HomeMy WebLinkAboutRES NO 36-92RESOLUTION NO. 3 6 - 9 2
A RESOLUTION ADOPTING FEES AND
SERVICE CHARGES PURSUANT TO THE
REVENUE/COST COMPARISON SYSTEM
UNDER CHAPTER 3.70 OF THE
BAKERSFIELD'MUNICIPAL CODE
WHEREAS, state law requires new fees and charges and
increases in existing fees and charges be adopted by ordinance or
resolution following a public hearing on said fees and charges; and
WHEREAS, Chapter 3.70 of the Bakersfield Municipal Code
authorizes the establishment and increase of service charges under
the revenue/cost comparison system; and
WHEREAS, a public hearing before the City Council was
advertised twice in the Bakersfield Californian, a newspaper of
general circulation, and held on February 12, 1992; and
WHEREAS, adoption of new and increased fees and charges,
pursuant to Chapter 3.70 of the Bakersfield Municipal Code, is
necessary for the City to recover the reasonable estimated cost of
providing the services for which the fees are charged; and
WHEREAS, the fees and charges set forth in Exhibits "A"
and "B", attached hereto and incorporated by reference as though
fully set forth herein, do not exceed the reasonable estimated cost
of providing the services for which the fees are charged.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City
of Bakersfield as follows:
1. The above recitals and findings are true and correct.
2. The fees and charges set forth in Exhibit "A" and "B"
concerning service charges under Chapter 3.70 of the Bakersfield
Municipal Code are hereby adopted and shall become effective on
April 13, 1992, except for development fees which shall become
effective on May 12, 1992.
.......... ooo ..........
ORIGINAL
I HEREBY CERTIFY that the foregoing Resolution was passed
and adopted by the Council of the City of Bakersfield at a regular
meeting thereof held on MAR 1 1 1992 , by the
following vote:
AYES; COUNCILMEMBERS: EDWAR.~,"~. SMITH, BRUNNI, ,~.,',~J,3.~,~, McDERMOTT, SALVAGGIO
NOES; COU~ILME~ER$:
~NT C~LME~RS: ~,
~TAIN: CO~M[~E~'
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
APPROVED MAR 1 ! '1992
CLARENCE E. MEDDERS
Mayor of the City of Bakersfield
APPROVED as to form:
LARRY M. LUNARDINI
CITY ATTORNEY of the City of Bakersfield
LARRY M. LUNARDI~
CITY ATTORNEY
NS/krc
MSI
03/05/92
CITY OF BAKERSFIELD
PROPOSED FEE CHANGES FOR VARIOUS DEPARTMENTS
FOR COUNCIL ! MANAGER REVIEW - FEBRUARY 1992
SUMMARY
WORKSHEET
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991 ~ 92
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES / COMMENTS
oCIT~o~
COMMUNITY DEVELOPMENT SERVICES
S-20 DOWNTOWN PROJECT DESIGN REVIEW
PUBLIC SAFETY SERVICES
S-34 BUSINESS REGULATION
- CARD ROOMS
- NEW APPLICATION
- RENEWAL APPLICATION
- CARD DEALERS
- NEW APPLICATION
- LIQUIDATION (CLOSEOU~) SALE-PERMIT
- MOTION PICTURE PERMIT
- RESIDENT SOLICITATION
S-46 STATE-MANDATED FIRE INSPECTION
S-51 FIRE SAFETY REVIEW/INSPECTION
- FIREWORKS BOOTH PERMIT
LEISURE AND CULTURAL SERVICES
S-56 CITY ADULT SOFTBALL PROGRAM
- LEAGUE ENTRY FEE PER TEAM
- MEDICAL BENEFIT FEE
- RESCHEDULING FEE
S-63 RECREATIONAL SWIMMING
- SEASONAL PASS
- SWIM FOR FITNESS
- CHARGE PER DAY
- SEASONAL PASS
- WATER MOVIES
- PER PERSON ($3.00 DISCOUNT FOR
FAMILY OF FIVE OR MORE)
100.0%
100,0%
100.0 %
100.0%
75.0 %
25.0 %
$20.00
$610.00
$320.00
$140.00
$15.00
$250.00
$0.00
$0.00
$50.00
$380.00
$35.00
$0.00
$25.00
$1.00
$25.00
N/A
PAGE 1 OF 2
$25.00
$550.00
$1,135.00
$120.00
$25.00
$150.00
$20.00
$43.00
$100.00
$420.00
$35.00
$35.00
$30.00
$2.00
$30.00
$3.00
$5.00
($60.00)
$815.00
($20.00)
$10.00
($100.00)
$20.00
$43.00
$50.00
$40.00
$0.00
$35.00
$5.00
$1.00
$5.00
$3.00
PRIOR FEE WAS LISTED IN ORDINANCE
NEW FEE
CHARGE PER LABOR HOUR
NEW FEE
NEW PROGRAM
CITY OF BAKERSFIELD
PROPOSED FEE CHANGES FOR VARIOUS DEPARTMENTS
FOR COUNCIL ! MANAGER REVIEW - FEBRUARY 1992
SUMMARY
WORKSHEET
t~Sl
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED AMOUNTOF
FEE FEEINCREASE
1991-92 /(DECREASE)
NOTES/COMMENTS
S-64 SWIMMING LESSONS
- ONE SESSION (10 DAYS)
- AUTISTIC/DEAF CLASS FEE
(COVERS ALL SESSIONS)
- JUNIOR LIFEGUARD CLASS
- COMPETITIVE SWIMMING
S-65 SWIM POOL RENTAL (PER HOUR - 2 HR MINIMUM)
(NON-REFUNDABLE)
- JEFFERSON POOL
51 - 100 PEOPLE
131 - 200 PEOPLE
- CALIFORNIA POOL (M.L. KING)
51 - 100 PEOPLE
131 - 200 PEOPLE
- ALL OTHER POOLS
I - 50 PEOPLE
51 - 100 PEOPLE
FINANCE AND ADMINISTRATIVE SERVICES
S-99 DOCUMENT PRINTING AND COPYING
- PRINTED DOCUMENTS (IE BUDGET)
- PHOTOCOPYING (STANDARD & LEGAL SIZE)
- OVERSIZED DOCUMENTS (MAPS, BLUEPRINTS)
.
Current Fees were adopted by Council on
June 19, 1991 per Resolutio~ 116-01.
100.0%
100.0%
100.0%
$12.50 $15.00 $2.50
$12.50 $15.00 $2.50
N/A $20.00 $20.00
$12.50 $20.00 $7.50
$30.00 $40.00 $10.00
$45.00 $50.00 $5.00
$30.00 $40.00 $10.00
$45.00 $50.00 $5.00
$15.00 $30.00 $15.00
$30.00 $40.00 $10.00
PAGE 2 OF 2
$0.00 ACTUALCOSTS ACTUALCOSTS
$2.00 $2.00 $0.00
$0.00 ACTUALCOSTS ACTUALCOSTS
FILE NAME: CHANGES
PREPARED BY: 03-Mar--~2
LAST UPDATED: Finance Dept.
NEW PROGRAM
$15/HR FOR EACH HOUR OVER THE 2 HR MiN.
