Loading...
HomeMy WebLinkAboutUNDERGROUND TANK-C-09/10/99 TIME CHARGED BUSINESS/DEAPRTMENT NAME: PROJECT DESCRIPTION: PRO.CT NUMBER: ~ TI DA~: N~E: CHGD: COMME~S: PROJECT COMPLETION: ' I DATE: RECORD OF TELEPHONE CONVERSATION Location: /C--O I (~-~, J~^, ~ ID# Business Name: ? Om Contact N~e: Business Phone: F~: Insp~or's N~e: ~me of C~I: Date: ~o/,~/~ Time: /0 Type of C~l: Incoming ~] Outgoing [ ] R~urn~ [ ] Content of C~l: ~~ ¢ ~ TA~ ~~ ~/~ ~ o g Actions Required: Time Required to Complete Activity # Min: AM PM MINI MARKET ID Number: 215-000-000264 DANA 11/18/93 Location: 1501 CALIFORNIA AV Bus. Phone: (805) 323-2024 City : Community: BAKERSFIELD STATION 01 Mail: P.O. BOX 6225 State: CA City: ARTESIA Zip: 90702- Owner: PRESTIGE STATIONS INC Phone: (310) 402-1278 Addrs: P.O. BOX 6225 State: CA City: ARTESIA Zip: 90702- IParcel ID: Dunn/Brad: 51-012-0713 GASOLINE SERVICE STATIONS Last Inv.: 000019U SqFt: SIC: 5541 Your Activity Code: Last P.O.: <A> Financial <B> Tracking <C> UST Info <D> Topic D <E> Topic E <F> Event F <G> Event G <P> Print <Esc> Exit F AM PM MINI MARKET ID Number: 215-000-000264 9 ~ <A> Financial Branch ~:"~ <1> General Information VALERIE 08/11/92 ~ I[Fee Groups ,I A:05 C: E: G: I: K: M: O: Q: S: U: W:~ <5> Account History IProg Date Type Invoice Misc. Notations Debit Credit Balance U 04/04/94 ManInv 000019U '~~ 124.00'//0.00 124.00 <1> Gen. Info. <2> Cur. Bill. <3> UST Permit <4> UST Action <5> Acct Hist <%> Next <~> Previous <P> Print <Fl> Help <Esc> Exit · April 17, 2000 Raymond Vose Arco Products Co P.O. Box 6038 Artesia, Ca 90702 RE: Arco #6115 at 1501 California Avenue in Bakersfield Dear Mr. Vose: FIRE CHIEF RON FRAZE 1 This is to inform you that this department has reviewed the result of the ADMINISTRATIVE SERVICE8 Request for Site Closure dated December 28, 1999 associated with the underground 2101 'H' Street Bakersfield, CA 93301 tank removal. VOICE (805) 326-3941 FAX (805) 395-1349 Based upon the information provided, this department has determined that SUPPRESSION SERVICES appropriate response actions have been completed, that acceptable remediation 2101 'H' Street practices were implemented, and that, at this time, no further investigation, remedial Bakersfield, CA 93301 VOICE (805) 326-3941 ~ or removal action or monitoring is required at the above stated address. FAX (805) 395-1349 PREVENTION SERVICES Nothing in this determination shall constitute or be construed as a 1715 Chester Ave. satisfaction or release from liability for any conditions or claims arising as aresult Bakersfield, CA 93301 VOICE (805) 326-3951 of past, current, or future operations at this location. Nothing in this determination FAX (805) 326-0576 [ is intended or shall be construed to limit the rights of any parties with respect to claims arising out of or relating to deposit or disposal at any other location of ENVIRONMENTAL SERVICES 1715 Chester Ave. substances removed from the site. Nothing in this determination is intended of shall Bakersfield, CA 93301 [ be construed to limit or preclude the Regional Water Quality Control Board or any VOICE (80fi) 326-3979 FAX (805) 326-0576 other· agency from taking any further enforcement actions. TRAINING DIVISION This letter does not relieve the tank owner of any responsibilities inandated 5642 Victor Ave. Bakersfield, CA 93308 under the California Health and Safety Code and Califomia Water Code if existing, VOICE (805) 399-4697 FAX (805) 399-5763 additional, or previously unidentified contamination at the site causes or threatens to cause pollution or nuisance or is found to pose a threat to public health or water quality. Changes in land use may require further assessment and mitigation. If you have any questions regarding this matter, please contact me at (661) 326-3979. Sincerely, Howard H. Wines, III Hazardous Materials Specialist Office of Environmental Services cc: B. Myers, RWQCB J. Bollier, SECOR S:\USTFORMS\UST.L8 Feb-23-O0 13:07 Raymond Vose 818 957 2353 P.O] ARCO Products Company Division of AtlanticRichfleldComp~Ry Facsimile Cover Sheet To: Howard H. Wines III Company: Bakersfield Fire Department Phone: 661 326-3979 Fax: 661 326-0576 From: Raymond Vose Company: ARCO Products Company Phone: 818.957.1755 Fax: 818.957.2353 Date: 02/23/00 Pages including this cover page: 2 Comments: Howard; Here is the Corporation Grant Deed for ARCO SS# 6115 located at 1501 California Ave. that we spoke about earlier today. If there is any other information I can provide, please feel free to contact me at the number above. Ray ,Feb-23-O0 13:07 Ra.ymond Vose 818 957 2353 P.02 I -o~5223 f',~c.[ ?32 T'dle lflsurir~¢e: & Tr~s~ Co. ~ T~xs kn~, (~ 90051 A 3.00 ~ / ~r~m~on Gra~ ~ D ,y February 16, 2000 FIRE CHIEF RON m~ZE Mr. John Bollier, R.G. SECOR International, Inc. ADMINISTRATIVE SERVICES 290 Conejo Ridge Ave., Ste. 200 2101 'H" Street ~akers1~e~d, CA 9~01 Thousand Oaks CA 91361 VOICE (661) 326-3941 FAX (661) 395-1349 RE: New Landowner Notification and Participation Requirements SUPPRESSION SERVICES 2101 'H" Street ARCO Station No. 6115, 1501 California Ave. Bakersfield, CA 93301 VOICE (661) 326-3941 FAX (661) 395-1349 Dear Mr. Bollier: PREVENTION SERVICE8 1715 Chester Ave. This letter is to inform you of new legislative requirements Bakersfield, CA 93301 VOICE (661) 326-3951 pertaining to cleanup and closure of sites where an unauthorized release of FAX (661) 326-0576 hazardous substance, including petroleum, has occurred from an ENVIRONMENTAL SERVICES underground storage tank CUST). Section 25297.15(a) of Ch. 6.7 of the 1715 ChesterAve. Health & Safety Code requires the primary or active responsible party to Bakersfield, CA 93301 VOICE (661)326-3979 notify all current record owners of fee title to the site of: 1) a site cleanup FAX (661) 326-0576 proposal, 2) a site closure proposal, 3) a local agency intention to make a determination that no further action is required, and 4) a local agency TRAINING DIVISION 5042 WctorAve. intention to issue a closure letter. Section 25297.15(b) requires the local Bakersfield, CA 93308 VOICE (661)399-4697 agency to take all responsible steps to accommodate responsible FAX (661) 399-5763 landowners' participation in the cleanup or site closure process and to consider their input and recommendations. For purposes of implementing these sections, you have been identified as the primary or active responsible party. Please provide to this agency, within twenty (20) calendar days of receipt of this notice, a complete mailing list of all current record owners of fee title to the site. You may use the enclosed list of landowners .form (sample letter 2) to comply with this requirement. If the list of current record owners of fee title to the site changes, you must notify the local agency of the change within twenty (20) calendar days from when you are notified of the change. If you are the sole landowner, please indicate that on the landowner list form. The following notice requirements do not apply to responsible parties who are the sole landowner for the site. In accordance with Section 25297.15(a) of Ch 6.7 of the Health & Safety Code, you must certify to the local agency that all current record owners of fee title to the site have been informed of the proposed action before the local agency may do any of the following: 1) consider a cleanup proposal (corrective action plan) 2) consider a site closure proposal 3) make a determination that no further action is required 4) issue a closure letter You may use the enclosed notice of proposed action form (sample letter 3) to comply with this requirement. Before approving a cleanup proposal or site closure proposal, determining that no further action is required, or issuing a closure letter, the local agency will take all reasonable steps necessary to accommodate responsible landowner participation in the cleanup and site closure process and will consider all input and recommendations fi.om any responsible landowner. Sincerely, Howard H. Wines, III Hazardous Materials Specialist HHW/mv enclosures S:FEB 00XUST. L4 290 Conejo Ridge Ave. St¢ 200 Sample Letter (2): List of Lar~wners Form Date: City of Bakersfield Fire Department Office of Environmental Services c/o Ralph E. Huey, Director 1715 Chester Avenue, Suite 300 Bakersfield, CA 93301 RE: Certified List of Record Fee Title Owners for Site name Site address Fill out item 1 if there are multiple site landowners. If you are the sole site landowner, skip item 1 and fill out item 2. 1. In accordance with section 25297.15(a) of Chapter 6.7 of the Health & Safety Code, I, Name of primary responsible party certify that the following is a complete list of current record fee title owners and their mailing addresses for the above site: 2. In accordance with section 25297.15(a) of Ch. 6.7 of the Health & Safety Code, I, Name of primary responsible party certify that I am the sole landowner for the above site. Sincerely, Signature of primary responsible party Name of primary responsible party Sample Letter (3) Notice of Proposed Action Submitted to Local Agency Date: City of Bakersfield Fire Department Office of Environmental Services c/o Ralph E. Huey, Director 1715 Chester Avenue, Suite 300 Bakersfield, CA 93301 RE: Notice of Proposed Action Submitted to Local Agency for Site name Site address In accordance with section 25297.15(a) of Ch. 6.7 of the Health & Safety Code, I, , certify that I have notified all Name of primary responsible party responsible landowners of the enclosed proposed action. Check space for applicable action(s): ... cleanup proposal (corrective action plan) site closure proposal local agency intention to make a determination that no further action is required. local agency intention to issue a closure letter. Sincerely, SignatUre of primary responsible party Name of primary responsible party CC: (Names and addresses of all record fee title owners) ~'~E~_RSFIELD FIRE DEPARTMEN".~ '~ ENVIRONI~NTAL SERVICES ~w 171§ Chester Ave., Bakersf£eld, CA 93301 (805) 326-3979 TANK REPI~V~ INSPECTION FORM CONDITION OF TANKS Permit No. CITY OF BAKERSiS[ELD OFFICE OF ENVIRONMENTAL SERVICES 1715 Chester Ave., Bakersfield, CA (805) 326-3979 PERMIT APPLICATION FOR REMOVAL OF AN UNDERGROUND STORAGE TANK SITE FACILITY NAME ~~ ~~ CROSS STRffffT TANK OWNER/OPERATOR~ ~ ~~. PHONE NO. PRELIMINAR~ ASSESSMENT INFO~ATION COMPANY ~~ PHO~ NO.~ ~'/~ LICENSE NO. INSURANCE CAR~ER WO~NS COMP NO. WASTE TRANSPOR~R IDENTIFICATION~ER '~ NAME OF RINSA~ DIS~SAL FACmI~ ~~ .~~ ADDR[SS CI~ ~~ ~ ZIP FACILITY IDE~IFICATION NU~ER TA~K I~FOR~ATIO~ C~MICAL DATES C~MICAL TANK NO. AGE VOLUME STO~ED , STORED P~EVIOUSLY STORED 3'1 IlS Fi)RM I IAS III{EN COMPI,ETI~I) UNDER PENALTY OF PERJI~Y, AND TO TI IE BEST OF MY ~()WI,EIXH~ IS TRUE APPI.ICART ~AME (PRAT) T~IS ~PPLIC~TIO~ BECOME ~ PER~IT W~E~ APPROVE~ RECORD OF TELEPHONE CONVERSATION Loc~on: fiE: 5 Business Name: Conm~ N~e: Busin~ Phone: Insp~or's N~e: ~me of C~I: D~e: Type of C~I: In.ming Content of Call: Time Required to Complete Activity # Min: '~~, Motor Certification Inspection ~~'ARCO Products Company This letter certifies that the monitor(s) is/are in place, the probes are in correct/position and the system is operating properly. //~ / Station # r~,Z//-c~'' Date ? ~ 19 Address' I.C'/r~ i ,F,O ~t~..,. ,,, ,v' ~.o .,.q-. ,./~"' Type Inspection: ~ r .,~,,.e, I/.~ ~, r/.-, / / ,~ Annual ~ Permit ,,~.,..,~ ., -.,; ~? Recheck Leak Type & Model of Monitor f(,Or~/'~/ .V'. ,'7' ff ~ System Function Tanks In Tank Pass Fail N/A Pass Fail Regular Midgrade ,.... Supreme Waste Oil Other Product Lines pdurbih~-gum~ In-Line (...--~ Fill Sump{~ Pa~N/A Pass Fail Pass Fail Regular Midgrade Supreme '"' Waste Oil Other When monitor is turned off or in alarm, is there positive shutdown of turbines?((Yes._.)__ No If No, were precision product line tests performed? Yes ~ No Monitor Panel Is the monitor panel mounted and labeled correctly? Does monitor alarm horn function properly? 7 Is panel accessible and visible to station personnel? Replaced all failed probes? Yes ~ No (N/A) If No, probes to be replaced/repaired by (Date) / / ........ Inspected By: Contractor Technician Signature APC-3324 (8/96) ~, Mechanical Leak Detector Test Data Sheet '~'ARCO Products Company Station ii 0 6 ~ , ,/0-.2 Address Test Informati°n 1 Manufacturer Model Full Operating Pressure (psi) Line Bleed Back (~) ] Trip Time (sec) Metering ~essure (psi) Fm Holing Pressure (psi) Test Le~ Ra~ (~n) (gph) PASS or FAro Replaced All Failed Le~ Detectors Yes If No, Replacement To Bc Completed By (Date) This letter certifies that the annual leak detector tests were performed at the above referenced facility according to the equipment manufacturers procedures and limitations and the results as listed are to my knowledge tree and correct. The mechanical leak detector test pass/fail is determined using a low flow threshold trip rate of 3 gph at 10 PSI. Inspected By: Contractor 'e~''~ ~ Technician '~,,~'~ .. , , Lic# O O t~ cl ) . ! Signature t -----._x APC-332.5 (8/~t] Triangle Environmental, Inc. 2525 West Burbank Boulevard, Burbank, California 91505 (818) 840-7020 FAX (818) 840-6929 T.E.I. UST TESTING SYSTEMS SUMMARY SHEET Precision Underground Storage Tank System Leak Test Client: ARCO Products Company Work/4:341137 P.O. BOX 6038 ARTESIA, CA 90702 Test Date: 3/21/99 Facility: ARCO//06115 County: KERN 1501 CALIFORNIA AVE Cross Street: CHESTER/CALIFORNIA BAKERSFIELD, CA 93304 Tank Line Tank# Product Capacity Test System Type Rate/Results Ullage Result Rate/Result L/D Result I Unleaded Premium 10000 System 5000 PASS PASS -0.011 PASS PASS 2 Unleaded Plus 10000 System 5000 PASS PASS -0.005 PASS PASS 3 Unleaded Regular I0000 System 5000 PASS PASS -0.01 l PASS PASS 4 Unleaded Regular 10000 System 5000 PASS PASS N/A N/A Certified By: Technician: Tony Kiani State Lic. #s: CA-1049 .~, fi~ Mfgr's#: TEI-047 Comments: Tanks, lines, leak detector, monitor certification and inspection form This precision tank testing system exceeds the criteria required by Local, State and Federal NFPA #329 and EPA UST Technical Standards Part 280 for precision testing systems. I CITY OF BAKERSFIELD FIRE DEPARTMENT OFFICE OF ENVIRONMENTAL SERVICES 1715 CHESTER AVENUE BAKERSFIELD, CALIFORNIA 93301 ARCO Products Company '~b. Facility Number. 6115 Division of Atlantic Richfield Company ,~p, Customer Account Number. 0412841 AMENDMENT TO LESSEE PMPA FRANCHISE AGREEMENT/DEALER/PREMISES LEASE OPERATION OF UNDERGROUND STORAGE TANKS CAUFORNIA This Amendment, dated /~i/~ Y'/'~ /~ /~? ~ ~' , is attached to, incorporated in and made a part of the Lessee PMPA fl'anchise Agreement/Dealer/Premises Lease ("PMPA Agreement'), in effect as of the date of this Amendment or, if applicable, to become effective concurrently with this Amendment, between Atlantic Richfield Company, a Delaware Corporation, through its division ARCO Product Company, ("ARCO'), and Prestige Stations Inc. #0589 ("Franchisee'), covering premises located at 150t Califomia Ave., Bakersfield, CA 93304. In retum for good and valuable consideration, each party's receipt of which is hereby acknowledged, the parties agree as follows: 1. The parties have entered into this Amendment i.n accordance with legal requirements imposed on ARCO and Franchisee conceming operation of the underground storage tanks at the above- referenced location. 2. ARCO has provided Franchisee a copy of: (a) California Health and Safety Code Section 25299 or an approved summary concerning civil and criminal penalties for violating terms of any permit to operate these underground storage tanks and relevant statutory and regulatory requirements; (b) the following listed documents, a copy of which is attached and initiated by Franchisee: Monltodn;I and Response Plan - X 3. Where ARCO has provided Franchisee with a copy of the permit to operate the underground storage tanks, Franchisee has read and understood its responsibilities as operator under the permit and agrees to comply with each of the provisions of the permit. Irrespective of whether Franchisee has received and reviewed a copy of the underground storage tank operating permit, Franchisee hereby expressly agrees to do the following: (a) monitor the underground tanks as required by law; (b) maintain ail required records and make such records available to the federal, state, and local government agencies and to ARCO at all reasonable times; (c) follow all reporting procedures as required by law; (d) · mail, when submitted to, ARCO, at the address specified in paragraph 1 of the PMPA Franchise Agreement/Dealer/Premises Lease, a copy of all reports submitted to ovemment agencies; (e) follow all operating procedures specified by ARCO; (0 immediately report to ARCO all suspected or confirmed releases from the tanks and connected piping system, unusual operating conditions, release detection signals and environmental conditions suggesting a release may have occurred, and any spills and overfills that are not contained and cieaned up; (g) properly close the underground tanks as required by law; and, (h) comply with all federal, state, and local legal requirements relevant to the operations of the underground tanks and all amendments to any permit to operate. 4. With respect to the operation of the underground storage tank system and monitoring equipment, Franchisee hereby acknowledges and agrees: - that ARCO has provided Franchisee with training on each of the items described in the attached Monitoring and Response Plan, - that Franchisee understood the content of the training, and asked any questions necessary to facilitate his understanding, - that Franchisee indicated to ARCO at the time of training any subjects addressed by the training which Franchisee did not fully understand, and, - that Franchisee received complete training and information necessary for Franchisee to fully understand the subject of operating undergrbund storage tanks. 5. ARCO has provided Franchisee a copy of and Franchisee agrees to maintain on the Premises the Certificate of Financial Responsibility (as required by the United States Environmental Protection Agency in Subpert H, 40 CFR, Part 280 and California Health and Safety Code, Chapter 6.7, Section 2S292.2). 6. Except to the extent that conflict with, or are less rigorous than the terms of this Amendment, all of the terms and conditions of the PMPA Agreement, as previously or hereafter amended or supplemented, remain in full force. IN WITNESS WHEREOF, ARCO and Franchisee have executed this Amendment. ARCO Products Company, Franchisee a dlvtMm of Atianec, RichlteldCompany ~..~:~"~"~'~ ~- .,/ ' Ddte ' Prestige Sta't~ns Inc. #0589 Date - ' Dat~ Witness Date MONITORING AND RESPONSE PLAN - X , ARCO PRODUCTS COMPANY FACILITY WITH SECONDARY CONTAINMENT OF UNDERGROUND STORAGE TANKS & PRODUCT LINES wrrtl SUBMERSIBLE PUMP SHUTDOWN ARCO Facility: 6115 Address: 1501 California Ave Bakersfield, CA 93304 This plan is designed to meet the monitoring and response requirements of Section 2632, Article 3, Title 23, CCR 1. MONITORING EQUIPMENT Secondarily contained storage tanks and lines at this facility are monitored by a continuous electronic leak detection system which consists of an alarm panel, sensors and associated electronics. Liquid sensors are installed in the annular space of each double wall tank and product line piping sump. Whenever a sensor detects the presence of a liquid there is both a visual and audible alarm at the control panel. In addition, the continuous monitor on the product piping system will shut down the pump and activate the alarm system when a release is detected or if the continuous product piping monitoring system fails or is disconnected, the pumping system will shut down. Automatic line leak detectors are installed on the secondarily contained pressurized product piping. The line leak detector will detect a loss of pressure in the product lines and restrict the flow of product. 2. MAINTENANCE SCHEDULE OF MONITORING EQUIPMENT The continuous electronic leak detection system including line leak detectors will be inspected according to the manufacturer's instructions by an outside contractor once during each calendar year. ROUTINE MONITORING PROCEDURE On a daily basis the facility operator shall: ,4~ Inspect the control lJanel for visual and audible alarm signals to confirm that · the unit is operating. B. Inspect island and tank fill areas for signs of spillage or petroleum sheen. C. Record the inspection observations on the Daily Visual Monitoring Log (Form APPC-765: attached.) 4. RESPONSE PLAN OPERATOR RESPONSIBILITIES A. LEAK RECORDING AND REPORTING PROCEDURE Whenever an alarm is activated, station personnel are to immediately: ~ a. Contact ARCO Maintenance or its designated a~ent by usin~ the telephone number previously provided. b. If any visible indications of petroleum products or vapors are noticed cad1911. c. Make an entry in the Recordable Discharge Log (Form APPC-765-1: attached) indicating the action taken d. Complete the Recordable Discharge Log when and as the source of the alarm is known. ARCO RESPONSIBILITIES B. METHOD OF REMOVING AN UNAUTHORIZED RELEASE FROM THE SECONDARY CONTAINMENT a. Any unauthorized release into the secondary containment system of a product tank will be removed by pumping. Uncontaminated product may be returned to the tank. Contaminated product may be returned to the refinery to be recycled or may be disposed of following procedures in accordance with California Health Safety Code requirements. b. ARCO Maintenance will be responsible for authorizing and selecting contractors for the work to be performed. 5. TRAINING In addition to the training covering subjects mentioned in Sections 3 and 4 above, training needed for the operation of the tank system and monitoring equipment includes: How to: Take tank level measurements Read dispenser meters - Inspect equipment - Recognize warning signs.' dispenser hesitations, meter spins and odors - Manually close dispenser impact valve Replace dispenser filters - Shut down the system with and location of: ARCOmatic switch, electrical panel breakers, and emergency shut off switch Test the electronic monitor 6. RECORDS RETENTION Written records of ail monitoring testing, and maintenance performed shall be maintained on- site or off-site at a readily available location for a period of at least :5 years. These records must be made available, upon request within 36 hours, to the local agency or the Board. CALIFORNIA I:IF~LLTH AND SAFETY CODE DIVISION 20 DATa' CHAPTER 6.7 SECTION 25299 (a) Any operator of an underground tank system shall be liable for a civil penalty of not less than five hundred dollars ($500) or more than five thousand dollars ($5,000) for each underground storage tank for each day of violation for any of he following violations: (1) Operating an underground tank system which has not been issued a permit, in violation of this chapter. (2) Violation of any of the applicable requirements of the permit issued for the operation of the underground tank system. (3) Failure to maintain records, as required by this chapter. (4) Failure to report an unauthorized release, as required by Sections 25294 and 25295. (5) Failure to properly close an underground tank system, as required by Section 25298. (6) Violation of any applicable requirement of this chapter or any requirement of this chapter or any regulation adopted by the board pursuant to Section 25299.3. (7) Failure to permit inspection or to perform any monitoring, testing, or reporting required pursuant to Section 25288 or 25289. (8) Making any false statement, representation, or certification in any application, record, or other document submitted or required to be maintained pursuant to this chapter. Co) Any owner of an underground tank system shall be liable for a civil penalty of not less than five hundred dollars ($500) or more than five thousand dollars ($5,000) per day for each underground storage tank, for each day of violation, for any of the following violations: (1) Failure to obtain a permit as specified by this chapter. (2) Failure to repair or upgrade an underground tank system in accordance with this chapter. (3) Abandonment or improper closure of any underground tank system subject to this chapter. (4) Knowing failure to take reasonable and necessary steps to assure compliance with this chapter by the operator of an underground tank system. (5) Violation of any applicable requirement of the permit issued for operation of the underground tank system. (6) Violation of any applicable requirement of this chapter of any resulafion adopted by the board pursuant to Section 25299.3. (7) Failure to permit inspection or to perform any monitoring, testing, or reporting required pursuant to Section 25288 or 25289. (8) Making any false statement, representation, or certification in any application, record, or other document submitted or required to be maintained pursuant to this chapter. (c) Any person who intentionally fails to notify the board or the local agency when required to do so by this chapter or who submits false information in a permit application, amendment, or renewal, pursuant to Section 25286, is liable for a civil penalty or not more than five thousand dollars ($5,000) for each underground storage tank for which notification is not given or false information is submitted. (d) Any person who falsifies any monitoring records required by this chapter, or knowingly fails to report an unauthorized release, shall, upon conviction, be punished by a fine of not less than five thousand dollars ($5,000) or more than ten thousand dollars ($10,000) by imprisonment in the county jail for not to exceed one year, or by both that fine and imprisonment. (e) In determining both the civil and criminal penalties imposed pursuant to this section, the court shall consider all relevant circumstances, including, but not limited to, the extent of harm or potential harm caused by the violation, the nature of the violation and the period of time over which it occurred, the frequency of past violations, and the corrective action, if any, taken by the person who holds the permit. (O Each civil penalty or criminal fine imposed pursuant to this section for any separate violation shall be separate, and in addition to, any other civil penalty or criminal fine imposed pursuant to this section or any other provision of law, and shall be paid to the treasury of the local agency or state, whichever is represented by the office of the city attorney, district attorney, or Attorney General bringing the action. All penalties or fines collected on behalf of the board or a regional board by the Attorney General shall be deposited in the State Water Pollution Cleanup and Abatement Account in the State Water Quality Control Fund, and are available for expenditure by the board, upon appropriation, pursuant to Section 13441 of the Water Code. (g) This section shall become operative on January 1, 1991. (Added by Stats. 1988, c. 296, Section 3, operative Jan. 1, 1991. Amended by Stats. 1989, c. 11397, Section 19, operative Jan. 1, 1991.) ARCO Products Company ~ Dailly Visual 'Underground z~o~ of AUm~ ~f~ co~y ~ Storage Tank Monitoring Lo~ ARCO facility no. Dealer~ Month/Year System condition Inspector Da~ Oper~b~ Alarm* Initials Comments 1 2 4 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 26 27 29 31 *NOTE: IF ALARM CONDITIO~(ISTS, IMMEDIATELY NOTIFY ARCO I~NTENANCE OR 1TS AGENT ~ DESIGI',{~I~ED AND MAKE ENTRY ON ALARM AC'WI~ATION/DISCHARGE LOG APP'-765 (1/24/97) ARCO Products Company ~Nff~J3 RECO~LE DISCHARGE LOG Division of Atlantic Richfield Company DOUBLE CONTAINMENT UNDERGROUND ~ STORAGE TANK SYSTEM ARCO Facility Dealer / Franchisee NO. Date / Time Reported To Date / Description of Conditions Corrective Action Taken of Discover~ Time D February 9, 1999 ~*R~ CHIEF AM PM Mini Market #6115 RCN FRAZE 1501 California Ave ~M'N'S~m'ESE~WCES Bakersfield, CA 93305 2101 'H' Street Bakersfield, CA 93301 VOICE (805) 326-3941 FAX (805) 395-1349 ]~E: Compliance Inspection SUPPRESSION SERVICES Dear Underground Storage Tank Owner: 2101 "H' Street Bakersfield, CA 93301 VOICE (805) 325-3941 FAX (805) 395-1349 The city will start compliance inspections on all fueling stations within the city limits. This inspection will include business plans, PRt~N~ON SER~¢tS underground storage tanks and monitoring systems, and hazardous 1715 Chester Ave. Bakersfield, CA 93301 materials inspection. VOICE (805) 326-3951 FAX (805) 326-0576 To assist you in preparing for this inspection, this office is ENVIRONMENTAL SERVICES enclosing a checklist for your convenience. Please take time to read this 1715 Chester Ave. Bakersfield, CA 93301 list, and verify that your facility has met all the necessary requirements to VOICE (805) 326-3979 be in FAX (805) 326*0576 compuance. TP~JNSNG O~S'ON Should you have any questions, please fee] free to contact me at 5642 Victor Ave, Bakersfield, CA 93308 805-326-3 979. VOICE (805) 399-4697 FAX (805) 399-5763 Sincerely, Steve Underwood Underground Storage Tank Inspector Office of Environmental Services SBU/dm enclosure Hazardous Materials/Hazardous Waste Unified Permit CONDITIONS OF PERMIT ON REVERSE SIDE ............... ~,,~,,,,~,,,,~,,,,~,~,~,~,~,,~,~,,~,.~ ............... This permit is issued for the following: ???:='i'., ~)~:,.!?'~:?'~'::;i i!ii:~;~. ,~ii?~!!!!!iii~. i!~{ii~i ii;;:::::':, iiii':i}ii~ii~Be[ground Storage of Hazardous Materials LOCATION 1501 CALIFORNIA&?.~:*;;~=..... '=~?/ BAE~RSE~ELD CA ~;.:'--.?4r~? ':'?~t;~ ",,~,.~:~,.~ ~. ,ii~?. ~; u[~. ~;:~.'~j~i~ ........ ~:.~-....'!j ~ ................ : · :~lJ['~, ~ ~ ii.."'CJ~ CAPAGiTY ~ ~AB---" '.' ~ Y~AR.-...:]~];~.~;::~"/~'~E,~;~ ~:;T~NK r-~: ANE~ PIPING PIPING PIPING PIPING TAN H~RDOUS SUBSTANCE '~::.::--'.::~ ..... ' [:.:, INS~~"~ ':'~......~;~',~[~V~i~'["~'~N~iTOfi :~:;~t.~O~l~bR TYPE TYPE METHOD ONITOR 0001 GASOLINE MIDG~DE UNLE lO,O00J~ .~AL "?:.. "'~? '~;~D'~':~.:~'~ F CLM.,¢:?" 'TT~-.:2? DW F PRESSURE ALD 0002 GASOLINE ARCO UNLEADE 10,000.~ ::GAL "~": .... DW :"'~"'F CLM:?''' ~'T~':~,?' DW F PRESSURE ALD 0003 GASOLINE ARCO UNLEADE IO,O00.O0~GA~. ~?'?::';:?':~::::~:~:~?~ .,D~'~ F ?% M:i~' .?~T'~ DW F PRESSURE ALD 0005 GASOLINE ARCO EC PREMI 10,000.00 ~:::%~ ;,,~:; ~,'"": ~ ;~::~ :::~'.D~,,~:~.', F:[., ~":~.~;:~':~:~;~;':~M ..... ?[:' .'~X gw F PRESSURE ALD omc~ o~ ~o~~ s~ mc~s 1715 Chewer Ave., 3rd Floor fi/ ~ph Hu~~ Office of B~e~el~ CA 93301 Voice (805) 32~3979 F~ (805)~26-0S76 Expiration Date: ~n~ ~0~ City of Bakersfield Office of Environmental Services 1715 Chester Ave., Suite 300 Bakersfield, California 93301 (805) 326-3979 An upgrade compliance certificate has been issued in connection with the operating permit for the facility indicated below. The certificate number on this facsimile matches the number on the certificate displayed at the facility. Instructions to the issuing agency: Use the space below to enter the following information in the format of your choice: name of owner; name of operator; name of facility; street address, city, and zip code of facility; facility identification number (from Form A); name of issuing agency; and date of issue. Other identifying information may be added as deemed necessary by the local agency.. This permit is issued on this 2nd day of November, 1998 to' AM PM MINI MARKET #6115 Permit #015-021-000264 1501 California Ave Bakersfield, California 93304 BAKERSFIELD FIRE DEPARTMENT February 13, 1998 R~ CHIEF MICHAEL R. KELLY AM PM Mini Market #6115 1501 California Avenue n~~m~-~s Bakersfield, CA 93304 2101 'H' Street Baker~fld, CA 93,301 (805) 326-3941 FAX (805) 395-1M9 som~mon~ RE: "Hold Open Devices" on Fuel Dispensers 2101 'H' Slteet Bako~fleld. CA 93301 (806) 326-3941 Dear Underground Storage Tank Owner: FAX (805) 395-1349 n~ramo~ srawcm The Bakersfield City Fire Department will commence with our annual 1715 C~terAve. Underground Storage Tank Inspection Program within the next 2 weeks. B~om~ld, CA 93301 (805) 326-395 i FAX (~)326-0576 The Bakersfield City Fire Department recently changed its City Ordinance concerning "hold open devices" on fuel dispensers. The Bakersfield City Fire ENVII~IMF. NTAL ~J~nCES 1715Ch~^,~. Department now requires that "hold open devices" be installed on all fuel B~d. CAg~0~ dispensers. The new ordinance conforms to the State of California guidelines. (805) 326-3979 FAX (805) 32.6-0576 The Bakersfield Fire Department apologies for any inconvenience this ~.ssnne ~s~on may cause you. 5642 Victor S'lmet [klkersfl~d, CA 93,308 (805) 399-4697 FAX (~05)3~576a Should you have any questions, please feel free to contact me at 326-3979. Sincerely, Steve Underwood Underground Storage Tank Inspector cc: Ralph Huey ARCO Products Company Environmental Health & Safety 4 CenterpoJnte Drive La Palina, California 90623-1066 i~ailing Address: Bo× 6038 Artesia, California 90702-6038 September 30, 1997 Bakers~ Fire Department 171~hester Ave., 3rd Floor  ftkersfield, CA 93301 Dear Mr. Huey: RE: MONITOR AND LEAK DETECTOR TESTS RESULTS ARCO #5365 - 4110 Wible Rd., Bakersfield ARCO #6115 - 1501 California Ave., Bakersfield Enclosed is the documentation to notify you that the monitors and leak detectors at the above facilities passed the system test, as noted in the attached test results. ARCO is committed to the compliance of all environmental laws that govern the safe operations of our facilities. Feel free to call me at (714)-670-5423. Sincerely, Senior Engineer Environmental Compliance LA:ds Encls: APC-7116 ARCO Products Company is a Division ol AtlanticnichfieldCompany (10/96) ¢~~, ' Moni~ Certification Inspection ,~n~'. ARCO Products Company This le,tter certifies that the monitor(s) is/are in place, the probes are in correct position and the system is operatin~.,prop_erly. Station # ~(D~'~ Date Address '~1~0 ~t. llb~ ~ Type Inspect)pm ~X~0 C,~'~ ~ ~..C) Ot~ Annual ~ Permit Recheck Leak Type & Model of Monitor .~~ )K'~ % System Function Tanks Annular Space In Tank Pass Fail N/A Pass Fail N/A Regulart.44~.. ~ ~ Midgrade Supreme Waste Oil OtherCldL.:Z.. Product Lines Turbine Sump In-Line Fill Sump Pass Fail N/A Pass Fail .I~A P~.s Fail N/A Regular t~. ~ 9/' Midgrade >t Supreme >~ Waste Oil ~ When monitor is turned off or in alarm, is there positive shutdown of turbines? Yes,~ No . If No, were precision product line tests performed? Yes ~ No ~ . Monitor Panel Is the monitor panel mounted and labeled correctly? Does monitor alarm horn function properly? Is panel accessible and visible to station personnel? Replaced all failed probes? Yes No ~ N/A ~'~ If No, probes to be replaced/repaired by (Date) / / Technician Signature. APC-3324 (8/96) ~~ " Mechani~l Leak Detector Test Data Sheet " ARCO Products Company ~ost-lt'" Fax Note 7671 _ , ,'~ '~' Station ~ , . .... Date ' ~ .......... ,' Address ' ' ... Test Information 1 2 ] 3 4 5 Product ~ ~ Model P~ ~9 ~L~' ' ........... '. ~Full Opera~ng Pressure (psi) ~; }~ '""" Trip Time (sec) ~ ',:~;,. ~',::., Metering ~essure (psi) [~ ~O [O :'.~:: }:.'._~ ............. · '..';" F~ Holding Pressu~ (psi) ~ ~'0'1 ,.-"..'"'~" ....... .':; .,~ ) (gph) .,'.,' : Test Le~, ,,,Rate, (mt/rain ,... . ~ - , , i:' ' . ............. ..:.. / Replaced All Failed Le~ Demctors Yes No __ N/A ~ If No, Replacement To Be Complemd By (Date) ._. / .... This letter certifies that the annual leak' detector tests were performed at the above referenced facility according ~o the equipment manufacturers procedures and limitations and the results as listed are to my knowledge true and correct. The mechanical leak detector test paso/fall, is determined using a Iow flow · ~'threshold trip rate of 3 gph at 10 PSI. · ?2': Inspected By: ContractOr _ ' , ' :'"' Technician Lic .. ;;:;" ' · '" "' ': Signature ~.,~, ".'-4. % ..o HAZARDOUS MATERIALS INSPECtiON ~kersfield F~e Dept. OFFI~L~ OF ENVIRONMENTAL SERVICES 1715 Chester Ave. Bakersfield, CA 93301 Date Completed ~.