Loading...
HomeMy WebLinkAboutTests Notification_4800 White LaneUNDERGROUND STORAGE TANK TANK AND LINE INTEGRITY TESTING, AND ENHANCED LEAK DETECTION TEST NOTIFICATION FORM OFFICE OF TANK TESTER LICENSING OTTL@waterboards.ca.gov Test notifications for testing tank and line integrity testing, and enhanced leak detection (ELD) testing are required to be submitted to the Office of Tank Tester Licensing (OTTL) in accordance with the California Code of Regulations, tile 23, chapter 17, section 2772. If changes to test notifications occur after submittal to OTTL, please notify OTTL of those changes immediately. Using this form, provide OTTL with the following information when submitting test notifications: SUBMITTAL DATE: 1/23/25 FACILITY INFORMATION CERS ID Test Date and Time: 1/27/25 at 8AM Facility: Fast Break Mobil Facility Address: 4800 White Lane City: Bakersfield ZIP Code: 93309 TANK TESTER INFORMATION Company Performing the Test: LEAK DETECTION TECHNOLOGIES Phone :8552555325 X 746 Mailing Address:2765 e WIEDING RD, TUCSON, AZ 85706 Licensee Name: Ben Getz OTTL License #21-1772 Expiration Date: 09/30/27 TEST METHOD INFORMATION Test Method: Components Tested Enhanced Leak Detection Under Ground Storage Tank System Post Construction ELD: Is the form for post construction contractor statement attached? X YES NO If no is selected, provide general contractor statement prior to testing. Failure to comply with and provide all the above information may result in disciplinary action against the licensed tank tester. Please note that this notification does not waive the requirement for the 48- hour notice to the local agency in accordance with the provisions of California Code of Regulations, title 23, chapter 16, sections 2643(g) and 2644.1(a)(4).