HomeMy WebLinkAbout10.3.24 Final
BAKERSFIELD PLANNING COMMISSION
AGENDA
REGULAR MEETING
October 3, 2024, 5:30 p.m.
Council Chambers, City Hall, 1501 Truxtun Avenue
1.ROLL CALL
2.PLEDGE OF ALLEGIANCE
3.PUBLIC STATEMENTS
3.a Non-Agenda Item Public Statements
3.b Agenda Item Public Statements
4.CONSENT CALENDAR
4.a Approval of Planning Commission Minutes of September 5, 2024
Staff recommends approval.
5.CONSENT CALENDAR PUBLIC HEARINGS
5.a General Plan Amendment and Zone Change 23-0330
Swanson Engineering, Inc. representing of Leah Volkoff (property owner), is
proposing a General Plan Amendment (GPA) and Zone Change (ZC) on
approximately 6.18 acres generally located on the northwest corner of Rosedale
Highway and Sablewood Drive. The request includes: (1) an amendment of the Land
Use Element of the Metropolitan Bakersfield General Plan land use designation from
OC (Office Commercial) to HR (High Density Residential); and (2) a change in zone
classification from C-O/PCD (Commercial Office/ Planned Commercial Development)
to R-3 (Multiple-Family Dwelling). A Mitigated Negative Declaration will also be
considered. (Ward 5).
Staff recommends approval.
5.b Zone Change No. 22-0025
Swanson Engineering, Inc. representing FBT, INC. (property owner), is proposing a
Zone Change from M-3 (Heavy Manufacturing) to M-2 (General Manufacturing) zone
district on approximately 69 acres located at 75 E. White Lane and 2572 S. Union
Avenue to facilitate the continued operation of a trucking yard consisting of 1,202
truck parking spaces. A Mitigated Negative Declaration will also be considered.
(Ward 1).
Staff recommends approval.
5.c Tentative Parcel Map 12522
DeWalt Corp., representing Michael Duncan, et.al., Trustees of the D.C. Duncan
Family Trust (property owner), is proposing to subdivide 20 acres into 7 parcels in a
C-1/PCD (Neighborhood Commercial/Planned Commercial Development) zone
district located at the southeast corner of McCutchen Road and Ashe Road. The
project includes a request waiver of mineral rights signatures pursuant to BMC
16.20.060.A.1. Use of a previously adopted Negative Declaration will also be
considered. (Ward 7).
Staff recommends approval.
6.NON-CONSENT PUBLIC HEARINGS
6.a GPA ZC SPA No. 19-0342 McAllister Ranch Groundwater Banking Project
Buena Vista Water Storage District, representing the Rosedale Rio Bravo Water
Storage District, is proposing a General Plan Amendment (GPA) and Zone Change
(ZC) on 2,072 acres located at the northwest corner of the Panama Lane and South
Allen Road Intersection. The request includes: (1) an amendment of the Land Use
Element of the Metropolitan Bakersfield General Plan (MGBP) land use designation
from SR (Suburban Residential), LR (Low Density Residential), LMR (Low Medium
Density Residential), HMR (High Medium Density Residential), HR (High Density
Residential), and GC (General Commercial) to R-EA (Resource – Extensive), (2)
Specific Plan Amendment to rescind the McAllister Ranch Specific Plan; (3) an
amendment of the Circulation Element of the MBGP to remove all McAllister Ranch
interior street alignments approved by Resolution 094-07, (4) an amendment to the
Housing Element of the MBGP to remove the housing units approved with the
McAllister Ranch Specific Plan from the City’s Vacant Land Inventory, and (5) a
change in zone classification from R-1 (One Family Dwelling), E (Estate), R-2/PUD
(Limited Multiple Family Dwelling/Planned Unit Development), R-3/PUD (Multiple
Family Dwelling/Planned Unit Development), C-1/PCD (Neighborhood
Commercial/Precise Commercial Development), C-C-/PCD-PE (Commercial
Center/Precise Commercial Development-Petroleum Extraction Combining) and DI
(Drill Island) to A-WR (Agriculture-Water Recharge Combining). An Environmental
Impact Report will also be considered. (Ward 5).
Staff recommends certification of the Final EIR and approval of the project and
recommends same to City Council.
7.REPORTS
Public comments on each Report item will be received after Staff's presentation.
8.DEFERRED BUSINESS
Public comments on each Deferred Business item will be received after Staff’s presentation.
9.NEW BUSINESS
Public comments on each New Business item will be received after Staff's presentation.
10.COMMUNICATIONS
11.COMMISSIONER COMMENTS
12.ADJOURNMENT
Page 2 of 2