Loading...
HomeMy WebLinkAboutRES NO 188-03RESOLUTION NO. 1 88'" 0 8 RESOLUTION UPHOLDING THE DECISION OF THE PLANNING COMMISSION APPROVING THE NEGATIVE DECLARATION AND TENTATIVE PARCEL MAP 11010, AND DENYING THE APPEAL BY MCINTOSH AND ASSOCIATES. WHEREAS, in accordance with the procedure set forth in the provisions of Title 16 of the Municipal Code of the City of Bakersfield, Mclntosh and Associates, filed an appeal of the Planning Commission's decision relative to Tentative Parcel Map 11010 made during the Commission's regular meeting of September 4, 2003; and WHEREAS, on September 4, 2003, the Planning Commission adopted Resolution No. 127-03 approving a Negative Declaration with mitigation measures and approving Tentative Parcel Map 11010 with conditions of approval; and WHEREAS, Mclntosh and Associates, the appellant, filed a written appeal stating objection to approval of Tentative Parcel Map 11010; and WHEREAS, the City Council, through the City Clerk, set the time and place of the hearing as WEDNESDAY, OCTOBER 22, 2003, in the Council Chambers of City Hall, 1501 Truxtun Avenue, Bakersfield, California, as the time and place for a public hearing before said City Council on said appeal, and notice of the public hearing was given in the manner provided in Title Sixteen of the Bakersfield Municipal Code; and WHEREAS, the Council of the City of Bakersfield, conducted and held a public hearing on WEDNESDAY, OCTOBER 22, 2003, to consider the appeal; and WHEREAS, testimony was heard during the public hearing; and WHEREAS, Tentative Parcel Map 11010 is generally located on the north side of Hageman Road, between Landco and Knudsen Drives as shown on attached map labeled Exhibit "B," which consists of one sheet; and WHEREAS, proposed Tentative Parcel Map 11010 consists of 6 parcels for purposes of commercial development on 14.49 acres, zoned C-2 (Regional Commercial) zone, as shown on attached map labeled Exhibit "C," which consists of one sheet; and WHEREAS, the application for Tentative Parcel Map 11010 was deemed complete on August 7, 2003; and WHEREAS, the above described project site is a portion of previously approved General Plan Amendment and concurrent Zone Change No. 99-0482 for which the "Kyle Cater and the North of the River Sanitation District EIR (GPA/ZC #99-0482)" was certified; and ORIGINAL WHEREAS, a Statement of Overriding Considerations was adopted for General Plan Amendment and concurrent Zone Change Ne. 99-0482 related to air quality impacts; and WHEREAS, the laws and regulations relating to CEQA and the City of Bakersfield's CEQA Implementation Procedures, have been duly followed by city staff and the Planning Commission; and WHEREAS, for the above described project, an initial study was conducted and it was determined that the proposed project would not have a significant effect on the environment and a Negative Declaration was prepared at least 20 days prior to the public hearing before the Planning Commission, in accordance with CEQA; and WHEREAS, the facts presented in the staff report and evidence at the above referenced public hearings support the findings contained in this resolution; and WHEREAS, recommended mitigation measures reduce impacts to aesthetics/light and glare, air quality, biological resources, cultural resources, geology/soils, human health/risk, service/utilities and traffic to less than significant levels; and WHEREAS, said mitigation measures have been incorporated into the project as conditions of approval listed in attached Exhibit "A"; and WHEREAS, the applicant has agreed to all conditions of approval, including mitigation measures; and WHEREAS, the Council has considered and hereby makes the following findings: All required public notices have been qiven. Hearing notices regarding the proposed project were mailed to property owners within 300 feet of the project area and published in a local newspaper of general circulation at least 20 days prior to the hearing. The provisions of CEQA and City of Bakersfield CEQA Implementation Procedures have been followed. Staff determined that the proposed activity is a project and an initial study was prepared and a Negative Declaration was prepared and duly noticed. A Negative Declaration for the proposed prelect is the appropriate environmental document to accompany proiect approval. In accordance with CEQA, staff prepared an initial study for the proposed project and indicated that because mitigation measures relating to aesthetics/light and glare, air quality, biological resources, cultural resources, geology/soils, human health/risk, services/utilities and traffic have been incorporated into the project, the project will not significantly impact the physical environment. Urban services are available for the proposed development. The project is within an area to be served by all necessary utilities and waste disposal systems. Improvements proposed as part of the project will deliver utilities to the individual lots or parcels to be created. ORJGINAL The proposed subdivision, together with the provisions for its desiqn and improvement, is consistent