~.2' Business Namei Location: ~ ( dM,~r.,£ ,~co Business Identification No. 215-000 O6 q (Top of Business Plan) Station No. Shift Inspector Arrival Time: Departure Time: Inspection Time: Adel~te Inadequate Adet~late Inadequate Address Visable r'! Emergency Procedures Posted [] Correct Occupancy El/' r'l Containers Propedy Labled ~ [] Verification of Inventory Materials133/ [] Comments: Verification of Quantities I~f [] Verification of Location 13/" r'l Verification of Facility Diagram li3", [] Proper Segregation of Matedal ~ [] Housekeeping (~' [] Fire Protection ~ [] Comments: Electrical Comments: Verification of MSDS Availablity Number of Employees: ~ // UST Monitoring Program ~ [] Comments: Verification of Haz Mat Training I~ [] Permits Comments: Spill Control Hold Open Device O~' [] Verification of Hazardous Waste EPA No. Abbatement Supplies and Procedures ~/' [] Proper Waste Disposal 13/ [] Comments: Secondary Containment I;~,, [] Security ~!' [] Special Hazards Associated with this Facility: / All Items O.K Business O~er/Uanag~ PRINT NAME SIGNATURE Correction Needed ~ite-H~ Mat Div. Yellow-Sta~on C~y Pink-Business Copy UNDERGROUND STORAGE TANI~I~ISPECTION Bakersfield Fire Dept. : Bakersfield, CA 9.3301 FACILITY NAME t~v',",e .,4. m ~ BUSINESS I.D. No. 215-000 .,O~, FACILITY ADDRESS .1~'0[ ~_¢/,~--~r~t~_ t~(,~ CITY ~a~&( ZIP CODE FACILI~ PHONE No. ~'~0 2~ ~ ~ INSPECTION DATE------ Pr~uct Pr~u~ ~r~u~ TIME IN TIME OUT ~L ~ ~/~ ~ Insl ~te Inst Date Inst Date INSPECTION ~PE: I¢ ~Z /~ /~ Size Size S~e ROUTINE ~ FOLLOW-UP /E,~ ~E~ /~ ~ REQUIREMENTS yes no n/a yes no n/a yes no ~a la. Forms A & B Submiffed 1 b. Form C Submiff~ lc. O~rating F~s Paid ld. State Sumharge Paid le. Statement of Financial Res~nsibili~ Submiff~ lf. Wri~en Contract Exists ~een Owner & O~rator to O~rate UST~ 2a. Valid O~mting Permit 2b. Approv~ Wriffen Routine Monitoring Procedure 2c. Unauthorized Release Res~nse Plan~ 3a. Tank Integrity Test in Last 12 Months ~ ~i 3b. Pressur~ed Piping Integrity Test in Last 12 Months ~~: ~. Suction Piping ~ghtness Test in Last 3 Years ~ ~ ~. Gmvi~ Flow Piping Tightness Test in Last 2 Yearn ~ ~ ~. Test Results Submiffed Within ~ Da~ ~ ~ 3f. Daily ~sual Monitoring of Suction Pr~uct Piping ,/ ~ ~. Manual Invento~ Reconciliation Each Month ~. ~ ~. Annual Invento~ R~onciliation Statement Submi~ed ~ ~ ~. Metem Calibmt~ Annually 5. Weekly Manual Tank Gauging R~ords for Small Tanks 6. Monthly Statistical Invento~ Reconciliation Results 7. Monthly Automatic Tank Gauging Results 8. Ground Water Monitoring 9. Vapor Monitoring 10. Continuous Interstitial Monitoring for Double-Walled Tanks 11. Mechanical Line Leak Detectom 12. El~tronic Line Leak Det~tom 13. Continuous Piping Monitoring in Sumps 14. Automatic Pump Shrift Capabili~ 15. Annual Maintenance/Calibration of Leak Detection Equipment 16. Leak Det~tion Equipment and Test Methods Listed in LG-113 Series 17. Wriffen Records Maintained on Site 18. Re~d~ Changes in Usage/Conditions to Operating/Monitoring Pr~edures of UST System Within ~ Days 19. Repo~ Unauthorized Release Within 24 Houm 20. Approved UST System Repaim and Upgrades 21. Records Showing Cath~ic Protection Ins~tion 22. Secured Monitoring Wells / 23. Drop Tu~ ~ ~ . INSPECTOR: _~ ~~ OFFICE TELEPHONE No. FD 1~9 (rev. 9/~) ~~'ARCO Products Company ' "- '"- Monitor Certification Inspection This letter certifies that the monitor(s) is/are in place, the probes are in correct position and the system is operating properly. Station # (z911~3 DateC3 -~(~., .19 C~--, Address !~3~ CPC~ Q)( ~._~,'~ 1-:~. Type Inspection' ,~'~C('%£1c\ & ?~ ,__~ , Annual ~/ Permit Recheck Leak Type & Model of Monitor System Function Tanks Annul~- Space In-Tank Pass Fail N/A Pass Fail N/A' Regularo~c-! "~ NlidD--ade Supreme Waste Oil Comments: Product Lines Turbine Sump In-Line Fill Sump Pass Fai[ N/A Pass Fail N/A Pass Fail N/A .X.fid~ade 5./ ) Supreme ~./' I Waste Oil ..~ ! "~ Otherb ,t_:_-2___ ...?×/ ] N ' Pa~e 1 of 2 Revision 17J95 Monitor Certification Inspection (continued) When mOnitor is turned offor in alarm, is there positive shutdown of turbines? Yes ~,,, No If No, were precision product line tests performed? Yes . No Comments: Sensors / Probes Are sump sensors suspended within one inch of sump bottom? Are double walled FRP sensors installed properly in tank? Monitor Panel Is the monitor panel mounted and labeled correctly? ~ ~ Does monitor alarm horn function properly? ~ c~ ! Is panel accessible and visible to station personnel? /QL(7/Q Comments ,-- : I ,~ SCOTT CO. OF CALIFORNIA Inspected By: Contractor'--')(Cr-r (.( .,._ ,.-,, 1717 DOOLITTLE DRIVE .-~L._ ~ , Tecknici~(~ 'T,'v;,;"~',_~.,.,, ~75{,..,,-t SAN LEANDRO, CA 94577 ' ~ ~ . · i,/---~ 510/895-2333, EXTENSION 385 Signature ."',.~ :.::;- "" "' ""----'3Page 2 of 2 Revision 12195 Mechanical Leak Detector Test Data Sheet Test Information 1 ' I 5 ?rod, uct REG. UNLEADI NIDGRADE I.SUPREM[ I DI[$[L · OTHER ., ,E :,--¢",+Z...: I l:ull Operatin_ ?ressure~ (Dsi). ¢:->:-~'--' PSI Line Bleed Back (ml) [~-'<-. J i, .~, I ~ " '-'-' SEC,I J SEC SEC. SEC,; , SEC, i { · ; - . N:[eterin~ ?~essu~e (Dsi) .~1. PSi :F/'E ~oldin~?ressdre (psi) "3(~ PSi Tes~LeakRate(mYmin)(gph) I:~--~.HL/HINI \c,t) ML/MI~ ~ ML/MIN blL/MIi1! ML/MtN This lerner certifies tha~. the aD, ual le!k c2ersc.:c.: r~__:.:s were veE%,u-med at the above reference5 facilir, y according to the equipment manufacturers ' urcceaures and ii..-rJrarions and the results as listed :--s to my '~ox, I..~=,. and correct, lne mecnav:cM le:",: c~tec:.~r test pass/fail is aetemv_nea usin~ iow flow threshold t.,.ip rare of 3 gph at. 10 P~,.. Insoec-r. edBy: Contractor SCOTT CO. !717 DOOLiTTLE DR. SAN LEANDRO. CA 94577 (5!0/ 895-2333 · --,'~:,-- F'r".,Z ,-,. ,--- Lic ,-) TechnJcia-fi- ;,, .. ~...~ . i ~ / Sianature . ..., .... /. --t? R :'.'i~:.o n 13/95 ate Underground Hazardous Materials Storage Facility CONDITION p !, i , : EVERSE SIDE HAZARDOUS MAIERIALS DIVISION ' 1715 Chester Ave.. 3rd Floor ~;~ ~/~ P~,'~', ~ Approved by: Ralph E. Huey, Haza,dous Materials Coordinator Valid ,o~: 2,~ 1~ ~', fqq ~ to: 3,~1>~' /~ 7'~ APPLICATION '~ In conformity wid~ provisiom~o~pe~tinent ordinances, c~ . -. to di~, ~m, i~ll, ~,.~mte, ~11 m ha~le ~terials or ~ti~s ~ ~r~ ~ life or pr~ as foll~s: ~'~ inscallati~ of .ft~r glass pr~uct li~s at Arco Stati " '  CITY of BAKERSFIELD FIRE DEPARTMENT ~ FIRE SAFETY CONTROL & HAZARDOUS MATERIALS DIVISIONS 1715 CHESTER AVE. · BAKERSFIELD, CA · 99301 R.E. HUEY March 3, 1995 ~.B. TOBIAS, HAZ-MAT COORDINATOR FlEE MARSHAL (805) 326-3979 (805) 326-3951 Kateri Luka Arco Products Co. P.O. Box 6037 Artesia, CA 90702 RE: ARCO AM/PM #6115 AT 1501 CALIFORNIA AVENUE, IN BAKERSFIELD, CA Dear Ms. Luka: This is to inform you that this department has reviewed the results of the Additional Site Assessment dated February 10, 1995 associated with the above site. Based upon the information provided, this department has determined that appropriate response actions have been completed, that acceptable remediation practices were implemented, and that, at this time, no further investigation, remedial or removal action or monitoring is required at the above stated address. Nothing in this determination shall constitute or be construed as a satisfaction or release from liability for any conditions or claims arising as a result of past, current, or future operations at this location. Nothing in this determination is intended or shall be construed to limit the rights of any parties with respect to claims arising out of or relating to deposit or disposal at any other location of substances removed from the site. Nothing in this determination is intended or shall be construed to limit or preclude the Regional Water Quality Control Board or any other agency from taking any further enforcement actions. This letter does not relieve the tank owner of any responsibilities mandated under the California Health and Safety Code and California Water Code if existing, additional, or previously unidentified contamination at the site causes or threatens to cause pollution or nuisance or is found to pose a threat to public health or water quality. Changes in land use may require further assessment and mitigation. If you have any questions regarding this matter, please contact me at (805)-326-3979. Sin~:erely, Howard H. Wines, III Hazardous Materials Technician HHW/dlm cc: J. Castillo, RWQCB ARCO QUARTERLY REPORT By. Station No.: 6115 Address: 1501 California Avenue, Bakersfield, CA '-~ ARCO Environmental Engineer/Phone No.: Kateri Luka/(714) 670-5374 Consulting Co./Contact Person/Phone No.: SECOR/John Bollier/(714)379-3366 SECOR Project No.: N0600-002-01 Primary Agency/Regulatory ID No.: Bakersfield Fire Department/Howard Wines Other Agencies to Receive Copies: N/A WORK PERFORMED THIS QUARTER ]Fourth- 1994]: 1. Prepared Quarterly Report. WORK PROPOSED FOR NEXT QUARTER [First- 1995]: 1. Prepare Site Assessment Report for ARCO review. 2. Submit approved Site Assessment Report to BFD. 3. Prepare Quarterly Report. Current Phase of Project: Assessment (Assmnt, Remed. etc) Frequency of Sampling: None (Quarterly, etc.) Frequency of Monitoring: N/A (Monthly, etc.) Is Liquid Phase Hydrocarbon Present On N/A (Yes/No) Cumulative LPH Recovered to Date: N/A (gallons) LPH Recovered This Quarter: N/A (gallons) Bulk Soil Removed to Date: 600 (cubic yards) Bulk Soil Removed This Quarter: None (cubic yards) Water Wells or Surface Waters w/in a Radius & Their Respective Directions: None Identified (Distance and Direction) Current Remediation Techniques: N/A (SVES, LPH Removal, Permits for Discharge: N/A (NPDES, POTW, etc.) Approximate Depth to Ground Water: l g0-100 (est.) (Measured Feet) Ground Water Gradient: Smlthwe.qt (e~t) (Direction) 1 li~known (Magnitude) Summary of Unusual Activity: None Agency Directive Requirements: Submit Site Assessment Report ATTACHED: ' · Site location map (Figure 1). · Site Plan (Figure 2). 01.0GI5'1 6115q~.494 ~~ N06~2-01 Source: USGS-7.5 Minute series (topographic} ,nap, gosford Quadrangle; / photorevised 1973; Scale 1:24000 VICINITY MAP SECOR In[erna[ional Incorporated ARCO STATION NO. 13115 1501 CALIFORNIA AVENUE 5401 California Ave., Suite 300, Bakersfield, CA 93309 (805) 634-9541 BAKERSFIELD, CALIFORNIA DATE: [ FIGURE: CAD FILE:A22_A6115VM PROJECT #N0600_002_01 NOVEMBER 1994 I CALIFORNIA AVENUE ~ew Gasoline Former Gasoline B5 um~p .................................. P Stqra~e Tanks ~"'o ~ " '. '- ':' -<' B4" -.... ..' ~co s~I0~ NO. 6115 ~ Pump/ Equipment Island Enclosure~ , ~Enclosure ~Planter~ North LEGEND B6 Denotes Approximate Location I ' I · of Soil Boring 0 30 60 ~ > Denotes Approximate Location of Angle Boring and Trend. SITE MAP SECOR International Incorporated ARCO STATION NO. 6115 1501 CALIFORNIA AVENUE 5401 California Ave., Suite 300, Bakersfield, CA 9;3309 (§05) 6:34-9541 BAKERSFIELD, CALIFORNIA I DATE: l FIGURE: CAD FILE: Aaa-AOIISSM PROJECT # N0600-002-01 NOVEMBER 1994 2 DATE: tober 3l, 1994 ARCO QUARTERLY REPORT Station No.: 6115 Address: 1501 California Avenue, Bakersfield, CA ARCO Environmental Engineer/Phone No.: Kateri Lukad(714) 670-5374 Consulting Co./Contact Person/Phone No.: SECOR/John Bollier/(714)379-3366 SECOR Project No.: N0600-002-01 Primary Agency/Regulatory ID No.: Bakersfield Fire Department/Howard Wines Other Agencies to Receive Copies: N/A WORK PERFORMED THIS QUARTER [Third- 1994]: 1. Prepared Quarterly Report. WORK PROPOSED FOR NEXT QUARTER [Fourth- 1994]: 1. Prepare Site Assessment Report. 2. Request site closure from BFD. Current Phase of Project: Assessment (Assmnt, Remed. etc) Frequency of Sampling: None (Quarterly, etc.) Frequency of Monitoring: N/A (Monthly, etc.) Is Liquid Phase Hydrocarbon Present On-site: N/A (Yes/No) Cumulative LPH Recovered to Date: N/A (gallons) LPH Recovered This Quarter: N/A (gallons) Bulk Soil Removed to Date: 600 (cubic yards) Bulk Soil Removed This Quarter: None (cubic yards) Water Wells or Surface Waters w/in a 2000' Radius & Their Respective Directions: Unknown (Distance and Direction) Current Remediation Techniques: N/A (SVES, LPH Removal, etc.) Permits for Discharge: N/A (NPDES, POTW, etc.) Approximate Depth to Ground Water: 180-190 (est.) (Measured Feet) Ground Water Gradient: Southwest (est) (Direction) Unknown (Magnitude) Summary of Unusual Activity: None Agency Directive Requirements: Site Assessment Report due to BFD. (No date specified) ATTACHED: · Site location map (Figure 1). · Site Plan (Figure 2). arcog2:6115qtr.394 N0600-002-01 Source: USGS-7.5 Minute series (topographic) map, Gosford Quadrangle; i photorevised 1973; Scale 1:24000 VICINITY MAP SECOR International Incorporated ARCO STATION NO: 6115 1501 CALIFORNIA AVENUE 5401 California Ave., Suite 300, Bakersfield. CA 93309 (805) 634-9541 BAKERSFIELD, CALIFORNIA DATE: [ FIGURE: CAD FILE: A2~-^6115¥M PROJECT # N0600-00~-01 NOVEMBER 1994 1 CALIFORNIA AVENUE New Gasoline [orage Tanks Former Gasoline / .... eu'mp ' Stqrage Tanks B ARCO STATION BUILDING NO. 6115 Pump// Equipment Island Enclosure~ [/Trash 11 I ~Encl°sure --~ t f~Planter-~ North LEGEND B6 Denotes Approximate Location $ of Soil Boring 0 30 60 ~ Denotes Approximate Location of Angle Boring and Trend. SITE MAP SECOR International Incorporated ARCO STATION NO. 6115 1501 CALIFORNIA AVENUE 5401 California Ave., Suite 300, Bakersfield, CA 93309 (605) 634-9541 BAKERSFIELD, CALIFORNIA DATE: I FIGURE: CAD FILE: A22-A6115SM PROJECT # N0600-002-01 NOVEMBER 1994 "WE CARE" FIRE DEPARTMENT 1715 CHESTER AVENUE M. R. KELLY BAKERSFIELD, 93301 ACTING FIRE CHIEF June 1, 1994 326-3911 Kevin Hamilton Groundwater Technology 4101 Alken Street, Suite B-1 Bakersfield, CA 93308 RE: ARCO No. 6115, 1501 California Ave., Bakersfield, CA Dear Mr. Hamilton: This is to notify you that the workplan for the above stated address is satisfactory. Please give this office 5 working days notice prior to the commencement of work. As per our phone call this day, it is mutually understood that the scope of the workPlan involves defining the extent of the contamination plume beneath the North side pump islands as well as the former UST site. This is evidenced through the proposed slant boring exhibited in Figure 2, although not specifically referenced as the dispenser area in the text of the workplan. Please be advised that any work done that is not performed under direct over sight by this office will not be accepted, unless previously approved. If you have any questions, please call me at (805) 326-3979. Sincerely, Howard H. Wines, III Hazardous Materials Technician HHW/ed "WE CARE" FIRE DEPARTMENT 1715 CHESTER AVENUE M. R. KELLY BAKERSFIELD, 93301 · ACTING FIRE CHIEF April 4, 1994 326-3911 Stephen A. Bork Groundwater Technology, Inc. 4101 Alken Street, Suite B-1 Bakersfield, CA 93308 RE: Laboratory results from preliminary site assessment conducted at 1501 California Ave., Bakersfield, CA Dear Mr. Bork: Upon review of the recently submitted laboratory results from your facility, this office has determined that the extent of the contamination plume, associated with the fuel tanks previously located on your property, have not been adequately defined. This office requires (in accordance with Chapter 6.7 of the California Health and Safety Code and Chapter 16, Title 23 of the California 'Code of Regulations) that further assessment be done to define the vertical and horizontal extent of the contamination plume. Please submit a work plan for further assessment, to this office, with in 30 days from receipt of this letter. The work plan should follow guidelines found in: Appendix A - Reports, Tri - Regional Board Staff Recommendations for Preliminary Evaluation and Investigation of Underqround Tank Sites; January 22, 1991. Additionally, be advised that oversight cost for this project will be billed to you at a rate of $62.00 per hour. If you have any questions, please call me at (805) 326-3979. Sincerely, Hazardous Materials Coordinator REH/ed ~ ~ .~CO PRODUCTS COM~,NY -~ ~ DIV. OF ATLANTIC RICHFIELD COMPANY P 0 BOX 2570 ~ LOS ANGELES CA 90051 956000672 ATTN : ACCOUNTS PAYABLE DEPT. (213) 486-3383 . CITY OF BAKERSFIELD -Y- Invoice Date Invoice Number Description Net Paid 110993 ARC06115 ELLICH-CR343-FAC61'15-ST.SURCHG. $224.00 APPC-6048-C (6-90) Check No. 986556 Check Date 1 11993 Check Sequence No. 000596 Detach From Check Before Depositing .... ,-, ! ....... · .... · CITY of BAKERSFIELD "WE CARE" FIRE DEPARTMENT 2101 H STREET s. D. JOHNSON November 9, 1993 BAKERSFIELD,93301 FIRE CHIEF 326-3911 Bill Zapka Arco Products Co. P. O. Box 6038 Artesia, CA 90202 Dear Bill: We are in receipt of the S~ate Form C for 1501 California Avenue representing the completion of construction. A state surcharge of $56.00 per tani~2_4_~.~00~ total)..will be required before we can issue you an new operating permit. Please send a check for the state surcharge, payable to the City of Bakersfield, to 2130 "G" Street, Bakersfield, Ca. 93301. If you have any questions or if we can be of any further assistance please don't hesitate to call 326-3979. Sincerely Yours, Esther Duran Hazardous Materials Division /ed Environmental Health & Safety 17315 Studebaker Road Cerritos, California 90701-1488 Telephone 310 404 5300 ~ai~ing Address: [~o× (~038 Ar~esia, CalifornJe g0702-(~038 FIECEIVED October 14, 1993 FIAZ. MAT. DIV. Bakersfield Fire Department Hazardous Materials Division 2130 "G" Street Bakersfield, CA 93301 Gentlemen: Enclosed are four Form C's representing completion of construction at our facility listed below: ARCO Facility//6115 1501 California Avenue Bakersfield, CA 93304 Please call me at 310/407-2617 if I could be of further assistance. Yours very truly, Mary Lou Ellich Environmental Health & Safety /mle Enclosures APPC-7116 ARCO Products Company is a Division of AtlanticRichfieldCompany (6~92) C'.~RECTI~N N OT:jji~ E BAKERSFIELD FIRE DEPARTMENT Sub Div. [?~ ./ You are hereby required to make the following corrections at the above l~ation: Cot. No ~ . ~ / - Completion Date fo,' Corrections Date ~'-,/' < IZ~ Inspector 326-3979 ... UNDERGROUND STC INSPEC I,0Nzr ' ' . ' ". Bakersfield Fire Dept. \ !!:' Bakersfield, CA 93301 FACILITY NAME g~.C~ h~m~'~ BUSINES.~I.D. No. 215-000 c~ ~'/ FACILITY ADDRESS /--~'-O/ ~/). /')~ CITY j~/,,J?.~,~,~/J zIP CODE FACILITY PHONE No. ~D~ ~D~ INSPECTION DATE Product Product iI:~[oduct, TIME IN TIME OUT I),~ Insl Dal~ Insl Date ' Insl Dal~ INSPECTION TYPE: ~ov~A~ ~-/(,~ ~-/~ ~,;--~_~.~ /~¢~ /~'~ Size Size Size ROUTINE / FOLLOW-UP /(? ~no~=~ /~., REQUIREMENTS yes a yes no ~/a yes no ~rVa 1 a. Forms A & B Submiffed 1 b. Form C Submitted lc. Operating Fees Paid ~'" ld. State Surcharge Paid le. Statement of Financial Responsibility Submitted 1 f. Written Contract Exists between Owner & Operator to Operate UST 2a. Valid Operating Permit · , · 2b. Approved Written Routine Monitoring Procedure 2c. Unauthorized Release Response Plan 3a. Tank Integrity Test in Last 12 Months 3b. Pressurized Piping Integrity Test in Last 12 Months 3c. Suction Piping Tightness Test in Last 3 Years 3d. Gravity Flow Piping Tightness Test in Last 2 Years 3e. Test Results Submitted Within 30 Days 3f. Daily Visual Monitoring of Suction Product Piping r/' ~ ~' 4a. Manual Inventory Reconciliation Each Month 4b. Annual Inventory Reconciliation Statement Submitted 4c. Meters Calibrated Annually 5. Weekly Manual Tank Gauging Records for Small Tanks 6. Monthly Statistical Inventory Reconciliation Results 7. Monthly Automatic Tank Gauging Results 8. Ground Water Monitoring 9. Vapor Monitoring 10. Continuous Interstitial Monitoring for Double-Walled Tanks 11. Mechanical Line Leak Detectors 12. Electronic Line Leak Detectors 13, Continuous Piping Monitoring in Sumps 14, Automatic Pump Shut-off Capability ~ ~'" 15. Annual Maintenance/Calibration of Leak Detection Equipment 16. Leak Detection Equipment and Test Methods Listed in LC-113 Series 17. Written Records Maintained on Site ,~ 18. Reported Changes in Usage/Conditions to Operating/Monitoring Procedures of UST System Within 30 Days 19. Reported Unauthorized Release Within 24 Hours 20. Approved UST System Repairs and Upgrades 21. Records Showing Cathodic Protection Inspection 22. Secured Monitoring Wells 23. Drop Tube RE-INSPECTION DATE ~ /~ ~ RECEIVED BY. FD 1669 (rev. 9t INS~TIC)N. mjj~ ' ~,, Bakersfield Fire Dept. HAZARDOUS MATERIALS . ' ~'~ OPFICE OF ENVIRONMENTAL SERVICES 1715 Chester Ave. Bakersfield, CA 93301 Date Completed Business Name: Location: I_~'tS! ~.~, ~___ Business Identification No. 215-000 "'J_~_ (Top of Business Plan) Station No. Shift~__ Inspector Arrival Time: Departure Time: Inspection Time: Adequate Inadequate Adequate Inadequate Address Visable I]3'" I-I Emergency Procedures Posted ~ [3 Correct Occupancy ~ r'l Containers Propedy Labled Verification of Inventory Materials ~ [] Comments: Verification of Quantities ~ [] Verification of Location ~ [] Verification of Facility Diagram Proper Segregation of Matedal 1:3..// [] Housekeeping Fire Protection Comments: Electrical Comments: Verification of MSDS Availablity ~ [] Number of Employees: UST Monitoring Program Comments: Verification of Haz Mat Training ~ [] Permits Comments: Spill Control Hold Open Device Verification of Hazardous Waste EPA No. Abbatement Supplies and Procedures ~ i-I Proper Waste Disposal Comments: Secondary Containment ~ r"l Secudty Special Hazards Associated with this Facility: Violations: ~$e/".. S / _ All Items O.K Business O~anag~ PRINT NAME SIGNATURE Correc~on Needed ~ite-H~ Mat Div. Yellow-Station Copy Pink-Business C~y Environmental Health & Safety 17315 Studebaker Roadt Cerritos, California 90701-1488 Telephone 310 404 5300 il ~ai~ing Address: Box 8038 0CT ~ 8 1993 Ar~®sia, California 90702-6038 OctOber 25, 1993 CERTIFIED MAIL P 046 870 883 Mr. Ralph E. Huey Bakersfield Fire Department Hazardous Materials Division 2130 'G' Street Bakersfield, CA 93301 Dear Mr. Huey: RE: TANK, LINE, AND LEAK DETECTOR TESTS ARCO #6115 - 1501 California Ave., Bakersfield, CA 93304 This letter is to notify you that the tank, line, and leak detector tests at the above ARCO facility passed the system test, as noted in the attached test results for the underground storage tank and line system. ARCO is committed to the compliance of all environmental laws that govern the safe operation of underground storage tanks. Feel free to call me at (310)407-2610. Sincerely, ARCO Products Company A Division of Atlantic Richfield Company C. A. Holman Environmental Compliance Engineer CAH:dds Encls: cc: ARCO Dealer File APPC-71 16 ARCO Products Company is a Division of AtlanticRichfieldCompany (6-92) Trianq le Environmental . Inc. 172 West Verdugo Avenue, Burbank, California 91502 (818) 848-7028~ TEl S'YS-[EM 4088 SUMMARY SHEE-I- Precision Underground Storage Tank System Leak Test WO#: N 1694 'lient: ARCO PETROLEUM 17315 STUDEBAKER RD. CERRITOS, CA. 90701 _. D~te: 10-9-95 County: KERN CO Site: ARCO #6115 1501 CALIFORNIA AVE. BAKERSFIELD ~ CA. ' Yank Product Tank Tank/Lines Product Line Leak # Description Capacity Rate/Result Rate/Result Detector 1 MID GRADE 10000 +0.017 PASS -0.008 PASS PASS 2 TK~I UNLEAD 10000 -0.044 PASS -0.010 PASS PASS 5 TKO2 UNLEAD 10000 -0.008 PASS -0.010 PASS PASS 4 PREMIUM 10000 +0.058 PASS -0.005 PASS PASS 5 6 Signature:~~ _ _ ~ Tech. License #: 90-1072 y~~'~ Technician Name: J, RICH Date: ~--/0- ~ £ommen t s: ~l-his precision tank testing system exceeds the criteria required by \Local, State and Federal NFPA g329 and EPA UST Technical Standards Part ~80 for precision testing systems. BAKERSFIELD FIRE DEPARTMENT HAZARDOUS MATERIAL DIVISION 2130 G Street, Bakersfield, CA 93301 (805) 326-3979 APPLICATION TO PERFORM A TIGHTNESS TEST PERMIT TO OPEm~TE # ! ~,O O 0 V C_ OPERATORS NAME ~~ ~/~ ~;~O O~ERS N~E :/~.~'C O ~BER OF T~S TO BE TESTED ~ IS 'PIPING ~ING TO'BE TESTED__ TANK% VOLUME CONTENTS I io/~ SI~'L-- TANK TESTING COMPANY ?-~/~ ~...6L.d- TEST METHOD ~i DATE & TIME TEST IS TO BE CO~UCTED ~ / TRI~qN(~LE ~NVI)~ONMEN?~L, INC, ,,-, ~ ~m _£ ........... ~_=_ CALIFORNIA AUE Site Lauout Fo~: ARCO )6115 1581 CALIFORNIA flU, BflXERSFIELD, CA 'f'ANI( I NFORMA'f' I ON: Product : IdID-GRAD Date~ 1~/~9/95 Capacity : 10~00 ]"ime~ 12~:,;~:~ PRODUC"I" I NFORMAT I ON: Diameter (in.) : 92 Product Level (in.) ~ 140" above tank bottom. % = 100.0 Specific Gravity : 0.750 []oe~~. of Expansior~ : 0.00~6582 .. Water on Tank (in.) : 0" above tank bottom. : Starting Temp. (F) : 76.445 Resolution (Gallons): 0.0000337 Head Pressure (PSI) ~ ~.8 at tank' bottom Delta Temp. (F/Hr.) : -~.0~54 ' COMPUTER ANAL. YSIS RESULTS: Level Rate (GPH) = -0.005 Temp. Rate (GPH) .... 0.022 Final Rate (GPH) = 0.017 I"ANK I Nf"'ORMA'I" I ON: Product : 'T'K~i-UNI.. Date: 10/09/97."; Capacity : 1000~ Time~ 09~51~15 PRODUCT INF'ORMATION: Diameter (in.) : 92 Produc.'.t Level (in.) : .1.4~" above tank bottom. % = ],~.0 Specific Gravity : ~.'75~ Coef. of Expansion ~ ~.~6561 Water on Tank (in.) : ~" above tank b~ttom. Starting Temp. (F') : 79.98~ Resolution (Gallons): ~.~14 Head Pressure (PSI) : 3.8 at tank bottom Delta Temp. (F/Hr.) : 0.0099 50MPL;TEF( ANAL. YSIS RESULTS: Level Rate (GPH) = ~.~2~ 'T'emp. Rate (GF'H) = G.~64 Final Rate (GPH) = -~.~44 TANK INFORMATION: Pr'oduct : TK~2-UNL Date:..,: Capacity : J. 8~8~ Time: 89:51:15 PRODUCT INFORMATION: Diameter (in.) : 92 Product Level (in.) : 14~" above tank bottom. % = 1~.~ Specific Gravity : ~.75~ Coef. of Expansion : ~.~659~, Water on Tank (in.) : ~" above tank~-bottom. Starting Temp. (F') : 74.766 Resolution (Gallons): ~.~261 Head F'ressure (PSI) : 3.8 at tank bottom Delta Temp. (F/Hr.) : COMPUTER ANALYSIS RESULTS: L. evel Ra~e (GF'H) = ~.2~ Temp. Rate (GPH) = ~.2~8 Final Rate (GPH) = -~.~8 I"ANK INFORMA'I"ION: Product : PREMIUM Date: 10109/93 Capacity : 10000 Time: PRODUCT INFORMATION: Diameter (in.) : 92 Product Level (in.) : 148" above tank bottom. % = 188.8 Specific Gravity : ~.75~ Coef. of Expansion : ~.~66~9 Water on Tank (in.) : ~" above tank bottom. Starting Temp. (F') : 74.214 Resolution (Gallons): 8.8888257 Head Pressure (PSI) : 3.8 at tank bottom Delt. a 'l"emp. (F/Hr.) : 8.8874 C[]MPlY'[EI:~ ANALYSIS RESULTS: Level Rate (GPH) = Temp. Rate (GPH) = 8.848 Final Rate (GPH) = 8.8~8 Triangle Environmental, Inc. 172 West Verdugo Ave., Burbank, California 91502 FTA LEAK DETECTOR TEST DATA SHEET Product Serial Number Drain ~rip Test Funct. Tripping Pass Type Detector Style Back Time Rate Ele~ Pressure or mi sec ml/min psi psi Fail DLD PLD XLD XLP VPR DLD PLD XLD XLP VPR I certify the above tests were conducted on this date according to the equipment manufacturer's procedures and limitations and the results as listed are to my knowledge true and correct. Technician: .:/~J The mechanical Leak Detector Test pass/fail is determined using a low flow threshold trip rate of 284 ml per minute or less at 10 psi as set by Red Jacket Pumps Field Test Apparatus testing procedure. Copyright (c) , Triangle Environmental, Inc., January 1991. MRL Triangle Environmental, Inc. 172 West Verdugo Ave., Burbank, CA 91502 T.£.I LT-3 Hydrostatic Product Line Test Result Sheet START TIME END TIME TEST VOLUME PRODUCT /READING /READING PRESSURE RATE RESULT PASS/ 00:00/ML 00:00/ML (psi) (GPH) FAIL /~,~ t ~ ,' ~)/,~ ._ I certify that the above line tes%s were conducted on this date according to the equipment manufacturer's procedures and limitations and the results as listed are to my knowledge true and correct. Tech. : Mfr's Cert.# NOTE: The test data collection time period must be fifteen minutes. The test pass/fail is determined using a threshold of 190 m~ per hour (0.05 GPH) rate at 150% working pressure or 50 psi which ever is less. The GPH rate is calculated as: ml/ 0.00106. Copyright (c) Triangle Environmental, Inc., March, 1992. MRL BAKERSFIELD FIRE DEPARTMENT HAZARDOUS MATERIAL DIVISION 2130 G Street, Bakersfield, CA 93301 (805) 326-3979 APPLICATION TO PERFORM A TIGHTNESS TEST PERMIT TO OPE~TS ~ / 7'900 ~ ~ ~ER OF T~S TO BE TESTED ~ IS PIPING ~ING TO'BE TESTED T~% VOL~ CONTE~S TANK TESTING COMPANY .7'~/~'~.6£d- s~s ~S~ON ~ ~t--Io'7.~ DATE & TIME TEST IS TO BE CO~UCTED /O 10-07-1993 12:00PM TRIANGLE ENVIRONMENTAL 180532605?6 P.01 TRIANGLE ENVIRONMENTAL, INC · FACSIMILE TRANSMITTAL FOEM DATE: 10/07/93 NUMBER OF PAGES: 2 INCLUDING COVER SHEET TO: DANA HAZARDOUS MATERIAL DIVISION FAX $:(805) 326-05?6 TRIANGLE ENVIRONMENTAL, INC. DAVID DUKE TEL:(818) 840-7020 172 W. VERDUGO AVE. FAX:(818) 840-6929 BURBANK, CA 91502-2132 HESSAGE: COPY OF CHECK #3590. 10-07-1995 12:00PM ~TRIANGLE ENUIRONMENTAL 18055~60576 P.O~ i TRIANGLE ENVIRONMENTALw INC. 203 N~h Glendale Avenue CITY of BAKERSFIELD "WE CARE" August 13, 1993 FIRE DEPARTMENT 2101 H STREET S. D. JOHNSON BAKERSFIELD, 93301 FIRE CHIEF . 326-3911 Dan WilkensOn 1217 Sara Toga Ave. Ventura, CA 93003 Dear Mr. Wilkenson: Enclosed please find the approved site.?lans for the Arco Station at Union and 34th (Station Cf 3090) and 1501 California Ave. (Station # 6115). This constitutes approval of the Underground 'Storage Tank System, including all piping. However if any electrical approval is needed for these projects they will have to be obtained separately through the City of Bakersfield Building Department. I have also enclosed copies of the approved UST removal permits and UST construction permits as required. Please note that the permit to remove the tanks at these facilities is approved but.incomplete. We will obtain the information from the contractor on a) insurance, b) preliminary assessment information, c) tank cleaning and tank transporter, prior to any work on that site. Sincerely yours, REH/ed UNDERGROUND STORAGE TANK UNAUTHORIZED RELEASE (LEAK) / CONTAMINATION SITE REPORT EMERGENCY HAS STATE OFFICE OF EMERGENCY SERVICES i!::'FOR LOCAI~'AGENCYiUSE YES NO ~ ADDRESS ~ ADDRESS ~ CROSS STREET z (1) NAME OUANTI~ LOST (~LLONS) z UNKNOWN ~ ~ UNKNOWN ~ DA~ DI~HARGE BE~N M~HOD USED TO STOP DISCHARGE (CHECK ~L ~AT ~PLY)~ "1 "1 ~1 ~1 ~1 ~1 U.~.OW. ~ REMOVE CONTENTS ~ CLOSE TANK& REMOVE ~ REPAIR PIPING HAS DISC~RGE BEEN STOPP~ ? ~ REPAIR T~K ~ CLOSE TANK & FILL [N P~CE ~ CHANGE PR~EDURE SOURCE OF DI~HARGE CAUSe(S) ~ m CHECK ONE ONLY ~ UNDE~RMINED ~ SOIL ONLY ~ GROUNDWATER ~ DRINKING WATER - (CHECK ONLY IF WATER WELLS HAm ACtuALLY BEEN AFFEC~D) CHECK ONE ONLY ~ ~ NO ACTION TAKEN ~ PRELIMINARYSI~ASSESSMENT~RKP~NSUBMI~ED ~ POLLUTIONCHARACTERI~TION ~ REMEDIATION P~N ~ CASE CLOSED(CLE~HP~MPLE~DOR UNNECESSAR~ ~ CLE~UP ~NDERWAY CHECK APPROPRIATE ACTION(S) ~ EXCAVATE & DISPOSE (ED) ~ REMOVE FREE PRODUCT (FP) ~ ENH~CED BIO DEGRADATION {1~ ~O ~ CAPSI~(CD) ~ EXCAVATE&TREAT(E~ ~ PUMP&TREATGROUNDWATER(G~ REP~CE SUPPLY (RS) HSC ~ (~ I NSTRiJCTIONS EMERGENCY Leak Bein~kConfirmed - t,e~k ~uspected at site~ but has not been confirmed. indicate whether emergency response persoanei and eq~:ipment were involved Preiimina~'z Site Assessment Workplan Submitted - workp].an/proposgl at any t,i~ne, if so, a ffazardous Material. incident Report should be filed requeste~ of/submitted by re~ponsible party to determine whether ~round: with the Stale Office of Emergency [fervices (OES) at 2800 Headov~,iew Road, water has 10een~ or will be~ impacted as a result of the release. Sacramento, 'CA 958~g. Copies of the OEg~repor% forum may be o~tai~ed at Preliminary Site Assessment Underwa~ - zmplementation of workp!.an. your local underground ~torage t~nk permitting agencv~ indicah~ ¥+hether Fo!iution Characterization res';~onsib!..e party is in the ~rocess of the OES report has been filed as of. the date of h~Js report.-, defining the extent of contamination in soil and ground water and assessing impacts on surface and/or ground water. I,OCAL AGENCY ONLY Remediation Plan - remediatian plan submit,0ed evaluating long term Yo avoid dup!icahe notification pursuant to Health and Safety code Section zamediation options. Proposal and implementation schedule for appzopl:iate 25180.5, a government employee should sign and date the form in this.block, zemediahian options aisc submitted. A signature here does not mean that the leak has been detemnined to pose a Cleanup U'nderwav - implementation of remedi, aticn plan. significant threat to human health or safety, only that notification Post C~eanuR Monitorim~~ss periodic ground wa%er or o~her -. procedures have been followed if requmred.., monitoring al site~ as necessary, to ve~hj-~'~ and/or evaluate e~.fe:~rveness' ~ of remedial activities. REPORTED BY Case Closed - regional ~oard and ]coal al~e!~cy i.n concurrence %h~L youm name~ telephone number, and address. Indicate which party you further work is necessary at the site. 'epresent and provide company or agency name. !HPORTANT: THg iNFO~iTtON PROVIDED ON TBiS FO~d iS INTENDED FOR RESPONSIBLE PART~ STATtSTiCf~ PURPOSES O~LY AND !S NOT TO BE CONSTRUED AS REPRESENTING THE Enter name, telephone number, contact person and address of rj%e p?u?ty OFFiCI~ POSITION OF ANY ~3V~R~ ME~ AGENCY responsible for the leek, The r~[sponsible party would normally be the tank o~mez, REMEDIAL ACTION ~ indicate which action have been used %0 cleanup cz remediate ~he leak. SITE LO,~A~N Descriptions of options feliow~ Enter information regarding the t~r~_facitity. At a minimum, you must provide the facility name a~d full address. '. Cap Site - install horizontal impermeable layer tc reduce rainfall infiltration. IMPLEMENTING AGENCIES Containment Barrier - install vertical dike to block horizontal movement of Enter n~es of the locJi ageucy and Regional Water Quai. ity Cantzol Board contaminant. involved, ~ Excav~te and D~s~%~ .- remove contamznated soil and di. spose in approved SUBSTANCES INVOLVED . . Ercavate and Treat - z~move contamin~ted soil add treat (includes spreading Enter the name and ~uan~[.ity. l. ost of the hazardous substance involved. Ro'om or land ~a~ ~ ."'ant', ~. is provided for information on two substances if approDriate~ If more than Remove Free Product remove floating product, fron~ water table. two substances leaked~ list the two of mo:~t concern fo~ cleanup. Pun= and Treat Oroun~water - generally crop,eyed to remove dis~;oived cont~ninants. DISCOVERY/ABATEMENT u Enhanced [$iode~radar, ion- use of uny availab}e technology to Provide infozm~tion reg. ardi~g tJ~e discovery and ahatema, nt of bye leak. bacterial decompos~tJoa ti contentments, ~:l~.~J.>l provide alternative w:i~ter supply to affected .>OU~/~A~Sz, Treat,sent ~ ~;~oekuo - install water breabm~n% devices at each dwelling or indicate source(a) of leak. Check box(es).}ndicatzng cause of ie~k. other l.,]aae of use. Vacu~m E~.ract - use p~aps or biowera to ~raw air through soil. CASE %YPE Vent Soil ~ bore holes in soil to ~[!ow volatilize%ion of contaminants. Indicate the ease typ~[ category for t}.rJs leak. Check oI~e bo~ on,ky Cas~· No Action ~eqn~red - incident is minor~ requiring ~o remedial action. type i5 based cn the .~ost sensitive resource affected. For example, .~f both soil and ground water have been affected, case type will be 'Grou~d CO~ENTS - Use .bi~ ~paee to elaborate on any as~?c%s of the incident, Water". indicate "Orinkin~ Water" onl.y if o~e or more municipal or domestic water walls ha'ye actua~!y been affected. A "Ground Nater" SIGNATURE - Si~3~ ~>he form in the space provided. designation does mot P~" that' the affected wac. er cannot be, o~: [~ not used for drinking water, bet only that water wells have not yet teen DIST}fiiBU'flON a~.fe~teu, .~t is understood that casf~ type may change upon furthest i~' the f'orm is co~pieted by thc tank o?~]er or ills a~3ent.~ reLazn the las% copy for distribunLcY~, ~,~u{r,~= STATtS l, Original I,ocal.Ta~k Perm!ttJns A~ency indicate the category which best describes the current, status of the case. ~. o~ate . a,,o~ Reao~lrc~%s Control_ ~oard~ [}lvif:~i.O~l Of Ci. ean Water Pro?;rams~ Cheek eno box only. !bp response should be relative to the case type. Fo}: gnder~round Storage Tank Program, P.O. !~ox 9/~A212 $acram~ute exam~}le~ if case hype is "Groumi Water"~ %hen "Current Status'" shou]~i ~"~ ' 2 to the status of the. ground water {nvestisaainn or cleanup, as cE}posed to 3, Regional Wab~rr Quai!ty Centroi Boazd that of soiL, Descriptions of options follow: 6, Local HenLbh Offiter and County [~oard cf Supervisors or their de~i~},'~?e to receive-P~ropesit, ion 65 notifications. N~l. Acr<jo__l!..T_fl~!e}_O* - No ac~{eu ~}!'_ been talon by re::;pOns{b]_e pa~:ty beye~h~ 5, (Z?ner/respen:~:.~l_e Environmental Health & Safety 17315 Studebaker Road Cerritos, California 90701-1488 Telephone 310 404 5300 ~ ~~[j[ ~ai~ing Addr®ss: ~ox 6038 Ar~esia, Cs~ifornia 90702-6038 August 3, 1993 CERTIFIED MAIL P 689 781 451 Mr. Joe Dunwoody Bakersfield Fire Department ~0~ 5 1993 2130 'G' Street HAZ. tvlA T. DIV. Bakersfield, cA 93301 Dear Mr. Dunwoody: RE: TANK, LINE, AND LEAK DETECTOR TESTS ARCO #6115 - 1501 California, Bakersfield, CA This letter is to notify you that the tank, line, and leak detector tests at the above ARCO facility passed the system test, as noted in the attached test results for the underground storage tank and line system. ARCO is committed to the compliance of all environmental laws that govern the safe operation of underground storage tanks. Feel free to call me at (310)407-2610. Sincerely, ARCO Products Company A Division of Atlantic Richfield Company C. A. Holman Environmental Compliance Engineer CAH:dds Encls: cc: ARCO Dealer File APPC-71 16 ARCO Products Company is a Division of AtlanticRichfieldCompany (6-92) · ' LRAK DW.T~CTOR TEST Date: No.: ~,/, /.S- .' DBA: tress: /Ko/ ntractor: ~~ ~ Job No. ( Print ) Full Line Simulated Line ~duet Pumpblock Model Pressure (PSI) Leak Test Seals Corrections Mad( O - Outside ~1 o i Leak Detector M - Middle o, z o, ~. Open Close ~ & Impact Valve I - Inside ~ ~~. Max. 12 Min. 26 Pass I Fail . (Date) ,reme I ~ ~' /' ~Y I I .... I I , I I . ! ,er { I { ' -- { I ' I I , I , , ' 4 .,- Data Chart for TAnk System Tightness Test PL~SE PRINT STATION#~ OPERATOR WHO REOU ? w. ,.., ,, ESTED o,,, TEST AND WHEN I } 5. TANK NVOLVED I I'~' .5 I .... ~.. FILL-UP / "" '~ ' ' ""' .... " · / "~"~0'~"~ ~tt ~ of ~'tifomia Paul Fe~eira (5101 834-2333 MECHANICS, / SC 0~'~'- SERVZC~ ?