ACTUAL COST BASED ON PRINTING COSTS
$2 FOR 1ST PC, THEN ~0.10/PAGE
ACTUAL COST BASED ON PRINTING COSTS
M~SI
S-14
S-15
S-16
SERVICE CENTER
COMMUNITY DEVELOPMENT SERVICES
S-1 BUILDING PLAN CHECKING
S-2 CONSTRUCTION INSPECTION
S-3 PLUMBING INSPECTION
S-4 ELECTRICAL INSPECTION
S-5 A/C, HEATING & MECH. INSPECTION
S-6 REQUESTED BUILDING INSPECTION
- NORMAL BUSINESS HOURS
- OTHER THAN NORMAL HOURS
S-6.1 REINSPECTION OF MUNICIPAL CODE
VIOLATIONS
S-7 SIGN REVIEW
- COMPREHENSIVE SIGN REVIEW
- REVISED COMPREHENSIVE SIGN REVIEW
-' SIGN REVIEW ISSUANCE FEE
S-8 CONDITIONAL SIGN PERMIT
S-9 REVIEW OF REQUESTED ANNEXATION
S-10 ENVIRONMENTAL REVIEW
S-11 PRELIMINARY PROJECT REVIEW
- PRELIMINARY PROJECT REVlE'W
- REQUESTED LAND USE & ZONING REVIEW
S-12 ZONE MODIFICATION REVIEW
- ADVERTISED
- UNADVERTISED
S-13 CONDITIONAL USE REVIEW
- GENERAL REVlLL-~N
- OIL WELL REVIEW
ZONE CHANGE REVIEW
PUD OR PCD ZONE CHANGE
SITE PLAN REVIEW
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
% OF COST CURRENT
RECOVERY FEE
REQU RED 1991-92
PROPOSED
FEE
1991-92
100.0 % SEE EXIB. B SEE EXlB. B
100.0 % SEE EXIB. B SEE EXlB. B
100.0 % SEE EXIB. B SEE EXlB, B
100.0 % SEE EXIB. E~ SEE EXIB. B
100.0 % SEE EXlB. B SEE EXlB. B
100.0%
$50.00 $50.00
$40,00 $40.00
100.0 % $50.00
100.0 %
$300.00
$175.00
$30.00
100.0 % N/A
20.0 % ACTUAL COST
100.0 % ACTUAL COST
100.0 %
$480.00
$30.00
100.0 %
$700.00
$300.00
100.0%
$700.00
$1,000.00
100.0 % $1,200.00
100.0 % $1,210.00
100.0 % FORMULA
EXHIBIT "A"
PAGE 1 OF 21
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES/COMMENTS
$50.00
$300.00
$175.00
$30.00
NIA
ACTUALCOST
ACTUALCOST
$480.00
$30.00
$700.00
$300,00
$700.00
SI,000.00
SI,200.00
$1,210.00
FORMULA
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 FLAT FEE
$0.00 $40PER HOUR-2 HR MIN.
$0.00
$0.00
$0.00
$0.00
N/A
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
FEES SET BY LEGISLATION
ACTUAL COST BASED ON LABOR HOURS
FEE = $245 + BLDG VALUE * 0.000154
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
M~SI
S-17
S-18
S-19
S-20
S-21
S-22
S-23
SERVICE CENTER
HOME OCCUPATION REVIEW
- HOME OCCUPATION PERMIT
- LARGE FAMILY DAY CARE
SPECIFIC PLAN AND HISTORIC
PRESERVATION REVIEW
GENERAL PLAN AMENDMENT REVIEW
- GENERAL PLAN AMENDMENT
- CONCURRENT APPLICATIONS
DOWNTOWN PROJECT DESIGN REVIEW
LAND DIVISION REVIEW
- LOT LINE ADJST
- PARCEL MAP WAIVERS
TENTATIVE SUBDIVISION MAP REVIEW
- TENTATIVE PARCEL MAP REVIEW
- REVISED TENTATIVE PARCEL MAP REVIEW
- TENTATIVE TRACT MAP REVIEW
- REVISED TENTATIVE TRACT MAP REVIEW
- TENTATIVE MOD/DEL. OF CONDITIONS
- WALL AND LANDSCAPE REVIEW
MAP & IMPROVEMENT PLAN CHECKING
- FINAL TRACT MAPS
- FINAL PARCEL MAPS
- STREET/SEWER IMPROVEMENTS
- SINGLE FAMILY - VOLUNTARY
- ALL OTHERS
PUBLIC IMPROVEMENT PLAN CHECK
AND INSPECTION
- STREET/SEWER IMPROVEMENTS
- SINGLE FAMILY - VOLUNTARY
- ALL OTHERS
APPEAL PROCESSING
% OF COST CURRENT
RECOVERY FEE
REQUIRED 1991-92
100.0%
$25.00
$25.00
100.0% $2,500.00
100.0%
$2,500.00
$3,100.00
100.0%
100.0%
$700.00
$530.00
100.0%
$1,300.00
$505.00
$1,900.00
$1,300.00
$290.00
$480.00
100.0%
$500+$1~LOT
$1,200.00
$50.00
$100 + 0.7%
100.0%
PROPOSED
FEE
1991-92
$25.00
$25.00
$2,500.00
$2,500.00
$3,100.00
$700.00
$530.00
$1,300.00
$505.00
$1,900.00
$1,300.00
$290.00
$480.00
$500+$1~LOT
$1,200.00
$50.00
$100 + 0.7%
$50.00 $50.00
$100 + 0.5% $100 + 0.5%
100.0 % $275.00 $275.00
PAGE 2 OF 21
AMOUNT OF
FEE INCREASE
/ (DECREASE)
$0.00
$0.00
N/A
N/A
$0.00
NOTES / COMMENTS
$0.00
$0.00
$0.00
$0.00'
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$1 oo PLUS 0.70% OF VALUE OF IMPRVMT
$0.00
$0.00 $1oo PLUS o.50% OF VALUE OFIMPRVMT
$0.00
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
M~SI
S-26
S-27
S-28
S-29
S-30
S-31
S-32
S-33
S-34
SERVICE CENTER
STREET ENCROACHMENT INSPECTION
STREET CUT INSPECTION
DEVELOPMENT TIME EXTENSION REVIEW
PUBLIC SAFETY SERVICES
VEHICLE CODE ENFORCEMENT
HEALTH & SAFETY CODE ENFORCEMENT
PARKING ORDINANCE ENFORCEMENT - VEHICLE TOWING
- PARKING VIOLATION
POLICE FALSE ALARM RESPONSE - INITIAL ALARM PERMIT
- ALARM PERMIT RENEWAL
- PERMIT RENEWAL DELINQUENCY PENALTY
- ALARM REVOCATION
- CHARGE AFTER 4TH FALSE ALARM
- CHARGE AFTER 10TH FALSE ALARM
WIDE/OVERLOAD REVIEW
BUSINESS REGULATION
- ADULT ENTERTAINMENT - NEW APPLICATION
- ANNUAL PERMIT RENEWAL
- EMPLOYEE PERMIT
- MASSAGE ESTABLISHMENTS - NEW APPLICATION
- EMPLOYEE INVESTIGATION
- CARD ROOMS
- NEW APPLICATION
- RENEWAL APPLICATION
- CARD DEALERS
- NEW APPLICATION
- RENEWAL APPLICATION
% OF COST CURRENT
RECOVERY FEE
REQUIRED 1991-92
PROPOSED
FEE
1991-92
AMOUNT OF
FEE INCREASE
/ (DECREASE) NOTES / COMMENTS
100.0% $75.00 $75.00 $0.00
100.0% $70.00 $70.00 $0.00
100.0% $490.00 $490.00 $0.00
50.0 % N/A
50.0 % N/A
100.0 %
90.0 %
100.0%
100.0%
N/A
N/A
N/A FEESSET BY LEGISLATION
N/A FEESSET BY LEGISLATION
$35.00 $35.00 $0.00
N/A N/A N/A
$35.00 $35.00 $0.00
$20.00 $20.00 $0.00
$1.00 $1.00 $0.00
$50.00 $50.00 $0.00
$80.00 $80.00 $0.00
$130.00 $130.00 $0.00
$15.00 $15.00 $0.00
FEES SET BY LEGISLATION
$11PERMIT/MONTH (MAX 10 MONTHS)
FEES SET BY LEGISLATION
$400.00 $400.00 $0.00
$1,135.00 $1,135,00 $0.00
$25.00 $25.00 $0.00
$110.00 $110.00 $0.00
$60.00 $60.00 $0.00
CHANGED 112J92 DUE TO ORD. RE-VIS.
