HomeMy WebLinkAboutRES NO 35-94RESOLU OS 5 ' 9 4'
A RESOLUTIONAMENDING RESOLUTION NO.
116-93, AS AMENDED BY RESOLUTION NO.
27-94, ADOPTING FEES AND SERVICE
CHARGES PURSUANT TO THE REVENUE/COST
COMPARISON SYSTEM UNDER CHAPTER 3.70
OF THE BAKERSFIELD MUNICIPAL CODE
WHEREAS, state law requires new fees and charges and
increases in existing fees and charges be adopted by ordinance and
resolution following a public hearing on said fees and charges; and
WHEREAS, Chapter 3.70 of the Bakersfield Municipal Code
authorizes the establishment and increase or decrease of service
charges under the revenue/cost comparison system; and
WHEREAS, adoption of new and increased fees and charges,
pursuant to Chapter 3.70 of the Bakersfield Municipal Code, is
necessary for the City to recover the reasonable estimated cost of
providing the services for which the fees are charged; and
WHEREAS, a public hearing before the City Council was
advertised twice in the Bakersfield Californian, a newspaper of
general circulation, and held on June 1, 1993; and
WHEREAS, Resolution No. 116-93 was adopted by Council on
June 23, 1993, establishing fees and charges for the 1993-94 fiscal
year; and
WHEREAS, Resolution No. 27-94, adopted by Council on
February 23, 1994, amended Resolution No. 116-93 to include fees
and charges for Service Center S-55 (Adult Softball); and
WHEREAS, the fees and charges set forth in Exhibits "A",
"B", "C" and "D", attached hereto and incorporated by reference as
though fully set forth herein, do not exceed the reasonable
estimated costs of providing the services for which the fees are
charged; and
WHEREAS, it is necessary for the City to make adjustments
to the fee schedule as previously adopted; and
WHEREAS, a pubic hearing before the City Council was
advertised twice in the Bakersfield Californian, a newspaper of
general circulation, and held on March 9, 1994, with respect to
changes the City will charge for Convention Center Maintenance and
Operation (S-70) .
NOW, THEREFORE, BE IT RESOLVED by the Council of the City
of Bakersfield, as follows:
1. The above recitals and findings are true and
correct.
2. Except as set forth below, the fees and charges set
forth in Exhibits "A", "B", "C" and "D" concerning service charges
under Chapter 3.70 of the Bakersfield Municipal Code and their
effective dates as adopted in Resolution Nos. 116-93 and 27-94
shall remain the same.
3. The fees and charges for Convention Center
Maintenance and Operation (S-70) shall be as shown in Exhibit "A"
and shall become effective on March 10, 1994.
.......... o0o ..........
I HEREBY CERTIFY that the foregoing Resolution was passed
and adopted by the Council of the City of Bakersfield at a regular
meeting thereof held on March 9, 1994, by the following vote:
AYES: COUNCILMEMBERS McDERMOTT, EDWARDS, OIIMOND. ~ BRUNNI, ROWLE$, $ALVA(~10
NOES: COUNCILMEMBERS
ABSTAIN: COUNCILMEMBERS
AEk~IEHT; COUNCILMEMBER~ ~ ~ ~'~.~.
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield, CA
APPROVED MAR 0 0 ~%
MAYOR of the City of Bakersfield,
CA
APPROVED as to form:
JUDY SKOUSEN
ACTING CITY ATTORNEY of the City of Bakersfield
NS/krc/nss
COSTAMEN.D
3/ 4/94 9:33am
~MSI
SERVICE CENTER
COMMUNIIY DEVELOPMENT SERVICES
8-2 CONSTRUCTION INSPECTION
S-3 PLUMBING INSPECTK~
S-4 ELECTRICAL ~NSPECTION
8-5 NC, HEATING & MECH. INSPECTION
8-6 RE-QUESTED BUILDING INSPECTION
- N OI~V, AL BUSINESS HOURS
- OTHER THAN NOF~MAI. HOURS
S-6.1 REIN SPECTION OF MUNICIPAL COOE VIOLATIONS
- DANGb-RCXJ~ BUILDING INVEStiGATIONS
- INITFd. COb'TACT AND INSPECTION
- FOLLOW-UP INSPECTK3N$ REQUIF~D
- LEGAL ACTION REQUIRED
- iNITIAL CONTACT AND INSPECTION
- FOLLOW-UP INSPECTIONS REQUIRED
- LEGAL ACTK)N REQUIRED
6-7 SIGN I~c~EW
- COMPREHENSIVE SIGN REVIEW
- REVISED COMPRB'IENSNE SIGN REVIEW
- SIGN REV1EW ISSUANCE FEE
8-8 CONDmONAL SIGN PEF~IIT
S-9 'R-IlS SERVICE CENTER DEl,- ~ ~u
8- I 0 BWIRONMENTAL REVIEW
8-11 PRELIMINARY PROJECT FEVIL=W
- REQUESTED LAND USE & ZONING REVIEW
ZONE MOOIRCA~ON REVIEW
City of Bakerslield
MASTER tH- SCHEDULE
for City Sewice Centers
EXHIBIT 'A'
% OF COST EXISTING
RECOVERY FEE8
REQUIRED 02/24/94
/ (OB;REASE)
100.0%
100.0%
100.0 %
100.0%
100.0%
I00,0 %
100.0%
SEE E~B. B
SEE E~8. 8
100.0%
1 o0.0 %
100.0 %
100.0 %
$0.00
$1,45.00
ACI~N. CO~
$1
$145.00
ACIUN. CO~T
$1 .gO0.O0
PAGE 1 OF 31
SERVICE CENTER
City of Bakerslield
MAS'IER FEE SCHEDULE
for City Sewice Centers
EXHIBIT 'A'
% OF COSff'
RECOVEHY
REQUIRED
EXlST1NG
FEES
02/24/94
FEES
~/10~
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES / COMMENTS
8-13 CO~AL USE REVIEW
- GE~IERAL REVlLL'W
- OIL WELL REVIEW
8-14 ZONE CHANGE REVIEW
S-15 PtJD OR PCO ZOflE CHN~IGE
S- 16 SffE Pr. AN REVIEW
- BUILDING VALUE LESS OR EQUAL $15O,5O0
- MINIMUM FEE
- BUILDING VALUE GREATER THAN $150,000
- MAXIMUM FEE
8-17 HOME OCCUPATION REVIEW
- HOME OCCUPATK3N PEF~41T
- LAR{3E FAMILY DAY CARE
8 - 18 SPECIFIC P!-N~ REVIEW
8-18.1 HISTORIC DISTRICT REVIEW
S-182 CUL~JRAL RESOURCE REVIEW
$-18.3 REHABIUTA'I'~N INSPECTIONS
- INITIAL INSPECTION/DOCUMENTATION
- ADDrTIONAL INSPECTION COSTS I FEES
- DEPAR]MENTAL PROCESSING CO~TS
-' ROOF REPU~CEMENT
- EI_ECTRICN.
- PLUMBING
- MECHANICAL
- FRN~E I FLOOR
- MAXIMUM CHARGE FOR REHAB INSPECTIONS
S- 19 GENERAL PLAN AMENDMENT REVIEW
$-19.1 CONCURRENT APPliCATIONS
$-20 DOWNTOWN PROJECT DESIGN REVIEW
$-21 [AND DNI~ION REVIEW
- LOT UNE AD JET
100.0 %
100.0 %
100.0 %
100.0 %
1{30.0%
100.0%
100.0%
100.0%
1(30.0 %
100.0%
100.0%
100.0%
100.0 %
St ,000.00 $1,000.00
$1,3~0.00 $1 .SOO.gO
$1,5O0.00 $1.560.00 $0.5O
$1,5O0.00 $1.560.00 $0.00
FORMULA
$150.00
$175.00
$175.00
$25.00
PAGE 2 OF 31
MSI
City of Bakendield
MASTER FEE SCHEDULE
for City Senace Centers Ray. Data: 04-1~-~4
% OF CO~T EXISTING ADOt'i ~.u AMCXJNT OF
REGOVERY FEES FEES FEE INCREASE
EXHIBIT 'A"
$-22
$-23
8-24
$-25
S-26
S-27
SERVICE CENTER REQUIRED 02/24/94 0~10/94 / (DECREAS~ NOTES
- PARCEL MAP WANERS $850.00 $850.00 $0.00
TI~rTA'3WE SUBDIVISION MAP REVIEW 1 00,0 %
- T'B~ITA'INE PARCEL MAP REVIEW $1,300.00 $1.300.00 $0.00
- REVISED ~ATIVE PARCEL MAP REVIEW $,505.00 $505.00 $0,00
- ~ITA~VE ~RACT MAP REVIEW $2~80.00 $2,280.00 $0.00
- REVVED TENT^~VE TRACT MAP REVIEW $1,300.00 $1,300.00 $0.00
- TENTA31VE MOO/DEL. OF CONDfflON$ ~370.00 r~70.00 $0,00
- WALL AND LANDSCAPE REVIEW $880.00 $880.00 $0.00
