Loading...
HomeMy WebLinkAboutTract 6880 Ph 3 & a portion of Ph 4 Hydraulics Report24-2000058212/4/2024 24-20000582 12/4/2024 2 Table of Contents 1.0 PURPOSE ............................................................................................................... 3 2.0 GUIDELINES .......................................................................................................... 3 3.0 DESIGN APPROACH ............................................................................................. 3 4.0 CONCLUSION AND RECOMMENDATIONS .......................................................... 43 Hydrology Calculations ........................................................................... back of report Hydraulic Calculations and Pipe Profiles ................................................. back of report Drainage Exhibit ...................................................................... sleeve in back of report Reference ............................................................................................... back of report 24-20000582 12/4/2024 3 1.0 PURPOSE The purpose for this drainage study is as follows: 1. To size the pipes for the proposed storm drainage system in accordance with the City of Bakersfield requirements and guidelines. 2. To provide an economical and reasonable design for storm drain conveyance and disposal facilities. 3. To supplement the Hydrology Study dated December 2023 which verified the curb capacity & sump size. 2.0 GUIDELINES The following design standards were used in the development of this study: 1. Initial times to concentration (roof to gutter) are 15 minutes for R-1 Development. 2. Approximately 100% of the site is Soil Group A – Kimberlina fine sandy loam, 0-2 percent slopes. The soil group was obtained from the US Department of Agriculture Soils Survey. A Soil Map is enclosed with this report. 3. The runoff coefficients used are: · 0.38 - R-1, 7500 SF · 0.40 - R-1, 6750 SF · 0.42 - R-1, 6000 SF · 0.85 - Pavement w/ Landscaping 3. Rainfall intensity curves used are those shown on Plate D-1 of the City of Bakersfield, Subdivision & Engineering Manual. 4. Sub-areas using multiple run-off coefficients are given a weighted average based on the area relative to each coefficient. 3.0 DESIGN APPROACH Catch Basin #1 will collect from Drainage Area 1 located at the T-intersection of Tarbert Ferry Avenue and Mykonos Street. A series of 18” RCP lines (Pipes M to Q) along Tarbert Ferry Avenue and Mykonos Street will convey this discharge towards Manhole (MH) #4 on Twelve Bens Avenue. Drainage Area 2 has a flow path is greater than one thousand feet thus will have analysis which will flowby into CB #2. This runoff will