Underground Storage Tank
Monitoring System Certification Form
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification,
ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-
Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank,
VPH = Vacuum/Pressure/Hydrostatic
Page 1 of 6
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month
1. FACILITY INFORMATION
CERS ID Certification Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code
of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting
documentation is attached; and all information contained herein is accurate.
Service Technician Signature Date Total # of Pages
10155971 08/08/2024
Jaco #7773 Fastrip #31
3501 Mt. Vernon Ave. Bakersfield 93306
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Billy Lane
1073967
10281488 03/15/2025
VR C33867 08/04/2025
08/08/2024 6Billy Lane
Underground Storage Tank
Monitoring System Certification Form
Page 2 of 6
5. MONITORING SYSTEM AND PROGRAMMING
A separate Monitoring System Certification Form must be prepared for each control panel.
Make of Monitoring System
Control Panel
Model of Monitoring System
Control Panel
Software Version Installed
Attach the post-certification reports if the monitoring system is capable of generating
either; ܆܆Monitoring System Set-up ܆܆ Alarm History Report Yes No NA
All monitoring equipment is operational per manufacturer’s specifications? ܆܆܆܆
Secondary containment systems are free of damage, debris, or liquid? ܆܆܆܆
Are the audible and visual alarms operational? ܆܆܆܆
All sensors have been: 1) visually inspected for wiring kinks, breaks and residual
buildup on floats; and 2) tested for functionality and confirmed operational? ܆܆܆܆܆܆
Are all sensors installed to detect a release at the earliest opportunity in the
secondary containment? ܆܆܆܆܆܆
The monitoring system set-up was reviewed, and proper settings confirmed? ܆܆܆܆܆܆
Was the monitoring control panel’s backup battery visually inspected, functionally
tested, and confirmed operational? ܆܆܆܆܆܆
Does the flow of fuel stop at the dispenser if a release is detected in the under-
dispenser containment? ܆܆܆܆܆܆
Does the turbine automatically shut down if the piping secondary containment
monitoring system fails to operate or is electrically disconnected? ܆܆܆܆܆܆
Does the turbine automatically shut down if the piping secondary containment
monitoring system detects a release? Which sensors initiate positive shut down?
(Check all that apply) ܆ Sump ܆ UDC
܆܆܆܆܆܆
If monitoring system alarms are relayed to a remote monitoring center, is all
communication equipment operational? ܆܆܆܆܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
VEEDER-ROOT TLS-350 336.02
Underground Storage Tank
Monitoring System Certification Form
Page 3 of 6
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List “Sensor ID” as labeled in system
programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID Sensor Model Component(s) Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
L1 420 UNL ANN
L2 420 DSL ANN
L3 N/A N/A
L4 208 UNL STP
L5 208 DSL STP
L6 208 PNL STP
L7 420 PNL ANN
L8 N/A N/A
L9 208 UDC 1-2
L10 208 UDC 3-4
L11 208 UDC 5-6
L12 208 UDC 7-8
L13 208 TRAN SUMP
Underground Storage Tank
Monitoring System Certification Form
Page 4 of 6
7. LINE LEAK DETECTOR TESTING
܆܆ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.)
Simulated release rate verified: (Check all that apply.)
܆܆ 3 GPH ܆܆ 0.1 GPH ܆܆ 0.2 GPH Yes No NA
Has the testing apparatus been properly calibrated? ܆܆ ܆܆ ܆܆
For emergency generator tank systems, does the LLD create an audible and visual
alarm when a leak is detected? ܆܆ ܆܆ ܆܆
For mechanical LLDs, does the LLD restrict the flow through the pipe when a
release is detected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off when a release is
detected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system is disabled or disconnected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system malfunctions or fails a tightness test? ܆܆ ܆܆ ܆܆
For electronic LLDs, have all accessible wiring connections been visually inspected
for kinks and breaks? ܆܆ ܆܆ ܆܆
Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆
Were all LLDs confirmed operational within regulatory requirements? ܆܆ ܆܆ ܆܆
LLD ID LLD Model Lines Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
T1 FX1V 87
T2 FX1V 91
T3 FX1DV DSL
Underground Storage Tank
Monitoring System Certification Form
Page 5 of 6
8. IN-TANK GAUGING TESTING
܆܆ Check this box if tank gauging is used only for inventory control.
