HomeMy WebLinkAboutTract 7043 Drainage Study
2
Table of Contents
1.0 PURPOSE ................................................................................................................. 3
2.0 GUIDELINES ............................................................................................................ 3
3.0 DESIGN APPROACH ............................................................................................... 3
4.0 CONCLUSION AND RECOMMENDATIONS ............................................................ 4
Soil Map .................................................................................................. back of report
Hydrology Calculations ........................................................................... back of report
Inlet Sizing Calculations .......................................................................... back of report
Hydraulic Calculations and Pipe Profiles ................................................. back of report
Basin Exhibit ............................................................................ sleeve in back of report
DReference - Drainage Exhibit .................................................. sleeve in back of report
Reference ............................................................................................... back of report
3
1.0 PURPOSE
The purpose for this drainage study is as follows:
1. To provide a storm drainage system in accordance with the City of Bakersfield
requirements and guidelines.
2. To provide an economical and reasonable design for storm drain conveyance and
disposal facilities.
2.0 GUIDELINES
The following design standards were used in the development of this study:
1. Initial times to concentration (roof to gutter) are 15 minutes for R-1 Development.
2. The entire site is Soil Group A - Kimberlina fine sandy loam, 0 to 2 percent slopes. The
soil group was obtained from the US Department of Agriculture Soils Survey. A Soil Map
is enclosed with this report.
3. The runoff coefficients used are:
A. 0.15 - Park
B. 0.42 - R-1, 6,000 S.F.
C. 0.95 - Pavement, drives, and roofs
3. Rainfall intensity curves used are those shown on Plate D-1 of the City of Bakersfield,
Subdivision & Engineering Manual.
4. Sub-areas using multiple run-off coefficients are given a weighted average based on the
area relative to each coefficient.
3.0 DESIGN APPROACH
The contributing areas to the retention basin are zoned residential, park/landscaping, pavement;
therefore were modeled as such so that the improvements were accurate.
This report also studies the required pipe sizes for the main lines leading from Berkshire Road to the
retention basin. The project area for the storm drain improvements are dictated by the flat terrain that
is present. More specifically the improvements are designed to benefit all areas bounded to the east
by Independence High School, to the north by Existing Tract 7044, to the south by McCutchen Road
and to the west by existing agriculture that takes storm drain runoff into the Basin Drainage Area.
The northerly half width of McCutchen Road, Minam River Way, and part of Nigu River Street (Area 1
and Area 2) will discharge its runoff into two catch basins (CB #1 & CB #2). These inlets will be located
at the intersection of McCutchen Road and Minam River Way. These drainage areas will have its own
weighted coefficient value from the park, the street/pavement, and the residential lots. Drainage Areas
3 and 4 will drain into catch basins (CB #3 & CB #4) located at the knuckle of McCloud River Avenue
and Cuyama River Street. CB #5 and CB #6 will collect the runoff produced by Areas 5 and 6 at the T-
intersection of Huslia River Avenue and Cuyama River Street. Drainage Areas 4 and 5 will have its
own weighted coefficient value from the park and the residential lots. CB #7 will collect the runoff
produced by westerly half of the cul-de-sac along Nigu River Street (Area 7) at the corner of Wood
River Way and Nigu River Street. Drainage Area 8 consists of five residential lots were its runoff goes
into a Catch Basin #8 located at the T-intersection of Nigu River Street and Wood River Way. Drainage
Areas 9, 10, & 11 will discharge into catch basins (CB #7, CB #8, & CB #9) located at the intersection
of Martian River Street and Argi River Avenue. CB #12 will collect the discharge produced by seven
residential lots (Area 12) at the T-intersection of Arno River Lane and Martian River Street. Two catch
basins (CB #13 & CB #14) will be located at the knuckle of Arno River Lane and Cuyama River Street
Way adjacent to the sump. These inlets will collect the discharge produced by Drainage Areas 13 and
14.
The flows for the sizing of the pipes were estimated utilizing the City of Bakersfield Rational Method in
accordance with the Subdivision Standards. Flows were computed for the 10-year event using the
formula Q = CIA, where Q is the flow in cubic feet per second, C is the runoff coefficient, I is the
4
intensity in inches per hour, and A is the catchment’s area in acres. Since the main purpose of this
report is the storm drain system leading to the basin and the curb capacities were determined based
the 5-year storm event.
