Loading...
HomeMy WebLinkAboutRES NO 35-94RESOLU OS 5 ' 9 4' A RESOLUTIONAMENDING RESOLUTION NO. 116-93, AS AMENDED BY RESOLUTION NO. 27-94, ADOPTING FEES AND SERVICE CHARGES PURSUANT TO THE REVENUE/COST COMPARISON SYSTEM UNDER CHAPTER 3.70 OF THE BAKERSFIELD MUNICIPAL CODE WHEREAS, state law requires new fees and charges and increases in existing fees and charges be adopted by ordinance and resolution following a public hearing on said fees and charges; and WHEREAS, Chapter 3.70 of the Bakersfield Municipal Code authorizes the establishment and increase or decrease of service charges under the revenue/cost comparison system; and WHEREAS, adoption of new and increased fees and charges, pursuant to Chapter 3.70 of the Bakersfield Municipal Code, is necessary for the City to recover the reasonable estimated cost of providing the services for which the fees are charged; and WHEREAS, a public hearing before the City Council was advertised twice in the Bakersfield Californian, a newspaper of general circulation, and held on June 1, 1993; and WHEREAS, Resolution No. 116-93 was adopted by Council on June 23, 1993, establishing fees and charges for the 1993-94 fiscal year; and WHEREAS, Resolution No. 27-94, adopted by Council on February 23, 1994, amended Resolution No. 116-93 to include fees and charges for Service Center S-55 (Adult Softball); and WHEREAS, the fees and charges set forth in Exhibits "A", "B", "C" and "D", attached hereto and incorporated by reference as though fully set forth herein, do not exceed the reasonable estimated costs of providing the services for which the fees are charged; and WHEREAS, it is necessary for the City to make adjustments to the fee schedule as previously adopted; and WHEREAS, a pubic hearing before the City Council was advertised twice in the Bakersfield Californian, a newspaper of general circulation, and held on March 9, 1994, with respect to changes the City will charge for Convention Center Maintenance and Operation (S-70) . NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield, as follows: 1. The above recitals and findings are true and correct. 2. Except as set forth below, the fees and charges set forth in Exhibits "A", "B", "C" and "D" concerning service charges under Chapter 3.70 of the Bakersfield Municipal Code and their effective dates as adopted in Resolution Nos. 116-93 and 27-94 shall remain the same. 3. The fees and charges for Convention Center Maintenance and Operation (S-70) shall be as shown in Exhibit "A" and shall become effective on March 10, 1994. .......... o0o .......... I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on March 9, 1994, by the following vote: AYES: COUNCILMEMBERS McDERMOTT, EDWARDS, OIIMOND. ~ BRUNNI, ROWLE$, $ALVA(~10 NOES: COUNCILMEMBERS ABSTAIN: COUNCILMEMBERS AEk~IEHT; COUNCILMEMBER~ ~ ~ ~'~.~. CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield, CA APPROVED MAR 0 0 ~% MAYOR of the City of Bakersfield, CA APPROVED as to form: JUDY SKOUSEN ACTING CITY ATTORNEY of the City of Bakersfield NS/krc/nss COSTAMEN.D 3/ 4/94 9:33am ~MSI SERVICE CENTER COMMUNIIY DEVELOPMENT SERVICES 8-2 CONSTRUCTION INSPECTION S-3 PLUMBING INSPECTK~ S-4 ELECTRICAL ~NSPECTION 8-5 NC, HEATING & MECH. INSPECTION 8-6 RE-QUESTED BUILDING INSPECTION - N OI~V, AL BUSINESS HOURS - OTHER THAN NOF~MAI. HOURS S-6.1 REIN SPECTION OF MUNICIPAL COOE VIOLATIONS - DANGb-RCXJ~ BUILDING INVEStiGATIONS - INITFd. COb'TACT AND INSPECTION - FOLLOW-UP INSPECTK3N$ REQUIF~D - LEGAL ACTION REQUIRED - iNITIAL CONTACT AND INSPECTION - FOLLOW-UP INSPECTIONS REQUIRED - LEGAL ACTK)N REQUIRED 6-7 SIGN I~c~EW - COMPREHENSIVE SIGN REVIEW - REVISED COMPRB'IENSNE SIGN REVIEW - SIGN REV1EW ISSUANCE FEE 8-8 CONDmONAL SIGN PEF~IIT S-9 'R-IlS SERVICE CENTER DEl,- ~ ~u 8- I 0 BWIRONMENTAL REVIEW 8-11 PRELIMINARY PROJECT FEVIL=W - REQUESTED LAND USE & ZONING REVIEW ZONE MOOIRCA~ON REVIEW City of Bakerslield MASTER tH- SCHEDULE for City Sewice Centers EXHIBIT 'A' % OF COST EXISTING RECOVERY FEE8 REQUIRED 02/24/94 / (OB;REASE) 100.0% 100.0% 100.0 % 100.0% 100.0% I00,0 % 100.0% SEE E~B. B SEE E~8. 8 100.0% 1 o0.0 % 100.0 % 100.0 % $0.00 $1,45.00 ACI~N. CO~ $1 $145.00 ACIUN. CO~T $1 .gO0.O0 PAGE 1 OF 31 SERVICE CENTER City of Bakerslield MAS'IER FEE SCHEDULE for City Sewice Centers EXHIBIT 'A' % OF COSff' RECOVEHY REQUIRED EXlST1NG FEES 02/24/94 FEES ~/10~ AMOUNT OF FEE INCREASE / (DECREASE) NOTES / COMMENTS 8-13 CO~AL USE REVIEW - GE~IERAL REVlLL'W - OIL WELL REVIEW 8-14 ZONE CHANGE REVIEW S-15 PtJD OR PCO ZOflE CHN~IGE S- 16 SffE Pr. AN REVIEW - BUILDING VALUE LESS OR EQUAL $15O,5O0 - MINIMUM FEE - BUILDING VALUE GREATER THAN $150,000 - MAXIMUM FEE 8-17 HOME OCCUPATION REVIEW - HOME OCCUPATK3N PEF~41T - LAR{3E FAMILY DAY CARE 8 - 18 SPECIFIC P!-N~ REVIEW 8-18.1 HISTORIC DISTRICT REVIEW S-182 CUL~JRAL RESOURCE REVIEW $-18.3 REHABIUTA'I'~N INSPECTIONS - INITIAL INSPECTION/DOCUMENTATION - ADDrTIONAL INSPECTION COSTS I FEES - DEPAR]MENTAL PROCESSING CO~TS -' ROOF REPU~CEMENT - EI_ECTRICN. - PLUMBING - MECHANICAL - FRN~E I FLOOR - MAXIMUM CHARGE FOR REHAB INSPECTIONS S- 19 GENERAL PLAN AMENDMENT REVIEW $-19.1 CONCURRENT APPliCATIONS $-20 DOWNTOWN PROJECT DESIGN REVIEW $-21 [AND DNI~ION REVIEW - LOT UNE AD JET 100.0 % 100.0 % 100.0 % 100.0 % 1{30.0% 100.0% 100.0% 100.0% 1(30.0 % 100.0% 100.0% 100.0% 100.0 % St ,000.00 $1,000.00 $1,3~0.00 $1 .SOO.gO $1,5O0.00 $1.560.00 $0.5O $1,5O0.00 $1.560.00 $0.00 FORMULA $150.00 $175.00 $175.00 $25.00 PAGE 2 OF 31 MSI City of Bakendield MASTER FEE SCHEDULE for City Senace Centers Ray. Data: 04-1~-~4 % OF CO~T EXISTING ADOt'i ~.u AMCXJNT OF REGOVERY FEES FEES FEE INCREASE EXHIBIT 'A" $-22 $-23 8-24 $-25 S-26 S-27 SERVICE CENTER REQUIRED 02/24/94 0~10/94 / (DECREAS~ NOTES - PARCEL MAP WANERS $850.00 $850.00 $0.00 TI~rTA'3WE SUBDIVISION MAP REVIEW 1 00,0 % - T'B~ITA'INE PARCEL MAP REVIEW $1,300.00 $1.300.00 $0.00 - REVISED ~ATIVE PARCEL MAP REVIEW $,505.00 $505.00 $0,00 - ~ITA~VE ~RACT MAP REVIEW $2~80.00 $2,280.00 $0.00 - REVVED TENT^~VE TRACT MAP REVIEW $1,300.00 $1,300.00 $0.00 - TENTA31VE MOO/DEL. OF CONDfflON$ ~370.00 r~70.00 $0,00 - WALL AND LANDSCAPE REVIEW $880.00 $880.00 $0.00 MAP & IMPROVEMENT PLAN CHECKING 100.0 % - FINAL TRACT MAPS $SeO+~LOT $SeO+~)LOT $0.00 - FINAL PARCEL MAPS $1,200.00 $!,200.00 $0.