܆܆ Check this box if NO tank gauging equipment is installed.
(Do not complete this section if either box is checked.)
Yes No NA
All wiring has been: 1) visually inspected for kinks, breaks and proper entry and
termination; and 2) tested for ground faults? ܆܆ ܆܆ ܆܆
Were all in-tank gauging probes visually inspected for damage and residue buildup
to ensure that floats move freely, functionally tested, and confirmed operational? ܆܆ ܆܆
Was accuracy of system’s product level readings tested? ܆܆ ܆܆ ܆܆
Was accuracy of system’s water level readings tested? ܆܆ ܆܆ ܆܆
Were all probes reinstalled properly? ܆܆ ܆܆ ܆܆
Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆
Probe ID Probe Model Tanks Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
9. COMMENTS
Describe all answers marked “No” or “Fail” and proposed remedy.
List all monitoring equipment either replaced or repaired.
܆܆
Underground Storage Tank
Monitoring System Certification Form
Page 6 of 6
10. MONITORING SITE PLAN
Date site plan was prepared:
If a site plan has been prepared that shows all required information, you may include it, rather than this page,
with your Monitoring System Certification Form. The site plan must show the general layout of tanks and
identify locations of the monitoring panel, and all leak detection equipment and monitoring locations. Include
a legend for all symbols depicted. PARKIN
G
175'EXISTING BUILDINGNO
PRICE SIGNMOUNT VERNON AVE.UNIVERSITY AVE.CATCHBASIN
N
94.2'50'117.5'180'HSTPL4
AL1
V
F
L11
G
W
PROPERTY LINE
PROPERTY LINEL12
L9L10
DUMPS
T
ER
L13
12,000 GALLONDIESEL 12,000 GALLONPREMIUM40' STORAGE C
ONTAINE
R
40' STORAGE C
ONTAINE
R
STPL5
AL2
V
F
STPL6
AL3
V
F
12,000 GALLON87 UNL
LEGEND
L1 87 ANNULAR
L2 DSL ANNULAR
L3 91 ANNULAR
L4 87 STP
L5 DSL STP
L6 91 STP
L9 UDC 1 - 2
L10 UDC 3 - 4
L11 UDC 5 - 6
L12 UDC 7 - 8
L13 TRANS SUMP
87 GAS 3/2 INCH DBL WALLED PIPE
91 GAS 3/2 INCH DBL WALLED PIPE
DIESEL 3/2 INCH DBL WALLED PIPE
VAPOR RETURN 3 AND 2 INCH SINGLE WALL PIPE
VAPOR VENT 2 INCH SINGLE WALLED PIPE
PRODUCT SPILL CONTAINER
VAPOR SPILL CONTAINER
ANNULAR
EMERGENCY SHUT-OFF
OVERFILL ALARM
FIRE EXTINGUISHER
GAS METER SHUT-OFF
WATER METER SHUT-SHUT OFF
HEALY CAS
EVACUATION MEETING POINT
CIRCUIT BREAKER
UST ELECTRICAL PANEL
AUTOMATIC TANK GAUGE
AIR AND WATER DISPENSER
HAZWASTE DRUM
W
G
A
H
P
V
SITE MAP SITE PLAN
C1
TAB:SITE PLAN
1"=10'-0"
INCHES012
SHEET SIZE 22 X 34
DATE REVISIONS
DATE:
DRAWN BY:
CHECKED:
APPROVED:
RAC FASTRIP - 7-773 CADFILE:
SHEET NO.7773-MSP
A.P.N.:382-020-16-00-8
SCALE:
FASTRIP FOOD STORECONVENIENCE MARKET FOR:
BAKERSFIELD, CALIFORNIA 93306
JAMIESON HILL
3501 MT VERNON AVE.
3101 STATE RDBAKERSFIELD, CA 93308
PROJECT OWNER:
DRAWING:
CD
10/13/2020
3501 MT VERNON AVE.BAKERSFIELD, CA 93306
MT VERNON AVE.UNIVERSITY AVE.