~.: ,, ~.,.. . INFORMATION OR REMARKS / ' OUIOK GH~K ~000 [,12 SENSOR I 13. CONTRACTOR CERTIFICATION f. . 'CERTIFICATION / ~-- 27, s,n~o, cah~,a,o. ~ / ~ 30. ' .TO~OST^tm 31. 34. 39. LOG OF IESr Pfl~ECuRES CONIfl~ tiE'ilO lO ~1 GAL. USE fACf~ lefl~h OI lint II PRODUCT ~C' ' ' < [~:'%~ ~RI~D AT.~SITE,RE~O~D STAR~ CIRC~ATION 1ST THERMO READING START 42' HIGH LEVEL TES 1ST HIGH LEVEL CONT'D HIGH LEVEL READIN~ DROP TO LOW LEYET,,W^IT START LOW LEVEL TEST 1ST" LOWLLEVEL.' READING CONT'D LOW LEVEL READING STOP TEST P-T Tank Test D-la Chart 2. SlAlomant: II II the reaponlibilily of the owner and/or oper.tor oi lhla Addlllonal Info {~. TAn~ end producl handflng eyatom hal been le~led Ilghl according Io Ihe Preclslon Test Criteria al eslabltshad by Implledhaz~rdlnelhepos=lblllWofanyfeporllblapoIlullonlo I. Nel Volume Ch~ge II ~ncluz;on Of Pfecis~ Tell ~gph OR ~gflllure Of Tester: ,~ ( :' [~ ~ ~ . ~ Tank and product hahdling syslem has tailed the tank Ilghtflesl .~' n,~ %% regulatory agency. ' Oale: OR -. ,- Data Chart for Thnk System Tightness Test ~s~P,,,, STATION~, ~ /( i~ DATE ~ *~-~ OWNER ~0~ OPERATOR TEST WHO REOUESTED TANK INVOLVED *-. .'/' LLATtON ,..i~ ~,,~/ .. UNOERGROUNO WATER ~ .......... .*, ........,.d./Z:/ ',~ ' ' ~,,. CONTRACTOR, 10. OTHER Usinq ~-2'000 ~ Pet~Tite Self ~v~ers INFORMATION OR REMARKS / ~'~' 1919 t.1A~T STI. IOA~AND. CA' o~n7 ~4. PRODUCT ~ C~ c~,,~, p,, ,. ARRIVED AT.:SITE,REMOVED SET-UP EQUI P~tENT START CIRCULATION 1ST THERr40 READING ST.~_RT 42' HIGH LEVEL TES! 1ST HIGH LEVEL READING CONT'D HIGH LEVEL DROP TO,LOW LEVEL,WAIT 1 START LOW LEVEL TEST 1ST' L'OW~ &EVEL.' READING CONT'D LOW LEVEL READ] - 0'~ STOP TEST P-T Tank Test Dale Chart 2. $1alemont: II I~ lbo relponllbllity ot the owner end/or operltor of thll Additional Info ~ Tao~ and producl handlln~ sy=lom ho~ been tested Ilghl lyslem Io Immadl.laly.dvlso slale ind local aulhotlllel al any Net Volume Cha~;e ~r ConclusiOn of Pr~s~n~lsl ~gph OR anYenvlronment.responslblllly or liablllly for .ny loss of product to the ,.. Data. Chart for TAnk System Tightness Test .L~S~..,.~ STATIOn~~. ( ,",'~ DATE ('~' q~.- ~. 0wN~R ~.~ , ....... 4. WHO REOUESTEO 15. TANK INVOLVED ~ 6. INSTALLATION ~ ..... i WATER "' ~:~; AR~NGEMENTS ~,,..,~ ,. ~m .,r ~ ........... '~ 9 CONTRACTOR. > MECHANICS, ) lO, OTHER 'Usinq ~-2~6 ~ Pet~-Tite self . ~<12. SENSO~ 13. CONrI1ACIOR CERTIFICA'rlON - . ;, ..,. SCOTT C0f. IP~ h,,,,~ ~ ~,~d~ [,;] ~ .......... ~'~' 1919 1.1AR~T ST. ~OA~,AHD. eA 27. $4flsoe CShlX&llen / ~ 30. IIY~OSIA, IIC 31. 34. 38. #ET vo~.uuE 39. PRODUCT ARRIVED AT.~SITE,REMOVED SET-UP EQUIValENT START CIRCULATION 1ST THERMO READING START 42' HIGH LEVEL 1ST HIGH LEVEL READING CONT'D HIGH LEVEL READING DROP TO LOW LEVEL,WAIT START LOW LEVEL TEST 1STLOW~&EVEL-'READING CONT'D LOW LEVEL READING STOP TEST P-T Tank TosI Data Chart 2~tnlomont: It Is Ihe reaponlibllity al the owner Ind/or operltor o! thll Additional Info ~'T°ni end product handling system has been tested tight system toImmedlltelyadvlse slelelnd according Io Ih$ Precision Tosl Criteria BI eslablllhed by Imprledhezardandlhlposslbllltyolany/epo~lablepollutlonlo 0 ~ al a leak. system. The manulaclurer of Ibis test method does hal isluml ' '! ~ G ~ any responsibility of liabillly lot Iny loss OI product lO the 1. Nel Volume Change It C~clullon al Pre,lies Tesl ~gph ' lest according to the P~ecision 'test Criteria as established by / ~ ~, ~. ~ ~ regulato~ agency. ' . 'tank Ownet/Ope~ Date: ~ Tesl invalid due to environmental or mechanical factors beyond Date control of tl~e testing equipment. ..) DATA CHART For Use With 10 W~THER ' ~ ~ TEMPE~TURE IN TANK~ 'F 'C OVER UNE~ ~ ~ ~ APPROXIMATE ~ ~ BURIAL DEPTH EACH LINE (MILITARY) AMBIENT TEMP[RATUR~ ~i OR kPa R~DING N~ CONCLUSIONS. REPAIRS AND COMMENTS &S TESTEDI I W~TH[~ [TC BEFORE A~[R J ~EFORE A~ER CHANGE I I D PAINTED FOR CONCEALMENT (IF REOUIRED)~m VAPOR RECOVERY P,P,NG FOR FU TU RE EX~lr~,ON. ;D AT' FUTURE DISPENSER LOCATIONS. ~ ~FOR TANK ELEVATION. (SEE GENERAL NOTES) NS AND INSTALLATION INSTRUCTIONS, CONTRACTOR SHALL TANK SUMP TO THE VAPOR RECOVERY MANIFOLD, MAIN )R SHALL PROV1DE AT LEAST 4 FEET OF STRAIGHT FRP PiPE OF MORE THAN 30 DEGREES. · K MANHOLES AND INSPECTION WELLS, INSTALLATION NOTES JBLE WALL TANKS WiTH "A.P.I." ALARM SYSTEM. -INISH GRADE. £ TANK SLAB. SET MANHOLE COVERS H "RED JACKET"/"TOKHEIM" YUNE.SLOPE ~/4' PER FOOT TO TANKS. ~ODUCT LINES, LINES TO BE EQUIPPED WiTH FTACHED TO TANK WiRED FOR TURBINE SHUT DOWN. ANUFACTURER'S RECOMMENDATION. ~M CONTROL BOX MODEL ~ X76S IN BUILDING. LINES. SLOPE 1/'4' PER FOOT TO TANKS. · UBMERSIBLE PUMP POWER. /E SIPHON LINES AS SHOWN ON DETAILS. ISLANDS H~RDQUS' MATERIALS ~ISION .. UNDERGROUND STOOGE TANK PROGRA~ PERMIT ~PPLICATION FOR REMOVAL OF'AB'UNDERGROUND STORAGE'TANK TANK OWNER/OPeRA, OR ~.~ ~~ F~. fl~No. ~t02 qO¢ MAILING ADDRESS ~.~ ~ CIW ZI~CODE ~ CONTRACTOR INFORMATION ~ COMPANY . PHONE No. LICENSE No. ADDRESS ~ CIW ZiP CODE INSURANCE CARRIER . WOEKMENS COMP No. ~ PRELIMANARY ASSEMENT INFORMA~N' INSURANCE ~ARRIER · · WO~NS ~OMP N°. ' ~ TANK CLEANING INFORMATION COMPANY PHONE No. ADDRESS Cl~ ZIP CODE WASTE TRANSPORTER IDENTIFICATION NUMBER NAME OF RINSTATE DISPOSAL FACILI~ ADDRESS CI~ ZIP CODE FAClLI~ INOENTIFICATION NUMBER ~ TANK ~ANSPORTER.INFORMATION COMPANY PHONE No. LICENSE No. ADDRESS CI~ ZiP CODE TANK DESTINATION TANK No, AGE VOLUME CHEMICAL DATES CHEMICAL  STORED ST~RED PREVIOUSLY STORED I THE APPLICANT HAS RECEIVED, UNDERSTANDS, AND WILL COMPLY WITH THE A]'rACHED CONDITIONS OF THIS PERMIT AND ANY OTHER STATE. LOCAL AND FEDERAL REGULATIONS. THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT. ' PPRJOVED B,~ APPLICANT NAME. (PRINT) ' APPLICANT SIGNATURE _. .... ..TH/_S- ~APPLICATION.BECOMES A PERMIT-WHEN APPROVED .... :': .... '.' MAKE CHECKS PAYABLE TO THE "CITY OF BAKERSFIELD" STATE OF CAUFORNIA ........ sTATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B COMPLETE A SEPARATE FORM FOR EACH TANKSYSTEM. . MARK ONLY ~ I NEW PERMIT [] 3 RENEWAL PERMIT [] 5 CHANGE_ OF INFORMATION ,%:, ~'~RMANENTLY CLOSED ON SITE ONE ITEM [] 2 INTERIM PERMIT [] 4 AMENDED PERMIT [] 6 TEMPORARY TANK CLOSURE = , ~ 8 TANK REMOVED DBAOR FACILITY NAME WHERE TANK IS INSTALLED: ~ ~ ~' I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNOWN .· c. DATE ,,STALLED MO AWEARI /..Z-- ? ? D. TANK C AOTY ,N GALLONS: II.TANKCQNT'ENTS IFA-liSMARKEO, COMPLETEITEMC.' '*'::* ": *:" ""' ' .... '' '~ ;:~ ¢' "* .... :' "* · r--~; REGULAR ~ 3 DIESEL : [] 6 AVIATION GAS [] ~ PETROLEUM I----~ ~0 EMPTY .... :: -" P.ODUCT- '·~'i-'1 ~PREM~U~..' [] 7 M~.ANOL [] 3 CHEMICAL PRODUCT [] 95 UNKNOWN I-' [] 2 WASTE' ['-'~ 2 LEADED [] 99 OTHER (DESCRIBE IN ITEM D. BELOW D. IF !S NOT MARKED. E,TER NAME OF SUBSTANCE STORE C.A.S.,: II1. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A, B, ANDC, ANOALLTHATAPPLESlNBOXOANDE A. TYPE OF ' [] ,~,J~UBLE WALL [] 3 SINGLE WALL WITH EXTERIOR LINER -. [] 95 UNKNOWN SYSTEM ~ 2,,~5'~NGLE WALL -- [] 4' SECONDARY CONTAINMENT (VAULTED TANK) [] 99. OTHER ~1 EARN STEEL [] 2 STAINLESS STEEL [] 3 FIBERGLASS [] 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC; B. TANK MATERIAL [] 5 CONCRETE [] 6 POLYVINYL CHLORIDE [] 7 ALUMINUM [] 8 100% METHANOL COMPATIBLE W/FRP (PrlrnaryTartk) [] 9 BRONZE [] 10 GALVANIZED STEEL [] ~5 UNKNOWN [] '99 OTHER [] ~ RUBBER L,NED ~__~O L~,,NG [] ~ EPOX~ L,NING [] · P"ENOL~ L,N,NG ,. C'INTERIOR [] 5 GLASS LININGI__..~S UNUNED [] 95 ~NOWN [] 9g OTHER LINING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? YES__ __ '' D. CORROSION [] ~ POLYETHYLENE WRAP ~,.._~.~ATING ' [] 3 VINYL WRAP' ['---['. 4 FIBERGLASS REINFORCED PLASTIC PROTECTION [] 5 CATHOOICPROTEC~ION L_~ 91 NONE ." [] 95 UNKNOWN . [],:,.9?,.O.~.tER E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) ~ OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) IV,'PIPING INFORMATION - c~RCL~ A IFABOVE GROUND OR U IF UNDERGROUND BOTH IF APPLICABLE - A. SYSTEM TYPE A I.I 1 SUCTION A~2 PRESSURE A U 3 GRAVI"P¢ A U, 99 OTHER B. CONSTRUCTION ~1 SINGLE WALL A IJ 2 DOUBLE'WALL A U 3 LINED· TRENCH A U 95 UNKNOWN A U 99 OTHER C. MATERIAL AND A{~_.~ BARESTEEL A U 2 STAINLESS STEEL ,& IJ 3.POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE CORROSION A U 5 ALUMINUM A U 6 CONCRETE' A U 7 STEEL W/ COATING A U 8 100% METHANOL COMPATIBLEW/FRP PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHOOICPROTECTION A IJ 95 UNKNOWN A IJ 99 OTHER D. LEAK DETECTION [] 1 AUTOMATIC LINE LEAK DETECTOR [] 2 LINE. TIGHTNESS TESTING [] 3 INTERSTITIAL ~ONr~OR~.G [] 99 OTHER V. TANK LEAK DETECTION [] 1 VISUAL CHECK [] 2 INVENTORY RECONCILIATION [] 3 VADOZE MONITORING [] 4. AUTOMATIC TANK GAUGING [] 5 GROUND WATER MONITORING [] 6 TANK TESTING [] 7 INTERSTITIAL MONITORING [] 91 NONE [] 95 UNKNOWN [] 99 OTHER VI, TANK CLOSURE INFORMATION I1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH · '~ I ' THIS FORI~ HAS BEEN COMPLETED UNDER PENAL ~' OF ~I~,URY,~ 'D TO THE BEST OF'~LEDGE, IS TRUE AND CORRECT LOCAL AGENCY USE ONLY 'T.E STATE ~.D: NUMaER ~S C0MPOSEg~,T.E ~J~ NUMRERS aELOW - ' '" COUNTY #~ JURISDICTION ~" · 'FACILITY # ·~. '~ , ~' ,- ';," ~ ~ TANK # FORUS (7-mi: THIS FORM MIDST BE ACCOMPANIED BY A PERMIT APPUCATION - FOR~, UNLESS A CURRENT FORM A HAS BEEN RI. ED: .. FOROO348-R5 · STATE OF CAUFORNIA ~,'. .... ~l STATE WATER RESOURCES CONTROL EIOARO UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. MARK ONLY [] 1 NEW PERMIT [] 3 RENEWAL PERMIT [] 5 CHANGE OF INFORMATION* ONEITEM* [] 2 INTERIM PERMIT [] 4 AMENDED PERMIT'* [] 6 TEMPORARY TANK CLOSURE [] 8 TANK REMOVED DBAOR FAC. TY.AMEWHE,ETANK S .STALLED: I. TANK DESCRIPTION COMPLETE ALL ~TEMS - SPEC~' ~F UNK~ c. DATE ,NSTALLED,M AY' EAR, I D. TANK C' AC, ,N GALLONS: iI.TANKC~)N'FENTS ~FA-1 ISMARKED, COMPLETEITEMC. *' j ":: A. MOTOR VEHICLE FUEL [] 4 OIL .. :i B., ~;~a'REGULAR 3 DIESEL [] 6 AVIATION GAS [] 2 PETROLEUM [] 80. EMPTY '* oDuCT C. ~ UNLEADED ..... [] lb PREMIUM,. * '~ C.,,~OL [] 7 M~,ANOL UNLEADED [] 3 CHEMICAL PRODUCT [] 95 UNKNOWN [] 2 WASTE . [] 2 LEADED [] 99 oTHER (DESCRIBE IN ITEM O. BELOW) O. ,F(A.1) IS NOT MARKED. ENTER NAME OFSUBSTANCESTORED C.A.S.#:i~i~ ~;~//~, . III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BoxEs A. B, AND C. AND ALLTHAT APPLIES IN BOX D AND E [] I~UBLE WALL [] 3 SINGLE WAll WITH EXTERIOR LINER [] 95 UNKNOWN A, TYPE OF SYSTEM ~ 2~]NGLE WALL -- [] 4 SECONDARY CONTAINMENT (VAULTED TANK) [] 99 OTHER . B. TANK ~ 1 BARESTEEL [] 2 STAINLESS STEEL [] 3 FIBERGLASS* [] 4 STEELCLADW/FIBERGLASSREINFORCEDPLASTIC MATERIAL [] 5 CONCRETE [] 6 POLYVINYL CHLORIDE [] ? ALUMINUM [] 8 100% METHANOL COMPATIBLEW/FRP (PrimaryTank) [] 9 BRONZE [] 10 GALVANIZED STEEL [] 95 UNKNOWN [] 99 OTHER C. iNTER[OR [] 5 GLASS LINING L__~"6 UNLINED [] 95.,/LJNl~OWN [] 99 OTHER LINING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL ? YES__~'"' ~c~NO__ ' [] 1 POLYETHYLENE WRAP 2.,~TING ' [] 3 VINYL WRAP [] 4 FIBERGLASS REINFORCED PLASTIC D. CORROSION PROTECTION [] 5 CATHODIC PROTECTION ~ NONE [] ~ 91 [] 95 UNKNOWN 99. OTHER E. SPILL AND OVERFILL, SPILL CONTA~INMENT INSTALLED (YEAR) ~ OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) "-' IV; PIPING INFORMATION C~RCU~ A IF ABOVE G~J,~ND OR U IF UNDERGROUND, BOTH IF APPLICABLE A. SYSTEM TYPE A U 1 SUCTION A/U .,~ pRESSURE J, U 3 GRAVITY A U 99 OTHER B, CONSTRUCTION~'~ SINGLE WALL At~200UBLE WALL A U 3 LINED TRENCH A IJ 95 UNKNOWN A IJ 99 OTHER ~J C MATERIAL AND A~ BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PiPE CORROSION A U 5 ALUMINUM A IJ 6 CONCRETE A U 7 STEEL WI COATING A U 8 100% METHANOL COMPATIBLEW/FRP PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A IJ 95 UNKNOWN A U 99 OTHER D, LEAK DETECTION [] 1 AUTOMATIC LINE LEAK DETECTOR [] 2 LINE TIGHTNESS TESTING [] 3 INTERSTITIAL MONITORING [] 99 OTHER V. TANK LEAK DETECTION I [] 1 VISUAL CHECK [] 2 INVENTORY RECONCILIATION [] 3 VADOZE MONITORING, [] 4. AUToMATIC TANK GAUGING [] 5 GROUNDWATER MONITORING [---[' 6 TANK TESTING [--'-j 7 INTERSTITIAL MONITORING [] 91 NONE [-~ 95 UNKNOWN [] o~3 OTHER VI, TANK CLOSURE INFORMATION il. ESTIMATED DATE LAST USED (MO/DAY/YR) I 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH ¥¢~ r-'-I Nn 1--'-1 . , J" SUBSTANCE REMAINING _GALLONS J INERT MATERIAL ? --7 I I _~ I I THIS FORM~dAS BEEN COMPLETED UNDER PENAL TY OF P~J{~t~fI.RY, ~D TO/I~IE BEST~V~t4Y KNOWLEDGE, IS TRUE AND CORRECT LOCAL AGI:NCY USE ONLY ,HE STATI= LDo NUMBER IS cOMPOSED OF/HE FOL~ NUMRERS BELOW''~- I , COUNTY # JURISDICTION #[ [ FACILITY # · * - TANK # ' STATE I D # O0 7 iF I PERM.APP VE "Y ATE,, PERM,TEX.,RA O. OA' FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A pERMIT APPLICATION'. F~RM A, UNLESS A CURRENT FORM A HAS BEEN FILED .... FORO~B-R5 STATE OF CALIFORNIA STATE WATER RESOURCES CONTROL BOARD UNBERGROUND STORAGE TANK PERMIT APPLICATION . FORM COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM, MARK ONLY [] I NEW PERMIT [] 3 RENE~NAL PERMIT [] 5 CHANGE. OF INFORMATION ~,~"~ERMANENTLY CLOSED ON SITE ONE ITEM - [] 2 INTERIM PERMIT '[] 4 AMENDED PERMIT [] 6 TEMPORARY TANK CLOSURE ~ 8 TANK REMOVED DBA OR FACILITY NAME WHERE TANK IS INSTALLED: I. TANK DESCRIPTION COMPLETE ALL ~TEMS- SPECter ~F UNKNOT C. DATE INSTALLED (MO/OAY/YEAR) /~- O. TANK CAPACI'~f IN GALLONS: II. TANK C~TENTS IF A-1 IS MARKED, COMPLETE ITEM C. -'"" '-'' '. ' A. MOTOR VEHICLE FUEL [] 4 OIL . '~ B. C. ~,~NLEADED [] 6 'AVIATION GAS [] 2 PETROLEUM [] 80 EMPTY · ' ODUCT .,... it,,,~WlbPREMiUM 4 GASAHOL ~],.7 METHANOL ~ UNLEADED [] 5 JET FUEL 99 oTHER IO~SE iN ITEM o. ~ELOW) [] 3 CHEMICAJ_PRODUCT ~-[ 95 UNKNOWN [] 2 WASTE ',..[---[ 2 LEAOEO [] C'A'S'#:I~)~ ~;~/ D. ~F IA.q) ~S NOT MARKED, ENTER NAME OF SUaSTANCE STORED .,- IlL TANK CONSTRUCTION MARK ONE ITEM ONLY ~N SOXES A, alANOC, ANDALLTHATAPPUESlNSOXDANDE © BLE WALL [] 3 S,.GLE W,TH E ER,OR L,NER [] 9S UNKNOWN', A. TYPE OF SYSTEMr-~L_~ 2~IGLE WALL -- [] 4 SECONDARY CONTAINMENT (VAULTED TANK) [] 99 OTHER [~ BARE STEEL ' B. TANK [] 2 STAINLESS STEEL [] 3 FIBERGLASS [] 4 STEEL CLAD W/ FIBERGLASs REINFORCED PLASTIC MATERIAL [] 5 CONCRETE [] 6 POLYVINYL CHLORIDE [] 7 ALUMINUM [] 8 100% METHANOL COMPATIBLEW/FRP (p~==~T~.k) [] 9 ERONZE [] ~0 C~LVANmO STEEL [] ~S UN~OWN [] 99 OTHER C. INTERIOR [] 5 GLASS LINING ~_~6 UNLINED [] 95 ,~[Nf~OWN '[~] 99 OTHER LINING ~S LINING MATERIAL COMPATIBLE WITH 100% METHANOL ? YES_ ~ NO__ [] 1 POLYETHYLENE WRAP ~ATING [] 3 VINYL WRaP [] 4 FIBERGLASS REINFORCED PLASTIC D. CORROSION PROTECTION [] 5 CATHOOICPROTECTION~L~ 91 FOND = [] 95 UNKNOWN r-'~. 99' OTHER E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) ~ OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) IV. PIPING INFORMATION C~RCLE A IFABOVEGR~L,NDOR U IFUNOERGROUND. SOTHIF APPLICABLE A. SYSTEM TYPE A/~)U 1 SUCTION A~U_~_ PRESSURE A U 3 GRAVI3Y A U 99 OTHER U B. CONSTRUCTION AU~ SINGLE WALL A U 95 .UNKNOWN A U 99 OTHER 2 DOUBLE WALL 3 LINED TRENCH C. MATERIAL AND ~J~___.~ARESTEEL ALI 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A t) 4 FIBERGLASS PiPE CORROSION . A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/ COATING A U 8 100% METHANOL COMPATIBLEWlFRP PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER D. LEAK DETECTION. [] 1 AUTOMATIC LINE LEAK DETECTOR [] 2 LINE TIGHTNESS TESTING [] 3 MONITORINGINTERSTITIAL [] 99 OTHER V. TANK LEAK DETECTION · - []. v,suA~ CHEOK~ [] ~ .NVENTORY RECONC,L,ATIO. [] ~ VAOOZEMON.TORING [] ~ AUTOMATIC TANK ~*UG.NG f--q ~ GROUND WATER ~ONI.OR,NG , [] $ TANK TESTING [] 7 INTERSTITIAL MONITORING [] 91 NONE [] 95 UNKNOWN [] 99 OTHER VI. TANK CLOSURE INFORMATION 1. ESTIMATED DATE LAST USED (MO/DAY/YR) I 2. ESTIMATED QUANTITY OF ' '\ ~ I SUSSTANCEREMAINING _~LLONS THIS FO/RIV/ HAS BEEN COMPLETED UNDER PENALTY OF, PiE. R~ J.U, RY/'j~ ID T~ THE BES~NOWLEOGE, IS TRUE AND CORRECT · LOCAL AGENCY USE ONLY THE STATE LO. NUMBER ~ COMPOSE~-pFT.E ~UR NUMBERS ~ELOW ' · I COUNTY # JURISDICTIOI~--# , FACILITY # . TANK # ~ PERMI~I'~M~iER J PERM~PFy~VEDBY/D,A'I]E / FORM a (7-91) THIS FORM MUST BE ACCOMPANIED ~Y A PERMIT APPUCATIO~I~RM ~ UNLESS A CURRENT FORM A HAS BEEN FILED. FORO~4B-R5 ,.x~ :~.~ '-.7.' Bakersfield Fire Dept. PERMIT NO. _ ~ ,.~_~.. ~~ HAZARDOUS MATERIALS DIVISION UNDERGROUND STORAGE TANK PROGRAM ......:. PERMIT APPLICATION TO CONSTRUCT/M_ODIFY UNDERGROUND STORAGE TANK TYPE OF APPLICATION (CHECK) Q NEW FACILITY I~ MODIFICATION OF FACILITY I~NEW TANK INSTALLATION AT EXISTING FACILITY STARTING DATE ~-~/~_ (~]_ PROPOSED COMPLETION DATE ~ -~/~:'/~ ,,~ FACILITY NAME ~,..~ '/~' ~_ ~/',r~ __ EXI~NG CACIL~ P~IT No.. ,. FACILI~ ADDRESS'-/~ ~ ~~~ ~, ~~~. ZIP CODE ~PE OF BUSINES~ ~~ ~ ~~' ~~ APN TANK OWNER ~~ ~~~ ~. - ' PHONE No ~ - -- ADDRESS Z Y ~ ~~~ ~ C~ F~X~ Z~P CODE CONTRACTOR ~ ~~~/~ 6~ UCENSE No. ' - ' ADDRESS CI~ ZIP CODE PHONE No, BAKERSFIELD CI~ BUSINESS LICENSE No. WORKMAN COMP: No. ' INSURER '~ ' BRE~F~fS~mBETH~WORKTO BEDON~' J~~ ~/~o~ ~,~. ~~ ~~ WATER TO FAC~U~ PROVIDED BY ~~~ DEPTH TO GROUND WATER ~ ~ ~' SO~L ~PE EXPECTED AT S~TE 'No. OF TANKS TO BE INSTALLED ~ ARE THEY FOR MOTOR FUEL ~YES QNO S~CYION FOR MOTOR FU~L TANK No. VOLUME UNLEADED REGULAR PREMIUM DIESEL AVIATION SECTION FOR NON MOTOR FUR[STORagE T~NKS TANK No. VOLUME CHEMICAL STORED CAS No. CHEMICAL P~EVIOUSLY (no brand name) (if known) STORED THE APPLICANT HAS RECEIVED. UNDERSTANDS, AI~D WILL COMPLY WITH THE A~ACHED CONDITIONS OF THIS PERMIT AND ANY OTHER STATE. LOCAL AND FEDERAL REGULATIONS. THIS FORM HAS BEEN COMPLETED UNDER PENALPf OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AIWD CORRECT. -' ApRC~ED B'Y(,' f,~ "-- APPLIC/~,NT THIS APPLICATION BECOMES A PERMIT WHEN APPROVED STATE OF CALIFORNIA STATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM A COMPLETE THIS FORM FOR EACI~CILITY/SITE MARK ONLY E~ 1 NEW PERMIT [~] 3 RENEWAL PERMIT ~""5 CHANGE OF INFORMATION ~ 7 PERMANENTLY CLOSED SITE ONE ITEM ~ 2 INTERIM PERMIT [~ ,4 AMENDED PERMIT [] 6 TEMPORARY SITE CLOSURE I. FACILITY/SITE INFORMATION & ADDRESS- (MUST BE COMPLETED) ~~R~RATION ~ INDIVIDUAL ~ PARTNERSHIP ~ LOCAL-AGENCY ~ COU~Y-AGENCY ~ STATE-AGENCY ~ F~E~L-AGENCY D~TRICTS ~PE OF BUSINESS ~ GASSTATION~ '3 FARM ~ 20ISTRiBUTOR~ 4 PROCESSOR .~ 5 OTHER ~ ~oRRESERVATIONTRuST ~ IFINOIAN~.OFT~ATSITE ~ E.P.A.LANDS I.D..(opti~al) EMERGENCY CONTACT PERSON (PRIMARY) EMERGENCY CONTACT PERSON (SECONDARY)- optional  : NAM~(LAS~S~ PHONE ~ WITH AREA CODE · S: N~E (LAS~ FIRS~ PHONE ~ WITH AREA CODE ~ ~2~-- II. PROPERTY OWNER INFORMATION - {MUST BE COMPLETED) MA~OR S2REET~RESS ' ~ --~ /I ~i~ic~ ~ INDIVIDUAL ~ LOCAL-AGENCY ~ ~ATE-AGEN~ III. TANK OWNER INFORMATION- (MUST BE COMPLETED) ~ ' ~ ' / ~ ~ i ~ COR~A~ON ~ PARTNERSHIP '~ COU~Y-AGE~Y ~ FEDE~L-AGE~Y IV. BOARD OF EQUALIZATION UST STORAGE FEE ACCOUNT NUMBER- Call (916) 323-9555 if questions arise. V, PETROLEUM UST FINANCIA~SPONSIBILITY- (MUST BE COMPLETED) - IDENTIFY THE METHOD(S) USED ~ ~x ~indica[e ~ SELF-INSURED ~ 2 GUARA~EE ~ 3 INSURANCE ~ 4 SURE~ ~NO ~ ~ 5 LE~ER OF CREDIT ~ 6 ~EMPTtON ~ ~ OTHER VI. LEGAL NOTIFICATION AND BILLING ADDRESS Legal notification and billing will be sent to the tank owner unless box t or II is choked. ~ THIS FORM HAS BEEN COMPLETED UNDER PENALT~ OF PERJURY, AND TO T~ BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT LOCAL AGENCY USE ONLY ' / '~ COU~ ~ // JURISDICTION ~ FACILI~ ~ LOCATION CODE - OPTIONAL CENSUS TRACT ~ - OPTIONAL SUPVISOR - ~ISTRICT CODE - OPTIONAL THIS FORM MUST BE ACCOMPANIED BY AT LEAST (1) OR MORE PERMIT APPLICATION - FORM B, UNLESS THIS IS A CHANGE OF SEE INFORMATION ONLY, FORM A (5-91) F~33A STATE OF CALIFORNIA ~% STATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B COMPLETE A SEPARATE FORM FOR E~H TANK SYSTEM. MARK ONLY [~ I NEW PERMIT [] 3 RENEWAL PERMIT [~'/5 CHANGE OF INFORMATION [] 7 PERMANENTLY CLOSED ON SITE ONE ITEM [] 2 INTERIM PERMIT [] 4 AMENDED PERMIT [] 6 TEMPORARY TANK CLOSURE ' [] 8 TANK REMOVED DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ~ ~.~'- ~ ~'~'/.~ ' · I. TANK DESCRIPTION COMPLETE ~,LL ITEMS - SPECIFY IF UNKNOWN c. DATE ,NSTALLED(MO, OAY EAR, D. TANK. CAPAC, IN GALLONS: II. TANK CpNTENTS IF A-1 IS MARKED, COMPLETE ITEM C. ., ~ A. MOTOR VEHICLE FUEL [] 4 OIL B.~1 PR C. ~ UNLEADED [] 4 GASAHOL [] 2 PETROLEUM [] 80 EMPTY ODUCT [] 1bPREM,UM [] 7 METHANOL UNLEADED [] 5 JET FUEL [] 3 CHEMICALPR,OOUCT [] 95 UNKNOWN [] 2 WASTE [] 2 LEADED [] 99 OTHER~S RIBE IN ITEM O. BELOW D. IF IA.l> IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: 0I~) 0 ~ ~ / ¢ Ill. TANK CONSTRUj~ION MARK ONE ITEM ONLY IN BOXES A, B. ANOC, ANOALLTHATAPPUESINBO×DANDE A. TYPE OF [~/ I DOUBLE WALL [] 3 SINGLE WALL WITH EXTERIOR LINER [] 95 UNKNOWN SYSTEM [] 2 SINGLE WALL '- [] 4 SECONDARY CONTAINMENT (VAULTED TANK) · [] 99 OTHER B, TANK [] 1 BARE STEEL [] 2 STAINLESS STEEL [~ FIBERGLASS [] 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC MATERIAL [] 5 CONCRETE [] 6 POLYVINYL CHLORIDE [] 7 ALUMINUM ~-~ 8 100% METHANOL COMPATIBLE WIFRP (Primarymank) [] 9 BRONZE [] 10 GALVANIZED STEEL [] 95 UNKNOWN [] 99 OTHER [] ~ RU~ER UNEO ~_~L~YD UN,NG [] ~ EPO~ UN,N~ [] ~ PHENOL~ LIN,NG C, INTERIORLINiNG [] 5 GLASS LINING' L_~ 6 UNLINED ~'] ~NOWN [] 99 OTHER YES__ NO__ IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL ? J . D. CORROSION I~DO~YETHYLENE WRAP [] 2 COATING [] 3 VINYL WRAP [~4 FIBERGLASS REINFORCED PLASTIC PROTECTION~CATHODICPROTECTION [] 91 NONE [] g5 UNKNOWN ~-~ gg OTHER E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) IV: PIPING INFORMATION CIRCLE A IFABOVE~NDOR U IF UNDERGROUND, BOTH IF APPLICABLE A. SYSTEM TYPE A U 1 SUCTION {~. U~ PRESSURE- A U 3 GRAVITY A U gg OTHER B. CONSTRUCTION A U 1 SINGLE WALL DOUBLE WALL A U 3 .LINED TRENCH A Ugs UNKNOWN A U 99 OTHER C, MATERIAL AND A U 1 BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE (PVC)AL=_~_.~ERGLASS PIPE CORROSION A U 5 ALUMINUM A /~ CONCRETE A U 7 STEEL W/ COATING A U 8 100% METHANOL COMPATIBLEW/FRP PROTECTION A U.~GALVANIZED STEEL A..IJJ~ CATHODIC PROTECTION A U 95 UNKNOWN.~/x A U 99 OTHER__ L O. LEAK DETECTION ~'~ AUTOMAT~CUNELEAKDETEOTOR ~ 2 LINET[GHTNESBTEST[NO ~[~;~3 fNTERSTITIALMoNiTORiNG ~ gg OTHER V. TANK LEAK DETECTION I[] 1 VISMAL CHECK ~ /~I'NVENTORY RECONCILIATION [~]~ VA~OZE MONITORmNG E~4 AUTOMATIC TANK GAUGING [] $ GROUND WATER MONITORING [] 6 TANK TESTING~b~ 7 [NTERSTITIALMONITORING [] gl NONE [] 95 UNKNOWN [] g9 OTHER VI. TANK CLOSURE INFORMATION 1. ESTIMATEO DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF I3. WAS TANK FILLED WtTH ~ ~ ,,^ , ~ ) SUBSTANCE REMAINING _GALLONS ) iNERT M~A. TERtAL) .:o L---J ,.u L~ STATE I D # IPERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION- FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. FOROO348-R5 STATE OF CALIFORNIA STATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B COMPLETE A SEPARATE FORM FOR ~/AG'H TANK SYSTEM. MARK ONLY [] ~ NEW PERMIT [~ 3 RENEWAL PERMIT [~5 CHANGE OF INFORMATION [] 7 PERMANENTLY CLOSED ON SITE ONE ITEM [] 2 INTERIM PERMIT [] 4 AMENDED PERMIT [] 6 TEMPORARY TANK CLOSURE ~ 8 TANK REMOVED . I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNOWN II. TANK CONTENTS ~F A-1 IS MARKED, COMPLETE ITEM C. A. ~1 MOTOR VEHICLE FUEL ~ 4 OIL B.~ 1 P C. ~UNLEADED ~ 4 GASAHOL ~ 2 PETROLEUM ~ 80 EMP~ RODUCT ~ lbPREMIUM ~ 7 METHANOL UNLEADED ~ 5 JET FUEL 99 OTHER~(~BE IN ITEM D. gE[CW) ~ 3 CHEMICAL PRODUCT .~ 95 UNKNOWN ~ 2 WASTE ~ 2 LEADED D. IF (A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED III, TANK CONSTRU~ION MARK ONE ITEM ONLY IN BOXES A, B, ANDC, AND ALL THAT APPLfES IN BOX D AND E A. ~PEOF ~ 1 DOUBLE WALL ~ 3 SINGLE WALL WITH EXTERIOR LINER ~ 95 UNKNOWN SYSTEM ~ 2 SINGLE WALL - ~ 4 SECONDARY cONTAiNMENT (~EDTANK) ~ 99 OTHER B, TANK ~ 1 BAR~ STEEL ~ 2 STAINL~SS STEEL ~; F~BERGLASS ~ 4 STEELCLAD W/F~ERGLASS REINFORCED PLASTIC MATERIAL ~ 5 CONCRETE ~ 6 POLWlNYL CHLORIDE ~ 7 ALUMINUM ~ 8 1~/. METHANOL COMPATIBLE W/FRP (Primary Tank) ~ 9 BRONZE ~ 10 GALVANIZED STEEL ~ 95 UNKNOWN ~ 99 O~ER C. INTERIOR ~ 6 UNLINED ~OWN LINING ~ 5 GLASS LINING ~ 95 IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL ? PROTECTION ~ 5 CATHOD~CPROTECT~ON ~ 9~ NONE . ~ 95 UNKNOWN E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED ~EAR) IV, PIPING INFORMATION CIRCLE A IFABOVE~NDOR U IF UNDERGRO~ND, BOTH IF APPLICABLE, A. SYSTEM TYPE A U 1 SUCTION ~ PRE~SURE A U 3 GRAVI~ A U 99 OTHER B, CONSTRUCTION A U 1 SINGL~ WALL ~200UBLE WALL A U 3 LINED TRENCH A U 95~OWN A U 99 OTHER C. MATERIAL AND A U 1 BARESTEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL cHLORIDE(PVC)A~ FIBERGLASS PIPE CORROSION A U 5 ALUMINUM A~6 CONCRETE A U 7 STEEL W/ COATING . A U PROTECTION A U ~GALVA~IZED STEEL. A~O CATHOOICPROTECTION A U 95 UNKNOW~ A U998 IOm/.OTHERMETHANOL COMPATIBLEW/FRP D. LEAK DETECTION ~ AUTOMATIC LINE LEAK ~ 3 INT[RSTITIAL V. TANK LEAK DETECTION ~ I VISUAL CHECK ~NVENTORY RECONCILIATION ~ 3 VA~ZEMONiTORING ~ 4 AUTOMATIC TANK GAUGING ~ 5 .GROUND WATER MONITORING ~ ~ 6 TANK TESTING ~ 7 INTERSTITIAL MONITORING ~ 91 NONE ~ 95 UNKNOWN ~ 99 OTHER VI. TANK CLOSURE INFORMATION ~I.ESTIMATEDDATELASTUSED(MO/DAY~R 2. ESTIMATED QUANTI~ OF -- ~ ~ SUBSTANCE REMAINING GALLONS 3. WASiNERTTANK MATERIALFILLED WITH? YES LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED 0,, E FO , UMBERS BELOW  COUN~ ~ JURISDICTION.~ TANK~ PERMIT NUMBER ~ PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERM¢ APPLICATION - FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. STATE OF CALIFORNIA STATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B cOMpLETE A SEPARATE FORM FOR E,~,CH TANK SYSTEM. MARK ONLY [] I NEW PERMIT ~ 3 RENEWAL PERMIT [~ CHANGE OF INFORMATION [] 7 PERMANENTLY CLOSED ON S~TEJ ONEITEM [] 2 INTERIM PERMIT ~ 4 AMENDED PERMIT ~ 6 TEMPORARY TANK CLOSURE ~ 8 TANK REMOVED DBAOR FAClLITY NAME WHERE TANK IS lNSTALLED: ~ ~ I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY I~ UNKNOWN C. DATE INSTALLED (MO/DAY'EAR) O. TANK CAPACI~ IN GALLONS: C~E~S IFA-1 ISMARKED. COMPLE~ITEMC. II, TANK ~ 2 PETROLEUM ~ 80 EMP~ ODUCT ~ lb PREMIUM ~ 7 METHANOL ~ UNLEADED ~ 5 JET FUEL ~ 3 CHEMICAL PRODUCT ~ 95 UNKNOWN ~ 2 WASTE ~ ~ LEADED ~ 99 OTHER ~R,~E~__IN ,TEM D. BELOW III. TANK CONSTRUC~N MAR~ ON~ ~TEM ONLY ~N aOX~S A. a, ANO C. ANO AL~ T,AT APPU~S ~N ~OX A. ~PEOF ~1 DOUBLE WALL ~ 3 S~NGLE WALL WITH EXTERIOR LINER ~ 95 UNKNOWN B, TANK ~ 1 BARESTEEL ~ 2 STAINLESS STEEL ~3 FIBERGLASS ~ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC MATERIAL ~ s CONCRETE ~ S POLYWNYL CHLORIDE ~ 7 ALUMINUM ~ ~ ~Om/. METHANOL COUPA~8LEW/FRP (Primary Tank) ~ 9 BRONZE ~ 10 GALVANIZED STEEL ~ 95 UNKNOWN ~ 9g OTHER ~ 1 RUBBER LINED ~KYD LINING ~ 3 EPO~ LINING C. INTERIOR ~ 5 GLASS LINING ~ 6 UNLINED ~t~NOWN ~ 99 OTHER LINING YES~ IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL ? ~~ETHYLENE WRAP ~ 2 COATING ~ 3 VINYLWRAP~FiBERGLASS REINFORCED PLAST,C D. CORROSION PROTE~ION ~5 CATHODIC PROTECTION ~ 91. NONE ~ 95 UNKNOWN ~ 99 OTHER ~E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) IV. PiPiNG INFORMATION C~RCL~ ~ ~F A~OV~ O~ ~ ~ UNDERG~OU~D~ S~T~ ~ APPL,CAaL~ A. SYSTEMTYPE A U 1 SUCTION ~PRESSURE A U 3 GRAVI~ A U 99 OTHER B. CONSTRUCTION A U 1 SINGLE WALL A~ DOUBLE WALL A U 3 LINED TRENCH A U 95~NOWN A U 99 OTHER C. MATERIAL AND A U 1 aARE STEEL A U ~ STAINLESS STEEL A U 3 POLYVINYL CHLORIDE (PVC)A~FIBERGLASS PiPE CORROSION A U 5 ALUMINUM A U~ CONCRETE A U 7 STEEL WI COATING ~ A U 8 1~/~ METHANOL COMPAT~L~WtFRP 99 OTHER ~ PROTECTION AU ~VANIZED STEEL A~CATHODICPROTECTION A U 95 UNKNOWn__ AU O. LEAK DETECTION ~ AUTOMATIC LINE LEAK D~T~OR ~ 2 ' ~NT~RSTt~IAL V, TANK LEAK DETECTION ~ 1 VISUAL CHECK ~VENTORY RECONC[L[ATION ~ 3 VAOOZE MONITORING ~ 4 AUTOMAT[CTANKGAUG{NG ~ 5 GROUNDWATER MONITORING ~ 6 TANK TESTING~ 7 INTERSTITIAL MONITORING ~ 91 NONE ~ 95 UNKNOWN ~ 99 OTHER VI, TANK CLOSURE INFORMATION 1. ESTIMATED DATE LAST USED (MO/DAY, R) 2. ESTIMATED QUANTI~ OF 3. WAS TANK FILLED WITH YES SUBSTANCE REMAINING GALLONS INERT MATERIAL ? LOCAL AGENCY USE ONLY THE STATE I.D, ~U~SER iS COMPOSED O~ ~ FO~ NUMBERS BELOW COUN~ ~ JURISDICTION ~ ~ FAClLI~ ~ TANK P~RM~T NU~R P~RMIT APPROVED BYIDAT~ P~RMIT EXPIRATION DATE FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMff APPLICA~ON · FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. FORO~ STATE OF CALIFORNIA ~"~ STATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B COMPLETE A SEPARATE FORM FOR ~C,H TANK SYSTEM. MARK ONLY [] 1 NEW PERMIT [] 3 RENEWAL PERMIT [~'~5 CHANGE OF INFORMATION F'~ 7 'PERMANENTLY CLOSED ON SITE ONE ITEM [] 2 INTERIM PERMIT [] 4 AMENDED PERMIT ~ 6 TEMPORARY TANK CLOSURE ~ 8 TANK REMOVED I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECI ~KNOWN A. OWNER'S TANK I, D. e ~ g. MANUFACTURED ~Y: C. DATE INSTALLED (MO/DAY'EAR) O. TANK C~ACI~ I'N G~LONS: II. TANK c~TE~S ~ A-1 IS MARKED, COMPLETE ITEM C. A. ~1 MOTOR VEHICLE FUEL ~ 4 OIL B. C. ~/UNLEADED ~ 3 OHEMIOALPROOOOT ~ 95 UNKNOWN ~ 2 WASTE ~ 2 LEADEO ~ 99 OTHER (DESCRIBE IN ITEM O. BELOW) Ilk TANK CONSTRU~ON UARK ONE iT~U O.~V ~N BOXES A, A. ~PEOF ~ DOUaLE WALL ~ 3 S~NGLE WALL W~TH EXTERIOR UNER ~ 95 UNKNOWN SYSTEM ~ 2 S~NGLE WALL - ~ 4 SECONDARY CONTAINMENT (V~DTANK) ~ 99 OTHER a. TANK ~ ~ BARE STEEL ~ 2 STAINLESS STEEL ~ F~ERGLASS ~ 4 STEELCLAD W/F~a~GLASS RE,NFO~CEDPLAST,C MATERIAL ~ 5 CONCRETE ~ 6 POLYVINYL CHLORIDE ~ 7 ALUMINUM ~ 8 1Om/. METHANOL COMPATIBLE W/FRP' (Pri=aryTank) ~ 9 BRONZE ~ 10 GALVANIZED STEEL ~ 95 UNKNOWN ~ 99 OTHER C. INTERIOR ~ S GLASS LINING ~ 6 UNUNEO ~ ~OWN ~ ~ OTHER LINING YES ~ NO · ,S UN~N~ UATE.~AL COU.~TJBLS W~T. ~00% U~NOL PROTE~ION ~ S CAT~OO~C~ROT~CT~ON ~ g~ NON~ ~ gS UNKNOWN ~ ~ OTH~. E. SPILL AND OVERFILL StaLL CONTAINMENT INSTALLED (YEAR) OVERFILL PREVENTION EQUIPMENY iNSTALLED (YEAR) IV. PIPING INFORMATION c~actE A ISABOVE~OOa U ~F UNO~SOUNO. BO~SA..UCASLE A. SYSTEMTYPE A U 1 SUCTION ~ PRESSURE A U 3 GRAVI~ ' A U ss OTHER B, CONSTRUCTION A U 1 SINGLE WALL ~ DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER C. MATERIAL AND A U I BARE STEEL A ~ 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE (PVC)~IBERGLASS PIPE CQRROSION A U 5 ALUMINUM A~6 CONCRETE A U 7 STEEL W/ COAT~NG~ A U 8 10~/~ METHANOL COMPATIBLEW/FRP PROTE~ION A U ~LVANIZED STEEL ~U~O CATHOOIC PROTECTIQN' A U 95 UNKNOW A U 99 OTHER D, LEAK DETECTION ~ AUTOMATIC UNE LEAK DETECTOR ~ 2 LINE TIGHTNESS TESTING ~ INTERSTITIAL MON~ORING ~ 99 OTHER V. TANK LEAK DETECTION ~ I VISUAL CHECK ~ ~ENTORY RECONCILIATION ~ 3 VAOOZE MON~TORING ~ 4 AUTOMATIC TANK GAUGING ~ 5 GROUND WATER MONITORING ~ 6 TANK TESTING ~7 INTERSTITIAL MONITORING ~ 91 NONE ~ 95 UNKNOWN ~ 99 OTHER VI. TANK CLOSURE INFORMATION ~. ESTIMATED DATE LAST USED (MO/OAY~R) 2. ESTIMATEDsuBSTANcEQUANTI~REMAiNiNGOFGALLONS THIS FOX,AS BEEN COMPLETED UNDER PENAL ~ 0~ ~E~RY, ~D T~ THE BEST ~OWLEDGE, IS TRUE AND CORRECT . GOUN~ ~ JURISDICTION PERMIT NUMBER P~RMIT APPROVED BY/DAT~ 'P~RMIT EXPIRATION DAT~ FORM e (7-9~) ' THIS FOR~ MUS~ BE AC~PANIED BY A PERM~ APPLICATION. FORM A, UNLESS A CURRENT FOR~ A HAS BEEN FILED. FORO~5 HAZARDOUS MATERIALS 13111FISION U.~NDERGROUND STORAGE TANK PROGRAM '- PERMIT ~PPt. ICATION FOIl RI=MOVAL OF A~' UNDERGROUND STORAGE TANK FAClLI~ NAME ~_~ ~//~' ._ CROSS STREET ~5~ ' TANK OWNER/~RA~OR ~O ~~ ~. PHONE No, MAILING ADDRESS ~.~. ~ ~d~' Cl~ ~~ ~ CONTRACTOR INFORMATION ~ ~ COMPANY . PHONE No. LICENSE No. ADDRESS ' CI~ ZIP CODE INSURANCE CARRIER WORKMENS COMP No. ~ PRELIMANARY ASSEMENT INFORMA~N' COMPANY ¢~ , (~ ~f) PHONE No~~-~/~E~E No. INSURANCE ~ARRIER WO~MENS COMP No. ~. TANK CLEANING INFORMATION COMPANY PHONE No. ADDRESS CI~ ZIP CODE WASTE TRANSPORTER IDENTIFICATION NUMBER NAME OF RINSTATE DISPOSAL FACILI~ ADDRESS CI~ ZIP CODE FACILI~ INOENTIFICATION NUMBER~, ~ TANK TRANSPORTER.INFORMATION COMPANY PHONE No. LICENSE No. ADDRESS CI~ ZIP CODE TANK DESTINATION TANK No. AGE VOLUME CHEMICAL DATES CHEMICAL ~~~ STORED · STCRED PREVIOUSLY STORED }.'v ::::.., :. :. :. :.:. :,..: ~ .:. :.:. :<:. :. :~ :. :. :-:~:~..~:?~. ,~,~. x ,. ~ ~ ~¥~ > :-: ..'--z<.: ~¢~ ~ $~',¢ ;?;; ~:: ~ x ,...'... :~-"~'~..';.,~.,: :::.--.: ::::-'.::-:::.-: .'-;:: .'-:-'.::~:.~:: .'.: ~.:~: :-'. ~::~: e: .'.:,. ~::.".-.'.i~ ':~:;~ ~<*.,..'.'::~-~...~ ~ ~-'.,' e-'; ~-~ ~ ~ ~~,.'~ ~:f~$,'. ~-:,..'~::~'.-:: ;;.~:.~.f .:'~.~-.'-.'-:~ ~ ~: :~:.:..'.'..:-.:: :~:~.':.'::...' :::~:~ ::.~.:: :~.'..¢~: :::.-:::~[~.'-~: .'.-:: .'.::-~::: ~::::::::::-':>.:::: .~:: :;::: .-::: :::::::~ ::-'.:: :::::: ::: :::~ ........ ...... . ....................... ~:¢..,...:. ,,~ ~:.:~:-:..,,~.:.:..~..~:~,. ......... · .... · ........ ~:~ ......... .~:: ....... - ........................... ~,:..::.,. ................... F::...~.:.. :.:-:.:.:-:.~ ..................................... ~~[~:~...~..: ....... .~.~....-~. ............ ,~i~2~,~,-~ ............. ~.:....~.~ .......... ~.:~...~ ~.s.:: ...................... ~ ..~ ........................................... ~:.:~:.:`:~:<~:~..:~`-~.~....:..~:~:~..~.:~:~.`v~.~.~-~.~4~:.~`:~:~... ................................ :~:'::~,'~,...-.>-.....,.,.. ,~..,:~?~..,,:9;.~.. - ' . .. ~...:<...,,~,........:......'.....:-.....:~.:.. ........... x.:.:.:..>.:.....:-.-,.. ....................... ~.... :~: :! ::: ~:~ :::>. ~:!:~!::::.-:::¢:::.:?. :: ::::-:: :::,~-'; ~.-'..'.:::-'-: ::>~ ~! .~-.'::-;.~;~$:!:~ ::: ~:::;:: :::::: :::: :: ~-: ~!.< ~ ::.~::~:!:~::: ::.'. ~ :~ ::: '_.::.¢:: :: :: ::: ~: ::~ :::.>. ~ :~ ~ ~ ~ ~::$$~i:,¢-¢ ¢:,':;~-~ ::: ~%~::'~:.< ;:~.-'.::::f: ~::;i:::!:>- :::: ~ ::i :i::: :g: :: ~:~ ~ ~:'~: ::::.-' ::::-'::~-'.-:~:~:~:>.:-'-:!:!-¢ ~ ::::: .?; ~ ~::: ::::::::':':':<~: ~-'::'-::t:' ::::::::::::::::::::: ~:~:: :~:::~:::::::::::' ::.':': <':':' :::: :::: ~::::::,':t :'. r:~. t. t-:-:-:' :-:' :' :' :' :' :' :-: :' THE APPLICANT HAS RECEIVED, UNDERSTANDS, AND WILL COMPLY WITH THE Alq'ACHED CONDITIONS OF THIS PERMIT AND ANY OTHER STATE. LOCAL AND FEDERAL REGULATIONS. THIS FORM HAS BEEN COMPLY, rED UNDER PENALI'¢ OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT. "'/A'PPR~)VED g~~ APPLICANT NAME (PRINT) APPLICANT SIGNATURE .. THIS APPLICATION. BECOMES A PERMIT WHEN APPROVED .... M^K CHECKS TO ' HE " i'IWOF S 0 U T H C H E S T E R A V 2'1 / ~ ,'~ % ~ ~ ~ ~ ~ ~ ~ I" ,'o ',,, ~ '..~ ,, '~ ~ . i.. i~1,~ " '. ' !~ S~TE PLAN ARCO Products Company 1501 CAUrORN~A AVE ~ SOUTH CHESTER AVE . Retail Marketing Design & Engineering BA.KERSFIELD CA 93.304 1055 West Sevevth St. P.O, BOX 2570, Los Angeles. CA. 90051-0570 SITE PLAN ARCO Products Company 1501 CALI¢ORNiA AVE $ SOUTH CHESTER A~ Retail Marketing , Design & Engineering ~AKERSFtELD CA 93.304 1055 West Sevevth St. P.O. BOX 2570, LOS Angeles, CA. 90051-0570 S 0 u '~ H C ii E S I E R A V E SITE PLAN ARCO Products Company ~501 CALIFORNIA AvE ~ SOUTH CHESTER A~ Retail Marketing Design & Engineering BAKERSFIELD CA 93304 1055 West Sevevth P,O. BOX 2570. Los Angeles., CA. 90051-0570 STATE OF CALIFORNIA STATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. MARK ONLY [] 1 NEW PERMIT [] 3 RENEWAL PERMIT [] 5 CHANGE OF INFORMATION [] ..~../PERMANENTLY CLOSED ON SITE ONE ITEM [] 2 INTERIM PERMIT [] 4. AMENDED PERMIT [] 6 TEMPORARY TANK CLOSURE ~ 8 TANK REMOVED DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ~ ~ I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNO~ A. OWNER'S TANK LD., ~ ~~ ~ ~. MANUFACTURED ~Y: II.TANK C~E~S IF A-1 ~S MARKED, COMPLETE ITEM C. ~. ~1 MOTOR V.HICL" FU.L ~ 4 OIL ~- / C. ~ UNLEADED ~ 2 PETROLEUM ~ 80 EMP~ PRODUCT ~ lbPREMIUM ~ 7 METH~OL UNLEAOEO ~ 5 ~ETFUEL ~ 3 CHEMICAL PRODUCT ~ 95 UNKNOWN ~ 2 WASTE ~ 2 LEADED ~ 99 OTHER (DESCRIBE IN ITEM D. BELOW) D. IF(A.I, IS NOTMARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.,: III. TANK CONSTRUCTION MARKONEITEUONLYINBOXESA. a. ANDC. ANDALLTHATAPPUESlNaOXDANOE A. WPEOF ~ ~OUBLE WALL ~ 3 S,NGLE WALL WITH EXTERIOR LINER ~ 95 UNKNOWN SYSTE~ ~ ~NGL~ WA~L - ~ ~ S~CO.OARY COUTA~UT (WULT~OTAN~> B. TANK MATERIAL ~ 5 CONCRETE ~ 6 POLYVI~YL CHLORIDE ~ 7 ALUMINUM ~ 8 10~/. ~ETHANOL COMPATIBLE WtFRP (PrimaryTa~) ~ 9 BRONZE ~ 10 GALVANI~D STEEL ~ 95 UNKNOWN ~ 99 OTHER ~ 1 RUBBER LINED ~~D LINING ~ 3 EPO~ UNING ~ 4 PHENOLIC UNING C,[NTERIORLiNiNG ~ 5 GLASS LINING ~6 UNLINED ~ .~NOWN ~ 99 OTHER IS LINING MATERIAL COMPATIBLE WITH 100% ME~ANOL ? YES ~ ~ 1 POLYETHYLENE WRAP ~ ~ATING ~ 3 VINYL WRAP .