Loading...
HomeMy WebLinkAboutTract 7337 1, 2, 5, 10 Revised Sewer StudyPLANNING ENGINEERING SURVEYING GOVERNMENT RELATIONS IRVINE LOS ANGELES RIVERSIDE SAN DIEGO PRINCIPALS: FRED GRAYLEE BRADLEY HAY PAUL HUDDLESTON KAMAL H. KARAM DOUGLAS L. STALEY KRIS WEBER JOSEPH E. WIGHTMAN FOUNDING PARTNERS: RICHARD HUNSAKER TOM R. McGANNON JOHN A. MICHLER DOUGLAS G. SNYDER Three Hughes Irvine, California 92618-2021 (949) 583-1010 PH (949) 583-0759 FX www.hunsaker.com HUNSAKER & ASSOCIATES I R V I N E , I N C . Sewer System Hydraulic Analysis Date: May 11, 2021 For:City of Bakersfield By: John R. Gass, P.E. Public Works Project Manager Bakersfield, CA Hunsaker & Associates Irvine, Inc. Project:Tentative Tract 7337 – Phase 2, 5 & 10 Hunsaker & Associates Irvine, Inc. (H&A) is pleased to submit the Sewer System Hydraulic Analysis for Phase 2, 5 & 10 of Tentative Tract 7337, previously identified as Tract 6498-Phase 2. This analysis has been prepared to analyze the proposed changes to the previously approved sewer system for the aforementioned residential development project in the City of Bakersfield. The project lies within the jurisdiction of the City of Bakersfield and their standards have been used for this report. Hydraulic models were prepared using Bentley Systems modeling software to model the peak flows the proposed sewer systems would experience. This evaluation is based on existing and known conditions and should be re-evaluated if these conditions change or new information becomes available. Any interpretation of the information presented in this report should be referred to H&A to ensure the integrity of the results. Project Location The project is located adjacent to City Hills Drive, Panorama Drive & Masterson Drive in the City of Bakersfield. The general project location is shown on exhibit entitled, “Sewer System – Figure 1.” Summary of Findings 1.The proposed project, Tentative Tract 7337-Phase 2, will include 12 residential dwelling units located on Asuncion Place. The sewer system was originally designed as an 8-inch line with a slope at 0.35 percent to the existing 8-inch sewer line in Moengo Way. The sewer line is proposed to lower the connection point at Moengo, to allow for the last reach to be constructed as a 6-inch with a slope of 1 percent. 2.The proposed project, Tentative Tract 7337-Phase 5, will include 25 residential dwelling units located at the northwest portion of the project. The sewer system was originally designed to drain to Kuma Way, via Cuzco Way & Potosi Way. Currently the construction of the downstream portions of Cuzco Way & Potosi Way will be constructed at a later date. It is proposed to re-route the sewer system, for the 25 lots, to the existing 8-inch sewer line in Moengo Way. 3.The proposed project, Tentative Tract 7337-Phase 10, will include 29 residential dwelling units located on Pasto Way. The sewer system was originally designed as an 8-inch line with a slope at 0.35 percent to the existing 8-inch sewer line in Pilar Way. The sewer line is proposed to construct the last reach as a 6-inch line at 1 percent. Sewer System Hydraulic Analysis, cont. May 11, 2021 Page 2 4.The sewer system schematic is shown on the attached exhibit entitled, “Sewer System – Figure1.” The exhibits identifies points of sewer connection, sewer reaches, manholes, proposed and existing sewer mains. 