MAP & IMPROVEMENT PLAN CHECKING 100.0 %
- FINAL TRACT MAPS $SeO+~LOT $SeO+~)LOT $0.00
- FINAL PARCEL MAPS $1,200.00 $!,200.00 $0.(30
- STREET/SEWER IMPROVEMENTS
- ~NGLE F~MILY - VOLUNTARY $50.00 $50.00
- AU- O~HER~ $1o0 + 0.~2% $1~o +
PUBUC IMPROVEMENT INSPECTION 1 00.0 %
- PUBMC IMPROVEMENT INSPECTION $1oo + o.7e% $100 + 0.Te~
- MAINT. DIST. MAP PREPN~.TION FEES
- NO COMPUTER DISC PROVIDED $1~0+$1~tOT $1~+~3~OT $0.00
- COMPUTER DISC PROVIDED $135O+S1~OT $1350+Sl~LOT $0.00
- CITY REVIEW & PROCESSING ONLY (MINIMUM FEE) $300.00 $300.00 $0.00
- C~P( REVIEW & PROCESSING ONLY $3.eS~OT ' $3.65~OT $0,~O
APPEAL PROCESSING 1 00.O % $330.00 &330.00 $0,00
STREET I-~ICROACHMENT INSPECTION 100.0 % $125.O0 $125.O0
STREET CUT INSPECTION 100.0 % $100.00 $100.00 $0.00
- INSPECTION FEE DEPOSIT (TO COVER $50.00 $50.00 $0.00
CO~[$ OF ADOff. INSPECTIONS IF REQUIRED)
DEVELOPMENTTIME EXTENSION REVIEW 100.0 % S490.00 $490.00 $0.00
PUBUC SA~c I ¥ SERVICES
VB-IICLE CODE ENFORCEMENT 50.0 % N/A
HEAL3H & EAFETY COOE ENFORCEMI-~IT 50.0 % N/A
PARKING ORDINANCE ENFORCEMENT 1 00.0 %
PAGE 3 OF 31
City of Bakersfield
MASTER FEE SCHEDULE
for City Sewice Centers
SERVICE CENTER
- VEH(C!..E TOWING
- PARKING VIOLA'nON
POLICE FALSE At. AF~I RESPONSE
- INi'RAL ALARM PEFNIIT
- ALARM ~IT RENEWAL
- PE~IT RENEWAL DEUNQUENCY PENAL~Y
- CHARGE AFTER 4'n-I FALSE
- CHARGE AFTER 10'R-I FALSE ALAF~I
WIDE/OVERLOAD REVIEW
- STANDARD CHARGE
- SINGLE TRIP PERMIT
- ANNUAL TRIP PEP~dlT
- MAXIMUM CHARGE (SINGLE TRIP PEl:~drl~
- ADULT ENTERTAINMI~IT
~ NEW APPliCATION
- ANNUAL PEF~Mff RENEWAL
- EMPLOYEE PE~ff
- MASSAGE
- NEW APPU~-.ATICN
- EMPLOYEE INV.E~rlGAllON
- CAP4) ROOM~
- NEW APPLICATION
- RI~,IEWAL APPLICATION
- CARD DEALER~
- RENEWAL APPLICATION
- E,~:X)FR'! DATING SERVICES
- NEW APPLICATION
- EMPLOYEE INVESTIGATION
100.0 %
1(30.0%
100.0 %
EX~STING
FEF.8
02/24/94
EXHIBIT "A"
Rev. Date: 04-1~ar -94
ADOt'~ r.u AMOUNTOF
FEE8 FEE INCREASE
03/10/94 / (DECREASE) NOTES I COMMENTS
$1.00 $1.00 $0.00 $1.PERMIT/MON'IH (MAX 10 MONll-lS)
$50.00 $50.00 $0.00
$~o.ao $9o.~o ~.oo
$155.00 $155.00 $0.00
t~0,00
$16.00
$420.00 $420.00 $0.00
$1,170.00 $1,170,00 $0.00
$25,00 $25.00
$~ to.oo $1~o.oo $o.oo
t~o.oo Sao.oo $o.oo
$570.00 $570.00 $0.00
$I.170.00 $1,170.00
$125.00 $125.00 $0.00
$15.Q0 $15.00 $0.00
$245.00 $~45.00 SO.IX)
$125.00 $125.00 $0.00
PAGE 4 OF 31
City of Bakersfield
MASTER FEE SCHEDULE
for City Sewice Centers
EXHIBIT 'A'
SERVlCE CENTER
- RETNL 8ALES OF CONCEALED
WEAPON8 PERMIT
- LIQUIDATION (CI.OSE(XZT)8ALE-PEF~IT
- BINGO - NEW PERMIT
- BINGO - RENEWAL FERMIT
- SECOND HN~O DEALERS, ffINERN~T
MERCHANTS~ FUBUC DANCE HALLS,
OUTOOOR FESTNAL8, AMPURED
MUSIC, NdPUFIED SPEECH,
AMPLIFIED SOUND-TRUCKS,
MOTELS & HOTELS NEW PERMITS
- BAIL BOND OWNER/AG~4T$/SOUCITORS
- RESIOENT SOLICffATION
- DOG LICENSES
- ALTERI~) (SPAYED /NEUTERED)
- ONE YEAR UCENSE
- TWO YEAR UCENSE
- '~'IREE YEAR UCENSE
- ONE YEAR UCENSE
- TWO YEAR UCENSE
= 'IHREE YEAR LICENSE
- LATE FEES (PAST 30 DAYS)
- REPLACEMB%iT TAG
CAT TAGS
- (3NE YEAR
- UFE~IME
- OWNER I~F~I-IN
% OF COST EXISTING ADOPTE~
RECOVERY FEES FEES
REQUIRED O2/24/94 03/'10/94
50.0
~00.00
$15.00
~5.00
$25.00
$25.00
$15.00
$165.00
$14.00
~8.~
$30.00
$10.00
$5.00
$10.00
$50.00
$15.00
$25.00
$25.00
$25.00
$1 5.0O
S25.00
$165.00
$20.00
$14.00
$90.00
$10.00
~7.ao
0.00
NOTES / C(3f,~d ENrTs
PAGE 5 OF 31
I7'
City of Bakersfield
MASTER rr_~ SCHEDULE
for City Sen~ice Centers
SERVICE CENTER
% OFCOST
RECOVERY
REQUIRED
EXISTING
FEES
02/24/94
ADC)HIP-L)
FEES
03/10/94
- AT OWNERS LOCATK3N
-DOG/PUPPY
-CAT/KITTEN
- IMPOUND CHARGES
- DOGS
- SMALL / MEDIUM / LARGE
- GIANT BREEDS
- FEMALE IN HEAT
- VICIOUS
$45.00 $45,00
$16.00 $15.00
$15,00 $15.00
$45,00 $45.00
$100.00 $100.00
- CATS
- RABBITS / GUINEA PiGS
- SNAKES / TORTOISES
- BIFFS - SMALL DOMESTIC
- BIRDS - LARGE DOMESTIC
- PO4JLTRY
- SHEEPIGOATS/PIGS
- HORSE / CATTLE
$25.00 $25.00
$10.00 $10.00
$10,00 $10.00
$10.00 $10.00
S20.00 $20.O0
$100.00 S100.00
- BOAF~ING - (CHARGES ARE PER DAY)
- DOGS
- SMALL/MEDIUM/LARGE
- GIANT BREEDS
- FEMALE IN HEAT
- VICIOUS
- RABBITS / GUINEA PiGS
- SNAKES/TORTOISES
- BIRD~ - LARGE DOMESTIC
- FOULTRY
- SHEEP/GOATS/PIGS
- HORSE ! CATrLE
EXHIBIT 'A'
PAGE 6 OF 31
04-Mar-94
AMO[JNT OF
FEE g~REASE
/ (DECREASE) NOTES / COIVlMENTS
$0.00 P~ HOUR (t HOUR MINIMUM)
$0.00.
$15.00 $15.00 $0.00
$15.oo $15.oo Ss.bo
$15.00 $15,00 Ss. O0
S25.oo sss,oo
S15.00 S15.~0 Ss. O0
$1o.oo $10.00 Ss. O0
s5.oo $5.00
~.oo Ss. O0 $0.00
$~o.oo $10.00 SS.O0
$-36
S-37
S-38
8-40
S-41
$-42
S-43
S-44
S-45
$-46
City of Bakersfield
MASTER FEE SCHEDULE
for City Sen~ce Centers
EXHIBIT "A"
SERVICE CENTER
POLICE RECORDING DUPLICATION SERVICE
LIMOU$1N F_/rAXl/'FOWlNG REGULATION
- LIMOUSINE DRIVER PEFMIT
- TAXI DRNER PEI~MIT
- AMBULANCE VB-flCLE INSPECTION
- UMO VEHICLE flSPECTION
- TAXI VEHICLE IN8PEGTION
- TOWING VEHICLE INSPECTIO~
]HI8 8ERVIGE CENTER DEU: ~=u
SPECIAL EVENT SECURITY
AUTOMOTIVE ACCID El*fl' INVE8TIGAT]ON
- 8TANDARD REPORT
- SHORT FOFM
fiNGERPRINT 8ERVICE
- F]R8T CAflD
- EACH ADDITIONAL GAF~
'IHI~ SEflV]CE CENTER DELETED
SCHOOL CflO881NG GUARD $ERVICE
POLICE PHOTOGRAPH 8ALE
- fiRST PRINT
- ADDITIONAL PRINT6 (EACH) S X ~0
- ADDITIONAL PRINT8 (EACH) 5 X 7
- ADDITIONAL PRINT6 (EAGH) 4 X 5
CONCEALED W~APON PERMIT PROCESSING
STATE-MANDATeD FIRE IN8PEGTION
- CMLIAN IN8PECTOR
THIS 8ERVlGE CI~ITEfl DELETED
1]-118 8ERVlGE GENTER DELi: ~ bu
fiRE REPORT 8ALE
WEED ABATEMENT OR FIRE HAT-Af~ ABATE~I~T
96 OF CO6"r EXlS'I]NG
RECOVERY FEES
F~QUIRED 02/24/94
FEES
03/t0/94
100.0 % $~5.00 $25.00
100.0%
$15.00 $15.00
$15.00 $15.00
$~:).00
StO.O0 $10.00
$~.00 $2.0O
100.0 % $0.00 $O.00
1(]0.0%
$10.00 $10.00
$7.00 $7.00
1oO.O % N/A
100.0°/,,
100.0 % ~3.00 $3.00
100.0 % $160.00
AMOUNT OF
FEE INCREASE
/ (~ECF~.~E)
NOTES / CONIMENTS
$0.00 ~5 CHA~GE PI~ HOUR
N/A FEES SET BY LEGISLA1]ON
~0.00 CHA~GE PER HO~R (MAX FEE $200.)
$0.00 CHARGE PER HO(JR (MAX FE~ ~00.)
PAGE 7 OF 31
1
S-51
City of BakersNeld
BASTER FEE SCHEDULE
for City Sen~ce Centers
SERVICE CEN'rER
% OF COST
RECOVERY
REQUIRED
EXISTING
FEES
O2/24j94
EXHIBIT 'A'
FIRE SAFETY REVIEW/INSPECTION
- UQUIRED PETROLEUM GAS INSTALLA'I3ON
- LES8 THN412(30 U.S. GALLONS
- MORE TH.N~I 1200 U.S. GALLONS
- REINSPECTION FEE
- TENT INSTALLATION (ONETIME FEE)
- LESS THAN 10,~30 SQ. FT.
- MORE TI-IN~110,000 SQ. FT.