with the General Plan. (Subdivision Map Act 66473.5) The proposed density and intensity of development are consistent with the commercial land use classification on the property. Proposed road improvements are consistent with the Circulation Element. The overall design of the project, as conditioned, is consistent with the goals and policies of all elements of the general plan. The proiect must be qranted a "de minimis: exemption with respect to the payment of Fish and Game Section 711 fees. Based on the absence of evidence in the record as required by Section 21082.2 of the State of California Public Resources Code (CEQA) for the purpose of documenting significant effects, it is the conclusion of the Lead Agency that this project will result in impacts that fall below the threshold of significance with regard to wildlife resources and, therefore, must be granted a "de minimis" exemption in accordance with Section 711 of the State of California Fish and Game Code. Additionally, the assumption of adverse effect is rebutted by the above-referenced absence of evidence in the record and the Lead Agency's decision to prepare a Negative Declaration for this project. Mineral riqht owners' siqnatures may be waived on the final map pursuant to BMC 16.20.060 B. 1. The applicant has provided evidence with the project application that it is appropriate to waive mineral right owner's signatures because in accordance with BMC Section 16.20.060 B.I., the party's right of surface entry has been expressly waived by recorded document as indicted in the preliminary title report. Bakersfield as NOW, THEREFORE, BE IT RESOLVED and found by the Council of the City of follows: 1. The above recitals and findings incorporated herein, are true and correct. 2. The Negative Declaration is hereby approved. 3 The decision of the Planning Commission to approve Tentative Parcel Map 11010 is upheld. 4. The appeal is denied. 5. Tentative Parcel Map 11010 is hereby approved, subject to the mitigation measures and conditions of approval shown in attached Exhibit "A." ......... o0o ........ I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on OCT ~.2 2003 , by the following vote: ABSTAIN: ABSENT: COUNCILMEMBER COUCH, CARSON, BENHAM, MAGGARD, HANSON, SULLIVAN, SALVAGGIO COUNCILMEMBER COUNCILMEMBER COUNCILMEMBER PAMELA A. McCARTH~ CMC CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED 00T 22 20§3 Mayor of the City of BakerSfield APPROVED as to form BART J. THILTGEN City Attorney Exhibits: A. Conditions of Approval B. Location Map C. Tentative Parcel Map 11010 October 9, 2003 4 EXHIBIT "A" TENTATIVE PARCEL MAP 11010 CONDITIONS OF APPROVAL PUBLIC WORKS EIR mitigation measures/conditions of approval included in City Council Resolution #100-00 (General Plan Amendment) and Zone Change Ordinance # 3977 for General Plan Amendment/Zone Change #99-0482 shall be incorporated herein. (Noted as "Mitigation" after applicable PWD condition listed below.) Prior to recordation of the parcel map, the subdivider shall 2.1. submit an enforceable, recordable document approved by the City Attorney to be recorded concurrently with the Final Parcel Map which will prohibit occupancy of any parcel until all improvements have been completed by the subdivider and accepted by the City. 2.2. ensure that each cable television company provides notice to the City Engineer of its intention to occupy the utility trench. 3. Prior to recordation of the parcel map, all improvement plans shall be reviewed and approved by the City Engineer. Concurrently with recordation of the parcel map, the following covenant shall be recorded by the property owner: a covenant containing information with respect to the addition of this subdivision to the consolidated maintenance district. Said covenant shall also contain information pertaining to the maximum anticipated annual cost per parcel for the maintenance of landscaping associated with this parcel map. Said covenant shall be provided to each new property owner through escrow proceedings. 5. Install 200 watt street light for arterial and collector streets. Prior to recordation of the first final map, submit a street lighting plan. The recommendations of the traffic study contained in the Draft EIR on pages 1-6 through 1-8 concerning the need for supplemental traffic analysis shall apply to each new phase of project development. Items (a) through (d) recommend more detailed analysis which couldn't be performed at the time of the study. These would include, but not be limited to, (a) assessing the mitigation needs for major intersections such as Hageman Rd. at Mohawk St., Hageman Rd at Landco Dr. and Mohawk St. at Krebs Rd. (2) Assessing needs for various road improvements, and (3) assessing the phasing and timing of various mitigation improvements. (Mitigation). Subdivider is required to submit a supplemental traffic analysis and implementation of all recommended mitigation conditions associated therewith. 