HomeMy WebLinkAboutRES NO 087-03 087-03
RESOLUTION NO.__
RESOLUTION MAKING FINDINGS, APPROVING
NEGATIVE DECLARATION AND ADOPTING GENERAL
PLAN AMENDMENT 03-0008 OF PROPOSED
AMENDMENT TO THE CIRCULATION ELEMENT OF
THE METROPOLITAN BAKERSFIELD GENERAL
PLAN.
WHEREAS, the Planning Commission of the City of Bakersfield in accordance with the
provisions of Section 65353 of the Government Code, held a public hearing on MONDAY,
MARCH 17, 2003 and THURSDAY, MARCH 20, 2003, on General Plan Amendment 03-0008
of a proposed amendment to the Circulation Element of the General Plan, notice of the time and
place of hearing having been given at least twenty (20) calendar days before said hearing by
publication in the Bakersfield Californian, a local newspaper of general circulation; and
WHEREAS, such General Plan Amendment 03-0008 of the proposed amendment to the
Circulation Element of the Metropolitan Bakersfield General Plan is as follows:
General Plan Amendment 03-0008
Mclntosh & Associates has applied to amend the Circulation Element of the
Metropolitan Bakersfield General Plan, realigning Valley Lane, south of Paladino
Drive and a segment of Panorama Drive; and, deletion of a third unnamed
collector south of the Panorama Drive alignment; generally located between
Paladino Drive, State Route-178, Masterson Street and Queen Street;
and
WHEREAS, for the above-described project, an Initial Study was conducted and it was
determined that the proposed project would not have a significant effect on the environment and
a Mitigated Negative Declaration was prepared; and
WHEREAS, the law and regulations relating to the preparation and adoption of Negative
Declarations as set forth in CECA and City of Bakersfield's CECA Implementation Procedures,
have been duly followed by the city staff and the Planning Commission; and
WHEREAS, by Resolution No. 48-03, on March 20, 2003, the Planning Commission
recommended approval and adoption of General Plan Amendment 03-0008 subject to mitigation
measures, listed in Exhibit "1" and this Council has fully considered the finding made by the
Planning Commission as set forth in that Resolution; and
WHEREAS, the Council of the City of Bakersfield, in accordance with the provisions of
Section 65355 of the Government Code, conducted and held a public hearing on
WEDNESDAY, May 14, 2003, on the above described General Plan Amendment 03-0008 of the
proposed amendment to the Circulation Element of the Metropolitan Bakersfield General Plan,
notice of time and place of the hearing having been given at least ten (10) calendar days before
the hearing by publication in the Bakersfield Californian, a local newspaper of general
circulation; and
WHEREAS, the Council has considered and hereby makes the following findings:
1. All required public notices have been given.
2. The provisions of the California Environmental Quality Act have been followed.
Based on the Initial Study and comments received, staff has determined that the
proposed project could not have a significant effect on the environment. A
Mitigated Negative Declaration was prepared for the project in accordance with
CEQA.
Mitigation Measures shown on Exhibit "1" are included in the project to
ameliorate impacts.
5. The proposed project is consistent with the surrounding land uses.
The proposed project is consistent with the Metropolitan Bakersfield General
Plan.
Based on the absence of evidence in the record as required by Section 21082.2
of the State of California Public Resources Code (CEQA) for the purpose of
documenting significant effects, it is the conclusion of the Lead Agency that this
project will result in impacts that fall below the threshold of significance with
regard to wildlife resources and, therefore, must be granted a "de minimis"
exemption in accordance with Section 711 of the Sate of California Fish and
Game Code. Additionally, the assumption of adverse effect is rebutted by the
above-reference absence of evidence in the record and the Lead Agency's
decision to prepare a Negative Declaration for this project.
NOW, THEREFORE, BE IT RESOLVED and found by the Council of the City of
Bakersfield as follows:
1. The above recitals and findings incorporated herein, are true and correct.
The Negative Declaration for General Plan Amendment 03-0008 is hereby
approved and adopted.
The report of the Planning Commission, including maps and all reports and
papers relevant thereto, transmitted by the Secretary of the Planning
Commission to the City Council, is hereby received, accepted and approved.