(30 - STREET/SEWER IMPROVEMENTS - ~NGLE F~MILY - VOLUNTARY $50.00 $50.00 - AU- O~HER~ $1o0 + 0.~2% $1~o + PUBUC IMPROVEMENT INSPECTION 1 00.0 % - PUBMC IMPROVEMENT INSPECTION $1oo + o.7e% $100 + 0.Te~ - MAINT. DIST. MAP PREPN~.TION FEES - NO COMPUTER DISC PROVIDED $1~0+$1~tOT $1~+~3~OT $0.00 - COMPUTER DISC PROVIDED $135O+S1~OT $1350+Sl~LOT $0.00 - CITY REVIEW & PROCESSING ONLY (MINIMUM FEE) $300.00 $300.00 $0.00 - C~P( REVIEW & PROCESSING ONLY $3.eS~OT ' $3.65~OT $0,~O APPEAL PROCESSING 1 00.O % $330.00 &330.00 $0,00 STREET I-~ICROACHMENT INSPECTION 100.0 % $125.O0 $125.O0 STREET CUT INSPECTION 100.0 % $100.00 $100.00 $0.00 - INSPECTION FEE DEPOSIT (TO COVER $50.00 $50.00 $0.00 CO~[$ OF ADOff. INSPECTIONS IF REQUIRED) DEVELOPMENTTIME EXTENSION REVIEW 100.0 % S490.00 $490.00 $0.00 PUBUC SA~c I ¥ SERVICES VB-IICLE CODE ENFORCEMENT 50.0 % N/A HEAL3H & EAFETY COOE ENFORCEMI-~IT 50.0 % N/A PARKING ORDINANCE ENFORCEMENT 1 00.0 % PAGE 3 OF 31 City of Bakersfield MASTER FEE SCHEDULE for City Sewice Centers SERVICE CENTER - VEH(C!..E TOWING - PARKING VIOLA'nON POLICE FALSE At. AF~I RESPONSE - INi'RAL ALARM PEFNIIT - ALARM ~IT RENEWAL - PE~IT RENEWAL DEUNQUENCY PENAL~Y - CHARGE AFTER 4'n-I FALSE - CHARGE AFTER 10'R-I FALSE ALAF~I WIDE/OVERLOAD REVIEW - STANDARD CHARGE - SINGLE TRIP PERMIT - ANNUAL TRIP PEP~dlT - MAXIMUM CHARGE (SINGLE TRIP PEl:~drl~ - ADULT ENTERTAINMI~IT ~ NEW APPliCATION - ANNUAL PEF~Mff RENEWAL - EMPLOYEE PE~ff - MASSAGE - NEW APPU~-.ATICN - EMPLOYEE INV.E~rlGAllON - CAP4) ROOM~ - NEW APPLICATION - RI~,IEWAL APPLICATION - CARD DEALER~ - RENEWAL APPLICATION - E,~:X)FR'! DATING SERVICES - NEW APPLICATION - EMPLOYEE INVESTIGATION 100.0 % 1(30.0% 100.0 % EX~STING FEF.8 02/24/94 EXHIBIT "A" Rev. Date: 04-1~ar -94 ADOt'~ r.u AMOUNTOF FEE8 FEE INCREASE 03/10/94 / (DECREASE) NOTES I COMMENTS $1.00 $1.00 $0.00 $1.PERMIT/MON'IH (MAX 10 MONll-lS) $50.00 $50.00 $0.00 $~o.ao $9o.~o ~.oo $155.00 $155.00 $0.00 t~0,00 $16.00 $420.00 $420.00 $0.00 $1,170.00 $1,170,00 $0.00 $25,00 $25.00 $~ to.oo $1~o.oo $o.oo t~o.oo Sao.oo $o.oo $570.00 $570.00 $0.00 $I.170.00 $1,170.00 $125.00 $125.00 $0.00 $15.Q0 $15.00 $0.00 $245.00 $~45.00 SO.IX) $125.00 $125.00 $0.00 PAGE 4 OF 31 City of Bakersfield MASTER FEE SCHEDULE for City Sewice Centers EXHIBIT 'A' SERVlCE CENTER - RETNL 8ALES OF CONCEALED WEAPON8 PERMIT - LIQUIDATION (CI.OSE(XZT)8ALE-PEF~IT - BINGO - NEW PERMIT - BINGO - RENEWAL FERMIT - SECOND HN~O DEALERS, ffINERN~T MERCHANTS~ FUBUC DANCE HALLS, OUTOOOR FESTNAL8, AMPURED MUSIC, NdPUFIED SPEECH, AMPLIFIED SOUND-TRUCKS, MOTELS & HOTELS NEW PERMITS - BAIL BOND OWNER/AG~4T$/SOUCITORS - RESIOENT SOLICffATION - DOG LICENSES - ALTERI~) (SPAYED /NEUTERED) - ONE YEAR UCENSE - TWO YEAR UCENSE - '~'IREE YEAR UCENSE - ONE YEAR UCENSE - TWO YEAR UCENSE = 'IHREE YEAR LICENSE - LATE FEES (PAST 30 DAYS) - REPLACEMB%iT TAG CAT TAGS - (3NE YEAR - UFE~IME - OWNER I~F~I-IN % OF COST EXISTING ADOPTE~ RECOVERY FEES FEES REQUIRED O2/24/94 03/'10/94 50.0 ~00.00 $15.00 ~5.00 $25.00 $25.00 $15.00 $165.00 $14.00 ~8.~ $30.00 $10.00 $5.00 $10.00 $50.00 $15.00 $25.00 $25.00 $25.00 $1 5.0O S25.00 $165.00 $20.00 $14.00 $90.00 $10.00 ~7.ao 0.00 NOTES / C(3f,~d ENrTs PAGE 5 OF 31 I7' City of Bakersfield MASTER rr_~ SCHEDULE for City Sen~ice Centers SERVICE CENTER % OFCOST RECOVERY REQUIRED EXISTING FEES 02/24/94 ADC)HIP-L) FEES 03/10/94 - AT OWNERS LOCATK3N -DOG/PUPPY -CAT/KITTEN - IMPOUND CHARGES - DOGS - SMALL / MEDIUM / LARGE - GIANT BREEDS - FEMALE IN HEAT - VICIOUS $45.00 $45,00 $16.00 $15.00 $15,00 $15.00 $45,00 $45.00 $100.00 $100.00 - CATS - RABBITS / GUINEA PiGS - SNAKES / TORTOISES - BIFFS - SMALL DOMESTIC - BIRDS - LARGE DOMESTIC - PO4JLTRY - SHEEPIGOATS/PIGS - HORSE / CATTLE $25.00 $25.00 $10.00 $10.00 $10,00 $10.00 $10.00 $10.00 S20.00 $20.O0 $100.00 S100.00 - BOAF~ING - (CHARGES ARE PER DAY) - DOGS - SMALL/MEDIUM/LARGE - GIANT BREEDS - FEMALE IN HEAT - VICIOUS - RABBITS / GUINEA PiGS - SNAKES/TORTOISES - BIRD~ - LARGE DOMESTIC - FOULTRY - SHEEP/GOATS/PIGS - HORSE ! CATrLE EXHIBIT 'A' PAGE 6 OF 31 04-Mar-94 AMO[JNT OF FEE g~REASE / (DECREASE) NOTES / COIVlMENTS $0.00 P~ HOUR (t HOUR MINIMUM) $0.00. $15.00 $15.00 $0.00 $15.oo $15.oo Ss.bo $15.00 $15,00 Ss. O0 S25.oo sss,oo S15.00 S15.~0 Ss. O0 $1o.oo $10.00 Ss. O0 s5.oo $5.00 ~.oo Ss. O0 $0.00 $~o.oo $10.00 SS.O0 $-36 S-37 S-38 8-40 S-41 $-42 S-43 S-44 S-45 $-46 City of Bakersfield MASTER FEE SCHEDULE for City Sen~ce Centers EXHIBIT "A" SERVICE CENTER POLICE RECORDING DUPLICATION SERVICE LIMOU$1N F_/rAXl/'FOWlNG REGULATION - LIMOUSINE DRIVER PEFMIT - TAXI DRNER PEI~MIT - AMBULANCE VB-flCLE INSPECTION - UMO VEHICLE flSPECTION - TAXI VEHICLE IN8PEGTION - TOWING VEHICLE INSPECTIO~ ]HI8 8ERVIGE CENTER DEU: ~=u SPECIAL EVENT SECURITY AUTOMOTIVE ACCID El*fl' INVE8TIGAT]ON - 8TANDARD REPORT - SHORT FOFM fiNGERPRINT 8ERVICE - F]R8T CAflD - EACH ADDITIONAL GAF~ 'IHI~ SEflV]CE CENTER DELETED SCHOOL CflO881NG GUARD $ERVICE POLICE PHOTOGRAPH 8ALE - fiRST PRINT - ADDITIONAL PRINT6 (EACH) S X ~0 - ADDITIONAL PRINT8 (EACH) 5 X 7 - ADDITIONAL PRINT6 (EAGH) 4 X 5 CONCEALED W~APON PERMIT PROCESSING STATE-MANDATeD FIRE IN8PEGTION - CMLIAN IN8PECTOR THIS 8ERVlGE CI~ITEfl DELETED 1]-118 8ERVlGE GENTER DELi: ~ bu fiRE REPORT 8ALE WEED ABATEMENT OR FIRE HAT-Af~ ABATE~I~T 96 OF CO6"r EXlS'I]NG RECOVERY FEES F~QUIRED 02/24/94 FEES 03/t0/94 100.0 % $~5.00 $25.00 100.0% $15.00 $15.00 $15.00 $15.00 $~:).00 StO.O0 $10.00 $~.00 $2.0O 100.0 % $0.00 $O.00 1(]0.0% $10.00 $10.00 $7.00 $7.00 1oO.O % N/A 100.0°/,, 100.0 % ~3.00 $3.00 100.0 % $160.00 AMOUNT OF FEE INCREASE / (~ECF~.~E) NOTES / CONIMENTS $0.00 ~5 CHA~GE PI~ HOUR N/A FEES SET BY LEGISLA1]ON ~0.00 CHA~GE PER HO~R (MAX FEE $200.) $0.00 CHARGE PER HO(JR (MAX FE~ ~00.) PAGE 7 OF 31 1 S-51 City of BakersNeld BASTER FEE SCHEDULE for City Sen~ce Centers SERVICE CEN'rER % OF COST RECOVERY REQUIRED EXISTING FEES O2/24j94 EXHIBIT 'A' FIRE SAFETY REVIEW/INSPECTION - UQUIRED PETROLEUM GAS INSTALLA'I3ON - LES8 THN412(30 U.S. GALLONS - MORE TH.N~I 1200 U.S. GALLONS - REINSPECTION FEE - TENT INSTALLATION (ONETIME FEE) - LESS THAN 10,~30 SQ. FT. - MORE TI-IN~110,000 SQ. FT. - REINSPECTION FEE - PAINT BOOTHS (ONE 33ME FEE) - NEW 8PRAY PAINT BOOTI-IS - REINSPECTION FEE - NON - R. AMMABLE MEDICAL GAS SYSTEMS INSTALLA'nON (ONE TIME FEE) - 1 TO 5 STATICN OUI'LETS - EACH N3OITK3NAL STATION OVER THE INrriAL 5 - REINSPE~ FEE - FIRE PRO'~-CTION EQUIFMENT -SPRINKLER SYSTEM INSPECTION (COMMERCIAL) - MINIMUM FEE - OTHERTHN~I MINIMUM (0.02 X SQ. FT,) - REINSPECTION FEE - SPRINKLER SYSTEM INSPECTION (ADOiTIONS / REMOOELS) - MINIMUM FEE - OTHERTHAN MINIMUM (0,015XSQ. FT.) - REINSPECTICN FEE - RRE ALARM SYSTEM COMFONB~T INSPECTION - MINIMUM FEE - OTHER THAN MINIMUM (0.005 X SQ. FT.) - COMMERCIAL VB~'T HOOD INSPECTICN - INSPECTION OF EACH N~DiTICNAL VENT HOOD 100.0% $100.00 S200.00 $75.00 $50,00 $100.00 $100.00 $100.00 $75.00 $150.00 $75.