HomeMy WebLinkAbout08/05/91 MINUTES RABakersfield, California, August 5, 1991
Minutes of the Regular Meeting of the Central District
Development Agency of the City of Bakersfield, California, held
in the Council Chambers of City Hall at 3:00 p.m., August 5,
1991.
Deputy City Clerk Welty called the roll as follows:
Present: Agency Members Rubin, Dunn, Gaskill, Paynter
Absent: Agency Members Ruddell, Araujo, $ceales
CONSEI~ C~.~ENDAR
The following items were listed on the Consent
Calendar:
Approval of Voucher Nos. 03 to 16,
inclusive, in the amount of $18,962.80.
Minutes of the Regular Meeting of July 15,
1991, for approval.
Upon a motion by Agency Member Paynter, Items a and b
of the Consent Calendar were adopted by the following roll call
vote:
Ayes:
Noes:
Abstain:
Absent:
Agency Members Rubin, Dunn, Gaskill, Paynter
None
None
Agency Members Ruddell, Araujo, Sceales
REPORTS
Agency Member Paynter read Design Review Committee
Report No. 91-11 regarding an application by Terry Moreland for
the construction of an office building at 2216 "H" Street, as
follows:
The Design Review Committee, July 25, 1991,
reviewed the application by Terry Moreland
for the proposed office building at 2216 "H"
Street. The Committee reviewed the site
plan, architecture, landscaping, materials
and color.
The plan calls for the development of
approximately the south half of the block
bounded by 23rd, "H", 22nd and Eye Streets°
The block presently has surface parking and
an abandoned P.G. & E. substation. The
project is subject to Site Plan Review and
approval by the Central District Development
Agency.
The project consists of a single story, 7,884
square foot office building with
approximately 62 surface parking spaces. The
site is zoned C-2. The office layout is
along "H" Street with its entrance facing
22nd Street. The entrances to the parking
lot will be from 22nd and Eye Streets.
The Committee reviewed the conditions
outlined in the attached Site Plan Review
(SPR #17-91) and approved the project subject
to these conditions. Additionally, the
Committee added the following Conditions:
200
Bakersfield, California, August 5, 1991 - Page 2
o
10.
The building should be set back 5'
off the property line along "H"
Street, resulting in 10' of
sidewalk from the face of curb and
a 9' planting space between the
sidewalk and building.
Trees along 23rd Street should be
set behind the sidewalk, pursuant
to Cal Trans requirements,
resulting in a 5'6" sidewalk and 6"
curb and 8' of planting area with
said trees within the 14' right-of-
way.
Sidewalks along 22nd, "H" and Eye
Streets are to be constructed to a
10' width (including 6" curb). A
4' wide planting area between
sidewalk and property line is to be
developed. Sidewalks are to
include standard detail planters
adjacent to curb with tree
varieties consistent with the
Master Street Tree Plan.
Refuse bin should be relocated to
the first two parking spaces behind
the two trees on the north side of
the parking lot entrance on Eye
Street.
The three small planters located
within the interior parking spaces
should be eliminated.
A lighting plan for the parking lot
and exterior of the building should
be developed and submitted prior to
building completion.
The planter between the parking lot
and sidewalk along 22nd and Eye
Streets should be planted with low
growing hedge shrubs rather than
turf.
A site conceptual plan should be
developed and submitted for the
rest of the undeveloped property
prior to Agency approval of this
project.
The undeveloped area should be
planted with turf and properly
irrigated/maintained prior to
building occupancy, unless building
plans/construction drawings have
been submitted to Building and
Planning Department for project(s)
covering the entire undeveloped
area·
A signage plan shall be submitted
to the Planning Department prior to
building occupancy.
Bakersfield, California, August 5, 1991 - Page 3
Pursuant to these conditions, the Committee
recommends that the Agency approve this
application.
Agency Member Paynter made a motion to accept the
report.
Report,
action,
Principal Planner Lyman advised that Item No. 8 on the
which is required to be submitted prior to the Agency
has just been delivered.
Assistant to he City Manager Stinson suggested
proceeding to the next Item on the Agenda, and returning to this
item after staff has had a chance to review the Site Plan.
Agency Member Paynter read Design Review Committee
Report No. 91-12 regarding an application by Bruce E. Keith for
the rehabilitation of the Tegeler Hotel at 19th and "H" Streets,
as follows:
The Design Review Committee on July 29, 1991,
reviewed the application by Bruce E. Keith
for the rehabilitation of the Tegeler Hotel
at 19th and "H" Streets. The Committee
reviewed the site plan, architecture,
landscaping, materials and color. The
project is subject to Site Plan Review and
approval by the Central District Development
Agency.
The project consists of rehabilitating the
Tegeler Hotel which fronts "H" Street,
between 19th and 20th Streets. Zoning for
the site is C-2. The four-story hotel with a
mezzanine and basement will be remodeled to
create 53 low to moderate income living
units, and 3 small commercial spaces fronting
19th Street. Each living unit is
approximately 260 square feet, except for the
four handicapped units which are larger.
The Committee reviewed the project and
approved it subject to the Site Plan Review
(SPR #8-91) and the following Conditions:
Trees to be consistent with the
proposed standard detail, spacing,
and tree varieties of the proposed
Master Street Tree Plan.
A lighting plan for the exterior of
the building will be submitted
prior to building completion.
Color scheme for exterior of
building including actual paint
chips shall be submitted prior to
painting of exterior of building.
Fourth floor exterior panels
between the windows will be
delineated with scoring or painted
as represented in original
preliminary hotel rendering
submitted to the Committee.
Pursuant to these conditions, the Committee
recommends that the Agency approve this
application.
2O2
Bakersfield, California, August 5, 1991 - Page 4
Upon a motion by Agency Member Paynter, Design Review
Committee Report No. 91-12 was accepted.
At the request of Agency Member Paynter, Mr. Bruce
Keith was recognized and responded to questions from Chairperson
Rubin and Agency Member Paynter regarding the roof garden and
lobby areas of the hotel.
Upon a motion by Agency Member Paynter, the
recommendations of Design Review Committee Report No.
implemented.
91-12 were
At this time, the Agency returned to Design Review
Committee Report No. 91-11 regarding an application by Terry
Moreland for the construction of an office building at 2216 "H"
Street.
Assistant to the City Manager Stinson advised that
staff has determined that Item No. 8 of Design Review Committee
Report No. 91-11 has not been addressed by the developer, and he
suggested that this matter be referred back to the Design Review
Committee.
Upon a motion by Agency Member Dunn, the matter was
referred back to the Design Review Committee for study and
recommendation.
CLOSED SESSION
Closed Session pursuant to Government Code
Section 54956.9(a) regarding pending
litlgation involvlng the City of Bakersfield
v. Bakersfield Convention Center Hotel
Associates.
Chairperson Rubin recessed the meeting to the city
Manager's Conference Room for Closed Session at 3:25 p.m.
Agency,
ADJOURNMENT
There being no further business to come before the
Chairperson Rubin adjourned the meeting at 3:50 p.m.
Development Agency of the City of
Bakersfield
ATTEST:
SECRETARY of the Central District
Development Agency of the city of
Bakersfield
ndw