HomeMy WebLinkAboutOPI 2024CERS = California Environmental Reporting System, ID = Identification, ICC = International Code
Council, OPE = Overfill Prevention Equipment
Page 1 of 2
TYPE OF ACTION Installation Repair 36 Month
1. FACILITY INFORMATION
CERS ID Inspection Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Inspection Phone
Mailing Address
Service Technician Performing Inspection
Contractor/Tank Tester License Number
ICC Number Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. INSPECTION PROCEDURES INFORMATION
Inspection Procedures Used Components Inspected
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING INSPECTION
I hereby certify that the OPE was inspected in accordance with California Code of
Regulations, title 23, division 3, chapter 16, section 2637.2; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date Total # of Pages
Additional copies of this page may be attached.
Attach tank chart(s), measurements, calculations, and In-Tank Setup report(s)
Page 2 of 2
6. OVERFILL PREVENTION EQUIPMENT DETAILS
Tank ID (one OPE per column)
Are both vent and tank riser piping
secondarily contained?
Yes
No
Yes
No
Yes
No
Yes
No
OPE Model
What is the OPE response when
activated?
(Check all that apply.)
Shut off
Flow
Restricts
Flow
Audible
Alarm
Visual
Alarm
Shut off
Flow
Restricts
Flow
Audible
Alarm
Visual
Alarm
Shut off
Flow
Restricts
Flow
Audible
Alarm
Visual
Alarm
Shut off
Flow
Restricts
Flow
Audible
Alarm
Visual
Alarm
Are flow restrictors installed on vent piping
that may interfere with the OPE operation?
Yes*
No
Yes*
No
Yes*
No
Yes*
No
At what level in the tank is the OPE set to
activate? (Inches from bottom of tank)
What is the percent capacity of the tank at
which the OPE activates?
Is the OPE in proper operating condition to
respond when the stored substance
reaches the designated regulatory level?
Yes
No
Yes*
No
Yes*
No
Yes*
No
7. SUMMARY OF TESTING RESULTS
OPE Inspection Results Pass
Fail
Pass
Fail
Pass
Fail
Pass
Fail
1
8. COMMENTS
Describe all answers marked “No” or “Fail” and proposed remedy.
List all monitoring equipment either replaced or repaired.
* Mark here if:
Flow restrictors interfere with overfill prevention and equipment repairs required.
CK #2701270
10/30/2024
T1 87
117.75
14,425
46.5
65
18.5
99.25
13,621
94.4
CK #2701270
10/30/2024
T2 91
117.75
11,849
47
61
14
103.75
11,171
94.2