confluence at MH-4 with the discharge from Pipe M and conveys easterly through an 18” RCP” line (Pipe L) into MH-5. Drainage Areas 2 & 3 will discharge into two catch basins (CB #2 & #3) located at the T-intersection of Twelve Bens Avenue & Coltswold Way. Drainage Area 3 has been broken up into two parts (Areas 3A & 3B) since the longest flow path is greater than one thousand feet into CB #3. A portion of Drainage Areas 2 & 3 will consist of the southerly side of the residential lots along Blackwater Valley Drive, future Phase 2. The discharge from this cumulative area will flow downstream through Pipe K to MH-6 where it will confluence with at the runoff from Drainage Area 4.Catch Basin #4 will collect discharge at the northwesterly corner at the intersection of Coltswold Way & Glendalough Avenue from this area. Drainage Area 5 has been broken up into two parts (Areas 5A & 5B) since the longest flow path is greater than one thousand feet into CB #5. This catch basin will be the confluence point for the two drainage areas at the T-intersection of Glendalough Avenue & Rossaveel Way. Drainage Area 5A consists of the residential lots along Blackwater Valley Drive, Twelve Bens Avenue, and Coltswold Way. Most of the lots along Glendalough Avenue comprises Drainage Area 5B. The flows form this area and Pipe J will confluence at MH-7 will convey down Rossaveel Way to MH-8 through Pipe I, an 18” RCP. Catch Basin #6 will collect discharge at the northwesterly corner at the intersection of Rossaveel Way & Gregans Castle Avenue from Area 6. This runoff will confluence at MH-8 with the discharge from Pipe I and conveys easterly an 18” RCP” line (Pipe H) into MH-9. Drainage Area 7 consists of the residential lots along Glendalough Avenue, and Rossaveel Way. This area will flow into CB #7 located at the T-intersection of Gregans Castle Avenue and Troy Island Way. These flows will confluence at MH-9 will convey 24-20000582 12/4/2024 4 down Troy Island Way to MH-10 through Pipe G, 24” RCP. Two catch basins (CB #8 & CB #9) will also be located at this intersection to collect runoff from Drainage Areas 8 & 9. The cumulative runoff of Areas 1-9 is conveyed southerly towards MH-11 via a 24” RCP, Pipe F. Two catch basins (CB #10 & CB #11) will be located on Ballingarry Avenue at the intersection with Troy Island Way and handle the runoff from Drainage Areas 10 & 11. The runoff from Area 10 will confluence with the upstream flow, in Pipe F at MH-11 then convey it easterly through an 24” RCP” line (Pipe E) into MH-12. The discharge produced by these Areas will be conveyed through a series of 36” lines (Pipes C & D) to MH-15, towards the knuckle of Ballingarry Avenue. Drainage Areas 13 will