Loading...
HomeMy WebLinkAboutRES NO 115-97RESOLUTION NO. 1 1 5 - 9 7 A RESOLUTION ADOPTING FEES AND SERVICE CHARGES PURSUANT TO THE REVENUE/COST COMPARISON SYSTEM UNDER CHAPTER 3.70 OF THE BAKERSFIELD MUNICH~AL CODE. WHEREAS, Chapter 3.70 of the Bakersfield Municipal Code authorizes the establishment and increase of Sanitary Sewer service charges under the revenue/cost comparison system; and WHEREAS, a public hearing before the City Council was advertised twice in the Bakersfield Californian, a newspaper of general circulation; and WHEREAS, the Sanitary Sewer service connection charge buys and reserves wastewater collection and treatment capacity; and WHEREAS, the City caused to be prepared a master plan entitled "City of Bakersfield Wastewater Master Plan, Supplemental Report, August 1995" wherein was summarized the connection fees required to provide capacity for growth through development; and WHEREAS, adoption of new and increased fees and charges, pursuant to Chapter 3.70 of the Bakersfield Municipal Code, is necessary for the City to recover the reasonable estimated costs of providing the services for which the fees are charged; and WHEREAS, the fees and charges set forth in Exhibit "A" attached hereto and incorporated by reference as though fully set forth herein, do not exceed the reasonable estimated cost of providing the services for which the fees are charged; and WHEREAS, there is a reasonable relationship between the fee's use and the type of development project on which the fee is imposed in that only those new developments which require sewer service will pay the sewer connection fee; and WHEREAS, there is a reasonable relationship between the need for the public facility and the type of development project on which the fee is imposed in that all new developments which require sewer service will pay for the necessary wastewater treatment plant expansion; and WHEREAS, there is a reasonable relationship between the amount of the fee and the cost of the public facility attributable to the development on which the fee is imposed in that the fee is proportional to the capacity needed by the project; and -1- ORIGINAL WHEREAS, the means through which the City shall collect said fees shall be the County property tax rolls. NOW, TIIEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1. The above recital and findings are true and correct. The fees and charges set forth in Exhibit "A", concerning service charges under Chapter 3.70 of the Bakersfield Municipal Code are hereby adopted and approved. The effective date of this resolution shall be 60 days after the date of adoption. Page 2 of 3 ORIGINAL I HERFRy CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on July 16, 1997, by the following vote: AYES: COUNCILMEME1ER DeMOND, CARSON, SMITH, McDERMOTT, ROWLES, SULLIVAN, SALVAGG.,J NOES: COUNCILMEMBER ABSTAIN: COUNCILMEMBER .~NT: COUNCILMEMBER the Council of the City of Bakersfield~ JUL 1 6 1997 APPROVED MAYOR of the City of Bakersfield APPROVED as to form: Page 3 of 3 EXHIBIT CONNECTION CHARGES All new connections or new fixture units connected to the City sewer system will require payment of a sewer connection charge. Any individual, firm, company of corporation making such connection shall pay the following charge at the time the building permit is issued: 1) Single Family Dwellings. 2) 3) 4) Multiple Family Dwellings. Single family dwellings or units in multiple family dwellings with 14 or less fixture units (including share fixtures in multiple unit complexes) as per Uniform Building Code and with 2 bedrooms or less. $1,500.00 $1,080.00/DU $ 920.00 Per fixture unit for commercial and industrial (a). $ 66.00 (a) Equivalency factor shall be 1.0 for all uses excepting markets, mortuaries, restaurants/coffee shops, food service shops and bakeries which uses shall have an equivalency factor of 2.0. To determine the total connection charge, multiply the number of fixture units (as per Uniform Plumbing Code) by $66.00 and that answer by the equivalency multiplier. The equivalency multiplier adjusts for loadings greater or less than the residential loadings. II. TIMING AND BASIS The sewer connection charge is to be paid prior to issuance of a building permit, and will be based on the current adopted charges '~ the time of issuance of the permit. DU shall mean dwelling unit. Fixture Units shall be as defined in the Uniform Plumbing Code. 5~iGIN^L City of Bakersfield MASTER FEE SCHEDULE for City Service Centers Rev. Date; EXHIBIT "A" 7-OCTOBER-96 SERVICE CENTER % OF COSTI EXISTING FEES t PROPOSED RECOVERY I I FEES REQtJIRED 9125195 7101197 UTILITY AND ENTERPRISE SERVICES s-71 DOMESTIC WATER SERVICE S-72 AGRICULTURAL WATER SERVICE 1000 % N/A N/A 1000 % N/A N/A IAMOUNTOF FEEINCREAS / DECREASE NOTES/COMMENTS