PER EXEC. ORDER 91-5
$15.00 $15.00 $0.00
PAGE 3 OF 21
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT ~A'
M~SI
SERVICE CENTER
- ESCORT / DATING SERVICES - NEW APPLICATION
- EMPLOYEE INVESTIGATION
- RETAIL SALES OF CONCEALED
WEAPONS PERMIT
- LIQUIDATION (CLOSEOUT) SALE-PERMIT
- BINGO - NEW PERMIT
- BINGO - RENEWAL PERMIT
- SECOND HAND DEALERS, ITINERANT
MERCHANTS, POOL HALLS, PUBLIC
DANCE HALLS, OUTDOOR FESTIVALS,
AMPLIFIED MUSIC, AMPLIFIED
SPEECH, AMPLIFIED SOUND-TRUCKS,
MOTELS & HOTELS - NEW PERMITS
- BAIL BOND OWN~=PJAGENTS/SOLICITORS
- PUSHCART FOOD VENDORS
- MOTION PICTURE PERMIT
- RESIDENT SOLICITATION
ANIMAL REGULATION
- DOG LICENSE - ANNUAL RENEWAL
- UNSPAYED ! UNNEUTERED
- SPAYED / NEUTERED
- LATE FEES (PAST 60 DAYS)
- REPLACEMENT TAG
- CAT TAGS
- ONE YEAR
- LIFETIME
- IMPOUND CHARGES - DOG
- VICIOUS DOG
- CATS
% OF COST
RECOVERY
REQUIRED
40.0 %
CURRENT
FEE
1991-92
PROPOSED
FEE
1991 - 92
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES/COMMENTS
$240.00
$120.00
$45.00
$25.00
$25.00
$240.00
$120.00
$45.00
$25.00
$25.00
$0.00
$0.00
$0.00
$0.00
$0.00
$25.00
$15.00
$25.00
$25.00
$15.00
$25.00
$0.0O
$0.00
$0.00
$20.00
$10.00
$5.00
$2.00
$5.00
$10.00
$35.00
$50.00
$10.00
$20.00
$10.0O
$5.00
$2.0O
$5.00
$10.00
$35.00
$50.00
$10.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
PER CITY COUNCIL MOTION (6/5/91)
PAGE 4 OF 21
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
M~SI
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES / COMMENTS
S-36
S-37
S-38
S-39
S-40
S-41
S-42
S-43
S-44
- HORSE / CA'FI'LE
- OTHER ANIMALS
- BOARDING - (CHARGES ARE PER DAY)
- GENERAL DOGS/CATS
- FEMALE IN HEAT/GIANT BREEDS
- VICIOUS ANIMAL
- LIVESTOCK
- IN-FIELD COLLECTIONS (PER HOUR)
POLICE RECORDING DUPLICATION SERVICE
LIMOU SIN EFFAXl/TOWING REGULATION
- LIMOUSINE DRIVER PERMIT
- TAXI DRIVER PERMIT
- AMBULANCE VEHICLE INSPECTION
- LIMO VEHICLE INSPECTION
- TAXI VEHICLE INSPECTION
- TOWING VEHICLE INSPECTION
PARADE SERVICES
SPECIAL EVENT SECURITY
AUTOMOTIVE ACCIDENT INVESTIGATION
- STANDARD REPORT
- SHORT FORM
FINGERPRINT SERVICE - FIRST CARD
- EACH ADDITIONAL CARD
VEHICLE EQUIPMENT INSPECTION
SCHOOL CROSSING GUARD SERVICE
POLICE PHOTOGRAPH SALE - FIRST PRINT
- ADDITIONAL PRINTS (EACH) 8 X 10
- ADDITIONAL PRINTS (EACH) 5 X 7
- ADDITIONAL PRINTS (EACH) 4 X 5
100.0 %
100.0 %
0.0 %
75.0 %
100.0 %
100.0 %
0.0 %
50.0 %
100.0 %
$75.00
$50.00
$5.00
$7.00
$10.00
$7,50
$35.00
$25.00
$15.00
$15.00
$15.00
$15.00
$15.00
$30.00
$0.00
ACTUALCOST
$10.00
$1.00
$10.00
$6.00
$0.00
$0.00
$10.00
$7,00
$6.00
$5.00
PAGE 5 OF 21
$75.00
$50.00
$,5.00
$7.00
$10.00
$7.50
$35.00
$25.00
$15.00
$15.00
$15.00
$15.00
$15.00
$30.00
$0.00
ACTUALCOST
$10.00
$1.00
$10.00
$6.00
$0.00
$0.00
$10.00
$7,00
$6.00
$5.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
~SCHARGEPERHOUR
ACTUAL SALARY COST PER EVENT
$0.00 $10 UP TO SIX PAGES, THEN $1/PG
$0.00 $1 PER PAGE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$6 FOR EACH ADDITIONAL CARD
SERVICE CENTER HAS BEEN DELETED
ASSMT DIST. FORMATION REQUIRED
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
~SI
S-45
S-46
S-47
S-48
S-49
S-50
S-51
SERVICE CENTER
CONCEALED WEAPON PERMIT PROCESSING
STATE-MANDATED FIRE INSPECTION
FIRE HAZARD INSPECTION
FIRE COMPANY INSPECTION
FIRE REPORT SALE
WEED ABATEMENT INSPECTION
FIRE SAFETY REVIEW/INSPECTION
- LIQUIFIED PETROLEUM GAS INSTALLATION
- LESS THAN 100 U.S. GALLONS
- 101 TO 500 U.S. GALLONS
- 501 TO 1200 U.S. GALLONS
- OVER 1200 U.S. GALLONS
- REINSPECTION FEE
-.TENT INSTALLATION (ONE TIME FEE)
- 201 TO 450 SQ. FT.
- 451 TO 3,000 SQ. FT.
- 3,001 TO 10,000 SQ. FT.
- OVER 10,000 SQ. FT.
- REINSPECTION FEE
- PAINT BOOTHS (ONE TIME FEE)
- NEW SPRAY PAINT BOOTHS
- REINSPECTION FEE
- NON-FLAMMABLE MEDICAL GAS SYSTEMS
INSTALLATION (ONE TIME FEE)
- 1 TO 4 STATION OUTLETS
- 5 TO 10 STATION OUTLETS
- OVER 10 STATION OUTLETS
- REINSPECTION FEE
- FIRE PROTECTION EQUIPMENT
- NATIONAL FIRE PROTECTION AGENCY
FIRE SPRINKLER SYSTEM 13-231-231C
% OF COST
RECOVERY
REQU RED
100.0
100.0
100.0
50.0
100.0
100.0
100.0
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES / COMMENTS
N/A
$0.00
$5.00
$3.00
$135.00
$100.00
$100.00
$100.00
$200.00
$75.00
$50.00
$50.00
$50.00
$100.00
$50.00
$100.00
$50.00
N/A
$0.00
$0.00
$3.00
$135.00
$100.00
$100.00
$100.00
$200.00
$75.00
$50.00
$50.00
$50.00
$100.00
$50.00
$100.00
$50.00
N/A FEESSETBY LEGISLATION
$0.00
$0.00
$0.00
$0.00
ONE T~ME FEE
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$100.00
$100.00
$200.00
$75.00
$100.00
$100.00
$200.00
$75.00
$0.00
$0.00
$0.00
$0.00
$162.00
$162.00
$0.00 $162 PER RISER
PAGE 6 OF 21
k~SI
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
EXHIBIT
AMOUNT OF
FEE INCREASE
/ (DECREASE) NOTES / COMMENTS
- REINSPECTION FEE
- JUNIOR FIRE SPRINKLER SYSTEM
UNDER 20 HEADS
- REINSPECTION FEE
- NATIONAL FIRE PROTECTION AGENCY
FIRE SPRINKLER SYSTEM 13D
- REINSPECTION FEE
- STANDPIPE SYSTEM INCLUDING ALL
WET, DRY OR COMBO SYSTEM
- FIRE EXTINGUISHING SYSTEM
- REINSPECTION FEE
- FIRE ALARM SYSTEMS
- REINSPECTION FEE
- HAZARDOUS MATERIAL STORAGE & HANDLING
- MATERIAL TYPE A
- MATERIAL TYPE B
- MATERIAL TYPE C
- MATERIAL TYPE D
- MATERIAL TYPE E
- MATERIAL TYPE F
- MATERIAL TYPE G
- MATERIAL TYPE H
- MATERIAL TYPE I
- MATERIAL TYPE J
- MATERIAL TYPE K
- MATERIAL TYPE L
- MATERIAL TYPE M
- MATERIAL TYPE N
- MATERIAL TYPE O
- MATERIAL TYPE P
- RISK MGT PREVENTION PLAN FEE
$54.00
$108.00
$54.00
$108.00
$54.00
$162.00
$108.00
$54.00
$108,00
$54.00
$63.00
$135.00
$189.00
$250,00
$94.00
$187.00
$281.00
$324.00
$135.00
$250.00
$324.00
$346.00
$187.00
