HomeMy WebLinkAbout2025 FMCAppendix VI
Underground Storage Tank
Monitoring System Certification Form
CERS = California Environmental Reporting System, GPH = Gallons Per Hour, ID = Identification,
ICC = International Code Council, LLD = Line Leak Detector, NA = Not Applicable, SW = Single-
Walled, UDC = Under-Dispenser Containment, UST = Underground Storage Tank,
VPH = Vacuum/Pressure/Hydrostatic
Page 1 of 6
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month
1. FACILITY INFORMATION
CERS ID Certification Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Certification Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that the monitoring system is operational in accordance with California Code
of Regulations, title 23, division 3, chapter 16, section 2638; that required supporting
documentation is attached; and all information contained herein is accurate.
Service Technician Signature Date Total # of Pages
7\OHU$VK
10884616 01/22/2025
Samco Buena Vista
825 Buena Vista Rd Bakersfield 93311
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Tyler Ash
1073967
10265132 01/10/2027
Veeder Root - C33895 05/31/2025
01/22/2025 6
Underground Storage Tank
Monitoring System Certification Form
Page 2 of 6
5. MONITORING SYSTEM AND PROGRAMMING
A separate Monitoring System Certification Form must be prepared for each control panel.
Make of Monitoring System
Control Panel
Model of Monitoring System
Control Panel
Software Version Installed
Attach the post-certification reports if the monitoring system is capable of generating
either; ܆܆Monitoring System Set-up ܆܆ Alarm History Report Yes No NA
All monitoring equipment is operational per manufacturer’s specifications? ܆܆܆܆
Secondary containment systems are free of damage, debris, or liquid? ܆܆܆܆
Are the audible and visual alarms operational? ܆܆܆܆
All sensors have been: 1) visually inspected for wiring kinks, breaks and residual
buildup on floats; and 2) tested for functionality and confirmed operational? ܆܆܆܆܆܆
Are all sensors installed to detect a release at the earliest opportunity in the
secondary containment? ܆܆܆܆܆܆
The monitoring system set-up was reviewed, and proper settings confirmed? ܆܆܆܆܆܆
Was the monitoring control panel’s backup battery visually inspected, functionally
tested, and confirmed operational? ܆܆܆܆܆܆
Does the flow of fuel stop at the dispenser if a release is detected in the under-
dispenser containment? ܆܆܆܆܆܆
Does the turbine automatically shut down if the piping secondary containment
monitoring system fails to operate or is electrically disconnected? ܆܆܆܆܆܆
Does the turbine automatically shut down if the piping secondary containment
monitoring system detects a release? Which sensors initiate positive shut down?
(Check all that apply) ܆ Sump ܆ UDC
܆܆܆܆܆܆
If monitoring system alarms are relayed to a remote monitoring center, is all
communication equipment operational? ܆܆܆܆܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
Veeder Root TLS-350
Underground Storage Tank
Monitoring System Certification Form
Page 3 of 6
6. SENSOR TESTING RESULTS
List only sensors tested on date of this certification. List “Sensor ID” as labeled in system
programming. Additional copies of this page may be attached to accommodate all sensors tested.
Sensor ID Sensor Model Component(s) Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
L1 208/304 Dispenser 15/16
L2 208/304 Dispenser 13/14
L3 208/304 Dispenser 9/10
L4 208/304 Dispenser 11/12
L5 208/304 Dispenser 7/8
L6 208/304 Dispenser 5/6
L7 208/304 Dispenser 1/2
L8 208/304 Dispenser 3/4
L9 208/304 Unleaded STP
L10 208/304 Unleaded Fill
L11 208/304 Premium STP
L12 208/304 Premium Fill
L13 208/304 Diesel STP
L14 208/304 Diesel Fill
L15 208/304 Vent Box
Underground Storage Tank
Monitoring System Certification Form
Page 4 of 6
7. LINE LEAK DETECTOR TESTING
܆܆ Check this box if line leak detectors ARE NOT installed. (Do not complete this section.)
Simulated release rate verified: (Check all that apply.)