~0 0.015XSQFT $120.00 o.~o4 X SQFT ADOPii:~ AMOUNT OF FEES FEE INCREASE 03/t 0/94 / (DECP, E~E) $1~0.00 $75.00 $50.00 $100.00 $100.00 $100.00 $75.00 $300.00 0.02 X ~QFT $150.00 $75.00 O.015XSQFT $120.00 NOTES / COMMENTS $0.00 PE~ N)DiT. STA33ON ~ INmN. 5 $0.00 PAGE 8 OF 31 S-53 S-53,1 S-53.2 City of Bakersfield MASTER rrJ: SCHEDULE for City Sewice Centers EXHIBIT 'A' SERV;CE CENTER % OF Co~r RECOVERY RB3UIRED - STANDPIPE INSP~ - INSPECTION OF ONE STANDPIPE - CHARS E FOR EACH N3DmONAL ST/~IDPIPE - REINSPECTION FEE - EXPLC~NES PURCHASE INSPECTION - FIRST INSPECTION - EXPLC~NES PURCHASE PEP&Iff (ANNUAL RENEWA{~ - EXPLOSIVES STORAGE INSPECTION (IF MATERIAL TYPE CHANGES OCCUR) (~IEN ~ A NEW INSPECTION FEE AND NEW PEF~IIT FEE WILL APPLY) - FIRST INSPECTION - EXPLO~NE8 STORAGE PEF~IIT - ABOVE GROUND FLAMMABLE LK}UID STORAGE TANK INSTALLATION INSPECTION - INSPECTION OF ONE TANK - CHARGE FOR EACH ASDmONALTANK - PYROTECHNICS INSPECTK3N - INSPECTION BYFIRE SUPPRESSION PERSONNEL - INSPECTION BY F1RE SRFE'[Y CONTOL PERSONNEL - FIREWORKS BOOSt PEI~IIT FEE OIL WELL INSPECTION (ANNUAL) - REINSPECTION (IF REQUIRED) FIRE FALSE ALARM RESPONSE HA7-AFOOUS MATERIAL RESPONSE HAZARDOUS MATERIALS HANDLER FEES - MATERIAL ~YPE A - MATERIAL TYPE B - MATERIAL TYPE C - MATERIAL TYPE D - MATERIAL TYPE E - MATERIAL ~YPE F - MATERIAL ~'PE G - MATERIAL 7YFE H 100.0% 100.0 % 100.0 % EXISTING ADOPiI=U NvlOUNT OF FEE8 FEE8 FEE INCREASE O2/24/94 oa/~ o/~ / (DECREASE) r~qs.oo $95.0o $o.oo $18.00 $18.00 $0.00 $140.00 $140.00 $0.00 $12.00 $12.00 $0.00 $120.00 $120.00 SO.iX) $18.00 $18.00 ~.00 $130.00 $130.00 $0.00 $170.00 $170.00 $0.00 $100.00 $100.00 $0,00 $50.00 $S0.00 $0.00 $1~5,00 $185.00 $423.00 $423.00 $0.00 $110.00 $110.00 $0.00 ~10.00 $21e.00 $0.00 $327.00 $327.00 $0.00 $377.0o $377.0o $0.00 PERMIT MU~T BE RENEWED ANNUALLy PAGE 9 OF 31 $-53.3 S-53.4 S-54 City of Bakerdield MASIER FEE SCHEDULE for City Sewice Centers EXHIBIT 'A' SERVICE CENTER % OF CO~i' RECOVERY REQUIRED - MATERIAL 'WPE I - MATERIAL1YPE J - MATEPdAL'IYPE K - MATERIAL'tYPE L - MATERIAL ~YPE M - MATERIAL ~YPE N - MATERIAL TYPE 0 - RISK MGT PREVENTION PLAN FEE - HAZARDOUS MATERIALS HANDLER ANNUAL INSPECTION FEE (ADDITIONAL CHARGE TO BUSINESSES IDENTIRED AS ) (HAZARDOUS MATERIAL HANDLERS - ANNUAL INSPECTION) - 30 MINUTE ANNUAL INSPECTION - EACH ADDff, 15 MINUTES (IF N ECES~J:iY) UNDERGROUND STORAGE TANK PEF~IffS - NEW TANK INSTALLA~ON - ANNUAL OPERATING INSPECTION - TANK 'RGH3~IES~ TESTING - TANK MOOIFICATION - TANK REMOVAL - STATE SURCHARGE - SiTE ASSMT & CLEANUP OVERSIGHT - FILE RESEARCH FEE FIRE HYDRANT SALE AND INSPEC'RON LEISURE AND CULTURAL SERVICES PARK FACILITY RENTAL - PARK PICNIC FACILITY - ONE FACILITY - EACH ADDmONAL FAClUTY - SOFTBALL RENTAL- DAYTIME USE (PLUS 10% OF GROSS RECEIPTS IF 'FOR PROFIT' ) 100.0% 100.0% 100.0% EXISTING FEE8 O2/24/94 S25.00 $25.00 $15.00 $65.00 ADOt'I b.U AMOUNT OF FEE INCREASE / (DECREASE) NOTES / f'~'~.M ENTS ~5.00 $0.00 COV~S l ST ~0 MIN. QF INSPECliON r~l.O0 f.25 FOR EACH ADOJT. 15 MIN. REQ~JiRED $25,00 $15.00 $65.00 PAGE 10 OF 31 $-54.1 City of Bakerslleld MASTER rr_l= SCHEDULE for City Service Centers EXHIBIT "A" SERVICE CENTER (AND ACI~AL CHARGES FOR ANY ADOmONAL CO~T8 ) (~UCH AS REID PREP WORK'IHAT MAY BE INCURRED ) - BALLRELD LIGHT1NG SERVICE MISCELLANEOU~ PARKS SERVICES - ALCOHOL PEF~IIT - WiTH FACIUTY RESERVATION - WITHOUT FACILITY RESERVATION (NON REFUNDABLE) - OPEN TO THE PUBLIC - SOUND PEF~AIT - RESCHEDUMNG FEE ON FACILITY RENTALS - CANCELLATION FEE ON FACILITY RENTALS - FIREWOOO SALES - ONE-~tlF~ OF A COF~I (UNCLT~ - ONE-HALFOF A CORD (UNCUT) - ~NO-~;FO8 OF A CORD (UNCUT) crrY ADULT PROGRAMS AND ACTIVmES - CITY A[XJLT VOLLEYBALL PROGRAM - OUT1XX)R PROGRAM - PRN^TE LEAGUES - City ADULT SOFTBALL PROGRAM - LEAGUE [~'4T'RY FEE PER TEAM - wm-I OFFICIALS - RESCHEDUMNG FEE - P~IVATE LEAGUES - CIIY ADULT BASKETBALL PROGRAM - MEN8 PROGRAM - WOMEN8 PROGRAM - ADULT TENNIS PROGRAM - SINGLES - DOUBLES % OF CO~T EXISTING ADOPTED RECOVERY FEES FEES REQUIRED 02/24/94 03/10/94 100.0% 85.0 % $13.50 $8.00 $50.00 $20.00 $8.00 $t3.00 $215.00 $140.00 $415.00 ACTdAL COS~ $410.00 $185.00 $12.00 $18.00 $13.50 $4.~ $13.~ $30.00 $215.00 $140.00 .~'TLL~. COSlS $415,00 $410.00 $185.00 $12.00 $18.00 / (DECREASE) PAGE 11 OF 31 8-56 8-57 $-58 G-59 $-60 S-61 SERVICECENTER - ADULT SPORTS TOU Fg,,IAM B',~S THIS SERVICE CEN ! EH DEIk ~ f::u 11'11S SERVICE CENTER DELETED '11118 SERVICE CEN'I~=R DELe ~ ~=u THIS SERVICE CENTER DELt=I ,~u CITY YOUll-I PROGRAMS AND ACTNI~ES - ClIY YOU~-I BASKETBALL PROGRAM - CHARGE PER PU~YER WIn-lOUT COACHES - TEAM FEE - BABYSrTTING CLASSES - CROSS COUNTRY EVENT - PRE REGISTRATION - LATE REGISTRATION RECREATIO~ CENTER RENAL City of Bakersfield MASTER rr_J: SCHEDULE for City Sewice Centers % OF COST EXISTING RECOVERY FEE8 REQUIRED 02/24/94 50.0% ADO~I bU V/~RKX.IS VAqlOLIS EXHIBIT 'A' AMOUNT OF FEE INCRF..ASE / DECREASE) NOTES / COMMENTS $0.0o CHARGE $0.00 20.0% CATEGORY A - NON PROFTT - NO CHARGE TO'THE PUBLIC (THE FOLLOWING CHARGES ARE FOR ONE HOUR OF RENTAL) (A'1%¥O HOUR MINIMUM RENTAL 18 REQUIRED.) (AN EXTENDED HOUR RATE SCHEDULE IS AVAILABLE UPON REQUES1) - MARTIN LU13'IER KING FACII. YrY - G'TRONG ROOM - STRONG ROOM W/KffCHEN - GREEN ROOM - GREEN ROOM W/KiTCHEN - STRONG/GREEN ROOMS - STRONG/GRE~4 ROOMS W/KffCHBd - YOUNG (GAME) nOO~ YOLk%'G (GAME) ROOM W/KiTCHEN - BROWN (WEIGHI~ ROOM - BROWN (WEK~HT) ROO~ WlKJTCHEN - YOUNG / BROWN ROOMS ;10.00 ;14.00 H4.00 ;15.00 rl 9.00 ;12.00 ;16.00 ;15.00 ;19.00 $10.00 $14.00 $~o.oo $14.00 $~5.oo $19.00 $12.00 $16.00 $15.00 Sm. Oo PAGE 12 OF31 City of BakerMield MASIER FEE SCHEDULE for City Sewice Centers SERVICE CENTER % OFCOST RECOVERY REQUIRED EXISTING FEES O2/24/94 - YOUNG / BROWN ROOMS W/I(ffCHEN - WILLIAMS MULTI PUt~O(~E ROOM (GYM) - WlI. I-I~tS ROOM (GYM) W/BLEACHERS - CONFERENCE ROOM - Ci'TY STAFF CHARGES (RATES SUBJECTTO CHANGE DEPENDING) (ON ACTUAL PosmoN8 U~UZED FOR THE SERVICE) - SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN.) - CUSTODIAL (CHARGE PER HOUR - 2 HOUR MIN,) - EQUIPMENT RI~ITN. (INCLUDES ~=T-UP AND TAKE-DOWN) - TABLES (PER TABLE) - CHAIRS (PER CHAIR) - SCOREBOA~ - PER HOUR (OPERATOR INCLUDED) - P.A. - 3WO SPEAKERS AND A MIC - ADDmONAL SPEAKERS (PER PAIR) - PORTABLE STAGE - SILVER CREEK COMMUNn'Y C B"~TE R - MEETING ROOM #1 - MEETING ROOM #1 W/I(~rCHEN - MEETING ROOM #2 - MEETING ROOM ~ WjKITCHEN - MEL='r~G ROOM #1 & #2 - MEETING ROOM #1 & ~ W,~JTCHEN - COVERED COURT AREA - COVERED COURT AREA WA.IGHTS - Cl3Y STAFF CHARGES (RATES SUBJECTTO CHANGE DEPENDING) (ON AC3tJAL FOSITIONS UTlUZED FOR THE SERVICE) - SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN,) - OUSTOOIAL (CHARGE PER H(XJR - 2 HOUR MIN.) - EQUIPMENT RENTN. (INCLUDES SET-UP AND TAKE-DOWN) EXHIBIT 'A' Rev, Date: 04-Mar -94 ADOP't ~.u NdOUNT OF FEES FEE INCREASE 03/10/94 / (DECPE_ASE) $24.00 $24.00 SO.O0 $15.00 $15.00 SO.O0 $13.00 $13.00 SO.00 CH,aRGE PER HO~IR $11,00 $11.00 S0.QO CHARGE PI~ HOUR $1.00 $1.00 SO.OO SO.25 SO25 SO.O0 $7.50 $7,50 SO.00 $12.00 $16.00 $12.oo $16.00 $12,00 $13.(X} $11.oo $12,00 $16.00 $12,00 $16,00 ~?.4.(X3 $12.00 $13.00 $11.00 SO.O0 CHN:IGE PER ~ PAGE 13 OF 31 City of Bakerslield MAS~IER FEE SCHEDULE for City Sewice Centers EXHIBIT 'A' SERVICE CENTER % OF COE;T RECOVERY REQUIRED EXIS~NG 02~4/94 - TABLES (PER TABLE) - CHAIR~ (PER CHAIR) - P.A. SYSTEM - TWO SPEAKERS AND A MIC - ADDITIONAL SPEAKERS (PER PAIR) CATEGORY B - NON PROFIT - ADMISSION CHARGE TO FUBMC CFHE FOLLOWING CHARGES ARE FOR ONE HOUR OF RENTAL) (A TWO HOUR MINIMUM RENTAL I$ REQUIRED.) (AN EXTENDED HOUR RATE SCHEDULE IS AVAILABLE UPON RE-QUEST) - MARTIN LU'IHER KING FACILITY - STRONG ROOM - STRONG ROOM W/IGTCHEN -GREENROOM - GREEN ROOM W/KITCHEN - STRONG IGREEN ROOMS - STRONG/GREEN ROOMS W/YJTCHEN - YOUNG (GAME) ROOM - YOUNG (GAME) ROOM W/KITCHEN - E~OWN {WE~H~ ROC~ W/KnCHEN - YOUNG / BROWN ROOMS - YOUNG / BROWN ROOMS W/KffCHEN - WILLIAMS MULTI PURPOSE ROOM (GYM) - W~LLU~S ROOM (GYM) W/Bb~CHE~S - CONFERENCE ROOM - ~ ~TAFF CHARGE~; (RATES SUBJECT TO CHANGE DEPB~ID~IG) (ON ACTUAl. POntoON8 UTIUZED FOR THE SB:NICE) - SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN.) - CUSTOOIAL (CHAR3E PER HOUR - 2 HOUR MIN.) - EQUIPMENT RENTAL (BICLUDE$ SET-UP AND TAKE-DOWN) - TABLES (PER TABLE) $24,00 ~.0,00 $24,00 $30.00 $24,00 ~0.00 $34.00 $40,00 $44.00 $20.00 $13.IX) $11 $1.50 ADOPTED FEES 03/~0/94 $20.00 ~24.00 $20.00 $24.0O ~4.00 $28.00 $13.00 $11.00 $1.50 AMOUNT OF FEE INCREASE / (DECREASE') NOTES / COMMENTS ~ PR EPARA1tON FEE MAy B~ REQUIRED PAGE 14 OF 31 City of Bakemlield MASTER FEE SCHEDULE for City .~-n~ice Centers EXHIBIT 'A' SERVICE CI~I'rER %OFCOST RECOVERY RE(~IBED - SCOREBOARD - PER HOUR (OPERATOR INCLUDED) - P.A. SYUl - ~&/O SPEAKERS AND A MIC - ADDmONAL SPEAKER~ (PER PNR) - PORTABLE STAGE - SILVER CREEK COMMUNITY CENTER - MEE"RNG ROOM - MEETING ROOM #1 W/KITCHEN - MEETING ROOM - Mt-~ I lNG ROOM #2 W/KITCHEN - MEETING ROOM #1 & ~2 - MEETING ROOM #1 & #2 W/KITCHEN - COVERED COURT AREA W/LIGHTS - KITCHEN - CITY STAFF CHARGES (RATES SUBJECT TO CHANGE DEPENDING) (ON ACTUAL POSITIONS UTILIZED FOR THE SERVICE) - SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN.) - CUSTOOIAL (CHARGE PER HOUR - 2 HOUR MIN.) - EQUIPMENT RENTAL (INCLUDES SET-UP AND TAKE-DOWN)' - TABLES (PER TABLE) - CHAIRS (PER CHAIR} - P.A. - TWO SPEAKERS AND A MIC - ADDITIONAL SPEAKERS (PER PAIR) CATEGORY C - PRNATE USE - ALL CHARGE8 TO'IHE PUBLIC PROHIBn'ED (THE FOLLOWING CHARGES ARE FOR ONE HOUR OF RENTAL) (A THREE HOUR MINIMUM RENTAL IS REQUIRED.) (AN EXTENDED HOUR RATE SCHEDULE IS AVAILABLE UP(~I REQUEST) - MARTIN LUTHER KING FAClLR'Y EXISTING ADOP!t:U AMOUNT OF FEES FEES FEE INCREASE 02/24.~94 03/10/94 / {DECREASE) ~.~0 $0.30 $o.oo $10.00 $10.00 $17.50 $17.50 $0.00 $7.50 $7.50 $0.00 $7.5O $7.5O $0.00 $36.00 SaS.oo $o.oo $4o.oo $40.00 $0.00 $10.00 $10.00 $14.00 $14.00 $o.oo $10,00 $1o.0o $13.00 $11.00 $13.00 $tl.00 NOTES $~5.00 $25.00 $0.00 $10.00 $10.00 $0.00 PAGE 15 OF 31 1 SERVICE CENTER - STROiflG ROOM - STRONG ROOM W/KiTCHEN - GFI~I~I ROOM - GREEN ROOM W/KffCHEN - STRONG/GREEN ROOMS - smoNG/GREEN ROOMS W/~dTCHEN - YOUNG (GAME) ROOM - YOUNG (GAME) ROOM W/KffCHEN - BROWN ONEIGHT) ROOM - BROWN (WEIGHT) ROOM w/KrrCHEN - YOUNG / BROWN ROOMS - YOUNG / BROWN ROOMS W/KITCHEN - WILUAM8 MULTI PURPOSE ROOM (GYM) - WILLIAMS ROOM (GYM) W/BLEACHERS - CONFERENCE ROOM City of Bakemtield MASTER FEE SCHEDULE for City Senace Centers % o~cosT RECOVERY - ClIY STAFF CHARGES (RATES SUBJECT TO CHANGE DEPENDING) (ON ACTUAL POSmONS UTILIZED FOR THE SERVICE) - SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN.) - OUSTOOIAL (CHARGE PER HOUR - 2 HOUR MIN.) - EQUIPMENT RENTAL (INCLUDE8 SET-UP AND TAKE-DOWN) - TABLES (PER TABLE) - CHAIR8 (PER CHAIR) - 8COREBOAFO - PER HOUR (OPERATOR INCLUDED) - P.A. SYSTEM - TWO SPEAKERE AND A MIC - ADD~ SPEAKER8 (PER PNR) - PORTABLE STAGE - SILVER CREEK COMMUNITY CENTER - MEET1NG ROOM #1 - MEETING ROOM #1 W/KiTCHEN - MEETING ROOM ~ EXHIBIT 'A' Fbv. Date: 04-Mar-94 EXISt'lNG FEES 02/24/94 ADOP'~ e.u FEES 0a/1o/94 AMOUNT OF FEE INCREASE / (DECREASE) NOTES / COMMBqTS $13.00 $11 $2.00 $0.35 $12.50 $20.00 $10.00 $10.00 $13.00 $11.00 Sl2.~ $10.OO $10.00 PAGE 16 OF 31 SERVICE C~(TER City of Bakerslield MASTER FEE SCH~DUIF for City Sewice Centers EXHIBIT 'A' %OFCO~T RECOVERY REQUIRED 02/24/94 S-62 S-63 - MEETING ROOM ~2 W/KITCHB~I - MEETING ROOM ~1 & #2 - MEETING ROOM #1 & f2 W/KITCHI~I - COVERED COURT AREA - CITY STAFF CHARGES (RATES SUBJECT TO CHANGE DEPENDING) (ON ACflJAL POSfltON8 UTILIZED FOR '~IE SERVILE) - SUPEFIVl81ON (CHARGE PER HOUR - 2 HOUR MIN.) - CUSTODIAL (CHARGE PER HOUR - 2 HOUR MIN.) - EQUIPMENT RENTAL (rNCLUDES SET-UP AND TAKE-DOWN) - TABLES (PER TABLE) - CHNRS (PER CHAIR} - P.A. SYu;t:M - TWO SPEN(ERS AND A MIC - ADDmONAL SPEAKERS (PER PAIR) CATEGORY D - MARTIN LL,q~ ER KING CEN ~ t::H OFFICE PENTAI.S - CHARGE PER OFFICE PER MONTH 1HIS SERVICE CENTER DELr= ~ ~u RECREA1]ONAL SWIMMING 20.0 % - CHARGE PER DAY - SEASONAL PASS - SWIM FOR FITNESS - CHARGE PER DAY - SEASONAL PASS - WATER MOVIES - PER PERSON ($3.00 DI~X~XJNT FOR FAMILY OF FIVE OR MORE) - SPECIAL AI~JATIC EVENTS AQUATIC PROGRAMS - CITY RESIDENTS 35.0 % - SWIMMING LESSONS - CITY RESIDENTS $35.00 $45.00 $50.00 $'12.00 $12.00 $13.00 S11.00 $12.50 $120.00 $1 .IX) $35.00 S45.00 $50.