Loading...
HomeMy WebLinkAboutRES NO 107-90RESOLUTION NO. 107-90 A RESOLUTION OF THE COUNCIL OF THE CITY OF BAKERSFIELD MAKING FINDINGS, APPROVING AND ADOPTING NEGATIVE DECLARATION WITH MITIGATION MEASURES AND APPROVING SEGMENT II OF PROPOSED AMENDMENT TO THE LAND USE ELEMENT OF THE BAKERSFIELD METROPOLITAN 2010 GENERAL PLAN (LAND USE AMENDMENT 2-90). WHEREAS, the Council of the City of Bakersfield referred Segment II of a proposed amendment to the Land Use Element of the Bakersfield Metropolitan 2010 General Plan to the Planning Commission; and WHEREAS, the Planning Commission of the City of Bakers- field, in accordance with the provisions of Section 65353 of the Government Code, held a public hearing on Thursday, June 21, 1990, on Segment II of a proposed amendment to the Land Use Element of the General Plan, notice of the time and place of hearing having been given at least ten (10) calendar days before said hearing by publication in the Bakersfield Californian, a local newspaper of general circulation; and WHEREAS, such Segment II of the proposed amendment to the Land Use Element of the Bakersfield Metropolitan Area General Plan is as follows: SEGMENT II GOODWILL INDUSTRIES, has requested a change from HMR (High Medium Density Residential) to LI (Light Industrial) on 5.48 acres of a 9.64 acre parcel of land (APN 4142-200-01) located on the east side of Quantico Avenue, northeast of Texas Street in East Bakersfield, for the construction of a central warehousing and processing center with vocational rehabilitation center; and WHEREAS, for the above described Segment, an Initial Study was conducted and it was determined that the proposed pro- ject would not have a significant effect on the environment and a Negative Declaration with mitigation was prepared, advertised and posted on April 30, 1990, in accordance with CEQA, and agreed to by the applicant, as set forth in the attached Exhibit "B"; and ORIGINAL WHEREAS, the law and regulations relating to the preparation and adoption of Negative Declarations as set forth in CEQA and City of Bakersfield Resolution 107-86 have been duly followed by the City staff and the Planning Commission; and WHEREAS, by Resolution No. 24-90 on June 21, 1990, the Planning Commission recommended approval and adoption of Segment II subject to conditions by this Council and this Council has fully considered the findings made by the Planning Commission as set forth in that Resolution; and WHEREAS, the Council of the City of Bakersfield, in accordance with the provisions of Section 65355 of the Government Code, conducted and held a public hearing on WEDNESDAY, AUGUST 8, 1990, on the above-described Segment II of the proposed amendment to the Land Use Element of the Bakersfield Metropolitan 2010 General Plan, notice of time and place of the hearing having been given an least ten (10) calendar days before the hearing by pub- lication in the Bakersfield Californian, a local newspaper of general circulation. NOW, THEREFORE, BE IT RESOLVED and found by the Council of the City of Bakersfield as follows: 1. The above recitals and findings, incorporated herein, are true and correct. 2. The Negative Declaration for Segment II is approved and adopted with mitigation measures listed in the attached Exhibit "B". 3. Public necessity, convenience, general welfare and good planning practice justify the proposed General Plan Amend- ment, as conditioned in Exhibit "A". 4. Proposed General Plan Amendment, as conditioned in Exhibit "A", will be compatible with future development in sur- rounding areas and development on the project area. 5. The report of the Planning Commission, including maps and all reports and papers relevant thereto, transmitted by the Secretary of the Planning Commission to the City Council, is hereby received, accepted and a~proved. 6. The City Council hereby approves and adopts Segment II of proposed amendment to the Land Use Element, constituting a change from High Medium Density Residential to Light Industrial and generally located north of East Brundage Lane, aouth of Virginia, on the east side of Quantico, as shown on the map attached hereto as Exhibit "C", subject to conditions of approval listed in Exhibit "A". 