HomeMy WebLinkAbout2024 FMC #2Appendix VI Underground Storage Tank Monitoring System Certification Form CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification, ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single- Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank, VPH = Vacuum/Pressure/Hydrostatic Page 1 of 6 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month 1. FACILITY INFORMATION CERS ID Certification Date Facility Name Facility Address City ZIP Code 2. SERVICE TECHNICIAN INFORMATION Company Performing the Certification Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date 3. TRAINING AND CERTIFICATIONS Manufacturer and Test Equipment Training Certifications Expiration Date 4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST I hereby certify that the monitoring system is operational in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting documentation is attached; and all information contained herein is accurate. Service Technician Signature Date Total # of Pages 10901998 12/30/2024 Skyway Liquors 4199 Union Ave Bakersfield 93305 Nwestco LLC (800) 339-9930 2209 Zeus Court, Bakersfield, CA 93308 Brandon Nunez 1073967 10226373 08/02/2026 VeederTEC ATG Technician - C32655 10/02/2026 Vaporless Manufacturing Inc. - #5265 09/10/2026 OPW - 1193585 04/14/2025 12/30/2024 5 Underground Storage Tank Monitoring System Certification Form Page 2 of 6 5. MONITORING SYSTEM AND PROGRAMMING A separate Monitoring System Certification Form must be prepared for each control panel. Make of Monitoring System Control Panel Model of Monitoring System Control Panel Software Version Installed Attach the post-certification reports if the monitoring system is capable of generating either; ܆܆Monitoring System Set-up ܆܆ Alarm History Report Yes No NA All monitoring equipment is operational per manufacturer’s specifications? ܆܆܆܆ Secondary containment systems are free of damage, debris, or liquid? ܆܆܆܆ Are the audible and visual alarms operational? ܆܆܆܆ All sensors have been: 1) visually inspected for wiring kinks, breaks and residual buildup on floats; and 2) tested for functionality and confirmed operational? ܆܆܆܆܆܆ Are all sensors installed to detect a release at the earliest opportunity in the secondary containment? ܆܆܆܆܆܆ The monitoring system set-up was reviewed, and proper settings confirmed? ܆܆܆܆܆܆ Was the monitoring control panel’s backup battery visually inspected, functionally tested, and confirmed operational? ܆܆܆܆܆܆ Does the flow of fuel stop at the dispenser if a release is detected in the under- dispenser containment? ܆܆܆܆܆܆ Does the turbine automatically shut down if the piping secondary containment monitoring system fails to operate or is electrically disconnected? ܆܆܆܆܆܆ Does the turbine automatically shut down if the piping secondary containment monitoring system detects a release? Which sensors initiate positive shut down? (Check all that apply) ܆ Sump ܆ UDC ܆܆܆܆܆܆ If monitoring system alarms are relayed to a remote monitoring center, is all communication equipment operational? ܆܆܆܆܆܆ Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. List all monitoring equipment either replaced or repaired in Section 9 VeederRoot TLS-350 336.02 Underground Storage Tank Monitoring System Certification Form Page 3 of 6 6. SENSOR TESTING RESULTS List only sensors tested on date of this certification. List “Sensor ID” as labeled in system programming. Additional copies of this page may be attached to accommodate all sensors tested. Sensor ID Sensor Model Component(s) Monitored Pass Fail ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. List all monitoring equipment either replaced or repaired in Section 9 L1 208 Dispenser 1-2 UDC L2 304 Dispenser 1-2 UDC ANN L3 208 Dispenser 3-4 UDC L4 304 Dispenser 3-4 UDC ANN L5 208 Dispenser 5-6 UDC L6 304 Dispenser 5-6 UDC ANN L7 208 Dispenser 7-8 UDC L8 304 Dispenser 7-8 UDC ANN L9 208 91 Premium STP L10 304 91 Premium STP ANN L11 208 91 Premium Fill L12 304 91 Premium Fill ANN L13 208 87 Unleaded STP L14 304 87 Unleaded STP ANN L15 208 87 Unleaded Fill L16 304 87 Unleaded Fill ANN L17 208 Diesel STP L18 304 Diesel STP ANN L19 208 Diesel Fill L20 304 Diesel Fill ANN L21 208 Vent Box L22 304 Vent Box ANN Underground Storage Tank Monitoring System Certification Form Page 3 of 6 6. SENSOR TESTING RESULTS List only sensors tested on date of this certification. List “Sensor ID” as labeled in system programming. Additional copies of this page may be attached to accommodate all sensors tested. Sensor ID Sensor Model Component(s) Monitored Pass Fail ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. List all monitoring equipment either replaced or repaired in Section 9 S6 463/464 91 PNL Product S7 463/420 Tank Annular S8 463/464 91 PNL Vent S9 463/464 87 UNL Product S10 463/464 87 Vent S11 463/464 87 Vapor S12 463/464 Diesel Product S13 463/464 Diesel Vent Underground Storage Tank Monitoring System Certification Form Page 4 of 6 7. LINE LEAK DETECTOR TESTING ܆܆ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.) Simulated release rate verified: (Check all that apply.) ܆܆ 3 GPH ܆܆ 0.1 GPH ܆܆ 0.2 GPH Yes No NA Has the testing apparatus been properly calibrated? ܆܆ ܆܆ ܆܆ For emergency generator tank systems, does the LLD create an audible and visual alarm when a leak is detected? ܆܆ ܆܆ ܆܆ For mechanical LLDs, does the LLD restrict the flow through the pipe when a release is detected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off when a release is detected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? ܆܆ ܆܆ ܆܆ For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a tightness test? ܆܆ ܆܆ ܆܆ For electronic