$324,00
$346. O0
$362.00
$45.00
PAGE 7 OF 21
$54.00
$108.00
$54.00
$108.00
$54,00
$162.00
$108.00
$54.00
$108.00
$54.00
$63.00
$135.00
$189.00
$250.00
$94.00
$187.00
$281.00
$324.00
$135.00
$250.00
$324.00
$346.00
$187.00
$324.00
$346, O0
$362,00
$45.00
$0.00 FEE PLUS $0.25 PER HEAD
$0.00
$0.00
$0.00 $108 PER RISER
$0.00 FEE PLUS S0.25 PER HEAD
$0.00
$0,00
$0.00
$0.00
$0.00
$0,00'
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
$0.00
$0.00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
FEE PLUS$3.50PER NOZZLE
FEEPLUS$0.50PER DETECTOR
ANNUALFEE
CHARGEPERHOUR
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT 'A~
k~SI
SERVICE CENTER
- UNDERGROUND STORAGE TANK PROGRAM
- NEW TANK INSTALLATION
- ANNUAL OPERATING INSPECTION
- TANK TIGHTNESS TESTING
- TANK MODIFICATION
- TANK REMOVAL
- STATE SURCHARGE
- SITE ASSMT & CLEANUP OVERSIGHT
- FIREWORKS BOOTH PERMIT
S-52 OIL WELL INSPECTION
S-53 FIRE FALSE ALARM RESPONSE
S-53.1 HAZARDOUS MATERIAL RESPONSE
LEISURE AND CULTURAL SERVICES
S-54 PARK PICNIC FACILITY RENTAL
(NON-REFUNDABLE)
- ONE FACILITY
- EACH ADDITIONAL FACILITY
S-55 CITY ADULT VOLLEYBALL PROGRAM
- INDOOR PROGRAM
- OUTDOOR PROGRAM
S-56 CITY ADULT SOFTBALL PROGRAM
- LEAGUE ENTRY FEE PER TEAM
- MEDICAL BENEFIT FEE
- RESCHEDULING FEE
S-57 CITY ADULT BASKETBALL PROGRAM
S-58 BALLFIELD LIGHTING SERVICE
(NON-REFUNDABLE)
S-59 OTHER BALLFIELD USE (NON-REFUNDABLE)
S-60 CITY YOUTH BASKETBALL PROGRAM
- WINTER PROGRAM
- SUMMER PROGRAM
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
100.0
30.0
100.0
50.0%
75.0 %
75.0 %
75.0%
75.0 %
50.0 %
50.0 %
$450.00
$50.00
$40.00
$450.00
$350.00
$56.00
$45.00
$50.00
$50.00
$445.00
$12.00
$8.00
$190.00
$115.00
$35.00
$425.00
$10.00
$0.00
$200.00
$175.00
$450.00
$50.00
$40.00
$450.00
$350.00
$56.00
$45.00
$50.00
$50.00
$445.00
$12.00
$8.00
$190.00
$115.00
$35.00
$425.00
$10.00
$0.00
$200.00
$175.00
PAGE 8 OF 21
AMOUNT OF
FEE INCREASE
/ (DECREASE)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
NOTES / COMMENTS
NEW PROGRAM
$0.00 ANNUAL INSPECTION
$0.00
$0.00 ESTIMATED AVG. CHARGE PER HOUR
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$5.00
$0.00
$0.00
$0.00
CHARGE PER HOUR - 2 HR MIN.
M~SI
S-61
S-62
S-63
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991 - 92
PRE-SCHOOL & TINY TOT PROGRAMS
AFTER SCHOOL & PLAYGROUND RECREATION
RECREATIONAL SWIMMING
- CHARGE PER DAY
- SEASONAL PASS
- WADING POOL
- SWIM FOR FITNESS
- CHARGE PER DAY
- SEASONAL PASS
- WATER MOVIES
- PER PERSON ($3.00 DISCOUNT FOR
FAMILY OF FIVE OR MORE)
SWIMMING LESSONS
- ONE SESSION (10 DAYS)
- AUTISTIC/DEAF CLASS FEE
(COVERS ALL SESSIONS)
- BASIC LIFEGUARD CLASS
- JUNIOR LIFEGUARD CLASS
- PRIVATE LESSONS
- SEMIPRIVATE LESSONS
- COMPETITIVE SWIMMING
SWIM POOL RENTAL (2 HR MINIMUM)
(NON-REFUNDABLE)
- JEFFERSON POOL
1 - 50 PEOPLE (Per Hour)
51 - 100 PEOPLE (Per Hour)
101 - 130 PEOPLE (Per Hour)
131 - 200 PEOPLE (Per Hour)
- CALIFORNIA POOL (M.L. KING)
I - 50 PEOPLE (Per Hour)
51 - 100 PEOPLE (Per Hour)
AMOUNT OF
FEE INCREASE
/ (DECREASE)
50.0 % $520.00 $520.00 $0.00
0.0 % $0.00 $0.00 $0.00
$0.75 $0.75 $0.00
NOTES/COMMENTS
25.0 %
100.0 %
$0.00 $0.00 $0.00 NO CHARGE FOR WADING POOL
$0.00 $0.00 $0.00
$50.00 $50.00 $0.00
$25.00 $25.00 $0.00
~7.~ :
$1~/HR FOR EAOH HOUR OVER THE 2 HR ~IN.
$30.00 $30.00 $0.00
$45.00 $45.00 $0.00
100.0%
$30.00 $30.00 $0.00
PAGE 9 OF 21
k~SI
S-66
S-67
S-68
S-69
S-70
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
SERVICE CENTER
101 - 130 PEOPLE (Per Hour)
131 - 200 PEOPLE (Per Hour)
- ALL OTHER POOLS
I - 50 PEOPLE (Per Hour)
51 - 100 PEOPLE (Per Hour)
101 - 130 PEOPLE (Per Hour)
- OTHER POOL RENTALS (I.E. HIGH SCHOOLS)
LEISURE CLASSES
SUMMER BAND CONCERTS
ART GALLERY RENTAL
BAKERSFIELD SYMPHONY SUPPORT
AUDITORIUM MAINTENANCE & OPERATION
- BASIC BUILDING RENTAL RATES
- CONCERT HALL
- ARENA
- CONCERT HALL AND ARENA
- CASH DEPOSIT IN ADDITION TO RENTAL
RATES LISTED ABOVE IS REQUIRED
FOR FIRST-TIME USAGE OF THE
CONVENTION CENTER TO COVER OTHER
EXPENSES LISTED BELOW
- MEETING ROOMS
- GRAPE ROOM
- MARS ROOM
- BANK ROOM
- CARROT ROOM
- COTTON ROOM
- ALL OTHER ROOMS
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991 - 92
AMOUNT OF
FEE INCREASE
! (DECREASE)
$45.00 $45.00 $0.00
$45.00 $45.00 $0.00
ACTUAL COSTS ACTUAL COSTS $0.00
75.0 % 30.0% 30.0% $0.00
0.0 % N/A N/A N/A
0.0 % N/A N/A N/A
0.0 % N/A N/A NIA
28.0 %
$600.00 $600.00
$500.00 $500.00
$1,000.00 $1,000.00
NOTES/COMMENTS
A c~ OF CLASS REGIS. FEE
SERVICE CENTER HAS BEEN DELETED
SERVICE CENTER HAS BEEN DELETED
SERVICE CENTER HAS BEEN OELETED
$0.00 I ORTEN PERCENT
$0.00 I OF GROSS RECEIPTS,
$0.00 I WHICHEVER ISGREATER
$3,000.00 $3,000.00 $0.00
RATE PER DAY
$150.00 $150.00 $0.00
$150.00 $150.00 $0.00
$150.00 $150.00 $0.00
$100.00 $100.00 $0.00
$100.00 $100.00 $0.00
$75.00 $75.00 $0.00
PAGE 10 OF 21
t~SI
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT ~A'
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
~ EXHIBIT / TRADE SHOWS
- $1000 PER DAY - OR FIVE CENTS PER
SQ. FT., WHICHEVER IS GREATER -
PLUS 10% OF GROSS GATE RECEIPTS
- CONVENTIONS
- BUILDING RENT AND PARKING
- SOUND AND LIGHT MAN
- SOUND AND LIGHT MAN (OVER 8 HOURS)
- AIR CONDITIONING
- OTHER FACILITY USES - $1000 PER DAY
OR 10~ OF GROSS, WHICHEVER IS GREATER
- CATERING - $300 OR 15% OF GROSS SALES,
- FOOD - $300 OR 15% OF GROSS SALES,
PER DAY, WHICHEVER IS GREATER
- ALCOHOLIC BEVERAGES - CONTACT
JEFF ROSENBERG, (805) 322-9903
- INSURANCE - COVERAGE MUST INCLUDE:
- PUBLIC LIABILITY INSURANCE WITH
COMBINED BODILY INJURY AND PROPERTY
DAMAGE LIMITS OF $1,000,000 FOR
ANY ONE INCIDENT.