The existing retention basin on the northeasterly side of tract will not be expanded and is to remain in
place. It will handle all of the discharge from this tract and existing Tract 7044. The proposed tract will
consists of the residential lots, landscaping areas, and McCutchen Road. Both Tracts 7043 & 7044 are
currently owned by the same developer. The proposed basin will have a bottom elevation of 328.0’
which already took into account the runoff from this project. The runoff coefficient is calculated in the
table below thus the updated required sump capacity is 4.23 AF
Area Acres Coefficient C x A
TRACT 7043
Park/Landscaping 2.46 0.15 0.37
R-1, 6000 SF 26.27 0.42 11.03
McCutchen Road 1.81 0.95 1.72
TRACT 7043 Ʃ(CXA) = 13.12
VOLUME REQUIRED (AF) = 1.97
VOLUME REQUIRED – TRACT 7044 (AF) = 2.23
TOTAL (AC) 78.50 TOTAL VOLUME REQUIRED (AF) = 4.20
The rational method for the 10-year event was performed using Autodesk Storm and Sanitary Analysis
2020. This program routes the flows and calculates the HGL for the system. The program allows you
to enter the discharge calculated from a separately spreadsheet. This spreadsheet was used to
determine the initial time of concentrations in a 10-year event. The flows from the 10-year event were
calculated and routed. Starting HGL at the basin was estimated to be 5.0’ above the basin bottom
which is an elevation of 333.0’.
4.0 CONCLUSION AND RECOMMENDATIONS
The flows from the 10-year event were calculated and routed. The beginning HGL was estimated to
be 5.0’ above the basin bottom at the outlet structure. All the pipes in this system were sized to be 18”
RCP and 24” RCP. The HGL is not less than 0.5’ below the existing grade at any manhole.
The Hydraflow program determines the minimum catch basin opening required to capture 100% of the
runoff. Tract 7043 will consists of 14 sag catch basin located throughout the proposed development.
And all of these catch basins will have a 3.5 ft. wide opening based on the discharge tributary to each
inlet (See Inlet Sizing Calculations).
The storm drain system will be able to handle a 10-year event. The Basin Exhibit, part of this study,
shows the basin handling both this tract and the existing Tract 7044. The proposed basin will have a
total water depth of 10’ with a minimum of 1’ of freeboard. The proposed basin will be able to store
4.56 AF of storm water. The depth of the basin is +16 deep with a water surface of 338. The required
volume for both tracts is 4.20 AF which has an excess volume of 0.36 AF.
SOIL MAP
Hydrologic Soil Group—Kern County, California, Northwestern Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
3/25/2020
Page 1 of 439063503906410390647039065303906590390665039067103906770390629039063503906410390647039065303906590390665039067103906770307370307430307490307550307610307670307730
307370 307430 307490 307550 307610 307670
35° 17' 8'' N 119° 7' 5'' W35° 17' 8'' N119° 6' 51'' W35° 16' 52'' N
119° 7' 5'' W35° 16' 52'' N
119° 6' 51'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 11N WGS84
0 100 200 400 600
Feet
0 30 60 120 180
Meters
Map Scale: 1:2,360 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Rating Polygons
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Lines
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Soil Rating Points
A
A/D
B
B/D
C
C/D
D
Not rated or not available
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: Kern County, California, Northwestern Part
Survey Area Data: Version 12, Sep 16, 2019
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Feb 25, 2019—Mar
15, 2019
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Hydrologic Soil Group—Kern County, California, Northwestern Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
3/25/2020
Page 2 of 4
Hydrologic Soil Group
Map unit symbol Map unit name Rating Acres in AOI Percent of AOI
174 Kimberlina fine sandy
loam, 0 to 2 percent
slopes MLRA 17
A 27.6 100.0%
Totals for Area of Interest 27.6 100.0%
Description
Hydrologic soil groups are based on estimates of runoff potential. Soils are
assigned to one of four groups according to the rate of water infiltration when the
soils are not protected by vegetation, are thoroughly wet, and receive
precipitation from long-duration storms.