7. Install traffic signal interconnect conduit with pull rope on Hageman Road. 8. Provide a sewer study and provide sewer service to each parcel. Jeng I S:iTRACTSilOIOtcciExhA.DOC 10/27/2003 Concurrently with recordation of the parcel map, the following covenants shall be recorded by the property owner: 9.1. a covenant containing information with respect to the addition of this subdivision to the consolidated maintenance district. Said covenant shall also contain information pertaining to the maximum anticipated annual cost for the maintenance of landscaping associated with this subdivision. Said covenant shall be provided to each new property owner through escrow proceedings. ORIGINAl. Exhibit "A" TPM 11010 Page 2 of 13 10. This is a phased project. Pdor to submission of improvement plans, the applicant shall provide a phasing plan. Prior to recordation of Phase 2, the parcel map will reflect the most recently adopted alignment of Landco Drive 11. The phasing map to be submitted may be unbalanced (or is to be balanced) with respect to the required improvements along the tract frontages. Therefore, in order to promote orderly development, each phase shall be responsible for an equal dollar amount of frontage improvement. Prior to recordation of a final map for any phase that does not construct its share of the improvements, the difference between the cost of the frontage improvements constructed and the phase share shall be placed into an escrow account. The money deposited in this account would be for the use of the developer of any future phase responsible for more than its share of improvements. The final per lot share will be based upon an approved engineer's estimate. In lieu of the use of an escrow account, the developer may choose to construct with each phase its proportionate share of the frontage improvements, with approval of the City Engineer 12. With phase 1, 12.1 construct to City standards all street improvements including curb & gutter, street paving, drainage improvements, and sidewalk on Knudsen Drive and Hageman Road fronting the subdivision and on all streets within the subdivision; and 12.2 provide additional dedication and construct two lanes on that portion of Knudsen Ddve north of the Parcel Map to Olive Drive not within the subdivision; and 12.2.1 if the subdivider is unable to obtain the required dght of way, then he shall pay to the City the up-front costs for eminent domain proceedings and enter into an agreement and post security for the purchase and improvement of said right of way, or those costs may be paid for by traffic impact fees. 13 With the phase fronting Landco Drive, censtruct to City standards all street improvements including curb & gutter, street paving, drainage improvements, and sidewalk on Landco Drive. 14 Provide proof of adequate sump capacity in TR 6013. 15 On and off site road improvements are required from any collector or arterial street to provide left turn channelization into each street (or access point) within the subdivision (or development). Said channelization shall be developed to provide necessary transitions and deceleration lanes to meet the current CalTrans standards for the design speed of the roadway in question. 16 Access to Knudsen Drive and Landco Drive shall be limited per city standards and specific locations to be determined at the time of plan review. 17 A waiver of direct access rights from all abutting parcels to Hageman shall be required. 18 Municipal sewer, water, gas, electrical, telephone, and Cable TV services shall be provided for each parcel in accordance with Section 16.32.060 B of the Municipal Code. 19 Approval of this tentative map does not indicate approval of grading, drainage lines and appurtenant facilities shown, or any variations from ordinance, standard, and policy requirements which have neither been requested nor specifically approved. 20 The following improvements shall be implemented off-site in conjunction with the proposed development (Mitigation): Jeng / S:ITRACTSt lOIOk:~clExhA.DOC lO~7/'2oo3 ORIG~NA£ Exhibit "A" TPM 11010 Page 3 of 13 Krebs Road shall be constructed adjacent to the project site at its ultimate half-section width as a Collector (2 lanes undivided) in conjunction with development. Mohawk Street shall be constructed adjacent to the project site (south of Hageman Road) at its ultimate half-section width as an Arterial (4 lanes divided) in conjunction with development. Landco Road shall be constructed adjacent to the project site (north of Hageman Road) at its ultimate cross-section width as a Arterial (4 lanes divided) in conjunction with development. Hageman Road shall be constructed adjacent to the project site (west of Mohawk Street) at its ultimate half-section width as an Arterial (6 lanes divided) and as an Arterial (4 lanes divided) east of Mohawk Street in conjunction with development. 21. Traffic signing/striping within the project boundaries shall be implemented in conjunction with detailed construction plans for the project (Mitigation). 22. Sight distance at each intersection shall be reviewed with respect to Caltrans/City of Bakersfield sight distance standards at the time of preparation of final grading, landscape and street improvement plans (Mitigation). 