܆܆ 3 GPH ܆܆ 0.1 GPH ܆܆ 0.2 GPH Yes No NA
Has the testing apparatus been properly calibrated? ܆܆ ܆܆ ܆܆
For emergency generator tank systems, does the LLD create an audible and visual
alarm when a leak is detected? ܆܆ ܆܆ ܆܆
For mechanical LLDs, does the LLD restrict the flow through the pipe when a
release is detected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off when a release is
detected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system is disabled or disconnected? ܆܆ ܆܆ ܆܆
For electronic LLDs, does the turbine automatically shut off if any portion of the
monitoring system malfunctions or fails a tightness test? ܆܆ ܆܆ ܆܆
For electronic LLDs, have all accessible wiring connections been visually inspected
for kinks and breaks? ܆܆ ܆܆ ܆܆
Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆
Were all LLDs confirmed operational within regulatory requirements? ܆܆ ܆܆ ܆܆
LLD ID LLD Model Lines Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
Describe all answers marked “No” or “Fail” and proposed remedy in Section 9.
List all monitoring equipment either replaced or repaired in Section 9
LLD1 FX1V Unleaded Product
LLD2 FX1V Premium Product
LLD3 FX1DV Diesel Product
Underground Storage Tank
Monitoring System Certification Form
Page 5 of 6
8. IN-TANK GAUGING TESTING
܆܆ Check this box if tank gauging is used only for inventory control.
܆܆ Check this box if NO tank gauging equipment is installed.
(Do not complete this section if either box is checked.)
Yes No NA
All wiring has been: 1) visually inspected for kinks, breaks and proper entry and
termination; and 2) tested for ground faults? ܆܆ ܆܆ ܆܆
Were all in-tank gauging probes visually inspected for damage and residue buildup
to ensure that floats move freely, functionally tested, and confirmed operational? ܆܆ ܆܆
Was accuracy of system’s product level readings tested? ܆܆ ܆܆ ܆܆
Was accuracy of system’s water level readings tested? ܆܆ ܆܆ ܆܆
Were all probes reinstalled properly? ܆܆ ܆܆ ܆܆
Were all items on the equipment manufacturer’s maintenance checklist completed? ܆܆ ܆܆ ܆܆
Probe ID Probe Model Tanks Monitored Pass Fail
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
܆܆ ܆܆
9. COMMENTS
Describe all answers marked “No” or “Fail” and proposed remedy.
List all monitoring equipment either replaced or repaired.
܆܆
APPENDIX C-10
SHEAR VALVE OPERATION INSPECTION )DFLOLW\1DPH2ZQHU$GGUHVV$GGUHVV&LW\6WDWH=LS&RGH&LW\6WDWH=LS&RGH)DFLOLW\,'3KRQH7HVWLQJ&RPSDQ\3KRQH7KLVGDWDVKHHWLVIRULQVSHFWLQJVKHDUYDOYHVORFDWHGLQVLGHGLVSHQVHUV6HH3(,536HFWLRQIRUWKHLQVSHFWLRQSURFHGXUH3URGXFW*UDGH'LVSHQVHU,' 6KHDU9DOYH7\SH3URGXFW9DSRU,VWKHVKHDUYDOYHULJLGO\DQFKRUHGWRWKHGLVSHQVHUER[IUDPHRUGLVSHQVHULVODQG"<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R,VWKHVKHDUVHFWLRQSRVLWLRQHGEHWZHHQóLQFKDERYHRUEHORZWKHWRSVXUIDFHRIWKHGLVSHQVHULVODQG"<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R,VWKHOHYHUDUPIUHHWRPRYH"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$'RHVWKHOHYHUDUPVQDSVKXWWKHSRSSHWYDOYH"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$&DQDQ\SURGXFWEHGLVSHQVHGZKHQWKHSURGXFWVKHDUYDOYHLVFORVHG"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$$´1RµWR/LQHVRUD´<HVµIRU/LQHLQGLFDWHVDWHVWIDLOXUHTest Results3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLOComments:7HVWHU·V1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB7HVWHU·V6LJQDWXUHBB7\OHU$VKBBBBBBBBBBBBBBBBB1ZHVWFR//& Samco Buena Vista825 Buena Vista RdBakersfield108846161/23/4 5/6UnleadedPremiumUnleadedPremiumDieselUnleadedPremiumUnleadedPremium1/23/43/45/67/87/8ProductProductProductProductProductProductProductProductProductTyler Ash
APPENDIX C-10