~0 $12.00 $15.00 $12.~0 $13.~O $11 $3.00 $30.00 $12.50 $120.00 $1.00 PAGE 17 OF 31 1 City of Bakersfield MASTER r~-c SCHEDULE for City Sewice Centers EXHIBIT "A' SERVICE CI~4TER % OFCO~I' RECOVERY REQUIRED - ONE $E88[~ (10 DAYS) - Cl/Y RESIDENTS - AUTlSlqC~EAF CLASS FEE (COVERS ALL SESS~qS) - BASIC UFE~UAF~ CLASS - JUNIOR UFEGUARD CLASS - PRIVATE LESSONS - ~EMIPRIVA'IE LESSONS - COMPt;iiiIVE SWIMMING - CITY RESIDENTS - SWIM POOL RENTAL - CIIY RESE)ENTS (RATES ARE PER HOUR) (2 HOUR MINIMUM RI~qTAL REQUIRED) - JErH:tt~ON POOL & SILVER CREEK POOL 1 - 5O PEOPLE 51 - 100 PEOPLE 101 - 180 PEOPLE 131 - 200 PEC~Ot.E - CAUFORNIA POOL (M.L KING) 1 - 50 PEOPLE 51 - IiX) PEOPLE 101 - 130 PEOPLE 13! - 200 PEOPLE - ALL OTHER POOLS 1 - 50 PEOPLE 51 - 100 PEOPLE 101 - 130 PEOPLE AGUATIC PROGRAMS - NON RESIDENTS - SWldMiNG LES,.qON$ - NON RESIDENT8 - ONE 8E881ON (10 DAYS) - NON RESIDBqTS BASIC UFBGiUAFO CLASS - JUNIOR UFEGUARD CLASS - PRIVATE LESSONS - 8EMIPPaVATE LESSONS 45.0 % EX!b~TING FEE8 02/24/94 $17.00 $17.00 ADOPTED 08/10/04 AMOUNT OF FEE INCREASE I (DECREASE) $17.00 $17.00 ~5.00 $25.00 PAGE 18 OF 31 S-66 8-67 S-68 ~S-69 City of Bakersfield MASTER FEE SCHEDULE for City Sendce Centers EXHIBIT 'A' SERVICE CI~TER % OF COST EXISTING RECOVERY FEES REGUIRED 02/24/94 - COMPt: ~ ~ ~ WE SWIMMING - NON RESIDENTS - SWIM FOOL RENTAL - NON RESIDENTS (RATES ARE PER HOUR) (2 HOUR MINIMUM RENTAL ~IRED) - JEFFERSON POOL & SILVER CREEK POOL I - 50 PEOPLE 51 - 100 PEOPLE 101 - 130 PEOPLE 131 - 200 PEOPLE - CAUFOI~IA POOL (ML KING) 1 - 50 PEOPLE 51 - 100 PEOPLE 101 - 130 PEOPLE 131 - 200 PEOPLE ALL OTHER POOLS 1 - 50 PEOPLE 51 - 100 PEOPLE 101 - 130 PEOPLE LEISURE CLASSES THIS SERVICE CENTER DELETED ~HIS SERVICE CENTER DELETED ADOPTED FEES 03/10/94 AMOUNT OF FEE iNCREASE / (DECREASE) $0.00 NOTES / COMMENTS $45.00 75.0 % $40.00 $0.00 3 IFF=GUARDS $0.00 4 L~=EQUN~DS $0.5O 4 LFEGUAROS THIS SERVICE CENTER DELETED - BASK:: BUILDING RENTAL RATES - CONCERT HALL $800.~0 ARENA $650.~0 - CONCERT HALL AND ARENA - MUL'I1-DAY PERFORdANCES - TICIM:[~tu PERFORMANCES OF TWO OR MORE CONSECUTNE DAYS ARE OFFERED THE FOLLOWING RENTAL CAPS FOR THE CONCERT HALL TICKET PRICE $1,5O0.00 $800.00 $650.00 $1,5O0.5O PAGE 19 OF 31 j?' City of Bakersfield MASIER FEE SCHEDULE for City Sewice Centers EXHIBIT "A' SERVICE CENTER - $1 .oo TO $2o.o0 - $20.01 TO ~0.00 - $30.0t NqD ABOVE - CASH PERFORM~ICE DEPORT IN ADDiTK~I TO RENTAL RATES USTED ABOVE IS REQUIRED TO COVER O'I~ER EXPENSES Lt~ ~ ~LJ BELOW - MEETING ROOMS - GRAPE ROC~ - POTATO ROOM - BANK ROOM - CARROT ROOIVl - ALL OIHER ROOMS - EX}'flBff / TRADE SHOWS - ENT1RE BUILDING (PER DAY) - CONCERT HALL OR ARENA (PER DAY) - CONVEN'rloNs - BUILDING RENTAND PARi(JNG - SOUND AND UGHT MAN - SOUND AND LIGHT MAN (OVER 8 HOURS) - AIR CONDITIONING TECHNICIAN - AIR CONDITIONING TECH (OVER 8 HOURS) - E.)O'IIBff SPACE ($O.05/EQ.FT./DAY) - O~-IER FACILIIY USES - $1000 PER DAY OR 10% O~= GROSS, WHICHEVER IS GREATER - CA'~ERING - $,.q00 OR 15~ OF GROSS SN..ES, - FOOD - $200 OR 15% OFGROSS RALE$, PER DAY, WHICHEVER IS GREATER - ALCOHOUC BEVERAGE8 - CONTACT PANI SI.-IIPLEY, (805) 322-9903 - BOX OFFICE % OF COST EXISTING RECOVERY FEE8 REQUIRED 02/24/94 $150.00 $~so.oo $100.00 $1,000.00 $1 $15o.oo $150.00 $150.00 $100.00 $100.00 $75.00 $1 $1,000.00 $34.50 $23.00 $84.50 $O.05 NV47dNT OF FEE INCREASE / (OECREASE) NOTES/~ENTS SO.Q0 $2.00 PAGE 2O OF 31 fM81 SERVICE CENTER City of Bakerslield MASTER Pr_t: SCHEDULE for City Sewice Centers EXHIBIT 'A' %OFCO~T RECOVERY REQUIRED EXISTING FEES 02/24/94 AMOUNT OF FEE INCREASE ! (OECREASE) NOTES / COMMENTS - TICKET ORDERING - ADVANCE TICI~-'T SALES - PER DAY - ~CKET SELLERS - PER HOUR PER PERSON - DOORMAN - PER HOUR PER PERSON - PHONE O~ER SERVICE FEE - SALES FOR EVENTS NOT HELD AT CONVENTION CENTER = 5% OF GROSS. OUTSIDE TICKET OUR.ETS CANNOT COMME~ICE SALES PRIOR TO 1HE CENTER FRONT OF HCX)SF PFR~Z)NNEL USHFRS CONCERT HALL (PER EVEN'~ - AHENA (PER EVENI} ENTIRE BUILDING (PER EVENT) - ,qTAGENAN~ I; - 8TAGB4AND I - WARDROBE SECURITY - AT ALL EVENTS WHICtt REQUIRE SECURITY. PflNATE SFCURITY OFRCERS MUST BE USED OFFICERS ARE PAID PER HOUR WITH A 4 - HOUR MINIMUM TIMF AND ONE,l-IAI F (I 5) Wll L BE PAID IF THF FVFHT TAKr$ PLACE ON A C~Y IIOLIDAY AS ADOPTED BY SkPARATE H~-~OLUt'ION. ~-IE TO IAL NUMBER OF OFFICI-RS ASSIGNED WILL BE DECIDED BY '~ IE MANAGEMENT OF ~-IE BAKEF~FIELD CONVENTION CENTER ROCK ENOWS USUALLY REOUlRE 35- 45 OFFICERS SECURriY SUPERVISOR ASSISTANT SUPEF~,'ISOR $250.00 $125.00 $125.00 $17500 $1300 $1150 $125.00 $125.00 $175.00 $15.~} $14,50 $t8,00 $11.~0 $13.00 $11,50 S0.00 SO.IX) PER DAY ~).00 PE~ PBRSON P~ HOUR $0.00 PER PE~8ON PI~ HO~R $0.00 CHARGE P~I ~.ANSAC11ON SEE COMM~IIS $1.75 FI~ PER~N PB~ HO~ PAGE 21 OF 31 M~SI SERVICE CENTER City of 6akerslield MASIER FEE SCHEDULE for City Sen4ce Centers EXHIBIT 'A' % OF COST FC-COVERY REQUIRED EX~NG FEES O2/24/94 ADO~t:u FEES 0O/1 O/94 AMOUNT OF FEE INCREASE NOTES / COMMENTS - 8ECURI~( OFFICER - NOVEL1Y ITEMS - THE SALE OFANY NOVELTY ~ (E.G. RECORDS, SHIRTS, PROGRAMS, ETC.) DURING AN EVENT MUST RRRT BE CHECKED ~HROUGH THE BUILDING MGT. - 25% OF GROSS SALES TO BE PAID TO THE CONVENTION CENTER - 15% OF ~ SALES FOR REUGIOU8 EVENTS - ALL TRANSACTIONS MUST BE SETTLED WITH THE BUILDING PERSONNELTHE NIGHT OF THE EVENT. - THE CONVENTION CENTERWlLL PROVIDE ~AI.E8 PERSON AT NO CHARGE - VEN~CLE PARKING - DAILY RENTAL OF PAFI~NG LOT - PER VB-IICLE PER ENYRY - DECORATING CHARGES - RATE8 ARE FOR DURATE)N OF EVENT - FOLDING CHAIR - 3'X 3' TABLE - 0O' X 5'TABLE - 30' X 6'TABLE - 3(7' X 8'TABLE - 3'X 8' TABLE - 18' X 6' TABLE - 5' ROUND TABLE - 7' BENCH TABLE - 3' X 3' TABLE W/SKIRT - 30' X 5' TABLE W/SI~RT - 30' X 6' TABLE W/SKIRT $10.50 25.00% 15.0(ffo $7.bo $8.00 $10.00 $12.00 $13.00 $10.00 $17.50 $2s.so ~7.00 $10.50 :~$.00% $7.00 $8.00 $12.0O $13.00 $7.0O $10.0O $8.00 $17.50 $23.50 $27.0O PAGE 22 OF 31 City of Baker~eld MASTER FEE SCHEDULE for City Sen4ce Centers EXHIBIT 'A' SERVICE CENTER - 30" X 8' TABLE W/SKIRT - 3' X 8' TABLE W/SKIRT - 5' ROUND TABLE W/~KJRT - 7' BENCH TABLE W/SKIRT - BOO'TH: 8' X I0' OR 10' X 10' - BOOTH: 8' DRAPE (UNE FEE~ - BOOTH: $' DRAPE (LINE FEED - CARPET8' X 8' - PIT CARPET - AISLE CARPET (PER LINE FOOl') - CARPET RUNNER 4' X 8' - 4' X 8' DISPLAY BOARD - 4' X 6' DRY MARKER BOARD - EAS~. ~ 500TH ~U~ RAT~S A~E ~E~ S~OW - 12'X 14'MOVIE SCREEN - 96" X g6' MOVIE SCREEN - 70" X 70' MOVIE SCREEN - 10' X 10' REAR VIEW SCREEN SUPER '~OUPER - '[ROUPER - EXTRA STAGE (56' X 32') - EX'mA STAGE (56' X 40') % OF CO~T EXISTING RECOVERY PEES FEE8 REQUIRED O2/24/94 03/10/94 $1.00 $0.50 $20.00 S~o.oo $10.00 $10.00 $7.50 $15.00 $100.00 $100.00 $! 