- CONTRACTUAL LIABILITY
- CITY OF BAKERSFIELD AS
ADDITIONALLY INSURED.
- BOX OFFICE
- TICKET ORDERING
- ADVANCE TICKET SALES - PER DAY
- TICKET SELLERS - PER HOUR PER PERSON
- DOORMAN - PER HOUR PER PERSON
CURRENT PROPOSED
FEE FEE
1991 - 92 1991-92
$1,000.00 $1,000.00
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES / COMMENTS
$0.00 PLUS 10% OF GROSS GATE RECEIPTS
$0.00 $0.00 $0.00
$19.00 $19.00 $0.00 RATE PER HOUR
$28.50 $28.50 $0.00 RATE PER HOUR
$19.00 $19.00 $0.00 RATE PER HOUR
$1,000.00 $1,000.00
$0.00
$300.00 $300.00 $0.00
VARIOUS VARIOUS $0.00
$225.00 $225.00 $0.00
$40.00 $40.00 $0.00
$8.00 $8.00 $0.00
$5.00 $5.00 $0.00
SEECOMMENTS
PAGE 11 OF 21
M~SI
SERVICE CENTER
- SALES FOR EVENTS NOT HELD AT
CONVENTION CENTER = 5% OF GROSS.
OUTSIDE TICKET OUTLETS CANNOT
COMMENCE SALES PRIOR TO THE CENTER
- FRONT OF HOUSE PERSONNEL - USHERS
- CONCERT HALL (PER EVENT)
- ARENA (PER EVENT)
- ENTIRE BUILDING (PER EVENT)
- STAGEHANDS - A FEE OF 21% OF THE TOTAL
PAYROLL WILL BE ASSESSED FOR
WORKMANS COMPENSATION COVERAGE.
- "IN" CALL (PER EMPLOYEE~
- "OUT" CALL (PER EMPLOYEE)
- "SHOW' CALL (PER EMPLOYEE)
- SPOTLIGHTMAN (PER EMPLOYEE)
- SECURITY - AT ALL EVENTS WHICH REQUIRE
SECURITY, PRIVATE SECURITY OFFICERS
MUST BE USED. THEIR RATE IS $10.50
PER HOUR WITH A 4-HOUR MINIMUM. THE
TOTAL NUMBER OF OFFICERS ASSIGNED
WILL BE DECIDED BY THE MGT OF THE
BAKERSFIELD CONVENTION CENTER.
ROCK SHOWS USUALLY REQUIRE 30 OFFICERS
- NOVELTY ITEMS - THE SALE OF ANY NOVELTY
ITEM (E,G. RECORDS, SHIRTS, PROGRAMS,
ETC.) DURING AN EVENT MUST FIRST BE
CHECKED THROUGH THE BUILDING MGT.
- 25% OF GROSS SALES TO BE PAID
TO THE CONVENTION CENTER
- 15% OF GROSS SALES FOR RELIGIOUS
EVENTS
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES / COMMENTS
5.00%
5.00%
SEE COMMENTS
$0.00
$100,00
$100.00
$150.00
21.00%
$100.00
$100.00
$150.00
21.00%
$0.00
$0.00
$0.00
$0.00
$37.00
$28.00
$37.00
$37.00
$37.00
$28.00
$37.00
$37.00
$0.00 4 HR MIN. ~ $9.25/HR
$0.00 3 HR MIN. ~ $9.25/HR
$0.00 4 HR MIN. ~ $9.25/HR
$0.00 4 HR MIN. ~ $9,25/HR
25.00%
15.00%
25.00%
15.00%
$0.00
$0.00
PAGE 12 OF 21
k~SI
SERVICE CENTER
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991 - 92
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES ! COMMENTS
- ALL TRANSACTIONS MUST BE SL i i LED
WITH THE BUILDING PERSONNEL THE NIGHT
OF THE EVENT.
- THE CONVENTION CENTER WILL PROVIDE
SALES PERSON AT NO CHARGE
- DECORATING CHARGES - RATES ARE FOR
DURATION OF EVENT
- BAR UNIT
- FOLDING CHAIR
- 3' X 3' TABLE
- 30" X5' TABLE
- 30" X 6' TABLE
- 30" X 8' TABLE
- 3' X 8' TABLE
- 18~ X6' TABLE
- 5' ROUND TABLE
- 7' BENCH TABLE
- 3' X 3' COVER
- 30" X 5' COVER
- 30" X 6' COVER
- 30" X 8' COVER
- 3' X 8' COVER
- 5' ROUND COVER
- 7' BENCH COVER
- BOOTH: 8' DRAPE (LINE FEET)
- BOOTH: 3' DRAPE (LINE FEE-T~
- CHAIR
- CARPET 8' X 10'
- PIT CARPET
- AISLE CARPET (PER LINE FOOl')
- CARPET RUNNER 4' X 8'
$10.00
$5.00
$7.00
$8.00
$10.00
$12.00
$13.00
$7.00
$10.00
$8.00
$10.00
$15.50
$17.00
$20.00
$22.50
$15.50
$15.00
$1.00
$0.50
$5.00
$20.00
$100.00
$2.00
$10.00
PAGE 13 OF 21
$10.00
$5.00
$7.00
$8.00
$10.00
$12.00
$13.00
$7.00
$10.00
$8.0O
$10.00
$15.50
$17.00
$20.00
$22.50
$15.50
$15.00
$1.00
$0.50
$5.00
$20.00
$100.00
$2.00
$10.00
$0.00
$0.00
$0.00
$0.00
$0.00
0.00
0.00
0.00
0.00
~0.00
~0.00
0.00
0.00
~0. O0
~0. O0
~0.00
~0.00
~0.00
~0.00
~0.00
~0.00
~0.00
~0. O0
~0. O0
M~S~
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
EXHIBIT
AMOUNT OF
FEE INCREASE
/ (DECREASE) NOTES ! COMMENTS
- EASEL
- WASTEBASKET
- ASH URN
- RED ROPES
- EXTENSION BARS
- BOOTH CLEANUP
- TELEPHONE SERVICE (AVAILABLE ON REQUEST)
- TECHNICAL EQUIPMENT CHARGES RATES ARE PER SHOW
- 20' X 30' MOVIE SCREEN
- 12' X 14' MOVIE SCREEN
- 70" X 70" MOVIE SCREEN
- 10' X 10' REAR VIEW SCREEN
- SUPER TROUPER
- TROUPER
- SOUND WINGS
- EXTRA STAGE
- STAGE BARRICADE
- 6' X 8' PORTABLE STAGE
- STRUCTURAL STEEL SEAT RISERS
- SCAFFOLDING
- UPRIGHT PIANO
- BABY GRAND PIANO
- 9' CONCERT GRAND PIANO
- ORGAN
- PROJECTION STAND
- SLIDE PROJECTOR
- OVERHEAD PROJECTOR
- 16mm PROJECTOR
- AUDIO FEED FROM HOUSE CONSOLE
- AUDIO CONSOLE
$8.00
$5.00
$8.00
$7.50
$3.00
$15.00
$100.00
$100.00
$50.00
$15.00
$100.00
$75.00
$35.00
$150.00
$150.00
$100.00
$20.00
$200.00
$75.00
$50.00
$100.00
$350.00
$100.00
$10.00
$35.00
$25.00
$65.00
$25.00
$100.00
PAGE 14 OF 21
$8.00
$5.00
$8.00
$7,50
$3.00
$15.00
$100.00
$100.00
$50.00
$15.00
$100.00
$75.00
$35.00
$150.00
$150.00
$100.00
$20.00
$200.00
$75.00
$50.00
$100.00
$350.00
$100,00
$10.00
$35.00
$25.00
$65.00
$25.00
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$100 PER LINE PLUS CHARGES
k~SI
SERVICE CENTER
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES/COMMENTS
- VIDIO PROJECTOR (INCLUDES SETUP)
- VCR/CART/MONITOR
- PC COMPATIBLE MONITOR (SONY)
- MONITOR SPEAKER
- WIRELESS MIC
- LARGE U.S. FLAG
- TAPING - CASS~- ~ ~ E
- TAPING - REEL
- MIRROR BALL
- PLYWOOD FLOOR COVERING
- PARQUET DANCE FLOOR:
- 9'X 12'
- 21' X24'
- 30' X 36'
- 42' X57'
- BASKETBALL FLOOR (EXCEPT FOR GAMES)
- CHOIR RISER (PER UNI'D
- CHOIR SHELL (PER UNIT)
- MUSIC STANDS
- ELECTRICAL
- SURGE PROTECTED PLUG STRIP
-EXTENSION CORD (PER 10 FT.)