discharge into a catch basin (CB #12) located at the T-intersection of Achill Island Way and Ballingarry Avenue. The flow from this area will discharge directly into MH- 15 were it will confluence with the upstream flow in Pipe C. Catch Basin #13 will collect from Drainage Area 12 (residential lots along Blackwater Valley Drive) located adjacent to the sump at the knuckle of Ballingarry Avenue. This catch basin will be the confluence point for the entire watershed discharge and drain directly into the sump through 36” storm drain lines (Pipe BB & A).Off- Off-site Drainage Areas 14, 15, and 16 (CB #14, CB #15 & CB #16) will discharge into catch basins located along McCutchen Road which will be part of a separate drainage system from the on-site storm drain. The discharge from the future commercial lot next to this site will discharge into a different sump and be analyzed in a separate study. The flows for the sizing of the pipes were estimated utilizing the City of Bakersfield Rational Method in accordance with the Subdivision Standards. Flows were computed for the 10-year event using the formula Q = CIA, where Q is the flow in cubic feet per second, C is the runoff coefficient, I is the intensity in inches per hour, and A is the catchment’s area in acres. Since the main purpose of this report is the storm drain system leading to the basin and the curb capacities were determined based the 5-year storm event. 4.0 CONCLUSION AND RECOMMENDATIONS The flows from the 10-year event were calculated and routed. All the pipes in this system were sized to be 18” RCP, 24” RCP, and 30” RCP. The HGL is not less than 0.5’ below the existing grade at any proposed manhole and catch basin. An addendum may be necessary to accurately reflect any future proposed grading and improvement plan set. The main objectives of this study were to design an economical storm drain system and meet the design standards set by the City of Bakersfield. The storm drain system will be able to handle a 10-year event. 24-20000582 12/4/2024 HYDROLOGY CALCULATIONS 24-20000582 12/4/2024 CITY OF BAKERSFIELD RATIONAL METHOD (In accordance with City of Bakersfield Standards) TABLE OF RUNOFF COEFFICIENTS R-1, 6000 SF 0.42 JOB TITLE:Tract 6880 - Phase 3 & a portion of Phase 4 R-1, 6750 SF 0.4 DATE:Oct-24 R-1, 7500 SF 0.38 R-1, 10000 SF 0.34 Rational Values:R-1, 15000 SF 0.27 Event: 10 YEAR Values: 5, 10, 50 R-3, R-4, M-H 0.8 M.A.P. 6 in./yr. Values: 6, 10, 15, 20, 25, 30 Commercial 0.9 Water Well Site 0.1 Curve Values Parks 0.15 a: 2.38 I=a+bTc (Tc<20min.) Grasslands, Type A Soil 0.15 b: -0.058 Grasslands, Type B Soil 0.25 P60: 0.550 I=K1*(6.02*Tc)^(0.17*LN(p60/K1) Grasslands, Type C Soil 0.35 K1: 40.00 (Tc>=20min.) Grasslands, Type