23. Opening day mitigation measures found in the above 21. and 22.shall be required to be implemented with the first phase of the development (Mitigation). 24. The project shall participate through payment of fees in the phased construction of off-site roadway improvements and traffic signals for the Year 2020 as follows (Mitigation): Olive Drive Knudsen Drive to Roberts Lane · Six lanes divided Hageman Road West of Patton Way to Mohawk Street Six lanes divided Mohawk Street to SR-204 Freeway Four lanes divided Rosedale Highway (SR-58) West of Patton Way to Mohawk Street Six lanes divided Mohawk Street east to Oak Street Eight lanes divided Fruitvale Avenue Hageman Road to Rosedale Highway (SR-58) Four lanes divided Mohawk Street Hageman Road to Rosedale Highway (SR-58) Four lanes divided South of Rosedale Highway (SR-58) Six lanes divided Jeng / S:ITRACTSt lOIOtcctExhA.DOC 10/27/2003 Exhibit "A" TPM 11010 Page 4 of 13 Landco Road Oliva Drive to Hageman Road · Four lanes divided Hageman Road to Rosedale Highway (SR-58) Four lanes undivided Gibson Street Gilmore Avenue to Rosedale Highway (SR-58) · Two lanes divided Buck Owens Boulevard SR-204 Freeway to Rio Mirada Drive Six lanes divided 25. The traffic signals required within the study area at buildout shall specifically include an interconnect of the signals to function in a coordinated system. 26. The project shall contribute on a pre-rata basis to the construction of ultimate intersection lane requirements for Year 2020 as follows: Patton Way (NS) at: Olive Drive (EW) Traffic signal Hageman Road (EW) Traffic signal Eastbound left turn lane Eastbound through lane · Westbound through lane Rosedale Highway - $R-58 (EW) Traffic Signal Fruitvale Avenue (NS) at: Olive Drive (EW) Northbound right turn overlap Hageman Road (EW) · Northbound left turn lane Northbound through lane Northbound right turn overlap Southbound left turn lane Southbound right turn overlap Eastbound dual through lane Westbound through lane Krebs Road (EW) Traffic signal · Northbound through lane · Southbound through lane Downing Avenue (EW) Traffic signal Northbound through lane Southbound through lane Jeng / S: I TRAC TSI I O I O~cc~ExhA.DOC 10/27,/2003 ORIGINAl. Exhibit "A" TPM 11010 Page 5 of 13 Rosedale Highway - SR-58 (EW) Southbound left turn lane Eastbound through lane Westbound through lane Mohawk Street (NS) at: Rosedale Highway - SR-58 (EW) Traffic signal Northbound dual left turn lane Northbound dual through lanes Northbound right turn lane with overlap Southbound dual left turn lanes Southbound dual through lanes Southbound right turn lanes with overlap Eastbound left turn lane Eastbound dual through lanes Eastbound right turn overlap Westbound left turn lanes Westbound dual through lanes Westbound right turn overlap Landco Road (NS) at: Rosedala Highway - SR-58 (EW) Southbound left turn lane Eastbound left turn lane Eastbound dual through lanes Westbound dual through lanes Knudsen Drive (NS) at: Norris Road (EW) · Traffic signal Northbound shared left turn lane Olive Drive (EW) Northbound left turn lane Northbound right turn overlap Southbound left turn lane Eastbound through lane Westbound left turn lane Westbound through lane Gibson Street (NS) at: Rosedale Highway - SR-58 (EW) Northbound left turn lane Southbound left turn lane · Eastbound left turn lane · Eastbound dual through lanes Westbound dual through lanes Jeng / S:ITRACTStlOIOtcclExhA.DOC 10,'27/2003 ORIGINAL Exhibit "A" TPM 11010 Page 6 of 13 SR-99 Freeway SB Ramps (NS) at: Olive Drive (EW) Traffic signal Eastbound through lane · Westbound through lane State Road (NS) at: Ofive Drive (EW) Eastbound through lane · Westbound through lane Roberts Lane (NS) at: Olive Drive (EW) Northbound left turn lane Southbound right turn lane with right turn overlap Eastbound left turn lane Eastbound right turn ovedap Buck Owens Boulevard (NS) at: Rio Mirada Drive (EW) Traffic signal SR-99 Freeway NB Ramps (EW) Northbound right turn lane · Southbound right turn lane · Eastbound left turn lane Eastbound right turn lane Westbound left turn lane Rosedale Highway - SR-58 (EW) Southbound free right turn lane Eastbound through lane · Westbound through lane Westbound free right turn lane 27. The project shall contribute to off-site improvements in accordance with the Capital Improvement Plan and establishment of transportation impact fees for the Metropolitan Bakersfield 2010 General Plan Area (Kern County Resolution 92-196 and 92-195) and (City of Bakersfield Municipal Code 15.84) (Mitigation). 28. The off-site roadway system shall be improved to roadway classifications as shown on the Metropolitan Bakersfield General Plan Circulation Element. The implementation of off-site improvements shall be determined as future entitlements are granted for development in and around the project area (Mitigation). 