- REINSPECTION FEE
- PAINT BOOTHS (ONE 33ME FEE)
- NEW 8PRAY PAINT BOOTI-IS
- REINSPECTION FEE
- NON - R. AMMABLE MEDICAL GAS SYSTEMS
INSTALLA'nON (ONE TIME FEE)
- 1 TO 5 STATICN OUI'LETS
- EACH N3OITK3NAL STATION OVER THE INrriAL 5
- REINSPE~ FEE
- FIRE PRO'~-CTION EQUIFMENT
-SPRINKLER SYSTEM INSPECTION (COMMERCIAL)
- MINIMUM FEE
- OTHERTHN~I MINIMUM (0.02 X SQ. FT,)
- REINSPECTION FEE
- SPRINKLER SYSTEM INSPECTION (ADOiTIONS / REMOOELS)
- MINIMUM FEE
- OTHERTHAN MINIMUM (0,015XSQ. FT.)
- REINSPECTICN FEE
- RRE ALARM SYSTEM COMFONB~T INSPECTION
- MINIMUM FEE
- OTHER THAN MINIMUM (0.005 X SQ. FT.)
- COMMERCIAL VB~'T HOOD INSPECTICN
- INSPECTION OF EACH N~DiTICNAL VENT HOOD
100.0%
$100.00
S200.00
$75.00
$50,00
$100.00
$100.00
$100.00
$75.00
$150.00
$75.~0
0.015XSQFT
$120.00
o.~o4 X SQFT
ADOPii:~ AMOUNT OF
FEES FEE INCREASE
03/t 0/94 / (DECP, E~E)
$1~0.00
$75.00
$50.00
$100.00
$100.00
$100.00
$75.00
$300.00
0.02 X ~QFT
$150.00
$75.00
O.015XSQFT
$120.00
NOTES / COMMENTS
$0.00 PE~ N)DiT. STA33ON ~ INmN. 5
$0.00
PAGE 8 OF 31
S-53
S-53,1
S-53.2
City of Bakersfield
MASTER rrJ: SCHEDULE
for City Sewice Centers
EXHIBIT 'A'
SERV;CE CENTER
% OF Co~r
RECOVERY
RB3UIRED
- STANDPIPE INSP~
- INSPECTION OF ONE STANDPIPE
- CHARS E FOR EACH N3DmONAL ST/~IDPIPE
- REINSPECTION FEE
- EXPLC~NES PURCHASE INSPECTION
- FIRST INSPECTION
- EXPLC~NES PURCHASE PEP&Iff (ANNUAL RENEWA{~
- EXPLOSIVES STORAGE INSPECTION (IF MATERIAL TYPE CHANGES OCCUR)
(~IEN ~ A NEW INSPECTION FEE AND NEW PEF~IIT FEE WILL APPLY)
- FIRST INSPECTION
- EXPLO~NE8 STORAGE PEF~IIT
- ABOVE GROUND FLAMMABLE LK}UID STORAGE TANK INSTALLATION INSPECTION
- INSPECTION OF ONE TANK
- CHARGE FOR EACH ASDmONALTANK
- PYROTECHNICS INSPECTK3N
- INSPECTION BYFIRE SUPPRESSION PERSONNEL
- INSPECTION BY F1RE SRFE'[Y CONTOL PERSONNEL
- FIREWORKS BOOSt PEI~IIT FEE
OIL WELL INSPECTION (ANNUAL)
- REINSPECTION (IF REQUIRED)
FIRE FALSE ALARM RESPONSE
HA7-AFOOUS MATERIAL RESPONSE
HAZARDOUS MATERIALS HANDLER FEES
- MATERIAL ~YPE A
- MATERIAL TYPE B
- MATERIAL TYPE C
- MATERIAL TYPE D
- MATERIAL TYPE E
- MATERIAL ~YPE F
- MATERIAL ~'PE G
- MATERIAL 7YFE H
100.0%
100.0 %
100.0 %
EXISTING ADOPiI=U NvlOUNT OF
FEE8 FEE8 FEE INCREASE
O2/24/94 oa/~ o/~ / (DECREASE)
r~qs.oo $95.0o $o.oo
$18.00 $18.00 $0.00
$140.00 $140.00 $0.00
$12.00 $12.00 $0.00
$120.00 $120.00 SO.iX)
$18.00 $18.00 ~.00
$130.00 $130.00 $0.00
$170.00 $170.00 $0.00
$100.00 $100.00 $0,00
$50.00 $S0.00 $0.00
$1~5,00 $185.00
$423.00 $423.00 $0.00
$110.00 $110.00 $0.00
~10.00 $21e.00 $0.00
$327.00 $327.00 $0.00
$377.0o $377.0o $0.00
PERMIT MU~T BE RENEWED ANNUALLy
PAGE 9 OF 31
$-53.3
S-53.4
S-54
City of Bakerdield
MASIER FEE SCHEDULE
for City Sewice Centers
EXHIBIT 'A'
SERVICE CENTER
% OF CO~i'
RECOVERY
REQUIRED
- MATERIAL 'WPE I
- MATERIAL1YPE J
- MATEPdAL'IYPE K
- MATERIAL'tYPE L
- MATERIAL ~YPE M
- MATERIAL ~YPE N
- MATERIAL TYPE 0
- RISK MGT PREVENTION PLAN FEE
- HAZARDOUS MATERIALS HANDLER ANNUAL INSPECTION FEE
(ADDITIONAL CHARGE TO BUSINESSES IDENTIRED AS )
(HAZARDOUS MATERIAL HANDLERS - ANNUAL INSPECTION)
- 30 MINUTE ANNUAL INSPECTION
- EACH ADDff, 15 MINUTES (IF N ECES~J:iY)
UNDERGROUND STORAGE TANK PEF~IffS
- NEW TANK INSTALLA~ON
- ANNUAL OPERATING INSPECTION
- TANK 'RGH3~IES~ TESTING
- TANK MOOIFICATION
- TANK REMOVAL
- STATE SURCHARGE
- SiTE ASSMT & CLEANUP OVERSIGHT
- FILE RESEARCH FEE
FIRE HYDRANT SALE AND INSPEC'RON
LEISURE AND CULTURAL SERVICES
PARK FACILITY RENTAL
- PARK PICNIC FACILITY
- ONE FACILITY
- EACH ADDmONAL FAClUTY
- SOFTBALL RENTAL- DAYTIME USE
(PLUS 10% OF GROSS RECEIPTS IF 'FOR PROFIT' )
100.0%
100.0%
100.0%
EXISTING
FEE8
O2/24/94
S25.00
$25.00
$15.00
$65.00
ADOt'I b.U
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES / f'~'~.M ENTS
~5.00
$0.00 COV~S l ST ~0 MIN. QF INSPECliON
r~l.O0 f.25 FOR EACH ADOJT. 15 MIN. REQ~JiRED
$25,00
$15.00
$65.00
PAGE 10 OF 31
$-54.1
City of Bakerslleld
MASTER rr_l= SCHEDULE
for City Service Centers
EXHIBIT "A"
SERVICE CENTER
(AND ACI~AL CHARGES FOR ANY ADOmONAL CO~T8 )
(~UCH AS REID PREP WORK'IHAT MAY BE INCURRED )
- BALLRELD LIGHT1NG SERVICE
MISCELLANEOU~ PARKS SERVICES
- ALCOHOL PEF~IIT
- WiTH FACIUTY RESERVATION
- WITHOUT FACILITY RESERVATION (NON REFUNDABLE)
- OPEN TO THE PUBLIC
- SOUND PEF~AIT
- RESCHEDUMNG FEE ON FACILITY RENTALS
- CANCELLATION FEE ON FACILITY RENTALS
- FIREWOOO SALES
- ONE-~tlF~ OF A COF~I (UNCLT~
- ONE-HALFOF A CORD (UNCUT)
- ~NO-~;FO8 OF A CORD (UNCUT)
crrY ADULT PROGRAMS AND ACTIVmES
- CITY A[XJLT VOLLEYBALL PROGRAM
- OUT1XX)R PROGRAM
- PRN^TE LEAGUES
- City ADULT SOFTBALL PROGRAM
- LEAGUE [~'4T'RY FEE PER TEAM
- wm-I OFFICIALS
- RESCHEDUMNG FEE
- P~IVATE LEAGUES
- CIIY ADULT BASKETBALL PROGRAM
- MEN8 PROGRAM
- WOMEN8 PROGRAM
- ADULT TENNIS PROGRAM
- SINGLES
- DOUBLES
% OF CO~T EXISTING ADOPTED
RECOVERY FEES FEES
REQUIRED 02/24/94 03/10/94
100.0%
85.0 %
$13.50
$8.00
$50.00
$20.00
$8.00
$t3.00
$215.00
$140.00
$415.00
ACTdAL COS~
$410.00
$185.00
$12.00
$18.00
$13.50
$4.~
$13.~
$30.00
$215.00
$140.00
.~'TLL~. COSlS
$415,00
$410.00
$185.00
$12.00
$18.00
/ (DECREASE)
PAGE 11 OF 31
8-56
8-57
$-58
G-59
$-60
S-61
SERVICECENTER
- ADULT SPORTS TOU Fg,,IAM B',~S
THIS SERVICE CEN ! EH DEIk ~ f::u
11'11S SERVICE CENTER DELETED
'11118 SERVICE CEN'I~=R DELe ~ ~=u
THIS SERVICE CENTER DELt=I ,~u
CITY YOUll-I PROGRAMS AND ACTNI~ES
- ClIY YOU~-I BASKETBALL PROGRAM
- CHARGE PER PU~YER WIn-lOUT COACHES
- TEAM FEE
- BABYSrTTING CLASSES
- CROSS COUNTRY EVENT
- PRE REGISTRATION
- LATE REGISTRATION
RECREATIO~ CENTER RENAL
City of Bakersfield
MASTER rr_J: SCHEDULE
for City Sewice Centers
% OF COST EXISTING
RECOVERY FEE8
REQUIRED 02/24/94
50.0%
ADO~I bU
V/~RKX.IS
VAqlOLIS
EXHIBIT 'A'
AMOUNT OF
FEE INCRF..ASE
/ DECREASE)
NOTES / COMMENTS
$0.0o CHARGE
$0.00
20.0%
CATEGORY A - NON PROFTT - NO CHARGE TO'THE PUBLIC
(THE FOLLOWING CHARGES ARE FOR ONE HOUR OF RENTAL)
(A'1%¥O HOUR MINIMUM RENTAL 18 REQUIRED.)