5.00 $100.00 $100.00 $175.00 NV4XJNT OF FEE INCREASE ~25.50 $25.0O $20.00 $1.00 $100.~o $1 $10.00 $1o.oo $1o.oo $15.oo $1oo.oo LINE FOOT $100.00 ~0.00 $100.00 ;0.00 $100.00 $175.00 ~0,00 PAGE 23 OF 31 1 SERVICE CENTER City of Bakerdield MASTER I-r_l: SCHEDULE for City Service Centers % OF CO~-q' RECOVER~ - STAGE BARRICADE - SOUND WINGS - 6' X 8' PORTABLE STN:~iE - STRUCTURAL STEEL SEAT RISERS - BOXING RING (3-ROPE, 20' X20') - SCAFFOLDING - UPRIGHT PIANO - BABYGRAND PIANO - 9' CONCERTGRAND PIANO -ORGAN - OVEi:~EAD PROJECTOR - SLIDE PROJECTOR - PROJEOTION STAND - 16mm PROJECTOR - VlOlO PROJECTOR (INCLUDES SETUP) - VCRK)ART/MONiTOR - FC COMPATIBLE MONITOR (,,~::~,dY) - MONITOR SPEAKER - WIRELESS MIC (LAVAMER) - WIRELESS MIC 0-1AND HELD) - IA. PGE U.S. FLAG - TAPING - CASSt:~ if= - MIRROR BALL - PLYWOOO FLOOR COVERING - PARQUET DANCE FLOOR 3' X 3' PANELS - 1ST 100 PANELS (MIN CHARGE $100) - ADDITTONAL PANELS $1.50 EACH (MAX FLOOR SIZE 42' X 57' = 266 PANELS) - BASI<ETBAU. FLOOR EXHIBIT 'A' FESS AMOUNT OF FEE INCREASE /(DECREASE) $100.00 $100.00 $12.00 $100.00 $75.00 $100.00 SmO.OO $25.00 $10.00 $25.00 $100.00 $25.00 ~25.oo $1 SO.00 $100.00 $100.00 $12.00 $100.00 $75.00 $100.00 $25.00 $10.00 $25.00 $100.00 S25.00 $75.00 $25.~o $15O.00 .50 $3.00 $1.5O $0.00 $3.00PER PAN~ OAIN Ct'IA,RGE $100) $0.00 $1.50PBR PANEL PAGE 24 OF 31 SERVICE CENTER City of Bakemliek:l MASTER FEE SCHEDULE for City Sen~ice Centers EXHIBIT 'A' % OFCOST RECOVERY REQUIRED FEES 03/1 NUOUNT OF FEE INCREASE / (OECREASE) NOTES I COMMENTS - CHC~R RISER (PER UNIT) - CHOIR 8HEU. (PER uNrr) - MUSIC STN~DS - ELECTRICAL - SURGE PROTECTED PLUG STRIP - EXTI~$1ON COED (PER 10 FT.) - SHORE POWER - liXX~ WATT, 120 VAC - 1000 WATT, 120 VAC (DEDICATED SERVICE) - 20(X3 WATT, 120 VAC - 3000 WATT, 120 VAC - FRACTIONAL HP MOTOR, 120 VAC - 1000 WATTOR 1 HP, 120/208 - 2000 WATT OR 2 HP, 120/208 - 3000 WATTOR 3 HP, 120/2~6 - 208v DISTRIB~ TO: LOADS OVER 3{~O WA'IT/INSOE LOADS OVER 3000 wA'rr ! OUTSIDE - MISCELLANEOUS CHARGES - ORIGINATION FEES (PER DAY RATES) -' OUTSIDE CLEANUP (PER EVENT) - PICTURES & FLOWERS (lff~ OF GROSS) - VIDEO HOOKUP - LABORER (RATE PER HOUR) - FORKUFT (4,000 LBS CAPACI~ (RATE PER flOUR) (1/2 HOUR $25 M~IMUM CHARGE) - FACILFTY OVERT1ME (IHO~E HOURS BE'rWEEN 12:00 MIDNIGHT AND 6:00 A.M.) - FAX CHARGES (SEND OR RECEIVE. CONTINENTAL USA) - FIRST PAGE - EACH ADDmONAL PAGE $100.00 $200.00 $5~0.00 $100.00 10.00% $50.00 $~5.oe S5.00 $1.00 $15.00 $,5.00 $40.00 ~30.00 ,'75.00 $100.00 $100.00 $.500.00 $100.00 $50.00 PAGE 25 OF 31 City of Bakerslield MASIER FEE SCHEDULE for City 8ewice Centers % OFCOST SERVICE CENTER REQUIRED EXHIBIT 'A" EXISllNG FEES 02/24/94 - ADVANCE MAR(~EE TIME (PER DAY) - LABOR CHARGE BACK - OPERATIONS (RATE PER HOUR) - FLOOR ;CE - INITIAL MAKING - MAINTAIN FLOOR ICE (CHARGE PER DAY) UTIMTY AND ENI'ERPRISE SERVICES $-71 DOMEST~ WA3ER SERVICE 100.0% S-72 AG RICULI~J RAL WATER SERV;CE 100.0% S-73 SANffARY 8EWER SERVICE 100.0% S-?4 IN DUS~RIAL WASTE DISCHARGE MON flORINS 100,0% - DISCHARGE MONffORING ANNUAL FEE - NONCOMPLIANCE REINSPECTICNS - OUTSDE LABORATORY TESTING FEES 8-75 WASTEWATER SERVICE - - O3~'IER AGENCIES 100.0% - UNION AVE COUN/Y SAN ffA~43N DIST. - ALTA VEI~)E COUN'IY SANffATION DIST. - FAST NILES COMMUNITY SERVICES DIST, 8-76 SEWER CONNECTE)N 100,0% S- 77 SEWER STOPPAGE INVESTIGATION 100,0 % S- 78 RESlDEN~AL REFUSE SERVICE 1 00.0 % - SINGLE FAMILY DWELLING - MUL¥1PLE FAMILY DWELLING S-79 COMMERCIAL REFUSE SERVICE 100.0 % - BIN SIZE BY CUBIC YARD - 1.5 CUBIC YARDS PICKUP DAY~ / WEEK = 1 PICKUP DAYS / WEEK = 2 PICKUP DAYS / WEEK = 3 PICKUP DAYS / WEEK = 4 PICKUP DAYS / WEEK = 5 PICI~JP DAYS / WEEK = 6 - 2.0 CUBIC YARDS $10.00 N/A ~A ~A $415.00 $415.00 ACTUN. COSIS $151,793,00 $250,103.00 N/A $100.00 $123.00 $111.00 $111.31 $155,24 S252.87 A[:X~PTED FEES 08/10/94 $10.00 N/A N/A N/A .$41500 $415.00 ACTUN. COSTS $151,793.00 $250,I03.00 N/A $100.00 $123.00 ' $111.00 $56.24 $70.30 $111.31 $155.24 $202.10 $252.87 AMOUNT OF FEE INCREASE ! (OECREASE) PAGE 26 OF 31 SERVICE CENTER City of Bakersfield MASTER FEE SCHEDULE for City Sewice Centers EXHIBIT 'A' % OF COST RECOVERY REQUIRED EXISTING FEES O2/24/94 AMOUNT OF FEE INCREASE PICKUP DAYS / WEEK = 1 PICKUP DAYS / WEEK = 2 PICKUP DAYS / WEEK = $ PICKUP DAYS/WEEK = 4 PICKUP DAYS / WEEK = 5 PICKUP D^Y8 / WEEK = 6 - 8,0 CUBIC YAPO8 PICKUP DAYS / WEEK = 2 PICKUP DAYS / WEEK = 3 PICKUP DAYS / WEEK = 4 PICKUP DAYS / WEEK = 5 PICK[JP DAYS / WEEK = 6 - 4.0 CUBIC YAF/~ PICKUP DAYS / WEEK = 2 PICKUP DAYS / WEEK = $ P~CKUP DAY8 / WEEK = 4 PICKUP DAYS / WEEK = 5 PICKUP DAY8 / WEEK = 6 * DETACHABLE COMPACTOR BINS ARE * CHARGED AT ~'IREE TIMES 'tHE 81'ANDARD SIN RATE - COMMERCIAL CANS - NUMBER OF CANS - ~ CANS PICKUP DAYS ! WEEK = 2 PICKUP DAYS / WEEK = 3 PICKLIp DAYS ! WEEK = 4 PICKUP DAYS ! WEEK = 5 PICKUP DAYS ! WEEK = 6 - THREE CANS PICKUP DAYS / WEEK = 2 PICKUP DAY8 / WEEK = 3 $70.30 $87.87 $139.13 $193.81 $315.36 $105.44 $166.95 $377.84 $141.57 $311.45 $,504.76 $16.11 $23.44 $31.24 $23.44 $35.14 $70.30 $87.87 $139.13 $193.81 $315.36 $105.44 $141.57 $222.60 $311.4~ $404.20 $504.76 $16.11 $33.44 $31.24 $23.44 $35,14 PAGE 27 OF 31 1 City of Bakerslield MASIER FEE SCHEDULE for City Sewice Centers EXHIBIT "A* % OF CO~T RECOVERY REQUIRED FEES 03/10/94 AMOUNT OF FEE INCREASE / ~ECREASE) NOTES / COMMENTS S-80 S-81 PICKUP DAYS / WEEK = 4 PICKUP DAYS I WEEK = 5 PICKUP DAYS / WEEK = 6 - FOUR CANS PICI~JP DAYS / WEEK = 2 PICKUP DAYS / WEEK = 3 PICKUP DAYS/WEEK = 4 PICKUp DAYS / WEEK = 5 PiCKUp DAYS / WEEK = 6 - SPECIAL SERVICES - REFUSE ROLL OFF BINS (PER PICK UP) - RECYCLING ROLLOFF BINS (PER HOUR) - COMMERCIAL AUTOMATED CARTS(PER MON3~) - RESIDEN11AL AUT~TED CART(PER MONTH) - DETACHABLE BIN RI3~rAL (PER MONTH) IN ADDnlON TO THE ABOVE CHARGES 'n-lE crrY WiLL BE COLLECTING A GATE FEE DISI~L CHARGE OF $29 PER TON (OR $2 PER CUBIC YARD) ON ALL COMMERCIAL REFUSE BILUNGS. THiS MONEY WILL THEN E~E PASSED CH TO KEEN COUNTY. - KERN COUNTY GATE FEE (PER TON) - KEF~I COUN3Y GATE FEE (PER CUBIC YARD) THis SERVICE CENTER DELe: ~ t:u MUNICIPAL AIRPORT MAINT. AND OPERATION - AII:~I..AN E STORAGE (PER MON'n-I) MONTHLY TIE DOWN MDNIHLY'rtE DOWN (NEW AREA) COCKPIT 8HADEPORT PORTA FORT (OWNER HANGERS) 8HADEFORT, WA'FrS 100.0% $31.73 $47.35 $175.