Loading...
HomeMy WebLinkAboutTract 7262 -Panama Lane - Offsite DrainageCITY OF BAKERSFIELD RATIONAL METHOD (In accordance with City of Bakersfield Standards) TABLE OF RUNOFF COEFFICIENTS R-1, 6000 SF 0.42 JOB TITLE:PANAMA LANE R-1, 6750 SF 0.4 DATE:Mar-21 R-1, 7500 SF 0.38 R-1, 10000 SF 0.34 Rational Values:R-1, 15000 SF 0.27 Event: 10 YEAR Values: 5, 10, 50 R-3, R-4, M-H 0.8 M.A.P. 6 in./yr. Values: 6, 10, 15, 20, 25, 30 Commercial 0.9 Industrial 0.8 Curve Values Parks 0.15 a: 2.38 I=a+bTc (Tc<20min.) Grasslands, Type A Soil 0.15 b: -0.058 Grasslands, Type B Soil 0.25 P60: 0.550 I=K1*(6.02*Tc)^(0.17*LN(p60/K1) Grasslands, Type C Soil 0.35 K1: 40.00 (Tc>=20min.) Grasslands, Type D Soil 0.45 Pavement, drives & roofs 0.95 Backyards 0.05 Lawn-landscape 2% slope 0.10 0.17 C: 0.01 Lawn-landscape 2-7% slope 0.15 0.22 0.92 Lawn-landscape 7% slope 0.20 0.35 SUBAREA C I A rslt Tc L dH Sg Q Street V Trial Tc Roof to Tm D Curb NAME Runoff Intensity Total Time Length Elev. Gutter Flow Type Vel. MIN. Gutter Travel Pipe Cap Coef. IN/HR Area Conc. Feet Diff. Slope CFS FPS Time Time Dia. In AC. MIN. Feet Ft/Ft MIN. MIN. In. OFF-SITE AREA (S)0.85 1.30 2.05 18.66 1126.0 2.80 0.25% 2.26 60 1.74 18.66 0.00 10.81 4.18 NEW PIPE 95.0 1.28 1.24 18 19.90 OFF-SITE AREA (N)0.85 1.22 3.36 19.90 1426.0 2.84 0.20% 3.50 60 1.84 19.90 0.00 12.94 4.68 PIPE 18 0.85 1.22 5.41 222.4 5.63 60 3.18 19.90 1.16 18 21.06 Org Total Q per Approved Study = 3.40 Delta Q =2.23 cfs to be added to existing Qs in the Approved Drainage Study. Tc CALCULATIONS PANAMA LANE CITY-REV.xls McIntosh Associates 2001 Wheelan Ct Bakersfield, CA 93309 10 yr Calc OFF-SITE AREA (S)2.05 ACRES NTS PANAMA LANE (SOUTH OF CL) TRIBUTARY AREA EXHIBITDe 18" RCP PIPE 27Q= 22.63 CFSPIPE 24Q= 21.03 CFSPIPE 23Q= 15.33 CFSPIPE 22Q= 15.33 CFSPIPE 19Q= 10.53 CFSPIPE 18Q= 5.63 CFSSTUB/NEW PIPEQ= 2.26 CFS