~ 4 FIBERGLASS REINFORCED PLASTIC D. CORROSION PROTE~ION ~ 5 CATHODIC PROTECTION~ 91 NONE ~ 95 UNKNOWN ~ 99 O~ER E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) ~ OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) IV. PIPING INFORMATION C~RCLE A IFABOVEGROUNOOR U IF UNOERGROUNO. BOTHIFAPPLIcABLE A. SYSTEM TYPE A U 1 SUCTION A U(U~,7~ PRESSURE A U 3 GRAVITY A U 99 OTHER B. CONSTRUCTION 1 SINGLE WALL A U 2 DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER C. MATERIAL AND I~ARESTEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A .U 4 RBERGLASS PIPE CORROSION A U 5 ALUMINUM A U 6 CONCRETE A U 7 STEEL W/ COATING A U 8 100% METHANOL COMPATIBLEW/FRP PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER O. LEAK DETECTION ~ 1 AUTOMAT[CUNELEAKDETECTOR ~ 2 UNET{GHTNESSTESTtNG ~ 3 INTERSTITIAL MONITORING ~ 99 OTHER V. TANK LEAK DETECTION ~ 6 TANK TESTING [] 7 INTERSTITIAL MONITORING [] 91 NONE [] 95 UNKNOWN [] 99 OTHER . VI. TANK CLOSURE INFORMATION THIS FOR, I~I HAS BEEN COMPLETED UNDER PENALTY OF ~E~PitJ: IRY, ~ND TO. THE BEST OF~WLEOGE, IS TRUE AND CORRECT LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED ~THE F~ BELOW COUN~ g JURISDICTION ' ~ FACtU~ g TANK g ~E~U~T NUMaER ~ERU~T A~P~OVED ~WOATE [ PE~T EX~RAT~ON DATE ~0~ ~ 17-~ THIS FORM MUST BE ~CCOMPANIED BY A PERMff APPLIO~TION - FORM ~, UNLESS A CURRENT FORM ~ HAS BEEN FILED. STATE OF CALIFORNIA STATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. MARK ONLY [] 1 NEW PERMIT [] 3 RENEWAL PERMIT [] 5 CHANGE OF INFORMATION [~"rpERMANENTLY CLOSED ON SITE ONE ITEM [] 2 INTERIM PERMIT [] 4 AMENDED PERMit [] 6 TEMPORARY TANK CLOSURE ~_j 8 TANK REMOVED DBA OR FACILITY NAME WHERE TANK IS INSTALLED: ~ ~ I. TANK DESCRIPTION COMPLETE ALL iTEMS - SPECIFY IF II.TANK CONTENTS IF A-1 IS MARKED, COMPLETE ITEM C. A. MOTOR VEHICLE FUEL ~ 4 OIL B. C. ~UNLEADED ~ 4 GASAHOL ~ 2 PETROLEUM ~ 80 EMP~~1 PRODUCT ~ lb PREM~UM ~ 7 METHANOL UNLEADED ~ 5 JET FUEL ~ 3 CHEMICAL PRODUCT ~ 95 UNKNOWN ~ 2 WASTE ~ 2 LEADED ~ 9g OTHER (DESCRibE IN ITEM D. BELOW II1. TANK CONSTRUCTION ~ARK ON~ ~TEM ONLY ~N ~OXES A. a, AND C. ANO ALLT~AT APPU~S ~N aOX A. ~PE OF ~OUBLE WALL ~ 3 SINGLE WALL_ W~ E~ERIOR UNER ~ 95 UNKNOWN SYSTEM ~ ~INGLE WALL '- ~ 4 SECONDARY CONTAINMENT (VAULTEDTAN~) ~ ~ OTHER ' ~ BARE STEEL ~ 2 STAINLESS STEEL ~ 3 FIBERGLASS ~ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC B. 'TANK MATERI~ ~ 5 CONCRETE ~ 6 POLYVINYL CHLORIDE ~ 7 ALUMINUM ~ 8 10~/. METHANOL COMPATIBLE W/FRP C, INTERIOR ~ 5 GLASS UN~NG ~6 UNLINED ~ 95 ~NOWN ~ ~ OTHER LINING IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL ? YES ~ NO~ ~ 1 POLYE~YLENE WRAP ~~TING ~ 3 VINYL WRAP ~ 4 FIBERGLAS REINFORCED PLASTIC D. CORROSION PROTECTION ~ '5 CATHODIC PRoTECTION ~91 NONE ~ 95 UNKNOWN ~ ~ OTHER E, SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) ~ OVERFILL PREVENTION EQUIPMENT INSTALLED ~EAR) _ IV. PIPING INFORMATION CIRCLE A IF ABOVE G~ND OR U IF UNDERGROUND, BOTH IF APPLICABLE A. SYSTEMTYPE A U 1 SUCTION ~U~RESSURE A U 3 GRAVI~ A U 99 OTHER B. CONSTRUCTION ~ SINGLE WALL A~ DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN U OTHER C MATERIAL AND A~ BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE ' CORROSION A U 5 ~UMINUM A U 6 CONCRETE A ~ 7 STEELW/COATING A U 8 1~ METHANOL COMPATIBLEW/FRP PROTECTION A U 9 GALVANIZED S~EL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER D. LEAK DETECTION ~ 1 AUTOMATIC LiNE LEAK DETECTOR ~ 2 LiNE T~HTNESS TESTING ~ 3 INTERSTITIALMoN~ORING ~ 99 OTHER V. TANK LEAK DETECTION [] 1 VISUAL CHECK [] 2 iNVENTORY RECONCILIATION [] 3 VADOZE MONITORING [] 4 AUTOMATIC TANK GAUGING [] 5 GROUND WATER MONITORING [] 6 TANK TESTING [] 7 INTERSTITIAL MONITORING ['----] 91 NONE [] 95 UNKNOWN [] 99 OTHER VI. TANK CLOSURE INFORMATION I1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3, WAS TANK FILLED WITH YES ~ NO ~ ' SUBSTANCE REMAINING GALLONS INERT MATERIAL ? THIS FOR~ ~'tAS BEEN COMPLETED UNDER PENALTY OF ,PF~JI~JRY, ~'~D TOIITHE BEST.~Y KNOWLEDGE. IS TRUE AND CORRECT LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED OF,~HE FOl~ NUMBERS BELOW COUNTY # JURISDICTION #1 .~ FACILITY # TANK # STATE I.D.tf ~ 1.1 i iLS/i i i i i I t I i i ii i ! PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE FORM B (7-91) THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION. FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. FOR0(~34 S-R5 STATE OF CALIFORNIA STATE WATER RESOURCES CONTROL BOARD UNDERGROUND STORAGE TANK PERMIT APPLICATION- FORM B COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. MARK ONLY [] I NEW PERMIT ' [] 3 RENEWAL PERMIT [] 5 CHANGE OF iNFORMATION ~ERMANENTLY CLOSED ON SITE ONE ITEM [] 2 iNTERIM PERMIT [] 4 AMENDED PERMIT ~'~ 6 TEMPORARY TANK CLOSURE ~J 8 TANK REMOVED DBAOR FACtLITY NAME WHERE TANK IS INSTALLED: ~ ~ ~ I, TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY iF UNKNO~.~ · II.TANK C~NTENTS ~F A-~ ~S MARKED, COUPLETE ITEM C. A. ~1 MOTOR VEHICLE FUEL ~ 4 OiL g. C. ~ ~LEADED III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A, B, ANDC, ANDALLTHATAPPLIESINBOXOANDE A. ~PE OF ~~BLE WALL ~ 3 SINGLE WALL WITH E~ERIOR LINER. ~ ,S UNKNOWN SYSTEM ~ 2 ~LE WALL -- ~ 4 SECONDARY CONTAINMENT (VAULTED TANK) ~ 99 OTHER ~8ARE STEEL ~ 2 STAINLESS STEEL ~ 3 FIBERGLASS ~ 4 STEELCLAD W/FIBERGLASS REINFORCED PLASTIC B. TANK MATERIAL ~ 5 CONCRETE ~ 6 POLYVINYL CHLORIDE ~ '7 ALUMINUM ~ 8 1~/. METHANOL COMPATIBL/W/FRP (PrimaryTa~k) ~ 9 BRONZE ~ 10 GALVANIZED STEEL ~ 95 UNKNOWN ~ 99 O~ER C. INTERIORLiNiNG ~ 5 GLASS LINING ~6 UNLINED ~ ~UOWU IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL ? YES' UO~ D. CORROSION ~ 1 POLYETHYLENE WRAP ~~TING ~ 3 VINYL WRAP ~ 4 FIBERGLASS REINFORCED PLASTIC PROTECTION ~ 5 CATHODIC PROTECTION ~ 91 NONE ~ 95 UNKNOWN E, SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) ~ OVERFILL PR~ENTION EQUIPMENT INST~LED IV. PIPING INFORMATION CIRCLE A IFABOVEGR~,~NDOR U IF UNDERGROUND, SOTH IF APPLICABLE A. SYSTEMTYPE A~U 1 SUCTION A(~UJPRESSURE A U 3 GRAVITY A U 99 OTHER B. CONSTRUCTION Au~ SINGLE WALL A Ij"-'~ DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER C. MATERIAL AND U~..~_~BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVINYL CHLORIDE (PVC)A U 4 FIBERGLASS PIPE CORROSION A U 5 ALUMINUM A I.l $ CONCRETE A U 7 STEEL W/ COATING A IJ 8 100% METHANOL COMPATIBLEW/FRP PROTECTION A U 9 GALVANIZED STEEL A U 10 CATHOOIC PROTECTION A U 95 UNKNOWN A U 99 OTHER D. LEAK DETECTION '[---[ 1 AUTOMATIC LINE LEAK DETECTOR [] 2 LINE TIGHTNESS TESTtNG [] 3 INTERSTITIAL MONrTORING [] 99 OTHER V; TANK LEAK DETECTION [] 1 VISUAL CHECK J'~ 2 iNVENTORY RECONCILIATION [] 3 VADOZE MONITORING [] 4 AUTOMATIC TANK GAUGING [] 5 GROUNDWATER MONITORING [] 6 TANK TESTING [] 7 'NTERSTITIALMONITORING [] 9.1 NONE [] 95 UNKNOWN [] 99 OTHER VI. TANK CLOSURE INFORMATION 1. ESTIMATED OATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF I 3. WAS TANK FILLED WITH YF~ THIS FO/R/v/HAS BEEN ,,COMPLETED UNDER PENALTY OF, PiER~J.U, RYI~ND T~ THE BES~NOWLEDGE, IS TRUE AND CORRECT LOCAL AGENCY USE ONLY THE STATE I.D. NUMBER IS COMPOSED'~F THE I~UR NUMBERS BELOW / ' COUN~ e JURISDICTIO~ ~ / FACILI~ ~ TANK ~ STATEI.D.~ ~ 1.,' t I I I I I I / I . PERM IT NUMBER PERM IT APPROVED BY/DATE PERMIT EXPIRATION D~TE FORM B (7-91) THIS FOR~ ~U~T BE AOOO~PANIEB BY ~ PER~ff APPLICATION · FOR~ &, UNLESS & CURRENT FOR~ A H~S BEEN FILED. FORO~B-RS BAKERSFIELD FIRE DEPARTMENT HAZARDOUS MATERIAL DIVISION 2130 G Street, Bakersfield, CA 93301 (805)~ 326-3979 TANK REMOVAL INSPECTION FORM FACILITY ADDRESS OWNER f PERMIT TO OPERATE# CONTRACTORk.5. ' "" _ - C.~%~ ~'%~o¢~ CONTACT PERSON ~,.~ LABORATORY ~,~Ek ~n # OF SAMPLES ~ TEST METHODO~0GY ,;Y~-~'.~ 7~ PRELI~NARY ASSESSMENT CO. CONTACT PERSON PLOT PLAN CONDITION OF TANKS CONDITION OF PIPING CONDITION OF SOIL ,~ COMMENTS September 8, 1993 Ralph E. 'Hue¥ DATE INSPECTORS NAME SIGNATURE '8.,~99451' NED 13', 55 :{. 3 O0 .... ? CO IlqC FSX NO, 1 6 P, O1 ....................................... ~'.' . ""'.:'Z/7%':%"-Z:ZE%%TZ'." ' -~ ............................ :~rs~~- ~;:, ~ .-. ......... ~-*;"~' ...... ~¢_.~ ~ 56 K I~:TfS 00NST 00 INC F/~× NO, ~ 9945 6 P, 02 1~835 W. Olympic B!vd , 5~h ~'i, --'~."; .... %c'.'.'. · ,L~s Aage!e,~, Cali~or'ni~ 90064 ~~ '~""'~";:~8 AdFORDtNG COVERAG~ itel: (310) 44~-3333 ..... :"'-'" ,:~u~,o ~ -' Home ~n~urance Company E,E. C~TIS 6OI~S~UCTION CO,, lNG, ' .... 'United Pacific In~, Co. (~tP) P,O,. Bo~2 4977 ;'~ Thc~:an~ Oaks, CA ~[359 .. .* ~, - '._;'-, z. ;'2. L~"'-=:'.,,~'=1'~': :~,',':~E . . z. . ' :'.. --_ - E ' ,,;-m', ;'"xr:'t- - 07,,.~ ,:,r-,, '~' z' .;(OU.,=E. " -' ' ':;~'~,~.'~'I'.," 2~ 3:~..~;'Av :.~:::,;..t'~ T;'~h'5,,;:;,',~ .... i~2 ' z ="':'-'r~i~S ';z~;~;~EOuE~?'JtS~L'%S37'7 I ................ I .......................... ' ' 'k,'5 .... 7:.. /' : _ ' X "': ....... .,I ,..., TfiO~2409 [/38 [0/0~/92 "/" " ' ...... ~ ........ [. ;' ~* .'x' 7~ =='~ ;: · - ' '' ' ¢F~S7";',, ', ,, , , -000 ~ .jC · ~ .--.'. X. -"-~ B~,F716g05 !0,~q!,,"92 1.('. ,' - ~,:', % · :., . -:, · .... .: ~ri~[ ~ : C'~"~".5.~T 0~, " .' .... C ...::,,.,:. ,,'~ .. ..... ,..., I.~4A-2016665-00 10/01/'92 10/01/93 ..... ' '.'f:'/_2 ._'_ . - ....................................................................... ~.CO SERVICE STAIION ~ ~501 C_AI, i'POR?L:'. 5:TRtl:'" ,7, .i,~,,.i':.i: ~"'-" : ' ' ', 7'7' ? :,' uo ff-, HAZARDOUS MATERIALS DIVISION ~ ,~.~ INSPECTION RECORD ~ 'L/~ I~ POST CARD AT JOBSITE FACILITY ARCO #6115 OWNER ARCO 'PRODUCTS C0. ADDRESS 1501 CALIFORNIA AVE. ADDRESS 17315 STUDEBAKER RD. C~TY, mP BAKERSFIELD, CA 93304 CITY, mP CERRIT0S~ CA 90701 PHONENO. (805) 323-2024 P£RMrr# BI-O013 INSTRUCTIONS: Please call for an inspector only when each group of inspections with the same.number are ready. They will run in consecutive order beginning with number 1. DO NOT cover work for any numbered group until all items in that group are signed off by the Permitting Authority. FollOwing these instructions will reduce the number of required inspec'don visils and therefore prevent assessment of additional fees. TANKS AND BACKFILL INSPECTION I DATE I INSPECTOR ~/~ Bac klill of Tank (s) ?/.~_.~/~=~ ~Y~J .~_~ ~/~ Spark Test Certification or Manufactures Method 7/~ ~;;:~/~'.~': ~' ~,~4 Cathodic Protection of Tank(s) PIPING SYSTEM Corrosion Pro.~on of Piping, Join., RI, .,~ Ele~i~i Isolation of Piping From Tank(s) Cathodic Protec~on System-Piping SECONDARY CONTAINMENT, OVERFILL PROTE~ION, LEAK DETECTION ~ner Ins~lla~on - Tan~(s) ~ner Ins~lla~on - Piping Veult With Product Compa~ble Sealer Level Gauges or Sensors. Roat Vent Valves Leak Dete~or(,) for Annular S~-D.W. Tank(s) Mon~oring Well(s)/Sump(s) - H.O Test Leak De~on Devil(s) for Vadose/Groun~ater FINAL ~; Mo.~oring Requireme., ~ 2130 G'Street, Bakersfield, ~ 933~1 .' R~E~VED .~PLICATION TO PE~OmE A TiG~SS ~ST :JU~ ~ 9 ;993 - HAZ. MAL D;V. ~ER OF T~S TO BE TESTED .~ !S PIPING GOING TO BE TESTED T.~'K~ VOL~ . CObWEbS 4 ;~nm~ 2~3 ~6 1794 (see utmched ~ of ~) [all tanks ,,,,,i,',Udned m, each of these f_-,,,i,ties are assured b~' this f;,,,,,,,'G,,t test] A fi,-,~,,~al tes~ is also used by this owner or operator to demonstrate evidence offin-,~-! responsi~l~ty in the foUow~,~ nmnunts under other EPA regulations or state progr~,~- authorized by EPA under 40 ~ Parts 271 and 145: EPA ~r~ Amounz Closure (Sections 264.~43 and 265.143) ..................... ~ .Post-Closure Care (Sections 264-145 a,m:12653,45) .......... ~ ................................ , ....... $ ~.~.000 1 ARCO is only an owner of the USTs at these listed facifities. Liability Covern~ (Sections 264.147 and 26S.147) .... Corrective Action (Sections 264.10~ (b)) ........ Plu~g~u~ and AbandonnMnt (Section 144.63) ............. ........................................................... o Post Closm'e Car~ ............................................ Liab~ty Covern~ ..................................... ? $ o CoFrecUve A~ion. ..................................... S 0 Pt~ and.~,n,~__~,,,--nt. .............. ·. Toc~ ...................................... independent, auditor' on his ~ stntmmmts for the latest completed tisch.! yens. 1. Alnotl~t of' nnn~nl US~ ~[~1~at~ ~ bein~ ~ by a financml te~ ~or ntse .......................................... .. 2. Amount of corrective action, closure and post-closure care mm, liability covern~, and pluf~zin~ and abnndmummt costs :3. Su2n of'lines ! and 9_ .............................. 4. Total tan~ble assets. .............................. '5. Totsl liabRit~es ............................................ 6. Tank, ible net woTth [subtract linn 5 line 4] ....................................... ; ........................ Yes No 7. Is line 6 at least S10 million? ............................. X 8. Is line 6 at least !0 times line 3?. ........................ 9. Have fi,,n,~e4ni statements for the l~test · . and Exchan~ Comnnsmen ........................ !0. Have financial smMments for the Istest fiscal ye~ been filed with the Ener~ ;nformation .~d~4,~4stmtion? ...................... !1. Have financinl st~ttements for the lates~ fisutl ~eaF been filed with ~e Rural '~' Financial statements for 1991 will not be provided to the EIA un~- Junn 30,199P. 12. Has 6nn,~al inf0r~stion been provided to Dun and Bradstreet, and has Dun and Bradm~ provided a financial strength rating of 4A or SA? .............. .l.hereby certify tl~,t subject to footnotes 1 and 2, the wording of this letter is ~dentical to the worrli,,~ specified in 40 CFR Part 280.95(d) as such re~tlations were ~co~nstituted on the date shown i",,,,,'~i~tely below. ~ Jam~s S. Momson ~e Executive Vice ¢l~e~Finanaal O~cer Da~e ..~-...v.~- p~_ Report Period: Inventory Reconciliation 1/1 to 12/31192 1992 Annual Summary Report Form COUNTY: KERN Facility Name: AM/PM MINI MARKET #589 Facility Address: 1501 California Avenue ~4; ~ Bakersfield, CA 93304 TANK #1 TANK #2 TANK #3 UNLEADED-1 Gasoline UNLEADED-2 Gasoline PREMIUM Gasoline 8,000 gallon 8,000 gallon 8,000 gallon single wall tanks single wall tanks single wall tanks single wall lines single wall lines single wall lines  I hereby certify under penalty of perjury that all inventory variations for the above mentioned facility were within allowable limits for this reporting period. Nancy B. Walti and Safety_  Inventory variations exceeded the allowable limits for this reporting period. I hereby certify under penalty of perjury that the source for the variation was not due to an unauthorized (leak) release. MAXIMUM MONTHLY VARIATIONS: 130 GALLONS + (MONTHLY DELIVERY X 1%) UNLEADED-1 UNLEADED-2 PREMIUM Allowed Actual Comments Allowed Actual Comments Allowed Actual Comments JAN 745 324 1151 102 431 -164 FEB 722 255 1164 162 436 99 MAR 712 176 1258 466 446 96 APR 706 513 1165 54 430 -10 MAY 632 176 1101 527 404 212 JUN 679 1111 6/14 +1754 & gg3 -239' 6/14-1768 & 385 119 6/15 -1161 cross 6/15 +1071 cross dump wAJNL2 dump w/UNL1 JUL 571 1235 7/7 +1099 cross 1001 92 7/7 -1044 cross 389 -22 dump w/UNL2 dump w/UNL1 AUe 614 325 1024 375 349 75 SEP 578 116 895 494 329 235 OCT 580 264 981 76 330 -72 NOV 604 92 977 433 328 159 DEC 654 1106 12/25 +927 cross 1189 -634 12/25 -866 cross 343 2 dump wAJNL2 dump w/UNL1 ~ ..~s~ s~^~o.s, ~.c~ Environmental, Health and Safety Department P. O. BOX 6225 ARTESIA, CA 90702 [310] 402-1278 OUARTERLY INVENTORY REPORTING Quarter Ending: 9/30/92 COUNTY: KERN FACILITY NAME: AM/PM MINI MARKET #589 ARCO #6115 FACILITY ADDRESS: 1501 California Avenue Bakersfield, CA 93304 BUSINESS PHONE: [805] 323-2024 All inventory variations are subject to Section 2646, CCR, Title 23, Division 3, Chapter 16 which states: "... variations shall be summed for a period of one month. Monthly variations exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons must be investigated in accordance with this section." I hereby certify under penalty of perjury that all product level variations for the above mentioned facility were within allowable limits for this quarter. ~.~_~_ilnventory variations exceeded the allowable limits for this quarter. I hereby certify under penalty of perjury that the variation was investigated for possible unauthorized (leak) release. SEE ATTACHED REPORT PAGES Operator Signature: Nancy B. Walti Manager-Environmental, Health & Safety 10/02/92 U.G.S.T. VARIANCE REPORT FOR ALL REGULAR TANKS IN THE SYSTEM PAGE 40 PPDCB019 OPENING ' ' CLOSING PHYSICAL ALLOHED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. .INVENT. VAR. VAR. OVER ST SIZE 00589 07/01/92 5.906 0 1,570 4,336 4~254 82- CA 8,000 07/02/92 4~254 2,700 1,734 5,220 5.286 66 CA 8,000 07/03/92 5.286 2,600 1,8.39 6,047 6.047 O. CA 8,000 07/04/92 6.047 0 1,146 4,901 4.901 07/05/92 4.901 2,600 1,231 6,270 6.446 176 CA 8,000 07/06/92 6.446 0 1,500 4,946 4~928 ,,~~,_~ '~fi L,~ 18- CA 8,000 07/07/92 4.928 2,800 1,528 6,200 7~290 t.~O. O0~''~'--! 1,090 CA 8,000 07/08/92 7,290 0 1,438 5,852 5,830 '~ 22- CA' 8,000 07/09/92 5,8.30 2,650 1,273 7,207 7,200 7- CA 8,000 07/10/92 7,200 0 1,633 5,567 5,470 97- CA 8,000 07/11/92 5,470 2,600 1,093 6,977 6,977 0 CA 8,000 07/12/92 6.977 0 1,058 5,919 6.007 88 CA 07/13/92 6.007 1,900 1,687 6,220 6.266 46 CA 8, 07/14/92 6.266 0 1,646 4,620 4.565' 55- CA 8, 07/15/92 4',565 2,000 1,755 4,810 4.782 28- CA 8,000 07/16/92 4,782 3,200 1,496 6,486 6~564 78 CA 8,000 07/17/92 6,564 0 2,002 4,562 4.525 37- CA 8,000 07/18/92 4,525 3,000 1,421 6,104 6,104 0 CA '8,000 07/19/92 6.104 0 .1,280 4,,824 4~782 ~2- CA 8,000 07/20/92 ~,782 1,900 1,983 4,699 4,795 96 CA 8,000 07/21/92 4,795 0 1,525 3,270 3,186 84- CA 8,000 07/22/92 3,186 3,100 1,664 4,622 4,240. 382- CA 8,000 07/23/92 4,240 0 1,732 2,508 2,5'01 7- CA 8,000 07/24/92 2,501 2,649 1,615 3,535 3,562 27 CA 8,000 07/25/92 3,562 2,700 1,761 4,501 4,501 0 CA 8,000 07/26/92 4,501 ~,350 1,231 7,620 7,832 212 CA 8,000 07/27/92 7,832 321 918 7,235 7,159 76- CA 8,000 07/28/92 7,159 0 1,539 5,620 5,639 19 CA 8,000 07/29/92 5.639 2,001 1,578 6,062 71086 ---"~{~'"~'~,_.4[-~-~..c,,-.~, 1,024 CA 8,000 07/30/92 7,086 I 1,322 5,765 5,022 ' 0 743- CA 8,000 07/31/92 5.022 1,000 1,761 4,261 4.254 7- CA 8,000 MONTH TOTALS: 169,653 44,072 46,959 166,766 168,001 571 1235 YES 08/01/92 ~.254 0 1,214 3,040 3.040 0 CA 8, 08/02/92 3.040 3,100 1,180 4,960 5.075 115 CA 08/03/92 5.075 0 1,604 3,471 3.399 72- CA 8,000 08/04/92 3,399 2,600 1,525 4,474 4,565 91 CA 8,000 08/05/92 4,565 1,650 1,777 4,438 4,376 62- CA 8,000 08/06/92 4,376 3,200 1,237 6,339 6,302 37- CA 8,000 08/07/92 6.302 0 1,476 4,826 4.835 9 CA 8,000 08/08/92 4,835 0 881 3,954 3,954 0 CA 8,000 08/09/92 3,954 3,250 908 6,296 6,362 66 CA 8,000 08/10/92 6,362 0 1,568 q,794 q,848 54 CA 8,000 08/11/92 4,848 0 1,624 3,224 3,186 38- CA 8,000 10/02/92 , U.G.S.T. VARIANCE REPORT FOR ALL REGULAR TANKS IN THE SYSTEH' PAGE ~1 PPDCB019 OPENING CLOSING PHYSICAL ALLONED ACTUAL TANK FACILITY DATE INVENT. DEL[VERY SALES [NVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 08/12/92 3,186 2,250 1,537 3,899 3~982 83 CA 8,000 08/13/92 3,982 4,300 1,653 6,629 6~690 61 CA 8,000 08/lq/92 6,690 0 2 051 q,639 4,592 47- CA 8,000 08/15/92 4,592 2,650 1,502 5,740 5,740' 0 CA 8,000 08/16/92 5,740 0 1 227 4,513 4,511 2- CA 8,000 08/17/92 4,511 5,200 1 656 6,075 6,057 ]8- CA 8,000 08/1.8/92 6,057 2,600 1,750 6,927 7,075 ]48 CA 8,000 08/19/92 7,075 0 1 465 5,610 5,457 153- CA 8,000 08/20/92 5,457 2,700 1.924 6,233 6,302 69 CA 8,000 08/21/92 6,302 0 1 843 4,459 4,457 2- CA 8,000 08/22/92 4,457 1,650 1 580 4,527 4,527 0 CA 8,000 08/23/92 4,527 0 1.362 3,165 3,079 86~ CA 8,0J~ 08/24/92 3,079 3,900 ] 833 5,146 5,234 88 CA 8, 08/25/92 5,234 0 1 750 3,484 3,454 30- CA 8'0,~ 08/26/92 3,454 2,000 1.338 4,116 4,131 15 CA 8,000 08/27/92 4,151 0 1 570 2,561 2,475 86- CA 8,000 08/28/92 2,475 2,000 1 834 2,641 2,735 94 CA 8,000 08/29/92 2,735 4,700 1.428 6,007 6,007 0 CA 8,000 08/50/92 6,007 0 I 004 5,003 4,995 8- CA 8,000 08/51/92 4,995 2,600 1,850 5,745 5,818 73 CA 8,000 HONTH TOTALS~ 145,696 48,350 47,111 146,935 147,260 614 325 NO 09/01/92 5,818 0 1,963 3,855 3,806 49- CA 8,000 09/02/92 '3,806 2,899 1,604 5,101 5,102 1 CA 8,000 09/03/92 5,102 2,000 1,617 5,485 5,729 244 CA 8,OOO 09/04/92 5,729 0 1,899 3,830 3,576 254- CA 8,000 09/05/92 3,576 2,600 1,380 4,796 4,796 0 CA 8,000 09/06/92 4,796 0 925 3,871 3,871 0 CA 8,000 09/07/92 3,871 4,200 868 7,203. 7,300 97 CA 8,000 09/08/92 7,300 0 1,648 5,652 5,652 0 CA 8,000 ' 09/09/92 5,652 1,100 1,457 5,295 5,359 44 CA 8,000 09/10/92 5,339 2,650 1,521 6,468 6,434 34- CA 8,000 09/11/92 6,434 0 1,530 4,904 4,835 69- CA . 8,000 09/12/92 4,835 2,800 1,026 6,609 6,609 0 CA' 8, 09/13/92 6,609 0 1,137 5,472 5,430 42- CA 8, 09/14/92 5,430 2,650 1,657 6,423 6,575 152 CA 8,000 09/15/92 6,575 0 1,802 4,773 4,646 127- CA 8,000 09/16/92 4,646 0 1,765 2,881 '- 2,8'80 1- CA 8,000 09/17/92 2,880 2,000 1,838 3,042 3,079 37 CA 8,000 09/18/92 3,079 2,650 2,116 3,615 3,576 37- CA 8,000 09/19/92 3,576 0 1,550 2,046 2,046 0 CA 8,000 09/20/92 2,046 3,200 1,334 3,912 3,928 16 CA 8,000 09/21/92 3,928 0 2,158 1,770 1,798 28 CA 8,000 09/22/92 1,798 4,196 1,708 4,286 4,376 90 CA 8,000 ]0/02/92 U.G.S.T.. VARIANCE REPORT FOR ALL REGULAR TANKS IN THE SYSTEM PAGE 4Z PPDCBOIg OPENING CLOSINO PHYSICAL ALLOHED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 09/23/92. 4,3~6 0 1,978 2,398 2~334 64- CA 8,000 09/24/92 2,334 4,300 1,592 5,042 5,220 178 CA 8,000 09/25/92 5,220 0 1,913 3,307 3,239 68- CA 8,000 09/26/92 3,239 2,700 1,461 4,478 4,478 0 CA 8,000 09/27/92 4,478 0 1,251 3,227 3,186 41- CA 8,000 09/28/92 3,186. 2,900 1,657 4,429 4,606 177 CA 8,000 09/29/92 4,606 0 1,455 3,151 3,013 138- CA 8,000 09/30/92 ,3,-013 2,000 1,562 3,451 3,427 24- CA 8,000 MONTH TOTALS: 133,277 44,845 47,3'52 130,770 130,886 578 116 NO FACILITY TOTALS: 4~8.,626 137,267 141,422 444,471 446,147 1503 1676 YES 10/02/92 U.G.S.T. VARIANCE REPORT FOR ALL UNLEADED TANKS IN THE SYSTEM PAGE PPDCB01g OPENING CLOSING PHYSICAL ALLOHED ACTUAL TANK · FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 07/01/92 6,860 0 3,409 3,451 3.3'99 52- CA 8 .000 07/02/92 3,399 4,300 2,876 4,823 4 ,848 25 CA 8 ,000 07/03/92 4,848 4,400 3,395 5,853 5,853 0 CA 8,000 07/04/92 5 853 0 2,065 3 788 3,788 0 CA 8,000 07/05/92 3.788 4,650 2,304 6 134 6.180 46 CA 8.000 07/06/92 6 180 0 2,833 3 347 3.331 ~./J /~t~ 16- CA 8.000 07/07/92 3.331 3,900 2,843 4 388 3.344 .O~__./'L.O.z),D ~ 1,044- CA 8 000 07/08/92 3.344 4,850 2,704 5 490 5.509 U'~'¢7 /~ 19 CA 8 ~000 07/09/92 5.509 c~,850 2,984 7 375 7.471 96 CA 8.000 07/10/92 7 .471 0 3,640 3 831 3.833 2 CA 8 000 07/11/92 3~833 4,400 2,520 5.713 5.713 0 CA 8.000 07/12/92 5.713 0 1,894 3 819 3.820 I CA 8 07/13/92 3.820 6,672 3,322 7 170 7.319 149 CA 8 07/14/92 7.319 0 2,920 4 399 4.376 23- CA 8 07/15/92 4.376 4,887 3,175 6 088 6.241 153 CA 8,000 07/16/92 6.241 4,150 3,220 7 .171 7.200 29 CA 8,000 07/17/92 7.200 0 3,472 3 728 3.752 24 CA 8,000 07/18/92 3.752 q,275 2,820 5.207 5.207 0 CA 8,000 07/19/92 5.207 0 2,333 2.874 2.841 33- CA 8,000 07/20/92 2.841 4,894 2,582 5 153 5.234 81 CA 8,000 07/21/92 5.234 0 2,854 2.380 2,411 31 · CA 8,000 07/22/92 2.411 5,700 2,658 5 453 5,944 491 CA 8,000 07/23/92 5.944 0 2,692 3.252 3,239 13- CA 8,000 07/24/92 3.239 '4,601 3,315 4 i525 4,579 54 CA 8,000 07/25/92 4.579 4,800 2,461 6 .918 6,918 0 CA 8,000 07/26/92 6.918 2,745 2,052 7.611 . 7,727 116 CA 8,000 07/27/92 7.727 321 1,828 6.220 6,205 15- CA 8,000 07/28/92 6.205 0 2,98o~ 3.217 3,372 ~ ~ - 155 CA '8,000 07/29/92 3.372 6,800 2,889 7 i283 6,314 "-'~'".,q-lk.~-'[-"~:~.q~- ~ 969- CA 8,000 07/30/92 6 .314 O 3,462 2.852 3,643 ~.) 791 CA 8,000 07/31/92 3,643 '5,896 4,089 5.450 5,444 6- CA 8,000 ' MONTH TOTALS: 156,471 87,091 88,599 154,963 155,055 1001 92 NO 08/01/92 5,444 . 0 3,569 1,875 1,'875 0 CA 8, 08/02/92 1,875 5,500 2,666 4,709 4,701 8- CA 8 08/03/92 q,701 O 3,349 1,352 1,330 22- CA 8,000 08/04/92 1,330 4,500 3,014 2,816 2,841 25 CA 8,000 08/05/92 2,86,1 5,850 3,093 5,598 5,626 28 CA 8,000 08/06/92 5,626 4,300 3,186 6,740 6,793 53 CA 8,000 08/07/92 6,793 0 3,807 2,986 2,973 13- CA 8,000 08/08/92 2,973 0 2,910 63 63 0 CA 8,000 08/09/92 63 4,200 2,621 1,642 1,655 13 CA 8,000 08/10/92 1,655 7,450 3,124 5,981 6,019 38 CA 8,000 08/11/92 6,019 0 2,970 3,049 3,106 57 CA 8,000 10/02/92 U.G.S.T. VARIANCE REPORT FOR ALL UNLEADED TANKS IN THE SYSTEM PAGE PPDCB019 OPENING " CLOSING PHYSICAL ALLOHED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 08/12/92 3,106 5,000 2,99'8 5,108 5,088 20- CA 8,000 08/13/92 5,088 .. 4,700 2,605 7,183 7,086 97- CA 8,000 08/14/.92 7,086 0 3,330 3,756 3,833 77 CA 8,000 08/15/92 3,833 4,850 2,502 6,181 6,181 0 CA 8,000 08/16/92 6,181 0 2,241 3,940 3,942 2 CA 8,000 08/17/92 3,942 4,300 2,991 5,251 5,339 88 CA 8~000 08/18/92 5,339 4,650 2,759 7,230 7,179 51- CA 8,000 08/19/92 7,179 0 2,484 4,695 4,687 8- CA 8,000 08/20/92 4,687 4,800 2;718 6,769 6,815 46 CA 8,000 08/21/92 6,815 0 3 585 3,230 3,212 18: CA 8,000 08/22/92 3,212' 5,850 2.479 6,583 6,583 0 CA 8,000 08/23/92 6,583 0 2.276 4,307 4,294 13- CA 08/24/92 4,294 4,700 2.652 6,342 6,434 92 CA 08/25/92 6,434 0 2.574 3,860 3,806 54- CA 08/26/92 3,806 4,~00 2.528 6,178 6,168 10- CA 8,000 08/27/92 6,168 0 2.735 3,433 3,427 6- CA 8,000 08/28/92 3,627 4,789 2.997 5,219 5,417 198 CA 8,000 08/29/92 5,417 4,300 2.442 7,275 7,275 0 CA 8,000 08/30/92 7,275 0 2.267 5,008 5,022 14 CA 8,000 08/31/92 5,022 4,800 2.828 6,994 6,958 36- .CA 8,000 MONTH TOTALS: 144,214 89,439 88,300 145,353 145,728 1024 375 NO 09/01/92 6,958 0 3.537 3,421 3,427 6 CA 8,000 09/02/92 3,427 4,100 3.030 4,497 4,511 .14 CA 8,000 09/03/92 4,511 4,779 21988 6,302 6,386 .84 CA 8,000 09/04/92 "6,386 0 3.492 2,894 2,973 79 CA 8,000 09/05/92 2,973 4,300 2.654 4,619 4,619 0 CA 8,000 09/06/92 4,619 0 2.000 2,619 2,619 0 CA 8,000 09/07/92 2,619 4,800 2.314 5,105 5,115 10 CA 8,000 09/08/92 5,115 0 3.286 1,829 1,859 30 CA 8,000 09/09/92 1,859 5,973 3,072 4,760 q,795 35 CA 8,000 09/10/92 4,795 4,850 2.831 6,814 6,838 24 CA 8,000 09/11/92 6,838 0 3.442 3,396 3,372 24- CA 8,000 09/12/92 3,372 6,200 2.646 6,926 6,926 0 CA 8 09/13/92 6,926 0 2.086 4,840 4,756 84- CA 8 09/14/92 4,756 4,800 2.869 6,687 6,713 26 CA 8,000 09/15/92 6,713 O' 2.744 3,969 3,942 27- CA 8,000 09/16/92 3,942 0 2.924 1,018 1,004 14- CA 8,000 09/17/92 1,004 5,000 2.337 3,667 3,657 10- CA 8,000 09/18/92 3,657 4,750 2.912 5,495 5,496 I CA 8,000 09/19/92 5,496 0 2.204 3,292 3,292 0 CA 8,000 09/20/92 3,292 5,800 1~760 7,332 7,387 55 CA 8,000 09/21/92 7,387 0 2.024 5,363 5,391 28 CA 8,000 09/22/92 5,391 2,900 2.006 6,285 6,374 89 CA 8,000 10/02/92 U.G.S.T. VARIANCE REPORT FOR ALL IJNLEADED TANKS IN THE SYSTEM PAGE PPDCBO19 OPENING CLOSING PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SiZE 00589 09/23/92 6,374 0 2,054 4,320 4,335 15 CA 8,000 09/24/92 4,335 4,700 2,539 6,496 6,446. 50- CA 8,000 09/25/92 6,446 0 3,828 2,618 2,604 14- CA 8,000 09/26/92 2,604 4,700 2,316 4,988 4,988 0 CA. 8,000 09/27/92 4,988 0 1,833 3,155 3,199 44 CA 8,000 09/28/92 3,199 4,000 2,731 4,468 4,498 30 CA 8,000 09/29/92 4,498 0 2,653 1,845 1,774 71- CA 8,000 09/30/92 1,774 4,839 2,971 3,642 3,860 218 CA 8,000 MONTH TOTALS: 136,254r 76,491 80,083 132,662 '133,156 895 494 NO FACILITY TOTALS: ~36,939 253,021 256,982 432,978 433,939 2660 961 NO 10/02/92 U.G.S.T. VARIANCE REPORT FOR ALL PREMIUM TANKS 'IN THE SYSTEM PAGE 40 PPDCBO19 OPENING CLOSING PHYSICAL ALLONED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 07/01/92 3.695 0 913 2,782 2.732 50- CA 6,000 07/02/92 2,732 1,600 ],079 3,253 3 297 44 CA 6,000 07/03/92 3.297 1,600 1,019 3,878 3.878 0 CA 6,000 07/04/92 3.878 0 648 3,230 3.230 0 CA 6,000 07/05/92 3.230 1,550 789 3,991 3.972 19- CA 6,000 07/06/92 3.972 0 776 3,196 3.203 7 CA 07/07/92 3,203 1,700 955 3,948 4,003 55 CA 6,000 07/08/92 4,003 1,500 7'83 4,720 4,661 59- CA 6,000 07/09/92 4~661 1,500 737 5,424 5,451 27 CA .6,000 07/10/92 5,451 0 866 q,585 4,545 40- CA 6,000 07/11/92 4,545 1,801 855 5,491 5,491 0 CA 6,000 07/12/92 5,491 0 597 4,894 4,916 22 CA 07/13/92 4,916 0 705 4,211 4,257 46 CA 6, 07/14/92 4.257 0 905 3,352 3 318 34- CA 6, 07/15/92 3.318 1,774 824 4,268 4 337 69 CA 6,000 07/16/92 4.337 1,650 734 5,253 5,117 136- CA 6,000 07/17/92 5.117 0 1,118 3,999 4.054 55 CA 6,000 07/18/92 4,054 1,501 736 4,819 4,819 0 CA 6,000 07/19/92 q,819 0 785 fi,O3fi 4,085 51 CA 6,000 07/20/92 4,085 1,775 772 5,088 5,161 73 CA 6,000 07/21/92 5,161 .0 712 4,449 ~,427 22- CA 6,000 07/22/92 4,427 0 1,018 3.,409 3~402 7- CA 6,000 07/23/92 3.402 0 663 2,739 2.732 7- CA 6,000 07/24/92 2.732 1,550 1,060 3,222 3.088 134- CA 6,000 07/25/92 3,088 1,500 733 3,855 3,855 0 CA 6,000 07/26/92 3.855 1,500 584 4,771 4.944 173 CA 6,000 07/27/92 4~944 1,553 271 6,226 6.035 191- CA 6;000 07/28/92 6.035 0 765 5,270 5.179 91- CA 6,000 07/29/92 5,179 0 536 4,643 4~661 18 CA 6,000 07/30/92 4,661 0 765 5,896 3,911 15 CA 6,000 07/31/92 3,911 1,800 1,057 4,654 4,767 113 CA 6,000. MONTH TOTALS~ 130,456 25,854 24,760 131,550 131,528 389 22- NO 08/01/92 4,767 0 684 4,083 4,083 0 CA 6, 08/02/92 4,083 0 859 3,224 3,151 73- CA 6, 08/03/92 3.151 0 976 2,175 2.195 20 CA 6,000 08/04/92 2,195 1,501 834 2,862 2,878 16 CA 6,000 08/05/92 2,878 1,500 .829 3,549 3,590 41 CA 6,000 08/06/92 3.590 1,500 802 4,288 . 4.207 81- CA 6,000 08/07/92 4.207 0 '793 3,414 3.423 9 CA 6,000 08/08/92 3,423 0 569 2,854 2,854 0 CA 6,000 08/09/92 2,854 1,551 566 3,839 3,860 21 CA 6,000 08/10/92' 3,860 1,550 864 4,546 4,632 86 CA 6,000 08/11/92 4,632 0 617 4,015 3,993 22- CA 6,000 10/02/92 U.G.S.T. VARIANCE REPORT FOR ALL PREMIUM TANKS IN THE SYSTEM PAGE PPDCB019 OPENING 'CLOSING PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES . INVENT. INVENT. VAR. VAR'. OVER ST SIZE 00589 08/12/92 5,993 1,550 668 4,875 4.889 14 CA 6,000 08/13/92 4,889 0 648 4,241 4.247 6 CA 6,000 08/14/92 4,247 0 917 3,330 3.308 22- CA 6,000 08/15/92 3,308 1,500 666 4,142 4.142 0 CA 6,000 08/16/92 4,142 0 710 3,432 3.444 12 CA 6,000 08/17/92 3,444 1,500 696 .~ 4,248 4.277 29 CA 6,000 08/18/92 4,277 1,550 767 5,060 5.072 12 CA 6,000 08/19/92 5,072 O 967 4,105 4.054 51- . CA 6,000 08/20/92 4,054 1',500 743 4,811 4,851 40 CA 6,000 08/21/92 4,851 0 949 3,902 3.901 1- CA 6,000 08/22/92 3,901 1,500 559 4,842 4,842 0 CA 6,000 08/23/92 4,842 0 679 4,163 4.126 37- CA 6, 08/24/92 4,126 .0 716 3,410 3.402 8- CA 6,~ 08/25/92 3,402 0 675 2,727 2.711 16- CA 6, 08/26/92 2,711 1,801 647 3,865 3.962 97 CA 6,000 08/27/92 3,962 0 600 . 3,362 3.339 23- CA 6,000 08/28/92 3,339 1,770 894 4,215 4.186 29- CA 6,000 08/29/92 · 4,186 0 765 3,421 3.421 0 CA 6,000 08/30/92 3,421 0 537 2,884 2.847 37- CA 6,000 08/31/92 2,847 1,600 929 3,518 3.590 72 CA 6,000 MONTH TOTALS, 118,654 21,873 23,125 117,402 117,477 349 75 NO 09/01/92 3,590 0 900 2 690 2,690 0 CA 6,000 09/02/92 2,690 1,801 780 3 711 3,726 15 CA 6,000 09/03/92 3,726 1,778 677 4.827 4,870 43 CA 6,000 09/04/92 4,870 0 985 3 885 3,829' 56- CA 6,000 09/05/92 3,829 1,900 519 5 210 5,210 0 CA 6,000 09/06/92 5,210 O 567 4,643 4,643 0 CA 6,000 09/07/92 4,643 0 559 4 084 4~126 42 CA 6,000 09/08/92 4,126 0 656 3 470 ' 3,528 58 CA 6,000 09/09/92 3,528 1,601 625 4.504 4.506 2 CA 6,000 09/10/92 4,506 '1,500 659 5 347 5.292 55- CA 6,000 09/11/92 5,292 0 717 4 575 4.593 18 CA 6,000 09/12/92 4,593 0 630 3,963 3,963 0 CA 6 09/13/92 3,963 0 460 3 503 3.507 4 CA 6 09/14/92 3,507 1,500 747 4 260 q.327 67 CA 6,0 09/15/92 4,327 0 753 3.574 3.538 36- CA 6,000 09/16/92 .3,538 0 749 2 789 2.795 6 CA 6,000 09/17/92 2,795 1,602 689 3 708 3.643 65- CA 6,000 09/18/92 3,643 1,600 818 4 425 4.525 100 CA 6,000 09/19/92 q,525 0 644 3 881 3.881 0 CA 6,000 09/20/92 3,881 O 482 3.399 3.529 70- CA 6,000 09/21/92 3,329 0 591 2.738 2.753 15 CA 6,000 09/22/92 2,753 1,577 651 3 679 3.675 4- CA 6,000 10/02/92 U.G.S.T. VARIANCE REPORT FOR ALL PREMIUM TANKS IN THE SYSTEM PAGE 42' PPDCB019 OPENING CLOSING PHYSICAL ALLOHED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 09/23/92 3,675 0 552 3,123 3,214 91 CA 6,000 09/24/92 3,214 0 569 2,645 2,584 61- CA 6,000 09/25/92 2,58q 0 793 1,791 1,81~ · 23 CA 6,000 09/26/92 1,814 1,600 527 2,887 2,887 0 CA 6,000 09/27/92 2,887 0 456 2,431 2,297 13q- CA 6,000 09/28/92.. 2,297 1,700 568 3,429 3,53'8 10'9 CA 6,000 09/29/92 3,538 0 542 2,996 3,078 82 CA 6,000 09/30/92 3,078 1,778 550 4,306 4,3~7 41 CA 6,000 MONTH TOTALS~ 109,951 19,937 19,415 110,473 110,708 329 235 NO FACILITY TOTALS, 359,061 67,664 67,300 359,425 359,713 807 288 NO '"' _0 Agreement Number 0001780 ~-~ ~,RCO Pro,ducts Comparly '~, greement Sequence 002 ~ . Division of Attantic~Richfield Company '~' Facility Number 06115 I~,I , -~( ~ Customer Number 0412841 {~-~(~0,1)~L.~ AR Number 0412841 I Agreement Type PMAMPM February 93 Renewal ~ AMENDMENT TO LESSEE PMPA FRANCHISE AGREEMENT/DEALER/PREMISES LEASE OPERATION OF UNDERGROUND STORAGE TANKS CALIFORNIA This Amendment, dated~(.,(.L~Z.___.j. Z /~)] , 19 ~,' is attached to, incorporated in and made a part of the Lessee PMPA Franchise~Agreement/Dea[er/15r~ises Lease ("PMPA Agreement"), in effect as of the date of this Amendment or, if applicable, to become effective concurrently with this Amendment, between Atlantic Richfield Company, a Delaware Corporation, through its division ARCO Product Company, ("ARCO"), and PRESTIGE STATIONS INC 0589 ("Franchisee"), covering premises located at 1501 CALIFORNIA AVE BAKERSFIELD CALIFORNIA 93304 In return for good and valuable consideration, each party's receipt of which is hereby acknowledged, the parties agree as follows: 1. The parties have entered into this Amendment in accordance with legal requirements imposed on ARCO and Franchisee concerning operation of the underground storage tanks at the above-referenced location. 2. ARCO has provided Franchisee a copy of: (a) California Health and Safety Code Section 25299 or an approved summary concerning civil and criminal penalties for violating terms of any permit to operate these underground storage tanks and relevant statutory and regulatory requirements; (b) the following listed documents, a copy of which is attached and initialed by Franchisee: Monitoring and Response Plan - III with Attachments 3. Where ARCO has provided Franchisee with a copy of the permit to operate the underground storage tanks, Franchisee has read and understood its responsibilities as operator under the permit and agrees to comply with each of the provisions of the permit. Irrespective of whether Franchisee has received and reviewed a copy of the underground storage tank operating permit, Franchisee hereby expressly agrees to do the following: (a) ..moniter ti~e underground tanks as required by law; (b) maintain all required records and make such records available to the federal, state and local government agencies and to ARCO at all reasonable times; (c) follow all reporting procedures as required by law; (d) mail, when submitted, to ARCO, at the address specified in paragraph 1 of the PMPA Franchise Agreement/Dealer/Premises Lease, a copy of all reports submitted to government agencies; CA 1 of 2 (1192) PARSSV (e) follow all operating procedures specified by ARCO; (f) immediately report to ARCO all suspected or confirmed releases from the tanks and connected piping system, unusual operating conditions, release detection signals and environmental conditions suggesting a release may have occurred, and any spills and overfills that are not contained and cleaned up; (g) properly close the underground tanks as required by law; and, (h) comply with all federal, state and local legal requirements relevant to the operations of the underground tanks and all amendments to any permit to operate. 4. With respect to the operation of the underground storage tank system and monitoring equipment, Franchisee hereby acknowledges and agrees: that ARCO has provided Franchisee with training on each of the items described in the attached Monitoring and Response Plan, that Franchisee understood the content of the training, and asked any questions necessary to facilitate his understanding, that Franchisee indicated to ARCO at the time of training any subjects addressed by the training which Franchsee did not fully understand, and that Franchisee received complete training and information necessary for Franchisee to fully understand the subject of operating underground storage tanks. 5. ARCO has provided Franchisee a copy of and Franchisee agrees to maintain on the Premises the Certificate of Financial Responsibility (as required by the United States Environmental Protection Agency in Subpart H, 40 CFR, Part 280 and California Health and Safety Code, Chapter 6.7, Section 25292.2). 6. Except to the extent they conflict with, or are less rigorous than the terms of this Amendment, all of the terms and conditions of the PMPA Agreement, as previously or hereafler amended or SUl.:qemented, remain.;r, full force. " IN WITNESS WHEREOF, ARCO and Franchisee have executed this Amendment. ARCO Products Company a division of Atlantic Richfield Company ARCO WITNESS: Manager WITNESS PRESTIGE STATIONS INC 0589 Franchisee's Name PRESTIGE STATIONS INC 0589 cA 2 of 2 (1/92) PAR$SW .MONITORING & RESPONSE PLAN- III ARCO PRODUCTS COMPANY FACILITY WITH SINGLE WALL TANKS AND SINGLE WALL LINES ARCO Facility 06115 Address 1501 California Ave Bakersfield, CA 93304 1. DETECTION METHOD Tanks - Monthly Inventory Reconciliation and Annual Tank Integrity Testing in accordance with Sections 2646 and 2643(c)(2)(A) and (B), Article 4, Title 23, CCR. Lines - Automatic Pressure Erie Leak Detectors and Annual Line Tightness Testing in accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. 