Loading...
HomeMy WebLinkAboutFMC 2024 REPAIRSWRCB, January 2002 Page ____ of ____ Secondary Containment Testing Report Form This form is intended for use by contractors performing periodic testing of UST secondary containment systems. Use the appropriate pages of this form to report results for all components tested. The completed form, written test procedures, and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name:Date of Testing: Facility Address: Facility Contact:Phone: Date Local Agency Was Notified of Testing : Name of Local Agency Inspector (if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: Technician Conducting Test: Credentials: CSLB Licensed Contractor SWRCB Licensed Tank Tester License Type:License Number: Manufacturer Training Manufacturer Component(s)Date Training Expires 3. SUMMARY OF TEST RESULTS Component Pass Fail Not Tested Repairs Made Component Pass Fail Not Tested Repairs Made If hydrostatic testing was performed, describe what was done with the water after completion of tests: CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING To the best of my knowledge, the facts stated in this document are accurate and in full compliance with legal requirements Technician’s Signature:________________________________________________ Date:_________________________ 1 2 Penske Bakersfield 09/03/2024 29296 E. Brundage Lane Site Manager (888) 972-7581 N/A N/A Jones Covey Group, Inc. Shawn Rodriguez A, B and Haz 804431 International Code of Council Service Technician #8412602 Exp:11/19/2024 UDC 3 - 1 Hour Pressure Test UDC 3 - 1 Hour Vacuum Test N/A 09/03/2024 SWRCB, January 2002 Page ____ of ____ SUMP ANNULAR TESTING Test Method Developed By: Sump Manufacturer Industry Standard Professional Engineer Other (Specify) Test Method Used: Pressure Vacuum Hydrostatic Other (Specify) Test Equipment Used: Equipment Resolution: Sump # Sump # Sump # Sump # Is Sump Liquid Filled?1 Yes No Yes No Yes No Yes No Type of Liquid Used: Sump Material: Sump Manufacturer: Penetration Type: Wait time between applying pressure/vacuum/water and starting test: Test Start Time: Initial Reading (RI): Test End Time: Final Reading (RF): Test Duration: Change in Reading (RF-RI): Pass/Fail Threshold or Criteria: Test Result: Pass Fail Pass Fail Pass Fail Pass Fail Was sensor removed for testing? Yes No NA Yes No NA Yes No NA Yes No NA Was sensor properly replaced and verified functional after testing? Yes No NA Yes No NA Yes No NA Yes No NA Comments – (include information on repairs made prior to testing, and recommended follow-up for failed tests) 1 Secondary containment systems where the continuous monitoring automatically monitors both the primary and secondary containment, such as systems that are hydrostatically monitored or under constant vacuum, are exempt from periodic containment testing. {California Code of Regulations, Title 23, Section 2637(a)(6)} 2 2 Vacuum & Pressure gauges / Vacuum pump / Nitrogen Good UDC 3 UDC 3 Propylene Glycol Propylene Glycol Fiberglass Fiberglass Western Fiberglass Western Fiberglass Fiberglass Fiberglass 15 Minutes 15 Minutes 12:00pm 1:15pm 2 Psi 20 inHg 1:00pm 2:15pm 2 Psi 20 inHg 1 hour 1 hour 0 Psi 0 inHg Pass/Fail Pass/Fail Verified sump integrity by conducting vacuum and pressure for 1 hour each. All monitoring fluid was reintroduced using manufacture installation instructions and verified to be at correct levels. All testing performed today passed.