HomeMy WebLinkAboutFMC 2024 INSTALLATION Appendix VI Underground Storage Tank Monitoring System Certification Form
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification, ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank,
VPH = Vacuum/Pressure/Hydrostatic
Page 1 of 6
TYPE OF ACTION ☒ Installation ☐ Repair ☐ 12 Month
1. FACILITY INFORMATION
CERS ID
10953907
Certification Date
8/19/2024
Facility Name
Loves #830
Facility Address
1500 Taft HWY
City
Bakersfield
ZIP Code
93307
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification
B&T Service Station Contractors
Phone
805-929-8944
Mailing Address
630 S. Frontage rd Nipomo
Service Technician Performing Test
Rick Binger
Contractor/Tank Tester License Number
902034
ICC Number
8452629
ICC Expiration Date
3/16/2025
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
Veeder Root B47631 4/21/2025
Redjacket B47631 02/09/2025
VMI 3950 11/03/2024
4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code
of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting
documentation is attached; and all information contained herein is accurate.
Service Technician Signature Date
8/19/2024
Total # of Pages
Underground Storage Tank Monitoring System Certification Form
Page 2 of 6
5. MONITORING SYSTEM AND PROGRAMMING
A separate Monitoring System Certification Form must be prepared for each control panel.
Make of Monitoring System
Control Panel
Veeder Root
Model of Monitoring System
Control Panel
TLS-450
Software Version Installed
342005-010-H-
Attach the post-certification reports if the monitoring system is capable of generating
either; ☒Monitoring System Set-up ☒ Alarm History Report Yes No NA
All monitoring equipment is operational per manufacturer’s specifications? ☒ ☐
Secondary containment systems are free of damage, debris, or liquid? ☒ ☐
Are the audible and visual alarms operational? ☒ ☐
All sensors have been: 1) visually inspected for wiring kinks, breaks and residual
buildup on floats; and 2) tested for functionality and confirmed operational? ☒ ☐ ☐
Are all sensors installed to detect a release at the earliest opportunity in the
secondary containment? ☒ ☐ ☐
The monitoring system set-up was reviewed, and proper settings confirmed? ☒ ☐ ☐
Was the monitoring control panel’s backup battery visually inspected, functionally tested, and confirmed operational? ☒ ☐ ☐
Does the flow of fuel stop at the dispenser if a release is detected in the under-dispenser containment? ☒ ☐ ☐
Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically disconnected? ☒ ☐ ☐
Does the turbine automatically shut down if the piping secondary containment
monitoring system detects a release? Which sensors initiate positive shut down?
(Check all that apply) ☒ Sump ☒ UDC
☒ ☐ ☐
If monitoring system alarms are relayed to a remote monitoring center, is all communication equipment operational? ☒ ☐ ☐
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Underground Storage Tank Monitoring System Certification Form
Page 3 of 6
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List “Sensor ID” as labeled in system
programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID Sensor Model Component(s) Monitored Pass Fail
L1 794380-304 Vent Box Innterstitia ☒ ☐
L2 794380-208 Vent Box sensor ☒ ☐
L3 794380-208 UDC 1-2 Sensor ☒ ☐
L4 794380-304 UDC 1-2 Interstitial ☒ ☐
L5 794380-208 UDC 5-6 Sensor ☒ ☐
L6 794380-304 UDC 5-6 Interstitial ☒ ☐
L7 794380-208 UDC 9-10 Sensor ☒ ☐
L8 794380-304 UDC 9-10 Interstitial ☒ ☐
L9 794380-208 UDC 13-14 Sensor ☒ ☐
L10 794380-304 UDC 13-14 Interstitial ☒ ☐
L11 794380-208 UDC 3-4 Sensor ☒ ☐
L12 794380-304 UDC 3-4 Interstitial ☒ ☐
L13 794380-208 UDC 7-8 Sensor ☒ ☐
L14 794380-304 UDC 7-8 Interstitial ☒ ☐
L15 794380-208 UDC 11-12 Sensor ☒ ☐
L16 794380-304 UDC 11-12 Interstitial ☒ ☐
L17 794380-208 UDC 15-16 Sensor ☒ ☐
L18 794380-304 UDC 15-16 Interstitial ☒ ☐