5.The existing onsite sewer collection system analyzed consists of 8-inch diameter mains in Moengo Way, Kuma Way, Limache Place and Pilar Way, constructed at slopes of 0.35 percent. The proposed re-routed sewer in Cuzco Way Patagonia Way is designed at 0.4 percent slope due to the site grading and the elevation of the connection point at Moengo. 6.In order to analyze the impact for re-routing the sewer, we have estimated the average daily discharge of the domestic sewage using 250-gallons per day per unit, as identified in the City of Bakersfield Public Works Department Subdivision & Engineering Design Manual (Design Manual). Using the sum of the average daily flows for each reach in the study area, we peaked the flows per the Design Manual, to calculate the estimated capacity and velocities. We prepared a hydraulic model using Bentley FlowMaster V8i. The summary of outputs from the model runs is included in the Appendix of this report. 7.The calculation demonstrate the proposed and existing 8-inch sewer lines have adequate capacity, however, there are only 3 reaches that meet the velocity requirement of 2 fps. The vast majority has a velocity 1.50 fps to 2.16 fps. The sewer line with velocities below 1.5 fps, have calculated velocities ranging from 0.91 fps to 1.19 fps. This is due to the limited number of connected homes, existing slopes of 0.35 percent and the proposed slopes of 0.4 percent. We sincerely trust these calculations will provide sufficient evidence that the proposed sewer system is adequate, even with the velocities less than the desired 2 fps. Please contact me at (949) 768-2579 if you have any questions. JG:jg Enclosures xc:Ben Etemadi – H&A W.O. 1583-70x F:\0887\Engineering\SY_Sewer Study\sewer study.pdf GUARANDA PLACEMASTERSON DRIVE CITY HILLS DRIVE PANORAMA DRIVELIMACHE PLACEKUMA WAYPOTOSI WAY PONTA PORA PLACEASUNCION PLACEMONTEVIDEO PLACEMOENGO WAY BALTRA WAY PILAR WAY SUCRE PLACEPI L A R W A Y PASTO WAYPAYSANOU WAYMITU WAYMENDOZA PLACELARTI P L A C E LAVRAS PLACECUZCO WAY QUITO PLACEPATAGONIA WAYBO G O T A TANDIL WAYMOENGO WAY PLA C E19 93 DU'S 12 DU'S 12 DU'S151110987654321161713121814KUMA WAYAVIGNON WAYPARADISO WAY 13121110987654321252423222120191817161514 TTM 7337-PHASE 5LOZANO WAYOPORTO WAYRIATA LANETOSCANA DRIVEGARDEN PARKCICADA DR.BOBOLI DR.1234561211109878B8A 61 DU'S 24 DU'S TTM 7337-PHASE 2 1234567891312111029282726252423222120191817161514 TTM 7337-PHASE 10 13141516172021222324252628293027I R V I N E , I N C .PLANNINGPH: (949)583-1010SURVEYINGFX: (949)583-0759Irvine, CA 92618Three HughesENGINEERINGSEWER SYSTEM1PREPARED BY:LEGEND# TTM 7337-PHASE 2, 5 & 10 APPENDIX Estimate Sewer System Hydraulic Calculations Summary Reach No. Pipe Dia (in) Slope (ft/ft)∑ DU's Qa(1) (mgd) Peaking(2) Factor Qp(3) (mgd) Calc'd(4) D/d Velocity(4) (fps) 1 6 0.0100 4 0.0010 5.07 0.005068 0.082 1.02 2 8 0.0040 13 0.0033 4.50 0.014640 0.118 0.98 3 8 0.0040 13 0.0033 4.50 0.014640 0.118 0.98 4 8 0.0040 17 0.0043 4.39 0.018637 0.133 1.05 5 6 0.0260 6 0.0015 4.87 0.007300 0.078 1.59 6 8 0.0040 27 0.0068 4.19 0.028262 0.162 1.19 7 8 0.0035 124 0.0310 3.59 0.111445 0.334 1.69 8 8 0.0035 140 0.0350 3.55 0.124307 0.355 1.74 8A 6 0.0100 7 0.0018 4.79 0.008386 0.105 1.18 8B 8 0.0035 12 0.0030 4.54 0.013622 0.118 0.91 9 8 0.0035 156 0.0390 3.51 0.137022 0.373 1.79 10 8 0.0035 172 0.0430 3.48 0.149608 0.391 1.83 11 8 0.0035 317 0.0793 3.27 0.259378 0.536 2.11 12 8 0.0151 14 0.0035 4.47 0.015649 0.089 1.59 13 8 0.0168 24 0.0060 4.24 0.025420 0.109 