pinnaclex2.com Planning • Engineering • Surveying • Project Management PINNACLE Consulting & Engineering Services 16-760GRADING9/7/2022BMB/VALMKV1212EROSION CONTROL DETAILS SITE IMPROVEMENT & GRADING PLAN PARCEL 1 OF TENT. PARCEL MAP NO. 12212 PHASE-1 BAKERSFIELD, CALIFORNIA .. .. .. .. 9-7-22 APPENDIX “B” SR 119/ TAFT HWYSR 99/ GO L D E N S T A T E H W Y MCKEE ROADMCKEE ROADSR 119/ TAFT HWYWIBLE ROAD MATTHEW K. VOVILLARCE 43130 EXP. 3/31/20EXHIBIT "A" - AERIAL MAP TENTATIVE PARCEL MAP NO. 12212 BAKERSFIELD, CALIFORNIA16-760JOB No.:1CHECKED BY:DRAWN BY:OFSHEETDATE:DWG NO.:BMBSHEETS1MKV09/16/2022EXHIBITLAV// Pinnacle Engineering 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312 Phone: (661) 869-0184 Fax: (661) 885-4155 ENGINEERING ●PLANNING ●SURVEYINGEXHIBIT "A" - AERIAL MAP MATTHEW K. VOVILLARCE 43130 EXP. 3/31/20EXHIBIT "B" - USGS MAP TENTATIVE PARCEL MAP NO. 12212 BAKERSFIELD, CALIFORNIA16-760JOB No.:1CHECKED BY:DRAWN BY:OFSHEETDATE:DWG NO.:BMBSHEETS1MKV09/16/2022EXHIBITLAV// Pinnacle Engineering 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312 Phone: (661) 869-0184 Fax: (661) 885-4155 ENGINEERING ●PLANNING ●SURVEYINGEXHIBIT "B" - USGS MAP DATERCE 43130 EXP. 3/31/20LAV// Pinnacle EngineeringJOB No.: DATE: CHECKED BY: SHEET DWG NO.: SHEETSREVISIONSMATTHEW K. VOVILLADRAWN BY: OF 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312Phone: (661) 869-0184 Fax: (661) 885-4155ENGINEERING ●PLANNING ●SURVEYING16-760 EXHIBIT 09/16/2022 BMB MKV 1 1EXHIBIT "C" - DRAINAGE AREASTENTATIVE PARCEL MAP NO. 12212BAKERSFIELD, CALIFORNIA........ USGS The National Map: Orthoimagery. Data refreshed October, 2017. National Flood Hazard Layer FIRMette 0 500 1,000 1,500 2,000250 Feet Ü119°1'57.75"W 35°16'12.41"N 119°1'20.29"W 35°15'43.04"N SEE FIS REPORT FOR DETAILED LEGEND AND INDEX MAP FOR FIRM PANEL LAYOUT SPECIAL FLOODHAZARD AREAS Without Base Flood Elevation (BFE)Zone A, V, A99With BFE or Depth Zone AE, AO, AH, VE, AR Regulatory Floodway 0.2% Annual Chance Flood Hazard, Areasof 1% annual chance flood with averagedepth less than one foot or with drainageareas of less than one square mile Zone X Future Conditions 1% AnnualChance Flood Hazard Zone XArea with Reduced Flood Risk due toLevee. See Notes.Zone XArea with Flood Risk due to LeveeZone D NO SCREEN Area of Minimal Flood Hazard Zone X Area of Undetermined Flood Hazard Zone D Channel, Culvert, or Storm SewerLevee, Dike, or Floodwall Cross Sections with 1% Annual Chance17.5 Water Surface ElevationCoastal Transect Coastal Transect BaselineProfile BaselineHydrographic Feature Base Flood Elevation Line (BFE) Effective LOMRs Limit of StudyJurisdiction Boundary Digital Data Available