The soils in the United States are assigned to four groups (A, B, C, and D) and
three dual classes (A/D, B/D, and C/D). The groups are defined as follows:
Group A. Soils having a high infiltration rate (low runoff potential) when
thoroughly wet. These consist mainly of deep, well drained to excessively
drained sands or gravelly sands. These soils have a high rate of water
transmission.
Group B. Soils having a moderate infiltration rate when thoroughly wet. These
consist chiefly of moderately deep or deep, moderately well drained or well
drained soils that have moderately fine texture to moderately coarse texture.
These soils have a moderate rate of water transmission.
Group C. Soils having a slow infiltration rate when thoroughly wet. These consist
chiefly of soils having a layer that impedes the downward movement of water or
soils of moderately fine texture or fine texture. These soils have a slow rate of
water transmission.
Group D. Soils having a very slow infiltration rate (high runoff potential) when
thoroughly wet. These consist chiefly of clays that have a high shrink-swell
potential, soils that have a high water table, soils that have a claypan or clay
layer at or near the surface, and soils that are shallow over nearly impervious
material. These soils have a very slow rate of water transmission.
If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is
for drained areas and the second is for undrained areas. Only the soils that in
their natural condition are in group D are assigned to dual classes.
Rating Options
Aggregation Method: Dominant Condition
Hydrologic Soil Group—Kern County, California, Northwestern Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
3/25/2020
Page 3 of 4
Component Percent Cutoff: None Specified
Tie-break Rule: Higher
Hydrologic Soil Group—Kern County, California, Northwestern Part
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
3/25/2020
Page 4 of 4
HYDROLOGY CALCULATIONS
CITY OF BAKERSFIELD RATIONAL METHOD
(In accordance with City of Bakersfield Standards)
TABLE OF RUNOFF COEFFICIENTS
R-1, 6000 SF 0.42
JOB TITLE:Tract 7043 R-1, 6750 SF 0.4
DATE:Sep-20 R-1, 7500 SF 0.38
R-1, 10000 SF 0.34
Rational Values:R-1, 15000 SF 0.27
Event: 10 YEAR Values: 5, 10, 50 R-3, R-4, M-H 0.8
M.A.P. 6 in./yr. Values: 6, 10, 15, 20, 25, 30 Commercial 0.9
Industrial 0.8
Curve Values Parks 0.15
a: 2.38 I=a+bTc (Tc<20min.) Grasslands, Type A Soil 0.15
b: -0.058 Grasslands, Type B Soil 0.25
P60: 0.550 I=K1*(6.02*Tc)^(0.17*LN(p60/K1) Grasslands, Type C Soil 0.35
K1: 40.00 (Tc>=20min.) Grasslands, Type D Soil 0.45
Pavement, drives & roofs 0.95
Backyards 0.05
Lawn-landscape 2% slope 0.10 0.17
Lawn-landscape 2-7% slope 0.15 0.22
Lawn-landscape 7% slope 0.20 0.35
SUBAREA C I A rslt Tc L dH Sg Q Street V Trial Tc Roof to Tm D Curb
NAME Runoff Intensity Total Time Length Elev. Gutter Flow Type Vel. MIN. Gutter Travel Pipe Cap
Coef. IN/HR Area Conc. Feet Diff. Slope CFS FPS Time Time Dia In
AC. MIN. Feet Ft/Ft MIN. MIN. In.