1.90 14 8 0.0168 24 0.0060 4.24 0.025420 0.109 1.90 15 8 0.0035 341 0.0853 3.25 0.276987 0.558 2.14 16 8 0.0132 6 0.0015 4.87 0.007300 0.064 1.19 17 8 0.0189 16 0.0040 4.41 0.017648 0.089 1.78 18 8 0.0189 16 0.0040 4.41 0.017648 0.089 1.78 19 8 0.0035 357 0.0893 3.23 0.288656 0.573 2.16 20 6 0.0100 6 0.0015 4.87 0.007300 0.098 1.13 21 8 0.0035 14 0.0035 4.47 0.015649 0.126 0.95 22 8 0.0035 26 0.0065 4.20 0.027318 0.165 1.12 23 8 0.0035 29 0.0073 4.16 0.030140 0.173 1.16 24 8 0.0035 90 0.0225 3.71 0.083521 0.288 1.56 25 8 0.0035 114 0.0285 3.63 0.103322 0.321 1.65 26 8 0.0035 116 0.0290 3.62 0.104952 0.324 1.66 27 8 0.0035 122 0.0305 3.60 0.109826 0.332 1.68 28 8 0.0035 132 0.0330 3.57 0.117895 0.345 1.71 29 8 0.0035 137 0.0343 3.56 0.121907 0.341 1.79 30 8 0.0035 145 0.0363 3.54 0.128295 0.361 1.75 Note: (1) Qa = 250 gpd/DU (2)Peaking Factor = 2.54 x (Qa [mgd])-0.1 (3) Qpeak = PF x (Qavg [mgd]) (4) FlowMaster Calculation I R V I N E , I N C. HUNSAKER & ASSOCIATES F:\0887\Engineering\SY_Sewer Study\Calcs\Sewer Calcs.xls 5/11/2021 6:15 AM FlowMaster Calcs 1 of 1 Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 1 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 1 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0100 ft/ft Diameter 6 in Discharge 0.0051 mgd Results Normal Depth 0.04 in Flow Area 0.01 ft² Wetted Perimeter 0.29 ft Top Width 0.28 ft Critical Depth 0.04 ft Percent Full 8.20 % Critical Slope 0.00874 ft/ft Velocity 1.02 ft/s Velocity Head 0.02 ft Specific Energy 0.06 ft Froude Number 1.07 Maximum Discharge 0.39 mgd Discharge Full 0.36 mgd Slope Full 0.00000 ft/ft Flow Type SuperCritical Project Description Worksheet:Reach 2 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0040 ft/ft Diameter 8 in Discharge 0.0146 mgd Results Normal Depth 0.08 in Flow Area 0.02 ft² Wetted Perimeter 0.47 ft Top Width 0.43 ft Critical Depth 0.07 ft Percent Full 11.80 % Critical Slope 0.00752 ft/ft Velocity 0.98 ft/s Velocity Head 0.01 ft Specific Energy 0.09 ft Froude Number 0.74 Maximum Discharge 0.53 mgd Discharge Full 0.49 mgd Slope Full 0.00000 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 2 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 3 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0040 ft/ft Diameter 8 in Discharge 0.0146 mgd Results Normal Depth 0.08 in Flow Area 0.02 ft² Wetted Perimeter 0.47 ft Top Width 0.43 ft Critical Depth 0.07 ft Percent Full 11.80 % Critical Slope 0.00752 ft/ft Velocity 0.98 ft/s Velocity Head 0.01 ft Specific Energy 0.09 ft Froude Number 0.74 Maximum Discharge 0.53 mgd Discharge Full 0.49 mgd Slope Full 0.00000 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 4 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0040 ft/ft Diameter 8 in Discharge 0.0186 mgd Results Normal Depth 0.09 in Flow Area 0.03 ft² Wetted Perimeter 0.50 ft Top Width 0.45 ft Critical Depth 0.08 ft Percent Full 13.30 % Critical Slope 0.00731 ft/ft Velocity 1.05 ft/s Velocity Head 0.02 ft Specific Energy 0.11 ft Froude Number 0.75 Maximum Discharge 0.53 mgd Discharge Full 0.49 mgd Slope Full 0.00001 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 3 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 5 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0260 ft/ft Diameter 6 in Discharge 0.0073 mgd Results Normal Depth 0.04 in Flow Area 0.01 ft² Wetted Perimeter 0.28 ft Top Width 0.27 ft Critical Depth 0.05 ft Percent Full 7.80 % Critical Slope 0.00839 ft/ft Velocity 1.59 ft/s Velocity Head 0.04 ft Specific Energy 0.08 ft Froude Number 1.73 Maximum Discharge 0.63 mgd Discharge Full 0.58 mgd Slope Full 0.00000 ft/ft Flow Type SuperCritical Project Description Worksheet:Reach 6 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0040 ft/ft Diameter 8 in Discharge 0.0283 mgd Results Normal Depth 0.11 in Flow Area 0.04 ft² Wetted Perimeter 0.55 ft Top Width 0.49 ft Critical Depth 0.09 ft Percent Full 16.20 % Critical Slope 0.00697 ft/ft Velocity 1.19 ft/s Velocity Head 0.02 ft Specific Energy 0.13 ft Froude Number 0.76 Maximum Discharge 0.53 mgd Discharge Full 0.49 mgd Slope Full 0.00001 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 4 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 7 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1114 mgd Results Normal Depth 0.22 in Flow Area 0.10 ft² Wetted Perimeter 0.82 ft Top Width 0.63 ft Critical Depth 0.19 ft Percent Full 33.40 % Critical Slope 0.00644 ft/ft Velocity 1.69 ft/s Velocity Head 0.04 ft Specific Energy 0.27 ft Froude Number 0.74 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00020 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 8 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1243 mgd Results Normal Depth 0.24 in Flow Area 0.11 ft² Wetted Perimeter 0.85 ft Top Width 0.64 ft Critical Depth 0.20 ft Percent Full 35.50 % Critical Slope 0.00642 ft/ft Velocity 1.74 ft/s Velocity Head 0.05 ft Specific Energy 0.28 ft Froude Number 0.73 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00025 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 5 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 9 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1370 mgd Results Normal Depth 0.25 in Flow Area 0.12 ft² Wetted Perimeter 0.88 ft Top Width 0.64 ft Critical Depth 0.21 ft Percent Full 37.30 % Critical Slope 0.00644 ft/ft Velocity 1.79 ft/s Velocity Head 0.05 ft Specific Energy 0.30 ft Froude Number 0.73 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00031 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 10 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1496 mgd Results Normal Depth 0.26 in Flow Area 0.13 ft² Wetted Perimeter 0.90 ft Top Width 0.65 ft Critical Depth 0.22 ft Percent Full 39.10 % Critical Slope 0.00646 ft/ft Velocity 1.83 ft/s Velocity Head 0.05 ft Specific Energy 0.31 ft Froude Number 0.73 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00037 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 6 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 11 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.2594 mgd Results Normal Depth 0.36 in Flow Area 0.19 ft² Wetted Perimeter 1.10 ft Top Width 0.66 ft Critical Depth 0.30 ft Percent Full 53.60 % Critical Slope 0.00674 ft/ft Velocity 2.11 ft/s Velocity Head 0.07 ft Specific Energy 0.43 ft Froude Number 0.69 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00110 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 12 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0151 ft/ft Diameter 8 in Discharge 0.0156 mgd Results Normal Depth 0.06 in Flow Area 0.02 ft² Wetted Perimeter 0.40 ft Top Width 0.38 ft Critical Depth 0.07 ft Percent Full 8.90 % Critical Slope 0.00738 ft/ft Velocity 1.59 ft/s Velocity Head 0.04 ft Specific Energy 0.10 ft Froude Number 1.39 Maximum Discharge 1.03 mgd Discharge Full 0.96 mgd Slope Full 0.00000 