L19 794380-304 Premium STP sump Int ☒ ☐
L20 794380-304 Prem Fill Sump Inte ☒ ☐
L21 794380-208 Prem Fill Sump Sensor ☒ ☐
L22 794380-208 Diesel Fill Sump Sensor ☒ ☐
L23 794380-304 Diesel Fill Sump Int ☒ ☐
L24 794380-208 Diesel STP Sump Sensor ☒ ☐
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Underground Storage Tank Monitoring System Certification Form
Page 3 of 6
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List “Sensor ID” as labeled in system
programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID Sensor Model Component(s) Monitored Pass Fail
L25 794380-304 Diesel STP Interstitial ☒ ☐
L26 794380-304 Premium-Diesel Inter ☒ ☐
L27 794380-304 Premium STP Interstitial ☒ ☐
L28 794380-208 Unld STP sump Sensor ☒ ☐
L29 794380-304 Unld STP Sump Interstitial ☒ ☐
L30 794380-208 Unleaded Fill sump Sensor ☒ ☐
L31 794380-304 Unld Fill Sump interstitial ☒ ☐
L32 794380-304 Unleaded Inerstitial ☒ ☐
Vac 1 464-100 Premium Product Line ☒ ☐
Vac 2 464-100 Premium Vent Line ☒ ☐
Vac 3 464-100 Diesel Product Line ☒ ☐
Vac 4 464-100 Diesel Vent Line
vent ☒ ☐
Vac 5 464-100 Unlead Product Line ☒ ☐
Vac 6 464-100 Unleaded Vent Line ☒ ☐
Vac 7 464-100 Unld-Prem Vapor Line ☒ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Underground Storage Tank Monitoring System Certification Form
Page 4 of 6
7. LINE LEAK DETECTOR TESTING
☐ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.)
Simulated release rate verified: (Check all that apply.)
☒ 3 GPH ☐ 0.1 GPH ☐ 0.2 GPH Yes No NA
Has the testing apparatus been properly calibrated? ☒ ☐ ☐
For emergency generator tank systems, does the LLD create an audible and visual
alarm when a leak is detected? ☐ ☐ ☒
For mechanical LLDs, does the LLD restrict the flow through the pipe when a
release is detected? ☐ ☐ ☒
For electronic LLDs, does the turbine automatically shut off when a release is
detected? ☒ ☐ ☐
For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ☒ ☐ ☐
For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a tightness test? ☒ ☐ ☐
For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ☒ ☐ ☐
Were all items on the equipment manufacturer’s maintenance checklist completed? ☒ ☐ ☐
Were all LLDs confirmed operational within regulatory requirements? ☒ ☐ ☐
LLD ID LLD Model Lines Monitored Pass Fail
Tank 1 PLLD 87 Unleaded ☒ ☐
Tank 2 PLLD Aut Diesel ☒ ☐
Tank 3 PLLD Super ☒ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Underground Storage Tank Monitoring System Certification Form
Page 5 of 6
8. IN-TANK GAUGING TESTING
☒ Check this box if tank gauging is used only for inventory control.
☐ Check this box if NO tank gauging equipment is installed.
(Do not complete this section if either box is checked.)
Yes No NA
All wiring has been: 1) visually inspected for kinks, breaks and proper entry and termination; and 2) tested for ground faults? ☐ ☐ ☐
Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, and confirmed operational? ☐ ☐ ☐
Was accuracy of system’s product level readings tested? ☐ ☐ ☐
Was accuracy of system’s water level readings tested? ☐ ☐ ☐
Were all probes reinstalled properly? ☐ ☐ ☐
Were all items on the equipment manufacturer’s maintenance checklist completed? ☐ ☐ ☐
Probe ID Probe Model Tanks Monitored Pass Fail
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
☐ ☐
9. COMMENTS
Describe all answers marked “No” or “Fail” and proposed remedy.
List all monitoring equipment either replaced or repaired.
This is a start up on a new site.
Underground Storage Tank Monitoring System Certification Form
Page 6 of 6
10. MONITORING SITE PLAN
Date site plan was prepared:
If a site plan has been prepared that shows all required information, you may include it, rather than this page, with your Monitoring System Certification Form. The site plan must show the general layout of tanks and
identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include a legend for all symbols depicted.