AREA 1 0.47 1.25 3.97 19.41 508 1.47 0.29% 2.32 60 1.92 19.41 15 4.41 4.14
PIPE 9 37 1.31 0.47 18
19.88
AREA 2 0.75 1.80 1.27 10.00 603 1.67 0.28% 1.71 60 1.84 10.00 0 10.00 3.79
PIPE 8 7 0.97 0.12 18
10.12
PIPE 7 0.53 1.23 5.24 115 3.43 1.94 19.88 0.99 18
20.87
PIPE 6 0.53 1.18 5.24 357 3.31 1.87 20.87 3.18 18
24.05
AREA 3 0.42 1.16 4.82 21.48 678 1.70 0.25% 2.34 60 1.74 21.48 15 6.48 4.22
PIPE 14 24 1.33 0.30 18
21.78
AREA 4 0.42 1.39 1.95 17.08 197 0.50 0.25% 1.14 60 1.58 17.08 15 2.08 3.39
PIPE 15 26 0.64 0.67 18
17.75
PIPE 5 0.47 1.07 12.01 40 6.01 3.40 24.05 0.20 18
24.25
PIPE 4 0.47 1.06 12.01 280 5.98 3.38 24.25 1.38 18
25.62
Tc CALCULATIONS
Tract 7043
Hydrology_10_yr.xls
McIntosh Associates
2001 Wheelan Ct
Bakersfield, CA 93309 10 yr Calc
SUBAREA C I A rslt Tc L dH Sg Q Street V Trial Tc Roof to Tm D Curb
NAME Runoff Intensity Total Time Length Elev. Gutter Flow Type Vel. MIN. Gutter Travel Pipe Cap
Coef. IN/HR Area Conc. Feet Diff. Slope CFS FPS Time Time Dia In
AC. MIN. Feet Ft/Ft MIN. MIN. In.
Tract 7043
AREA 5 0.42 1.39 1.65 17.08 206 0.63 0.31% 0.96 60 1.64 17.08 15 2.08 3.15
PIPE 18 15 0.54 0.47 18
17.55
AREA 6 0.42 1.24 1.82 19.60 426 1.06 0.25% 0.95 60 1.54 19.60 15 4.60 3.21
PIPE 27 25 0.54 0.79 18
20.39
PIPE 17 0.42 1.20 3.47 43 1.75 0.99 20.39 0.72 18
21.11
PIPE 3 0.46 1.02 15.48 280 7.22 4.09 25.62 1.14 18
26.77
AREA 7 0.42 1.27 1.81 19.08 403 1.12 0.28% 0.97 60 1.65 19.08 15 4.08 3.15
PIPE 13 51 0.55 1.56 18
20.64
PIPE 12 0.42 1.19 1.81 173 0.91 0.51 20.64 5.64 18
26.28
AREA 8 0.42 1.37 1.50 17.38 218 0.55 0.25% 0.86 60 1.53 17.38 15 2.38 3.13
PIPE 16 28 0.49 0.95 18
18.33
PIPE 11 0.42 1.00 3.31 232 1.39 0.79 26.28 4.92 18
31.20
AREA 9 0.42 1.14 2.97 21.90 730 2.33 0.32% 1.42 61 1.76 21.90 15 6.90 3.55
PIPE 20 23 0.81 0.48 18
22.38
PIPE 26 0.42 0.88 6.28 83 2.32 1.32 31.20 1.06 18
32.26
AREA 10 0.42 1.40 1.28 16.82 200 1.05 0.53% 0.75 62 1.84 16.82 15 1.82 2.67
PIPE 19 25 0.43 0.97 18
17.79
AREA 11 0.42 1.37 1.82 17.33 218 0.55 0.25% 1.05 63 1.56 17.33 15 2.33 3.31
PIPE 21 17 0.59 0.46 18
17.79
PIPE 10 0.42 0.86 9.38 240 3.39 1.92 32.26 2.09 18
34.35
Hydrology_10_yr.xls
McIntosh Associates
2001 Wheelan Ct
Bakersfield, CA 93309 10 yr Calc
SUBAREA C I A rslt Tc L dH Sg Q Street V Trial Tc Roof to Tm D Curb
NAME Runoff Intensity Total Time Length Elev. Gutter Flow Type Vel. MIN. Gutter Travel Pipe Cap
Coef. IN/HR Area Conc. Feet Diff. Slope CFS FPS Time Time Dia In
AC. MIN. Feet Ft/Ft MIN. MIN. In.