ft/ft Flow Type SuperCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 7 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 13 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0168 ft/ft Diameter 8 in Discharge 0.0254 mgd Results Normal Depth 0.07 in Flow Area 0.02 ft² Wetted Perimeter 0.45 ft Top Width 0.42 ft Critical Depth 0.09 ft Percent Full 10.90 % Critical Slope 0.00705 ft/ft Velocity 1.90 ft/s Velocity Head 0.06 ft Specific Energy 0.13 ft Froude Number 1.50 Maximum Discharge 1.09 mgd Discharge Full 1.01 mgd Slope Full 0.00001 ft/ft Flow Type SuperCritical Project Description Worksheet:Reach 14 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0168 ft/ft Diameter 8 in Discharge 0.0254 mgd Results Normal Depth 0.07 in Flow Area 0.02 ft² Wetted Perimeter 0.45 ft Top Width 0.42 ft Critical Depth 0.09 ft Percent Full 10.90 % Critical Slope 0.00705 ft/ft Velocity 1.90 ft/s Velocity Head 0.06 ft Specific Energy 0.13 ft Froude Number 1.50 Maximum Discharge 1.09 mgd Discharge Full 1.01 mgd Slope Full 0.00001 ft/ft Flow Type SuperCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 8 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 15 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.2770 mgd Results Normal Depth 0.37 in Flow Area 0.20 ft² Wetted Perimeter 1.12 ft Top Width 0.66 ft Critical Depth 0.31 ft Percent Full 55.80 % Critical Slope 0.00680 ft/ft Velocity 2.14 ft/s Velocity Head 0.07 ft Specific Energy 0.44 ft Froude Number 0.69 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00126 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 16 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0132 ft/ft Diameter 8 in Discharge 0.0073 mgd Results Normal Depth 0.04 in Flow Area 0.01 ft² Wetted Perimeter 0.34 ft Top Width 0.33 ft Critical Depth 0.05 ft Percent Full 6.40 % Critical Slope 0.00819 ft/ft Velocity 1.19 ft/s Velocity Head 0.02 ft Specific Energy 0.06 ft Froude Number 1.23 Maximum Discharge 0.97 mgd Discharge Full 0.90 mgd Slope Full 0.00000 ft/ft Flow Type SuperCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 9 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 17 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0189 ft/ft Diameter 8 in Discharge 0.0176 mgd Results Normal Depth 0.06 in Flow Area 0.02 ft² Wetted Perimeter 0.40 ft Top Width 0.38 ft Critical Depth 0.07 ft Percent Full 8.90 % Critical Slope 0.00737 ft/ft Velocity 1.78 ft/s Velocity Head 0.05 ft Specific Energy 0.11 ft Froude Number 1.56 Maximum Discharge 1.15 mgd Discharge Full 1.07 mgd Slope Full 0.00001 ft/ft Flow Type SuperCritical Project Description Worksheet:Reach 18 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0189 ft/ft Diameter 8 in Discharge 0.0176 mgd Results Normal Depth 0.06 in Flow Area 0.02 ft² Wetted Perimeter 0.40 ft Top Width 0.38 ft Critical Depth 0.07 ft Percent Full 8.90 % Critical Slope 0.00737 ft/ft Velocity 1.78 ft/s Velocity Head 0.05 ft Specific Energy 0.11 ft Froude Number 1.56 Maximum Discharge 1.15 mgd Discharge Full 1.07 mgd Slope Full 0.00001 ft/ft Flow Type SuperCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 10 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 19 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.2887 mgd Results Normal Depth 0.38 in Flow Area 0.21 ft² Wetted Perimeter 1.14 ft Top Width 0.66 ft Critical Depth 0.31 ft Percent Full 57.30 % Critical Slope 0.00684 ft/ft Velocity 2.16 ft/s