2. MONITORING E(~I)IPMENT The Automatic line leak detectors will be maintained and inspected according to the manufacturer's instructions by an outside contractor once during each calendar year. 3. MONITORING PROCEDURE - Inventory Reconciliation Inventory reconciliation will be performed in compliance with the details of Section 2646, Article 4, Title 23, CCR (copy attached and hereby incorporated). A. The daily variation in inventory reconciliation shall be the difference between physically measured inventory in storage and the calculated inventory in storage. B. The physically measured inventory shall be determined at approximately the same time each day by taking liquid level measurement (stick reading) and converting it to gallons using a calibration chart. C. The calculated inventory shall be determined at approximately the same time of day for each business day by adding the inputs and subtracting the withdrawals from the physically measured inventory determined the day before. D. These variations shall be summed for a period of one month. Monthly variations exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons must be investigated in accordance with instructions attached. See Exhibit A for reconciliation form. 4. RESPONSE PLAN OPERATOR RE~;PONSlBILITIES If the monthly Inventory recon~ilii~tlon exceeds the allowable variation, the OPERATOR shall: A. Verbally notify ARCO Maintenance J~ of a suspected unauthorized release upon completion of ANY inventory reconciliation which exceeds the allowable variation. Notification to ARCO must be in sufficient time to allow ARCO to report the suspected unauthorized release to the local implementing agency within 24 hours of the inventory reconciliation which indicated the allowable variation was exceeded. B. Within 24 hours of discovering a variation which exceeds the allowable variation, review the inventory records for the preceding 30 days and determine if a calculation error exists that caused the apparent excessive variation. C. Continue to conduct inventory reconciliation. If a second 30-day period of data confirms the initial results, notify ARCO Maintenance ~ and record in the monitoring record the action taken. NOTE: If _Drior to month-end daily inventory reconciliations indicate p susoected release, rer~ort it immedi-atelv to ARCO Maintenance. Do not W~It Ijntil the end gf the month to report. ARCO RESPONSIBILITIES A. Upon notification by the Operator of a suspected unauthorized release, verbally notify the local implementing agency within 24 hours of discovery by the operator of any inventory reconciliation which exceeds the allowable variation. B. Within 24 hours of the notification by the Operator of a suspected unauthorized release, have all readily accessible facilities carefully inspected for leakage by appropriately trained persons and by following procedures in ARCO Products Company Procedure G.01. C. Have all dispenser meters associated with hazardous substance withdrawal checked for calibration within 24 hours of the inspection in item B. If a second 30-day period of data confirms the initial results: The requirements of Article 5, Title 23, CCR will be performed. 5. ANNUAL VARIATION STATEMENT The operator shall, on an annual basis, submit a statement to the local agency which states that all inventory reconciliation data are within allowable variations or which includes a list of the period of times and the corresponding variations which exceed the allowable variations. Said statement shall be executed under penalty of perjury. See Exhibit B for Annual Inventory Reconciliation Summary Report form. 6. TRAINING In addition to the training covering subjects mentioned in Sections 3 and 4 above, training needed for the operation of the tank system and monitoring equipment includes: How to: - Take tank level measurements - Read dispenser meters - inspect equipment - Recognize warning signs: dispenser hesitations, meter spins and odors - Manually close dispenser impact valve - Replace dispenser filters - Shut down the system with and location of: ARCOmatic switch, electrical panel breakers, and emergency shut off switch - Test the electronic monitor 7. RECORDS RETENTION Written records of all monitoring, testing, and maintenance performed shall be maintained on-site or off-site at a readily available location for a period of at least 3 years. These records must be made available, upon request within 36 hours, to the local agency or the Board. EXHIBIT A ARCO Products Company Division of AtlanticRichfieldCompany Arco Inventory Reconciliation She~~ California Facility' 06115 Tank #: .Size Product: Month/Year: 1 2 3 4 5 6 Previous Deliveries Metered Calculated Current Day's Actual Variation Day's Sales Inventory Dipstick Column 4 & 5 Dipstick Reading Subtract Reading Column Smaller # (Physically I + 2 - 3 from Larger # MeasuredI Da)/ Gallons ,. Gallons Gallons Gallons ,Gallons *1-* Gallons 1 2 3 4 5 6 7~ , , 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TOTAL 'Subtract Smaller # from Larger #. If Column 4 is less than 5 (+). If Column 5 is less than 4 (-). MONTHLy ALLOWABLE VARIATION: Total of Column 2 x .01 = + 130 = qallons. ACTUAL VARIATION: Total in Column 6 gallons. actual variation is greater than allowable variation, call ARGO Mpintenance ann follow the monitorina and response alan. EXHIBIT B ANNUAL INVENTORY RECONCILIATION SUMMARY REPORT ARCO Facility #: 06115 Initia~L,~~, ~, Address: 1501 California Ave. /~rco:~.~ ~.~//~///~7- City: Bakersfoeld Zip: 93304 A. All inventory rariations for the above mentioned facility were within allowable limits of Section 2646, CCR, Title 23, Division 3, Chapter 16, for the 12 month period from to , 19 to 19__ B. Inventory variations in excess of the allowable limits of Section 2646, occured on the following months, in the listed amounts, for the noted underground storage tanks. From Inventory Reconciliation Sheet. If actual is greater than allowable, subtract actual from allow, able and report difference as variation below. Month Product or Product or Product or Product or Tank # Tank # Tank # Tank # Submit report within 15 days following the end of the last month of the12-month time period covered by the report. Report to be submitted to your local implementing agency by Certified Mail if possible:. A copy of this report is to be submitted to: ARCO Products Company Environmental Compliance Administrator 17315 Studebaker Road Cerritos, CA 90701-1488 I certify under penalty of perjury, that all variations (if any) exceeding allowable limits are indicated above: Facility Tank Operator Date ,a, rco CALIFORNIA CODE OF REGULATIONS TITLE 23 WATERS DIVISION 3 STATE WATER RESOURCES CONTROL BOARD CHAPTER 16 UNDERGROUND TANK REGULATIONS ARTICLE 4, SECTION 2646. INVENTORY RECONClUATION (a) Inventory reconciliation shall only be used as part of non-visual monitoring for existing underground storage tanks which contain motor vehicle fuels. (b) After January 1, 1993, inventory reconciliation, and any other leak detection method that utilizeds manual stick readings, shall not be used as part of non-visual monitoring for existing underground storage tanks containing a hazardous substance including motor vehicle fuel, where the existing ground water level or the highest anticipated ground water level is less than 20 feet below the bottom of the tank. These ground water levels shall be determined according to the requirements of section 2649 (c) of this article. (c) Inventory reconciliation that utilizes manual stick readings shall not be used after December 22, 1998. (d) Owners or operators of existing underground storage tanks who utilize inventory reconciliation as part of non-visual monitoring shall comply with the requirements of this section. (e) Each underground storage tank shall be individually monitored utilizing an inventory reconciliation system that takes into account: ( I ) Separate daily underground storage tank quantity measurements for both the stored hazardous substance and any water layer; ( 2 ) Daily readings for underground storage tank input and withdrawals; and ( 3 ) Checking of product inputs indicated by delivery receipt by measurement of the tank inventory volume before and after delivery. Underground storage tanks that are connected by a manifold may require time for the level to stabilize before a measurement is taken. ( f ) Meters used for determining inputs and withdrawals shall comply with California Code of Regulations, Title 4, Chapter 9, Subchapter 1, "Tolerances and specifications for commercial weighing and measuring devices." Meters shall be inspected by the County Department of Weights and Measures or a device repairman as defined in the California Business and professions Code, 'Division 5, Chapter 5.5. ( g ) For the purpose of this section, "daily" means at least 5 days per week. The number of days involved may be reduced by the number of public holidays that occur during any such week. Local agencies may reduce the frequency of monitoring to no less than once every 3 days at facilities that are not staffed on a regular basis, provided that the monitoring is performed on every day the facility is staffed or when inputs or withdrawals are made from the underground storage tank. ( h ) Underground storage tank quantity measurements shall be based on liquid level measurements which are: ( I ) Pedormed during.periods when no additions or withdrawals are being made to the underground storage tank; ( 2 ) Performed by the underground storage tank owner, operator, or other designated persons who have had appropriate training; ( 3 ) Based on the average of two readings if stick or tape measurements are used: ( 4 ) Determined by equipment capable of measuring the level of the product over the full range of the tank's height to the nearest one-eighth of a inch; ( 5 ) Determined by equipment capable of measuring, to the nearest one-eighth of an inch, water present in the bottom of the underground storage tank. If the underground storage tank is not level, and the measurements are taken manually, then the measurement should occur at the lowest end of the underground storage tank; ( 6 ) Measured at the center of the longitudinal axis of the underground storage tank if access is available or measured at the lowest end of the underground storage tank with a calibration measurement at both ends, if possible, to determine if any underground storage tank tilt exists and, if so, its magnitude; and ( 7 ) Converted to volume measurements based on a calibration chart for the underground storage tank. This chart shall, where feasible, take into account the actual tilt of the underground storage 'tank. ( i ) The daily variation in inventory reconciliation shall be the difference between physically measured inventory in storage and the calculated inventory in storage. The physically measured inventory shall be determined at approximately the same time each day by taking liquid level measurement and converting it to gallons using the calibration chart. The calculated inventory shall be determined at approximately the same time of day for each business day by adding the inputs and subtracting the withdrawals from the physically measured inventory determined the day before. These variations shall be summed for a period of one month. Monthly variations exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons must be investigated in accordance with this section. ( j ) The owner or operator shall, on an annual basis, submit a statement to the local agency which states that all inventory reconciliation data are within allowable variations or which includes a list of the period of times and the corresponding variations which exceed the allowable variations. Said statement shall be executed under penalty of perjury. (k) If the monthly inventory reconciliation, conducted under subsection (i) of this section, exceeds the allowable variation, the owner or operator as appropriate shall: ( 1 ) Notify the local agency of a suspected unauthorized release within 24 hours of completing any inventory reconciliation which exceeds the allowable variation; ( 2 ) Within 24 hours of discovering a variation which exceeds the allowable variation, review the inventory records for the preceding 30 days and determine if a calculation error exists that caused the apparent excessive variation. ( 3 ) Within 24 hours of discovering a variation which exceeds the allowable variation, have all readily accessible facilities carefully inspected for leakage by appropriately trained persons; ( 4 ) Have all dispenser meters associated with hazardous substance withdrawal checked for calibration within 24 hours of completing the procedure required in subsection (3) immediately above. (5) Continue to conduct inventory reconciliation according to the requirements of this section., If a second 30-day period of data confirms the initial results, the owner or operator shall comply with the requirements of Article 5 of this chapter, and ( 6 ) Conduct such additional tests or investigations as may be required by the local agency. (I) Whenever any of the steps in subsection (k) of this section are performed, the results shall be documented in the monitoring record required under section 2712 of Article 10 of this chapter. If completion of any one of these steps indicates an inventory reconciliation error that, when corrected, indicates that allowable variations have not been exceeded, then the remainder of the steps need not be completed. If completion of any of these steps indicates that the apparent excessive variation is not due to a release or tank failure, then the remainder of the steps need not be completed. ( m ) The transfer of hazardous substances into and out of the underground storage tank may continue while the steps indicated in subsection (k) are being implemented provided the steps indicated are completed within the specified periods. Daily inventory readings and monthly reconciliation shall continue while the steps are being implemented. Authority: Health and Safety Code 25299.3, 25299.7 Reference: Health and Safety Code 25291, 25292 40 CFR 280.43 CHAPTER 6.7 SECTION 25299 (il) Any operator of an underground tank system shai~ be ila~le for a civil penalty of not less than five hundred dollars ($1~00) or mom than five thousand ciollars ($5,000) for each underground storaQe tank for each day of violation for any of the followinQ violalions: ( 1 ) Operating an unclergrouncl tank system which has not Deen 15sued a permit, in violation of mis chapter. ( 2 ) Violation of any of the applicable requirements of the permit issum:l for the operation of me underground tank system. ( 3 ) Failure to maintain reoords, as recluir~ by this clmpter. (4) Failure to report an unauthorized release, as required by Sections 25294 and 25295. ( 5 ) Failure to property close an underground tank system, as required by Section 25298. ( 6 ) Violation of any applicable requirement of this chapter or any requirement of this chapter or any regulation adopted by the boa. rd pursuant to Section 25299.3 (7) Failure to permit inspection or to perform ally monitoring, testing, or reporting required pursuant to Section 26288 or 25289. (8) Making any false statement, representation, or cerUfloation in any application, reGord, report, or other document submitted or required to be maintained pursuant to this chapter. (b) Any owner of an underground tank system shall be liable for a civil penally of not less than five hundred dollars ($500) or more than five thousand dollars ($5,000) per day for each underground storage lank, for each day of vlolatlon, for any of the following violations: ( 1 ) Failure to ol:)tain a permlt as specified by this chapter. (2) Failure to repair or upgrade an underground tank system in a(:xx:)rclance with this chapter. ( 3 ) Abandonment or improper closure of any underground tank system subject to this =hal=tar. ( 4 ) Knowing failure to take reasonable and ne(~essary steps to assure compliance with this chapter by the operator of an underground tank system. ( 5 ) Violation of any applicable requirement of the pen?tit Issued for operation of the underground tank system. ( 6 ) Violation of any applicable requirement of this ~apter of any regulation aclopled by the board pursuant to Section 25299.3. °' I (7) Failure to permit Inspection or to perform any' monitoring, testing, or reporting required pursuant to Section 25288 or 25289. ( 8 ) Making any' false statement, representation, or certification in any application, record, report, or other document submitted or requtred to be maintainod pursuant to this chapter. ( c ) Any person who Intentionally falls to notify the board or the local agency when required to do so by this chapter or who submits false Information in a permit application, amendment, or renewal, pursuant to Section 25286, is liable for a civil penalty or not more than five thousand dollars ($5,000) for each underground storage tank for whl~-h notlfle, ation is not given or false Information is submitted. (d) Any person who falsifies any monitoring re(;ord$ required by this chapter, or knowingly falls to report an unaulhorized release, shall, upon conviGtion, be punished by, a fine of not less than five lhouaand dollars ($5.000) or more.fflan ten thousand dollars ($10,0000, by imprisonment in the county Jail for not to exceed one year, or by both that line and Imprisonment. (e) In determining both the civil and criminal penalties imposed pursuant to this section, the court shall consider all relevant circumstances, Including, but not limited to, the extent of harm or potential harm caused by the violation, the nature of the violation and the period time over which It occurred, the frequency of past violations, and the corrective action, if any, taken by the person who holds the permiL (f) Each civil penalty or criminal fine Imposed pursuant to thl~ section for any separate violation shall be separate, and in addition to, any other civil penalty or criminal tine imposed pursuant to this section or any other provision of law, and shall be paid to the treasury of the local' agency or state, whichever is represented by the office of the city attorney, district attorney, or Attorney General bringtng the action. All penalties or fines collected on behalf of the board or a regional board I~y the Attomey General shall be deposited in the State Water Pollution Cleanup and Abatement AGcount in the State Water Quality Conu'cl Fund, and am available for expenditure by the board, upon appropriation, pursuant to Section 13441 of the Water Code. (g) This section shall become operative on Janumy 1, 1991. (Added by Stats. 1988, c. Section 3. operative Jan. 1, 1991. Amended by Stats. 19B9, o. 11397, Set, on 19, operative Jan. 1. 1991.) ARCO Products Company ', Environmental Health & Safety 17315 Studebaker Roacl CerrRos, California 90701-1488 Telephone 310 404 5300 ~ai~ing Addr®ss: Box ~5038 Ar~®sia, California g0702-{5038 RECEIVED BAKERSFIELD FIRE DEPARTMENT HAg, U.AT. DIV. HAZARDOUS MATERIALS DIVISIO~~/~ BAKERSFIELD, CA. 93301 SUBJECT: TANK/LINE INTEGRITY TEST RESULTS DATE 08/11/92 ARCO Station 6115 1501 California Ave. Bakersfield, CA. DEAR SIR: The tanks and piping at the above station passed a system test as noted in the attached results. ARCO Products Company is committed to compliance with the laws that govern the operation of underground storage tanks. If you have any questions, please call me at (310) 407-2611. Sincerely, J. S. ZAPOTOCZNY Environmental C. ompliance Engineer APPC-7116 ARCO Products Company is a Division of AtlanticRichfieldCompany (6-92) T~-ianq le Envi ~-onmen ta I - In~- 517 East Wilson Ave., Glendale, CA 9120~ (818) 246-24~4 TEI SYSTEM 4000 SUMMARY SHEET Precision Underground Storage Tank System Leak Test WO#: N ! 498 Client: ARCO PETROLEUM 17315 STUDEBAKER RD. CERRITOS, CA. Date: 7-27-92 County: KERN CO Site: ARCO #6115 1501 CALIFORNIA AVE. BAKERSFIELD, CA. Tank Product Tank Tank/Lines Product Line Leak # Description Capacity Rate/Result Rate/Result Detector I UNLEADED #1 8000 +0.025 PASS -0.013 PASS PASS 2 UNLEADED #2 8000 +0.024 PASS -0.010 PASS PASS 5 PREMIUM 6000 +0.054 PASS -0.015 PASS PASS 4 5 6 Signature: ~~/~~/~ State License #: 90-1072 Date: Comments: This precision tank testing system exceeds the criteria required by Local, State and Federal NFPA #529 and EPA UST Technical Standards Part 280 for precision testing systems. TANK INFORMATION: Product : UNL-TK#1 Date: 07/27/92 Capacity : 8000 Time: 10:01:22 PRODUCT INFORMATION: Diameter (in.) : 95 Product Level (in.) : 125" above tank bottom. % = 100.0 Specific Gravity : 0.750 Coef. of Expansion : 0.0006545 Water on Tank (in.) : 0" above tank bottom. Starting Temp. (F) : 82.581 Resolution (Gallons): 0.0000254 Head Pressure (PSI) : 5.4 at tank bottom Delta Temp. (F/Hr.) : 0.0547 COMPUTER ANALYSIS RESULTS: Level Rate (GPH) = 0.206 Temp. Rate (GPH) = 0.181 Final Rate (GPH) = 0.025 E E L 0 30 20 BO 120 150 Time-minutez WO# N1498A TANK INFORMATION: Product : UNL-TK#2 Date: 07/2?/92 Capacity : 8000 Time: 18:01:22 PRODUCT INFORMATION: Diameter (in.) : 95 Product Level (in.) : 125" above tank bottom. % = 100.0 Specific Gravity : 0.750 Coef. of Expansion : 0.0006545 Water on Tank (in.) : 0" above tank bottom. Starting Temp. (F) : 82.619 Resolution (Gallons): 0.0000475 Head Pressure (PSI) : 5.4 at tank bottom Delta Temp. (F/Hr.) : 0.0595 COMPUTER ANALYSIS RESULTS: Level Rate (GPH) = 0.229 Temp. Rate (GPH) = 0.205 Final Rate (GPH) = 0.024 L .... i ....... i ...... i ...... l ....... T E E P L ! I J t ........... I ...... I ...... 0 30 20 $0 120 150 Time-minutes TEI BYBTEM 4000 ~N~LYBIB BNEET TANK INFORMATION: Product : PREMIUM Date: 07)27/92 Capacity : 6888 Times PRODUCT INFORMATION: Diameter (in.) : 94 Product Level (in.) : 125" above tank bottom. % = 100.0 Specific Gravity : 0.760 Coef. of Expansion : 0.0006418 Water on Tank. (in.) s 0" above tank bottom. Starting Temp. (F) : 85.158 Resolution (Gallons): Head Pressure (PSI) : 5.4 at tank bottom Delta Temp. (F/Hr.) : COMPUTER ANALYSIS RESULTS: Level Rate (GPH) = 0.175 Temp. Ra~e (GPH) : :~ii_~=::_____ Final Rate (GPH) = 0,054  ' ......................... " .................... * .......... "'" " ............................... ""'" ........... ~" " ........... "'" ...... ' .......... ' .............. ' ....' "'" ' ....... 'l I i ....... , , ............ ', ,,, 0 30 60 90 120 150 ~,-~ ~l.~__~an~~ EnviroDmenta!, Inc. 517 East Wilson Ave., Glendale, CA 91206 T~E.I LT-3 Hydrostatic Product Line Test Result Sheet START TIME END TIME TEST VOLUME PRODUCT /READING /READING PRESSURE RATE RESULT (ML/H) PASS/ 00:00/ML 00:00/ML (psi) (rate*4) FAIL _~& ~,4~. ~~ ,_%--0 ,o/~ f~'//.~_~ I certify that the above line tests were conducted on this date according to the equipment manufacturer's procedures and limitations and the results as listed are to my knowledge true and correct. Signature: ~~ ~~~ OTTL#. 1072 Tech.: James ~ich Mfr's Cert.# 91002 NOTE: The test data collection time period must be fifteen minutes. The test pass/fail is determined using a threshold of 190 ml per hour [0.05 GPH) rate at 150% working pressure or 50 psi which ever is less. Copyright (c) Triangle Environmental, Inc., March, 1992. MRL T~-t~nele ]{nvtY-oY~rnent. al; In{:) _ 517 East Wilson Ave., Glendale, California 91206 FTA LEA~ DETE~R TEST DATA SITE: /~ ~ ~ ~//~ DATK:, ~-~ Product Serial Number Drain Trip Test Funct. Tripping Pass Type Detector Style Back Time Rate Els. Pressure or mi sec ml/min psi psi Fail / D~ P~ X~ X~ ~R D~ P~ X~ X~ ~R D~ P~ X~ X~ ~R I certify the above tests were conducted on this date according to the equipment manufacturer's procedures and limitations and the results as listed are to my knowledge true and correct. The mechanical Leak Detector Test pass/fail is determined uein~ a low flow threshold trip rate of 284 mi per minute or leos at 10 psi as set by Red Jacket Pumps Field Test Apparatus testin8 procedure. Copyright (c) , Triangle Environmental, Inc., January 1991. HRL HAZARDOUS MA'I~RIAL DIV'rSION ~'%,'~'"~ "~',j~ '" 2130 G Street, Bakersfield, CA 93301 '~~~ (805) 326-3979 ~_-~-~ ~ ~ER OF T~S TO BE TESTED~ IS PIPING ~ING TO'BE TESTED TANK# VOLUME COl%TENTS ,/ NME O~ ~S~R ~~ ~ C~R~C~O~ ~ ~/--~:~ Z /~m~OVED B~ / DAT~ S~G~K~R~ OF~~C~ PRESTIGE STATIONS, I"{~) Environmental, Health and Safety Department P, O, BOX 6225 ARTESIA, CA 90702 [310] 402-1278 T EP I Quarter Ending: 6/30/92 COUNTY: KERN-, .~ ~.~ +~-~ FACILITY NAME:AM/PM MINI MARKET #589 · '::' :': ~ ~'"'* :'~, ~''r~ ~ .D ' ~'~:~ ARCO #6115 FACILITY ADDRESS: 1501 California Avenue , Bakersfield, CA 93304 SUS~NESS P.ONE:[805] 323-2024 All inventory variations are subject to Section 2646, CCR, Title 23, Division 3, Chapter 16 which states: "...variations shall be summed for a period of one month. Monthly variations exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 galldns must be investigated in accordance with this section." .... I hereby certify under penalty of perjury that all product level variations for the above mentioned facility were within allowable limits for this quarter. Inventory variations exceeded the allowable limits for this quarter. I hereby certify under penalty of perjury that the variation was investigated for possible unauthorized (leak) release. SEE A'n'ACHED REPORT PAGES Tank Facility ~/ ~~~' Date: 7117192 Operator Signature: · Nancy B. Walti Manager-Environmental, Health & Safety 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL REGULAR TANKS IN THE SYSTEM PAGE' PPDCBO19 OPENING CLOSING PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES IflVENT. INVENT. VAR. VAR. .OVER ST SIZE 00589 04/01/92 4,619 2,500 2,060 5,059 5,088 '29 CA 8,000' 04/02/92 5,088 2,500 1,868 5,720 5,830 110 CA 8,000 04/03/92 5,830 0 2,399 3,431 3,331 100- CA 8,000 04/04/92 3,33! 2,600 2,083 3,848 3,848 0 CA 8;000 04/05/92 3,848 2,500 1,834 4,514 4,579 65 CA 8,000 04/06/92 4.579 2,600 1,923 5,256 5.220 36- CA 8,000 04/07/92 5,220 0 1,837 3,383 3,372 11- CA 8,000 04/08/92 3,372 2,500 1,723 4,149 4,254 105 CA 8,000 04/09/92 4,254 2,150 1,774 4,630 4,511 119- CA 8,000 04/10/92 4,511 2,600 2,550 4,561 4,674 113 CA 8,000 04/11/92 4,674 0 1,122 3,552 3,552 0 CA 8,000 04/12/92 3,552 2,500 2,135 3,917 3,820 97- CA 8, 04/13/92 3,820 2,500 1,876 4,444 4,701 257 CA 8, 04/14/92 4,701 0 1,804 2,897 3,013 116 CA 8, 04/15/92 3,013 2,600 2,230 3,383 3,427 44 CA 8,000 04/16/92 3,427 3,700 2,070 5,057 5,057 0 CA 8,000 04/17/92 5,057 4,150 2,621 6,586 6,725 139 CA 8,000 04/18/92 6,725 0 1,980 4,745 4,745 0 CA 8,000 04/19/92 4,745 0 1,491 3,254 3,106 148- CA 8,000 04/20/92 3,106 2,150 1,991 3,265 3,132 133- CA 8,000 04/21/92 3,132 4,650 1,891 5,891 6,069 178 CA 8,000 04/22/92 6069 2,600 1,851 6,818 6,925 107 CA 8,000 04/23/92 6 925 ' 0 1,663 5,262 5 181 81- CA 8,000 04/24/92 5181 2,150 2,030 5,301 5299 2- CA 8,000 04/25/92 5 299 2,150 1,957 5,492 5 492 0 CA 8,000 04/26/92 5 ~92 0 1,485 4,007 3 874 133- CA 8,000 04/27/92 3 874 2,600 1,771 4,703 4 782 79 CA 8,000 04/28/92 4,782 2,150 1,645 5,287 5 207 80- CA 8,000 04/29/92 5,207 0 1,731 3,476 3 535 59 CA 8,000 04/30/92 3,535 3,700 1,726 5,509 5,561 52 CA 8,000 MONTH TOTALS: 136,968 57,550 57,121 137,397 137,910 706 513 NO 05/01/92 5,561 0 2,416 3,145 3,066 79- CA 8,000 05/02/92 3,066 2,150 2,002 3,214 3,214 0 CA 05/03/92 3,214 2,150 1,528 3,836 3,942 106 CA 8, 05/04/92 3,942 2,600 1,915 4,627 4,565 62- : CA 8,000 05/05/92 4,565 0 1,960 2,605 2,643 38 CA 8,000 05/06/92 2,643 4,650 1,473 5,820 5,881 61 CA 8,000 05/07/92 5,881 2,150 1,700 6,331 6,326 5- CA 8,000 05/08/92 6,326 2,150 2,225 6,251 6,266 15 CA 8,000 05/09/92 6,266 0 1,787 4,479 4,479 0 CA 8,000 05/10/92 4,479 3,600 1,451 6,628 6,725 97 CA 8,000 05/11/92 6,725 0 1,895 4,830 4,756 74- CA 8,000 05/12/92 4,756 2,150 1,727 5,179 5,128 51- CA 8,000 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL REGULAR TANKS IN THE SYSTEM PAGE' 50 " PPDCB019 OPENING CLOSING PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE INVENT. DELIVERY S~LES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 05/13/92 5,128 0 1,642 3,486 3,481 5- CA 8,000 05/14/92 3,481 1,950 1,515 8,916 3,969 53 CA 8,000 05/15/92 3,969 1,950 2.157 3,762 3,725 37- CA 8,000 05/16/92 5,725 0 1.726 1,999 1,999 0 CA 8,000 05/17/92 1,999 4,275 1.350 4,924 4,995 71 CA 8,000 05/18/92 4,995 2,100 1.691 5,404 5,391 13- CA 8,000 05/19/92 5,391 2,150 1.679 5,862 5,906 44 CA 8,000 05/20/92 5,906 0 1.649 4,257 4,213 44- CA 8,000 05/21/92 4,213 3,000 1;425 5,788 5,881 93 CA 8,000 05/22/92 5,881 1,900 1~711 6,070 6,044 26- CA 8,000 05/23/92 6,044 0 1.593 4,451 4,451 0 CA 8,000 05/24/92 4,451 1,870 1.341 4,980 4,980 0 CA 8,Q,~ 05/25/92 4,980 2,721 1.003 6,698 6,793 95 CA 8, 05/26/92 6,793 0 1,590 5,203 5,168 35- CA 8, 05/27/92 5,168 1,500 1,715 4,953 5,022 69 CA 8,000 05/28/92 5,022 0 1,510 3,512 3,372 140- CA 8,000 05/29/92 3,372 2,200 2,107 3,465 3,562 97 CA 8,000 05/30/92 3,562 3,000 1,694 4,868 4,868 0 CA 8,000 05/31/92 4,868 0 1,322 3,546 3,454 92- CA 8,000 MONTH TOTALS: I46,372 50,216 52,499 144,089 164,265 632 176 NO 06/01/92 3,454 2,000 1.767 3,687 3,820 133 CA 8,000 06/02/92 3,820 2,600 1.738 4,682 4,687 5 CA 8,000 06/03/92 4,687 0 .] 756 2,93] 2,814 117- CA 8,000 06/04/92 2,814 ~,400 2.241 4,973 5,115 142 CA 8,000 06/05/92 5,115 2,301 2.240 5,176 5.,267 71 CA 8,000 06/06/92 5,247 0 1.636 3,611 3,611 0 CA 8,000 06/07/92 3,611 0 1 638 1,973 ],933 40- CA 8,000 06/08/92 1,933 2,650 2107 2,676 2,450 26- CA 8,000 06/09/92 2,450 4,400 1.993 4,857 4,795 62-' CA 8,000 06/10/92 4,795 2,150 1.685 5,260 5,299 39 CA 8,000 06/11/92 5,299 0 1 335 3,964 3,996 32 CA 8,000 06/12/92 3,996 2,600 I 801 4,795 4,861 66 CA 8,000 06/14/92 5,677 0 1.177 4,500 6,254 (~Ar.-~ 1,754 CA 06/15/92 6,254 2,000 1 965 6,289 5,123 ~)~-~ 1,161- CA 8,000 06/16/92 5,128 0 · 1,749 3,379 3,468 89 CA 8,000 06/17/92 3,468 4,000 1,799 5,669 5,767 98 CA 8,000 06/18/92 5,767 0 1.831 3,936. 3,887 49- CA 8,000 06/19/92 3,887 3,200 2 550 4,537 4,484 53- CA 8,000 06/20/92 4,484 2,850 I 718 5,616 5,616 0 CA 8,000 06/21/92 5,616 0 1 409 4,207 4,321 114 CA 8,000 06/22/92 4,321 2,600 1 871 5,050 5,048 2- CA 8,000 06/23/92 5,048 2,600 2 244 5,q04 5,496 92 CA 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL REGULAR TANKS IN THE SYSTEM PAGE 51 PPDCBO]g OPENING CLOSING PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 06/24/92 5,496 0 1,889 3,607 3,454 153- CA 8,000 06/25/92 3,454 3,300 1,453 5,301 5,496 195 CA 8~000 06/26/92 5,496' 0 1,872 3,624 3,616 8- CA 8,000 06/27/92 3,616 2,650 .1,623 4,643 4,643 0 CA 8,000 06/28/92 4,643 0 1,283 3,360 3,212 148- CA 8,000 06/29/92 3,212 2,800 1,816 4,196 4,267 71 CA 8,000 06/30/92 4,267 3,150 1,540 5,877 5,906 29 CA 8,000 MONTH TOTALS: 131,916 54,851 53,510 133,257 134,368 679 1111 YES FACILITY TOTALS: 415,256 162,617 163,130 414,743 416,543 1756 1800 YES 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL UNLEADED TANKS IN THE SYSTEM PAGE' PPDCB019 OPENING CLOSING 'PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE' INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 04/01/92 6,502 4,155 4,011 6,446 6,505 59 CA 8.000 04/02/92 6,505 4,758 4,255 7,008 7,053 25 CA 8,000 04/05/92 7,033 0 4,450 2,583 2,553 30- CA 8,000 04/04/92 2,553 4,404 3,285 5,672 3,672 0 CA 8,000 04/05/92 5,672 6,300 2,986 6,986 7,001 15 CA 8~000 04/06/92 7,001 4,050 4,072 6,979 7,065 86 CA 8.000 04/07/92 7,065 0 5,596 5,469 5,413 56- CA 8,000 04/08/92 3,415 4,750 3,655 4,508 4,538 50 CA 8,000 04/09/92 4,558 5,100 4,010 5,628 5,574 54- CA 8,000 04/10/92 5,576 6,200 5,227 6,547 6,656 109 CA 8~000 04/11/92 6,656 0 5,076 3.580 3,580 0 CA 8.00.0 04/12/92 3,580 4,155 2,634 5,101 5,141 40 CA 04/15/92 5,141 4,7.50 3,560 6.331 6,156 175- CA 04/14/92 6,156 0 3,599 2.557 2,411 146- CA 8 04/15/92 2,411 4,650 3,484 3,577 3,562 15- CA 8,000 04/16/92 3,562 5,100 2,967 5.695 5,695 0 CA 8.000 04/17/92 5,695 4,650 5,630 6,715 6,656 59- CA 8,000 04/18/92 6,656 1,550 3,024 5,182 5,182 0 CA 8,000 04/19/92 5,182 0 2,453 2.729 2,854 125 CA 8000 04/20/92 2,854 6,650 3,215 6,289 6,350 61 CA 8,000 04/21/92 6,550 2,600 3,035 5,915 5,843 72- CA 8,000 04/22/92 5,843 4',650 3,335 7,158 7,190 32 CA 8 000 04/23/92 7,190 0 5,557 5,633 3,657 24 CA 8,000 04/24/92 3,657 5,100 4,420 4,337 4,321 16- CA 8,000 04/25/92 4,321 5,100 3,180 6.241 6,241 0 CA 8 000 04/26/92 6,241 0 2,779 5.462 3,427 35- CA 8.000 04/27/92 3,427 4,650 3,075 5.002 5,075 73 CA 8.000 04/28/92 5,075 5,100 3,013 7.162 7,179 17 CA 8 000 04/29/92 7,179 0 2,940 4.239 4,199 40- CA 8 000 04/50/92 4,199 5,100 3,126 6.173 6,229 56 CA 8.000 MONTH TOTALS: 155,051 103,522 105,649 154,904 154,958 1165 54 NO 05/01/92 6,229 0 4,859 1,370 1,376 6 CA 8, 05/02/92 1,376 5,100 2,707 3,769 3,769 0 CA 8, 05/03/92 3,769 5,100 2,892 5,977 6,044 67 CA 8 05/04/92 6,044 4,500 3,453 7,091 7,159 68 CA 8,000 05/05/92 7 159 0 3,001 .4,158 4,077 81- CA 8,000 05/06/92 4,077 2,600 3,190 3,487 3,603 116 CA 8,000 05/07/92 3,605 5,100 3,284 5,419 5,378 41- CA 8,000 05/08/92 5,378 5,100 3,741 6,737 6,713 24- CA 8,000 05/09/92 6,713 0 2,849 3,864 3,864 0 CA 8,000 05/10/92 3.864 5,200 2,390 6.674 6,690 16 CA 8,000 05/11/92 6.690 0 3,095 3.595 3,589 6- CA 8,000 05/12/92 3,589 5,100 3,349 5,340 5,417 77 CA 8,000 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL UNLEADED TANKS IN THE SYSTEM PAGE' 50 PPDCB019 OPENING CLOSING PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 05/13/g2 5,417 0 3,066 2.351 2,194 157- CA 8.000 05/lq/92 2,194 4,890 3,018 4.066 4,240 174 CA 8.000 05/15/92 4,240 q,885 4,152 4.973 5,075 102 CA 8.000 05/16/92 5,075 0 3,183 1.892 1,892 0 CA 8.000 05/17/92 1,892 2,975 2,746 2.121 2,094 27- CA 8.000 05/18/92 2,094 4,900 3,626 3.368 3,385 17 CA 8.000 05/19/92 3,385 5,100 3,043 5,442 5,522 80 CA 8,000 05/20/92 5,522 0 3,427 2.095 2,044 51- CA 8.000 05/21/92 2,044 5,800 3,390 4,454 4,498 44 CA 8,000 05/22/92 4,498 4,926 4,099 5.325 5,417 92 CA 8.000 05/23/92 5,417 0 3,181 2.236 2,236 0 CA 05/24/92 2,236 5,130 2,159 5.207 5,207 0 CA 8,1 05/25/92 5,207 4,529 2,255 7.481 7,471 10- CA 05/26/92 7,471 0 3,472 3,999 3,996 3- CA 8 05/27/92 3,996 5,700 3,008 6.688 6,713 25 CA 8,000 05/28/92 6,713 0 3,148 3,565 3,535 30- CA 8,000 05/29/92 3,535 4,800 4,135 4,200 4,213 13 GA 8,000 05/30/92 4,213 5,700 3,016 6~897 6,897 0 CA 8,000 05/31/92 6,897 0 2,419 4.478 4,538 60 CA 8,000 MONTH TOTALS: 140,537 97,135 99,353 138,319 138,846 1101 527 NO 06/01/92 4,538 4,900 3,503 5,935 5,906 29- CA 8,000 06/02/92 5,906 4,650 2,783 7.773 7,325 52 CA 8,000 06/03/92 · 7,825 0 2,704 5,121 5,128 7 CA 8,000 06/04/92 5,128 2,600 3,001 4.727 4,729 2 CA 8,000 06/05/92' 4,729 6,500 3,383 7,846 7,817 29- CA 8,000 06/06/92 7,817 0 2,577 5.240 5,240 0 CA 8,000 06/07/92 5,240 0 2,342 2.898 2,788 110- CA 8,000 06/08/92 2,788 4,800 3,034 4.554 4,701 147 CA 8,000 06/09/92 4;701 2,650 2,669 4.682 4,756 74 CA 8,000 06/10/92 4,756 5,100 2,757 7.099 7,012 87- CA 8,000 06/11/92 7,012 0 2,707 4,305 4,335 30 CA 8,000 06/12/92 4,335 4,650 3,726 5,259 5,273 14 CA 8,000 06/13/92 5,273 4,311 2,898 6,686 6,686 0 CA 8 06/15/92 2,827 5,000 3,017 4.810 v. - - 8,000 06/16/92 5,881 0 2,858 3,023 3,119 96 CA 8,000 06/17/92 3,119 4,717 2,813 5,023 5,207 184 CA 8,000 06/18/92 5,207 0 2,865 2,342 2,194 148- CA 8,000 06/19/92 2,194 4,300 . 3,050 3,444 3,454 10 CA 8,000 06/20/92 3,454 4,204 2,483 5,175 5,175 0 CA 8,000 06/21/92 5,175 0 2,003 3,172 3,413 241 CA 8,000 '06/22/92 3,413 4,650 2,896 5 167 5,194 27 CA 8,000 06/23/92 5,194 4,650 2,498 7,346 7,280 66- CA 8,000 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL UNLEADED TANKS ZN THE SYSTEM PAGE" 51. PPDCB019 OPENING CLOSING PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 06/24/92 7,280 0 2,518 4,762 4,835 73 CA 8,000 06/25/92 4,835 3,700 2,670 5,865 5,868 3 CA 8,000 06/26/92 5,868 0 3,685 2,183 2,094 06/27/92 2,094 4,850 2,'325 4,619 4,619 O CA 8,000 06/28/92 4,619 0 2,179 2,440 2,334 106- CA 8,000 06/29/92 2,334 4,200 2,786 3,748 3,860 112 CA 8,000 06/30/92 3,860 5,850 2,900 6,810 6,860 50 CA 8,000 MONTH TOTALS: 144,088 86,282 83,721 146,649 146,410 993 239- NO FACILITY TOTALS: 439,656 286,939 286,723 439,872 440,214 2999 342 NO 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL PREMIUM TANKS IN THE SYSTEM PAGE PPDCB019 OPENING CLOSING PHYSICAL ALLONED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 04/01/92 3.402 2,152 964 4,590 4.545 45- CA 6,000 04/02/92 4,545 1,552 1,155 4,942 4,907 35- CA 6,000 04/03/92 4.907 0 1,237 5,670 3.766 96 CA 6,000 04/04/92 3.766 1,802 1,108 4,460 4.460 0 CA 6,000 04/05/92 4~460 0 738 3,722 3.726 4 CA 6,000 04/06/92 5,726 2,150 1,038 4,838 4~804 34- CA 6,000 04/07/92 4,804 0 1,014 3,790 3~839 49 CA ' 6,000 04/08/92 5,839 1,550 1,142 4,247 4,136 111- CA 6,000 04/09/92 4,136 1,550 1,104 4,582 4,700 118 CA 6,000 04/10/92 4,700 0 1,328 3,372 3,339 33- CA 6,000 04/11/92 3,339 0 787 2',552 2,552 0 CA 6,000 04/12/92 2,552 2,152 777 3,927 3,962 35 CA 6, 04/13/92 3,962 ],550 1,094 04/14/92 4,466 0 9'95 3,471 3,423 48- CA 6, · 04/15/92 3.423 1,550 983 3,990 3.983 7- CA 6,000 04/16/92 3.983 0 1,029 2,954 2.954 0 CA 6,000 04/17/9'2 2.954 0 1,230 1,724 1.676 48- CA 6,000 04/18/92 1.676 4,650 1,037' 5,289 5.289 0 CA 6,000 04Z19/92 5.289 0 684 .' 