No Digital Data Available Unmapped This map complies with FEMA's standards for the use of digital flood maps if it is not void as described below. The basemap shown complies with FEMA's basemap accuracy standards The flood hazard information is derived directly from theauthoritative NFHL web services provided by FEMA. This mapwas exported on 3/11/2019 at 5:56:03 PM and does notreflect changes or amendments subsequent to this date andtime. The NFHL and effective information may change orbecome superseded by new data over time. This map image is void if the one or more of the following mapelements do not appear: basemap imagery, flood zone labels,legend, scale bar, map creation date, community identifiers,FIRM panel number, and FIRM effective date. Map images forunmapped and unmodernized areas cannot be used forregulatory purposes. Legend OTHER AREAS OFFLOOD HAZARD OTHER AREAS GENERALSTRUCTURES OTHERFEATURES MAP PANELS 8 1:6,000 B 20.2 The pin displayed on the map is an approximate point selected by the user and does not represent an authoritative property location. APPENDIX “C” Job #: 16-760 Date: 9/16/2022 Created by:BMB Description C Area (ac)Runoff Volume (acre Feet) Entire Site 0.90 41.92 5.66 Note: Sump volume calculated using City of Bakersfield Standards Rational Method: V = 0.15 x C x A V = Runoff Volume (acre-feet) C = Stormwater runoff coefficient A = Area (acre) Table 1 Runoff Volume for Terminal Sump Tentative Parcel Map No. 12212 LAV//Pinnacle Engineering Job #: 16-760 Date: 9/16/2022 Created by:BMB Side Slope (H to V):2 1 Freeboard:2.07 ft Depth-water surface:13.73 ft Depth-total:15.8 ft Area-floor:12,937 sf Area-1/2 water surface:20,524 sf Area-water surface:29,618 sf Volume-provided-trial:285,243 cubic ft Volume-provided-trial:6.55 acre ft Conclusions: The volume provided by the dimensions of the sump shown above (6.55 acre-ft) is greater than the volume of runoff generated on site (5.66 acre-ft). Therefore, the sump is sufficient for storing runoff. Table 2 Required Sump Dimensions Tentative Parcel Map No. 12212 LAV//Pinnacle Engineering Project Number:16-760 Date: 9/16/2022 Drainage Area Runoff Coefficient Rainfall Intensity 5-yr (Inches per Hour) Rainfall Intensity 10-yr (Inches per Hour) Area (Acres) Flow 5-yr (cfs) Flow 10-yr (cfs) A 0.90 1.50 1.80 0.22 0.29 0.35 B 0.90 1.50 1.80 0.24 0.33 0.39 C 0.90 1.50 1.80 1.37 1.84 2.21 D 0.90 1.50 1.80 1.69 2.29 2.74 E 0.90 1.50 1.80 1.02 1.37 1.65 F 0.90 1.50 1.80 2.07 2.79 3.35 G 0.90 1.50 1.80 3.12 4.21 5.06 H 0.90 1.50 1.80 2.73 3.68 4.42 I 0.90 1.50 1.80 1.32 1.78 2.13 J 0.90 1.50 1.80 1.42 1.92 2.30 K 0.90 1.50 1.80 0.49 0.66 0.80 L 0.90 1.50 1.80 8.56 11.55 