Velocity Head 0.07 ft Specific Energy 0.45 ft Froude Number 0.68 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00137 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 8A Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0100 ft/ft Diameter 6 in Discharge 0.0084 mgd Results Normal Depth 0.05 in Flow Area 0.01 ft² Wetted Perimeter 0.33 ft Top Width 0.31 ft Critical Depth 0.06 ft Percent Full 10.50 % Critical Slope 0.00814 ft/ft Velocity 1.18 ft/s Velocity Head 0.02 ft Specific Energy 0.07 ft Froude Number 1.10 Maximum Discharge 0.39 mgd Discharge Full 0.36 mgd Slope Full 0.00001 ft/ft Flow Type SuperCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 11 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 8B Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.0136 mgd Results Normal Depth 0.08 in Flow Area 0.02 ft² Wetted Perimeter 0.47 ft Top Width 0.43 ft Critical Depth 0.07 ft Percent Full 11.80 % Critical Slope 0.00764 ft/ft Velocity 0.91 ft/s Velocity Head 0.01 ft Specific Energy 0.09 ft Froude Number 0.69 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00000 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 20 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0100 ft/ft Diameter 6 in Discharge 0.0073 mgd Results Normal Depth 0.05 in Flow Area 0.01 ft² Wetted Perimeter 0.32 ft Top Width 0.30 ft Critical Depth 0.05 ft Percent Full 9.80 % Critical Slope 0.00826 ft/ft Velocity 1.13 ft/s Velocity Head 0.02 ft Specific Energy 0.07 ft Froude Number 1.09 Maximum Discharge 0.39 mgd Discharge Full 0.36 mgd Slope Full 0.00000 ft/ft Flow Type SuperCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 12 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 21 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.0156 mgd Results Normal Depth 0.08 in Flow Area 0.03 ft² Wetted Perimeter 0.48 ft Top Width 0.44 ft Critical Depth 0.07 ft Percent Full 12.60 % Critical Slope 0.00750 ft/ft Velocity 0.95 ft/s Velocity Head 0.01 ft Specific Energy 0.10 ft Froude Number 0.70 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00000 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 22 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.0273 mgd Results Normal Depth 0.11 in Flow Area 0.04 ft² Wetted Perimeter 0.56 ft Top Width 0.49 ft Critical Depth 0.09 ft Percent Full 16.50 % Critical Slope 0.00701 ft/ft Velocity 1.12 ft/s Velocity Head 0.02 ft Specific Energy 0.13 ft Froude Number 0.72 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00001 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 13 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 23 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.0301 mgd Results Normal Depth 0.12 in Flow Area 0.04 ft² Wetted Perimeter 0.57 ft Top Width 0.50 ft Critical Depth 0.10 ft Percent Full 17.30 % Critical Slope 0.00699 ft/ft Velocity 1.16 ft/s Velocity Head 0.02 ft Specific Energy 0.14 ft Froude Number 0.72 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00001 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 24 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.0835 mgd Results Normal Depth 0.19 in Flow Area 0.08 ft² Wetted Perimeter 0.75 ft Top Width 0.60 ft Critical Depth 0.16 ft Percent Full 28.80 % Critical Slope 0.00647 ft/ft Velocity 1.56 ft/s Velocity Head 0.04 ft Specific Energy 0.23 ft Froude Number 0.74 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00011 