4,605 4.613 8 CA 6,000 04/20/92 4.613 0 1,108 3,505 3.559 54 CA 6,000 04/21/92 3~559 1,550 831 4,278 4.277 1- CA 6,000 04/22/92 4.277 1,550 1,026 4,801 4.814 13 CA 6,000 04/23/92 4.814 0 965 3,849 3~860 11 CA 6,000 04/24/92 3.860 1,550 1,279 '4,131 4.136 5 CA 6,000 04/25/92 4.136 1,550 937 4,749 4.7fi9 0 CA 6,000 04/26/92 4.749 0 704 4,045 4.02fi 21- CA 6,000 04/27/92 4.024 1,550 901 4,673 4.661 12- CA 6,000 04/28/92 4.661 1,550 777 5,434 5.516 82 CA 6,000 04/29/92 5.516 0 739 4,777 4.681 ' 96- CA 6,000 04/30/92 4.681 0 95fi 3,727 3.685 42- CA 6,000 MONTH TOTALS: 122,819 29,958 29,665 123,112 ']23,102 430 10- NO 05/01/92 3.685 0 1,282 2 403 2.441 38 CA 6,000 05/02/92 2.441 1,550 893 3 098 3.098 0 CA 6, 05/03/92 3,098 1,550 673 3975 4,044 69 CA 6, 05/04/92 4,044 1,510 1,067 4 487 4~466 21- CA 6,000 05/05/92. 4.466 0 873 3 593 3~569 24- CA 6,000 05/06/92 3.569 1,550 857 4262 4.156 106- CA 6,000 05/07/92 4.]56 1,550 1,069 4637 4.671 34 CA 6,000 05/08/92 4.671 1,550 1,181 5040 5.063 23 CA 6,000 05/09/92 5~063 0 774 4 289 q.289 0 CA 6,000 05/10/92 q.289 0 729 3 560 3~622 62 CA 6,000 05/11/92 3.622 0 1,048 2.574 2.503 71- CA 6,000 05/12/92 2.503 1,550 973 3.080 3.203 123 CA 6,000 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL PREMIUM TANKS IN THE SYSTEM PAGE' 50 PPDCB019 OPENING CLOSING PHYSICAL ALLOHED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST SIZE 00589 05/13/92 3,203 0 779 2,424 2,369 55- CA 6.000 05/14/92 2,369 1,836 893 3,312 3,318 6 CA 6.000 05/15/92 3,318 1,831 1,192 3,957 3,890 67- CA 6.000 05/16/92 3,890 0 911 2,979 2,979 0 CA 6.000 05/17/92 2,979 1,551 886 3,644 3,787 143 CA 6.000 05/18/92 3,787 1,650 849 4,588 4,584 4- CA 6.000 05/19/92 '4,584 1,550 822. 5,312 5,249 63- CA 6.000 05/20/92 5,249 0 984 4,265 4,287 22 CA 6.000 05/21/92 4,287 0 723 3,564 3,465 99- CA 6.000 05/22/92 , 3,465 1,782 1,198 4,049 4,247 198 CA 6.000 05/23/92 4;247 0 822 3,425 3,425 O CA 6.000 05/24/92 3,425 1,600 856 4,169 4,169 0 CA 05/25/92 q,169 1,550 603 5,116 5,090 26- CA 05/26/92 5,090 0 948 4,142 4,034 108- CA 6 05/27/92 4,034 1,600 6gg 4,935 5,018 83 CA 6,000 05/28/92 5,018 0 870 4,148 4,237 89 CA 6,000 05/29/92 4,237 1,601 1,088 4,750 4,661 89- CA 6,000 05/30/92 4,661 0 693 3,968 3,968 0 CA 6,000 05/31/92 3,968 0 715 3,253 3,308 55 CA 6,000 MONTH TOTALS: 121,587 27,361 27,950 120,998 121,210 404 212 NO 06/01/92 3,308 1,700 854 4,154 4,176 22 CA 6.000 06/02/92 4,176 1,550 985. 4,741 4,738 3- CA 6.000 06/03/92 4,738 0 978 3,760 3,736 24- CA 6.000 06/04/92 3,736 1,801 979 4,558 4,681 123 CA 6000 06/05/92 4,681 0 914 3,767 3,643 124- CA 6 000 06/06/92 3,643 0 738 2,905 2,905 0 CA 6.000 06/07/92 2,905 0 622 2,283 2,256 27- CA 6.000 06/08/92 2,256 1,550 815 2.991 '3,025 94 CA 6 000 06/09/92 3;025 1,600 728 3.897 3,931 34 CA 6 000 06/10/92 3,931 1,550. 939 4.542 4,447 95- CA 6.000 06/11/92 4,447 0 822 ' 3.625 3,622 3- CA 6 000 06/12/92 '3,622 1,550 1,137 4.035 4,075 40 CA 6,C 06/13/92 4,075 1,537 849 q,763 4,763 0 CA 6 06/14/92 4,763 0 701 4.062 q,075 13 CA 6 06/15/92 4,075 1,800 761 5.114 5,134 20 CA 6,000 06/16/92 5,134 0 677 4.457 4,377 80- CA 6,000 06/17/92 q,377 0 824 3.553 3,736 183 CA 6,000 06/18/92 3,736 0 914 2.822 2,711 111- CA 6,000 06/19/92 2,711 1,500 1,114 3.097 3,088 9- CA 6,000 06/20/92 3,088 1,576 773 3.891 3,891 0 CA 6,000 06/21/92 3,891 0 604 3.287 3,392 105 CA 6,000 06/22/92 3,392 1,550 939 4.003 4,003 0 CA 6,000 06/2'3/92 4,003 1,550 885 4.668 4,603 65- CA 6,000 07/06/92 U.G.S.T. VARIANCE REPORT FOR ALL PREMIUM TANKS IN THE SYSTEM PAGE' ~ ' PPDCB019 OPENING CLOSING PHYSICAL ALLOWED ACTUAL TANK FACILITY DATE INVENT. DELIVERY SALES INVENT. INVENT. VAR. VAR. OVER ST .SIZE 00589 06~24/92 q,603 0 768 3,835 3,829 6- CA 6,000 06/25/92 3,829 ],60,0 1,062 q,367 q,387 20 CA 6,000 06/26/92 4,387 0 1,041 3,346 3,423 77 CA 6,000 06/27/92 3,423 1,500 722 q,201 q,201 0 CA 6,000 06/28/92 4,201 0 607 3,594 3,423 171- CA 6,000 06/29/92 3,423 1,600 786 4,237 4,427 190 CA 6,000 06/30/92 4,427 0 70.8 3,719 3,695 24- CA 6,000 MONTH TOTALS: 116,006 25,514 25,246 116,274 116,393 385 119 NO FACILITY TOTALS~ 360,412 82,833 82,861 360,384 360,705 958 321 NO I~ {~llAgreement Number 0001780 ARCO Products Compa ~' ~greement Sequence 001 Division ot Atlantic Eich~ield Company ~' {~-F~ Facility Number 00115 Customer Number 0412841 AMENDMENT TO LESSEE PMPA FRANCHISE AGREEMENT/DEALER/PREMISES LEASE OPERATION OF UNDERGROUND STORAGE TANKS CALIFORNIA This Amendment, dated ~'~O./t.~ [~J., 19_~, is attached to, incorporated in and made a part of the Lessee PMPA Franchise Agreerr~nt/Dealer/Premises Lea~se ("PMPA Agreement"), in effect as of the date of this Amendment or, if applicable~ to become effective conWcurrently with this Amendment, between Atlantic Richfield Company, a Delaware Corporation, through its division ARCO Product Company, ("ARCO"), and PRESTIGE STATIONS INC 589 ("Franchisee"), covering premises located at 1501 CALIFORNIA AVE BAKERSFIELD CALIFORNIA 93304 In return for good and valuable consideration, each party's receipt of which is hereby acknowledged, the parties agree as follows: 1. The parties have entered into this Amendment in accordance with legal requirements imposed on ARCO and Franchisee concerning operation of the underground storage tanks at the above-referenced location. 2. ARCO has provided Franchisee a copy of: (al California Health and Safety Code Section 25299 or an approved summary concerning civil and criminal penalties for violating terms of any permit to operate these underground storage tanks and relevant statutory and regulatory requirements; (b) the following listed documents, a copy of which is attached and initialed by Franchisee: Monitor & Response Plan - III w/Attachments 3. Where ARCO has provided Franchisee with a copy of the permit to operate the underground storage tanks, Franchisee has read and understood its responsibilities as operator under the permit and agrees to comply with each of the provisions of the permit.' Irrespective of whether Franchisee has received and reviewed a copy of the underground storage tank operating permit, Franchisee hereby expressly agrees to do the following: a~~.O ~'~ ~ "-' ( r t .dergrdund ~tahks as required by law; "'"'"TO~'?l~a'~i'n '~ii"~'equired records and make such records available to the federal, state and local government agencies and to ARCO at all reasonable times; (c) follow all reporting procedures as required by law; (d) mail, when submitted, to ARCO, at the address specified in paragraph I of the PMPA Franchise Agreement/Dealer/Premises Lease, a copy of all reports submitted to government agencies; CA 1 of 2 (1/92) PARSSV (e) follow all operating procedures specified by ARCO; (f) immediately report to ARCO all suspected or confirmed releases from the tanks and connected piping system, unusual operating conditions, release detection signals and environmental conditions suggesting a release may have occurred, and any spills and overfills that are not contained and cleaned up; (g) properly close the underground tanks as required by law; and, (h) comply with all federal, state and local legal requirements relevant to the operations of the underground tanks and all amendments to any permit to operate. 4. With respect to the operation of the underground storage tank system and monitoring equipment, Franchisee hereby acknowledges and agrees: that ARCO has provided Franchisee with training on each of the items described in the attached Monitoring and Response Plan, that Franchisee understood the content of the training, and asked any questions necessary to facilitate his understanding, that Franchisee indicated to ARCO at the time of training any subjects addressed by the training which Franchsee did not fully understand, and - that Franchisee received complete training and information necessary for Franchisee to fully understand the subject of operating underground storage tanks. 5. ARCO has provided Franchisee a copy of and Franchisee agrees to maintain on the Premises the Certificate of Financial Responsibility (as required by the United States Environmental Protection Agency in Subpart H, 40 CFR, Part 280 and California Health and Safety Code, Chapter 6.7, Section 25292.2). 6. Except to the extent they conflict with, or are less rigorous than the terms of this Amendment, all of the terms and conditions of the PMPA Agreement, as previously or hereafter amended or supplemented, remain in full force. IN WITNESS WHEREOF, ARCO and Franchisee have executed this Amendment. ARCO Products Company a division of Atlantic Richfield Company ARCO WITNESS: WITNESS PRESTIGE STATIONS INC 589 Franchisee's Name CA 2 of 2 (1/92) PAI~ SSW MONITORING & RESPONSE PLAN- III ARCO PRODUCTS COMPANY FACILITY WITH SINGLE WALL TANKS AND SINGLE WALL LINES ARCO Facility Address 1. DETECTION METHOD Tanks - Monthly Inventory Reconciliation and Annual Tank Integrity Testing in accordance with Sections 2646 and 2643(c)(2)(A) and (B), Article 4, Title 23, CCR. Lines - Automatic Pressure Line Leak Detectors and Annual Une Tightness Testing in accordance with Section 2643 (d)(1) and (3), Article 4, Title 23, CCR. 2. MONITORING EQUIPMENT The Automatic line leak detectors will be maintained and inspected according to the manufacturer's instructions by an outside contractor once during each calendar year. 3. MONITORING PROCEDURE - Inventory Reconciliation Inventory reconciliation will be performed in compliance with the details of Section 2646, Article 4, Title 23, CCR (copy attached and hereby incorporated). A. The daily variation in inventory reconciliation shall be the difference between physically measured inventory in storage and the calculated inventory in storage. B. The physically measured inventory shall be determined at approximately the same time each day by taking liquid level measurement (stick reading) and converting it to gallons using a calibration chart, The calculated inventory shall be determined at approximately the same time of day for each business day by adding the inputs and subtracting the withdrawals from the physically measured inventory determined the day before. D. These variations shall be summed for a period of one month. Monthly variations exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons must be invesligated in accordance with instructions attached. See Exhibit A for reconciliation form. 4. RESPONSE PLAN OPERATOR RESPONSIBILITIES If the morlthlv inventory reconciliation exceeds the allowable variation, the OPERATOR cheil: A. Verbally notify ARCO Maintenance ]j~ of a suspected unauthorized release upon completion of ANY inventory reconciliation which exceeds the allowable variation. Notification to ARCO must be in sufficient time to allow ARCO to report the suspected unauthorized release to the local implementing agency within 24 hours of the inventory reconciliation which indicated the allowable variation was exceeded. B. Within 24 hours of discovering a variation which exceeds the allowable variation, review the inventory records for the preceding 30 days and determine if a calculation error exists that caused the apparent excessive variation. Continue to conduct inventory reconciliation. If a second 30-day period of data confirms the initial results, notify ARCO Maintenance IMMEDIATELY and record in the monitoring record the action taken. NOTE: If t)rior to month-end daily inventory reconciliations indicate a susa)acted release, report it immediately to ARCO Maintenance. Do rtot wait until the end of th{~ month to re~)ort. ARCO RESPONSIBILITIES A. Upon notification by the Operator of a suspected unauthorized release, verbally notify the local implementing agency within 24 hours of discovery by the operator of any inventory reconciliation which exceeds the allowable variation. B. Within 24 hours of the notification by the Operator of a suspected unauthorized release, have all readily accessible facilities carefully inspected for leakage by appropriately trained persons and by following procedures in ARCO Products Company Procedure G.01. Have all dispenser meters associated with hazardous substance withdrawal checked for calibration within 24 hours of the inspection in item B. If a second 30-day ~)eriod of data confirms the initial results; The requirements of Article 5, Title 23, CCR will be performed. 5. ANNUAL VARIATION STATEMENT The operator shall, on an annual basis, submit a statement to the local agency which states that all inventory reconciliation data are within allowable variations or which includes a list of the period of times and the corresponding variations which exceed the allowable variations. Said statement shall be executed under penalty of perjury. See Exhibit B for Annual Inventory Reconciliation Summary Report form. in addition to the training covering subjects mentioned in Sections 3 and 4 above, training needed for the operation of the tank system and monitoring equipment includes: How to: Take tank level measurements Read dispenser meters Inspect equipment Recognize warning signs: dispenser hesitations, meter spins and odors Manually close dispenser impact valve Replace dispenser filters Shut down the system with and location of: ARCOmatic switch, electrical panel breakers, and emergency shut off switch Test the electronic monitor 7. RECORDS RETENTION Written records of all monitoring, testing, and maintenance performed shall be maintained on-site or off-site at a readily available location for a period of at least 3 years. These records must be made available, upon request within 36 hours, to the local agency or the Board. ARCO Products Company Division of AtlanticRichfieldCompany Inventory Reconciliation Sheet California Facility: Tank #: Size. Product: Month/Year: I 2 3 4 5 6 Previous Deliveries Metered Calculated Current Day's Actual Variation Day's Sales Inventory Dipstick Column 4 & 5 Dipstick Reading Subtract Reading Column Smaller # (Physically 1 + 2 - 3 from Larger # MeasuredI Day Gallons Gallons Gallons Gallons Gallons +/-' Gallons 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 TOTAL 'Subtract Smaller # from Larger #. If Column 4 is less than 5 (+). If Column 5 is less than 4 (-). MONTHLY ALLOWABLE VARIATION: Total of Column 2 x .01 , + 130 - ;lallons. ACTUAL VARIATION: Total in Column 6 gallons. actual variation is oreater than allowable variation, call ARCO Maintenance and follow the monltorino and res~)onse olan, ANNUAL INVENTORY RECONCILIATION SUMMARY REPORT ARCO Facility #: Address: City: Zip: A. All inventory rariations for the above mentioned facility were within allowable limits of Section 2646, CCR, Title 23, Division 3, Chapter 16, for the 12 month period from to , 19 to 19~ B. Inventory variations in excess of the allowable limits of Section 2646. occured on the following months, in the listed amounts, for the noted underground storage tanks. From Inventory Reconciliation Sheet. If actual is greater than allowable, subtract actual from allowable and report difference as variation below. Month Product or Product or Product or Product or Tank # Tank # Tank # Tank # Submit report within 15 days following the end of the last month of the12-month time period covered by the report. Report to be submitted to your local implementing agency by Certified Mail if possible:. A copy of this report is to be submitted to: ARCO Products Company Environmental Compliance Administrator 17315 Studebaker Road Cerritos, CA 90701-1488 I certify under penalty of perjury, that all variations (if any) exceeding allowable limits are indicated above: Facility 'rank Operator Date CALIFORNIA CODE OF REGULATIONS TITLE 23 WATERS DIVISION 3 STATE WATER RESOURCES CONTROL BOARD CHAPTER 16 UNDERGROUND TANK REGULATIONS ARTICLE 4, SECTION 2646. INVENTORY RECONCIMATION (a) Inventory reconciliation shall only be used as part of non-visual monitoring for existing underground storage tanks which contain motor vehicle fuels. (b) After January 1, 1993, inventory reconciliation, and any other leak detection method that utilizeds manual stick readings, shall not be used as part of non-visual monitoring for existing underground storage tanks containing a hazardous substance including motor vehicle fuel, where the existing ground water level or the highest anticipated ground water level is less than 20 teet below the bottom of the tank. These ground water levels shall be determined according to the requirements of section 2649 (c) of this article. (c) Inventory reconciliation that utilizes manual stick readings shall not be used after December 22, 1998. (d) Owners or operators of existing underground storage tanks who utilize inventory reconciliation as part of non-visual monitoring shall comply with the requirements of this section. (e) Each underground storage tank shall be individually monitored utilizing an inventory reconciliation system that takes into account: ( I ) Separate daily underground storage tank quantity measurements for both the stored hazardous substance and any water layer; ( 2 ) Daily readings for underground storage tank input and withdrawals; and ( 3 ) Checking of product inputs indicated by delivery receipt by measurement of the tank inventory volume before and after delivery. Underground storage tanks that are connected by a manifold may require time for the level to stabilize before a measurement is taken. (f) Meters used for determining inputs and withdrawals shall comply with California Code of Regulations, Title 4, Chapter 9, Subchapter 1, 'Tolerances and specifications for commercial weighing and measuring devices.' Meters shall be inspected by the County Department of Weights and Measures or a device repairman as defined in the California Business and professions Code, Division 5, Chapter 5.5. ( g ) For the purpose of this section, 'daily' means at least 5 days per week. The number of days involved may be reduced by the number of public holidays that occur during any such week. Local agencies may reduce the frequency of monitoring to no less than once every 3 days at facilities that are not staffed on a regular basis, provided that the monitoring is performed on every day the facility is staffed or when inputs or withdrawals are made from the underground storage tank. ( h ) Underground storage tank quantity measurements shall be based on liquid level measurements which are: ( I ) Performed during periods when no additions or withdrawals are being made to the underground storage tank; ( 2 ) Performed by the underground storage tank owner, operator, or other designated persons who have had appropriate training; ( 3 ) Based on the average of two readings if stick or tape measurements are used: ( 4 ) Determined by equipment capable of measuring the level of the product over the full range of the tank's height to the nearest one-eighth of a inch; ( 5 ) Determined by equipment capable of measuring, to the nearest one-eighth of an inch, water present in the bottom of the underground storage tank. If the underground storage tank is not level, and the measurements are taken manually, then the measurement should occur at the lowest end of the underground storage tank; ( 6 ) Measured at the center of the longitudinal axis of the underground storage tank if access is available or measured at the lowest end of the underground storage tank with a calibration measurement at both ends, if possible, to determine if any underground storage tank tilt exists and, if so, its magnitude; and ( 7 ) Converted to volume measurements based on a calibration chart for the underground storage tank. This chart shall, where feasible, take into account the actual tilt of the underground storage tank. (i) The daily variation in inventory reconciliation shall be the difference between physically measured inventory in storage and the calculated inventory in storage. The physically measured inventory shall be determined at approximately the same time each day by taking liquid level measurement and converting it to gallons using the calibration chart. The calculated inventory shall be determined at approximately the same time of day for each business day by adding the inputs and subtracting the withdrawals from the physically measured inventory determined the day before. These variations shall be summed for a period of one month. Monthly variations exceeding a variation of 1.0 percent of the monthly tank delivery plus 130 gallons must be investigated in accordance with this section. ( j ) The owner or operator shall, on an annual basis, submit a statement to the local agency which states that all inventory reconciliation data are within allowable variations or which includes a list of the period of times and the corresponding variations which exceed the allowable variations. Said statement shall be executed under penalty of perjury. (k) If the monthly inventory reconciliation, conducted under subsection (i) of this section, exceeds the allowable variation, the owner or operator as appropriate shall: ( I ) Notify the local agency of a suspected unauthorized release within 24 hours of completing any inventory reconciliation which exceeds the allowable variation; ( 2 ) Within 24 hours of discovering a variation which exceeds the allowable variation, review the inventory records for the preceding 30 days and determine if a calculation error exists that caused the apparent excessive variation. ( 3 ) Within 24 hours of discovering a variation which exceeds the allowable variation, have all readily accessible facilities carefully inspected for leakage by appropriately trained persons; ( 4 ) Have all dispenser meters associated with hazardous substance withdrawal checked for calibration within 24 hours of completing the procedure required in subsection (3) immediately above. ( 5 ) Continue to conduct inventory reconciliation according to the requirements of this section., If a second 30-day period of data confirms the initial results, the owner or operator shall comply with the requirements of Art~e S of this chapter, and ( 6 ) Conduct such additional tests or investigations as may be required by the local agency. ( I ) Whenever any of the steps in subsection (k) of this section are performed, the results shall be documented in the monitoring record required under section 2712 of Article 10 of this chapter. If completion of any one of these steps indicates an inventory reconciliation error that, when corrected, indicates that allowable variations have not been exceeded, then the remainder of the steps need not be completed. If compleUon of any of these steps indicates that the apparent excessive variation is not due to a release or tank failure, then the remainder of the steps need not be completed. ( rn ) The transfer of hazardous substances into and out of the underground storage tank may continue while the steps indicated in subsection (k) are being implemented provided the steps indicated are completed within the specified periods. Daily inventory readings and monthly reconciliation shall continue while the steps are being implemented. Authority: Health and Safety Code 25299.3, 25299.7 Reference: Health and Safety Code 25291, 25292 40 CFR 280.43 CALIFORNIA HEALTH AND SAFETY CODE DIVISION 20, CHAPTER 6.7 SECTION 25299 (a) Any operator of an underground tank system shall be liable for a civil penalty of not less than five hundred dollars ($500) or more than f'we thousand dollars ($5,000) for each underground storage tank for each day of violation for any of the following violations: ( I ) Operating an underground tank system which has not been issued a permit, in violation of this chapter. ( 2 ) Violation of any of the applicable requirements of the permit issued for the operation of the underground tank system. ( 3 ) Failure to maintain records, as required by this chapter. ( 4 ) Failure to report an unauthorized release, as required by Sections 25294 and 25295. ( 5 ) Failure to property close an underground tank system, as required by Section 25298. ( 6 ) Violation of any applicable requirement of this chapter or any requirement of this chapter or any regulation adopted by the board pursuant to Section 25299.3 (7) Failure to permit inspection or to perform any monitoring, testing, or reporting required pursuant to Section 25288 or 25289. (8) Making any false statement, representation, or certification in any application, record, report, or other document submitted or required to be maintained pursuant to this chapter. ( b ) Any owner of an underground tank system shall be liable for a civil penalty of nol less than five hundred dollars ($500) or more than f'we thousand dollars ($5,000) per day for each underground storage tank, for each day of violation, for any of the following violations: ( 1 ) Failure to obtain a permit as specified by this chapter. ( 2 ) Failure to repair or upgrade an underground tank system in accordance with this chapter. ( 3 ) Abandonment or improper closure of any underground tank system subject to this chapter. ( 4 ) Knowing failure to take reasonable and necessary steps to assure compliance with this chapter by the operator of an underground tank system. ( 5 ) Violation of any applicable requirement of the permit issued for operation of the underground tank system. ( 6 ) Violalion of any applicable requirement of this chapter of any regulation adopted by the board pursuant to Section 25299.3. (7) Failure to permit inspection or to perform any monitoring, testing, or reporting required pursuant to Section 25288 or 25289. (8) Making any false statement, representation, or certification in any application, record. report, or other document submitted or required to be maintained pursuant to this chapter. ( c ) Any person who intentionally fails to notify the board or the local agency when required to do so by this chapter or who submits false information in a permit application, amendment, or renewal, pursuant to Section 25286, is liable for a civil penalty or not more than five thousand dollars ($5,000) for each underground storage tank for which notification is not given or false information is submitted. (d) Any person who falsifies any monitoring records required by this chapter, or knowingly fails to report an unauthorized release, shall, upon conviction, be punished by a fine of not less than five thousand dollars ($5,000) or more.than ten thousand dollars ($10,0000, by imprisonment in the county jail for not to exceed one year, or by both that fine and imprisonment. (e) In determining both the civil and criminal penalties imposed pursuant to this section, the court shall consider all relevant circumstances, including, but not limited to. the extent of harm or potential harm caused by the violation, the nature of the violation and the period of time over which it occurred, the frequency of past violations, and the corrective action, if any, taken by the person who holds the permit. (f) Each civil penalty or criminal fine imposed pursuant to this section for any separate violation shall be separate, and in addition to, any other civil penalty or criminal fine imposed pursuant to this section or any other provision of law. and shall be paid to the treasury of the local agency or state, whichever is represented by the office of the city attorney, district attorney, or Attorney General bringing the action. All penalties or fines collected on behalf of the board or a regional board by the Attorney General shall be deposited in the State Water Pollution Cleanup and Abatement Account in the State Water Quality Control Fund, and are available for expenditure by the board, upon appropriation, pursuant to Section 13441 of the Water Code. (g) This section shall become operative on January 1, 1991. (Added by Stats. 1988, c. 296 Section 3, operative Jan. 1. 1991. Amended by Stats. 1989. c. 11397, Section 19, operative Jan. 1. 1991.) BAKERSFIELD FIRE DEPARTMENT HAZARDOUS MATERIAL DIVISION PERMIT TO OPERATE UNDERGROUND HAZARDOUS STORAGE FACILITY Permit No.: 190009C State ID No.: 26855 Issued to: ARCO #6115 Location: 1501 CALIFORNIA AVE BAKERSFIELD, CA 93304 Owner:. ATLANTIC RICHFIELD COMPANY P O BOX 6038 ARTESIA, CA 90702-6038 Operator:. PRESTIGE STATIONS INC 1501 CALIFORNIA AVE BAKERSFIELD, CA 93304 Facility Profile: Year' Is Piping Tank No. Substance Capacity. Installed Ptesst~mi 1 GASOLINE 10,000 GAL 1993 YES 2 GASOLINE 10,000 GAL. 1993 YES 3 GASOLINE 10,000 GAL 1993 YES 4 GASOLINE 10,000 GAL 1993 YES This permit is granted subject to the conditions listed on the attached summary of conditions and may be revoked for failure to adhere to the stated conditions and/or violations of any other State or Federal regulations. Issued by: Ralph E. Huey Issue Date: JULY 1, 1991 ou r Expiration Date: JULY 1, 1994 POST ON PREMISES NONTRANSFERABLE ~.~ ]]a~e~'s£1e]ct F~e ])eptoi~I ~~ , .~RDOUS MATERI~LS DI~ON (~~ _~. 2130 O Street, Bakersfield, CA 93301 ~ .~ (805) 326-3970 UNDERGROUND TANK QUESTI~ I. FACILI~/SITE NO. OF TANKS ~ D~ OR FACILI~ NAME NAME ~ OPERATOR ADDRE~ N~R~T CEO~ STRE~ PARCEL No.(OPTIONAL) NAME STA~ ZIP CODE / BOXTO INDICA~ ~OR~ON ~INDIVIDUAL ~ PARmERSHIP ~ L~AL AGENCY DlSmlC~ ~COUNW AGENCY ~ STA~ AGENCY ~ FEDE~L AGENCY Q3FARM Q4 P~R Q5OmER TO OPE~TE ~. EMERGENCY CONTACT PERSON (PRIMAR~ EMERGENCY CON~ACT PERSON (SECONDAR~ optiond DAYS: NAME (~ST. FIm~ PHONE ~. WITH AR~ CODE I ~ NAME (~ST. FIm~ PHONE ~. Wl~ AR~ CODE I NIGHTS: NAME (~ST. ~1[ PHONE ~. Wl~ ii~ COD[ NIG~B: Ni~f (~ST, il~O PHONE ~. Wl~ II. PROPER~ OWNER INFORMATION (MUST BE COMPLETED) NAME CARE OF AOOR~ IN~RMA~ON MAILING Off S~R~ ADDRESS / ~ BOX ~ tp,~ INDIVIDUAL ~ LOCAL AGENCY ~ S~A~ A~NCY I ~ ~ I S ~ B~ ~ ~ TO INDICATE -- O PARTNERSHIP O COUNW AGENCY ClW NAME STATE ZIP CODE PHON~ ~. WI~ AR~ CODE C~1~o~ C~ qo~ol (~3) 404 -~3oo III. TANKOWNER INFORMATION (MUST BE COMPLETED) NAME CARE OF ADORE~ IN~RMATION MAILING OR ST'RE~ ADDRE~ ~ BOX ~ F~,~ INDIVIDUAL ~ LOCAL AGENCY ~ STATE AGENCY I w~ I~ ~+~e ~k~ ~ ~0 INDICATE Q PARTNERSHIP Q COUNW AGENCY Q FEDE~L AGENCY CIW NAME STATE ZIP CODE PHONE NO. WITH AR~ CODE TANK S~E OWNEE'S DA~E -~ ~EODBC~ IN ~ANK No. INSTALLED S~OEED ~EEVICE ~ I~/~/~ ~,ooo ~ ~~ ~l~ ~ N ~ I~/I~/~ ~,o~ ~[ ~ ~1~ ~1 N YIN YIN YIN DOYOU HAVE FINANCIAL ~ESPONSIBILITY2 ~N ~PE ~- ~) ~ ~ Fill one segment ~t for each tank, unless all tanks and piping are constructed oft~isame materials, style and~)e, then only fill one segment out. please identify tanks by owner ID I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNOWN A. OWNER'S TANK I.D.# '-'r~v~...' ~ ~. MANUFAC~RED BY: ~O~ c. / III. TANK C0NSTRUC~ON aARKONEI~aONLYIN~S~a, ANDC,~OA~ATAP~IESlNaOXD A. ~PE OF ~ ~ ~USLE WA~ ~ 3 SINGLE W~ WI~ E~RIOR LINER ~ 95 UN~OWN SYSTEM ~ 2 SINGLE WALL ~ 4 SECONDA~ ~NTNNMENT (VAUL~DTAN~ ~ ~ O~ER B. T~K ~ 1 ~RESTEEL ~ 2 STNNLESS S~ ~ 3 FIBERG~S ~ 4 ST~LC~ WlFI~ER~REINmRCEDP~C MATERI~ ~ 5 ~NCRE~ ~ 6 ~LWI~L CHLORI~ ~ 7 ~UMINUM ~ 8 1~* MEdrOL ~MPA~B~W~RP (Prim~yTa,k) ~ 9 BRO~ ~ 10 ~LV~O S~ ~ ~ UN~OW, ~ ~ O~E, C. INTERIOR . u.u. IS UNING MA~RIAL ~MPATI~E ~ 1~ ME~A~? YES~ D. CORROSION ~ 1 ~L~LENE W~P ~ 2 ~A~ ~ 3 ~L ~ ~ 4 FIBERG~S REINFO~ED ~C PROTEC~0N ~ 5 ~ P~TECTION ~ 91 ~NE ~ ~ UN~WN ~ ~ O~ER IV. PIPING INFORMATION c~,cm A IFABOVEGROUNDOR U ~rUN~.OUNO. aO~IFAmUGAaLE A. SYSTEM~PE A U 1 SUC~ON A ~ 2 PRESSURE A U 3 G~VIW A U ~ O~ER B. CONSTRU~ION A ~ 1 SING~ WALL A U 2 ~UaLE W~ A U 3 LINED TR~H A U ~ UN~OWN A U ~ O~ER C. MATERIAL AND A u I ~RE STOL A U 2 STNNLESS S~ A U 3 ~LWINYL CHLORIDE (PVC)A U 4 FIBERG~S PIPE CORROSION A U 5 ~UMINUM A U 6 ~NCflE~ A g 7 STEEL WI ~A~NG A U 8 I~ M~OL ~MPAT;B~W~RP PROTE~ION A~ 9 ~LVANI~D S~ A U 10 CATHODICPRO~CTION A U 95 UN~OWN A U ~ O~ER D. LEAK D~ECTION ~ ~TOMATIC LINE LEAK DE~CTOR ~ 2 LINE T~H~ESS ~STING ~Nff0RING ~ ~ O~ V. TANK LEAK D~ECTION ~ 6 TANK TESTING ~ 7 IN~RSTmALMONITORING ~ 91 ~E I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF uNKNowN A. OWNER'S TANK I.D.# --]'~W.'~--.. .-?--. S. MANUFACTURED aY: c. DATE INSTALLED(MO/DAY/YEAR) 12-/ Iq /-7(:~ D. TANK CAPACI'TY IN GALLONS: IlL TANK coNSTRUCTION MARK ONE ITEm ONLY IN BOXES A. B. AND C. N'.ID ALL THAT APPLIES IN SOX D A. TYPE OF [] ! DOUBLE WALL [] 3 SINGLE WALL WITH EXTERIOR LINER [] 95 UNKNOWN SYSTEM ~ 2 SINGLE WALL [] 4 SECONDARY CONTAINMENT (VAULTED TANK) [] 99 OTHER B. TANK ~ 1 BARE STEEL [] 2 STAINLESS STEEL [] 3 FIBERGLASS [] 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC MA~'ERJAL [] 5 CONCRETE [] 6 POLYVINYL CHLORIDE [] 7 'ALUMINUM [] 8 100% METHANOL COMPATIBLEW/FRP (PrimaryTank) [] g BRONZE [] 10 GALVANIZED STEEL [] 95 UNKNOWN [] 9~ OTHER [] , Rus . LINED[] 2 AL O L.,.G[] 3 LI...G [] 4` PHENOL': LINING C. INTERIOR LINING [] 5 GLASS LINING [] 6 UNLINED [] 95 UNKNOWN [] g9 OTHER mS UNING MATERIAL COMPATIBLE WITH 1~ METHANOL ? YES__ NO~ D. CORROSION [] 1 POLYETHYLENE WRAP [] 2 COATING [] 3 VINYL WRAP [] 4 FIBERGLASS REINFORCED PLASTIC PROTECTION [] 5 CATHODIC PROTECTION [] 91 NONE [] 95 UNKNOWN [] 99 OTHER IV. PIPING INFORMATION C~RC,~ A IFASOVEGROUNDOR U IFUNDERGROUND. BOTH IF APPLICASLE A. SYSTEM TYPE A U 1 SUCTION A (~ 2 PRESSURE A U 3 GRAVITY A U 99 OTHER B. CONSTRUCTION A ([~) I SINGLE WALL A U 200UBLE WALL A ti 3 LINED TRENCH .~ U 95 UNKNOWN A U 99 OTHER C. MATERIAL AND A U i BARESTEEL A U 2 STAINLESS STEEL A U 3 POLY%/INYL CHLORIDE(PVC)A t.I 4. FIBERGLASS PiPE CORROSION A U 5 ALUMINUM A U 6 CONCRETE & U 7 STEEL Wl COATING A U 8 100% METHANOL COMPATISLEWIFRP PROTECTION A ~)9 GALVANIZED STEEL A U 10 CATHODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER D. LEAK DETECTION [] 1 AUTOMATIC LINE LEAK DETECTOR [~ 2 LINE TIGHTNESS TESTING [] 3 INTERSTITIAL I~ONITORING [] 99 OTHER V. TANK LEAK DETECTION r ;"-~ 1 VISUAL CHECK, '~ 2 INVENTORY RECONCILIATION '--~_--] 3 VAPOR MONITORING r---] 4 AUTOMAT[CTANKGAUG[NG [] 5 GROUNDWATER MONITORING [ ~ ~. TANK DESCRIPTION COMPLETE - SPECIFY IF UNKNOWN A. OWNER'S TANK I.D.# T~i.4.~' I S. MANUFACTURED C. DATE ,NSTALLED(M~DAY'EAR) J~ / I~ / ~ J D. TANK C~ACIW IN ~ONS: II1. TANK CONSTRUCTION aA.KONEI~MONLYINBOXESAB. ANOC.~OALL~AT~IESlNaOXD A. ~PE OF ~ 1 ~UBLE WALL ~ 3 SINGLE W~ Wl~ E~ERIOR LINER ~ 95 UNKNOWN SYSTEM ~ 2 SINGLE WA~ ~ 4 ~NDARY ~NTAINMENT ~AUL~DTAN~ ~ ~ O~ER B. T~K ~ ~ ~RE STOL ~ 2 STAINLESS S~ ~ 3 F~BERG~S ~ 4 STEEL C~ W/FlaER~ RE~N~RCED P~C MATERI~ ~ 5 CONCRE~ ~ 6 ~LWINYL CHLORIDE ~ 7 ~UMINUM ~ 8 1~ M~ANOL ~MPA~B~W~RP ~. t~ERIOR UNING ~ 5 ~. UN~ ~ ~ UNLINED ~ ~ UN~ ~ ~ OmER D. CORROSION ~ 1 ~L~LENE W~ ~ 2 ~A~NG ~ 3 ~L ~ ~ 4 FIBERG~S REINFORCED ~C PROTEC~ON ~ s CA~D[C PRO~CTION ~ 9~ ~NE .-.~ ~ UN~WN ~ ~ O~ER IV. PIPING INFORMA~ON C~RCm A IF~O~GROUNDOR U IFUNDE~UND, BO~IF~A~ A. SYSTEM~PE A U 1 SUC~ON A ~ 2 PRESSURE & U 3 G~VI~ ~ U ~ O~ER B. CONSTRU~ION A ~ 1 SINGLE WA~ A U 2 ~UB~ W~ ~ U 3 UN~ TR~ A U ~ UN~OWN & U ~ O~ER · C. MA~RIALAND A U 1 ~RES~L A U 2 STNN~SS S~ A U 3 ~L~I~L CHLORIDE(PVC)A U 4 FIBERG~S PIPE CORROSION A U 5 ~UMINUM A U 8 ~R~ **~ U 7 ST~LWI~A~ A U 8 1~ M~L ~MPA~BLEW~RP PROTE~ION A ~ 9 ~LVANI~D S~ A U 10 ~T~PRQ~CTION A U ~ UN~O~ A U ~ O~ER D. LEAK D~E~ON ~ 1 ~TOMAT~ LINE LE~ D~C~R ~ 2 LINE T~H~ESS ~S~NG ~ 3 ~Sm~L ~NffORING ~ ~ O~ER V. TANK LEAK D~ECTION I I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNOWN IA. OWNER'S TANK I.D. # S. MANUFACTURED BY: C. DATE INSTALLED (MO/DAY/YEAR) D. TANK CAPACITY IN GN..LONS: III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES .~ B. ANOC, AND ALL THAT APPLIES IN BOX D A. TYPE OF [] 1 DOUBLE WALL ' [] 3 SINGLE WALL WITH EXTERIOR LINER [] 95 UNKNOWN SYSTEM ~ 2 SINGLE WALL [] 4 SECONDARY CONTAINMENT (VAULTED TANK) [] 99 OTHER B. TANK [] 3 BARE STEEL [] 2 STAINLESS STEEL [] 3 FIBERGLASS [] 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC MATERIAL ~ 5 CONCRETE [] 6 POLYVINYL CHLORIDE [] 7 ALUMINUM [] 8 10(~o METHANOL COMPA'FiaLEW/FRP (Prima.~,T.nk) [] 9 BRON~ [] .0 ~LVAN,~D STEEL [] 95 UNKNOWN[] 99 OTHER [] , RUBSER LI.ED [] 2 ~0 LI..G [] ~ ~0~ L,N~ [] ~ P.ENOL~ LINING C. INTERIOR lINING [] 5 GLASS LINING [] S UNLINED [] ~ UNKNOWN [] 99 OTHER ~s LINING UATERIAL COUPAT~SLE WITH ~o UETHANOL ? YES ~ ~ D. CORROSION [] ! POLYETHYLENE WRAP [] 2 COATING [] 3 VINYL WRA~ [] 4. FIBERGLASS REINFORCED PLASTIC PROTECTION .r~ 5 CATHODIC PROTECTION [] 91 NONE [] 95 UNKNOWN [] 99 OTHER IV. PIPING INFORMATION C~RC~ A IFABOVEGROUNDOR U IFUNDERGROUNO, BOTH IF APPLICASLE A. SYSTEM TYPE A U 1 SUCTION A U 2 PRESSURE A U :3 GRAVITY A U 99 OTHER B. CONSTRUCTION A U 1 SINGLE WALL A U 2 DOUBLE WALL A tJ 3 LINED TRENCH A U 95 UNKNOWN A U 9g OTHER C. MATERIAL AND A U I BARE STEEL A U 2 STAINLESS STEEL A U 3 POLYVlNYL CHLORIOE(PVC)A U 4 FIBERGLASS PIPE CORROSION A U 5 ALUMINUM A [J 6 CONCRETE A U 7 STEEL Wl COATING A U B 100% METHANOL COMPATIBLEW/FRP PROTECTION A tJ 9 GALVANIZED STEEL A [,I 10 CATHODIC PROTECTION A [J 95 UNKNOWN A ~1/ 99 OTHER D. LEAK DETECTION ~ 1 AUTOMATIC LINE LEAK DETECTOR [] 2 LINE TIGHTNESS TESTING [] 3 INT~511HAL MONITORING [~ 99 OTHER V. TANK LEAK DETECTION ~ 1 VISUAL CHECK [] 2 INVENTORY- RECONCILIATION [] 3 VAPOR MONITORING [] 4 AUTOMATIC TANK GAUGING [] 5 GROUND WATER MONITORING :?