Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Tract 7262 Revised Sewer Study
Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Jun 8 2021 8" Sewer Pipe Flowing Full at ---ths depth> Circular Diameter (ft) = 0.67 Invert Elev (ft) = 1.00 Slope (%) = 0.25 N-Value = 0.011 Calculations Compute by: Known Q Known Q (cfs) = 0.71 Highlighted Depth (ft) = 0.5334 Q (cfs) = 0.710 Area (sqft) = 0.30 Velocity (ft/s) = 2.33 Wetted Perim (ft) = 1.49 Crit Depth, Yc (ft) = 0.40 Top Width (ft) = 0.53 EGL (ft) = 0.62 0 1 Elev (ft)Section 0.75 1.00 1.25 1.50 1.75 2.00 Reach (ft) 8 10 Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Jun 8 2021 Proposed Flow in the existing 8" Pipe to Panama Lane Connection A> Circular Diameter (ft) = 0.67 Invert Elev (ft) = 1.00 Slope (%) = 0.25 N-Value = 0.011 Calculations Compute by: Known Q Known Q (cfs) = 0.09 Highlighted Depth (ft) = 0.16 Q (cfs) = 0.090 Area (sqft) = 0.07 Velocity (ft/s) = 1.38 Wetted Perim (ft) = 0.69 Crit Depth, Yc (ft) = 0.14 Top Width (ft) = 0.57 EGL (ft) = 0.19 0 1 Elev (ft)Section 0.75 1.00 1.25 1.50 1.75 2.00 Reach (ft) SEWER STUDY DATE: 6/8/21 TRACTS 7261, 7262, & 7263 - REV Minimum Velocity Full: 2 Maninings "n":0.011 Cumulat.Peak Total SERVICE Land DEN. AREA E.D.U.Avg. Average Ave. Res. Peak Flow Design AREA Use DU/AC acres cfs/ac Flow,cfs Flow,cfs Factor cfs Flow,cfs Tract 7262; Phase 1, & 2 (Lots 1-11 & 35-43) SF 58 0.02332 3.859 0.090 Point of Connection #A on Panama Lane 58 0.090 Tract 7262; Phase 2 (Lots 12-34) SF 22 0.00884 4.252 0.038 Point of Connection #B on Panama Lane 22 0.038 Direct Flow into Exist. 8" on Panama Lane >>> Direct Flow into Exist. 8" on Panama Lane >>> Channel Report Hydraflow Express Extension for Autodesk® Civil 3D® by Autodesk, Inc.Tuesday, Jun 8 2021 Proposed Flow in the existing 8" Pipe to Panama Lane Connection B> Circular Diameter (ft) = 0.67 Invert Elev (ft) = 1.00 Slope (%) = 0.25 N-Value = 0.011 Calculations Compute by: Known Q Known Q (cfs) = 0.04 Highlighted Depth (ft) = 0.11 Q (cfs) = 0.040 Area (sqft) = 0.04 Velocity (ft/s) = 1.06 Wetted Perim (ft) = 0.56 Crit Depth, Yc (ft) = 0.09 Top Width (ft) = 0.50 EGL (ft) = 0.13 0 1 Elev (ft)Section 0.75 1.00 1.25 1.50 1.75 2.00 Reach (ft) SEWER STUDY DATE: 6/8/21 TRACTS 7261, 7262, & 7263 - REV Minimum Velocity Full: 2 Maninings "n":0.011 Cumulat.Peak Total SERVICE Land DEN. AREA E.D.U.Avg. Average Ave. Res. Peak Flow Design AREA Use DU/AC acres cfs/ac Flow,cfs Flow,cfs Factor cfs Flow,cfs Tract 7262; Phase 1, & 2 (Lots 1-11 & 35-43) SF 58 0.02332 3.859 0.090 Point of Connection #A on Panama Lane 58 0.090 Tract 7262; Phase 2 (Lots 12-34) SF 22 0.00884 4.252 0.038 Point of Connection #B on Panama Lane 22 0.038 Direct Flow into Exist. 8" on Panama Lane >>> Direct Flow into Exist. 8" on Panama Lane >>> BA