29. The developer shall be required to pay his proportionate share of ail the year 2020 mitigation measures as specified in sections 5.9-2a through 5.9-2c of the DEIR. A fee schedule shall be prepared by the developer with a requirement for approval prior to recordation of a subdivision map or final occupancy of any commercial development with fees being paid at time of building permit on a per unit basis (Mitigation). Jeng / S:ITRACTStlOIOicclExhA.DOC 10/27/2003 Exhibit "A" TPM 11010 Page 7 of 13 30. The traffic impact fee schedule shall also include computation of fees for those facilities on the Phase 2 RTIF list which are not included in the improvements specifically listed for Year 2020. These additional facilities shall include all facilities on the RTIF list within the influence area of the project which is generally the area bounded by Coffee Road, Norris Road, Roberts Lane, Freeway 99 and Rosedale Highway. The additional facilities include, but are not limited to, the following: Olive Drive from Knudsen Drive to Coffee Road Mohawk Street from California Avenue to Rosedale Highway Mohawk Street Bridge over the Kern River Various other signals, bridges, culverts and improvements within the study area which are on the RTIF list. (Mitigation) 31. Within 60 days of the action of the City Council, submit easement documents for Mohawk Street, Hageman Road and Knudsen Drive for recordation (Mitigation). 32. Prior to the approval of the first development within GPAJZC P99-0482: 32.1. Submit a sewer study for the area for approval. 32.2. Submit a conceptual drainage study for the area for approval (Mitigation). 33. The project shall comply with all mitigation measures as specified in the DEIR, as well as the additional mitigation measures as follows (Mitigation): 33.1. Opening Day Mitigation Measures Opening day mitigation measures in sections 5.9-1a through 5.9-1c of the DEIR should be required to be implemented with the first phase of development. The traffic analysis based these upon full development of the project with a study year of 2002. No partial build out was addressed. 33.2. Cumulative: Year 2020 Mitigation Measures The developer shall be required to pay his proportionate share of all the year 2020 mitigation measures as specified in sections 5.9-2a through 5.9-2c of the DEIR. A fee schedule shall be prepared by the developer with a requirement for approval prior to recordation of a subdivision map or final occupancy of any commercial development with fees being paid at the time of building permit on a per unit basis. 33.3. Regional Transportation Impact Fee (RTIF) Mitigation In order to comply with the last paragraph of mitigation measure 5.9-2c, the aforementioned fee schedule shall also include computation of fees for those facilities on the Phase 2 RTIF list which are not included in the improvements specifically listed for Item 2 above. These additional facilities shall include all facilities on the RTIF list within the influence area of the project which is generally the area bounded by Coffee Rd, Norris Rd, Roberts Ln, Fwy. 99 and Rosedale Hwy. The additional facilities include, but are not limited to, the following: 1 ) Olive Drive from Kundsen Drive to Coffee Road. 2) Mohawk Street from California Avenue to Rosedale Highway. 3) Mohawk Street Bridge over the Kern River. 4) Various other signals, bridges, culverts and improvements within the study area which are on the RTIF list. 34. At the time of development or division, traffic signal interconnect conduit may be required to be installed in collector or arterial streets (Mitigation). Jeng / S:iTRACTSi 1010tcc~ExhA,DOC 10/27./2003 Exhibit "A" TPM 11010 Page 8 of 13 35. The recommendations of the traffic study contained in the Draft EIR on pages 1-6 through 1-8 concerning the need for supplemental traffic analysis shall apply to each new phase of project development. Items (a) through (d) recommend more detailed analysis which couldn't be performed at the time of the study. These would include, but not be limited to, (1) assessing the mitigation needs for major intersections such as Hageman Rd. at Mohawk St., Hageman Rd. at Landco Dr. and Mohawk St. at Krebs Rd, (2) assessing needs for various road improvements, and (3) assessing the phasing and timing of various mitigation improvements (Mitigation). PLANNING 36. This subdivision shall comply with all provisions of the Bakersfield Municipal Code, and applicable resolutions, policies and standards in effect at the time the application for the subdivision map was deemed complete per Government Code Section 66474.2. 37. In consideration by the City of Bakersfield for land use entitlements, including but not limited to related environmental approvals related to or arising from this project, the applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners or boards ("City" herein) against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this application, including without limitation any CEQA approval or any related development approvals or conditions whether imposed by the City, or not, except for CITY's sole active negligence or willful misconduct. This indemnification condition does not prevent the Applicant from challenging any decision by the City related to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. The City will promptly notify Applicant of any such claim, action or proceeding, falling under this condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by another entity or party. 