Tract 7043
PIPE 2 0.44 0.99 24.86 495 10.88 3.46 26.77 2.38 24
29.15
AREA 12 0.42 1.41 1.34 16.77 170 0.50 0.29% 0.79 64 1.60 16.77 15 1.77 3.00
PIPE 24 64 0.45 2.40 18
19.17
PIPE 25 0.42 1.27 1.34 198 0.71 0.40 19.17 8.16 18
27.33
AREA 13 0.42 1.31 2.31 18.39 351 1.05 0.30% 1.27 65 1.72 18.39 15 3.39 3.42
PIPE 23 25 0.72 0.59 18
18.98
AREA 14 0.27 1.26 2.03 19.24 374 1.02 0.27% 0.69 66 1.47 19.24 15 4.24 2.97
PIPE 28 30 0.39 1.26 18
20.50
PIPE 22 0.37 0.97 5.68 50 2.02 1.14 27.33 0.74 18
28.06
PIPE 1 0.43 0.93 30.54 71 12.15 3.87 29.15 0.30 24
29.45
Required Sump Capacity = 0.15 x C x A = 1.97 ac-ft
C = 0.43 30.54 acres
Hydrology_10_yr.xls
McIntosh Associates
2001 Wheelan Ct
Bakersfield, CA 93309 10 yr Calc
INLET & PIPE SIZING CALCULATIONS
INLET
PE SIZING CALCULATIONS INLET
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 1 – Catch Basin #1>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 2.32
Highlighted
Q Total (cfs) = 2.32
Q Capt (cfs) = 2.32
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 5.27
Efficiency (%) = 100
Gutter Spread (ft) = 4.80
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 2 – Catch Basin #2>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 1.71
Highlighted
Q Total (cfs) = 1.71
Q Capt (cfs) = 1.71
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 4.66
Efficiency (%) = 100
Gutter Spread (ft) = 4.19
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 3 – Catch Basin #3>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 2.34
Highlighted
Q Total (cfs) = 2.34
Q Capt (cfs) = 2.34
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 5.28
Efficiency (%) = 100
Gutter Spread (ft) = 4.82
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 4 – Catch Basin #4>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 0.92
Highlighted
Q Total (cfs) = 0.92
Q Capt (cfs) = 0.92
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.76
Efficiency (%) = 100
Gutter Spread (ft) = 3.29
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 5 – Catch Basin #5
CCurb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 0.75
Highlighted
Q Total (cfs) = 0.75
Q Capt (cfs) = 0.75
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.54
Efficiency (%) = 100
Gutter Spread (ft) = 3.06
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 6 – Catch Basin #6>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 0.95
Highlighted
Q Total (cfs) = 0.95
Q Capt (cfs) = 0.95
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.80
Efficiency (%) = 100
Gutter Spread (ft) = 3.33
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 7 – Catch Basin #7>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 0.97
Highlighted
Q Total (cfs) = 0.97
Q Capt (cfs) = 0.97
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.83
Efficiency (%) = 100
Gutter Spread (ft) = 3.35
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 8 – Catch Basin #8>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 0.86