~0 $23.44 $10.25 $16.00 $25.00 $31.73 $47.35 $62.97 $78.59 $175.00 SE0.00 S23.44 $10.25 $1e.00 Ir~5,O0 $0.00 $0.00 IS0PER I-KXJR $0.00 PER C&qTPBI UONTH (IM-I~E AVALM~ $0.00 PER CNTTPtm MC)N~ (WHERE AVAL,~.~ ~0.00 PER BINPER UONIH(WHI~EAV~) PAGE 28 OF 31 SERVILE CENTER City of Bakersfield MASTER FEE SCHEDULE for City Sewice Centers % OFCOST EXIST1NG RECOVERY FEES REQUIRED O2/24/94 EXHIBIT 'A' A~FI'ED FEES AMOUNT OF FEE INCRF-ASE / (DECRE~E) NOTES 8-82 8-83 8-84 8-85 S-86 8-87 8-88 8-89 S3O 8-91 8-93 8-94 8-96 8-97 8HADEPORT, QUAD COMM~n'Y HANGAR (FAA BLDG) T - HANGAR HEX HANGAR MAINTENANCE SERVICES u'rlUTY FRANCHISE FEES DRAINAGE MAINTENANCE STREET LIGHT MAINT. AND OPERATION ASSESSE~ MEDIAN MAINTENANOE & OPN. TAXED MEDIAN MAINTENANCE & OF'N. STREET 8WEEPING UNCURBED STREET MAINTENANCE GEOLOGILAL SURVEY STREET USE ALLEY MAINTENANCE ASSESSED NEIGHBOF~IOOO PARK MAINT. AND OPERATION TAXED NEIGHBORHOOD PARK MAINT. AND OPERATION DOWNTOWN OFF-STF~ET PARKING - 1 TO 10VEHICLES - 11 TO 20 VEHICLES - 21 TO 3O VI-~'IICLES - 31 TO 4O VEHICLES - 41 TO 5O VEHICLE8 - 51 OR MORE VEHILLES DOWNTOWN GARAGE PARKING - PER VI~IIILE (PER MONTH) 11-118 SERVICE CB~I'ER DELETED STATE HIGHWAY STREET MAINTENANCE FINANCE AND ADMINISIP, ATIVE SERVICES 43.0% 100.0% 100.0 % 100.0% t00.O % 100.0 % 100.0 % 100.0 % 100.0% 100.0% 100.0% 100.0% 100.0% 43.0% 100.0 % $60.00 ~80.00 $130.00 $140.00 N/A $0,00 $120.00 ~8,00 $26.00 $24.O0 $20.00 $18.00 $25.00 ~0.00 $130.00 $140,00 N/A $120.3O ma.bo $24.3O $18.00 $0.00 FEES SET BY S~ARA~ LEGi~LATiO N PAGE 29 OF 31 M;I 8-g6 8-g9 City of Bakerslield MASTER FtYs- SCHEDULE for City Sen4ce Centers EXHIBIT 'A' SERV;CE CENTER 'IHIS SERVICE CB%'TER DELETED DOCtJMENT PRNT1NG AND COPYING - PrK)TOCOPYING CHARGES - INmAL LOOK-UP FEE (CHARGE FOR 1ST PAGE OF EACH DOCUMB'~T) - STAN DAF~ & [.l~d~L ~i7[cl~ DOCUMENTS - COPY OF MICROFILMED DOCUMENTS - SPECIAL MAPS & OVERS~ED DOCUMENTS - PRINTED DOCUMENTS (IE BUOGET) - POLICE CRIME REPORTS $ 100 I-EGAL SERVICE TO OTHER AGENCIES 8-101 CHECK COLLECTION 8-102 REQUEST FOR PUBLIC RECORDS - REGUEEI~ BY SUBPENA - DIRECT LABOR COST~ (TO LOCATE, COMPILE & REVIEW REQUESTED RECORDS) - PHOTOCOPYING CHARGES STANDAPD & LEGAL SIZE COPIES FRO~ MICROFILM - OTHER DIRECT CHARGES - REQUESTS FOR'PUBUC RECORDS - DIRECT LABOR Co~'r'8 ('FO LOCATE, COMPILE & REVIEW REQUESTED RECORDS) - PHOTOCOPYING CHARGES STANDARD & LEGAL,SIZE COPIES ~ MICRORLM - OTHER DIRECT & INDIRECT CHARGES 8-100 RESEARCH & CERT1FICA'RON S- ! 04 AGENDA/MINUTE MAIMNG SERVICE $-105 MUNICIPAL COOE 8UPPEMENT 8-106 PROCESSING 8CHOOL FAClUTY FEES % OF COb~' EXISTING RECOVERY FEE8 PEQUI;~) 02/24j94 100.0% 100.0% 100.0% 100.0% 100.0 % 100.0 % 100.0% 100.0% $0.00 $15.00 $16.00 $0.10 ACTUAL CO~TS $0.25 Ac'r~ COS'TS $10.00 $0.25 $0.25 AC'~N. COrm ACTUN. COS'~ $0.00 $15.00 $16.00 $0.10 $0.20 COSTS $025 $025 ACIUN. COS'm $0.00 $69.00 $68.00 $10.00 AMOUNT OF FEE INCREASE NOTES / COMMENTS $0.00 $O.25PER PAGE $0.00 $0.25PB~ PAGE $0.00 $0.00 FEE Is CHM:IGED PER 0OC[JME~rl' $0.00 $3 EACH, 23 MAUNG8 pE~ ~tF_a.R $0.00 $17 EACH, 4 MALINC~ pER yEAR PAGE 30 OF 31 SERVICE CENTER City of Bakerslield MASTER FEE SCHEDULE for City Sewice Centers % OFCO~T EXISTING RECOVERY FEE~ REQUIRED 02/24/94 EXHIBIT 'A' ADOFi~ AMOUNT OF FEES FEE INCREASE 03/10/94 / (DECREASE) PAGE 31 OF 31 CITY OF BAKERSFIELD - BUILDING DEPARTMENT MINIMUM FEES PER UNIFORM CODE FOR FISCAL YEAR 1993-94 EXHIBIT ~B" % OFCOSTt ~SI RECOVERYI SERVICE CENTER REQUIRED I EXISTING: ADOPTED AMOUNT OF FEES FEES FEEINCREASE 04115/93 07101193 /(DECREASE) Community Development Sendces New Construction (S-1 throuoh S-5) 100.00% Estimated Market Value multiplied by .0085 Fee to be applied to five different costs centers as follows: S-1 Plan Check S-2 Construction Inspection S-3 Plumbing Inspection S--4 Electrical Inspection S-5 Mechanical Inspection 0.0085 0.0085 32.40% 32.40% 33.80% 33.80% 13.30% 13.30% 12.40% 12.40% 8.10% 8.10% 0 Improvements (Remodels, Additions, Reoairs) S-1 Plan Check Total Permit Fees multiplied by .65 S-2 Construction Inspection Structure fee rates based on total valuation S-3 Plumbing Inspection Square footage charge based on structure Additional specific fees S-4 Electrical Inspection Structure fee rates based on total valuation or Square footage charged based on structure S-5 Mechanical Inspection Structure fee rates based on total valuation or Square footage charged based on structure Additional specific fees 100.00% Set by Municipal Code 15.12.070 100.00% Set by Municipal Code 15.12.080 100.00% Set by Municipal Code 15.28.160 See Exhibit C 100.00% Set by Municipal Code 15.32.170 100.00% Set by Municipal Code 15.16.040 See Exhibit D S-1 Other Fees Plan Check Paint Booth Plan Check Non-Flammable Medical Gas System Plan Check Sprinkler System Plan Check (Commercial) Minimum Fee Other than Minimum (0.01 x Sq. Ft.) Sprinkler System Plan Check (Residential) Fire Alarm System Plan Check Commercial Vent Hood Plan Check 100.0 $100.00 $100.00 $100.00 $100.00 $150.00 $150.00 0.01 x sqff 0.01 x sqff $45.00 S45.00 $150.00 $150.00 $150.00 $150.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Page 1 of 2 EXHIBIT ¢ PLUHBING PERMTT FEES Single and Mul=lple Dwelllng Unl:s (Does no~ include tnll:lal fee of $3.00 or sewer fee of $5.00) 1. Issuance Fee ........................................ 3.00 2. Eac~ plum~lng fixture or :rap sac of fixtures on one =rap .......................................... 2.00 3. £ac~ building sewer or each trailer coac~ sewer ...... 5.00 4. £ach water heater or vent ............................ 2.00 5. For first fOUr gas ourlees ........................... 2.00 ~ach added gas ourlee of 5 or more ..................... 50 es. 6. For each water service ............................... 