38. Prior to filing a final map, located within one-quarter mile of any unlined canal, the subdivider shall construct a 6 foot high chain link fence, in accordance with City of Bakersfield Subdivision and Engineering Design Manual Standard D - 12 (aka $-10)including concrete curb, and approved by the City Engineer as measured from highest adjacent grade. The concrete curb may be waived subject to Planning Director approval. The canal fence may not be bonded or secured. Temporary fence may be approved in accordance with BMC Section 16.32.060 B.8.e. Requirement required canal fencing to satisfy BMC Section 16.32o060 B.8. c and based on a finding to provide for the public health, safety and welfare. Jeng / S:iTRACTS[ IOIO~cclExhA,DOC 10/2 7/2~03 ORIGINAL Exhibit "A" TPM 11010 Page 9 of 13 Mitigation Measures for Vesting Tentative Parcel Map 11010 (from General Plan Amendment/Zone Change No. P99-0482) AESTHETICS/LIGHT AND GLARE 39.Construction equipment staging areas shall be located away from existing residential uses and appropriate screening (i.e., temporary fencing with opaque material), shall be used to buffer views of construction equipment and material, when feasible. Staging location shall be indicated on project Final Development Plans and Grading Plans. AIR QUALITY 40.Prior to the approval of a grading plan for any residential tract, multiple family project, and commercial project, the project applicant shall submit a letter to the City of Bakersfield Planning Department from the San Joaquin Valley Unified Air Pollution Control Distdct (SJVUAPCD) stating the dust suppression measures that shall be completed during construction activities in order to comply with SJVUAPCD Regulation VIII. At a minimum, these measures shall include: the replacement of ground cover in disturbed areas quickly; proper maintenance of construction equipment; watering of haul roads two times per day; reduced speeds on unpaved roads of 15 miles per hour or less; and the use of Iow volatile organic compound asphalt. 41. Prior to the approval of a grading plan for any residential tract, multiple family project, and commercial project, the project applicant shall submit a letter to the City of Bakersfield Planning Department from the SJVUAPCD stating the measures that shall be completed during asphalt paving in order to comply with SJVUAPCD Rule 4641. 42. The construction grading plans shall include a statement that all construction equipment shall be tuned and maintained in accordance with the manufacture's specifications. 43. The construction grading plans shall include a statement that work crews shall shut off construction equipment when not in use. 44. The project applicant shall incorporate the following in building plans: Solar or Iow-emission water heater shall be used; Central water heating systems shall be used; Double-paned glass shall be used in all windows; and Energy efficient Iow-sodium lighting in parking areas shall be used. BIOLOGICAL RESOURCES 45. Prior to construction activities, focused surveys for the San Joaquin kit fox shall be conducted by a qualified biologist to determine if any known kit fox dens are located on the project sites. If an active den is not found, no further mitigation would be necessary. However, if an active den is present, kit foxes shall be relocated by a qualified biologist using California Department of Fish and Game (CDFG) and the United State Fish and Wildlife Service (USFWS) approved methods. If the biologist determines that relocation is not practicable, he/she shall destroy the den according to CDFG- approved methods and USFWS-approved methods to allow the foxes to relocate on their own. Results of the surveys shall be provided to CDFG. Jeng / S:ITRACT$11OIO~:~c /~SxhA.DOC 10,/27/2003 Exhibit "A" TPM 11010 Page 10 of 13 46. Thirty days prior to construction activities, a qualified biologist shall conduct a survey to determine if the burrowing owl is present on the project sites and the nesting status of any individuals present. If nesting is not occurring, construction work shall proceed after any owls have been evacuated from the project sites using CDFG-approved burrow closure procedures. If an active nest is present, to protect any active burrow site, the following restriction on construction shall be required between February 1 and June 30 or until nests are no longer active as determined by the project biologist: clearing limits shall be established by the biologist in any direction from raptor nests/burrows depending on the species and existing conditions. Results of the surveys and relocation efforts shall be provided to CDFG. 47. Thirty days prior to construction activities, a qualified biologist shall conduct a survey to determine if any raptors are nesting in trees on the project sites. If nesting is not occurring, construction work shall proceed. If an active nest is present, to protect any active nest/burrow sites, the following restriction on construction shall be required between