Highlighted
Q Total (cfs) = 0.86
Q Capt (cfs) = 0.86
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.68
Efficiency (%) = 100
Gutter Spread (ft) = 3.21
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 9 – Catch Basin #9>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 1.42
Highlighted
Q Total (cfs) = 1.42
Q Capt (cfs) = 1.42
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 4.35
Efficiency (%) = 100
Gutter Spread (ft) = 3.88
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 10 – Catch Basin #10>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 0.75
Highlighted
Q Total (cfs) = 0.75
Q Capt (cfs) = 0.75
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.54
Efficiency (%) = 100
Gutter Spread (ft) = 3.06
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 11 – Catch Basin #11>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 1.05
Highlighted
Q Total (cfs) = 1.05
Q Capt (cfs) = 1.05
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.92
Efficiency (%) = 100
Gutter Spread (ft) = 3.45
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 12 – Catch Basin #12>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 0.79
Highlighted
Q Total (cfs) = 0.79
Q Capt (cfs) = 0.79
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.59
Efficiency (%) = 100
Gutter Spread (ft) = 3.12
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 13 – Catch Basin #13>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 1.27
Highlighted
Q Total (cfs) = 1.27
Q Capt (cfs) = 1.27
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 4.18
Efficiency (%) = 100
Gutter Spread (ft) = 3.71
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
Inlet Report
Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Wednesday, Mar 25 2020
Drainage Area 14 – Catch Basin #14>
Curb Inlet
Location = Sag
Curb Length (ft) = 3.50
Throat Height (in) = 4.00
Grate Area (sqft) = -0-
Grate Width (ft) = -0-
Grate Length (ft) = -0-
Gutter
Slope, Sw (ft/ft) = 0.020
Slope, Sx (ft/ft) = 0.083
Local Depr (in) = 2.00
Gutter Width (ft) = 2.00
Gutter Slope (%) = -0-
Gutter n-value = -0-
Calculations
Compute by: Known Q
Q (cfs) = 1.09
Highlighted
Q Total (cfs) = 1.09
Q Capt (cfs) = 1.09
Q Bypass (cfs) = -0-
Depth at Inlet (in) = 3.97
Efficiency (%) = 100
Gutter Spread (ft) = 3.50
Gutter Vel (ft/s) = -0-
Bypass Spread (ft) = -0-
Bypass Depth (in) = -0-
HYDRAULIC CALCULATIONS AND
PIPE PROFILES
TRACT 7043
HYDRAULIC CALCULATIONS (OUTPUT)
Pipe Pipe Pipe Flow Avg. Capacity Invert HGL Velocity Velocity EGL Sf Invert
No. Length Size Rate Velocity Flowing Down Down Down Head Down Down Down Up
(ft) (in) (cfs) (ft/s) Full (cfs) (ft) (ft) (ft/s) (ft) (ft)(%) (ft)
PIPE 1 70.66 24 12.15 3.87 36.10 328.40 333.00 3.87 0.23 333.23 0.289 330.20
PIPE 2 494.83 24 10.88 3.36 11.32 330.20 333.44 3.36 0.18 333.61 0.218 331.44
PIPE 3 280.00 18 7.22 4.09 5.25 332.14 334.69 4.09 0.26 334.95 0.473 332.84