__ ~ TANK TEST,NG [] ~ ,N~RSTIT,ALMON,TO.IN~ [] ~, NO.E [] 9. U.KNOW. [] ~ OTHE" The At]antic Richfield Company (ARCO) hereb~ cerl/fles that it is in complhmce with the req~r~menm of SUbl~-t H ~ 40 CFR Pm 280. The fin~,r~c/&l ~urance ~esponsibflity under Subpsrt H of 40 CFR P~-t 280 is ~ follows: Covera~: · ~t~/ve dat~: Jsnum7 ~4,1989 · Amount: At lea~t ~1,000,000 per o~-~,nce ~d $2,000,000 third partie~ for bodily injury a~l property daum~ =used by miden m~:idental relm mi uomudden f~cidental reles~e~ w~Afn $~ ARCO (213) 4m.7290 i I~E'R~,! ~.COU.NTY RE:SOURCE I~ANA6EMI:NT AGE:N{. ~ "~ ' ~,~" ~.~j :~ E~VIRON~TAL HEALTH SERVICES DEPAR~NT .:-~;,,~¥: ~..~ )2700'" 'M 'ST~ET, SUITE 300, BA'KERSFI'E~CA.93301" · ., . :...:'~ :.~ '. ~;:. .. * INSPECTION .REPORT -.'. .'. : :.-~':~ ' ~'"c ,- ' - . ' . '' ':'..:' .... ' , ..... ,.' :, '":' '4. '..~",' :' 'F".::'.'L~ "...::.?T : - ~..-~ ; .-":,;/ ~:~ ";L{ : ";~'::~L-:;:' :-' -::..'~ ...-/ ' ".. -:;~:'.. ' :.;'.:'~ ..-~..':..,;:'-: .-'.:~:~.~- ..... '-.. · "PERMIT P~ YES..~"'N~ .... _~__ "''7-'~S CTION "DA~E:~rl '~":~ :}..TYPE OF .,INSPECTION: ' :.' ROUTINE ' ~ REINSPECTION "[ '-:-¢-. FAC ~ [LITY' NAME:ARCO SS~6115 /~':":'. ::" ' ''~' ~" ' "' .... " ";'~-'"-" ...... '~'":~'~: ~':~" .... '"" - ~"~" ....  ' , '-. ~ ~' ~ ~Z-'.:'"" ' : .'~':zr". ,.:.':~,A ~'~ ~=. ~'~ ~,.~ g~ ~'~,~'~ ~;.~?;~<~:.~-.'% ~.~',Z~=~'' :- -f'... , ,..OWNER3 NA~E:ARCO ~ - .... :F ;~:'OPERATORS~A~E:PRESTIGE STAT ONS, .~NC.- . :~ [~ ::.::~:~--~'-.(mteeceptlng an d~rectlng, system ':?: ] ':':'~-'""-:'~ ~'>' .':~ ': "-'"' Standard Inventory Contnol '-.-,. . ...... ' '"! - . d, !n-tank Level Sensing Device .I ~ ~~ .. . . :.. ' f, ' Vadose Z~e ~oni~o~ng '/ ' I " I '2. SECONDARY CONTAINMENT ~ONITORING: a. Line~ b. ~ub]e-Wa]]ed ~ank c. Gravity ~,~8. ~NEN CONSTRUCTION/~ODIFICATIONS 1. CLOSURE/ABANDONMENT ~/~ .; B. UNAUTHORIZED RELEASE (1~~ ~:' ~INTENANCE, GENERAL SAFETY, AND OPERATIN~ CONDITION 0F FACILITY ~ ~ ~ COMMEN TS/RECOMMEN DAT IONS ~.,~..~ ' REINSPECTION SC~EDULED?~ yes ~ no APPROXIMATE REINSPEC~ON DATE:~.~._+~ 4~.~ '- , 5. BROKEN C~ LOCK' ON VAPOR CAP --: ~" ; 8. ~SKET MISSING FROM FILL CAP .~:~-.~ ; ' '.._':-. 9. ~SKET MISSING FROM VAPOR CAP , 10. R~. ADAPTOR NOT qGHT -' 11. VAPOR ADAPTOR NOT TIGHT 12. GASKET BE~EEN ADAPTOR & FILL ~BE MISSING / IMPROPERLY SEATED 13. DRY BR~K GASKE~ DETERIORATED 14. EXCESSIVE VERTICAl'PLAY IN COAXIAL FILL TUBE 15. CO~IAL FILL TUBE SPRING MECHANISM DEFECTIVE 16. TANK DEPTH M~SUREMENT .... .. 19. _ OTHER 20. COMMENTS: WARNING: SYSTEMS MARKED WITH A CHECK ABOVE ARE IN VIOLATION OF KERN COUNTY AIR POLLUTION CONTROL DISTRICT RULE(S) 209, 412 AND/OR 412.1. THE CALIFORNIA HEALTH & SAFETY CODE SPECIFIES PENALTIES OF UP TO $1,000.00 PER DAY FOR EACH VIOLATION. TELEPHONE (805) 861-3682 CONCERNING FINAL RESOLU- ,~1~9- m~o APCD FILE · ~: ~ ...... ::: .:.. -:":~ KE :OUNTY AIR POLLUTION CON DISTRICT :"L;..~.-:.~:..?~. "~:?~-":~ .... -'..' · 2700 "M'~ Street, Suite 275 '. ~. -· ' · -:' -": " -: '~- .~ ~-, · - · ~ Bakersfield, CA. 93301 ' '-' ~', . . "~' '. .L~L,:.tt,: ,"" "': . .':''.. i(805)861-3682 . .~ . .;' .:~.? .~-...?::.? ~.. :~!.,. :.:.!...: . _. - -': '.:' · 'PHASE II VAPOR RECOVERY INSPECTION FORM '... -. - .~ - ' ........... .: '" -.-,' . L:?:-'- ;t.-: .t . -;'.' .. ........... : Z '4. RING, RIVET ' ' L ~i -..... :.- .......~ E 5. BE~O~ ~-' .,- ..... ~,, ,,~'"IVEL, S, ..... ~t~. -:'.." -~ ::'' ' ':~' · . 6. ": · "" 7. ~OW UMITER (EW) :- 1. HOSE CONDITION p 0 3. CONFIGU~TION ' .:. R 4. SWIVEL H 0 5. OVERH~D RE~ACTOR S E 6. POWER/PILOT ON 7. SIGNS POSTED Key to system ~pes: Key to deficiencies: NC: not certified, B= broken BA:Balance HE=Healey M= missing, TO= torn, F= flat, ~= t~ngled RJ =R~ Jacket CH=Gulf Hasselmann AD='needs adjustment, L= long,. LO= loose, HI :Hi~ ~ =Hasstech S= shod MA: misaligned, '..,1 K: kink~, FR= frayed· ** INSPECTION RESULTS ** Key to inspection results: BlankTM OK, 7= Repair within seven days, T= Tagged (nozzle tagged out-of-order until repaired) U= Taggable violation but left in use. COMMENTS: VIOLATIONS: SYSTEMS MARKED WITH A "T OR U" CODE IN INSPECTION RESULTS, ARE IN VIOLATION OF KERN COUNTY AIR POLLUTION CONTROL DISTRICT RULE(S) 412' AND/OR 412.1. THE CALIFORNIA HEALTH & SAFETY CODE ..~' SPECIFIES PENALTIES OF UP TO $1,000.00 PER DAY FOR EACH DAY OF VIOLATION. TELEPHONE (805) 861-3682 , CONCERNING FINAL RESOLUTION OF THE VIOLATION. NOTE: CALIFORNIA HEALTH & SAFETY CODE SECTION 41960.2, REQUIRES THAT THE ABOVE MSTED 7-DAY DEFICIENCIES BE CORRECTED WITHIN 7 DAYS. FAILURE TO COMPLY MAY RESULT IN LEGAL ACTION 9~49-~o~ APCD FILE NUMBER:OF TANKS AT THE SITE: ENV. SENSITIVITY... ? ...... EMERGENCY CONTACT PERSON( PRIMARY): NAME: ......................................................................................................... . ........................................................... PHONE NUMBER: ....................................................................................................................................................... EMERGENCY CONTACT PERSON(SECONDARY): NAME: PHONE NUMBER: ......................................................................................................................................... TANK OWNER INFORMATION: ~AME: AOORESS: PHONE NO.: TANK CONTENTS: TANK ~ MANUFACTURER YEAR INSTALLED CAPACITY CONTENTS TANK CONSTRUCTION: TANK ~ TYPE(dw, .sw, sec.cont.) MATERIAL INT. LINING CORROSION PROT. LEAK DETECTION: TANKS: VISUAL GROUNDWATER MONITORING, WELLS VADOSE ZONE MONITORING WELLS U-TUBES WITH LINERS U-TUBES WITHOUT LINERS VAPOR DETECTOR LIQUID SENSORS CONDUCTIVITY SENSORS PRESSURE SENSORS IN ANNULAR SPACE LIQUID RETRIEVAL SYSTEMS IN U-TUBES, MONITORING WELLS, OR ANNULAR NONE UNKNOWN OTHER PIPING INFORMATION: TANK ~ SYSTEM TYPE CONSTRUCTION MATERIAL (SUC, PRES. ,GRAV. ) (SW, DW, LINED TR) I ~f~,:~ " LEAK DETECTION: PIPING: ........ .~...... FLOW RESTRICTING LEAK DETECTORS FOR PRESSURIZED PIPING MONITORING SUMP WITH RACEWAY SEALED CONCRETE RACEWAY HALFCUT COMPATIBLE PIPE RACEWAY ..................... SYNTHETIC LINER RACEWAY .................. NONE ................UNKNOWN c~'H ER Emcon ASSOCIATES Co..u,tant. ,. wa~ January 15, 1991 Management and Env,ronment.l Control Project 805-96.04 --~ ;~ Environmental Health Services Department ~'~' 2700 M Street, Suite 300 '~"~ Bakersfield, California 93301 Attn: Amy E. Green Re: UST Line Leak Detection Requirements Dear Ms. Green: In response to your letter dated December 27, 1990, EMCON Associates (EMCON) is preparing this letter on behalf of Mr. Fred Seguin at ARCO Products Company (ARCO). Enclosed is the Kern County UST Line Leak Detection Requirement Installation sheets that you requested for the following ARCO Facilities: #0132, ,~371, #1960, ~2057, #3054, #3090, #5096, #5365, '#5496, #5513, #5526, #5634, '#5751, #6115, #6150, #6202, #6208, #62'18 Also enclosed is a copy of ARCO's Certification of Financial Responsibility for each ARCO Facility. We have prepared these documents as completely as possible with the available information. If you have any questions, please contact me at (818) 841-1160. Sincerely, EMCON Associates David R. White Senior Geologist cc: Fred Seguin - ARCO 3300 N San Fernando Blvd., Burbank, California 91504, (818)841-!160 ~ PERMIT NUMBER / ~ doo ? d TYPE OF INSTALLATION ( ) 1.. In-Tank Level Sensor (~) 2. Leak Detector ~k() S. Fill Box CONTACT PERSON ~r~¢~ ~¢~ · 1. IN TANK LEVEL SENSORS - Number of Tanks List By Tank ID - "'- Name.of System Manufacturer & Model Number Contractor/Installer 2. LEAK DETECTORS Number of Tanks -~ List By Tank ID 7-/ 7-~ 7-3 Name of System /?C~ c_.~c~t~.+ L~R Manufacturer & Model Number Contractor/Installer 3. FILL BOXES N~ber of Tanks ~ List By Tank ID Name of System ~¢-~ ~F?// ~ Manufacturer a Model Number ~k~m Contractor/Installer ~k~ OWNER/OPERATOR DATE 17315 Studebaker Road Cerritos, California 90701-1488 Telephone.213 404 5300 M~iling Address: Box 6411 Artesia, California 90702-6411 County of Kern Environmental Health ~700 Flower Street. Bakersfield, Ca. 93305 SUBJECT Tank Interity test results Date 09/14/90 ARCO Station 6115 1501 California Ave.. Bakersfield, Ca. Dear Sir The tanks an~ piping at the above station passed a system test as noted in the attached test results. ARCO Petroleum Products Company is committed to compliance with the laws that govern the operation of underground storage tanks, If you ~have any question please call. Sincerely C.D. ~orton 213 404-5353 ~? ~' APPC-7076-B AES -- SYSTEM II PRECISION TANK & LINE TEST RESULTS SUMMARY Invoice Address: Tank Location: W. 0.~: ARCO PETROLE.:Ubl PROC, bLTi'S P:Rt..:'C~ ':St~. ~.~.~ I, D. Number: 6.L :L5 Date: ~r:~/'!b6/9~Z Time Start: E~z?.:~Znb End: .!.S:c!,Z~ County: KE Tan~ FilitVent Ppodu~t Typ~ Of ~apo~ Inches of Pump Tank Tank Capacity Product Tank Vapor Lines Line Recovery Water/Tank Type Material Additional Information: SI'rE I-OG TlhlE Set Up Equip: ~Z~6:~:,, i .... Bled Product Lines: Bled Vapor Li;les: Bled Vent lines: Bled Turbine: :i Bled Suction [:'Limp; a) This system and me'thod meets 'the c.'r, ite¥-ia set forth in NFPA ~.~389. b) Any failure listed above may r.equire further aotion, oheok with ali regulatory agenoies. Copy~'ight (o) 1989 by AES, Inc. Certified ]'echnio:Lan Signatu~.'e Date : ASSOCIATE~ ENVIRONMENTAL SYSTEMS __J L_ CALIFORNIA AVE E T ~ ~(/UL ~ ~'. ~",~ , .......... -. ............................... .~, ~---:.. ........ ~..,=~.,.. / . ..,I ARCO A~tPI~ ~1' ........... . _.S .~ , ' / ........ ,,,,,, VENTS- Si~e Layou~ Fo~' ', ~RCO ~G,~S ~S~ CAL[F AYE ~AKERSF[ELB CAL~.F AI:FS/~y,~t em 11 I;::'r(:.:.ci ~:i, on i ear I'e~:t Graph l'nvoice No. : i25,-~.~S~'/' D~'~: ~.:?:~:,,,. v~,.-. -,::.~,:: Time : Technician: 87,~L.~ Tank: i 'l"~nl~ Diamete~-(il~): Volume (gal): ~O~Z,Z~ Grade L. evel (in): :~:./. F'~-oduct Level (in): ~.~:::7' Wa'~et- Level On 'TanR<~n): Specific ~ravity: . 7~:~ :-' Coc~'Fficien~ Of Expansion:' ~.~006641 CaliOration Value(mi): 5,~)~Z~ Channel.: Level Segmen~ From: 45 'i'~:~ 3,Z~.~ "['e~::) Segmen'l: From: Change In Calibration Zone = .[~'..~;, Cai3. D~."ation Unit(gal/unit) = 0.000'72 Sta~tinB Temperature (F): ~:.~',', ;.','~,::~ Head Pressure(~ol/in (Btm)): 9/:..~Z~ ~urfa~e Area(~q. in~: .L,".,,9 "l"er~p. Change (F:'/h) : Level volume (gph): '~:, Temp. volume (gph): 0.4') I.::'r'od,.~c:t L.~ne (~:jph) : ., ~Z~Z; Ne~ change (gph) : .... ~:~. ;.~'.?: R ~ ~ ,_~ ~ t .... > ~::::' ~::t ~ $~ ~::::::"/" L_ ~ -- C~ o p y r ~ g h i:; ~ ,.::. > ;I. ':.) .2.'~:, b v ~:.~1~ ~}:~;. J; ~', ~:::-. ~0iZI Change In Calibration Zone =~ ~:: . ~ ~l Caiibr, ation Unit(ga]./ur',it) := E~.00062 Starting Temperature (F'): .~: ~-. ill' l' ' : {' :l' : ' ~ ' ~ Head [::lressure (col/in (Btm)) : 'iS. 8 Su~-'fiaee Area(sq. in): .~l .~ i Temp. Change <F/h) : Temp. vo~.llil~ (gph): ,.",~ :'.? I::)~.-od .~(..~ Li~e (gph) : i Net change (gph) : :~. E:Ol:)y'r"igi'~C (,:::-; 1989 L)y I:.~::.. .}.h~ .... 50~Z* ML..-'CF~t_. J'-t!::. ~ / ~:: '~" *~' *.'~-! I~'J .~..i. !- '~ 'l~' ~.~* '..]' :i. i~i i. ~, ~] .i. I' ~ ~'~ 1'~ ~. ~' (~ ]'" ~;~ ~.~* ~"'l ' II~V0 i~e No. : .L..:?.]~..:.:-.:..~.'.' Da'L' (~,: ~.~ ':).' ~::,.'. - '-.:' :~ T :~ me : ~ .:'~ ~ ..:~: ~ T~{~hn~aT'~: B,.JL... ]'anT(: ..~. "l"~n~( O~am~t~-( ,.. Voll.~lil~ (gal > : 6~,?~,'?:: Gr'.:~(:'le Lc,~ve ]. '. :L~.~ : ...:.."' Pr. oduc:t; Level (in) '... Wate~- Level On '¥'a'~'~((~n : ,:, .' C a 1 i b t' a t i o n V a 1 ~.~ e ( m :L ): '::,'....:; :::. C h a n n :, 1: .:. Level Segment F:'~'om: ... :. :. ~'. :.:.:',:) . ::, "l'emp Segment F",.~om: '; :::':":~ j.'. ~., .. : ..... ~,, J : ,. ~ - ..........:.. ~ ~, ,,.,h,,, ................................... ~,. · ~ ., . I , ~ ~ ~ ~' ~,"'"' ...................................................... ;~ ........ ' '- ' ,'" ~ ~l :~ h .................. ,I ~"~,, ~i J Jl .... ,,., ,. '~ ~,, ~,::.. , ChanDe In Caiib~ation Zone = .:.':~',,:~ Calib~ation Unit(c. lal/unit) = Starting '['empe~a'tu~e (F') : .':.'~ t..i..~. Head I::'~essu~e(c. ol/in (Btm)) : "':~'~ Sue'face ~ea(sq. ~n): ' :.~..~:' ]'e~f~l:). change(F:/h) : ,~.,,::.v,'~ Level vol,.~me (gph): .... ,.::. Net change (gph) : -~:,. ** Notes ** , ...... · ,:. ~'~ ~ ., .:::~ .~. ~ ...... ,.~:.:'~. , ~.:- ~.-J .i ~'~.-~ L.E:.¥~:L. ~ ASSOCIATED ENVIRONMENTAL SYSTEMS. INC. ~ ~ TM .~,~., ,,=,, P.O. BOX 8o427 .- .BAKERSFIELD, CA 93380 (805) 3~-22 ~ 2 AES HYDROSTATIC PRODUCT LINE TEST WORK SHEET TEST PRODUCT START END START END I TEST VOL. NO. TIME TIME VOL. (el) VOL. (el) DIFF. (ml) Divide the volume differential by the test time (15 minutes) and multiple by 0.0158311, which will convert the volume differential from milliliters per minute to gallons per hour. The conversion constant is found by: (60 nin/hr)/(3790 ml/gal) = 0.01583il(rain/hr) (gal/ml) The conversion constant causes the milliliters and minutes to cancel out. Ex. If the level drogped 3ml in 15 minutes then= 3/15 ml./min. X 0.0158311(min/hr)(ga~/ml) = 0.003 gal/hr. RESULTS OF THIS WORK SHEET TO BE COMPLIED ON A.E.S. RESULTS BAKERSFIELD, CA 93380 · (805) 393-2212 L'EAK DETECTOR TEST DATA TEST LOCATION: FACILITY #: ~~ CONTACT: ~'-~,m~-~,. ~---~\ ~'~.\~-(~3.L~Fk. ~,'.../~._ PHONE ~: ~/,X~%~ ~ (~ ~--- TEST DATE: DOES LEAK RESULTS PRODUCT DET EXIST TEST ~1 TE5~ ~2 RESULTS P/L TEST SERIAL ~ yes ~' Pass Pass ....... ' PEG no ,tO~k Gai ~~ GaI Faii FaiI yes Pass Pass yes ~ 00~% Pass Pass S/UL no ~0~% Gai ~ ~.'. 'Ga'I Fail FaiI SERIAL ~ yes Pass pass DSL no Gai Gai Faii Faii NOTES: TEST PROCEDURE Test #1: perform for 30 seconds with nozzie in fuli open position Test #2: perform for 30 seconds after nozzie cIosed for 10 seconds EXAMPLE OF POSSIBLE RESULTS , Test #1 Test #2 Resuits Test #1 Test #2 Resuits / Gal .~ Gal Pass __~ Gal .3 Gal Fail TECHNICIAN I.l~-~%-~-'~-b DATE q-.~-~ 1[ ,, SITE SUMMERY FOR ARCO PETROLEUM SOUTH DO ALL FIBERGLASS TANKS HAVE STEEL STRIKER PLATES? YES ZF NOT WHICH TANKS DO NOT? DO THE MECHANICAL LEAK DETECTORS OPERATE PROPERLY? NO IF NOT WHICH LEAK DETECTORS DO NOT? DO THE LEAK DETECTORS SHOW SIGNS OF TAMPERING? YES ~_] IF YES WHICH ONES? WERE ANY ¥{SU~L LEAKS REPAIRED ~Y THE TECHNICIAN? YES ~"'-'~ 'IF YES WHERE? WERE ANY VISUAL LEAKS NOTICED BY THE TECHNICIAN YES \N~_~ WHICH COULD NOT BE REPAIRED AT THE TIME OF THE TEST? IF YES WHERE? .DOES THE EMERGENCY STOP SWITCH OPERATE PROPERLY? IY~J NO IF NOT WHICH PUMPS DOES IT NOT STOP? YES, WHICH PRODUCTS? Activity Date # Of Tanks Comments Activity Date # Of Tanks Comments ARCO Products Co ' 17315 Studebaker Road Cerritos, California 90701-1488 Telephone. 213 404 5300 ~U~ M~iling Address: Box 641.1 Artesia, California 90702-6411 ENVIRON M £NTAL H EALT;-t .County of Kern ~~-~ Environmental Health 1700 Flower Street. 'Bakersfield, Ca. 93305 SUBJECT Tank Interity test .results Date 08/~2/8~ ARCO Station 6115 1501 California Ave. Bakersfield, Ca. Dear Sir The tanks and piping at the above station passed a Gasoline system test as noted in the attached test results. ARCO Petroleum Products Company is committed to compliance with the laws that govern the operation of underground storage tanks~ If you have any question please Sincerely 213 ~0~-5353 ,'",PPC-7076-B ARCO Products Company i¢ a Oivision of AllanticRichfieldCompany ,~.¢7 ~. Associated Environmental Systems, Inc. P.O. Box 80427 Bakersfield, CA 933 (805) 393-2212 PRECISION TANK & LINE TEST RESULTS Invoice Add~ess: Tank Location: W.O.#: 9596 ARCO PETROLEUM PRODUCTS ARCO SS # 6115 I.D. Numbep: 6115 17315 STUDEBAKER RD. 1501 CALIFORNIA AVE. Technician:KEM CERRITOS, CA.90701-1488 BAKERSFIELD, CALIF. Tech.#:87129 Van#:811 Date: 08-15-89 Time'~Sta~t: 08:00 End: 13:30 County: KE Facility Phone#1 805-323-2024 8~oundwate~ Depth: 15 FT+ Blue Prints: N/A Contact: MGR Dare,Time system was .filled: 08-15 08:00 Tank Product TyEe Of ~,lapor Inches of Pump Tank Tank Capacity Product Tank Line ~ecovery Water/Tank /ype Material i 6K S/UL PASS ' PASS I I ' 0 TUR SWS ~ 8K REG PASS PASS I I 0 TUR SWS ~ 8K R/UL PASS PASS I I 0 TUR SWS 4 Additional Info.marion: CLEAR 85 DEGREES SITE LOG TIME Set Up Equip: 09:05 Bled Product Lines: 09:00 Bled Vapor Lines: 8:55 Bled Vent lines: 08:50' Bled Turbine: 08:45 Bled Suction Pump: N/A Risers Instal led: N/A .~!~~_~ ~.~--~ ~:~1RONM ENTAL HEALTH b) Th~s system and method mee~s the c~e~a set forth ~n NFP~ ~3~, ~) Any failure listed above may ~equi~e fu~the~ a~tion, che~k ~ith all ~egulatory agencies. 000 UEHTS Si~e LauOu~ Fo~, AES/Syst em I I P~eci s ion- Leak Test Technician KEM I Calibration-Value ~ UNITS Date 8/15/89 I System Variation ~ UNITS Time Started 09:06 I. HIGH LEVEL (FULL SYSTEM) I Gallons 6K I LOW LEVEL(~ MID LEVEL( )1 ~ Tank Diameter 95" I PRODUCT LINE I I Ground Water 15'+ I TEsT IS ~ASSED ()FAILED ()INCONCLUSIVE TEST CONDUCTED AT/~/ .INCHES I GRADE LEVEL AT /~/ INCHES L ',1'. I I I I I I I,.,~ .I L ~.:, ~ ~, ~ ="-- · - .~ ---- T E ,:::: .... I..I I',,I !i!i: Ji:'.~ .... '1: .J. '""" '7',,,,'1:::' ~',il~ ..... ' . :.::: ~,:.~ ,~i:, 'i1'.' I 1'"1 I!!'. .... M 'i I",1 I.J T I!!i '.ii', '" ' '" :1 .... I1',1', ,i I .... I,',, , ' FOCU$ ~,~ L/ ~,~ T 0RDER N0, 9~9~ ** Notes ARCO SS # 6115 1501 CALIFORNIA BAKERSFIELD, CA. LOW LEVEL TEST CALIB. = 3X CLEAR 80 DEGREES o ASsociated Environmental Systems, In~. P.O. Box 80427 Bakersfield, CA 933~ <805) 393-2212 .. TANK RESULTS Work Order No.: 9596 Tank: 1 Technician: KEM Date: .... 8/15/89 Time: 09:06 Product: S/UL Sallons: 6K Tank Diameter: 95" 6round Water Level: 15'+ Data Calibrat ion: · · Amount Used: 0. 15 Reading Zone Start 120 to 150 Level Segment From: 150 to 600 Temp Segment From: 1.°0 to 600 Volume: 6000 I Product Level: 101.0 Water Level: 0.0 Specifi~c Gravity: 0. 762000 Coefficient Of Expansion: 0.0005717 Tank Diameter: 95.0 Resuits Change In Calibration Zone = 54 Calibration Unit(gal/unit) = 0.00278 Starting Temperature(F) = 103.86 Head Pressure (col/in (Btm)) = ?6.96 Surface Area(sq. in) = 63. 16 Total Change(gph) = -0.01129 Temperature Effect(gph) = 0. 02987 Net. Change (gph) = -0. 04116 AE$/$y_st em I I ~'?'e¢i s i on Leak Test Technician -KEM Calib~-ation Value UNITS Date 8/15/89 System va~-iation ~ UNITS ~ GPH Time Started 11:57 HISH LEVEL .(FULL SYSTEM) I I 8allons 6K LOW LEVEL( ) MID LEVEL( )~ Tank Diameter 95 PRODUCT LINE ~ ~c~ ~ 8pound~Watep 15 FT+ TEST IS~PASBED ()FAILED ()INCONCLUSIVE TEST ~ONDU~TED AT INCHES GRADE LEVEL AT INCHES E T FOCUS ~,~0 L/ 1,00 T ORDER NO, 9~: ** Notes #6115 1501 CALIFORNIA AVE. BAKERSFIELD, CA. ARCO PRODUCT LINE TEST NO LOSS AE~/~yst em I I Precis i on Leak Te I Technician KEM I Calibration Value ~,~UNITS = ~o~Gal- I Date 8/15/89 I System Variation I UNITS I Time Started 09:06 I HIGH LEVEL (FULL SYSTEM.) I I I Tank Diameter 95" I PRODUCT LINE I I ~ I G~ound .Water 15' + I TEST IS ,~ASSED ()FAILED L '1 TEST CONDUCTED AT /O~ INCHES I GRADE LEVEL AT /~ INCHES " .E V ~:::' ~':.~ ' " ,:::'.~:::. · .. E _ '"' "i" ~: ** Notes ARCO SS # 6115 1501 CALIFORNIA AVE. BAKERSFIELD, CA. LOW LEVEL TEST CALIB. = 3X CLEAR 80 DEGREES AES/Sy s.t em I I Pre¢is i on Leak Test 'l Technician KEM Cal ibr~at ion Value UNITS = Gal. Date 8/15/89 System Vaeiation I UNITS I 8PH Ti~e Started 11:~7 HIGH LEVEL'(FULL SYSTEM) I I 8allons 8K LOW LEVEL(). MID LEVEL( ) I I Tan~ Dia~e~e~ 95" P~ODUCT ~INE ~ '~oxfl I · I Gpou~d Water 1~' + TEST IS ~PASSED () FAILED () INCONCLUSIVE ~ TEST CONDUCTED AT 'INCHES G~ADE LEVEL AT INCHES LI I ,:1.' ** Notes ARCO SS # 6i15 1501 CALIFORNIA AVE BAKERSFIELD, CA. PRODUCT LINE TEST NO LOSS AES/Syst em I I Precis i on Leak Tes~ Te=hni=ian KEM Calibration.Value ~ UNITS =~ 8al. Date 8115/89 System Variation I UNITS I GPH Time Started 09:06 HIGH LEVEL (FULL SYSTEM) Tank Diameter 9~" PRODUCT LINE ~ I G~ound Water 15'+ TEST IS ~PASSED ()FAILED ()INCONCLUSIVE TEST CONDUCTED AT ~ INCHES GRADE LEVEL AT /~ INCHES ~ "i:::', '.1'. "' '",,::. ,1',,,, I.,1'.1~., 'I' ~,,.~ I .I,1',, '"" .... FO C U $ :=', 8~ T~./ :IL, 00 'l' 0 ~:I) E~ NO, 9S 9~ ** Notes ARCO SS # 6:115 1501 CALIFORNIA AVE. BAKERSFIELD, CA. LOW LEVEL TEST CALIB. = 3X CLEAR 80 DEGREES AES/S.y.s.t em I I Ppe¢is i on Leal~ Tes~: Te=hni=ian KEM Calibration Value UNITS = Gal. Date 8/15/89 System Variation I UNITS I GPH Time Started 11:37 HIGH LEVEL (FULL SYSTEM) I I Gallons 8K LOW LEVEL( ) MID LEVEL( )1 I Tank Diameter 95" PRODUCT LINE ~V~ ~o~ i i Grou~d''Water 15~+ TEST IS~PASSED ()FAILED ()INCONCLUSIVE TEST CONDUCTED AT INCHES ~GRADE LEVEL AT INCHES ~' FOCUS 1,00 L/ 1,00 ~T ORDER NO, ~ ** Notes ARCO SS #6115 1501 CALIFORNIA AVE. BAKERSFIELD~CA. PRODUCT LINE TEST NO LOSS ARCO Petroleull~)il~ _.,ucts Company 17315 Studeu,,~(er Road Cerritos, California 90701-1488 Telephone 213 404 5300 Mailing Address: Box 6411 Artesia, California 90702-6411 'OCT 06 ~ Environmenta..ealth Div. County of Kern Environmental Health 1700 Flower Street. Bakersfield, Ca. c~3305 SUBJECT Tank Interity test results Date ~/2~/88 ARCO Station 6115 1501 California Ave Bakersfield~ Ca. Dear Sir The tanks and'piping at the above station passed a Gasoline system test as noted in the attached test results. ARCO Petroleum Products Company is committed to compliance with the laws that govern the operation of underground storage tanks~ If you have any question please call. Sincerely_~, C.D. Morton 213 AOA-5353 APPC-7076-A ARCO Petroleum Pr.oaucts Company is a Division ol AllanlicRichfieldCompany (7-86) .; ENVIRONMENTAL COUNTY -' LABOP TORIES COPY September.23~ 1988 C.D. Morton ARCO Petroleum Company 17315 Studebaker Road CerHtos~ CA 9070 !-! I§01 California A venue Bakersfield~ CA .".Dear Mr. Morton: . On September 14~ 1985~ a Petro Tire System Test(s) was performed at the above- referenced location. The test.was performed by Ray Norman~ E.L.I. Technician. The NFPA Code 329.02 criteria for a ti§hr system is a maximum loss of .0§ i. ,. -' gallons per hour. Because of the almost infinite variables ..involved, this is not the permission of actual leaka§e. Durin§ the stand-pipe test procedure, the internal liquid hydrostatic pressure applied to the under§round tank system is §enerali¥ two to three times §reater than normal i/quid stora§e pressures. This increase in hydrostatic pressure w/ii amplify the indicated rate of leak accordin§ly. SYSTEM TESTS: Tank No. 3 - South Size - 6,000 gallons Product - Premium The test showed a plus .005 gallons per hour. Based on the above criteria, we find the tank tested mathemalically tight. This concludes our test and findings on September Ig~ 1988. It you have any questions regarding the results~ please contact me. It is your responsibility to notify your local County Health Department~ Environmental Health~ within thirty (30) days of the results ot this test. This notification is required by the California Administrative Code, Title 23 Waters, Ghapter 3~ Water Resources Gontrol Board, Sub-chapter 16, Underground Tank Regulations, Article #.30. We have enjoyed working with you on this project. It you need any further in~ormation~ please reel tree to contact our oHice. Sirtcerely) ~/Office Manager Encls 1477 E. Shaw, Suite 150 / Fresno, California 93710 / (209) 225-6698 15. TANK TO TEST 16. CAPACITY 17. FILL'UP FOR TEST =,.,,.,.~ ~,,,,o.,,,, 18. SPECIAL CONDITIONS AN0 PROCEDURES T0 TEST ~IS TANK ~ ~, 5--Z ~ VA~R REC~ERy SYSTEU O~ ~ O~ ~ 0~ ~ c.o.d. --/~ /~ 19. TA~K ~ASURE~E~ FO~ 21. T~PERATURE/VOLU~E FAVOR (~) ~ ~ ~tS T~K T~TT ~B[~ .' .l~e~ b~M~ ~ ...................... /~ . 23. ~s~r~~M , ~. EXTENSION HOSE SETTING ~'. 24. ~ ~,.-~ ........................................... ~ 25, ~ ARRIVED AT TE~T SITE AND MEASURED FOR WA~R ON TANK ~M, ~ANS~ TRUCK ~PP~ OFF TANK, AND T~K INVEN~ OF ~OUCT, REM~EO FILL CAP AND SPLASH TUBE. SET-UP TEST EOUIPME~ 26. 30. ~TAt~ 31. ~U~ 27. 28. 2g. ~ ~_~ Prill Test Equip~t ~lh Pfodu~ & ~mp Primed aM Runni~ FaVor A ~ R~ST SENSOR READING ' ~// .. ~/~/~ ~'CONTINUEHIGHL~ELTEST ~ ~/.~ // I.~ ~. ~ ~0 --.~d~ ~Z~ ~ ~.~ ~.~( /~' .~ ~ ~ ~ . ~0o ~.o/~ ~ P~ +.~ ~.~ I' TeS, CO.dud.d ~ ~~ fou~ to be ~ or .I light ~ENV~RONME_NTAL PLEASE PRINT Data Chart for Tank System T, ghtUess Test ~ Nlme Ad,less Regf~entativl TeleDhone Tank(s) TEST (Expl~n 4. WHO REQUESTED ~. D. TEST AND WHEN FOR THIS TEST? Com~nv. Agen~ or I~iUull ,e~n Aulho~ing Tiff* Tel,,one Billing Add~! CI~ / S~te I~enliN ~ Diction Cap~y Brand/Su~pli~ Gr~e : Ag~on. Age $tsel/Fi~glasa Location Cove~ Fills Vents Siphones Pumps 7. INSTALLATION DATA S~e of 3/~ ~./- Rear of station, etc. Earth. etc. tubes. Remote Fills Size. Manifold~ Which tanks ? Make il knowo 8. UNDERGROUND WATER 9. FILL-UP Nlm, Tale.hone ARRANGEMENTS Ex.e produc~ to "top off" and run TSP. How and who to provide ~ Consider NO Lead. Terminal or other conlact for notice or inqui~ Comoanv Name T~leDhone 10. CONTRACTOR. MECHANICS. any other contractor involv~ 11. OTHER INFORMATION r o 0R REMARKS Additional information on any items above. Officials or others to be advis~ when testing is in p~ogress or completed. Visitors or observers present during test etc. Teats were made on the a~ve tank systems in accordance with test pmc~ures prescri~ for ~ro..~t~ 12. TEST RESULTS ~ detail~ ~ a~h~ test cha~a with resulta a~ follows: Tank Identification Tight Leakage Indicated Date Tested This Is to certify that these tank systems were teated on the date(s) shown. Those indicated as "Tight" meet the criteria established by 13. CERTIFICATION the National Fire Protection Asoclatlon Pamphlet 329. O.,e ENVIRONMENTAL LABORATORIES./NC. ' / 82/ sie..,u,o L ~ ~z_ 5//__9,~/// "' Se~m No oTThermal - Tech.,c;an~ 1447 E. Shaw Ave. Suite 150 Fresno, CA 93710 s~s~ (209) 225-6698 ' -~ Sta$ion ~Tes~ing or Construction~1 Opera~or Arrival Time ~.YO~ ~p.m. // Fuel Arrival Time '~-'j~ ~-p.m.' J(~ ~~TATXO~ S~LEET: ') LEGEND I FILL V = ~OR DROP IN~ VALVE MONITOR SYS~ 8IPHON SYS~ VAPOR DROP W/OV~SPILL CONTAIN~ MISC .....Asso¢ I a~ edt' ' '?/'~ "~' '"J'i£nv i pon~ent a !' ':" '":" Systems,"'~'' '" Zn~."' '?~ '~ '" ' ~ ' '~''~'~..~ -~j~' ......... '~:' '" ~' ' '~':. "' . ~' ~,'" ~''., .... ~ .-. -." ~."'""'~'...~.' ~'' ''''~.~--?':`?.~.~-c', ;~' "" - ... - . , ,.. ARCO PEDRO PRODUCTS '-ARCO SS ~ 6115 . I.D. Numbe~: 6115,, ':: .... ', 17315 STUDEBAKER RD. "'- CERR!TCS CA. 90701 14B~' .,''BAKERSFI.E~D CA .... ~.~Tech.~:87!29 Van~:8!!i ~,~,~,. Tank -. ' " -.' Fill/Vent P~oduc~ TyEe Of Vapo~ Inches o~ , Pump'"'~?~Tank Tank Capacity Product Tank Vapo~ Lines Line .ecove~y Water/Tank Type Material 1 ~OOO ~ SOOO REG PASS ~ PASS P~SS i Z 0 TU~ SWS 3 6000 S/UL PASS FAiL Additional Set Up Eq~ip: Bled Product Line~: 09:50 Bled Vapor- Lines: Bled Vent lines: 09:40 BLed Tu~-bine: 09:35 Bi'ed Suction Pump: N/A Risers Installed: N/A a) These results Obtained using the patented A.E.S./Brockman system. b) .This syste~ and method ~eets the criteria set ~opth in NFPA.#~9.. -- '" c) ~n¥ ~ailu~e listed.above may require further action, check ~ith '- all eegulatopy agencies. Certified Technician Signatu~-e ~'_. '1 '~.$allons., '" .aK ..:.. ~. .. .... :..)>'-".,,,~; .,..,--.--I . LOW. LEVEL( '1.: MID .LEVELi'.')...... l'..'x:~'::? .':.::'~.'_:.?'::~.:'.?:;;,. .: .>.. , ..... ..,., ...... >1 ' ' ' -. "-;. , . ': ,. , ~ .S .. ' ' ...~.'~ .:, "~"'~ ,~'%;?./~:,%,?~, '"',.:"~.~;-,--~'~" -' .'~' - .--'~! . '~ ~>~+:'-~,~>"~'~:~,¥~"'~ ... j. ~-.',' ~'~ .~..~-,~..,.j-~.t~'- ' · - -' t ,~' I '" ' · - : ' ' ' ' ' ' · '  ' ' i Iii . iL.'"'" "' = / I~ t · / ! 1 '-I I"" :12 5: ~' E: ~ ' ,, -- .T ~'.', ~',~ T ~'-. ' ..... ': - .~...'--." . . -- .. ......... ., . ~ '--~., ;:,.:: ;.: :: .... "' ' ;::-TAI4] [J~ -~' ' "' ' :') "'"' ~:.: ' .:,.,,, .., . ..... .. ..~ ..' .' ,..: :', ,~....._ :..., ' , , .... ,.. .... ~... ..... . ..~,......, .~.:.... . .....-.>::...._: .,.......,.,..,:...., ... ~; :}::,::}~" .,;.:,.::.. ~' '~- :...'~ :~' '- ' ,. '9,' ." ~;;~"~ ' ;.,.;~s:~;; *'; ~, '~..';' ' -' .- 'f:t:"?,' "':, ~ ,.t: ;~-~;~;~ ~;'- .... ' ; ' .~, · ,: . ,, . ~. ::: ~," ~, ;.'.?~:--~:,' ';, ~-~'-.,-=,' .-,;:/, ".k';;:.:: .... '-.: ...:..:'x.:' ... . .: '.' :.x',.. :? ..:. ::::::::::::::::::::: .:;::::.:: ...:: .. :': ::. :...-...::;:~ :.:.:.". :. ..... :. ---_ _:'-.::...-'-'.." ~.... :.' . ... _.-:_ ,::::,:: .',?,,:.~ . .,.::.' ........ -: .,-::** No b mm' ':S:t::!....-.-... :.-':/'.: :..:::~:::::::A. >','-::' ~:::,::..:~?C.:~:.':::,..... .... :: :?.-....:..... '-- HIGH LEVEL TEST CALIB. = 10 X · CL~A~ 95 D~E~S : :~.:~?_______ .... _ ___.___.___ .... -__,._,.______-__-.._._.~ ;; , ....... "'~':'~:~,:i"<:Time 8~~ :--17=0G ...... ~;~,...<....-I 'HIGH L~VEL (FULL · ~1 ::8mllon5'"~ .': ..... 8~ - .... ..-"':":,'.:...:;~- .,.I ..'LOW'LEVEL( ) ~lO' ,'~'--I "G~ou~d Water ~' :"-, 30 FT+. -." I TE~T ZG ~G~ED '() F~ILED .-- () INCONcLUGzVE I ',,,. i - 'TEST CONDUCTED AT- ... ZNOHES I. -' ~RADE LEVEL ~T .... . ...... ,..,...,'~INOHES:_ . ' ~,:::..:-~:~:;:'~:.~:~'.~-},'.::_{::'::. ~1. ..: ., .. . :...:.,.. .. ,:~/':_:... ~ : ,.. .l "'7. ' ': ; ' " " ' " . . ~ ~,,- , ..... . ..: -%, ,:- '.:%:::./ ":":' ':" .... ::" ' '...:~':. :- " ~ t~ ~ T ,;~:' ~ ......~~ E , '" ! "" ~7'"::: · , , ,;?., ':: ,;:,, ,,:., ~':', T :i: i','1 ~: .... h'i :[ ?,.I I.J':[' E '~: T" "' :~ '"' "PRODUCT ~NE TEST NO ~O~S ':'c'- . .~aI ..... ,I ' I Ground ~Wate~ '.~-30 FT+ ~--..I -'TEST IS ~PASSED ()FAILED -',()INCONCLUSIVE .I ~RCO SS ~ ~I15 1501 CALIFORNIA AVE. BAKERSFIELD CLEAR 95 DEGREES ' I Date .... '~ a/11/g8 -"' "" '" '1' syS~ern' 'varia~ io~ - , I' -Time Started 17:06 '- "i ' HIgH LEVEL'~(.~ULL ~YSTEM) I : I Gal ions 8K ' I -LOW LEVEL( ) MID LEVEL( ) I ~ ... , .:,:..?:~. I Tan~ Diameter 94 " ';I PRODUCT LIN I · ::. I "~ound wate~ . - ~0 ~T+ I .-TEST IS ~P~SSED- ()FAILED -?(). INCONCLUsivE I TEST CONDUCTED AT INCHES I. GRADE LEVEL 'AT :':':' ' ...-"INCHES "' "... "/.~:~":"~":':'::'' .--.- :. - .... ~,.. : ;'.:~,-., % ,-- .... .~ : ..... ..~ :.. ~. . . .~:-T,~ .~. :. :., ..~,..."~'?/ ,~.~, ~,:~' - .... ,,. .-: ~,..~:.'~ ... :-~ -~i~..,~ - . ',:-,- .:, . ::~: ~'~..~:~.',~i'-C.'~- . L ! I..T .,.* I., ":' ' ~ '~" E ~,'"._.,,:., + E ~ ;:: "-' ' i i ' i T ..' ~' ;11:',, ',:".. I~? ,;~? ' "'" 'T ..... la '" ' " -: ' T A t".1" ':~:: ~',. I:. ~,~, . ::..::: ., :--.. · .:.,,. · ..: ..,... '.~ ...L - ... :.... · '.FOc u~ :.:i, ~e "L/' 1, e~ z ..:: ..... ..ox~x NO ,'TZ~ .~.'O'-..:~--' .. - :.'T:'"-- · ." ' ,. . . . .. 7.-:-..';}.'.. .' . · .... , . ;....,.: . · * No~es .- .. ~RCO SS ~ ~115 1501 CALIFORNIA AVE. 'BAKERSFIELD CA. ' -'./ :";".'- ' PRODUCT LINE TEST NO LOSS :!-~!-.,-..:- ., ,..: . , ~. .~ .,.... . .. · > :: .-,.-~ :. :..~ :',..~..<, . : ~ :. ' · ..-*'..-,..s~ --..t.~ ~:~.~ ~ ............ ...... · · ":'~.~ ' ....... _v · i, .~; ~.:~'~. "..u ':. · - . :~:~ .:72.: :.:'~', :~:.~j~ ~.,:~ ~:.?l-:r *.?:_~ %':. '. ::'TL'-iL~ '.- .= ;~L~ :'i-::~<~'~e~':*<v~;~?- I' Time Started ::,14:07 :':.. ":' .~.,- "-.:-:! ~'HZGH LEVEL }(FULL 'SYSTEM) I :Ta~k Diamete'~ ,95 .-" I ?.PR DUCT INE --......---~,.~,:~x~¢:~::;~.:~.-- ' ....... ~' . . '~).Pn~[g ..~ CZ~ :.:-__-...__ ..... I TEST CONBUCTED ~T /~ INCHES I ~RADE LEVEL ~T ~ .~INCHES . , ...... ~..: ,. ....... L= I Il I.~! ' ??:I'.:' T .~ :':~ ~. I ' ! ..... ,,,,.}:::' I ~' ~? ~ .... , .T J: i'"l E'"' 1"'I i i",i W T i~: · -. ~: "U:IL .-.'-. FO L/ '.l . T ~ ........ ..--,': :?: '<".. '- · -~ C ~ < '::.': · * Notes - ' . 1501 CALIFORN -ARCO $S ~ 6115 IA ~VE. :BAKERSFIELD CA. . ::.:",, HIGH LEVEL TEST CALIB. = lOX CLEAR 95 'DEGREES ..... .......~....~ ..-. ~ ~: .~. ~.,:.~ ~. ~ ~::~ ~ I .~S .,. I Z .~ .~ v E ' '~:' :~: ~,..~ ~:,-~,,,i z ~,,,i uT ~ ~ .~. .... ' ~: '.. ,:j ,'. .. ... . ./...,-:-'~'.... .. -....~:;~ ... ~ CLEAR 95 DEGREES ~.~. .. ............. ~ LI I .I ,,. I :~: .~. I '.' :1: ~ .. i ,:~' ~- No, e5 ...... -- . -:" ' - ...' .:'. PRODUCT LIN~ TEST ' CERTI~-~ATE OF PREClSIONiI)- AK TEST Associated Environmental Systems, Inc. has tested and certifies ' 887246 the following: DATE: 08/i 1/88 CERTIFIED TESTER: KEN # 87129 LOCATION: Arco SS f~6115 1501 California Ave.y* Bakersfield~ CA TANKS: TANK LINE PROD/LINE 2. 8K RE~, pA_s_q p~ _p~ .- ANY FAILURE LISTED MAY REQUIRE 3. ~K S/UL ~ FATI ~4~ NOTIFICATION OF AGENCY. 4. xxxxx;~ xxxx xxxx XXXX 5. xxxxxx xxxx xxxx Xxxx . RecertiflcationDateRecomme .~.__ . 6. ,,,xxxxxx XXXX XXXX Xxxx Associated Environmental Systems, Inc. Ho.~ Cffice P.O: Box 80427, Bake~stield, CA 93380 - 805 / 393-2212 17315 StudebaKer Road Cerritos, California 90701-1488 Telep'hone 213 404 5300 . Mailing Address: Box 6411 Artesia, California 90702-6411 I~000~ County of Kern .~ Environmental Health 1700 Flower Street. Bakersfield, Ca. 93305 SUBJECT Tank Interity test results Date 8/18/88 ARCO Station 6115 1501 California Ave. Bakersfield, Ca. Dear Sir The Super unleaded tank and piping at the above station did not pass a Gasoline system test as noted .in the attached test results. All failed tanks systems will be uncovered repai,-ed or replace and retested as a system test. The results will be forwarded to you as soon as possable. ARCO Petroleum Products Compan.y is committed to compliance with the laws that govern the operation of underground storage tanks, If you have any question please call. Sincerely ~ C.D. Mop ton P13 A0~-5353 / ,I,~~' ~ i f ~.'--?'!~ . ,~ ~ 'i' . , . , -__-/ ./ ,~ / '..': ....... APPC-7OTG-g ARCO Petroleum Products Company ~s a Division o~.AtlanticRichtieidCompany Permit No. Division of Environmental~[~'~,Ch .cation Date ' 1700 Flower Street, Bakersfield, CA 93305 (805) 861-3636 APPLICATION FOR PERMIT TO OPERATE UNDERGROUND HAZARDOUS SUBSTANCES STORAGE FACILITY Type Of Application (check): [~New FacilityOModiflcatton Of Factlity~gxisting Facility,]Transfer Of 0~nershtp A. gaergency 24-Hour Contact (n~e, area code, phone): Days 2'/~/ ~0 Facility Naae ~O 55 ~ ~//~ No. Type 0f Business (check): ~6asoltne Station ~0ther (describe) Is Tank(s) Located On An Agricultural Far~? ~Yes ~No Is Tank(s) Used Priaarily For Agricultural Purposes? ~Yes ~No Facility Address /~ol ~l,~c~,~ A~ ~cs~,~Jg Nearest Cross St. T ';$ R SEC (Rural Locations Only) Owner ~ · Contact Person Operator P~,~,~ K~..= r.~ Contact Person ..: B. Nater To Factllty Provided By Depth to Groundwater Soil Characteristics At Facility Basis Fo~ Soil Type and Groundwater Depth Deter=lnattons C. Contractor · CA Contractor's License No. Address Zlp Telephone Proposed Startlng Date Proposed Completion Date Norker's Compensation Certification No. Insurer D. If This Permit Is For Hodtflcatton Of An Extstlng Facility, Briefly Describ~ Hodlflcattons Proposed E. Tank(s) Store (check all that apply): Tank $ Naste Product Hot'oe Vehicle Unleaded Regular Premium Diesel Naste Fuel 0tl F. Chemical Composition Of Haterials Stored (not necessary for motor vehicle fuels) Tank ~ Chemical Stored (non-commercial n~e) CAS ~ (if known) Chemical Previously Stored (if different) O. Transfer Of Ownership Date Of Transfer Previous Owner Previous Facility Name I, accept fully all obligations of Permit No. issued tc I understand that the Permitting Authority may review am modify or terminate the transfer of the Permit to Operate this underground storag. facility upon receiving this completed form. This form has been completed under pej~alty of perjury and to the best of my knowledge is true Signature(''' /" ~'/~~ Tit-l~ Y4~r.,Re~ail FacilitieS0ate 6-9-87 -~ ~ ~//5 Permit No. Facility Name '.. ~.. TANK ~ 8d~ ~lf (FILL OUT SEPARATE FORM FOR EACH TANK) · FOR EACH SECTION, CtlECK ALL APPROPRIATE BOXES H. 1. Tank is:' [~]Vaulted [] Non-Vaulted [] Double-Wall [] Single-Wall 2. Tank Material  Carbon Steel [] Stainless Steel [] Polyvinyl Chloride [] Fiberglass-Clad Steel .Fiberglass-Reinforced Plastic [] Concrete [] Aluminum [] Bronze [] Unknown [] Other (describe): 3. Primary Containment .Date Installed Thickness (Inches) Capa~/~d~Gallons) Manufacturer 4. Tank Secondary Containment [] Double-Wall [] Synthetic Liner [] Lined Vault ~None [-I Unknown' ~ Othem (describe): Hanufa¢turer: -~ Material ~ Thickness (Inches) Capacity (Gals.) 5.'Tank'Interior Lining ~ Rubber ~ Alkyd ~Epoxy ~Phenolic ~ Glass ~ Clay ~nlined ~ Unknown ~ Other (describe): 6. Tank Corrosion Protection ~ Galvanized ~ Fiberglass-Clad ~ Polyethylene Wrap ~ Vinyl Wrapping - ~ Tar or Asphalt ~ Unknown ~ None ~ Other (describe): Cathodic Protection: ~None ~ Impressed Current System ~ Sacrificial Anode System ~ Describe Sy~em & Equipment: ~. Leak Detection, Monitoring, and Interception a. Tank: ~ Visual (vaulted tanks only) ~ G~oundwater Monitoring Well(s) ~ Vadose Zone Mon]torin~ Well(s) ~ U-Tube Without Liner ~ U-Tube with ComPatible Liner Oirecting Flow To Monitoring Well(s)* ~ Vapor Detector *~ Liqu]d Level Sensor * ~ Conductivity Sensor* ~ Pressure Sensor In Annular Space Of Double Wall Tank * ~ Liquid Retrieval & Inspection From U-Tube, MonitorinK Well Or Annular Space ~aily Gauging & Inventory Reconciliation ~Periodic Tightness Testing ~ None ~ Unknown ~ Other b. PipinM: ~low-Restricting Leak Detector(s) For Pressurized Piping* ~ Monitoring Sump With Raceway ~ Sealed Concrete Raceway ~ Half-Cut Compatible Pipe Raceway ~ Synthetic Liner Raceway ~ None ~ Unknown ~ Other · Describe Make & Model: 8. Tank Ti~htnesm Has This Tank Been TiMhtness Tested? ~ Yes ~ No ~ Unknown Date Of Last Tightness Test Results Of Test Test Name Testing Company 9. Tank Repair Tank Repaired? ~ Yes ~o ~ Unknown Date(s) Of Repair(s) Describe Repairs 10. Overfill Protection ~ Operator Fills,-Controls, &Visua]ly Monitors Level ~ Tape Float Gau~e ~Float Vent Valves ~ Auto Shut-Off Controls ~ Capacitance Sen~or ~ Sealed Fill Box ~ None ~ Unknown ~ Other: List Make & Model For Above Devices a. Underground Piping: ~Yes ~ No ~ Unknown Material Thickness (inches) Diameter ~ ~Manufacturer ~Pressure ~ Suction ~ Gravity Approximate Length Of Pipe Run b. Underground PipinM Corrosion Protection: ~Galvanized ~ Fiberglass-Clad ~ Impresse~Current ~ Sacrificial Anode ~Polyethylene Wrap ~ Electrical Isolation ~Vinyl Wrap ~Tar or Asphalt ~ Unknown ~ None ~ Other (describe): c. Underground Piping, Secondary Containment: ~ Double-Wall ~ Synthetic Liner System ~one Unknown ~ Other (describe): Facility Name ~. ~ ~///$- ~!0 Permit , TANK # ~© ~ (FILL OUT SEPARATE FORM R EACH TANK) FOR EACH SECTION, CHECK ALL APPROPRIATE BOXES I" H. 1. Tank is: r~] Vaulted [] Non-Vaulted [] Double-Wall ~ Single-Wall 2. Tank Material ,,. --~ Carbon Steel [] Stain]ess Steel [] Polyvinyl Chloride [] Fiberglass-Clad Steel I [] Fiberglass-Reinforced Plastic [] Concrete [] Aluminum [] Bronze []Unknown [] Other (describe): S. Primary Containment .Date Installed Thickness (Inches) Capacity (Gallons) Manufacturer 4. 