Loading...
HomeMy WebLinkAbout2024 FMCE-STOP INSPECTION IMPACT VALVE LEAK DETECTOR MONITOR CERTIFICATION SPILL BUCKET TEST 11000 N. MoPac Expressway, Suite 500 Austin, Texas 78759 Phone: (512) 451-6334 Fax: (512) 459-1459 Date Printed and Mailed: 12/3/2024 BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES INSPECTOR KRIS KARNS 1501 TRUXTUN AVE. BAKERSFIELD, CA 93301 Test Date: 11/20/2024 Order Number: 3474314 Dear Regulator, Enclosed are the results of recent testing performed at the following facility: 7-Eleven 41745 9618 Panama Lane Bakersfield, CA 93311 In an effort to keep all our record keeping and reporting requirements as current as possible, Tanknology kindly requests you notify Dawn Kohlmeyer in writing at dkohlmeyer@tanknology.com when your CUPA requires all records to be submitted electronically via the CERS database. Your assistance in this endeavor is greatly appreciated. Testing performed: Sincerely, Dawn Kohlmeyer Manager, Field Reporting LDT 5000 Field Test Apparatus Line Leak Detector Test Page 1 of 1 Work Order:3474314 Date:11/20/2024 Site Name / ID:7-Eleven 41745 / 41745 Address:9618 Panama Lane City:Bakersfield State:CA Zip:93311 Tank ID Product Product Line Tested From Existing/New Mechanical/Electronic Manufacturer/Model Serial No. Pump Operating Pressure (psi) Calibrated Leak (ml/min) Calibrated Leak (gph) Holding PSI *N/A for Electronic LD's Resiliency (ml) *N/A for Electronic LD's Metering PSI *N/A for Electronic LD's Opening Time (sec) *N/A for Electronic LD's Test Results T1 RULL RUL 1 4 Existing Mechanical Vaporless LD-2000 22121432 31.00 189.0 3.00 31.00 200.00 20 5 Pass T2 PUL PUL 1 4 Existing Mechanical Vaporless LD-2000 22121433 30.00 189.0 3.00 29.00 200.00 19 4 Pass T3 DIESEL Diesel 1 4 Existing Mechanical Vaporless LD-2000 22121434 33.00 189.0 3.00 29.00 175.00 20 5 Pass Technician Comments: ADJUSTED LEAK DETECTORS 87 AND 91 IN ORDER TO PASS THE TEST. Technician Name:Edwin Pineda Certification #:2344 Technician Signature:Expire Date:12/2/2024 Environmental Compliance for Petroleum Systems © 2024 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com Impact Valve Inspection Impact Valve Operational Inspection Work Order:3474314 Date:11/20/2024 Site Name/ID:7-Eleven 41745 Address:9618 Panama Lane City:Bakersfield State:CA Zip:93311 How Inspected: Line Test NFPA 30A PEI RP1200 Other Dispenser Number Grade Secure Mount? Valve Lock?Pass/ Fail Comments 1/2 87 Pass Fail Not Tested 1/2 91 Pass Fail Not Tested 3/4 40 Pass Fail Not Tested 3/4 87 Pass Fail Not Tested 3/4 91 Pass Fail Not Tested 5/6 87 Pass Fail Not Tested 5/6 91 Pass Fail Not Tested 7/8 87 Pass Fail Not Tested 7/8 91 Pass Fail Not Tested 9/10 87 Pass Fail Not Tested 9/10 91 Pass Fail Not Tested 11/12 87 Pass Fail Not Tested 11/12 91 Pass Fail Not Tested 13/14 87 Pass Fail Not Tested 13/14 91 Pass Fail Not Tested 15/16 40 Pass Fail Not Tested 15/16 87 Pass Fail Not Tested 15/16 91 Pass Fail Not Tested Technician Comments: Technician Name:Edwin Pineda Signature: Environmental Compliance for Petroleum Systems ©2024 Tanknology Inc., Austin, TX. All rights reserved. tanknology.com Tanknology, Inc.800-964-1250 11000 N Mopac Expy #500 Austin, Tx 78759 Edwin Pineda 10930363 11/20/2024 7-Eleven 41745 9618 Panama Lane Bakersfield 93311 Class A General Engineering 743160 8373052 05/24/2025 12/05/2024 12/02/2024 11/20/2024 6 Veeder Root:ATG Technician (B37453) VMI:TLDT-5000 Tester (2344) Veeder Root TLS-350R 336.02 L1 UDC 1-2 L2 L3 UDC 5-6 L4 L5 L6 L7 UDC 13-14 L8 L9 RUL STP L10 L11 L12 PUL STP L13 PUL FILL L14 DSL STP L15 DSL FILL L16 PUL/DSL ANNULAR L17 VENT BOX S17 RUL PRUDUCT LINE S18 S19 RUL VENT S20 PUL PRODUCT LINE S21 PUL SUMPS S22 PUL VENTS DSL PRODUCT LINES23 794380-208 UCD 3-4 UDC 7-8 UDC 9-10 UDC 11-12 UDC 15-16 RUL FILL RUL ANNULAR RUL VAPOR-UDC,S 794380-208 794380-208 794380-208 794380-208 794380-208 794380-208 794380-208 794380-208 794380-208 794380-303 794380-208 794380-208 794380-208 794380-208 794380-303 794380-208 847990-001 847990-001 847990-001 847990-001 847990-001 847990-001 847990-001 S24 DSL VENT S25 847990-001 DSL SUMPS847990-001 T1 87 RUL T1 87 RUL T2 91 PUL T3 DSL T3 DSL Vaporless LD-2000 T2 91 PULVaporless LD-2000 Vaporless LD-2000 ADJUSTED LEAK DETECTOR 87 AND 91 IN ORDER FOR THEM TO PASS THE TEST ALSO,MAINTENANCE REPLACE A VACUUM SENSOR FOR S19 REGULAR VENT,ALSO REMOVED LIQUID FROM ALL THE STP SUMPS. 