(AN EXTENDED HOUR RATE SCHEDULE IS AVAILABLE UPON REQUES1)
- MARTIN LU13'IER KING FACII. YrY
- G'TRONG ROOM
- STRONG ROOM W/KffCHEN
- GREEN ROOM
- GREEN ROOM W/KiTCHEN
- STRONG/GREEN ROOMS
- STRONG/GRE~4 ROOMS W/KffCHBd
- YOUNG (GAME) nOO~
YOLk%'G (GAME) ROOM W/KiTCHEN
- BROWN (WEIGHI~ ROOM
- BROWN (WEK~HT) ROO~ WlKJTCHEN
- YOUNG / BROWN ROOMS
;10.00
;14.00
H4.00
;15.00
rl 9.00
;12.00
;16.00
;15.00
;19.00
$10.00
$14.00
$~o.oo
$14.00
$~5.oo
$19.00
$12.00
$16.00
$15.00
Sm. Oo
PAGE 12 OF31
City of BakerMield
MASIER FEE SCHEDULE
for City Sewice Centers
SERVICE CENTER
% OFCOST
RECOVERY
REQUIRED
EXISTING
FEES
O2/24/94
- YOUNG / BROWN ROOMS W/I(ffCHEN
- WILLIAMS MULTI PUt~O(~E ROOM (GYM)
- WlI. I-I~tS ROOM (GYM) W/BLEACHERS
- CONFERENCE ROOM
- Ci'TY STAFF CHARGES (RATES SUBJECTTO CHANGE DEPENDING)
(ON ACTUAL PosmoN8 U~UZED FOR THE SERVICE)
- SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN.)
- CUSTODIAL (CHARGE PER HOUR - 2 HOUR MIN,)
- EQUIPMENT RI~ITN. (INCLUDES ~=T-UP AND TAKE-DOWN)
- TABLES (PER TABLE)
- CHAIRS (PER CHAIR)
- SCOREBOA~ - PER HOUR (OPERATOR INCLUDED)
- P.A.
- 3WO SPEAKERS AND A MIC
- ADDmONAL SPEAKERS (PER PAIR)
- PORTABLE STAGE
- SILVER CREEK COMMUNn'Y C B"~TE R
- MEETING ROOM #1
- MEETING ROOM #1 W/I(~rCHEN
- MEETING ROOM #2
- MEETING ROOM ~ WjKITCHEN
- MEL='r~G ROOM #1 & #2
- MEETING ROOM #1 & ~ W,~JTCHEN
- COVERED COURT AREA
- COVERED COURT AREA WA.IGHTS
- Cl3Y STAFF CHARGES (RATES SUBJECTTO CHANGE DEPENDING)
(ON AC3tJAL FOSITIONS UTlUZED FOR THE SERVICE)
- SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN,)
- OUSTOOIAL (CHARGE PER H(XJR - 2 HOUR MIN.)
- EQUIPMENT RENTN. (INCLUDES SET-UP AND TAKE-DOWN)
EXHIBIT 'A'
Rev, Date: 04-Mar -94
ADOP't ~.u NdOUNT OF
FEES FEE INCREASE
03/10/94 / (DECPE_ASE)
$24.00 $24.00 SO.O0
$15.00 $15.00 SO.O0
$13.00 $13.00 SO.00 CH,aRGE PER HO~IR
$11,00 $11.00 S0.QO CHARGE PI~ HOUR
$1.00 $1.00 SO.OO
SO.25 SO25 SO.O0
$7.50 $7,50 SO.00
$12.00
$16.00
$12.oo
$16.00
$12,00
$13.(X}
$11.oo
$12,00
$16.00
$12,00
$16,00
~?.4.(X3
$12.00
$13.00
$11.00
SO.O0 CHN:IGE PER ~
PAGE 13 OF 31
City of Bakerslield
MAS~IER FEE SCHEDULE
for City Sewice Centers
EXHIBIT 'A'
SERVICE CENTER
% OF COE;T
RECOVERY
REQUIRED
EXIS~NG
02~4/94
- TABLES (PER TABLE)
- CHAIR~ (PER CHAIR)
- P.A. SYSTEM
- TWO SPEAKERS AND A MIC
- ADDITIONAL SPEAKERS (PER PAIR)
CATEGORY B - NON PROFIT - ADMISSION CHARGE TO FUBMC
CFHE FOLLOWING CHARGES ARE FOR ONE HOUR OF RENTAL)
(A TWO HOUR MINIMUM RENTAL I$ REQUIRED.)
(AN EXTENDED HOUR RATE SCHEDULE IS AVAILABLE UPON RE-QUEST)
- MARTIN LU'IHER KING FACILITY
- STRONG ROOM
- STRONG ROOM W/IGTCHEN
-GREENROOM
- GREEN ROOM W/KITCHEN
- STRONG IGREEN ROOMS
- STRONG/GREEN ROOMS W/YJTCHEN
- YOUNG (GAME) ROOM
- YOUNG (GAME) ROOM W/KITCHEN
- E~OWN {WE~H~ ROC~ W/KnCHEN
- YOUNG / BROWN ROOMS
- YOUNG / BROWN ROOMS W/KffCHEN
- WILLIAMS MULTI PURPOSE ROOM (GYM)
- W~LLU~S ROOM (GYM) W/Bb~CHE~S
- CONFERENCE ROOM
- ~ ~TAFF CHARGE~; (RATES SUBJECT TO CHANGE DEPB~ID~IG)
(ON ACTUAl. POntoON8 UTIUZED FOR THE SB:NICE)
- SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN.)
- CUSTOOIAL (CHAR3E PER HOUR - 2 HOUR MIN.)
- EQUIPMENT RENTAL (BICLUDE$ SET-UP AND TAKE-DOWN)
- TABLES (PER TABLE)
$24,00
~.0,00
$24,00
$30.00
$24,00
~0.00
$34.00
$40,00
$44.00
$20.00
$13.IX)
$11
$1.50
ADOPTED
FEES
03/~0/94
$20.00
~24.00
$20.00
$24.0O
~4.00
$28.00
$13.00
$11.00
$1.50
AMOUNT OF
FEE INCREASE
/ (DECREASE')
NOTES / COMMENTS
~ PR EPARA1tON FEE MAy B~ REQUIRED
PAGE 14 OF 31
City of Bakemlield
MASTER FEE SCHEDULE
for City .~-n~ice Centers
EXHIBIT 'A'
SERVICE CI~I'rER
%OFCOST
RECOVERY
RE(~IBED
- SCOREBOARD - PER HOUR (OPERATOR INCLUDED)
- P.A. SYUl
- ~&/O SPEAKERS AND A MIC
- ADDmONAL SPEAKER~ (PER PNR)
- PORTABLE STAGE
- SILVER CREEK COMMUNITY CENTER
- MEE"RNG ROOM
- MEETING ROOM #1 W/KITCHEN
- MEETING ROOM
- Mt-~ I lNG ROOM #2 W/KITCHEN
- MEETING ROOM #1 & ~2
- MEETING ROOM #1 & #2 W/KITCHEN
- COVERED COURT AREA W/LIGHTS
- KITCHEN
- CITY STAFF CHARGES (RATES SUBJECT TO CHANGE DEPENDING)
(ON ACTUAL POSITIONS UTILIZED FOR THE SERVICE)
- SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN.)
- CUSTOOIAL (CHARGE PER HOUR - 2 HOUR MIN.)
- EQUIPMENT RENTAL (INCLUDES SET-UP AND TAKE-DOWN)'
- TABLES (PER TABLE)
- CHAIRS (PER CHAIR}
- P.A.
- TWO SPEAKERS AND A MIC
- ADDITIONAL SPEAKERS (PER PAIR)
CATEGORY C - PRNATE USE - ALL CHARGE8 TO'IHE PUBLIC PROHIBn'ED
(THE FOLLOWING CHARGES ARE FOR ONE HOUR OF RENTAL)
(A THREE HOUR MINIMUM RENTAL IS REQUIRED.)
(AN EXTENDED HOUR RATE SCHEDULE IS AVAILABLE UP(~I REQUEST)
- MARTIN LUTHER KING FAClLR'Y
EXISTING ADOP!t:U AMOUNT OF
FEES FEES FEE INCREASE
02/24.~94 03/10/94 / {DECREASE)
~.~0 $0.30 $o.oo
$10.00 $10.00
$17.50 $17.50 $0.00
$7.50 $7.50 $0.00
$7.5O $7.5O $0.00
$36.00 SaS.oo $o.oo
$4o.oo $40.00 $0.00
$10.00 $10.00
$14.00 $14.00 $o.oo
$10,00 $1o.0o
$13.00
$11.00
$13.00
$tl.00
NOTES
$~5.00 $25.00 $0.00
$10.00 $10.00 $0.00
PAGE 15 OF 31
1
SERVICE CENTER
- STROiflG ROOM
- STRONG ROOM W/KiTCHEN
- GFI~I~I ROOM
- GREEN ROOM W/KffCHEN
- STRONG/GREEN ROOMS
- smoNG/GREEN ROOMS W/~dTCHEN
- YOUNG (GAME) ROOM
- YOUNG (GAME) ROOM W/KffCHEN
- BROWN ONEIGHT) ROOM
- BROWN (WEIGHT) ROOM w/KrrCHEN
- YOUNG / BROWN ROOMS
- YOUNG / BROWN ROOMS W/KITCHEN
- WILUAM8 MULTI PURPOSE ROOM (GYM)
- WILLIAMS ROOM (GYM) W/BLEACHERS
- CONFERENCE ROOM
City of Bakemtield
MASTER FEE SCHEDULE
for City Senace Centers
% o~cosT
RECOVERY
- ClIY STAFF CHARGES (RATES SUBJECT TO CHANGE DEPENDING)
(ON ACTUAL POSmONS UTILIZED FOR THE SERVICE)
- SUPERVISION (CHARGE PER HOUR - 2 HOUR MIN.)
- OUSTOOIAL (CHARGE PER HOUR - 2 HOUR MIN.)