February I and June 30 or until nests are no longer active as determined by the project biologist: clearing limits shall be established by the biologist in any direction from raptor nests/burrows depending on the species and existing conditions. Results of the surveys shall be provided to CDFG. CULTURAL RESOURCES 48. Prior to construction, the project applicant shall implement the following measures as outlined in the February, 1991 Archaeological Assessment for the project area: Recorded sites CA-KER-2873 and CA-KER-2874 shall be mapped and surface collected. Two backhoe trenches (minimum depth: 1.5m. [5 ft.]) and two test units (1 x 2 m.) shall be placed at each recorded site to determine the presence and content of any intact subsurface deposit. Further recommendations, if any, will depend on the results of these tests. Efforts shall be made to locate, borrow, and record artifacts previously removed from the project area. 49. In the event that a material of potential cultural significance is uncovered during grading activities on the project sites, all grading shall cease and the project applicant shall retain a professional archaeologist to evaluate the quality and significance of the material. Grading shall not continue until resources have been completely removed by the archaeologist and recorded as appropriate. Compliance with this measure is subject to periodic field inspection by the project applicant. GEOLOGY AND SOILS 50. Engineering design for all structures shall consider the probability that the project area will be subjected to strong ground motion during the lifetime of the proposed developments. Construction plans shall be subject to the City of Bakersfield Municipal Code and shall call for standards which address horizontal bedrock accelerations of at least 0.24 gravity. 51. Pursuant to City of Bakersfield Municipal Code Section 16.16.100, prior to site grading or excavation, the project applicant shall submit to the Engineering Division for review and approval, an Erosion Control Plan. Jeng / S:tTRACTS[ IOIOicclExhA.DOC 10/27/2003 ORIGINAL Exhibit "A" TPM 11010 Page 11 of 13 HUMAN HEALTH/RISK OF UPSET 52. Prior to issuance of any grading permit, the project applicant shall perform soil tests to determine concentrations of pesticide and fungicide residues which may be present within the project site. Should contaminant levels be in excess of acceptable Federal, State and/or County levels, the project applicant shall identify and implement remedial action, subject to approval by the City of Bakersfield and responsible regulatory agencies to reduce contaminants to acceptable levels. 53. Pursuant to the Division of Oil, Gas, and Geothermal Resources (Division), active wells which would remain upon project completion and associated equipment within the project area shall be enclosed by an eight-foot block wall. Appropriate gates shall be installed and climbable landscaping around the perimeter of the facility shall be avoided. The inside grade of the facility shall be constructed so that potential spillage will be confined to the enclosure. Improvements are the responsibility of the project applicant/developer. 54. Sufficient access to the existing and abandoned wells shall be maintained in order for the Division of Oil, Gas, and Geothermal Resources (Division) to investigate the conditions of the wellheads and check for leakage. If any re-abandonments are required, the Division shall furnish necessary specifications to the property owner. 55. If any abandoned or unrecorded wells are uncovered, or damaged during excavation or grading activities, remedial plugging operations pursuant to Division of Oil, Gas, and Geothermal Resources requirements would be required. 56. Prior to issuance of building permits, any discovered oil contaminated soil shall be remediated to the satisfaction of the Local Unified Program Agency (the Office of Environmental Services-Bakersfield City Fire Department) in conjunction with the State Regional Water Quality Control Board (RWQCB) and/or California Department of Toxic Substances Control (DTSC). 57. Prior to issuance of grading permits, the project applicant shall provide sufficient evidence that the existing groundwater well has been properly closed pursuant to the RWQCB requirements. 58. Prior to issuance of demolition permits, the project applicant shall remove all above ground storage tanks and oil storage drums from the sewage treatment plant facility. Areas beneath the storage drums and storage tanks shall be re-inspected to verify if additional staining has occurred. All reported stained soils as well as newly identified staining shall be tested, removed, and properly disposed of off-site in accordance with local, state, and federal regulations. 59. Prior to demolition work, the applicant shall sample structures within the sewage treatment area (i.e., equipment shed, truck shed, maintenance shop, engine room, and office building) to determine the presence or absence of Asbestos Containing Materials (ACMs). Any demolition of the existing buildings shall comply with State law, which requires a contractor, where there is asbestos-related work involving 100 square feet or more of ACMs, to be certified and that certain procedures regarding the removal of asbestos be followed. 