11/20/2024 10930363 11/20/2024 7-Eleven 41745 9618 Panama Lane Bakersfield 93311 Tanknology, Inc.800-964-1250 11000 N Mopac Expy #500 Austin, TX 78759 Edwin Pineda 743160 8373052 05/24/2025 12/05/2024 11/22/2026 06/05/2079 PEI:RP1200 SPILL BUCKETS 11/20/2024 2 Veeder Root:ATG Technician OPW:EVR Phase 1 PEI:RP1200 T1 87 RUL T2 91 PUL T3 DSL OPW OPW OPW SWRCB, January 2006 Spill Bucket Testing Report Form This form is intended for use by contractors performing annual testing of UST spill containment structures. The completed form and printouts from tests (if applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. 1. FACILITY INFORMATION Facility Name: 7-Eleven 41745 Date of Testing: 11/20/2024 Facility Address: 9618 Panama Lane , Bakersfield, CA 93311 Facility Contact:Phone: 661-596-7122 Date Local Agency Was Notified of Testing: Name of Local Agency Inspector (if present during testing): 2. TESTING CONTRACTOR INFORMATION Company Name: TANKNOLOGY INC. Technician Conducting Test: Edwin Pineda Credentials1: CSLB Contractor ICC Service Tech. SWRCB Tank Tester Other (Specify) License Number(s): 743160 3. SPILL BUCKET TESTING INFORMATION Test Method Used By: Hydrostatic Vacuum Other Test Equipment Used: LAKE TEST Equipment Resolution: 0.0625 in. Identify Spill Bucket (By Tank Number, Stored Product, etc.) Bucket Installation Type: Bucket Diameter: Bucket Depth: Wait time between applying vacuum/water and start of test Test Start Time (TI): Initial Reading (RI): Test End Time(TF): Final Reading (RF): Test Duration(TF–TI): Change in Reading (RF–RI) : Pass/Fail Threshold or Criteria: Test Result: Spill Box # Tank T1 RUL RUL - Fill 1 - Direct - Below Grade in containment sump Direct Bury Contained in Sump 12.00 15.00 10 min 09:00:00 14.00 in. H20 14.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T2 PUL PUL - Fill 1 - Direct - Below Grade in containment sump Direct Bury Contained in Sump 12.00 12.00 10 min 09:00:00 11.00 in. H20 11.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Tank T3 DIESEL Diesel - Fill 1 - Direct - Below Grade in containment sump Direct Bury Contained in Sump 12.00 15.00 10 min 09:00:00 14.00 in. H20 14.00 in. H20 1 hr 0.00 in. H20 +/- 0.00 Pass Spill Box # Direct Bury Contained in Sump min +/- Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. Technician's Signature:Date:11/20/2024 1State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements may be more stringent. WO: 3474314 Emergency Stop (E-Stop / ESO) Periodic Inspection Facility Information Technician Information Site #: 7-Eleven 41745 41745 Date: 11/20/2024 Address: 9618 Panama Lane Name: Edwin Pineda City / State: Bakersfield CA Technician Signature: The objective of this test is to provide assurance that the when the E-Stop switch is activated, all the fueling system circuits (turbines, and dispensers) are de-energized, and remain de-energized until they are re-set manually). The test procedures and guidelines shall be in accordance with the E-Stop Testing Process. SITE DATA 1 Number of E-Stop switches INSIDE of the building: 1 2 Number of E-Stop switches OUTSIDE of the building: 1 PERFORMANCE DATA Yes No NA 3 You have added or confirmed that all E-Stop locations are on the Site Diagram 4 Do all E-Stops shutdown power to ALL DISPENSERS 5 Do all E-Stops shutdown power to ALL STP's 6 Are ALL E-Stops clearly Labeled 7 Are the TURBINE BREAKERS clearly identified / labeled POST TEST 8 All equipment secured and any access ports, lids, enclosures are closed. 9 All safety barricades and test equipment has been properly removed 10 E-Stop was reset and all dispensing functions are normal E-Stop Inspection Results 11 PASS FAIL INCONCLUSIVE Comments (Clearly describe any deficiencies found) WO: 3474314 Site Diagram (This site diagram is for reference only and is not drawn to scale) Work Order:3474314 Site ID / Name:41745 / 7-Eleven 41745 Address:9618 Panama Lane City:Bakersfield State:CA Zip:93311