HomeMy WebLinkAboutRES NO 109-2024RESOLUTION NO. 10 9- 2 0 2 4
A RESOLUTION DISPENSING WITH BIDDING UNDER
SECTION 3.20.060 OF THE BAKERSFIELD MUNICIPAL
CODE RELATING TO DESIGN/BUILD FOR THE
BAKERSFIELD POLICE DEPARTMENT TRAINING
FACILITY PROJECT.
RECITALS
WHEREAS, the use of design/build methodologies has been shown to be an
effective method of reducing construction costs; and
WHEREAS, the use of design/build joins the construction and design of a
project under one single legal entity thereby reducing conflicts; and
WHEREAS, the City Council believes the use of design/build is appropriate
for certain unique projects where specialized design or construction methods are
necessary or special design expertise must be employed; and
WHEREAS, the City Council believes the public and the procurement
process can be adequately protected through the use of a fair competitive
process for choosing a design/build entity which best serves the interests of the
City.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as
follows:
1. The above recitals are true and correct and are incorporated herein by
reference.
2. The Bakersfield Police Department Training Facility project is appropriate for
design/build because of the specialized nature of the design or
construction or because specialized design expertise must be employed.
3. The Bakersfield Police Department Training Facility project justifies an
exception to the bidding process and the City Council hereby determines
that the work, supplies, equipment and material can be best obtained
through the design/build construction procurement process.
- Page 1 of 3 Pages -
M:\Advanced Project Delivery\Projects\FY 2022-2023\P31300 - BPD Training
Facility\ResoBPDTrainingFaciltyDesignBuild.docx
-gA�Cg��'
o
0oRIGINAL
4. Upon adoption of this Resolution, the Public Works Director is authorized to
proceed with the design/build procurement process, as set forth in the
Bakersfield Municipal Code Section 3.20.060(D), et al, for the Bakersfield
Police Department Training Facility project.
5. The Public Works Director shall recommend a design/build entity that
combines appropriately licensed contracting, architectural and
engineering services, as needed, into one legal entity.
6. The Public Works Director shall invite no less than three appropriate
design/build entities to participate in the selection process.
7. The Public Works Director shall, in a timely manner, bring the contractor to
award of the project to the City Council for approval with a report setting
forth the reasons the award is recommended to the chosen design/build
entity.
EFITITITITIM
- Page 2 of 3 Pages -
M:\Advanced Project Delivery\Projects\FY 2022-2023\P31300 - BPD Training
Facility\ResoBPDTrainingFaciltyDesignBuild.docx
i HEREBY CERTIFY that the foregoing Resolution was passed and adopted
by the Council of the City of Bakersfield at a regular meeting thereof held on
AUj 1. k @& , by the following vote:
V v ✓ f/
(YF„4. COUNCIL MEMBERARIA-S; GONZALES, WEIR, SMITH, FREEMAN, GRAY, KAUR
NOES: COUNCIL MEMBER
ABSTAIN: COUNCIL MEMBER
BSENT- COUNCIL MEMBER AQACk5
APPROVED AU, .1 419'
By &A,.
KAREN K. GOH
Mayor
APPROVED AS TO FORM:
VIRGINIA GENNARO
City Attorney
81V-4
SHUA H. RUDNICK
puty City Attorney
"- b vl JW' "I -
J LIE DRIMAKIS, CPMC, MMC
CITY CLERK and Ex Officio of the
Council of the City of Bakersfield
- Page 3 of 3 Pages -