- EQUIPMENT RENTAL (INCLUDE8 SET-UP AND TAKE-DOWN)
- TABLES (PER TABLE)
- CHAIR8 (PER CHAIR)
- 8COREBOAFO - PER HOUR (OPERATOR INCLUDED)
- P.A. SYSTEM
- TWO SPEAKERE AND A MIC
- ADD~ SPEAKER8 (PER PNR)
- PORTABLE STAGE
- SILVER CREEK COMMUNITY CENTER
- MEET1NG ROOM #1
- MEETING ROOM #1 W/KiTCHEN
- MEETING ROOM ~
EXHIBIT 'A'
Fbv. Date: 04-Mar-94
EXISt'lNG
FEES
02/24/94
ADOP'~ e.u
FEES
0a/1o/94
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES / COMMBqTS
$13.00
$11
$2.00
$0.35
$12.50
$20.00
$10.00
$10.00
$13.00
$11.00
Sl2.~
$10.OO
$10.00
PAGE 16 OF 31
SERVICE C~(TER
City of Bakerslield
MASTER FEE SCH~DUIF
for City Sewice Centers
EXHIBIT 'A'
%OFCO~T
RECOVERY
REQUIRED
02/24/94
S-62
S-63
- MEETING ROOM ~2 W/KITCHB~I
- MEETING ROOM ~1 & #2
- MEETING ROOM #1 & f2 W/KITCHI~I
- COVERED COURT AREA
- CITY STAFF CHARGES (RATES SUBJECT TO CHANGE DEPENDING)
(ON ACflJAL POSfltON8 UTILIZED FOR '~IE SERVILE)
- SUPEFIVl81ON (CHARGE PER HOUR - 2 HOUR MIN.)
- CUSTODIAL (CHARGE PER HOUR - 2 HOUR MIN.)
- EQUIPMENT RENTAL (rNCLUDES SET-UP AND TAKE-DOWN)
- TABLES (PER TABLE)
- CHNRS (PER CHAIR}
- P.A. SYu;t:M
- TWO SPEN(ERS AND A MIC
- ADDmONAL SPEAKERS (PER PAIR)
CATEGORY D - MARTIN LL,q~ ER KING CEN ~ t::H OFFICE PENTAI.S
- CHARGE PER OFFICE PER MONTH
1HIS SERVICE CENTER DELr= ~ ~u
RECREA1]ONAL SWIMMING 20.0 %
- CHARGE PER DAY
- SEASONAL PASS
- SWIM FOR FITNESS
- CHARGE PER DAY
- SEASONAL PASS
- WATER MOVIES
- PER PERSON ($3.00 DI~X~XJNT FOR
FAMILY OF FIVE OR MORE)
- SPECIAL AI~JATIC EVENTS
AQUATIC PROGRAMS - CITY RESIDENTS 35.0 %
- SWIMMING LESSONS - CITY RESIDENTS
$35.00
$45.00
$50.00
$'12.00
$12.00
$13.00
S11.00
$12.50
$120.00
$1 .IX)
$35.00
S45.00
$50.~0
$12.00
$15.00
$12.~0
$13.~O
$11
$3.00
$30.00
$12.50
$120.00
$1.00
PAGE 17 OF 31
1
City of Bakersfield
MASTER r~-c SCHEDULE
for City Sewice Centers
EXHIBIT "A'
SERVICE CI~4TER
% OFCO~I'
RECOVERY
REQUIRED
- ONE $E88[~ (10 DAYS) - Cl/Y RESIDENTS
- AUTlSlqC~EAF CLASS FEE
(COVERS ALL SESS~qS)
- BASIC UFE~UAF~ CLASS
- JUNIOR UFEGUARD CLASS
- PRIVATE LESSONS
- ~EMIPRIVA'IE LESSONS
- COMPt;iiiIVE SWIMMING - CITY RESIDENTS
- SWIM POOL RENTAL - CIIY RESE)ENTS (RATES ARE PER HOUR)
(2 HOUR MINIMUM RI~qTAL REQUIRED)
- JErH:tt~ON POOL & SILVER CREEK POOL
1 - 5O PEOPLE
51 - 100 PEOPLE
101 - 180 PEOPLE
131 - 200 PEC~Ot.E
- CAUFORNIA POOL (M.L KING)
1 - 50 PEOPLE
51 - IiX) PEOPLE
101 - 130 PEOPLE
13! - 200 PEOPLE
- ALL OTHER POOLS
1 - 50 PEOPLE
51 - 100 PEOPLE
101 - 130 PEOPLE
AGUATIC PROGRAMS - NON RESIDENTS
- SWldMiNG LES,.qON$ - NON RESIDENT8
- ONE 8E881ON (10 DAYS) - NON RESIDBqTS
BASIC UFBGiUAFO CLASS
- JUNIOR UFEGUARD CLASS
- PRIVATE LESSONS
- 8EMIPPaVATE LESSONS
45.0 %
EX!b~TING
FEE8
02/24/94
$17.00
$17.00
ADOPTED
08/10/04
AMOUNT OF
FEE INCREASE
I (DECREASE)
$17.00
$17.00
~5.00
$25.00
PAGE 18 OF 31
S-66
8-67
S-68
~S-69
City of Bakersfield
MASTER FEE SCHEDULE
for City Sendce Centers
EXHIBIT 'A'
SERVICE CI~TER
% OF COST EXISTING
RECOVERY FEES
REGUIRED 02/24/94
- COMPt: ~ ~ ~ WE SWIMMING - NON RESIDENTS
- SWIM FOOL RENTAL - NON RESIDENTS (RATES ARE PER HOUR)
(2 HOUR MINIMUM RENTAL ~IRED)
- JEFFERSON POOL & SILVER CREEK POOL
I - 50 PEOPLE
51 - 100 PEOPLE
101 - 130 PEOPLE
131 - 200 PEOPLE
- CAUFOI~IA POOL (ML KING)
1 - 50 PEOPLE
51 - 100 PEOPLE
101 - 130 PEOPLE
131 - 200 PEOPLE
ALL OTHER POOLS
1 - 50 PEOPLE
51 - 100 PEOPLE
101 - 130 PEOPLE
LEISURE CLASSES
THIS SERVICE CENTER DELETED
~HIS SERVICE CENTER DELETED
ADOPTED
FEES
03/10/94
AMOUNT OF
FEE iNCREASE
/ (DECREASE)
$0.00
NOTES / COMMENTS
$45.00
75.0 %
$40.00
$0.00 3 IFF=GUARDS
$0.00 4 L~=EQUN~DS
$0.5O 4 LFEGUAROS
THIS SERVICE CENTER DELETED
- BASK:: BUILDING RENTAL RATES
- CONCERT HALL $800.~0
ARENA $650.~0
- CONCERT HALL AND ARENA
- MUL'I1-DAY PERFORdANCES - TICIM:[~tu
PERFORMANCES OF TWO OR MORE
CONSECUTNE DAYS ARE OFFERED THE
FOLLOWING RENTAL CAPS FOR THE CONCERT HALL
TICKET PRICE
$1,5O0.00
$800.00
$650.00
$1,5O0.5O
PAGE 19 OF 31
j?'
City of Bakersfield
MASIER FEE SCHEDULE
for City Sewice Centers
EXHIBIT "A'
SERVICE CENTER
- $1 .oo TO $2o.o0
- $20.01 TO ~0.00
- $30.0t NqD ABOVE
- CASH PERFORM~ICE DEPORT IN ADDiTK~I
TO RENTAL RATES USTED ABOVE IS REQUIRED
TO COVER O'I~ER EXPENSES Lt~ ~ ~LJ BELOW
- MEETING ROOMS
- GRAPE ROC~
- POTATO ROOM
- BANK ROOM
- CARROT ROOIVl
- ALL OIHER ROOMS
- EX}'flBff / TRADE SHOWS
- ENT1RE BUILDING (PER DAY)
- CONCERT HALL OR ARENA (PER DAY)
- CONVEN'rloNs
- BUILDING RENTAND PARi(JNG
- SOUND AND UGHT MAN
- SOUND AND LIGHT MAN (OVER 8 HOURS)
- AIR CONDITIONING TECHNICIAN
- AIR CONDITIONING TECH (OVER 8 HOURS)
- E.)O'IIBff SPACE ($O.05/EQ.FT./DAY)
- O~-IER FACILIIY USES - $1000 PER DAY
OR 10% O~= GROSS, WHICHEVER IS GREATER
- CA'~ERING - $,.q00 OR 15~ OF GROSS SN..ES,
- FOOD - $200 OR 15% OFGROSS RALE$,
PER DAY, WHICHEVER IS GREATER
- ALCOHOUC BEVERAGE8 - CONTACT
PANI SI.-IIPLEY, (805) 322-9903
- BOX OFFICE
% OF COST EXISTING
RECOVERY FEE8
REQUIRED 02/24/94
$150.00
$~so.oo
$100.00
$1,000.00
$1
$15o.oo
$150.00
$150.00
$100.00
$100.00
$75.00
$1
$1,000.00
$34.50
$23.00
$84.50
$O.05
NV47dNT OF
FEE INCREASE
/ (OECREASE)
NOTES/~ENTS
SO.Q0
$2.00
PAGE 2O OF 31
fM81
SERVICE CENTER
City of Bakerslield
MASTER Pr_t: SCHEDULE
for City Sewice Centers
EXHIBIT 'A'
%OFCO~T
RECOVERY
REQUIRED
EXISTING
FEES
02/24/94
AMOUNT OF
FEE INCREASE
! (OECREASE)
NOTES / COMMENTS
- TICKET ORDERING
- ADVANCE TICI~-'T SALES - PER DAY
- ~CKET SELLERS - PER HOUR PER PERSON
- DOORMAN - PER HOUR PER PERSON
- PHONE O~ER SERVICE FEE
- SALES FOR EVENTS NOT HELD AT
CONVENTION CENTER = 5% OF GROSS.
OUTSIDE TICKET OUR.ETS CANNOT
COMME~ICE SALES PRIOR TO 1HE CENTER
FRONT OF HCX)SF PFR~Z)NNEL USHFRS
CONCERT HALL (PER EVEN'~
- AHENA (PER EVENI}
ENTIRE BUILDING (PER EVENT)
- ,qTAGENAN~ I;
- 8TAGB4AND I
- WARDROBE
SECURITY - AT ALL EVENTS WHICtt REQUIRE SECURITY.