'rank Secondary Containment [] Double-Wall [] Synthetic Liner ['~ Lined Vault ~None [] Unknown '~ [] Other (describe): Manufacturer: ...... -~Material Thickness (Inches) Capacit~ (Gals.) 5.'Tank~Interior Lining [] -Rubber [] Alkyd [-]Epoxy ~-]Phenolic '[] Glass ~-i Clay ~Unlined []-- Unknown C~ Other (describe): !' 6. Tank Corrosion Protection [] Galvanized [] Fiberglass-Clad [] Polyethylene Wrap ['] Vinyl Wrapping ,.:'., . - [] Tar 'or Asphalt [~ Unknown [] None ~-I Other (describe): Cathodic Protection: [] None [] Impressed Current System rq sacrificial Anode System [~ Describe System & Equipment: 7. Leak Detection. Monitoring. and Interception a. Tank: [] Visual tvaulted tanks only) [] Groundwater Monitoring Well(s) [] Vadose Zone Mon~orin~ Well(s) [] U-Tube Without Liner ~] U-Tube with Compatible Liner Directing Flow To Monitoring Well(s)* [] Vapor Detector *[] Liquid Level 'Sensor* ~] Conductivity Sensor* [] Pressure Sensor in Annular Space Of Double Wall Tank * [] Liquid,Retrieval & Inspection From U-Tube. Monitoring Well O~ Annular Space N Daily Gauging & Inventory Reconciliation ~,Periodic Tightness Testin~ one [] Unknown [] Other b. Piping: ~-~low-Restricting Leak Detector(s) For Pressurized Piping* [] Monitoring Sump With Raceway [] Sealed Concrete .Raceway [] Half-Cut Compatible Pipe Raceway []Synthetic Liner Raceway ~ None r-] Unknown [] Other · Describe Make & Model: 8. Tank Tightness Has This Tank Been Tightness Tested? [] Yes [] No [] Unknown Date Of Last Tightness Test Results Of Test Test Name Testing Company 9. Tank Repair Tank Repaired? []Yes [~-No [] Unknown Date(s) Of Repair(s) Describe Repairs 10. Overfill Protection [] Operator Fills, Controls, & Visually Monitors Level ['] Tape Float Gauge -~Float Vent Valves. [] Auto Shut-Off Controls [] Capacitance Sensor [] Sealed Fill Box [] None [] Unknown [] Other: List Make & Model For Above Devices 11. Pipin~ a. Underground Piping: ~-Yes [] No [~ Unknown Material Thickness (inches) Diameter ~ Manufacturer ~Pressure Gravity Approximate Length P!peRun r~ suction uf b. Underground Piping Corrosion Protection: , · t~alvanized [] Fiberglass-Clad ~] Impressed~jCurrent [] Sacrificial Anode [2] Polyethylene Wrap [] Electrical Isolation [~Vinyl Wrap (2]Tar or Asphalt [] Unknown [] None [] Other (describe): c, Underground Piping, Secondary Containment: [] Double-Wall [] Synthetic Liner System [~one [] Unknown [] Other (describe): Facility Name ~ ~" ~//~' Permit , TAN__~K ~ ~006 5~ (FILL OUT SEPARATE FORM FOR EACH TANK) FOR EACH SECTION, ~tlECK ALL APPROPRIATS BOXES H. 1. Tank is: ~-~'Vaulted [] Non-Vaulted [] Double-Wall ~ Single-Wall ,~ 2, Tank Material ..~Carbon Steel [] Stainless Steel [] Polyvinyl Chloride [] Fiberglass-Clad Steel Fiberglass-Reinforced Plastic [] Concrete [] Aluminum f-] Bronze ~ Unknown ~ Other (describe); 3. Primary Conkainmen~ ,Date Installed Thickness (Inches) Capacity (Gallons) Manufacturer .~ 4. Tank Secondary Containment ~ ~ Double-Wall ~ Synthetic Liner ~ Lined Vault ~ None ~ Unknown ~ Othe~ (describe): ~anufacturer: ~Material Thickness (Inches) Capacity (Gals.) .~(~,~i:5.'Tank ~Inte~io~ Lining ~,:.¥~'-' ~ Rubber ~ Alkyd ~ Epoxy ~ Phenolic ~ Glass ~ Clay ~Unlined ~ Unknown '~:~::~.:'~ ~ Other (describe): -- -~:,~.[6. Tank CorFosion Protection .... ~j~)~, ~ Galvanized ~ Fiberglass-Clad ~ Polyethylene Wrap ~ Vinyl Wrapping - ~ :~;~'~-~. ~.,~.~:~.. ~ Ta~ o~ Asphalt ~ Unknown ~ NOne ~ Othe~ (describe): ~--" Cathodic Protection: ~one ~ Impressed Current S~stem ~ Sacrificial Anode ' .':~ ..... ' ~ Describe System a Equipment: 7. Leak Detection. Monitoring, a~d Interceptio[] a. Tank: ~ Visual (vaulted tanks only) ~ Groundwater Monitoring Well(s) ~ Vadose Zone MonJtorin~ Well(s) ~ U-Tube Without Line~ ~ U-Tube with Compatible Liner Directing Flow To ~onito~ing Well(s)* ~ Vapor Detector *~ Liquid Level Sensor* ~ Conductivity Sensor* ~ Pressure Sensor In Annular Space Of Double Wail Tank * ~ Liquid Retrieval & Inspection From U-Tube, Monitoring Well O~ Annular Space  aily Gauging & Inventory Reconciliation Tightness Testing ~ None ~ Unknown ~ Other b. Piping: ~o~-~eskricking Leak Detector(s) For Pressurized Piping" ~ Nonitorin~ Sump ~ith Race~ay ~ Sealed Concrete ~ Half-Cut Compatible Pipe Raceway ~ Synthetic Liner Raceway ~ None ~ Unknown ~ Other · Describe Make & Model: 8. Tank Tightness Has This Tank Been Tightness Tested? ~ Yes ~ No ~ Unknown Date Of Last Tightness Test Results Of Test Test Name Testing Company 9. Tank Repair Tank Repaired? ~ Yes ~o ~ Unknown Date(s) Of Repair(s) Describe Repairs 10. Overfill Protection ~ Operator Fills, Controls, ~ Visually Monitors Level ~ Tape Float Gauge ~Float Vent Valves ~ Auto Shut-Off Controls ~ Capacitance Sensor ~ Sealed Fill Box ~ None ~ Unknown ~ Other: List Make ~ Model Fo~ Above Devices a. Underground Piping: ~es ~ No ~ Unknow. ~aterial T~ckness (inches) Diameter ~'~ Manufacturer ~ Pressure ~ Suction ~ Gravity Approximate Length Of Pipe Run b. Un~erKround Piping Corrosion Protection: ~alvanized ~ Fiberglass-Clad ~ Impressed Current ~ Sacrificial Anode ~ Polyethylene Wrap ~ Electrical Isolation ~Vinyl Wrap. ~Tar or Asphalt ~ Unknown ~ None ~ Other (describe):. c. Under,round Piping, Secondary Containment: ~ Double-Wall ~ Synthetic Liner System ~ne ~ Unknown ~ Other (describe): AGRICUL BORATORIES. In . J. J. EGLI~N, REG. CHEM. ENGR. P~:I'#OtW¥ ]~i'-~ .... ~: ..... ~4'i~ PIE~E RD~':~BAK~SFIELD, CALIFORNIA 93308 PHONE 327-4911 ~ , Mr. John Robinson .U~C 0-2 1986 Date Reported: 12/02/86 3006 Coronado Street Date' Received: 11/24/86 Anaheim, California ~COuN~~ DEPT Laboratory No.: 20975 & 20976 -~ample Bescr~pt~ons: Sampled by: lony Bonanno . of 8 C kaborato~es ~1 - gtco 2' (so~l) '#1 #2 Oil & Grease, mg/kg 591. 243. B C LABORATORIES, INC. j~. J/_/Egl ir~/ ,,,,,,,, LABORATORIES. In .. I~ETflOL£Ut~ ~. - '~ J.J. ~LIN, R~. CHE~. ENGR. ~ 4100 PIERCE R~D~,''B~KERSFIELD, CALIFORNIA 93308 PHONE 327-4911 Mr. John Robinson ~ 0 2 198~ te Reported: 12/02/86 3006 Coronado Street Date Received: 11/26/86 ~aheim, California 9280~2kN COUN[%~ ~Laboratory No.: 21163 & 21164 .Sample Descriptions: Sampled by: Tony Bonanno of B C Laboratories #1 - Arco 10' (soil) ~2 - Arco 18' (soil) #1 #2 Oil & Grease, mg/kg 97. (-) 20. (-) refers to "less than" B C LABORATORIES, INC. J. ~ ~j~ RATORIES J. J. EG/IN, REG. CHEM. ENGR. MAIN OFFICE: 4100 PIERCE ROAD, BAKERSFIELD, CA. g3308 PHONE 327-4911 PURGEABLE ORGANIC ANALYSIS (SOIL)' PETROLEUM FACILITIES CONSTRUCTION Date of 3006 CORONADO STREET · ~ REPORT: 11-26-86 ANAHEIM, CA. 92806 LAB No.: 209?6 ,~ SAMPLE DESCRIPTION: · !~' ARCO 6' DATE/TIME :DATE/TIME SAMPLE DATE ANALYSIS ~ SAMPLE COLLECTED: RECEIVED @ LAB: .COMPLETED: : 11-23-86 11-24-86. 11-26-86 TEST METHODS: EPA 8010 MINIMUM REPORTING STORET ANALYSES REPORTING CONSTITUENT .UNITS CODE RESULTS LEVEL Bromodichloromethane /~. ug/g .?32101 none detected 0.1 Bromoform ug/g 32104 none detected 0.1 Bromomethane ug/g 34413 none detected 0.1 Carbon tetrachloride ug/g 32102 none detected 0.1 Chloroethane ug/g 343.11 none detected 0.1 2-Chlor°ethylvinyl ether ug/g 345?6 none detected 0.1 Chloroform ug/g 32106 none detected 0.1 Chloromethane ug/g 34418 none detected 0.1 bis(2-Chloroethyl) ether ug/g 342?3 none detected 0.1 Dibromochloromethane ug/g 32105 none detected 0.1 Dichlorodifluoromethane ug/g 34668 none detected 0.1 1,1-Dichhloroethane ug/g 34496 none detected 0.1 1,2-Dichloroethane ug/g 34531 none detected 0.1 :~,l-Dichloroethene ug/g 34501 none detected 0.1 trans-l,2-Dichloroethene ug/g 34546 none detected 0.1 1,2-Dichloropropane ug/g 34541 none detected 0.1 cis-l,3-Dichloropropene ug/g 34?04 none detected 0.1 trans-l,3-Dichloropropene ug/g 34699 none detected 0.1 PUR~EA~L~ O~G~NIC ANAuz-oI (Continued) LAB no.: 80976 ~. SAMPLE DESCRIPTION: AR O 6' MINIMUM REPORTING STORET .ANALYSES REPORTING CONSTITUENT UNITS CODE RESULTS LEVEL Methylene Chloride ug/g 34483 none detected 0.1 1,1,8,2-Tetrachloroethane ug/g 34516 none detected 0.1 Tetrachloroethene ug/g 34475 none detected 0.1 1,1,1-Trichloroethane ug/g 34506 none detected '0.1 1,1,2-Trichloroethane ug/g 34511 none detected 0.1 Trichloroethene ug/g 39180 none detected 0.1 Trichlorofluoromethane ug/g 34488 none detected 0.1 .. Vinyl Chloride ug/g 39175 none detected 0.I LABORATORIES J. I. EGLIN, REG. CHEM. ENGI. MAIN OFFIC~ 4100 PIERCE ROAD, BAKERSFIELD. CA. 93308 PHONE 327-4911 PURGEABLE ORGANIC ANALYSIS SOIL) ~" PETROLEUM FACILITIES CONSTRUCTION .' Date of 300& CORONADO STREET ~- REPORT: 11-26-86 ANAHEIM, CA. ~2806 ~'~ ' LAB No.: SAMPLE DESCRIPTION: ~ .~'.' ','- . ~" ':' .:. ~' .'~, '~ ARCO 6' ":' :' ">''/~' ' '~ :: ' · '"" ~ "' ' DATE/TIME DATE/TIME SAMPLE DATE ANALYSIS . '- ~ SAMPLE COLLECTED- RECEIVED ~ LAB: COMPLETED: .... ..: " ' ','" ""' '""':' ~"' ~' · ~ ~-~6-8~ ~ .'~-~.-~. ' '~.~. ~ '11-23-86 ' --~.11-24-86 -..' ..... .~.-~,.~-~ ...¥:~ .. - .... ~ '- MINIMUM' -. REPORTING STORET ANALYSES REPORTING CONSTITUENT UNITS CODE RESULTS LEVEL 8romodichloromethane ug/g 32101 none detected 0.1 Bromoform .. ug/g 32104 none detected 0.1 Br°momethane ug/g 34413 none detected 0.1 Carbon tetrachloride ug/g 32102 none detected 0.1 Chloroethane ug/g 34311 none detected 0.1 2-Chloroethylvinyl ether .ug/g 345?6 none detected 0.1 Chloroform ug/g 32106 none detected 0.1 Chloromethane ug/g 34418 none detected 0.1 bis(2-Chloroethyl) ether ug/g 342?3 none detected 0.1 Dibromochloromethane ug/g 32105 none detected 0.1 Dichlorodifluoromethane ug/g 34668 none detected 0.1 1,l-Dichhloroethane ug/g 344~6 none detected 0.1. 1,2-Dichloroethane ug/g 34531 none detected 0.1 1,1-Dichloroethene ug/g 34501 none detected 0.1 trans-l,2-Dichloroethene ug/g 34546 none detected 0.1 1,2-Dichloropropane ug/g 34541 none detected 0.1 cis-l,3-Dichloropropene ug/g 34?04 none detected 0.1 ~trans-l,3-Dichloropropene ug/g 346~ none detected 0.1 PURGEABL~_, ~GA~NIC ANAL~~-~ (Continued) LAB no SAMPLE DESCRIPTION: -' REPORTING STORET ~:7'-~ ANALYSES REPORTING CONST I TUENT UN I TS CODE RESULTS LEVEL Methylene Chloride ug/g 34423 none detected 0.1 l~l~2~2-Tetrachloroethane ug/g 34516 .~none detected 0.1 Tetrach loroethene ug/g 3~75 . ~?~}~none detected O. 1 l~l~l-Trichloroethane ug/g 3~506 :?%:none detected 0.1 l~l~-Trichloroethane ug/g 3~511 ??none detected .0 1 Trichloroethene ug/g 3~180 Tr ich lorof luoromethane ug/g 3A~88 Vinyl Chloride. ug/g 3~175 ~' none detected 0.1 P£TROL£UAf .~ 4100 PIERCE RD., BAKERSFIELD, CALI~RNIA 93308 PHONE 327-4911 '. ~. ,.: .... :.. ,.. · ,., ..~.': .. _- ',. 1700 Flower Street KeRN COUNTY HEALTH DEPAR . ,~.T, O~qCER .*: .... Bakersfield, California 93305 ENVIRONMENTAL HEAL~ DIVISION L~ M Hebron, M.D. * ./' ' Telephone (805) 861~6 .: :-:" . '¥_; -~ ..': .: - > -._ '..' .. ~ - ~: . -- .: ~?~ ' ' DIRE~OR OF ENVIRONM~TAL'H~LTH '?FAC~I~ ~/~D~SS:'~.. ~/~D~S ' ~ 6115 Faci li~es [~lifo~a *Av~ue St~er /C~y ,~ ~:'~ 90701 'E.. '~oronadO St.~ ~;~e~, No.' [337393 .:i~ .-~.~-:~."!,.~;':;~:.:<;,!:::1 TANK ~,T. ~ >. *.,;~::~:,'~:~:~t::;:??~?~':**,.~P~ ~ ,.:~Nov~r 24; 1986 ' ~. · *, .' .... '7 . ...': '..... :' :*: ." . .: ~.~:..: :.... · ~ST ~ P~IS~ 1. P~b~ ~ ob~ a F~e ~~ ~ prior ho ~fa~g ~do~n~ ac~fon. 2. ~11 pr~es m~ ~ ~ accor~ce wf~ r~re~n~ o~ ~e s~ds ~d ~del~es develo~ for ~e ~le~n~bfon of Kern Co~y Or--ce C~e. ~ co~ of ~ese 3. The ~b~ ~5 ~e a con,actor wi~ a con~a~or's lic~se ~lfd ~d ~en~ ~or ~ re~l. appro~el~ ~o ~d s~ 'f~b. 5.. ~ ~~ of ~ s~les ~ ~ re~fe~ a~ dopes o~ appro~el~ ~. ~ee~ ~d f~ for eve~ 15 l~e~ f~ o~ pf~ ~. 6. ~11 s~les m~ ~ ~alyz~ ~or ofl ~d ~se, ~d ~o~1 ~l~e~ hy~~ns. 7. ~dvise ~is offfce of ~e h~ ~d ~e of pro~s~ s~l~g wi~ 24 ho~s advice no,ce. DISTRICT OFFICES Delano . Lamont . L.kel.abell. . Mojswe . Rldgecre~t . Shafl~ . TaN UNDERGROUND STORAGE TANK UNAUTHORIZED RELEASE (LEAK) / CONTAMINATION SITE REPORT NAME OF INDIVIDUAL FILING REPORT ~ ....: · -: _': ': ~ PHONE · , .~, ...... .?~, ...... :., ~ ,. [:a~m~ ¥~.~.~- ..~.~ - .,.' ~ ... ~; ....:~.~.,~..~__ ...: -::.. : . :- ~ ~ ~ ':' .: ~ '~: .R~D~ O~ER ~ ~~ F~... ~ _... ...... ~G~ ~A~ * P~E :, ( ) (~) ~/ ~ME ~ L~T (~ ~DI~RGEB~N~"~? ~ .~::" ,- ';.: ~,; ..~-~PAIRT~K . "" ~ ~AIRP~~ ~ CH~P~URE YE ~E~ ONE ONLY ~ , : ~ UmEmaUlNm mlLONLY GR~A~R ~ DRINKINGWA~R-~HECKONLYFWA~R~VEA~LYBEm~mC~) ~ ~T~T~ ~. ~~P~OR~GINP~:.~ ~AV~PR~ ~ ~A~C~R~S ~E~ ~PROPRIA~ ~N(S) (SEE B~K FOR ~TAI~) '. : ~ C~SI~(C~'' ::~' ~VA~&~(~ ":' "~ R~FR~P~T(~ ~ ~<EDBIOOEG~A~N(I~ ~ mNTAINM~B~RIERlm) ~ EXmVA~&~T(~ ~'j ~: ~MP&TR~TGR~WA~R(Gn ~ ~ES~Y(RS) : ~. -- ~.: ~: *. .~ . HEALTH OFRCER · : 1700 Flower Street ;.~. ,.=RN COUNTY HEALTH Leon M I-lebertson, M.D. .: Bakersfield, California 93305 - . ' 'ENVIRONMENTAL HEALTH DIVISION ' ' .- -. ... ' · - · :. '-: ,:-'. Telephone (805) 861-3636 ' .. ""' : ":"- · - :" ' .... ~' ~'.-' DIRECTOR OF ENVIRONMENTAL HEALTH :',,'a ~"PKI~IIT FOR PHENANILt~ ABANDONMILk~ -:- ~:~-~: ~-~- ~'.: :'4~.?~,,-, -:'~. ,,~'.-:. :~.~.~:~'~ '~-c/~'--:. :IL~TY NAME/ADDRESS: %!i:'~, Ob'NF, R (S) NAM~/ADDRKSS: ~' ;~::; COHTRACI~R: ~6115 ~Co~erc L~p .'.Supply 'Corp. 501 "Cai i fornia 'Avenue 7315 "Studeb~er ~. ~(~'Ma~o 1 la 'B1vd. ,rs field,~ CA ~:. '/CA ' .[:90701 ~- fCA ~f~:~91502 iCense No. ;~322635 '/* .... ;:~'~ .~'~_'i "T~ AT ~0~ .~ :.f ~, /: ':~:~-~-~;'(.-:).~. :...*':~PROV~ DATE ~ ..~Nove~ber~~18, 198 .: : .. , .. · .'. . .... _ ,.- .. ,-.~ ,, . . . ~ , ,~__-- : ...... .., ~. · . :- - *"*'- ........ =' .... " ' '-~' '*:' '":f' -. ;' -'*,.: ,..' ' ' /-?"~: ''~- [' :~-".~ ;'~ ' ' ?;,. '.e ~ ;, * -, ......... ; .......... '.POST 0N PREMISES. ' ' · ......... CONDITIONS AS FOLL0~S: ... 1. Pe~aittee must obtain a Pl~e Department pe~tt p~io~ to Initiating abandonment act/on. 2. All p~ocedu~es ~ust be in accordance ~tth =equl~eaents of the standards and guidelines developed fo~ the impleaentat/on of Ke~n County O~dlnance Code. A copy of these ~equ/~eaents a~e enclosed ~tth this pe~lt. 3. A minimum of t~o samples must be cet~leved beneath the centec of the tank at depths of approximately t~o and six feet. 4. A m/n/mum of two samples must be ~et~/eved at depths of appcox/mately t~o feet and slx feet fo~ every 15 lln'ea~ feet of pipe ~un. ,* 5. Ail samples ~ust be analyzed ~oc oll and g~ease, and, total halogeaated ' hydrocarbons · 6. Advise this office of the t/me and date o~ p~oposed samp-ling ~tth 24 houcs advance notice'. ' ACCEPTED BY DATE / r DISTRICT OFFICES Delano . Lamont . Lake Isabella ., Mojave . Ridgecrest . Shafter . Taft Division of Environm~ental~..h Ap~K, .ion Da~e i700 Street, Bakersfield, CA 93305 Tanks to be Abandoned Flower (80§) 861-3838 APPLICATION FOR PERMIT FOR TF_~PORARY OR PF.~NT CLOSURE/ABANDONNENT OF UNDERGROUND HAZARDOUS SUBSTANCES S~ORAGE FACILITY Type of Application (Fill Out One Application Per Facility) D Temporary Closure/Abandonment ~ermanent Closure/Abandonment A. Project Contact. (name, a. rea qode, phone): Days ~(9~--~-Zl~/~Nights Facility Address /S-c~/ ~.z;'cz~z Nearest Cr.%o~s~S_st. T R SEC (Rural Locations Only) _ Address Zip B. Water to Pacllity Provided by ~ ~~ Depth to Groundwater Soil Characteristics at Facility / ~ ~~ - Basis for Soil 'Type and ~roundwater Depth' Determinations ~~/~ ~ P~oposed Starting ~ate ~ · P~oposed Completion Date Worker's Compensation Certification ~ ~~fW~/F~ Insurer~~~' Environmental Assessment Contractor CA License No.' Address Zip Telephone Proposed Starting Date Proposed Completion Date Worker's Compensation Certification ~ Insurer D. Chemical Composition of Materials Stored Tank ~ Chemical Stored (non-'commercial name) Dates Stored Chemical Previously Stored  ~ (if differene) to E. Des~ibe .e_~)~oeror R~trieviog Samples ,-c.~~ ~~ samples W~ll be Analy~ed f.oq /~~ ~ ~~~~ ' La6oratory That Will Pe~f°~m~na~yses of~Samples ~ F. This Application for:~moval or ~ Abandonment in Place · * PLEASE PROVIDE INFOR~TION REQUESTED 0N REVERSE SIDE OF THIS SHEET BEFORE SUBMITTIN APPbICATION FOR REVIEW. This form has b~ compl~/d under penalty of prejury and to the best of my knowledge is tru and correct./ _.'/~ ~~ Signature /~W ~~ Title Date Provide DescriPtion. of Physical Layout of Facility Using Space Provided BeloW; Include Ail the Eo.~lowing Information: Location'of Tank(s), Piping & Dispenser(s) Proposed Sampling Locations Indicating Approximate Depth of Samples Nearest Street or Intersection '' . . __ Any Water Wells or Surface Waters Within 100' Radius'~of Facility I~'~ 1700 Flower Street KERN COUNTY HEALTH DEPART T HEALTH OFFICER Bakersfield, California 93305 ' ' '-*. Leon M Hebertson, M.D. - ~;+.F:.~:' ' -' ' . ~' Telephone (~5) 861-3636 . . 'ENVIRONMENTAL H~L~ DIVISION : ..' ~ "*:' :. · .... - ~ ~: .... ~ ~,~ ...:UNDERGROUND: . .. HAZARDOUS SUBSTANCES ...... ;.: ?:'~::-~:~'~.'. / FAC I L I TY. :.:~. -,.~.,. ....... ~ ..... _.. .... ; ..... IL IT.Y :' : .CALIFORNIA 'AVENUE ~i7315 STUDEBAKER .ROAD IELD :ERRITOS lANK ~# IN 'CODE ~RESSURIZED PING? ': DATE PEP, MIT M~,ILED: NOV g 4 1986 '' DATE PERMIT CHECK LIST RETURNED: 1577 GRIFF H RD. RAMONA, CA, 92065 Record of Computer (619) 789-4337 or Meter Change Location / Station number date - ~ Meter Change Contractor / O W/M Notified Make anO~odel Serial Number Tagged Pump ~ [~ (~ ~ ~Red ~Green ~Blue Totalizer Finish(money) : Fmish ~g. HOpS)~[ qq~ Calibrati°": Fuse (C~eck.0 Slow 0 Readings Start (monev) Start[~ [~olgallonsJ _ AdjustedTo Fast Slow Pro Return to Storage (gallons) Make un,Model Serial NumOer Tagge~ Tag ¢ Pump ~' t~ " 1~9~ ~Red ~Green ~Blue Finish {money) Finish (gallons)~~ Calibration: I FastO Slow moralizer {~g~J% ~ ~ Checked Product.. · Return to Stocage (gallons) Totaiizer Sealed Meter Sealed ~ ~Yes ~No ~Yes ~No TaggWd Pump I¢~ ~Red ~G .... ~8,ue ~inish (money) Finish (gallo~ts) Calibration: Fast Slow ' Totalizer Checked ...din.. Start(money, Star ~~,~ AdjustedTo Fast Slow ~~ ~V eyes ~No . ~es ~No Make and Moael Serial Num0er . Tagged Tag Fi ) F,r~aHons~ Calibration: ]Fas Totalizer ~"1 9~1 Checked ~ Readings Start (money) Start (gallor~s~ Adjusted .~ Fast Slow ~ake and Model Serial Ndmber Tagge~ Tag Pump ~Red ~Green ~Blue Finish {money) Finish (gallons) Calibration: ~Fast Slow Totalizer Checked Readings Starz {money) Start ~gaHons) Adjusted Fast Slow To Product Return to Storage {gallons) Totalizer Sealed Meter Sealed ~ y.~ ~ No ~ Y.~ ~ No Make anQ Model Serial Numoer Tagged Tag Pump ~Red ~Green ~Blue Finish (money) Fi&ish (gallons) Calibration: Fast Slow Totalizer Checked Readings Start (money) Star~ (gallons) AdiustedTo Fast Slow Product Return to Storage (gallons) Totalizer Sealed ~ Meter Sealed ~uplicate {canaryI District File Triplicate (pink Dealer Copy MARC~'S MAINTENANCE ,, 1577 GRIFFITH RD. .~ .RAMONA, CA. 92065 Record of Computer ., PH. (619) 789-4337 or Meter Change · Location Static .... her Date [ [~ Meter Change ] Contractor ~0 [i?~'l~r[J -~L ~ ~ ~L~ %~/L... ~(-~ ~"~ 4~' ~/~'~"'~[ [][] w/MC°mputer ChangeNotified Make and Model er(al Number 'Tagged Tag -~ Fin( y) ' - ' - :in(eh (gallons) .~, ,~ Calibration: Fast I Slow Totalizer I J~ ! ¢~ ,~{'~% Checked 0 . ~,.~ Totalize, Sealed ] Meter Sealed . Product{[~ Return to Storage lo(gall°ns) ~Yes ~No [ ~Yes ~ No v Ma nd Model Serial Number Taggea Tag ~ Finish~ (gallons) ~libration; Fast Slow~ Finish{money, ~~ " Totalizer ~'--~'~ Checked/ ~" Re~i~s Star~ (money) Sta Adjusted Fast Slow i . P rodu~ Return to Storage { gallons) moralizer Sealea Meier Sea, ed 0 ~Yes ~No Yes ~No Make and Model Serial Number Tag~d Tag ~  Ct Return to Storage {gallons) Totahzer Sealed Meter Sealed Make and Model Serial Number Taggdd ~Blue Tag ~ Totalizer Finish (money) Fiflish[~ ~ O~ ~~gall°ns) __ CalibratiOn:checked Fast ~ [ Slow Readings Start (money) Star~l gall on s~ ~ AdjustedTo Fast ~ Slow Product~ ~ ~ Return to Storage]~(gaHons) Totalizer~YesSealea ~No ~] Meter ~YesSealea ~No  Make and Moael Serial ~umOer TaggEd ' Tag ~ Readings Sta~(monev) Start /gallons) Adjusted F ~ · Pr~~, ~"~~ Return ,o Storage~ (gaHons) Totalizer Seaie~, ~ Meter Sealed Make and Model Serial Number Ta~e~ Tag ~ Finis~ (money~ Finish (qallo~) Calibration: [Fast SIc Totalizer e~q 53 Checked 0 Re~i~s Start (monev) ~ Start~~(o~llons) AdjustedTo ~ Fast ~ .SI°w c~~~ ] Return [o Storage~ (gallons) Totalizer~Yes ~NoSealed ~ ~Yes ~]No { Meter Sealed ' ~s'Signature distribution: Original'white) ~eg/on File Ouolicate (canarv) Distr~ct File Triplicate (pink) Dealer Copy MAR~ I'S MAINTENANCE 1577 GRIFF1TH RD. ,!~t/V[ONA, CA. 92065 Record of Computer · ' PH. (619). 789-4337 or Meter Change Location Statio bar .... ID~te ] ~'] Meter Change Contractor '[i~ Pump Maken~and Modei¥~b~ Serial. {0q / ~'~Number Tagged~.Red E~ Green I~ BlueITag Fi ne Finish {gallons) Calibration: Fast Readings Start (money) Sta t"~al~ns~.~.-~'''~'''' Adiusted Fast Slow Pr~,., ~ Return ~o Storage~ {gallons) Totalizer~yes ~NoSealed [ ~eter ~es ~NoSealea  Make and MoOel Serial Number TaggeO Tag ~ Finish (money) I r~ ~ ~,ibration: Fast+. : Totalizer 0~~ Checked Re~i~s Start (money) Sta ~ . AdjustedTo ~ Fast : Slow Product~ ~-~ ~~~ Return. to Star,gallons) Totalizer~yesSealed ~No {Meter~YesSealed ~No  Make anO Mo~el Number Return to ~torage (gallons~ Totalizer Seale~ Meter Seale~ Make and Mo~el Serial Number Tagged Tag ~ Finish {money) Finis~ {gallons) Calibration: Fast } Slow Readings ~tar( ( ~¢)~_~[ -' I Star{~[~(gallonsl AdjustedTo Fast ~ Slow Product~~ ~ Return ~o Storage[o~gallons) To~ahzer~yesSeaied ~No' [ Meter ~YesSealed~No MaKe and Model Tagg~ Pump ~Red ~Oreen ~Blue F {rash (money) F {nish {gallons) Cabbradon; Totalizer [{ ~0~ Checked ' Readings Start(money) Scarf ~[~ AdjustedTo Fas, Slow P~c[ Return [o S~orage {gallons) Totalizer Sealed ~ Meter ;ealed Slow Totalize, Finish(money, Finish (gaHor,s,__[l~W ~ Calibration:checked Fas~ ,__~ Readies . Start [money) Start.~ J'(~)~ ~ AdjustedTo Fast Slow ~eturn to Storage{gallons) Totalizer Sealed ~NO Bistributio.: Original~iwhite) Region File Duplicate (canary) District File Tr~plica[e (pink) Dealer Copy ARCO Petroleum Products Company '~' ' ,~, Leak Detector Annual Equipment Division of Atlantic Richfield ComDany ' Verification & ' Leak Inspection Retail Marketin~ ., .'. I Dispenser/Pump Leak No leak Repaired III Leak Detectors Test Leak No leak Rel~aired Piping ,~ ARCO ~ Check valve ARCO Clear Unleaded X Hoses ~. ARCO Unleaded Supreme '~ Nozzles ~ IV Visual check of area Fittings 7 Low spots around station ~/' II Tanks Landscaped area ~ Wellpoint ~ Nearby ditches, creeks, etc. ~ Piping ~, V Dealer/Operator Fill b°x" ~, Has experienced leaks ~ Vapor recovery fittings ~. Has experienced spills .~- Submerged Turbine ~'X (explain in comments) IIA Leak Detectors Existing Missing Installed VI Other Install, ~d ARCO ~ 'Filter Instructions ~ ARCO Clear Unleaded ~(~ ARCO Unleaded Supreme ~ Leak Detectors SealedI Comments I ~,,~. ~1 ~:tor' ' ature APPC-248 (8-81) Division o[ Environmental Health Application e '" 17O0 Flower Street, Bake..rsfield, CA 93305 · APPLICATION FOR PERMIT TO OPERATE UNDERGROUND HAZARDOUS SUBSTANCES STO~AGE FACILITY Type of Application (check): ~ [-]Ne--~ Facility [-]Modification of Facility ting Facility []Transfer of Ownership A. ]~ergency 24-Hour contact (name, area code, phone): Daysj~~~~ Type of Business {check,): Station ~Other scribe) Is Tank(s) Located on an Agricultural Farm? []-]Yes ~ Facility Address/_~N~/(_~A~ , ,,/~/~ Nearest Cross St. T- ,, R SEC (Rural Locations ~ly) Owner ~ C-~ Contact Person m :~ ~'~-~-~ /~ldresS. '~ ~L_ __'., ~0. Zip y'O?O( Telephone 2~ Operator ~C-O · J~O~ Contact Person. Tank(s) Store (check all that apply): Tank ! Waste Product Motor Vehicle Unleaded Regular Premium Diesel Waste ~uel O~ ~ Ccm_ Ft~_it~_ ~J-~-t:.-la.z= S~:~ ~ ~c:~ry for r~to~ .=~,i~e f~ls) an e .... ~--~,~ ~h~lual Pr~i~sly S~r~ ~ ~ (if different) ~A ~ a~ept f~ly ~11 obl~atiO~of ~mi~ ~. __ is~ ~ ~ . ~ . I ~ers~ ~at ~e ~mitti~ ~ority may r~i~ -~ify-or temi~te ~e transfer of ~e ~mit ~ ~rate ~is ~dergro~d facility u~n r~eivi~ ~fs c~ple~ fora. Facility Name __~~0 0' Permit No. TANK ~ / (FILL OUT SEPARATE FORM FOR EACH TANK) FOR EACH SECTION, CHECK ;~T3. APPROPRIATE BOXES 'H-- 1. Tank is: ['~Vaulted []Non-vaulted ~]Double-Wall ~l~all .. . 2. ~ Material ~t~rbon Steel ~]Stainless Steel []Polyvinyl Chloride D Fiberglass-Clad Steel _. fiFiberglass-Reinforced Plastic [] Concrete ~ Aluninu~ [] Bronze [~Unk~own Other (describe) -- 3. Primary Containment Dste Installed Thickness (Inches) Cavity (Galloons) Manufacturer 4. Tank Seco'6dary Con6air~ent []Double-Wall. ~]Synthetic Liner []Lined Vault [-]None ~own ~Other (describe) :. Manufacturer: [,]TMaterial Thickness (Inches) Capacity (Gals.) , 5. Tank Interior Linin~ . · [7 mx¥ []menoli¢ [] lass []Uay P 'fined E]un o=. ,- []Other (describe): 6. Tank Corrosion Protection .[]Tar or Asphalt~nknown []None []Other (describe): ' Cathodic Protection: []None .[]Impressed Current System ~lSacri-~icial Anode System 'Descri'be System & Equipment: 7. Leak Detection, Monitoring, and Interception a. Tank: U]Visual (vaulted tanks only) []Groundwater Monitoring' Well(s) ....... []Vadose zone Moni~orir~] Well(s) ~U-Tube Without Liner · []U-Tube with Compatible Liner Directing Flow to Monitoring We.Il(s)* Vapor Detector* [7 Liquid Level Sensor* [7 Conductivit~ Sensor' [] Pressure Sensor in Annular Space of Double Wall Tank[ [] Liquid Retrieval & Inspection Frcm U-Tube, Monitoring Well or Annular Space D Daily Ga~ng & Inventory Reconciliation [] Periodic Tightness Testing b. Piping: ~Flow-Restrictirg Leak Detector(s) for Pressurized Piping~ []Monitoring Sump with Race~y [] Sealed Concrete Race~y [2]Half-Cut Compatible Pipe Raceway [7 Synthetic Liner Raceway ~None [] Unknown [] Other · Describe Make & Model: -- 8. Tank Tightness .. l~-~-This TanX Seen Tightness Tested? ~ []No rqUnknown '_~-. . Date of Last Tightness Test '~--~ . Results of Test Te~t Name.. ~, .~,~ . Testing Company '~_~ , 9. Tank ~ Tank Repaired? []Yes []No ~"known Date(s) of Repair(s) Describe Repairs 10. Overfill Protection [~Operator '~ills, Controls, & Visually Monitors Level []Tape Float Gauge []Float Vent Valves [-]Auto Sh_~0ff Controls · []Capacitance Sensor [-]Sealed Fill Box [-]None ~.~nknown - [']Other: List Make & Model For Above Devices 11. Piping a. Underground Piping: ~s ~]No []Unknown Material Thick. p6ss (inches) Diameter Manufacturer ~ressure []Suction [qGravity Approximate Length of Pipe ~ .. b. Underground Pipirg Corrosion Protection : []Galvanized [~Fiberglass-Clad [-]Impressed Current [-]Sacrificial Anode ~U~U ]UnknYethylene Wrap [-]Electrical Isolation []Vinyl Wrap [qTar or Asphalt own []None [']Other (describe): c. Underground Pipirg, Secondary Contair~ent: []Double-Wall []Synthetic Liner System []None ~'k~own [-]Other (describe): Facility Name Permit No. TANK~ ~ (FILL OUT SEPARATE FORM FOR EACH TANK) FOR EACH SECTION, CHECK ;~r.t APPROPRIATE BOXES }{.' 1. Tank is: []Vaulted []Non-vaulted ~Double-Wall ~le-Wall , 2. ~ Material [~rbon Steel [] Stainless Steel [] Polyvinyl Chloride [] Fiberglass-Clad Steel B Fiberglass-Reinforced Plastic [] Concrete [~ Aluminum [] Bronze •Unknown Other (describe) -- 3. Primary Containment ~ate Installed Thickness (Inches) Ca~q~F. lt~ (Gallons~) Manufacturer 4. Tank 'Secondar~ Containment "~; ~'~) ~) []Double-Wall []Synthetic Liner '[]Lined Vault []None [-~ Other (describe): Manufacturer: [~Material Thickness (Inches) ' Capacity (Gals.) , 5. Tank Interior Lining ~" DRubber [-]Alkyd •Epoxy []menolic []Glass []Clay ~ined []tk~no,~, []Other (describe): 6. Tank Corrosion Protection ---~Galva6i'~ ~ss-Clad •Pol~thYlene t~¥ap F~vinyl Wrapping .•Tar orAsphalt ~3nknown []None ~Other (describe): Cathodic Protection: []None .[3Impressed Current System ~lSacrfficial ~ede System Descri'b~ System & Equipment: 7. Leak. Detection, .Monitoring, .and Int~' · a. Tank: ~Visual (vaulted tanks only) •Groundwater Monitorirg' W~ll(s) []Vadose Zone Monitoring Well(s) QU-Tube Without Liner ['TU-Tube with Ccmpatible Liner Directing Flow ~o Monitoring Well(s)* [~ Vapor Detector* [] Liquid Level Sensor* [] Conductivity Sensor* [] Pressure Sensor in Annular Space of Double Wall Tank., ' [] Liquid Retrieval & Inspection From U-Tube, Monitoring Well or Annular b~ce [] Daily Ga~3~ng & Inventory Reconciliation [~ Periodic Tightness Testing [] None ~3mkno~ [] Other , . ' b.. Piping: ~Flow-Restrictirg Leak Detector(s) for Pressurized Pipirg" []Monitoring Sump with Race~y []Sealed Concrete Race~y []Half-Cut C~mpatible Pipe Raceway [']Synthetic Liner Raceway ~No~e · [] Unknown [] Other *Describe Make & Model: -- 8. Tank Tightness ]~is Tan~ Been Tightness Tested? ~ []No ~Unknown Date of Last Tightness Test 7--~ Results of Test Test Name ,//~ , i Testing C~mpany , 9. Tank ~ . ~ank Repaired? []Yes [']No ~USknown Date(s) of Repair(s) Describe Repairs 10. Overfill Protection · [~]Operator Fills, Controls, & Visually' Monitors Level []Tape Float Gauge []Float Vent Valves []Auto Sh_u~r~Off Controls ~Capacitance Sensor []sealed Fill Box [2]None ~Unknown - [~Other: List Make & Model For Above Devices 11. Piping a. Underground Piping: ~s [~NO ~Unknown Material Thick. p6ss (inches) Diameter Manufacturer ~ressure []Suc~'ion ~]Gravity Approximate Length of Pipe lax% b. Underground Pipirg Corrosion Protection : [~Galvanized []Fiberglass-Clad [-]ImIxessed Current [~Sacrificial Anode ~U~f~yethylene Wrap ~']Electrical Isolation []Vinyl Wrap [~Tar or As~lt own [~None [']Other (describe): c. Underground Piping, Secondary Contairment: []Double-Wall ~Synthetic Liner System ~None ~'~own [-]Other (describe): TANK. ~_ .~ (FILL OUT SEPARATE FORM FOR EACH TANK) " FOR EACH SECTION, CHECK ;~T-L APPROPRIATE BOXES 1. Tank is: []Vaulted []Non-¥aUited ~]DoubI~Wall [~mgle-Wall ~Carbon Steel rq Stainless'Steel [] Polyvinyl Chloride [] Fiberglass-Clad Steel [] Fiberglass-Reinforced Plastic [] Concrete [] Alunint~ [] Bronze []Unknown [] Other (describe) 3. Primary Containment Date Installed Thickness(Inches)Ca~ac_i t~ ( ~C~llons){ Manufacturer 4. Tank Secondary Contairment ..~v~- ' r~Double-Wall []Synthetic Liner []Lined Vault []None ~"~own r~other (describe): ...... Manufacturer: r~Material Thickness (Inches) Capacity (Gals.) 5. Tank Interior Lining [~Rubber [-1Alkyd [']Epoxy~[']Phenoli¢ r~-Glass rqclay ~'~ined r~Unkno,~, ~Other (describe): '-':~; ' 6, Tank Corrosion Protection -'~GalVanlzed -~'F~oer---~_~mss-Clad rTPol~thYlene Wrap []Vinyl Wrapping "'~- .r~Tar orAsphalt ]~3nknown :'~None ~Other (describe): Cathodic Protection: [~None '~[]Impressed Current System ~']Sacrificial Anode Syst~ Descrik~ System & Equipment: 7. Leak Detection, Monitoring, and Interception a. Tank: [qVisual (vaulted tanks only) ~Groundwater Monitoring' Well(s) [] Vadose Zone Monitoring Well (s) ~ U-Tube Without Liner []U-Tube with Ccmpatible Lfner Directin~ Flow b3 Monitoring Well(s)* [] Vapor Detector* [] Liquid Level Sensor [] Conductivit~ Sensor* [] Pressure Sensor in Annular Space of Double Wall Tank- [] Liquid Retrieval & Inspection From U-Tube, Monitoring Well or Annular Space [] Daily Gaging & Inventory Reconciliation ~]Periodic Tightness Testing [] None~.Unl~own [] Other b. Piping: 'low-Restrtctirg Leak Detector(s)for Pressurized Pipingw []Monitoring Strap with Raceway [']Sealed Concrete Raceway []Half-Cut Compatible Pipe Raceway [] Synthetic Liner Race~ay r~None [] Unknown [] Other *Describe Make & MOdel: ~ 8. Tank Tightness ~-~--Tnis Tank Been Tightness ~s~ed~ Eh~s 'UNo Ii]Unknown Date of Last TiQhtness Test/./ t)/ Results of Test /-~.~~ , 9. Tank ~ Date(s) of Repair(s) Describe Repairs 10. Overfill Protection [qOperator Fills, Controls, & Visually Monitors Level []Tape Float Gau~e [-]Float Vent Valves []Auto Sh_u~T~Off Controls . ~Capacitance Sensor rqSealed Fill Box [2]None [~K]nknown - []Other: List .Make & Model For Above Devices 11.. Piping a. Underground Piping: ~i~s r~No []Unknown Mater. ia1 Thick, p6•• (inches) Diameter Manufacturer ~]Pressure rqsuction r~Gravity Approximate Length Of Pipe Run b. Underground Pipirg Corrosion Protection : []Galvanized []Fiberglass-Clad []fmpcessed Current rqsacrificial Anode []U~UY]UnknYethylene Wrap ~Electrical Isolation []Vinyl Wrap []Tar or Asphalt own []None rqother (Sescribe): c. Underground Pipirg, Secondary Containment: []Double-Wall []Synthetic Liner System []None '~"~own []Other (describe): TANK # (FILL OUT SEPARATE ~ ~ EACH TANK) FOR EACH SECTION, CHECK ALL APPROPRIATE BOXES H, 1. Tank i__~s: [].Vaui'~ed [] Non-Vaulted [].Double-Wall [] Single-Wall 2. Tank Material ~ Carbon Steel [] Stain]ess Steel '[] Polyvinyl'Chloride [] Fiberglass-Clad'Steel [] Fiberglass-Reinforced Plastic [] Concrete [] Aluminum [] Bronze ~] Unknown [] Other (describe): 8. Primary Containment Date Installed Thickness (Inches) c~Pacity (Gallons) Manufacturer 4. Tank Secondary Containment ~ Double-Wall [] Synthetic Liner [] Lined Vault [] None ['] Unknown ~ Other (describe): Manufacturer: Material Thickness (Inches) Capacity (Gals.) 5.'Tank Interior Lining D Rubber [-] Alkyd []Epoxy [q Phenolic ~ Glass [] Clay [] Unlined [] unknown [2] Other (describe): 6. Tank Corrosion Protection .' [] Galvanized [~] Fiberglass-Clad [] Polyethylene Wrap [] Vinyl Wrapping · . [] Tar or Asphalt [~ Unknown [] None [] Other (describe): Cathodic Protection: Iq None [] Impressed Current. System [] Sacrificial Anode System [] Describe System & Equipment: 7. Leak Detection, Monitoring, and ~nterception a, Tank: [] Visual (vaulted tanks only) [] Groundwater Monitoring Well(s) [] Vadose Zone Monftoring Well(s) [] U-Tube' Without Liner C] U-Tube with Compatible Liner Directing Flow To Monitoring Well(s)* [] Vapor Detector"*.[] Liquid Level Sensor* [] Conductivity Sensor* ~ Pressure Sensor' In Annular Space Of Double Wall' Tank * [] Liquid Retrieval.& Inspection From U-Tube, Monitoring Well Or Annular Space [~] Daily Gauging & Inventory Reconciliation. ~ Periodic Tightness Testing [] None [] Unknown [] Other b. Piping: [] Flow-Restricting Leak Detector(s) For Pressurized Piping* [~Monitoring Sump With Raceway [] Sealed Concrete Raceway ~Half-Cut Compatible Pipe Raceway []Synthetic Liner Raceway [] None [']Unknown [] Other · 'Describe Make & Model:. I 8. Tank Tightness Has This Tank Been Tightness Tested? [] Yes [] No [] Unknown Date Of Last Tightness Test Results Of Test Test Name TestinM Company 9. Tank Repair Tank Repaired? [~]Yes [] No []Unknown Date(s) Of Repair(s) " Describe Repairs 10. Overfill Protection [] Operator Fills, Controls,-& Visua]ly Monitors Level [] Tape Float Gauge [] Float Vent Valves [] Auto Shut-Off Controls [] Capacitance'Sensor [] Sealed Fill Box [] None [] Unknown [] Other: List Make & Model For Above Devices 11. Piping, a. Underground Piping: [] Yes [] No [] Unknown Material Thickness (inches) Diameter Manufacturer [~ Pressure []Suction [] Gravity Approximate Length Of Pipe Run b. Underground Piping Corrosion Protection: ~ Galvanized [] Fiberglass-Clad [] Impressed Current [] Sacrificial Anode [] Polyethylene Wrap Iq Electrical Isolation [] Vinyl Wrap i-]Tar or Asphalt []. Unknown ~ None [] Other (describe): c. underground Piping, Secondary Containment: [] Double-Wail [] Synthetic Liner System [] None [] Unknown' ~ Other (describe):