N/A FEES SET BY EXECUTIVE ORDER N/A FEES SET BY EXECUTIVEORDER S-74 INDUSTRIAL WASTE DISCHARGE MONITORING 100.0 % S-75 S-76 S-77 S~78 S-79 - DISCHARGE MONITORING ANNUAL FEE - NONCOMPLIA~ICE REINSPECTIONS - OUTSIDE LABORATORY TESTING FEES WASTEWATER SERVICE--OTHER AGENCIES 100 0 % - UNION AVE COUNTY SANITATION DIST. -ALTA VERDE COUNTY SANITATION DIST. - EAST NILES COMMUNITY SERVICES DIST. SEWER TAP FEE 100.0 % SEWER STOPPAGE INVESTIGATION 100 0 % RESIDENTIAL REFUSE SERVICE 1000 % - SINGLE FAMILY DWELLING - SPECIAL SERVICES - EXTRA RESIDENTIAL AUTOMATED CART(PER MONTH - MULTIPLE FAMILY DWELLING Maximum .5 cubit yard ced or bin volume per unit. Bins not provided in service rates. Limits: three {3) plastic carts provided per building at once per week pickup for buildings up to six (6) units; twice per week bin service pickup for buildings over six (6) units Buildings requiring more than .5 cubic yard capacity per unit per week must pay commercial bin rate. EXCEPTION: four and five unil buildings may use one, 1.5 cubic yard bin, once per week. COMMERCIAL REFUSE SERVICE 1000 % - BIN SiZE BY CUBIC YARD - 1.5 CUBIC YARDS PICKUP DAYS / WEEK = 1 PICKJ~JP DAYS / WEEK = 2 PICKUP DAYS / WEEK = 3 PICKUP DAYS / WEEK = 4 PICKUP DAYS / WEEK = 5 PICKUP DAYS / WEEK = 6 - 2.0 CUBIC YARDS PICKUP DAYS/WEEK = 1 $44000 $450 00 $10 00 $440.00 $440.00 $0.00 ACTUALCOSTS ACTUALCOSTS $0.00 $132,380.00 $114,68400 ($17,696,00) $12,996.00 $11,117.00 ($1,879.00) $332,06600 $285,419 00 ($46,64700) NM NM $0 00 $10000 $100.00 $000 $13000 $134.00 $400 $395 $3,95 $0,00 $11782 $121,24 $3 62 $59.13 $60.95 $1 82 $7391 $76.18 $2.27 $117.02 $120.62 $3.60 $163 21 $16823 $5.02 $212.48 $219.02 $6.54 $265 85 $274.03 $8.18 $7391 $76 18 $2 27 PAGE 32 OF 36 ANNUAL FEE CHARGE PER REINSPECTION ANNUAL COST SERVICE NO LONGER PROVIDED ANNUAL COST CltARGES LISTEDARE PER MONTH MEMORANDUM October 24, 1996 TO : FROM : SUBJECT: GREG KLI.MKO, FINANCE DIRECTOR RAUL M. ROJAS, PUBLIC WORKS DIRECTOR / ~ ,._~- WASTEWATER CAPITAL PROJECTS: 1998-2012 The attached list contains our best estimate of wastewater related capital projects projected into the future. The list generally conforms to the Brown & Caldwell Supplemental Master Plan with adjustments relative to more recent experience, e~pecially at WWTP#3. Projects have been included that were not considered in the master plan. All of WWTP#2 disposal area is curranfiy owned in fee by the City and operated by one lessee. If additional disposal area were acquired on other than a fee ba.~ and operated by a party other than our lessee, the probabilit~ of operational problems would be h/gh. (Such as: who gets water, how much, and when?) To avoid these problems and as.~re proper disposal of our e/fluent, we propose the additional 960 acres of farm property be acquired in fee. In the future should other meanx of d/~posal becotue available, (such a~ to a water cl/str/ct) the farm land could be sold and funds returned to the wastewater account. Attachment Alan Tandy, City Manager MEMORANDUM JANUARY 14, 1997 TO: FROM: SUBJECT: ALAN TANDY, CITY MANAGER /~././~_._ GREGORY J. KLIMKO, FINANCE DIRECTOR TREATMENT PLANT EXPANSION - CONNECTION FEES The financing plan for Sewer Treatment Plant upgrades and expansion are as follows: 1997 - Plant 2 upgrade and expansion to 25 mgcl - $26.5 million financed by cash on hand and a state 1998 - Plant 3 expansion to 16 mgd with odor control - $13.5 million. The connection fees were estimated as fottows: YEAR AMOUNT 1996-97 $1,260 1997-98 $1,500 1998-99 $1,700 1999-00 and after $1,900 The current bonds outstanding mature in Septem13er 2010. The connection fees to service this debt would then be decticated to service new debt issued in 2009. 2009 - Plant 3 expansion to 24 mgd with odor control - $25.5 million. The attaciqecl memo from Raul Rojas dated October 24, 1996 accelerates the 2009 Plant 3 expansion to 2003. This will require higher connection fees due to the overlap of the current bonds outstanding and a similar bond principal amount issue in 2003. WASTEWATER CAPITAL PROJECTS. 1998-2012 Yr Ending 1998 Treatment Plant 2 Negotiate Farm Land E.~ansion EST. COST (000~ S 2.000 Treatment Plant 3 Construct upgrade & expansion to 16mgd 13.000 w/partial odor control Expand laboratory. 400 Replace water supply (new well) 200 Landscape and irrigation system 40 (buffer trees) Expand cogeneration & standby power 1,000 1999 2001 Collection Svstem Construct Allen Road trunk sewer Construct Buena Vista II trunk sewer Treatment Plant 2 6.100 6.400 Convert aerated lagoons to storage, 1,500 remove/mod. pump sta. (provides 21.6 mgd, 90-day storage) Negotiate Farm Land Expansion 2.000 (960 Ac Total) Treatment Plant 3 Design conversion of Trickling Filter #4 to roughing filter. pumping station withIodor control 200