- CABLE TV AND/OR VIDEO CABLE
- 1000 WA'I-F, 120 VAC
- 1000 WATT, 120 VAC (DEDICATED SERVICE)
- 2000 WA'I-r, 120 VAC
- 3000 WATT, 120 VAC
- FRACTIONAL HP MOTOR, 120 VAC
- 1000 WATT OR 1 HP, 120/208
- 2000 WATr OR 2 HP, 120/208
- 3000 WA'I-r OR 3 HP, 120/208
$500.00
$50.00
$65.00
$25.00
$35.00
$25.00
$30.00
$40.00
$35.00
$150.00
$100.00
$200.00
$300.00
$400.00
$300.00
$5.00
$5.00
$1.00
$15.00
$5.00
$50.00
$30.00
$60.00
$40.00
$50.00
$30.00
$50.00
$75.00
$100.00
PAGE 15 OF 21
$500.00
$50.00
$65.00
$25.00
$35.00
$25.00
$30.00
$40.00
$35.00
$150.00
$100.00
$200.00
$300.00
$400.00
$300.00
$5.00
$5.00
$1.00
$15.00
$5.00
$50.00
$30.00
$60.00
$40.00
$50.00
$30.00
$50.00
$75.00
$100.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$3.00
$0.00
$0.00
~,0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
;0.00
RUNS WiTH HOUSE CABLES
k~SI
S-71
S-72
S-73
S-74
S-75
S-76
S-77
S-78
City of Bakersfield
MASTER FEE SCHEDULE
for City Sen/ice Centers
EXHIBIT "A"
SERVICE CENTER
- 208 DISTRIBUTION TO:
LOADS OVER 3000 WA~I- / INSIDE
LOADS OVER 3000 WA'I-I' / OUTSIDE
- MISCELLANEOUS CHARGES
- ORIGINATION FEES (PER DAY RATES)
CONCERT HALL
ARENA
ENTIRE BUILDING
- OUTSIDE CLEANUP (PER EVENT)
- PICTURES & FLOWERS (10% OF GROSS)
- VIDEO HOOKUP
- LABORER (RATE PER HOUR)
- FLOOR ICE - INITIAL MAKING
- MAINTAIN FLOOR ICE (CHARGE PER DAY)
UTILITY AND ENTERPRISE SERVICES
DOMESTIC WATER SERVICE
AGRICULTURAL WATER SERVICE
SANITARY SEWER SERVICE
INDUSTRIAL WASTE DISCHARGE MONITORING
WASTE'WATER SERVICE--OTHER AGENCIES
- UNION AVE COUNTY SANITATION DIST.
- ALTA VERDE COUNTY SANITATION DIST.
- EAST NILES COMMUNITY SERVICES DIST.
SEWER CONNECTION
SEWER STOPPAGE INVESTIGATION
RESIDENTIAL REFUSE SERVICE - SINGLE FAMILY DWELLING
- MULTIPLE FAMILY DWELLING
% OF COSTI CURRENT
RECOVERY FEE
REQU RED 1991-92
PROPOSED AMOUNT OF
FEE FEEINCREASE
1991-92 /(DECREAS~ NOTES/COMMENTS
$100.00 $100.00 $0.00
$200.00 $200.00 $0.00
$600.00 $600.00 $0.00
$500,00 $500.00 $0.00
$1,000.00 $1,000.00 $0.00
$100.00 $100.00 $0.00
10.00% 10.00% $0.00
$50.00 $50.00 $0.00
$15.e0 $15.00 $0.00
$400.00 $400.00 $0.00
$400.00 $400.00 $0.00
100.0 % NIA NIA NIA
100.0 % NIA NIA N/A
100.0 % N/A N/A N/A
100.0 % $350.00 $350.00 $0.00
100.0 %
$150,986.00 $150,986.00 $0.00
$10,756.00 $10,756.00 $0.00
$252,023.00 $252,023.00 $0.00
100.0 % $90.00 $90.00 $0.00
100.0 % $95.00 $95.00 $0.00
100.0%
$107.00 $107.00 $0.00
$95.00 $95.00 $0.00
FEES SET BY EXECUTIVE ORDER
FEES SET BY EXECUTIVE ORDER
FEES SET BY EXECUTIVE ORDER
ANNUAL COST
ANNUAL COST
PAGE 16 OF 21
M~SI
S-79
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
SERVICE CENTER
COMMERCIAL REFUSE SERVICE
- BIN SIZE BY CUBIC YARD
- 1.5 CUBIC YARDS
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS/WEEK = 5
PICKUP DAYS ! WEEK = 6
- 2,0 CUBIC YARDS
PICKUP DAYS / WEEK = 2
PICKUP DAYS/WEEK = 3
PICKUP DAYS / WEEK ---4
PICKUP DAYS / WEEK = 5
PICKUP DAYS / WEEK = 6
- 3,0 CUBIC YARDS
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP DAYS/WEEK = 6
- 4.0 CUBIC YARDS
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP DAYS / WEEK = 6
* DETACHABLE COMPACTOR BINS ARE *
CHARGED AT THREE TIMES THE
STANDARD BIN RATE
%OF COST CURRENT
RECOVERY FEE
REQUIRED 1991-92
100.0 %
$46.08
$72.96
$101.76
$132.48
$165.76
$46.08
$72.96
$101.76
$132.48
$165.76
$69.12
$109.44
$152.32
$198.40
$247.68
$92.80
$145.92
$204.16
$264.96
$330.88
PROPOSED
FEE
1991-92
$46.08
$72.96
$101.76
$132.48
$165.76
$46.08
$72.96
$101,76
$132.48
$165.76
$69.12
$109.44
$152.32
$198.40
$247.68
$92.80
$145.92
$204.16
$264,96
$330.88
AMOUNT OF
FEE INCREASE
/ (DECREASE)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
NOTES / COMMENTS
CHARGES LISTED ARE PER MONTH
PAGE 17 OF 21
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
f~SI
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
- COMMERCIAL CANS - NUMBER OF CANS
- TWO CANS
PICKUP DAYS I WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK -- 4
PICKUP DAYS/WEEK = 5
PICKUP DAYS / WEEK = 6
- THREE CANS
PICKUP DAYS / WEEK = 2
PICKUP DAYS/WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP DAYS / WEEK = 6
- FOUR CANS
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP DAYS / WEEK = 6
- FIVE CANS
PICKUP DAYS/WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS ! WEEK = 4
PICKUP DAYS / WEEK -- 5
PICKUP DAYS / WEEK = 6
- SIX CANS
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP DAYS / WEEK = 6
CURRENT
FEE
1991-92
$10,56
$15.36
$20.48
$25.60
$30.72
$15.36
$23.04
$30.72
$38.40
$46.08
$20.80
$31.04
$41.28
$51.52
$61.76
$26.56
$39.36
$52.16
$64.96
$77.76
$32.64
$48.00
$63.36
$78.72
$94.08
PAGE 18 OF 21
PROPOSED
FEE
1991-92
$10.56
$15.36
$20.48
$25.60
$30.72
$15.36
$23.04
$30.72
$38.40
$46.08
$20.80
$31.04
$41.28
$51.52
$61.76
$26.56
$39.36
$52.16
$64.96
$77.76
$32,64
$48.00
$63.36
$78.72
$94.08
/ (DECREASE)
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0,00
NOTES / COMMENTS
CHARGES LISTED ARE PER MONTH
k~SI
S-80
o~JTY O,~
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
SERVICE CENTER
% OF COST
RECOVERY
REQUIRED
- SEVEN CANS
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP DAYS / WEEK = 6
- EIGHT CANS
PICKUP DAYS/WEEK = 2
PICKUP DAYS / WEEK -- 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS I WEEK -- 5
PICKUP DAYS / WEEK = 6
- NINE CANS
PICKUP DAYS / WEEK = 2
PICKUP DAYS I WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS / WEEK = 5
PICKUP DAYS / WEEK = 6
- TEN CANS
PICKUP DAYS / WEEK = 2
PICKUP DAYS / WEEK = 3
PICKUP DAYS / WEEK = 4
PICKUP DAYS I WEEK = 5
PICKUP DAYS / WEEK = 6
- SPECIAL SERVICES
- COMPACTOR ROLL OFF BINS (PER PICK UP)
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES/COMMENTS
$39.04
$56.96
$74.88
$92.80
$110.72
$39.04
$56.96
$74.88
$92.80
$110.72
$0.00
$0.00
$0.00
$0.00
$0.00
$45,76
$66,24
$86.72
$107.20
$127.68
$45.76
$66.24
$86.72
$107.20
$127.68
$0.00
$0.00
$0.00
$0.00
$0.00
$52.80
$75.84
$98.88
$121.92
$144.96
$52.80
$75.84
$98,88
$121.92
$144.96
$0.00
$0.00
$0.00
$0,00
$0.00
$60.16
$85.76
$111.36
$136.96
$162.56
$60.16
$85.76
$111.36
$136.96
$162.56
$0.00
$0.00
$0.00
$0.00
$0.00
$120.00
$120.00
$0.00
- COMMERCIAL NEWSPAPER/CARDBOARD(RECYCLING)
- COMMERCIAL AUTOMATED CARTS(PER MONTH)
- RESIDENTIAL AUTOMATED CART(PER MONTH)
- DETACHABLE BIN RENTAL (PER MONTH)
APARTMENT REFUSE SERVICE 0.0 %
$45.00
$16.00
$8.92
$16.00
N/A
$45.00
$16.00
$8,92
$16.00
N/A
$0.00
$0.00
$0,00
$0.00
N/A
$45PERHOUR
COMBINED WrTH SERVICE CENTER S-78
PAGE 19 OF 21
M~SI
SERVICE CENTER
S-81 AIRPARK MAINTENANCE AND OPERATION
- AIRPLANE STORAGE (PER MONTH)
MONTHLY TIE DOWN
MONTHLY TIE DOWN (NEW AREA)
COCKPIT SHADEPORT
PORT A PORT (OWNER HANGERS)
SHADEPORT, WATTS
SHADEPORT, QUAD
COMMUNITY HANGAR (EAA BLDG)
T - HANGAR
HEX HANGAR
MAINTENANCE SERVICES
S-82 UTILITY FRANCHISE FEES
S-83 ORAINAGE MAINTENANCE
S-84 STREET LIGHT MAINT. AND OPERATION
S-85 ASSESSED MEDIAN MAINTENANCE & OPN,
S-86 TAXED MEDIAN MAINTENANCE & OPN.