D Soil 0.45 Pavement with Landscaping 0.85 Backyards 0.05 Lawn-landscape 2% slope 0.10 0.17 Lawn-landscape 2-7% slope 0.15 0.22 SUBAREA C I A rslt Tc L dH Sg Q Street V Trial Tc Roof to Tm D Curb NAME Runoff Intensity Total Time Length Elev. Gutter Flow Type Vel. MIN. Gutter Travel Pipe Cap Coef. IN/HR Area Conc. Feet Diff. Slope CFS FPS Time Time Dia. In AC. MIN. Feet Ft/Ft MIN. MIN. In. AREA 1 0.40 1.31 2.45 18.41 328 0.83 0.25% 1.28 60 1.60 18.41 15 3.41 3.52 PIPE Q 15 0.73 0.34 18 18.75 PIPE P 0.40 1.29 2.45 53 1.26 0.72 18.75 1.23 18 19.99 PIPE N 0.40 1.22 2.45 280 1.19 0.68 19.99 6.90 18 26.89 PIPE M 0.40 0.98 2.45 235 0.96 0.54 26.89 7.18 18 34.08 AREA 2 0.39 1.09 5.81 23.22 1000 3.55 0.36% 2.50 60 2.03 23.22 15 8.22 4.11 FL from AREA 2 TO CB 2 312 2.03 2.57 AREA 2 (Routed)0.39 1.01 5.81 25.79 2.32 25.79 4.04 AREA 2 (Total)0.39 1.01 5.81 25.79 2.32 1.74 25.79 4.21 PIPE R 25 1.31 0.32 18 26.10 PIPE L 0.40 0.83 8.26 43 2.70 1.53 34.08 0.47 18 34.55 AREA 3A 0.42 1.15 2.43 21.63 630 1.50 0.24% 1.17 60 1.58 21.63 15 6.63 3.42 FL from AREA 3A TO CB 3 334 1.58 3.51 AREA 3A (Routed)0.42 1.03 2.43 25.14 1.05 25.14 3.31 AREA 3B 0.42 1.17 4.25 21.10 630 1.50 0.24% 2.07 60 1.72 21.10 15 6.10 4.11 AREA 3 (Total)0.42 1.03 6.68 25.14 2.88 1.79 25.14 4.43 PIPE S 23 1.63 0.24 18 25.38 Tc CALCULATIONS Tract 6880 - Phase 3 & a portion of Phase 4 Hydrology_10_yr.xls McIntosh Associates 10800 Stockdale Hwy, Ste. 103 Bakersfield, CA 93311 10 yr Calc 24-20000582 12/4/2024 SUBAREA C I A rslt Tc L dH Sg Q Street V Trial Tc Roof to Tm D Curb NAME Runoff Intensity Total Time Length Elev. Gutter Flow Type Vel. MIN. Gutter Travel Pipe Cap Coef. IN/HR Area Conc. Feet Diff. Slope CFS FPS Time Time Dia. In AC. MIN. Feet Ft/Ft MIN. MIN. In. Tract 6880 - Phase 3 & a portion of Phase 4 PIPE K 0.41 0.82 14.94 280 4.96 2.81 34.55 1.66 18 36.21 AREA 4 0.42 1.33 1.44 18.15 287 0.60 0.21% 0.80 60 1.51 18.15 15 3.15 3.08 PIPE T 46 0.45 1.70 18 19.85 PIPE J 0.41 0.79 16.38 150 5.27 2.98 36.21 0.84 18 37.05 AREA 5A 0.41 1.04 4.05 24.88 1000 2.32 0.23% 1.73 60 1.69 24.88 15 9.88 3.93 FL from AREA 5A TO CB 5 366 1.69 3.62 AREA 5A (Routed)0.41 0.94 4.05 28.50 1.56 28.50 3.78 AREA 5B 0.42 1.30 1.42 18.61 327 0.66 0.20% 0.77 60 1.51 18.61 15 3.61 3.05 AREA 5 (Total)0.41 0.94 5.47 28.50 2.13 1.73 28.50 4.13 PIPE U 15 1.20 0.21 18 28.71 PIPE I 0.41 0.78 21.85 280 6.94 3.93 37.05 1.19 18 38.24 AREA 6 0.42 1.16 3.64 21.43 715 2.17 0.30% 1.77 59 1.85 21.43 15 6.43 3.85 PIPE V 48 1.00 0.79 18 22.22 PIPE H 0.41 0.76 25.49 155 7.94 4.49 38.24 0.57 18 38.81 AREA 7 0.42 1.12 4.24 22.40 762 2.00 0.26% 2.00 60 1.72 22.40 15 7.40 4.08 PIPE W 16 1.13 0.24 18 22.64 PIPE G 0.41 0.75 29.73 55 9.19 2.93 38.81 