PflNATE SFCURITY OFRCERS MUST BE USED
OFFICERS ARE PAID PER HOUR WITH A 4 - HOUR MINIMUM
TIMF AND ONE,l-IAI F (I 5) Wll L BE PAID IF THF FVFHT
TAKr$ PLACE ON A C~Y IIOLIDAY AS ADOPTED BY
SkPARATE H~-~OLUt'ION. ~-IE TO IAL NUMBER OF OFFICI-RS
ASSIGNED WILL BE DECIDED BY '~ IE MANAGEMENT OF ~-IE
BAKEF~FIELD CONVENTION CENTER
ROCK ENOWS USUALLY REOUlRE 35- 45 OFFICERS
SECURriY SUPERVISOR
ASSISTANT SUPEF~,'ISOR
$250.00
$125.00
$125.00
$17500
$1300
$1150
$125.00
$125.00
$175.00
$15.~}
$14,50
$t8,00
$11.~0
$13.00
$11,50
S0.00
SO.IX) PER DAY
~).00 PE~ PBRSON P~ HOUR
$0.00 PER PE~8ON PI~ HO~R
$0.00 CHARGE P~I ~.ANSAC11ON
SEE COMM~IIS
$1.75 FI~ PER~N PB~ HO~
PAGE 21 OF 31
M~SI
SERVICE CENTER
City of 6akerslield
MASIER FEE SCHEDULE
for City Sen4ce Centers
EXHIBIT 'A'
% OF COST
FC-COVERY
REQUIRED
EX~NG
FEES
O2/24/94
ADO~t:u
FEES
0O/1 O/94
AMOUNT OF
FEE INCREASE
NOTES / COMMENTS
- 8ECURI~( OFFICER
- NOVEL1Y ITEMS - THE SALE OFANY NOVELTY
~ (E.G. RECORDS, SHIRTS, PROGRAMS,
ETC.) DURING AN EVENT MUST RRRT BE
CHECKED ~HROUGH THE BUILDING MGT.
- 25% OF GROSS SALES TO BE PAID
TO THE CONVENTION CENTER
- 15% OF ~ SALES FOR REUGIOU8
EVENTS
- ALL TRANSACTIONS MUST BE SETTLED
WITH THE BUILDING PERSONNELTHE NIGHT
OF THE EVENT.
- THE CONVENTION CENTERWlLL PROVIDE
~AI.E8 PERSON AT NO CHARGE
- VEN~CLE PARKING
- DAILY RENTAL OF PAFI~NG LOT
- PER VB-IICLE PER ENYRY
- DECORATING CHARGES - RATE8 ARE FOR
DURATE)N OF EVENT
- FOLDING CHAIR
- 3'X 3' TABLE
- 0O' X 5'TABLE
- 30' X 6'TABLE
- 3(7' X 8'TABLE
- 3'X 8' TABLE
- 18' X 6' TABLE
- 5' ROUND TABLE
- 7' BENCH TABLE
- 3' X 3' TABLE W/SKIRT
- 30' X 5' TABLE W/SI~RT
- 30' X 6' TABLE W/SKIRT
$10.50
25.00%
15.0(ffo
$7.bo
$8.00
$10.00
$12.00
$13.00
$10.00
$17.50
$2s.so
~7.00
$10.50
:~$.00%
$7.00
$8.00
$12.0O
$13.00
$7.0O
$10.0O
$8.00
$17.50
$23.50
$27.0O
PAGE 22 OF 31
City of Baker~eld
MASTER FEE SCHEDULE
for City Sen4ce Centers
EXHIBIT 'A'
SERVICE CENTER
- 30" X 8' TABLE W/SKIRT
- 3' X 8' TABLE W/SKIRT
- 5' ROUND TABLE W/~KJRT
- 7' BENCH TABLE W/SKIRT
- BOO'TH: 8' X I0' OR 10' X 10'
- BOOTH: 8' DRAPE (UNE FEE~
- BOOTH: $' DRAPE (LINE FEED
- CARPET8' X 8'
- PIT CARPET
- AISLE CARPET (PER LINE FOOl')
- CARPET RUNNER 4' X 8'
- 4' X 8' DISPLAY BOARD
- 4' X 6' DRY MARKER BOARD
- EAS~.
~ 500TH ~U~
RAT~S A~E ~E~ S~OW
- 12'X 14'MOVIE SCREEN
- 96" X g6' MOVIE SCREEN
- 70" X 70' MOVIE SCREEN
- 10' X 10' REAR VIEW SCREEN
SUPER '~OUPER
- '[ROUPER
- EXTRA STAGE (56' X 32')
- EX'mA STAGE (56' X 40')
% OF CO~T EXISTING
RECOVERY PEES FEE8
REQUIRED O2/24/94 03/10/94
$1.00
$0.50
$20.00
S~o.oo
$10.00
$10.00
$7.50
$15.00
$100.00
$100.00
$! 5.00
$100.00
$100.00
$175.00
NV4XJNT OF
FEE INCREASE
~25.50
$25.0O
$20.00
$1.00
$100.~o
$1
$10.00
$1o.oo
$1o.oo
$15.oo
$1oo.oo
LINE FOOT
$100.00 ~0.00
$100.00 ;0.00
$100.00
$175.00 ~0,00
PAGE 23 OF 31
1
SERVICE CENTER
City of Bakerdield
MASTER I-r_l: SCHEDULE
for City Service Centers
% OF CO~-q'
RECOVER~
- STAGE BARRICADE
- SOUND WINGS
- 6' X 8' PORTABLE STN:~iE
- STRUCTURAL STEEL SEAT RISERS
- BOXING RING (3-ROPE, 20' X20')
- SCAFFOLDING
- UPRIGHT PIANO
- BABYGRAND PIANO
- 9' CONCERTGRAND PIANO
-ORGAN
- OVEi:~EAD PROJECTOR
- SLIDE PROJECTOR
- PROJEOTION STAND
- 16mm PROJECTOR
- VlOlO PROJECTOR (INCLUDES SETUP)
- VCRK)ART/MONiTOR
- FC COMPATIBLE MONITOR (,,~::~,dY)
- MONITOR SPEAKER
- WIRELESS MIC (LAVAMER)
- WIRELESS MIC 0-1AND HELD)
- IA. PGE U.S. FLAG
- TAPING - CASSt:~ if=
- MIRROR BALL
- PLYWOOO FLOOR COVERING
- PARQUET DANCE FLOOR 3' X 3' PANELS
- 1ST 100 PANELS (MIN CHARGE $100)
- ADDITTONAL PANELS $1.50 EACH
(MAX FLOOR SIZE 42' X 57' = 266 PANELS)
- BASI<ETBAU. FLOOR
EXHIBIT 'A'
FESS
AMOUNT OF
FEE INCREASE
/(DECREASE)
$100.00
$100.00
$12.00
$100.00
$75.00
$100.00
SmO.OO
$25.00
$10.00
$25.00
$100.00
$25.00
~25.oo
$1 SO.00
$100.00
$100.00
$12.00
$100.00
$75.00
$100.00
$25.00
$10.00
$25.00
$100.00
S25.00
$75.00
$25.~o
$15O.00
.50
$3.00
$1.5O
$0.00 $3.00PER PAN~ OAIN Ct'IA,RGE $100)
$0.00 $1.50PBR PANEL
PAGE 24 OF 31
SERVICE CENTER
City of Bakemliek:l
MASTER FEE SCHEDULE
for City Sen~ice Centers
EXHIBIT 'A'
% OFCOST
RECOVERY
REQUIRED
FEES
03/1
NUOUNT OF
FEE INCREASE
/ (OECREASE)
NOTES I COMMENTS
- CHC~R RISER (PER UNIT)
- CHOIR 8HEU. (PER uNrr)
- MUSIC STN~DS
- ELECTRICAL
- SURGE PROTECTED PLUG STRIP
- EXTI~$1ON COED (PER 10 FT.)
- SHORE POWER
- liXX~ WATT, 120 VAC
- 1000 WATT, 120 VAC (DEDICATED SERVICE)
- 20(X3 WATT, 120 VAC
- 3000 WATT, 120 VAC
- FRACTIONAL HP MOTOR, 120 VAC
- 1000 WATTOR 1 HP, 120/208
- 2000 WATT OR 2 HP, 120/208
- 3000 WATTOR 3 HP, 120/2~6
- 208v DISTRIB~ TO:
LOADS OVER 3{~O WA'IT/INSOE
LOADS OVER 3000 wA'rr ! OUTSIDE
- MISCELLANEOUS CHARGES
- ORIGINATION FEES (PER DAY RATES)
-' OUTSIDE CLEANUP (PER EVENT)
- PICTURES & FLOWERS (lff~ OF GROSS)
- VIDEO HOOKUP
- LABORER (RATE PER HOUR)
- FORKUFT (4,000 LBS CAPACI~ (RATE PER flOUR)
(1/2 HOUR $25 M~IMUM CHARGE)
- FACILFTY OVERT1ME (IHO~E HOURS BE'rWEEN
12:00 MIDNIGHT AND 6:00 A.M.)
- FAX CHARGES (SEND OR RECEIVE. CONTINENTAL USA)
- FIRST PAGE
- EACH ADDmONAL PAGE
$100.00
$200.00
$5~0.00
$100.00
10.00%
$50.00
$~5.oe
S5.00
$1.00
$15.00
$,5.00
$40.00
~30.00
,'75.00
$100.00
$100.00
$.500.00
$100.00
$50.00
PAGE 25 OF 31
City of Bakerslield
MASIER FEE SCHEDULE
for City 8ewice Centers
% OFCOST
SERVICE CENTER REQUIRED
EXHIBIT 'A"
EXISllNG
FEES
02/24/94
- ADVANCE MAR(~EE TIME (PER DAY)
- LABOR CHARGE BACK - OPERATIONS (RATE PER HOUR)
- FLOOR ;CE - INITIAL MAKING
- MAINTAIN FLOOR ICE (CHARGE PER DAY)
UTIMTY AND ENI'ERPRISE SERVICES
$-71 DOMEST~ WA3ER SERVICE 100.0%
S-72 AG RICULI~J RAL WATER SERV;CE 100.0%
S-73 SANffARY 8EWER SERVICE 100.0%
S-?4 IN DUS~RIAL WASTE DISCHARGE MON flORINS 100,0%
- DISCHARGE MONffORING ANNUAL FEE
- NONCOMPLIANCE REINSPECTICNS
- OUTSDE LABORATORY TESTING FEES
8-75 WASTEWATER SERVICE - - O3~'IER AGENCIES 100.0%
- UNION AVE COUN/Y SAN ffA~43N DIST.
- ALTA VEI~)E COUN'IY SANffATION DIST.