2.00 7. Each rain water system - eac~ drain .................. 2.00 8. For each industrial waste pre-crea~men~ In=at=apter (including trap and yen= ................. 5.00 9. For installation, repair, or al~eracion of wa=er piping or water treatment equipment ........ ~...2.00 i0. For repair or alterstie= of drainage or venC piping..1.00 11. For each vacuum breaker or backflow device ........... 2.00 12. For private sewage disposal system .................. 10.00 13. Lawn sprinkler s¥s=em ................................ 1.00 14. Pl-m~lng for trailer coach si=e...$ee M/H Ins=allaClon No=e: Minimum Permit Fee ................. 3~.00 CITY OF BAKERSFIELD - BUILDING DEPARTMENT MINIMUM FEES PER UNIFORM CODE FOR FISCAL YEAR 1993-94 EXHIBIT 'B" M~SI S-2 S-3 S--4 $-5 SERVICE CENTER Construction Inspection Reinspections (New Construction) Demolition Antenna Oisl~ Mobile Home MoOlie Home w/Perminent Foundation Mobile Home Garage Awning and Carport Swimming Pool Spa Pool & Spa Oil Well Permit Fee Plumbing Inspection Gas Line Hot Water Heater Replacement Solar Septic Tank Shower Pan Pool Plumbing Septic Abandonment/Sewer Line Water Softener Air Conditioning (up to 5 tons) Air Conditioning (above 5 tons) Grease Interceptors Electrical Inspection Electrical Meter, Temporary Power Pole Electrical For Pool, Spas or Portable Spas Electrical Subpanel Mecl~anical Inspection Heater for Pools, Spas or Portable Spas Wall Heater Installation Air Conditioning (up to 5 tons) Air Conditioning (above 5 tons) Cooler Installation % OF COST RECOVERY REQU RED 100.0 % 100.0 100.0 % 100.0 % EXISTING FEES 04115~93 $30.00 $30.00 $40.00 $40.00 $135.00 $50.00 $30.00 $92.00 S38.00 $110.00 $686.00 $30.00 $30.00 $40.00 $50.00 $3O.OO $30.00 $50.00 $30.00 S30.00 $50.00 $75.00 $30.00 $30.00 $30.00 $30.00 $30.00 $30.00 $50.00 $30.00 ADOPTED FEES 07101193 $30.00 $30.00 $40.00 $40.00 $135.00 $50.00 $30.00 $92.00 $38.00 $110.00 $686.00 $30.00 $30.00 $40.00 $50.00 $30.00 $30.00 $50.00 $30.00 $30.00 $50.00 $75.00 $30.00 $30.00 $30.00 $30.00 $30.00 $30.00 $50.00 $30.00 AMOUNT OF FEE INCREASE I (DECREASE) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $~00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IFile Name: i Prepared by: [Last Update: EXIB_B2 Finance Dept. 20-May-93 Page 2 of 2 EXHIBIT D Mechanical Permi~ Fees Page 2 ~.: 12. 13. For =he ins=alia:ion cr relocazion of each Boiler or refrigera:Aon compressor over 50 horsepower, or each a~sorp%lon sys=em over 1,750,000 BTU/h .......................................... 56.00 For each air handling uni= =o and including ~0,000 cubic fee: per mxnu:e, including duc=s a::ached there=o ......................................... 6.50 Note: This fee shall no: apply =o an air handling unit which is a portion of a ~actory assembled appliance, cooling unA=, evaporative cooler or a~sor~:ion uni= for which a permit £s required elsewhere in this code. 14. For each air handling u~i: over 10,000 CFM ................ 11.00 15. For, each evaporative cooler other :hah por~able :yps ...... 6.50 16. For each ventlie:ion Zan connec:ed :o a single duct ........ 4.50 17. For each von:llation system which is not a per:ion of any heating or air conditioning system authorized ~y a pez~=A= ................................................ 6.50 18. For the installation of each hood whioh is served'by mechanical exhaust, including the duc:s for such hood ...... .6.50 19. For :he inetalia:ion or reloca~ion of each domestic :Yl~e ln¢lnera:or .......................................... 11.00 20. For the inetalia:ion or reloca=Aon of each co~aercial or indus=tiaA tYl~e incAnera:or ............................ 45.00 21. For ea¢~ appliance or piece of equipmen: regulated by this Code but no: classed in o:her appliance ca:egories, or for which no o:her fee is listed in :he Code ............ 6.50 22. NEW SINGLE FAMILY DWELLINGS AND APARTMENT UNITS 0 - 1800 SQUARE FEET ................................ 22.50 1800 + SQUARE -==~ ...................................... 43.50 23. COMBINATION HEATING AND REFRIGERATION UNIT No~e: Less tAan 100,000 8TU Hea:£ng, less :hah 3 ton refr~gera=:on .................................. 18.00 More than 100,000 BTU Hea:~ng, more :hah 3 ton refrigera:~on ................................. 22. - S0 MINI:~UM PERMIT FEE ........................................ I5.00 £ffec=lve: January 1, 1991 10. 11. For the issuance of each permir ........................ 15.00 For the issuance of each supplemen= perm~= ............. 4.50 For =he ins=alia=ion or reloca=ion of each forceU-air or gravit¥-tYloe furnace or burner, including duc~s and ven=s a==ached =o suc~ appliance over 100,000 BTU/h ..... 9.00 For the ins=alia=ion or reioca=ion of each forced-air or gravi=¥-=¥pe furnace or Durner, including duc=s and vents a==ached =o.such appliance over I00,000 BTU/h ..... 11.00 For the £nstallation or reiocation of each floor furaace, including vent .................................. 9.00 For t~e £nstallation or relocation of each suspended heater, recessed wall heated or floor moun=ed unit heater ........ 9.00 For =he installation, relocatlon or replacemen= of each appliance vent installe~ and no= included in an appliance per~l~ ................................................ ,..4.50 For the repair of, alteration of, or aadition =o each hearing appliance, refrigeration uni=, cooling unit, aDsorp=lon, or evapore=lye cooling s¥s=em, including installation of con=rols regulated by t~ls Code .......... 9.00 For =~e installation or relocat~on of each boiler or compressor to and including three horsepower, or each a~sorp=ion system =o and including 100,000 BTU/h ......... 9.00 For the ins=alia:ion or relocation of each boiler or compressor over t~ree horsepower to ana including-15 horsepower, or eac~ aDsotis=ion sys:em over 100,000 BTU/h to and incluaing 500,000 BTU/h .......................... 16.50 For =he ins=alia=ion or relocation of each ~oiler or compressor over 15 horsepower to ana including 30 ~orsepower, or each ausor~=ion s¥$=em over 500,000BTU/h ........................................... 22.50 .--or %~e ins=allah'.on or r_=,.oca=~cn of eac~ ~oller or compressor over 20 h:r---e_Uower -.: anu inclu=ing 50 horsepower, or fTr each aDsor~=~on system over <.~ !,000,000 B~/h to ana incluGing !,T50,00~ B~/h ...... 33~:50 . . .