0.31 24 39.13 AREA 8 0.40 1.10 4.63 22.89 814 2.20 0.27% 2.05 60 1.72 22.89 15 7.89 4.10 PIPE X 15 1.16 0.22 18 23.11 AREA 9 0.42 1.13 3.65 22.29 971 4.43 0.46% 1.73 60 2.22 22.29 15 7.29 3.48 PIPE O 25 0.98 0.43 18 22.72 PIPE F 0.41 0.75 38.01 225 11.67 3.71 39.13 1.01 24 40.14 Hydrology_10_yr.xls McIntosh Associates 10800 Stockdale Hwy, Ste. 103 Bakersfield, CA 93311 10 yr Calc 24-20000582 12/4/2024 SUBAREA C I A rslt Tc L dH Sg Q Street V Trial Tc Roof to Tm D Curb NAME Runoff Intensity Total Time Length Elev. Gutter Flow Type Vel. MIN. Gutter Travel Pipe Cap Coef. IN/HR Area Conc. Feet Diff. Slope CFS FPS Time Time Dia. In AC. MIN. Feet Ft/Ft MIN. MIN. In. Tract 6880 - Phase 3 & a portion of Phase 4 AREA 10 0.57 1.20 3.72 20.52 582 1.30 0.22% 2.52 60 1.76 20.52 15 5.52 4.29 PIPE Y 51 1.42 0.60 18 21.12 PIPE E 0.42 0.73 41.73 55 13.00 4.14 40.14 0.22 24 40.36 AREA 11 0.58 1.27 3.01 19.06 467 1.37 0.29% 2.23 60 1.92 19.06 15 4.06 4.11 PIPE Z 25 1.26 0.33 18 19.39 PIPE D 0.44 0.73 44.74 284 14.23 2.90 40.36 1.63 30 41.99 PIPE C 0.44 0.71 44.74 417 13.82 2.82 41.99 2.47 30 44.46 AREA 13 0.38 1.32 2.35 18.30 414 2.68 0.65% 1.18 60 2.09 18.30 15 3.30 3.12 PIPE AA 15 0.67 0.38 18 18.68 AREA 12 0.39 1.18 3.42 20.96 734 3.10 0.42% 1.59 60 2.05 20.96 15 5.96 3.51 PIPE B 25 0.90 0.46 18 21.42 PIPE BB 0.43 0.68 50.51 56 14.78 3.01 44.46 0.31 30 44.77 PIPE A 0.43 0.68 50.51 75 14.71 3.00 44.77 0.42 30 45.19 AREA 14 0.85 1.80 1.32 10.00 586 1.64 0.28% 2.02 60 1.90 10.00 0 5.13 4.03 PIPE 7 14 1.14 0.20 18 10.20 PIPE 6 0.85 1.79 1.32 56 2.01 1.14 10.20 0.82 18 11.02 PIPE 5 0.85 1.74 1.32 323 1.95 1.11 11.02 4.87 18 15.89 AREA 15 0.85 1.80 1.03 10.00 458 1.14 0.25% 1.58 60 1.66 10.00 0 4.60 3.79 PIPE 8 18 0.89 0.34 18 10.34 Hydrology_10_yr.xls McIntosh Associates 10800 Stockdale Hwy, Ste. 103 Bakersfield, CA 93311 10 yr Calc 24-20000582 12/4/2024 SUBAREA C I A rslt Tc L dH Sg Q Street V Trial Tc Roof to Tm D Curb NAME Runoff Intensity Total Time Length Elev. Gutter Flow Type Vel. MIN. Gutter Travel Pipe Cap Coef. IN/HR Area Conc. Feet Diff. Slope CFS FPS Time Time Dia. In AC. MIN. Feet Ft/Ft MIN. MIN. In. Tract 6880 - Phase 3 & a portion of Phase 4 PIPE 4 0.85 1.46 2.35 404 2.91 1.65 15.89 4.09 18 19.98 PIPE 3 0.85 1.22 2.35 404 2.44 1.38 19.98 4.89 18 24.86 PIPE 2 0.85 1.04 2.35 12 2.08 1.18 24.86 0.17 18 25.03 AREA 16 0.85 1.80 0.85 10.00 350 1.14 0.33% 1.31 60 1.84 10.00 0 3.18 3.34 PIPE 1 0.85 1.03 3.20 67 2.82 1.59 25.03 0.70 18 25.73 Required Sump Capacity = 0.15 x C x A = 3.67 ac-ft C = 0.45 A= 53.71 acres Hydrology_10_yr.xls McIntosh Associates 10800 Stockdale Hwy, Ste. 103 Bakersfield, CA 93311 10 yr Calc 24-20000582 12/4/2024 HYDRAULIC CALCULATIONS AND PIPE PROFILES 24-20000582 