- FAST NILES COMMUNITY SERVICES DIST,
8-76 SEWER CONNECTE)N 100,0%
S- 77 SEWER STOPPAGE INVESTIGATION 100,0 %
S- 78 RESlDEN~AL REFUSE SERVICE 1 00.0 %
- SINGLE FAMILY DWELLING
- MUL¥1PLE FAMILY DWELLING
S-79 COMMERCIAL REFUSE SERVICE 100.0 %
- BIN SIZE BY CUBIC YARD
- 1.5 CUBIC YARDS
PICKUP DAY~ / WEEK = 1
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICI~JP DAYS / WEEK = 6
- 2.0 CUBIC YARDS
$10.00
N/A
~A
~A
$415.00
$415.00
ACTUN. COSIS
$151,793,00
$250,103.00
N/A
$100.00
$123.00
$111.00
$111.31
$155,24
S252.87
A[:X~PTED
FEES
08/10/94
$10.00
N/A
N/A
N/A
.$41500
$415.00
ACTUN. COSTS
$151,793.00
$250,I03.00
N/A
$100.00
$123.00
' $111.00
$56.24
$70.30
$111.31
$155.24
$202.10
$252.87
AMOUNT OF
FEE INCREASE
! (OECREASE)
PAGE 26 OF 31
SERVICE CENTER
City of Bakersfield
MASTER FEE SCHEDULE
for City Sewice Centers
EXHIBIT 'A'
% OF COST
RECOVERY
REQUIRED
EXISTING
FEES
O2/24/94
AMOUNT OF
FEE INCREASE
PICKUP DAYS / WEEK = 1
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = $
PICKUP DAYS/WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP D^Y8 / WEEK = 6
- 8,0 CUBIC YAPO8
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICK[JP DAYS / WEEK = 6
- 4.0 CUBIC YAF/~
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = $
P~CKUP DAY8 / WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP DAY8 / WEEK = 6
* DETACHABLE COMPACTOR BINS ARE *
CHARGED AT ~'IREE TIMES 'tHE
81'ANDARD SIN RATE
- COMMERCIAL CANS - NUMBER OF CANS
- ~ CANS
PICKUP DAYS ! WEEK = 2
PICKUP DAYS / WEEK = 3
PICKLIp DAYS ! WEEK = 4
PICKUP DAYS ! WEEK = 5
PICKUP DAYS ! WEEK = 6
- THREE CANS
PICKUP DAYS / WEEK = 2
PICKUP DAY8 / WEEK = 3
$70.30
$87.87
$139.13
$193.81
$315.36
$105.44
$166.95
$377.84
$141.57
$311.45
$,504.76
$16.11
$23.44
$31.24
$23.44
$35.14
$70.30
$87.87
$139.13
$193.81
$315.36
$105.44
$141.57
$222.60
$311.4~
$404.20
$504.76
$16.11
$33.44
$31.24
$23.44
$35,14
PAGE 27 OF 31
1
City of Bakerslield
MASIER FEE SCHEDULE
for City Sewice Centers
EXHIBIT "A*
% OF CO~T
RECOVERY
REQUIRED
FEES
03/10/94
AMOUNT OF
FEE INCREASE
/ ~ECREASE)
NOTES / COMMENTS
S-80
S-81
PICKUP DAYS / WEEK = 4
PICKUP DAYS I WEEK = 5
PICKUP DAYS / WEEK = 6
- FOUR CANS
PICI~JP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS/WEEK = 4
PICKUp DAYS / WEEK = 5
PiCKUp DAYS / WEEK = 6
- SPECIAL SERVICES
- REFUSE ROLL OFF BINS (PER PICK UP)
- RECYCLING ROLLOFF BINS (PER HOUR)
- COMMERCIAL AUTOMATED CARTS(PER MON3~)
- RESIDEN11AL AUT~TED CART(PER MONTH)
- DETACHABLE BIN RI3~rAL (PER MONTH)
IN ADDnlON TO THE ABOVE CHARGES 'n-lE crrY
WiLL BE COLLECTING A GATE FEE DISI~L CHARGE
OF $29 PER TON (OR $2 PER CUBIC YARD) ON ALL
COMMERCIAL REFUSE BILUNGS. THiS MONEY WILL
THEN E~E PASSED CH TO KEEN COUNTY.
- KERN COUNTY GATE FEE (PER TON)
- KEF~I COUN3Y GATE FEE (PER CUBIC YARD)
THis SERVICE CENTER DELe: ~ t:u
MUNICIPAL AIRPORT MAINT. AND OPERATION
- AII:~I..AN E STORAGE (PER MON'n-I)
MONTHLY TIE DOWN
MDNIHLY'rtE DOWN (NEW AREA)
COCKPIT 8HADEPORT
PORTA FORT (OWNER HANGERS)
8HADEFORT, WA'FrS
100.0%
$31.73
$47.35
$175.~0
$23.44
$10.25
$16.00
$25.00
$31.73
$47.35
$62.97
$78.59
$175.00
SE0.00
S23.44
$10.25
$1e.00
Ir~5,O0
$0.00
$0.00 IS0PER I-KXJR
$0.00 PER C&qTPBI UONTH (IM-I~E AVALM~
$0.00 PER CNTTPtm MC)N~ (WHERE AVAL,~.~
~0.00 PER BINPER UONIH(WHI~EAV~)
PAGE 28 OF 31
SERVILE CENTER
City of Bakersfield
MASTER FEE SCHEDULE
for City Sewice Centers
% OFCOST EXIST1NG
RECOVERY FEES
REQUIRED O2/24/94
EXHIBIT 'A'
A~FI'ED
FEES
AMOUNT OF
FEE INCRF-ASE
/ (DECRE~E)
NOTES
8-82
8-83
8-84
8-85
S-86
8-87
8-88
8-89
S3O
8-91
8-93
8-94
8-96
8-97
8HADEPORT, QUAD
COMM~n'Y HANGAR (FAA BLDG)
T - HANGAR
HEX HANGAR
MAINTENANCE SERVICES
u'rlUTY FRANCHISE FEES
DRAINAGE MAINTENANCE
STREET LIGHT MAINT. AND OPERATION
ASSESSE~ MEDIAN MAINTENANOE & OPN.
TAXED MEDIAN MAINTENANCE & OF'N.
STREET 8WEEPING
UNCURBED STREET MAINTENANCE
GEOLOGILAL SURVEY STREET USE
ALLEY MAINTENANCE
ASSESSED NEIGHBOF~IOOO PARK MAINT.
AND OPERATION
TAXED NEIGHBORHOOD PARK MAINT.
AND OPERATION
DOWNTOWN OFF-STF~ET PARKING
- 1 TO 10VEHICLES
- 11 TO 20 VEHICLES
- 21 TO 3O VI-~'IICLES
- 31 TO 4O VEHICLES
- 41 TO 5O VEHICLE8
- 51 OR MORE VEHILLES
DOWNTOWN GARAGE PARKING
- PER VI~IIILE (PER MONTH)
11-118 SERVICE CB~I'ER DELETED
STATE HIGHWAY STREET MAINTENANCE
FINANCE AND ADMINISIP, ATIVE SERVICES
43.0%
100.0%
100.0 %
100.0%
t00.O %
100.0 %
100.0 %
100.0 %
100.0%
100.0%
100.0%
100.0%
100.0%
43.0%
100.0 %
$60.00
~80.00
$130.00
$140.00
N/A
$0,00
$120.00
~8,00
$26.00
$24.O0
$20.00
$18.00
$25.00
~0.00
$130.00
$140,00
N/A
$120.3O
ma.bo
$24.3O
$18.00
$0.00 FEES SET BY S~ARA~ LEGi~LATiO N
PAGE 29 OF 31
M;I
8-g6
8-g9
City of Bakerslield
MASTER FtYs- SCHEDULE
for City Sen4ce Centers
EXHIBIT 'A'
SERV;CE CENTER
'IHIS SERVICE CB%'TER DELETED
DOCtJMENT PRNT1NG AND COPYING
- PrK)TOCOPYING CHARGES
- INmAL LOOK-UP FEE
(CHARGE FOR 1ST PAGE OF EACH DOCUMB'~T)
- STAN DAF~ & [.l~d~L ~i7[cl~ DOCUMENTS
- COPY OF MICROFILMED DOCUMENTS
- SPECIAL MAPS & OVERS~ED DOCUMENTS
- PRINTED DOCUMENTS (IE BUOGET)
- POLICE CRIME REPORTS
$ 100 I-EGAL SERVICE TO OTHER AGENCIES
8-101 CHECK COLLECTION
8-102 REQUEST FOR PUBLIC RECORDS
- REGUEEI~ BY SUBPENA
- DIRECT LABOR COST~ (TO LOCATE,
COMPILE & REVIEW REQUESTED RECORDS)
- PHOTOCOPYING CHARGES
STANDAPD & LEGAL SIZE
COPIES FRO~ MICROFILM
- OTHER DIRECT CHARGES
- REQUESTS FOR'PUBUC RECORDS
- DIRECT LABOR Co~'r'8 ('FO LOCATE,
COMPILE & REVIEW REQUESTED RECORDS)
- PHOTOCOPYING CHARGES
STANDARD & LEGAL,SIZE
COPIES ~ MICRORLM
- OTHER DIRECT & INDIRECT CHARGES
8-100 RESEARCH & CERT1FICA'RON
S- ! 04 AGENDA/MINUTE MAIMNG SERVICE
$-105 MUNICIPAL COOE 8UPPEMENT
8-106 PROCESSING 8CHOOL FAClUTY FEES
% OF COb~' EXISTING
RECOVERY FEE8
PEQUI;~) 02/24j94
100.0%
100.0%
100.0%
100.0%
100.0 %
100.0 %
100.0%
100.0%
$0.00
$15.00
$16.00
$0.10
ACTUAL CO~TS
$0.25
Ac'r~ COS'TS
$10.00
$0.25
$0.25
AC'~N. COrm
ACTUN. COS'~
$0.00
$15.00
$16.00
$0.10
$0.20
COSTS
$025
$025
ACIUN. COS'm
$0.00
$69.00
$68.00
$10.00
AMOUNT OF
FEE INCREASE
NOTES / COMMENTS
$0.00 $O.25PER PAGE
$0.00 $0.25PB~ PAGE
$0.00
$0.00 FEE Is CHM:IGED PER 0OC[JME~rl'
$0.00 $3 EACH, 23 MAUNG8 pE~ ~tF_a.R
$0.00 $17 EACH, 4 MALINC~ pER yEAR
PAGE 30 OF 31
SERVICE CENTER
City of Bakerslield
MASTER FEE SCHEDULE
for City Sewice Centers
% OFCO~T EXISTING
RECOVERY FEE~
REQUIRED 02/24/94
EXHIBIT 'A'
ADOFi~ AMOUNT OF
FEES FEE INCREASE
03/10/94 / (DECREASE)
PAGE 31 OF 31
CITY OF BAKERSFIELD - BUILDING DEPARTMENT
MINIMUM FEES PER UNIFORM CODE
FOR FISCAL YEAR 1993-94
EXHIBIT ~B"
% OFCOSTt
~SI RECOVERYI
SERVICE CENTER REQUIRED I
EXISTING: ADOPTED AMOUNT OF
FEES FEES FEEINCREASE
04115/93 07101193 /(DECREASE)
Community Development Sendces
New Construction (S-1 throuoh S-5) 100.00%
Estimated Market Value multiplied by .0085
Fee to be applied to five different costs centers as follows:
S-1 Plan Check
S-2 Construction Inspection
S-3 Plumbing Inspection
S--4 Electrical Inspection
S-5 Mechanical Inspection
0.0085 0.0085
32.40% 32.40%
33.80% 33.80%
13.30% 13.30%
12.40% 12.40%
8.10% 8.10%
0
Improvements (Remodels, Additions, Reoairs)
S-1 Plan Check
Total Permit Fees multiplied by .65
S-2 Construction Inspection
Structure fee rates based on total valuation
S-3 Plumbing Inspection
Square footage charge based on structure
Additional specific fees
S-4 Electrical Inspection
Structure fee rates based on total valuation
or Square footage charged based on structure
S-5 Mechanical Inspection
Structure fee rates based on total valuation
or Square footage charged based on structure
Additional specific fees
100.00% Set by Municipal Code 15.12.070
100.00% Set by Municipal Code 15.12.080
100.00% Set by Municipal Code 15.28.160
See Exhibit C
100.00% Set by Municipal Code 15.32.170
100.00% Set by Municipal Code 15.16.040
See Exhibit D
S-1
Other Fees
Plan Check
Paint Booth Plan Check
Non-Flammable Medical Gas System Plan Check
Sprinkler System Plan Check (Commercial)
Minimum Fee
Other than Minimum (0.01 x Sq. Ft.)