7KLVGDWDVKHHWLVIRULQVSHFWLQJVKHDUYDOYHVORFDWHGLQVLGHGLVSHQVHUV6HH3(,536HFWLRQIRUWKHLQVSHFWLRQSURFHGXUH3URGXFW*UDGH'LVSHQVHU,' 6KHDU9DOYH7\SH3URGXFW9DSRU,VWKHVKHDUYDOYHULJLGO\DQFKRUHGWRWKHGLVSHQVHUER[IUDPHRUGLVSHQVHULVODQG"<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R,VWKHVKHDUVHFWLRQSRVLWLRQHGEHWZHHQóLQFKDERYHRUEHORZWKHWRSVXUIDFHRIWKHGLVSHQVHULVODQG"<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R<HV1R,VWKHOHYHUDUPIUHHWRPRYH"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$'RHVWKHOHYHUDUPVQDSVKXWWKHSRSSHWYDOYH"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$&DQDQ\SURGXFWEHGLVSHQVHGZKHQWKHSURGXFWVKHDUYDOYHLVFORVHG"<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$<HV1R1$$´1RµWR/LQHVRUD´<HVµIRU/LQHLQGLFDWHVDWHVWIDLOXUHTest Results3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLO3DVV)DLOComments:7HVWHU·V1DPHBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB7HVWHU·V6LJQDWXUHB7\OHU$VKBBBBBBBBBBBBBBBBBBBBBBBBBDiesel15/16ProductProduct15/16PremiumUnleaded15/16ProductProduct13/14PremiumUnleaded13/14ProductProduct11/12PremiumUnleaded11/12ProductProduct9/10PremiumUnleaded9/10ProductTyler Ash
Appendix VIII
Underground Storage Tank
Spill Container Testing Report Form
CERS = California Environmental Reporting System, ID = Identification, ICC = International Code
Council
Page 1 of 2
TYPE OF ACTION ܆܆ Installation ܆ Repair ܆ 12 Month
1. FACILITY INFORMATION
CERS ID Test Date
Facility Name
Facility Address City ZIP Code
2. SERVICE TECHNICIAN INFORMATION
Company Performing the Test Phone
Mailing Address
Service Technician Performing Test
Contractor/Tank Tester License Number
ICC Number ICC Expiration Date
3. TRAINING AND CERTIFICATIONS
Manufacturer and Test Equipment Training Certifications Expiration Date
4. TEST PROCEDURE INFORMATION
Test Procedures Used Components Tested
5. CERTIFICATION BY SERVICE TECHNICIAN CONDUCTING TEST
I hereby certify that each spill container was tested in accordance with California Code of
Regulations, title 23, division 3, chapter 16, section 2637.1; that required supporting
documentation is attached; and all information contained herein is accurate. I understand
that test procedures shall be made available upon request by the governing authority.
Service Technician Signature Date Total # of Pages
7\OHU$VK
10884616 01/22/2025
Samco Buena Vista
825 Buena Vista Rd Bakersfield 93311
Nwestco LLC (800) 339-9930
2209 Zeus Court, Bakersfield, CA 93308
Tyler Ash
1073967
10265132 01/10/2027
OPW - 1193554 02/28/2025
PEI 1200 Spill Bucket Equipment
01/22/2025 2
Underground Storage Tank
Spill Container Testing Report Form
Additional copies of this page may be attached.
Page 2 of 2
6. SPILL CONTAINER DETAILS
Test Method Developed by ܆܆ Manufacturer ܆܆ Industry Standard ܆܆ Professional Engineer
Test Type ܆܆ Pressure ܆܆ Vacuum ܆܆ Hydrostatic
Tank ID
Spill Container Manufacturer:
Method of Cathodic Protection ܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
Is the spill container minimum
capacity five gallons excluding
riser volume?
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
Method to keep spill container
empty
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
Spill Container Test Results ܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
Tank ID
Spill Container Manufacturer:
Method of Cathodic Protection ܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
܆܆ Nonmetallic
܆܆ Other
Is the spill container minimum
capacity five gallons excluding
riser volume?
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
܆܆ Yes
܆܆ No*
Method to keep spill container
empty
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
܆܆ Drain
܆܆ Pump
܆܆ Other
Spill Container Test Results ܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
܆܆ Pass
܆܆ Fail
1 8. COMMENTS
Describe all answers marked “Other,” “No,” or “Fail” and each proposed remedy.
* Mark here if:
Spill containers do not have a minimum capacity of five gallons and require replacement.
Unleaded
OPW
Premium
OPW
Diesel
OPW