12/4/2024 TRACT 6880 - PHASE 1 HYDRAULIC CALCULATIONS (OUTPUT) Pipe Pipe Pipe Flow Avg. Capacity Invert HGL Velocity Velocity EGL Sf Invert No. Length Size Rate Velocity Flowing Down Down Down Head Down Down Down Up (ft)(in)(cfs)(ft/s)Full (cfs)(ft)(ft)(ft/s)(ft)(ft)(%)(ft) PIPE 1 66.57 18 2.82 1.60 9.10 332.50 337.00 1.60 0.04 337.04 0.072 333.00 PIPE 2 12.00 18 2.08 1.18 4.29 332.57 337.06 1.18 0.02 337.08 0.039 332.59 PIPE 3 404.04 18 2.44 1.38 3.54 332.59 337.08 1.38 0.03 337.11 0.054 333.05 PIPE 4 404.04 18 2.91 1.65 8.74 333.05 337.30 1.65 0.04 337.35 0.077 335.85 PIPE 5 322.63 18 1.95 2.06 3.56 342.30 343.09 2.06 0.07 343.16 0.115 342.67 PIPE 6 55.83 18 2.01 1.95 3.97 342.67 343.53 1.91 0.06 343.59 0.093 342.75 PIPE 7 14.00 18 2.02 1.90 6.27 342.75 343.64 1.85 0.05 343.69 0.084 342.80 PIPE 8 18.00 18 1.58 2.70 5.53 342.95 343.50 2.70 0.11 343.61 0.278 343.00 Pipe Pipe Pipe Flow Avg.Capacity Invert HGL Velocity Velocity EGL Sf Invert No. Length Size Rate Velocity Flowing Down Down Down Head Down Down Down Up (ft) (in) (cfs) (ft/s) Full (cfs) (ft) (ft) (ft/s) (ft) (ft)(%) (ft) PIPE A 75.06 30 14.71 2.99 38.16 332.50 337.00 3.00 0.14 337.14 0.129 333.15 PIPE BB 56.04 30 14.78 3.02 57.46 333.15 337.24 3.02 0.14 337.38 0.13 334.25 PIPE B 25.00 18 1.59 2.57 17.57 336.70 337.45 1.81 0.17 337.62 0 337.40 PIPE C 416.88 30 13.82 3.01 13.77 335.03 337.26 2.99 0.14 337.40 0.101 335.50 PIPE D 284.09 30 14.23 2.90 12.17 335.50 338.00 2.90 0.13 338.13 0.12 335.75 PIPE E 55.00 24 13.00 4.14 15.25 335.75 338.47 4.14 0.27 338.74 0.331 336.00 PIPE F 225.00 24 11.67 3.72 15.08 336.00 338.92 3.72 0.21 339.14 0.266 337.00 PIPE G 55.00 24 9.19 2.93 9.64 337.00 339.73 2.93 0.13 339.87 0.166 337.10 PIPE H 155.00 18 7.94 4.50 8.00 337.10 339.96 4.50 0.31 340.27 0.573 338.00 PIPE I 280.00 18 6.94 3.93 7.81 338.00 341.16 3.93 0.24 341.40 0.437 339.55 PIPE J 150.00 18 5.27 2.98 7.91 339.55 342.63 2.98 0.14 342.76 0.252 340.40 PIPE K 280.00 18 4.96 2.81 3.66 340.40 343.14 2.81 0.12 343.26 0.223 340.74 PIPE L 43.00 18 2.70 1.53 3.92 340.74 343.89 1.53 0.04 343.93 0.066 340.80 PIPE M 234.75 18 0.96 0.54 4.44 340.80 343.95 0.54 0.00 343.96 0.008 341.22 PIPE N 280.00 18 1.19 0.68 4.48 341.22 343.98 0.68 0.01 343.99 0.013 341.73 PIPE O 25.42 18 1.73 1.10 3.64 338.47 339.73 1.09 0.02 339.75 0.026 338.50 PIPE P 53.00 18 1.26 0.71 4.33 341.73 344.02 0.71 0.01 344.03 0.014 341.82 PIPE Q 15.00 18 1.28 0.72 4.70 341.82 344.04 0.72 0.01 344.05 0.015 341.85 PIPE R 25.00 18 2.32 1.31 3.64 340.80 343.95 1.31 0.03 343.98 0.049 340.83 PIPE S 23.24 18 2.88 1.63 3.77 340.74 343.89 1.63 0.04 343.93 0.075 340.77 PIPE T 46.41 18 0.80 0.45 3.73 340.40 343.14 0.45 0.00 343.14 0.006 340.46 PIPE U 15.00 18 2.13 