Sprinkler System Plan Check (Residential)
Fire Alarm System Plan Check
Commercial Vent Hood Plan Check
100.0
$100.00 $100.00
$100.00 $100.00
$150.00 $150.00
0.01 x sqff 0.01 x sqff
$45.00 S45.00
$150.00 $150.00
$150.00 $150.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Page 1 of 2
EXHIBIT ¢
PLUHBING PERMTT FEES
Single and Mul=lple Dwelllng Unl:s (Does no~ include tnll:lal fee
of $3.00 or sewer fee of $5.00)
1. Issuance Fee ........................................ 3.00
2. Eac~ plum~lng fixture or :rap sac of fixtures
on one =rap .......................................... 2.00
3. £ac~ building sewer or each trailer coac~ sewer ...... 5.00
4. £ach water heater or vent ............................ 2.00
5. For first fOUr gas ourlees ........................... 2.00
~ach added gas ourlee of 5 or more ..................... 50 es.
6. For each water service ............................... 2.00
7. Each rain water system - eac~ drain .................. 2.00
8. For each industrial waste pre-crea~men~
In=at=apter (including trap and yen= ................. 5.00
9. For installation, repair, or al~eracion of
wa=er piping or water treatment equipment ........ ~...2.00
i0. For repair or alterstie= of drainage or venC piping..1.00
11. For each vacuum breaker or backflow device ........... 2.00
12. For private sewage disposal system .................. 10.00
13. Lawn sprinkler s¥s=em ................................ 1.00
14. Pl-m~lng for trailer coach si=e...$ee M/H Ins=allaClon
No=e: Minimum Permit Fee ................. 3~.00
CITY OF BAKERSFIELD - BUILDING DEPARTMENT
MINIMUM FEES PER UNIFORM CODE
FOR FISCAL YEAR 1993-94
EXHIBIT 'B"
M~SI
S-2
S-3
S--4
$-5
SERVICE CENTER
Construction Inspection
Reinspections (New Construction)
Demolition
Antenna Oisl~
Mobile Home
MoOlie Home w/Perminent Foundation
Mobile Home Garage
Awning and Carport
Swimming Pool
Spa
Pool & Spa
Oil Well Permit Fee
Plumbing Inspection Gas Line
Hot Water Heater Replacement
Solar
Septic Tank
Shower Pan
Pool Plumbing
Septic Abandonment/Sewer Line
Water Softener
Air Conditioning (up to 5 tons)
Air Conditioning (above 5 tons)
Grease Interceptors
Electrical Inspection
Electrical Meter, Temporary Power Pole
Electrical For Pool, Spas or Portable Spas
Electrical Subpanel
Mecl~anical Inspection
Heater for Pools, Spas or Portable Spas
Wall Heater Installation
Air Conditioning (up to 5 tons)
Air Conditioning (above 5 tons)
Cooler Installation
% OF COST
RECOVERY
REQU RED
100.0 %
100.0
100.0 %
100.0 %
EXISTING
FEES
04115~93
$30.00
$30.00
$40.00
$40.00
$135.00
$50.00
$30.00
$92.00
S38.00
$110.00
$686.00
$30.00
$30.00
$40.00
$50.00
$3O.OO
$30.00
$50.00
$30.00
S30.00
$50.00
$75.00
$30.00
$30.00
$30.00
$30.00
$30.00
$30.00
$50.00
$30.00
ADOPTED
FEES
07101193
$30.00
$30.00
$40.00
$40.00
$135.00
$50.00
$30.00
$92.00
$38.00
$110.00
$686.00
$30.00
$30.00
$40.00
$50.00
$30.00
$30.00
$50.00
$30.00
$30.00
$50.00
$75.00
$30.00
$30.00
$30.00
$30.00
$30.00
$30.00
$50.00
$30.00
AMOUNT OF
FEE INCREASE
I (DECREASE)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$~00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
IFile Name:
i Prepared by:
[Last Update:
EXIB_B2
Finance Dept.
20-May-93
Page 2 of 2
EXHIBIT D
Mechanical Permi~ Fees
Page 2 ~.:
12.
13.
For =he ins=alia:ion cr relocazion of each
Boiler or refrigera:Aon compressor over 50
horsepower, or each a~sorp%lon sys=em over
1,750,000 BTU/h .......................................... 56.00
For each air handling uni= =o and including
~0,000 cubic fee: per mxnu:e, including duc=s
a::ached there=o ......................................... 6.50
Note: This fee shall no: apply =o an air handling
unit which is a portion of a ~actory assembled
appliance, cooling unA=, evaporative cooler or
a~sor~:ion uni= for which a permit £s required
elsewhere in this code.
14. For each air handling u~i: over 10,000 CFM ................ 11.00
15. For, each evaporative cooler other :hah por~able :yps ...... 6.50
16. For each ventlie:ion Zan connec:ed :o a single duct ........ 4.50
17. For each von:llation system which is not a per:ion
of any heating or air conditioning system authorized
~y a pez~=A= ................................................ 6.50
18. For the installation of each hood whioh is served'by
mechanical exhaust, including the duc:s for such hood ...... .6.50
19. For :he inetalia:ion or reloca~ion of each domestic
:Yl~e ln¢lnera:or .......................................... 11.00
20. For the inetalia:ion or reloca=Aon of each co~aercial
or indus=tiaA tYl~e incAnera:or ............................ 45.00
21. For ea¢~ appliance or piece of equipmen: regulated by
this Code but no: classed in o:her appliance ca:egories,
or for which no o:her fee is listed in :he Code ............ 6.50
22. NEW SINGLE FAMILY DWELLINGS AND APARTMENT UNITS
0 - 1800 SQUARE FEET ................................ 22.50
1800 + SQUARE -==~
...................................... 43.50
23. COMBINATION HEATING AND REFRIGERATION UNIT
No~e:
Less tAan 100,000 8TU Hea:£ng, less :hah
3 ton refr~gera=:on .................................. 18.00
More than 100,000 BTU Hea:~ng, more :hah
3 ton refrigera:~on ................................. 22.
- S0
MINI:~UM PERMIT FEE ........................................ I5.00
£ffec=lve: January 1, 1991
10.
11.
For the issuance of each permir ........................ 15.00
For the issuance of each supplemen= perm~= ............. 4.50
For =he ins=alia=ion or reloca=ion of each forceU-air
or gravit¥-tYloe furnace or burner, including duc~s and
ven=s a==ached =o suc~ appliance over 100,000 BTU/h .....
9.00
For the ins=alia=ion or reioca=ion of each forced-air
or gravi=¥-=¥pe furnace or Durner, including duc=s and
vents a==ached =o.such appliance over I00,000 BTU/h ..... 11.00
For the £nstallation or reiocation of each floor
furaace, including vent .................................. 9.00
For t~e £nstallation or relocation of each suspended heater,
recessed wall heated or floor moun=ed unit heater ........ 9.00
For =he installation, relocatlon or replacemen= of each
appliance vent installe~ and no= included in an appliance
per~l~ ................................................ ,..4.50
For the repair of, alteration of, or aadition =o each
hearing appliance, refrigeration uni=, cooling unit,
aDsorp=lon, or evapore=lye cooling s¥s=em, including
installation of con=rols regulated by t~ls Code .......... 9.00
For =~e installation or relocat~on of each boiler or
compressor to and including three horsepower, or each
a~sorp=ion system =o and including 100,000 BTU/h ......... 9.00
For the ins=alia:ion or relocation of each boiler or
compressor over t~ree horsepower to ana including-15
horsepower, or eac~ aDsotis=ion sys:em over 100,000 BTU/h
to and incluaing 500,000 BTU/h .......................... 16.50
For =he ins=alia=ion or relocation of each ~oiler or
compressor over 15 horsepower to ana including 30
~orsepower, or each ausor~=ion s¥$=em over
500,000BTU/h ........................................... 22.50
.--or %~e ins=allah'.on or r_=,.oca=~cn of eac~ ~oller
or compressor over 20 h:r---e_Uower -.: anu inclu=ing
50 horsepower, or fTr each aDsor~=~on system over <.~
!,000,000 B~/h to ana incluGing !,T50,00~ B~/h ...... 33~:50
. . .