PIPE 4 280.03 18 5.98 3.40 5.25 332.84 336.27 3.40 0.18 336.45 0.327 333.54
PIPE 5 40.32 18 6.01 3.40 5.23 333.54 337.37 3.40 0.18 337.55 0.327 333.64
PIPE 6 357.32 18 3.31 1.87 5.24 333.64 337.68 1.87 0.05 337.73 0.099 334.53
PIPE 7 115.08 18 3.43 1.94 5.27 334.53 338.09 1.94 0.06 338.15 0.107 334.82
PIPE 8 7.07 18 1.71 0.97 16.76 334.82 338.27 0.97 0.01 338.28 0.027 335.00
PIPE 9 36.93 18 2.32 1.31 8.11 334.82 338.27 1.31 0.03 338.29 0.049 335.04
PIPE 10 240.36 18 3.39 3.16 5.25 334.27 335.15 3.16 0.15 335.30 0.249 334.87
PIPE 11 231.75 18 1.39 1.72 5.25 335.08 336.03 1.18 0.02 336.05 0.033 335.66
PIPE 12 173.44 18 0.91 1.72 5.23 335.66 336.31 1.23 0.02 336.33 0.049 336.09
PIPE 13 51.24 18 0.97 2.73 9.95 336.09 336.59 1.89 0.20 336.79 0 336.55
PIPE 14 24.06 18 2.34 1.33 24.97 333.64 337.68 1.33 0.03 337.70 0.05 335.00
PIPE 15 26.01 18 1.14 0.65 24.01 333.64 337.68 0.65 0.01 337.68 0.012 335.00
PIPE 16 27.80 18 0.86 2.79 14.08 335.66 336.31 1.18 0.30 336.61 0 336.16
PIPE 17 42.75 18 1.75 0.89 5.33 332.84 336.27 0.89 0.01 336.28 0.022 332.95
PIPE 18 15.42 18 0.96 2.71 14.89 335.19 336.29 0.69 0.35 336.64 0 335.50
PIPE 19 24.78 18 0.75 2.54 15.36 334.87 335.90 0.58 0.31 336.22 0 335.40
PIPE 20 23.42 18 1.42 2.92 12.28 335.08 336.03 1.20 0.33 336.36 0 335.40
PIPE 21 16.52 18 1.05 3.07 16.94 334.87 335.90 0.81 0.44 336.34 0 335.30
PIPE 22 50.44 18 2.02 2.92 5.33 334.97 335.66 2.91 0.13 335.79 0.258 335.10
PIPE 23 25.47 18 1.27 3.19 14.71 335.10 335.92 1.28 0.40 336.33 0 335.60
PIPE 24 64.37 18 0.79 2.48 9.26 335.60 336.06 1.75 0.16 336.22 0 336.10
PIPE 25 197.51 18 0.71 1.19 5.28 335.10 335.92 0.72 0.01 335.93 0.013 335.60
PIPE 26 83.39 18 2.32 1.98 5.27 334.87 335.90 1.79 0.05 335.95 0.073 335.08
PIPE 27 25.42 18 0.95 0.54 7.51 332.95 336.29 0.54 0.00 336.30 0.008 333.08
PIPE 28 29.67 18 0.69 2.86 13.63 335.10 335.92 1.10 0.33 336.25 0 335.60
Pipe HGL Grnd/Rim Cover Velocity Velocity EGL Sf Sf Energy J-Loss Minor
No. Up Elev. Up Up Up Head Up Up Up Avg. Loss Coeff Loss
(ft)(ft)(ft)(ft/s)(ft)(ft)(%)(%)(ft)(ft)
PIPE 1 333.20 341.38 9.18 3.87 0.23 333.44 0.289 0.289 0.204 1 0.23
PIPE 2 334.51 341.80 8.36 3.36 0.18 334.69 0.218 0.218 1.077 1 0.18
PIPE 3 336.01 341.41 7.07 4.09 0.26 336.27 0.473 0.473 1.324 1 0.26
PIPE 4 337.19 340.39 5.35 3.40 0.18 337.37 0.326 0.327 0.914 1 0.18
PIPE 5 337.50 340.49 5.35 3.40 0.18 337.68 0.326 0.327 0.132 1 0.18
PIPE 6 338.03 341.40 5.37 1.87 0.05 338.09 0.099 0.099 0.355 1 0.05
PIPE 7 338.21 340.55 4.23 1.94 0.06 338.27 0.107 0.107 0.123 1 0.06
PIPE 8 338.27 340.19 3.69 0.97 0.01 338.28 0.027 0.027 0.002 1 0.01
PIPE 9 338.29 340.10 3.56 1.31 0.03 338.31 0.049 0.049 0.018 1 0.03
PIPE 10 335.75 340.85 4.48 3.16 0.16 335.90 0.25 0.25 0.6 1 0.16
PIPE 11 336.23 341.61 4.45 2.26 0.08 336.31 0.188 0.11 0.256 1 0.08
PIPE 12 336.51 342.08 4.49 2.21 0.08 336.59 0.246 0.148 0.256 1 0.08
PIPE 13 336.87 j 341.60 3.55 3.57 0.20 337.06 0 0 0 1.00 z n/a
PIPE 14 337.69 340.02 3.52 1.33 0.03 337.72 0.05 0.05 0.012 1 0.03