1.21 3.83 339.75 342.63 1.21 0.02 342.65 0.041 339.77 PIPE V 47.57 18 1.77 1.00 3.44 338.95 341.16 1.00 0.02 341.18 0.028 339.00 PIPE W 16.20 18 2.00 1.16 3.84 338.55 339.96 1.16 0.02 339.98 0.031 338.57 PIPE X 15.42 18 2.05 1.31 3.83 338.48 339.73 1.30 0.03 339.76 0.037 338.50 PIPE Y 51.07 18 2.52 2.20 3.60 339.30 340.23 2.20 0.08 340.30 0.117 339.36 PIPE Z 25.00 18 2.23 2.62 4.70 339.35 340.08 2.62 0.11 340.18 0.2 339.40 PIPE AA 15.00 18 1.18 2.67 6.06 340.60 341.05 2.67 0.11 341.16 0.333 340.65 24-20000582 12/4/2024 TRACT 6880 - PHASE 1 HYDRAULIC CALCULATIONS (OUTPUT) Pipe HGL Grnd/Rim Cover Velocity Velocity EGL Sf Sf Energy J-Loss Minor No. Up Elev. Up Up Up Head Up Up Up Avg. Loss Coeff Loss (ft)(ft)(ft)(ft/s)(ft)(ft)(%)(%)(ft)(ft) PIPE 1 337.05 347.50 13.00 1.60 0.04 337.09 0.072 0.072 0.048 0.18 0.01 PIPE 2 337.06 347.78 13.69 1.18 0.02 337.08 0.039 0.039 0.005 1 0.02 PIPE 3 337.30 348.78 14.23 1.38 0.03 337.33 0.054 0.054 0.218 0.15 0 PIPE 4 337.61 348.12 10.77 1.65 0.04 337.66 0.077 0.077 0.31 1 0.04 PIPE 5 343.46 348.44 4.27 2.06 0.07 343.53 0.115 0.115 0.37 1 0.07 PIPE 6 343.58 347.59 3.34 1.99 0.06 343.64 0.104 0.099 0.055 1 0.06 PIPE 7 343.65 347.28 2.98 1.96 0.06 343.71 0.099 0.092 0.013 1 0.06 PIPE 8 343.55 347.50 3.00 2.69 0.11 343.66 0.276 0.277 0.05 1 0.11 Pipe HGL Grnd/Rim Cover Velocity Velocity EGL Sf Sf Energy J-Loss Minor No. Up Elev. Up Up Up Head Up Up Up Avg. Loss Coeff Loss (ft) (ft) (ft) (ft/s) (ft) (ft) (%) (%) (ft) (ft) PIPE A 337.10 345.15 9.50 2.99 0.14 337.24 0.128 0.129 0.096 1 0.14 PIPE BB 337.31 344.25 7.50 3.02 0.14 337.45 0.13 0.13 0.073 1 0.14 PIPE B 337.87 j 346.15 7.25 3.33 0.17 338.05 0 0 0 1.00 z n/a PIPE C 337.69 345.28 7.28 3.04 0.14 337.83 0.103 0.102 0.424 0.15 0.02 PIPE D 338.34 344.56 6.31 2.90 0.13 338.47 0.12 0.12 0.342 1 0.13 PIPE E 338.65 344.49 6.49 4.14 0.27 338.92 0.33 0.33 0.182 1 0.27 PIPE F 339.52 343.64 4.64 3.71 0.21 339.73 0.266 0.266 0.599 1 0.21 PIPE G 339.83 343.53 4.43 2.93 0.13 339.96 0.165 0.165 0.091 1 0.13 PIPE H 340.85 343.93 4.43 4.50 0.31 341.16 0.573 0.573 0.889 1 0.31 PIPE I 342.39 344.73 3.68 3.93 0.24 342.63 0.437 0.437 1.223 1 0.24 PIPE J 343.00 345.10 3.20 2.98 0.14 343.14 0.252 0.252 0.378 1 0.14 PIPE K 343.77 345.86 3.62 2.81 0.12 343.89 0.223 0.223 0.625 1 0.12 PIPE L 343.92 345.84 3.54 1.53 0.04 343.95 0.066 0.066 0.028 1 0.04 PIPE M 343.97 346.11 3.39 0.54 0.00 343.98 0.008 0.008 0.02 1 0 PIPE N 344.01 346.94 3.71 0.68 0.01 344.02 0.013 0.013 0.037 1 0.01 PIPE O 339.74 343.64 3.64 1.11 0.02 339.76 0.027 0.026 0.007 1 0.02 PIPE P 344.03 346.99 3.67 0.71 0.01 344.04 0.014 0.014 0.008 1 0.01 PIPE Q 344.04 346.38 3.03 0.72 0.01 344.05 0.015 0.015 0.002 1 0.01 PIPE R 343.97 345.37 3.04 