13.86 M 0.90 1.50 1.80 6.38 8.61 10.34 N 0.90 1.50 1.80 4.73 6.38 7.66 O 0.90 1.50 1.80 6.58 8.89 10.66 Total 41.93 56.60 67.92 Note: Flow calculated using rational method Q = C x i x A where: Q = Flow Rate (Cubic Feet per Second) C = Runoff Coefficient i = Rainfall Intensity for 5-yr and 10-yr Storm (Inches per Hour) A = Runoff Area (Acres) Time of Concentration assumed to be 10 minute for all sub-areas Table 4 Sub-Area Flow Calculations Tentative Parcel Map No. 12212 LAV//Pinnacle Engineering 337.12 ft 0.5 Project Number:16-760 0.5 Date:9/16/2022 1.0 Reach Segment Flow (cfs) Length (ft) Pipe Diameter (in) Pipe Slope (%) Sf Pipe Friction Slope (ft/ft) Velocity (ft/sec)KT HLF (ft)HV (ft)HLM (ft)Htotal (ft)Yn HGL Downstream Elevation HGL Upstream Elevation Top of Grate/ Inlet Elevation Freeboard (ft) Pipe 1 67.92 79.2 42 4.01%0.00456 7.06 2.00 0.361 0.774 1.548 1.909 -337.12 339.03 MH 1 339.03 344.20 5.17 Pipe 2 47.75 62.7 36 0.50%0.00513 6.76 1.00 0.321 0.709 0.709 1.030 -339.03 340.06 MH 2 340.06 344.40 4.34 Pipe 3 44.67 226.9 36 0.78%0.00449 6.32 1.00 1.018 0.620 0.620 1.638 -340.06 341.70 MH 3 341.70 345.01 3.31 Pipe 4 42.54 370.6 36 0.78%0.00407 6.02 1.00 1.508 0.562 0.562 2.070 -341.70 343.77 MH 4 343.77 346.00 2.23 Pipe 5 42.54 9.0 36 0.15%0.00407 6.02 0.50 0.037 0.562 0.281 0.318 -343.77 344.08 EX MH 344.08 345.95 1.87 Pipe 6 20.17 387.1 30 0.69%0.00242 4.11 1.00 0.936 0.262 0.262 1.198 -339.03 340.23 MH 5 340.23 344.20 3.97 Pipe 7 10.69 466.0 30 0.49%0.00068 2.18 1.00 0.317 0.074 0.074 0.390 1.06 340.23 340.80 MH 6 340.80 345.50 4.70 Pipe 8 5.69 119.8 18 0.49%0.00293 3.22 1.00 0.352 0.161 0.161 0.513 0.99 340.80 341.33 MH 7 341.33 346.10 4.77 Pipe 9 3.48 49.5 18 0.49%0.00110 1.97 1.00 0.054 0.060 0.060 0.115 0.73 341.33 341.31 MH 8 341.31 346.56 5.25 Pipe 10 0.74 198.8 18 0.49%0.00005 0.42 1.00 0.010 0.003 0.003 0.013 0.32 341.31 341.81 MH 9 341.81 352.40 10.59 Pipe 11 0.35 207.5 18 0.30%0.00001 0.20 1.00 0.002 0.001 0.001 0.003 0.25 341.81 342.36 MH 10 342.36 348.69 6.33 Pipe 12 0.35 20.5 18 0.30%0.00001 0.20 0.50 0.000 0.001 0.000 0.001 0.25 342.36 342.42 CB 1 342.42 348.15 5.73 Pipe 13 0.39 214.6 18 0.30%0.00001 0.22 0.50 0.003 0.001 0.000 0.003 -341.81 341.81 MH 11 341.81 348.33 6.52 Pipe 14 0.39 7.5 18 0.30%0.00001 0.22 0.50 0.000 0.001 0.000 0.000 -341.81 341.81 CB 2 341.81 348.05 6.24 Pipe 15 0.80 27.0 18 0.50%0.00006 0.45 0.50 0.002 0.003 0.002 0.003 -340.06 340.06 CB 3 340.06 343.82 3.76 Pipe 16 2.30 26.0 18 0.50%0.00048 1.30 0.50 0.012 0.026 0.013 0.026 0.58 340.06 339.68 CB 4 339.68 343.81 4.13 Pipe 17 5.06 17.0 18 0.50%0.00232 2.86 0.50 0.039 0.127 0.064 0.103 0.91 340.23 340.74 CB 5 340.74 343.5 2.76 