S-87 STREET SWEEPING
S-88 UNCURBED STREET MAINTENANCE
S-89 GEOLOGICAL SURVEY STREET USE
S-90 ALLEY MAINTENANCE
S-91 ASSESSED NEIGHBORHOOD PARK MAINT,
AND OPERATION
S-92 TAXED NEIGHBORHOOD PARK MAINT,
AND OPERATION
S-93 TRAFFIC MARKING REQUEST REVIEW
S-94 DOWNTOWN OFF-STREET PARKING
- 1 TO 10 VEHICLES
- 11 TO 20 VEHICLES
- 21 TO 30 VEHICLES
- 31 TO 40 VEHICLES
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
EXHIBIT
% OF COST
RECOVERY
REQUIRED
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
AMOUNT OF
FEE INCREASE
I (DECREASE)
NOTES / COMMENTS
100.0 %
43.0 %
100.0%
100.0%
100.0 %
100,0 %
100,0 %
100.0 %
100.0 %
100,0 %
100.0 %
100,0 %
100.0 %
100.0%
$25.00
$30.00
$35.00
$35.00
650,00
$60.00
$70.00
$110.00
$120.00
$0.00
$0.00
$0.00
N/A
$0.00
$0.00
$0.00
$220.00
$0,00
N/A
$0.00
$68.00
$28.00
$26,00
$24.00
$22.00
$25.00
$30.00
$35,00
$35.00
$50.00
$60,00
$70.00
$110.00
$120.00
$0.00
$0.00
$0.00
N/A
$0.00
$0.00
$0.00
$220.00
$0.00
N/A
$0.00
$68.00
$28.00
$26.00
$24.00
$22.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00 ASSMT DIST. FORMATION REQUIRED
$0.00 ASSMT DIST. FORMATION REQUIRED
$0.00 ASSMT DIST. FO'RMATION REQUIRED
N/A FEES SET BY SEPARATE RESOLUTION
$0,00 ASSMT DIST. FORMATION REQUIRED
$0.00 ASSMT DIST. FORMATION REQUIRED
$0.00 ASSMT DIST. FORMATION REQUIRED
$0. O0
$0.00 ASSMTDIST. FORMATION REQUIRED
N/A FEES SET BY SEPARATE RESOLUTION
$0.00
$0.00
$0.00
$0,00
$0,00
$0.00
ASSMT DIST. FORMATION REQUIRED
CHARGE IS PER VEHICLE PER MONTH
PAGE 20 OF 21
SERVICE CENTER
- 41 TO 50 VEHICLES
- 51 OR MORE VEHICLES
S-95 DOWNTOWN GARAGE PARKING
- 1 TO 10 VEHICLES
- 11 TO 20 VEHICLES
-21 TO 30 VEHICLES
- 31 TO 40 VEHICLES
- 41 TO 50 VEHICLES
- 51 OR MORE VEHICLES
S-96 AUDITORIUM PARKING
S-97 STATE HIGHWAY STREET MAINTENANCE
FINANCE AND ADMINISTRATIVE SERVICES
S-98 KING CENTER OFFICE RENTAL
S-99 DOCUMENT PRINTING AND COPYING
'- PRINTED DOCUMENTS (IE BUDGET)
- PHOTOCOPYING (STANDARD & LEGAL SIZE)
- OVERSIZED DOCUMENTS (MAPS, BLUEPRINTS)
S-100 LEGAL SERVICE TO OTHER AGENCIES
S-101 CHECK COLLECTION
S-102 RESEARCH ON REQUEST
S-103 RESEARCH & CERTIFICATION
S-104 AGENDA/MINUTE MAILING SERVICE
S-105 CITY CODE UPDATES
S-106 PROCESSING SCHOOL FACILITY FEES
Current Fees were adopted by Council on ~
June t9, 1991 per Resolution 116-91.