1.31 0.03 343.99 0.049 0.049 0.012 1 0.03 PIPE S 343.91 345.36 3.09 1.63 0.04 343.95 0.075 0.075 0.017 1 0.04 PIPE T 343.14 344.97 3.01 0.45 0.00 343.15 0.006 0.006 0.003 1 0 PIPE U 342.63 344.28 3.01 1.21 0.02 342.65 0.041 0.041 0.006 1 0.02 PIPE V 341.18 343.53 3.03 1.00 0.02 341.19 0.028 0.028 0.013 1 0.02 PIPE W 339.96 343.08 3.01 1.17 0.02 339.98 0.031 0.031 0.005 1 0.02 PIPE X 339.74 343.01 3.01 1.31 0.03 339.77 0.038 0.037 0.006 1 0.03 PIPE Y 340.28 343.91 3.05 2.21 0.08 340.36 0.118 0.118 0.06 1 0.08 PIPE Z 340.13 343.91 3.01 2.63 0.11 340.23 0.201 0.2 0.05 1 0.11 PIPE AA 341.10 345.15 3.00 2.66 0.11 341.21 0.331 0.332 0.05 1 0.11 24-20000582 12/4/2024 PIPE ASUMPMH-1524-2000058212/4/2024 MH-15MH-15PIPE BB24-2000058212/4/2024 PIPE AAMH- CB-1224-2000058212/4/2024 PIPE BCB-13MH- 24-2000058212/4/2024 PIPE CPIPE DPIPE EMH-15MH-13MH-12MH-1124-2000058212/4/2024 PIPE FPIPE GMH-11MH-10MH-924-2000058212/4/2024 PIPE HMH-9MH-824-2000058212/4/2024 PIPE IMH-8MH-724-2000058212/4/2024 PIPE JMH-7MH-624-2000058212/4/2024 PIPE KMH-6MH-524-2000058212/4/2024 PIPE LPIPE MMH-5MH-4MH-324-2000058212/4/2024 PIPE NMH-2MH-324-2000058212/4/2024 PIPE OMH-10CB-924-2000058212/4/2024 PIPE PMH-2MH-124-2000058212/4/2024 PIPE QMH-1CB-124-2000058212/4/2024 PIPE RMH-4CB-224-2000058212/4/2024 PIPE SMH-5CB-324-2000058212/4/2024 PIPE TMH-6CB-424-2000058212/4/2024 PIPE UMH-7CB-524-2000058212/4/2024 PIPE VMH-8CB-624-2000058212/4/2024 PIPE XMH-10CB-824-2000058212/4/2024 PIPE YMH-11CB-1024-2000058212/4/2024 PIPE ZMH-12CB-1124-2000058212/4/2024 DRAINAGE EXHIBIT 24-20000582 12/4/2024 P H A S E 2 PHASE 3 PH ASE 4 PHASE 4 PHASE 3 138 137 136 135 134 133 132 1 189 188 18 143142 141 140 139 102 101 64 62 20 21 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 10103 63 1615 1413112119876510432 1718 2019 21 22 23 252627282930 313233343536373839 40 41 42 434445 46 54 PHASE 3 EX PHASE 1 PHASE 4 PHASE 2 PHASE 2 EX PHASE 1 PHASE 4 NEW GEN ENGINEERING GROUPFUTURE 5 123468791011121415131617181920 21 22 2324 25 26 27 28 293031 32 33 3435 3637 38 3940 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62636465666768697071727374757677 78 79 1 192021222324 25 26 27 28 29 30 31 32 33 42 41 38 37 36 35 34 43 44 45 46 47 48 49 50 51 52 53 54 64 63 62 61 60 59 58 57 56 556566 69 70 71 72 73 74 75 76 77 786768 80 81 82 83 84 85 86 87 88 90 91 929695949397 106101 98 117 114 113 107 125124 118 121 122 123 126 130132131135134133 139 140 136 141 142 146149148147152151150153 162 164 163 165167168 171 129 143 169 18 3 4 5 6 7 8 9 10 154155 156 157 158 159 160 161 17161514 13 12 11 2 40 39 79 89 99100 102 103 104 105 108 109 110111112115116119120 127 128 137138 144 145 170 166 FUTURE FUTURE 1 3 2 4 5 199 6 7 24-20000582 12/4/2024