60. Jeng / S:ITRACTS11010[cctExhA.DOC I 0/27/2{~3 If during demolition of the structure, paint is separated from the building material (e.g., chemically or physically), the paint waste shall be evaluated independently from the building material to determine its proper management. Should the Lead Based Paint (LBP) materials require disposal, the applicant shall contact the landfill operator in advance to determine any specific requirements they may have regarding the disposal of LBP materials. Exhibit "A" TPM 11010 Page 12 of 13 61. All areas with bare soil exposed as a result of grading activities shall be landscaped at the earliest time possible or stabilized by watering when winds exceed 25 miles per hour in order to reduce the potential inhalation of spores causing Valley Fever. SERVICES AND UTILITIES 62. An approved water supply system capable of supplying required fire flow for fire protection purposes shall be provided to all premises upon which buildings or portions of buildings are constructed. The establishment of gallons-per-minute requirements for fire flow shall be based on the "Guide for Determination of Required Fire Flow" published by the Insurance Service Office. 63. Fire hydrants shall be located and installed per Fire Department standards and approved by the Fire Chief. On-site fire hydrants shall be provided when any portion of the building protected is in excess of 150 feet from a water supply on a public street, or as required by the Fire Chief. 64. The project developer shall pay the appropriate connection fee to the North of River Sanitary District No. 1. All new wastewater facilities shall be located within public rights-of-way or utility easements. 65. Wastewater system design and all public mains, meters, and appurtenances shall be installed and constructed in compliance with the applicable standards, specifications, policies, and regulations of the North of River Sanitary District No. 1. 66. Development of wastewater facilities off site, if necessary, shall be subject to further environmental review to ensure that significant environmental effects, if any, are mitigated on a site specific basis. 67. The developer shall pay the appropriate connection fee to the California Water Service Company. All new water facilities shall be installed within public rights-of-way or utility easements. 68. Water system design and all public water mains, meters, and appurtenances shall be installed and constructed in compliance with the applicable standards, specifications, policies, and regulations of the California Water Service Company. 69. Prior to the issuance of occupancy permits, the developer shall install Iow water use fixtures, plumbing fixtures and appliances, to the satisfaction of the California Water Service Company. These fixtures/appliances may include the following: Interior: SUDDIV line pressure: Reduce water pressure greater than 50 pounds per square inch (psi) to 50 psi or less by means of a pressure-reducing valve; Drinkina fountains: Equip drinking fountains with self-closing valves; and Ultra-low flush toilets: Install 1.6 gallon per flush toilets in all new construction. Exterior: · Landscape with Iow water-consuming plants wherever feasible; · Minimize use of lawn by limiting it to lawn-dependant uses; Group plants of similar water use to reduce over irrigation of Iow-watar-using plants; Use mulch extensively in all landscaped areas (mulch applied on top of soil will improve the water-holding capacity of the soil by reducing evaporation and soil compaction); Jeng / S:[TRACTSi lOIOicc~ExhA.DOC 10/27/2003 ORIGINAL Exhibit "A" TPM 11010 Page 13 of 13 Preserve and protect existing trees and shrubs (established plants are often adapted to Iow-water-using conditions and their use saves water needed to establish replacement vegetation); Install efficient irrigation systems which minimize runoff and evaporation and maximize the water, which will reach the plant roots (drip irrigation, soil moisture sensors, and automatic irrigation systems are a few methods to consider in increasing irrigation efficiency and may be feasible for individual development projects; and Use pervious paving material whenever feasible to reduce surface water runoff. 70. The proposed project shall incorporate design features for the storage and collection of recyclables pursuant to federal, state, and local statutes (i.e., Bakersfield Municipal Code, Chapter 8.32) and regulations related to solid waste. 71. The applicant shall record an overflight easement prior to recordation of a final map. The overflight easement shall read substantially, like Exhibit D2 of the Kern County Airport Land Use Compatibility Plan. (NOTE: Traffic Mitigation Measures from the EIR are listed under Pubfic Works conditions.) Jeng / S:tTRACTSi IOIO[cciExhA.DOC 10,/27/2003 ORIGINAL rn z ORI(~INAL zo~£.m VACANT FUTURE COMMERCIAL SITE VACANT ~-~-- FUTURE SCHOOL S~TE % '~INAL