City of Bakersfield
MASTER FEE SCHEDULE
for City Service Centers
% OF COST CURRENT
RECOVERY FEE
REQUIRED 1991-92
PROPOSED
FEE
1991 - 92
EXHIBIT "A"
AMOUNT OF
FEE INCREASE
/ (DECREASE)
NOTES/COMMENTS
43.0 %
100.0 %
100.0 %
100.0 %
100.0 %
$20.00 $20.00 $0.00
$18.00 $18,00 $0,00
$28.00 $28.00 $0,00
$26,00 $26.00 $0.00
$24.00 $24.00 $0.00
$22.00 $22.00 $0.00
$20.00 $20.00 $0.00
$18.00 $18.00 $0.00
$1.00 $1.00 $0.00
$0.00 $0.00 $0.00
$120.00 $120.00 $0.00
CHARGE IS PER VEHICLE PER MONTH
100.0% $0.00 $0.00 $0.00
100.0% $10.00 $10.00 $0.00
100.0% $5.00 $5.00 $0.00
100,0% $5.00 $5.00 $0.00
100.0% $69.00 $69.00 $0.00
100,0% $68.00 $68.00 $0.00
100.0% $10.00 $10.00 $0,00
FILE NAME: 04-Mar-92
MASTRFEE
PREPARED BY: Finance Dept,
LAST UPDATED:
PER 1/4 HOUR, 1ST 5 MIN. ARE FREE
FEE IS CHARGED PER DOCUMENT
$3 EACH. 23 MAILINGS PER YEAR
$17 EACH. 4 MAILINGS PER YEAR
PAGE 21 OF 21
FILE NAME: EXIB_B1
CITY OF BAKERSFIELD - BUILDING DEPARTMENT
MINIMUM FEES PER UNIFORM CODE
FOR FISCAL YEAR 1991-92
EXIBIT 'B'
SERVICE CENTER
% OFCOST
RECOVERY
REQUIRED
Community Development Services
New Construction (S-1 through S-5) 100.00%
Estimated Market Value multiplied by .0085
Fee to be applied to five different costs centers as follows:
S-1 Plan Check
S-2 Construction Inspection
S-3 Plumbing Inspection
S-4 Electrical Inspection
S-5 Mechanical Inspection
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
0.0085 0.0085
32.40% 32.40%
33.80% 33.80%
13.30% 13.30%
12.40% 12.40%
8.10% 8.10%
AMOUNT OF
FEE INCREASE
/ (DECREASE)
0
improvements (Remodels, Additions. Repairs)
S-1 Plan Check
Total Permitt Fees multiplied by .65
$-2 Construction Inspection
Structure fee rates based on total valuation
S-3 Plumbing Inspection
Square footage charge based on structure
Additional specific fees
S-4 Electrical Inspection
Structure fee rates based on total valuation
or Square footage charged based on structure
S-5 Mechanical Inspection
Structure fee rates based on total valuation
or Square footage charged based on structure
Additional specific fees
100,00% Set by Municipal Code 15,12.070
100.00% Set by Municipal Code 15.12,080
100.00% Set by Municipal Code 15.28.160
See Exhibit C
100.00% Set by Municipal Code 15.32,170
100.00% Set by Municipal Code 15,16.040
See Exhibit D
S-2
Other Fees
Construction Inspection
Reinspections (New Construction)
Demolition
Antenna Dish
Mobile Home
Mobile Home w/Perminent Foundation
Mobile Home Garage
Awning and Carport
Swimming Pool
Spa
Pool & Spa
Oil Well Permit Fee
100.0 %
$30.00 $30.00
$30.00 $30.00
$40.00 $40.00
$40.00 $40.00
$135.00 $135.00
$50.00 $50.00
$30.00 $30.00
$92.00 $92.00
$38.00 $38.00
$110.00 $110.00
$686.00 $686.00
$0,00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Page 1 of 2
ORIGINAL
FILE NAME: EXlB_B1
CITY OF BAKERSFIELD - BUILDING DEPARTMENT
MINIMUM FEES PER UNIFORM CODE
FOR FISCAL YEAR 1991-92
I~SI
S-3
S-4
S-5
SERVICE CENTER
Plumbing Inspection Gas Line
Hot Water Heater Replacement
Solar
Septic Tank
Shower Pan
Pool Plumbing
Septic Abandonment/Sewer Line
Water Softener
Air Conditioning (up to 5 tons)
Air Conditioning (above 5 tons)
Grease Interceptors
Electrical Inspection
Electrical Meter, Temporary Power Pole
Electrical For Pool, Spas or Portable Spas
Electrical Subpanel
Mechanical Inspection
Heater for Pools, Spas or Portable Spas
Wall Heater Installation
Air Conditioning (up to 5 tons)
Air Conditioning (above 5 tons)
Cooler Installation
% OF COST
RECOVERY
REQUIRED
100.0 %
100.0 %
100.0 %
CURRENT
FEE
1991-92
PROPOSED
FEE
1991-92
EXIBIT "B~
AMOUNT OF
FEE INCREASE
/ (DECREASE)
30.00 $30.00 $0.00
30.00 $30.00 $0.00
40.00 $40.00 $0.00
~50.00 $50.00 $0.00
~30.00 $30.00 $0.00
~30.00 $30.00 $0.00
;50.00 $50.00 $0.00
;30.00 $30.00 $0.00
;30.00 $30.00 $0.00
;50.00 $50.00 $0.00
;75.00 $75.00 $0.00
$30.00 $30.00 $0.00
$30.00 $30.00 $0.00
$30.00 $30.00 $0.00
$30.00 $30.00 $0.00
$30.00 $30.00 $0.00
$30.00 $30.00 $0.00
$50.00 $50.00 $0.00
$30.00 $30.00 $0.00
File Name: EXIB_B2
Prepared by: Finance Dept.
Last Update: 05-Mar-92
Page 2 of 2
ORIGINAL
EXHIBIT C
PLUMBING PERMIT FEES
Single and Multiple Dwelling Units (Does not include initial fee
of $3.00 or sewer fee of $5.00)
o
10.
11.
12.
13.
14.
Issuance Fee ........................................ 3.00
Each plumbing fixture or trap set of fixtures
on one trap .......................................... 2.00
Each building sewer or each trailer coach sewer ...... 5.00
Each water heater or vent ............................ 2.00
For first four gas outlets ........................... 2.00
Each added gas outlet of 5 or more ..................... 50 ea.
For each water service ............................... 2.00
Each rain water system - each drain .................. 2.00
For each industrial waste pre-treatment
interceptor (including trap and vent ................. 5.00
For installation, repair, or alteration of
water piping or water treatment equipment ............ 2.00
For repair or alteration of drainage or vent piping..2.00
For each vacuum breaker or backflow device ........... 2.00
For private sewage disposal system .................. 10.00
Lawn sprinkler system ................................ 2.00
Plumbing for trailer coach site...See M/H Installation
Note: Minimum Permit Fee ................. 30.00
Exh. C
ORtGINAL
EXHIBIT D
CITY OF BAKERSFIELD
BUILDING DEPARTMENT
MECHANICAL PERMIT FEES
Effective: January 1, 1991
For the issuance of each permit ........................ 15.00
For the issuance of each supplement permit ............. 4.50
For the installation or relocation of each forced-air
or gravity-type furnace or burner, including ducts and
vents attached to such appliance over 100,000 BTU/h ..... 9.00
For the installation or relocation of each forced-air
or gravity-type furnace or burner, including ducts and
vents attached to such appliance over 100,000 BTU/h ..... 11.00
For the installation or relocation of each floor
furnace, including vent .................................. 9.00
For the installation or relocation of each suspended heater,
recessed wall heated or floor mounted unit heater ........ 9.00
For the installation, relocation or replacement of each
appliance vent installed and not included in an appliance
permit ................................................... 4.50
For the repair of, alteration of, or addition to each
heating appliance, refrigeration unit, cooling unit,
absorption, or evaporative cooling system, including
installation of controls regulated by this Code .......... 9.00
For the installation or relocation of each boiler or
compressor to and including three horsepower, or each
absorption system to and including 100,000 BTU/h ......... 9.00
For the installation or relocation of each boiler or
compressor over three horsepower to and including 15
horsepower, or each absorption system over 100,000 BTU/h
to and including 500,000 BTU/h .......................... 16.50
10.
For the installation or relocation of each boiler or
compressor over 15 horsepower to and including 30
horsepower, or each absorption system over
500,000BTU/h ........................................... 22.50
11.
For the installation or relocation of each boiler
or compressor over 30 horsepower to and including
50 horsepower, or for each absorption system over
1,000,000 BTU/h to and including 1,750,000 BTU/h ......... 33.50
ORIgiNAL
EXHIBIT D
Mechanical Permit Fees
Page 2 ~xh.D
12.
For the installation or relocation of each
boiler or refrigeration compressor over 50
horsepower, or each absorption system over
1,750,000 BTU/h .......................................... 56.00
13. For each air handling unit to and including
10,000 cubic feet per minute, including ducts
attached thereto ......................................... 6.50
Note: This fee shall not apply to an air handling
unit which is a portion of a factory assembled
appliance, cooling unit, evaporative cooler or
absorption unit for which a permit is required
elsewhere in this code.
14. For each air handling unit over 10,000 CFM ................ 11.00
15. For each evaporative cooler other than portable type ...... 6.50
16. For each ventilation fan connected to a single duct ........ 4.50
17.
For each ventilation system which is not a portion
of any heating or air conditioning system authorized
by a permit ................................................ 6.50
18.
For the installation of each hood which is served by
mechanical exhaust, including the ducts for such hood ...... 6.50
19.
For the installation or relocation of each domestic
type incinerator .......................................... 11.00
20.
For the installation or relocation of each commercial
or industrial type incinerator ............................ 45.00
21.
For each appliance or piece of equipment regulated by
this Code but not classed in other appliance categories,
or for which no other fee is listed in the Code ............ 6.50
22. NEW SINGLE FAMILY DWELLINGS AND APARTMENT UNITS
0 1800 SQUARE FEET ................................ 22.50
1800 + SQUARE FEET .................................. 43.50
23. COMBINATION HEATING AND REFRIGERATION UNIT
Less than 100,000 BTU Heating, less than
3 ton refrigeration .................................. 18.00
Note:
More than 100,000 BTU Heating, more than
3 ton refrigeration ....................... ~%~...22.50
MINIMUM PERMIT FEE ............................. ~ ...... ~...15.00
ORI~{NAL