The City Council hereby approves and adopts General Plan Amendment 03-
0008 of the proposed amendment to the Circulation Element of the Metropolitan
Bakersfield General Plan, constituting changes as shown on the map marked
Exhibit "2", attached hereto and incorporated as though fully set forth, for
property generally located between Paladino Drive, State Route-178, Masterson
Street and Queen Street, subject to mitigation measures shown on Exhibit "1".
That, General Plan Amendment 03-0008, approved herein, be combined with
other approved cases described in separate resolutions, to form a single
Circulation Element Amendment.
the
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted, by
Co~ 2~f20tl~e City of Bakersfield at a regular meeting thereof held on
by the following vote:
AYES:
NOES:
ABSTAIN:
ABSENT:
COUNCILMEMBER COUCH1 CARSON, BENHAM, MAGGARD, HANSON, SULLIVAN, SALVAGGIO
COUNClLMEMBER
COUNClLMEMBER I~
COUNCILMEMBER
PAMELA A. McCARTHY, I~C -
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED MAY 28 2003
~ aA~oVr Eo~'t hL~ ~;iAt~ Lof Bake r sfie~/
APPROVED as to form
BART J. THILTGEN
City Attorney
RED
S:\Dole\03-0008\CC GPAR CE.DOC
EXHIBIT "1"
Mitigation Measures
General Plan Amendment 03-0008
Public Works
An EIR was prepared for General Plan AmendmentJZone Change (GPA/ZC)
P99-0647 and certified (Resolution No. 136-00) by the City Council on November
15, 2000. General Plan Amendment 03-0008 subject site is located within the
boundaries of GPA/ZC P99-0647 and amends the Circulation Element within the
boundaries GPA/ZC P99-0647. The City Traffic Engineer has reviewed the
traffic/circulation mitigation from that EIR and has determined that GPA 03-0008
would be affected by the EIR's mitigation. Changes to the mitigation measures:
deletions are shown as a strlkcthrcu.3h and new/revised mitigation is shown in
bold. Changed mitigation measures are as follows:
1. Mitigation Measure No. TR-2 a and c
a) Traffic signals shall be installed at the following locations
prior to construction of approximately 2,025 dwelling units and
524,000 square feet of gross leaseable commercial floor area
which is defined as one-half buildout, or the equivalent of the
traffic volume generated at one-half buildout of the project
which is expected to occur in the year 2010 and full buildout
(4,050 + dwelling units and 1,048,706 -+ square feet of gross
leaseable commercial floor area) of the project which is expected
to occur in the year 2020:
Year 2010 (one-half buildout - approximately 2,025 dwelling
units and 524,000 square feet of gross leaseable commercial
floor area, or the equivalent of the traffic volume generated at
one-half buildout)
· Vineland Road and,.....,,..,"'*'-':^' .....,....,..,"'^"~^' .~.......e*"~* Panorama Drive
(Traffic Engineer Note: with elimination of the "loop" Collector,
only Panorama and Vineland segments will remain and shall be
signalized at the 2010 one-half buildout period (approximately
2,025 dwelling units and 524,000 square feet of gross leaseable
commercial floor area ).
c) The following roadway segments shall be installed at the
following locations prior to one-half buildout - approximately
2,025 dwelling units and 524,000 square feet of gross
leaseable commercial floor area - or the equivalent of the
traffic volume generated at one-half buildout of the project
which is expected to occur in the 2010.
Intstall Vineland Road Between SR 178 and Collcctcr
Locp Strcct Panorama Drive.
(Traffic Engineer Note: Since the collector "loop" street is to be
eliminated, the segment defined is from State Route-178 to
Panorama Drive).
2. Mitigation Measure No. TR- 4
· Install Vineland Road between Panorama Drive and
Paladino Drive.
(Traffic Engineer Note: The collector "loop" street is to be
eliminated. The former Valley Lane is the the Vineland alignment
and shall be installed between Parorama Drive and Paladino
Drive).
Other EIR mitigation measures are still in effect.
S:\Dole\03q) 008\Mitigation.doc
QUEEN STREET
VALLEY LANE
r-