PROJECT OWNER:
JAMIESON HILL
PO. BOX 82515
BAKERSFIELD, CA 93380
CONTACT:
SITE PLOT PLAN FOR:
FACILITY ID 15-021-003018
CERS ID 10155971
FASTRIP #7773
3501 MT VERNON AVE.
BAKERSFIELD, CA 93306
10/13/2020 REV.
VICINITY MAP
PROJECT DATA
APPENDIX C-10
SHEAR VALVE OPERATION INSPECTION )DFLOLW\1DPH2ZQHU$GGUHVV$GGUHVV&LW\6WDWH=LS&RGH&LW\6WDWH=LS&RGH)DFLOLW\,'3KRQH7HVWLQJ&RPSDQ\3KRQH7KLVGDWDVKHHWLVIRULQVSHFWLQJVKHDUYDOYHVORFDWHGLQVLGHGLVSHQVHUV6HH3(,536HFWLRQIRUWKHLQVSHFWLRQSURFHGXUH3URGXFW*UDGH'LVSHQVHU,' 6KHDU9DOYH7\SH3URGXFW9DSRU,VWKHVKHDUYDOYHULJLGO\DQFKRUHGWRWKHGLVSHQVHUER[IUDPHRUGLVSHQVHULVODQG"<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R,VWKHVKHDUVHFWLRQSRVLWLRQHGEHWZHHQóLQFKDERYHRUEHORZWKHWRSVXUIDFHRIWKHGLVSHQVHULVODQG"<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R,VWKHOHYHUDUPIUHHWRPRYH"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$'RHVWKHOHYHUDUPVQDSVKXWWKHSRSSHWYDOYH"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$&DQDQ\SURGXFWEHGLVSHQVHGZKHQWKHSURGXFWVKHDUYDOYHLVFORVHG"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$$´1RµWR/LQHVRUD´<HVµIRU/LQHLQGLFDWHVDWHVWIDLOXUHTest Results3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLOComments:7HVWHU·V1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB7HVWHU·V6LJQDWXUHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB1ZHVWFR//& Jaco #7773 Fastrip #313501 Mt. Vernon Ave.Bakersfield101559713-47-8MPDMPDMPDMPD1-25-6ProductProductProductProductBilly LaneBilly Lane
Appendix VIII
Underground Storage Tank
Spill Container Testing Report Form
CERS = California Environmental Reporting System, ID = Identification, ICC = International Code
Council
Page 1 of 2
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month
1. FACILITY INFORMATION
CERS ID
Test Date
Facility Name
Facility Address
City
ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Test
Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number
ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. TEST PROCEDURE INFORMATION
Test Procedures Used Components Tested
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that each spill container was tested in accordance with California Code of
Regulations, title 23, division 3, chapter 16, section 2637.1; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date
Total # of Pages
10155971 08/08/2024
Jaco #7773 Fastrip #31
3501 Mt. Vernon Ave.Bakersfield 93306
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Billy Lane
1073967
10281488 03/15/2025
OPW 1193586 06/09/2025
PEI-1200
08/08/2024 2Billy Lane
Underground Storage Tank
Spill Container Testing Report Form
Additional copies of this page may be attached.
Page 2 of 2
6. SPILL CONTAINER DETAILS
Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer
Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic
Tank ID
Spill Container Manufacturer:
Method of Cathodic Protection ܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
Is the spill container minimum
capacity five gallons excluding
riser volume?
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
Method to keep spill container
empty
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
Spill Container Test Results ܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
Tank ID
Spill Container Manufacturer:
Method of Cathodic Protection ܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
Is the spill container minimum
capacity five gallons excluding
riser volume?
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
Method to keep spill container
empty
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
Spill Container Test Results ܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
1 8. COMMENTS
Describe all answers marked “Other,” “No,” or “Fail” and each proposed remedy.
* Mark here if:
Spill containers do not have a minimum capacity of five gallons and require replacement.
87
OPW
Due to time constraints unable to perform hydrostatic test on spill buckets.
91
OPW
DSL
OPW