LLDs, have all accessible wiring connections been visually inspected for kinks and breaks? ܆܆ ܆܆ ܆܆ Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆ Were all LLDs confirmed operational within regulatory requirements? ܆܆ ܆܆ ܆܆ LLD ID LLD Model Lines Monitored Pass Fail ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ Describe all answers marked “No” or “Fail” and proposed remedy in Section 9. List all monitoring equipment either replaced or repaired in Section 9 Q1 848480-001 87 Unleaded Q2 848480-001 91 Premium Q3 848480-001 Diesel Underground Storage Tank Monitoring System Certification Form Page 5 of 6 8. IN-TANK GAUGING TESTING ܆܆ Check this box if tank gauging is used only for inventory control. ܆܆ Check this box if NO tank gauging equipment is installed. (Do not complete this section if either box is checked.) Yes No NA All wiring has been: 1) visually inspected for kinks, breaks and proper entry and termination; and 2) tested for ground faults? ܆܆ ܆܆ ܆܆ Were all in-tank gauging probes visually inspected for damage and residue buildup to ensure that floats move freely, functionally tested, and confirmed operational? ܆܆ ܆܆ Was accuracy of system’s product level readings tested? ܆܆ ܆܆ ܆܆ Was accuracy of system’s water level readings tested? ܆܆ ܆܆ ܆܆ Were all probes reinstalled properly? ܆܆ ܆܆ ܆܆ Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆ Probe ID Probe Model Tanks Monitored Pass Fail ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ ܆܆ 9. COMMENTS Describe all answers marked “No” or “Fail” and proposed remedy. List all monitoring equipment either replaced or repaired. ܆܆ APPENDIX C-10 SHEAR VALVE OPERATION INSPECTION )DFLOLW\1DPH2ZQHU$GGUHVV$GGUHVV&LW\6WDWH=LS&RGH&LW\6WDWH=LS&RGH)DFLOLW\,'3KRQH7HVWLQJ&RPSDQ\3KRQH7KLVGDWDVKHHWLVIRULQVSHFWLQJVKHDUYDOYHVORFDWHGLQVLGHGLVSHQVHUV6HH3(,536HFWLRQIRUWKHLQVSHFWLRQSURFHGXUH3URGXFW*UDGH'LVSHQVHU,'    6KHDU9DOYH7\SH 3URGXFW9DSRU ,VWKHVKHDUYDOYHULJLGO\DQFKRUHGWRWKHGLVSHQVHUER[IUDPHRUGLVSHQVHULVODQG"<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R,VWKHVKHDUVHFWLRQSRVLWLRQHGEHWZHHQóLQFKDERYHRUEHORZWKHWRSVXUIDFHRIWKHGLVSHQVHULVODQG"<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R,VWKHOHYHUDUPIUHHWRPRYH"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$'RHVWKHOHYHUDUPVQDSVKXWWKHSRSSHWYDOYH"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$&DQDQ\SURGXFWEHGLVSHQVHGZKHQWKHSURGXFWVKHDUYDOYHLVFORVHG"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$$´1RµWR/LQHVRUD´<HVµIRU/LQHLQGLFDWHVDWHVWIDLOXUHTest Results3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLOComments:7HVWHU·V1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB7HVWHU·V6LJQDWXUHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB1ZHVWFR//&  Skyway Liquors4199 Union AveBakersfield 10901998Disp 3-4Disp 7-8MPDMPDMPDMPDDisp 1-2Disp 5-6ProductProductProductProductBrandon Nunez Appendix VIII Underground Storage Tank Spill Container Testing Report Form CERS = California Environmental Reporting System, ID = Identification, ICC = International Code Council Page 1 of 2 TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month 1. FACILITY INFORMATION CERS ID Test Date Facility Name Facility Address City ZIP Code 2. SERVICE TECHNICIAN INFORMATION Company Performing the Test Phone Mailing Address Service Technician Performing Test Contractor/Tank Tester License Number ICC Number ICC Expiration Date 3. TRAINING AND CERTIFICATIONS Manufacturer and Test Equipment Training Certifications Expiration Date 4. TEST PROCEDURE INFORMATION Test Procedures Used Components Tested 5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST I hereby certify that each spill container was tested in accordance with California Code of Regulations, title 23, division 3, chapter 16, section 2637.1; that required supporting documentation is attached; and all information contained herein is accurate. I understand that test procedures shall be made available upon request by the governing authority. Service Technician Signature Date Total # of Pages 10901998 12/30/2024 Skyway Liquors 4199 Union Ave Bakersfield 93305 Nwestco LLC (800) 339-9930 2209 Zeus Court, Bakersfield, CA 93308 Brandon Nunez 1073967 10226373 08/02/2026 OPW - 1193585 04/14/2025 PEI 1200 1 Hour Hydrostatic All Spill Containers 12/30/2024 2 Underground Storage Tank Spill Container Testing Report Form Additional copies of this page may be attached. Page 2 of 2 6. SPILL CONTAINER DETAILS Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic Tank ID Spill Container Manufacturer: Method of Cathodic Protection ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other Is the spill container minimum capacity five gallons excluding riser volume? ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* Method to keep spill container empty ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other Spill Container Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail Tank ID Spill Container Manufacturer: Method of Cathodic Protection ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other ܆܆ Nonmetallic ܆܆ Other Is the spill container minimum capacity five gallons excluding riser volume? ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* ܆܆ Yes ܆܆ No* Method to keep spill container empty ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other ܆܆ Drain ܆܆ Pump ܆܆ Other Spill Container Test Results ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail ܆܆ Pass ܆܆ Fail 1 8. COMMENTS Describe all answers marked “Other,” “No,” or “Fail” and each proposed remedy. * Mark here if: Spill containers do not have a minimum capacity of five gallons and require replacement. T1: 87 UNL OPW T2: 91 PNL OPW T3: DSL OPW