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 14 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 25 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1033 mgd Results Normal Depth 0.21 in Flow Area 0.10 ft² Wetted Perimeter 0.80 ft Top Width 0.62 ft Critical Depth 0.18 ft Percent Full 32.10 % Critical Slope 0.00646 ft/ft Velocity 1.65 ft/s Velocity Head 0.04 ft Specific Energy 0.26 ft Froude Number 0.74 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00018 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 26 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1050 mgd Results Normal Depth 0.22 in Flow Area 0.10 ft² Wetted Perimeter 0.81 ft Top Width 0.62 ft Critical Depth 0.18 ft Percent Full 32.40 % Critical Slope 0.00646 ft/ft Velocity 1.66 ft/s Velocity Head 0.04 ft Specific Energy 0.26 ft Froude Number 0.74 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00018 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 15 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 27 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1098 mgd Results Normal Depth 0.22 in Flow Area 0.10 ft² Wetted Perimeter 0.82 ft Top Width 0.63 ft Critical Depth 0.19 ft Percent Full 33.20 % Critical Slope 0.00645 ft/ft Velocity 1.68 ft/s Velocity Head 0.04 ft Specific Energy 0.26 ft Froude Number 0.74 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00020 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 28 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1179 mgd Results Normal Depth 0.23 in Flow Area 0.11 ft² Wetted Perimeter 0.84 ft Top Width 0.63 ft Critical Depth 0.20 ft Percent Full 34.50 % Critical Slope 0.00643 ft/ft Velocity 1.71 ft/s Velocity Head 0.05 ft Specific Energy 0.28 ft Froude Number 0.73 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00023 ft/ft Flow Type SubCritical Tract 7337 Sewer System FlowMaster Calculations BASE.fm8 Project Engineer: Hunsaker & Associates Inc 5/11/2021 Bentley Systems, Inc. Haestad Methods Solution Center FlowMaster [08.01.058.00] 27 Siemons Company Drive Suite 200 W Page 16 of 16 Watertown, CT 06795 USA +1-203-755-1666 Project Description Worksheet:Reach 29 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0039 ft/ft Diameter 8 in Discharge 0.1219 mgd Results Normal Depth 0.23 in Flow Area 0.11 ft² Wetted Perimeter 0.83 ft Top Width 0.63 ft Critical Depth 0.20 ft Percent Full 34.10 % Critical Slope 0.00642 ft/ft Velocity 1.79 ft/s Velocity Head 0.05 ft Specific Energy 0.28 ft Froude Number 0.78 Maximum Discharge 0.52 mgd Discharge Full 0.49 mgd Slope Full 0.00024 ft/ft Flow Type SubCritical Project Description Worksheet:Reach 30 Flow Element:Circular Pipe Friction Method:Manning Formula Solve For:Normal Depth Input Data Roughness Coefficient 0.013 Channel Slope 0.0035 ft/ft Diameter 8 in Discharge 0.1283 mgd Results Normal Depth 0.24 in Flow Area 0.11 ft² Wetted Perimeter 0.86 ft Top Width 0.64 ft Critical Depth 0.20 ft Percent Full 36.10 % Critical Slope 0.00641 ft/ft Velocity 1.75 ft/s Velocity Head 0.05 ft Specific Energy 0.29 ft Froude Number 0.73 Maximum Discharge 0.50 mgd Discharge Full 0.46 mgd Slope Full 0.00027 ft/ft Flow Type SubCritical 5/∗5/∗5/∗5/∗ 2#6#)10+#9#; 2#6#)10+#9#;(145∋9∋45614/&4#+02.#055∋∋5∗∋∋62#6#)10+#9#; 21615+9#;2#6#)10+#9#;5∋∋5∗∋∋6%7<%19#;5∋∋64#%6/1∋0)19#;(145∋9∋45614/&4#+02.#0593DU's 93 DU's 12 DU's 12 DU's 12 DU's 145 DU's 2930 8B8A8B8A 2829292830292930 2928272625 252426252423 2322212020212223