PIPE 15 337.68 340.02 3.52 0.65 0.01 337.69 0.012 0.012 0.003 1 0.01
PIPE 16 336.41 j 341.16 3.50 4.40 0.30 336.71 0 0 0 1.00 z n/a
PIPE 17 336.28 341.30 6.85 0.89 0.01 336.29 0.022 0.022 0.01 1 0.01
PIPE 18 335.76 340.57 3.57 4.73 0.35 336.11 0 0 0 1.00 z n/a
PIPE 19 335.63 340.49 3.59 4.50 0.31 335.94 0 0 0 1.00 z n/a
PIPE 20 335.74 340.40 3.50 4.63 0.33 336.08 0 0 0 1.00 z n/a
PIPE 21 335.55 340.31 3.51 5.32 0.44 335.99 0 0 0 1.00 z n/a
PIPE 22 335.79 341.11 4.51 2.92 0.13 335.92 0.26 0.259 0.131 1 0.13
PIPE 23 335.90 j 340.62 3.52 5.10 0.40 336.30 0 0 0 1.00 z n/a
PIPE 24 336.40 j 341.00 3.40 3.20 0.16 336.56 0 0 0 1.00 z n/a
PIPE 25 336.04 341.53 4.43 1.66 0.04 336.08 0.135 0.074 0.147 0.54 0.02
PIPE 26 335.96 340.83 4.25 2.16 0.07 336.03 0.117 0.095 0.079 1 0.07
PIPE 27 336.30 340.62 6.04 0.54 0.00 336.30 0.008 0.008 0.002 1 0
PIPE 28 335.89 j 340.69 3.59 4.61 0.33 336.22 0 0 0 1.00 z n/a
NOTES: j-Line contains hyd. Jump
z-Zero Junction Loss
PIPE 1SUMPMH-13
PIPE 2PIPE 3PIPE 4CUYAMA RIVER STREETMH-13MH-8MH-5MH-4
PIPE 5PIPE 6MH-3MH-4MH-2
PIPE 7MH-2MH-1
PIPE 8CB-2MH-1
PIPE 9MH-1CB-1
ARGI RIVER AVENUEPIPE 10PIPE 26PIPE 11MH-11MH-10MH-9MH-8
PIPE 12PIPE 13CB-7MH-12MH-11
PIPE 16MH-11CB-8
PIPE 17MH-5MH-7
PIPE 18MH-7CB-5
PIPE 19MH-9MH-9
PIPE 20MH-10CB-9
PIPE 21MH-8CB-11
PIPE 22PIPE 25PIPE 24ARNO RIVER LANECB-12MH-15MH-14MH-13
PIPE 23MH-14CB-13
PIPE 27MH-7CB-6
PIPE 28MH-14CB-14
DBASIN EXHIBIT
NOTE:
BASIN TO BE CONSTRUCTED PER
C.O.B. STANDARDS D-11, D-12, & D-13
EX. TRACT 7044 and TRACT 7043
BASIN SIZING CALCULATIONS
1 339.0
338.0 328.0
10 feet
Abtm = 13,638 sq ft = 0.31 acres
Amid = 19,733 sq ft = 0.45 acres
Atop = 26,540 sq ft = 0.61 acres
Provided Sump Capacity =198,517 Cu. FT 4.56 AC-FT
TABLE OF RUNOFF COEFFICIENTS EXISTING C x A =
TR 7043 TR 7044
R-1, 6000 SF 0.42 26.27 11.03
R-1, 6750 SF 0.4
R-1, 7150 SF 0.395 32.58 12.89
R-1, 10000 SF 0.34
R-1, 15000 SF 0.27
R-2 0.55
R-3, R-4, M-H 0.8
Commercial 0.9
Industrial 0.8
Parks 0.15 2.46 0.37
Grasslands, Type A Soil 0.15
Grasslands, Type B Soil 0.25
Grasslands, Type C Soil 0.35
Grasslands, Type D Soil 0.45
Pavement, drives & roofs 0.95 1.81 2.07 3.69
Backyards 0.05
n C x A =27.98
EXISTING
TR 7043 TR 7044 Total AC
30.54 +34.65 =65.19
Required Sump Capacity = 0.15 x C x A = 0.15 X
n C x =4.20 AC-FT
0.36 AC-FT AC-FT
NOTE: The sump lot [0.59 acres] has been omitted from these calcs which was originally included
in the Approved Tract 7044 sump sizing calcs: 31.13 acres - 0.59 acres = 30.54 acres. (See
Reference for the Approved Tract 7044 Calcs)
Total Difference
Provided Sump Capacity
Required Sump Capacity
Volume = 1/6 x (0.31+1.81+0.61) x 10.0 = 1/6 x (2.73) x 10.0
Depth from Design Water Surface =
Bottom Area of Sump
Half Depth Area of Sump
Area of Design Water Level
Prismoidal Formula: Volume = 1/6 x(Abtm+4Amid+Atop) x D
Freeboard (ft)=
Water Surface Elev =
Lowest Inlet Elev =
Bottom Basin Elev =
DRAINAGE EXHIBIT
EX. INDEPENDENCE HIGH SCHOOL