Pipe 18 4.42 27.0 18 0.50%0.00177 2.50 0.50 0.048 0.097 0.049 0.096 0.84 340.23 340.71 CB 6 340.71 343.5 2.79 Pipe 19 1.65 17.0 18 0.30%0.00025 0.93 1.00 0.004 0.014 0.014 0.018 0.48 340.80 340.31 CB 7 340.31 345.05 4.74 Pipe 20 3.35 27.0 18 0.30%0.00102 1.90 0.50 0.027 0.056 0.028 0.055 0.71 340.80 340.58 CB 8 340.58 345.05 4.47 Notes: See hand calculations for KT breakdown HLF = Head Loss due to Friction HV = Velocity Head HLM = Head Loss due to Minor Losses Pipes 1-6 & 13-15 flow full. All other pipes flow open. F E Catch Basin/Manhole Table 5 Hydraulic Grade Line Calculations Tentative Parcel Map No. 12212 Sump Half Water Surface KT Values Bend Outlet A B C D LAV//Pinnacle Engineering Inlet Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Sep 19 2022 Catch Basin Inlet Capacity (50% Clogging) Combination Inlet Location = Sag Curb Length (ft) = 4.00 Throat Height (in) = 6.00 Grate Area (sqft) = 4.00 Grate Width (ft) = 2.00 Grate Length (ft) = 4.00 Gutter Slope, Sw (ft/ft) = 0.080 Slope, Sx (ft/ft) = 0.020 Local Depr (in) = -0- Gutter Width (ft) = 2.00 Gutter Slope (%) = -0- Gutter n-value = -0- Calculations Compute by: Known Q Q (cfs) = 5.06 Highlighted Q Total (cfs) = 5.06 Q Capt (cfs) = 5.06 Q Bypass (cfs) = -0- Depth at Inlet (in) = 5.21 Efficiency (%) = 100 Gutter Spread (ft) = 15.71 Gutter Vel (ft/s) = -0- Bypass Spread (ft) = -0- Bypass Depth (in) = -0- Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc. Monday, Sep 19 2022 TPM 12212 Curb and Gutter Capacity Gutter Cross Sl, Sx (ft/ft) = 0.020 Cross Sl, Sw (ft/ft) = 0.083 Gutter Width (ft) = 2.00 Invert Elev (ft) = 1.00 Slope (%) = 0.30 N-Value = 0.013 Calculations Compute by: Known Q Known Q (cfs) = 5.06 Highlighted Depth (ft) = 0.42 Q (cfs) = 5.060 Area (sqft) = 2.27 Velocity (ft/s) = 2.23 Wetted Perim (ft) = 15.08 Crit Depth, Yc (ft) = 0.42 Spread Width (ft) = 14.65 EGL (ft) = 0.50 0 2 4 6 8 10 12 14 16 18 20 22 24 Elev (ft) Depth (ft)Section 0.75 -0.25 1.00 0.00 1.25 0.25 1.50 0.50 1.75 0.75 2.00 1.00 Reach (ft) APPENDIX “D” DATERCE 43130 EXP. 3/31/24LAV// Pinnacle EngineeringJOB No.: DATE: CHECKED BY: SHEET DWG NO.: SHEETSREVISIONSMATTHEW K. VOVILLADRAWN BY: OF 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312Phone: (661) 869-0184 Fax: (661) 885-4155ENGINEERING ●PLANNING ●SURVEYING16-760 SEWER-SD 10/04/2022 ADA MKV 1 7COVER SHEETSEWER & STORM DRAIN PLANTENTATIVE PARCEL MAP NO. 122122201 TAFT HIGHWAYBAKERSFIELD, CALIFORNIA........SEWER AND STORM DRAIN PLAN REVISED TENTATIVE PARCEL MAP NO. 12212 BAKERSFIELD, CALIFORNIA DATERCE 43130 EXP. 3/31/24LAV// Pinnacle EngineeringJOB No.: DATE: CHECKED BY: SHEET DWG NO.: SHEETSREVISIONSMATTHEW K. VOVILLADRAWN BY: OF 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312Phone: (661) 869-0184 Fax: (661) 885-4155ENGINEERING ●PLANNING ●SURVEYING16-760 SEWER-SD 10/04/2022 ADA MKV 2 7GENERAL NOTES & SPECIFICATIONSSEWER & STORM DRAIN PLANTENTATIVE PARCEL MAP NO. 122122201 TAFT HIGHWAYBAKERSFIELD, CALIFORNIA........ DATERCE 43130 EXP. 3/31/24LAV// Pinnacle EngineeringJOB No.: DATE: CHECKED BY: SHEET DWG NO.: SHEETSREVISIONSMATTHEW K. VOVILLADRAWN BY: OF 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312Phone: (661) 869-0184 Fax: (661) 885-4155ENGINEERING ●PLANNING ●SURVEYING16-760 SEWER-SD 10/04/2022 ADA MKV 3 7DETAILS & TYPICAL SECTIONSSEWER & STORM DRAIN PLANTENTATIVE PARCEL MAP NO. 122122201 TAFT HIGHWAYBAKERSFIELD, CALIFORNIA........ DATERCE 43130 EXP. 3/31/24LAV// Pinnacle EngineeringJOB No.: DATE: CHECKED BY: SHEET DWG NO.: SHEETSREVISIONSMATTHEW K. VOVILLADRAWN BY: OF 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312Phone: (661) 869-0184 Fax: (661) 885-4155ENGINEERING ●PLANNING ●SURVEYING16-760 SEWER-SD 10/04/2022 ADA MKV 4 7BHULLAR STREETSEWER & STORM DRAIN PLANTENTATIVE PARCEL MAP NO. 122122201 TAFT HIGHWAYBAKERSFIELD, CALIFORNIA........BHULLAR STREET RETENTION BASIN SEE SHEET 7 ” “” “” DATERCE 43130 EXP. 3/31/24LAV// Pinnacle EngineeringJOB No.: DATE: CHECKED BY: SHEET DWG NO.: SHEETSREVISIONSMATTHEW K. VOVILLADRAWN BY: OF 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312Phone: (661) 869-0184 Fax: (661) 885-4155ENGINEERING ●PLANNING ●SURVEYING16-760 SEWER-SD 10/04/2022 ADA MKV 5 7GREWAL STREETSEWER & STORM DRAIN PLANTENTATIVE PARCEL MAP NO. 122122201 TAFT HIGHWAYBAKERSFIELD, CALIFORNIA........MATCH LINESEE SHEET 6GREWAL STREET MATCH LINESEE SHEET 6” “” “” DATERCE 43130 EXP. 3/31/24LAV// Pinnacle EngineeringJOB No.: DATE: CHECKED BY: SHEET DWG NO.: SHEETSREVISIONSMATTHEW K. VOVILLADRAWN BY: OF 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312Phone: (661) 869-0184 Fax: (661) 885-4155ENGINEERING ●PLANNING ●SURVEYING16-760 SEWER-SD 10/04/2022 ADA MKV 6 7GREWAL STREET & TAFT HWY.SEWER & STORM DRAIN PLANTENTATIVE PARCEL MAP NO. 122122201 TAFT HIGHWAYBAKERSFIELD, CALIFORNIA........MATCH LINESEE SHEET 5GREWAL STREET TAFT HIGHWAY (SR 119)MATCH LINESEE SHEET 5” “” “” DATERCE 43130 EXP. 3/31/24LAV// Pinnacle EngineeringJOB No.: DATE: CHECKED BY: SHEET DWG NO.: SHEETSREVISIONSMATTHEW K. VOVILLADRAWN BY: OF 12418 Rosedale Hwy., Suite A, Bakersfield, CA 93312Phone: (661) 869-0184 Fax: (661) 885-4155ENGINEERING ●PLANNING ●SURVEYING16-760 SEWER-SD 10/04/2022 ADA MKV 7 7SEWER CONNECTION & SUMP DETAILSEWER & STORM DRAIN PLANTENTATIVE PARCEL MAP NO. 122122201 TAFT HIGHWAYBAKERSFIELD, CALIFORNIA........SEWER TIE-IN ” “” “”