7. That Segment II, approved herein, be combined with other approved segments described in separate resolutions, to form a single Land Use Element Amendment, GPA 2-90. .......... o0o .......... ORIGI~L I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on AU~ 8 1990 , by the following vote: AYES: COUNCILMEMBERS: EDWARDS, DeM()ND, SMITH, BRUNNI, PETERSON, McDERMOTT, SALVAGGIO NOES, COUNCILMEMBERS ABSENT COUNCILMEMBERS: ABSTAIN: COUNCtLMEMSERS' CITY CLERK and Ex Officio Clerx of the Council of the City of Bakersfield APPROVED AU8 8 ~990 MAYOR of the City of Bakersfield APPROVED as to form: ARTHUR J. SAALF~ELD -/ LCM/meg ~ Attachment Exhibit "A" Exhibit "B" Exhibit "C" G GPA 4 2-90SEG2.1 7/30/90 EXHIBIT A Conditions of Approval Ordinance Requirements The applicant shall comply with the following conditions required pursuant to adopted City regulations, ordinances, policies and standards. 1. Applicant shall submit a Parcel Map or Waiver to create two separate parcels from the existing parcel (current APN ~142-200-01) along the M-1 / R-2 zoning boundary prior to site plan review of either the residential or industrial developments. 2. Applicant shall comply with all Site Plan Review conditions. 3. The applicant shall obtain a Conditional Use Permit from the City Board of Zoning Adjustment prior to constructing any day care facility on the M-1 property. Discretionary Requirements The following conditions are discretionary. The applicant shall comply with the following conditions to provide for orderly development in the area, ensure required improvements are constructed, buffer noise and visual impacts to surrounding properties, and to curtail the proliferation of smaller, independent drainage basins. 1. In order to assure that the industrial use will be buffered from the residential land use to the north, the following are required: a. If after two years from the date of approval of the GPA and ZUA, Goodwill has not submitted and received approval on plans for construction of a Goodwill-related housing complex on the northern property, Goodwill must construct an 8-foot high masonry brick wall along the entire northern boundary of the industrial site. Applicant shall plant one, 15 gallon evergreen tree every 30 feet along said wall with species and design to be approved by site plan review committee. Exhibit "A" GPA 2-90, Segment Page 2 b. If within two years, the applicant has submitted and received approval for plans for the construction of a Goodwill-related housing complex on the northern property, the applicant will construct an 8-foot high masonry brick wall along the northern boundary of the industrial site, from the east property line to the point of the proposed electric gate separating the office yard from the warehouse. Applicant shall plant one, 15 gallon evergreen tree every 30 feet along said wall with species and design to be approved by site plan review committee. 2. An offer of dedication will be required within the annexation area to allow for the construction of Quantico Avenue (1/2 width) to collector standards from the south industrial boundary of the project to the north residential boundary of the project. The right-of-way width of a standard collector is 90'. All offers of dedication, fully executed, shall be submitted to the City prior to development or recordation of any subdivision map or certificate of compliance or issuance of any building permit within the project area. 3. Construct Quantico Avenue from the south industrial boundary of the project area to the north residential boundary of the project area with full 1/2 width improvements on the east side (north bound) including curb, gutter, and 5.5' sidewalk. Existing manholes may require alteration to obtain proper final street elevation. Construction shall be completed prior to occupancy of any building within the annexation area. 4. Construct transition areas as required by the City Engineer for all approaches to and departures from the new ultimate paved area and where necessary for connecting to existing curb and gutter. 5. Applicant shall plant a five foot wide landscape strip along the southern boundary of the industrial site, on the interior of the chain link fence, with species and design approved by the site plan review committee. 6. Applicant shall plant one 15 gallon evergreen tree every 30 feet along the eastern boundary of the industrial site, on the interior of the eight foot block wall, with species and design approved by the site plan review committee. 7. Applicant will maintain all landscaping within the City right- of-way. Exhibit "A" GPA 2-90, Segment II Page 3 8. All street paving sections are to be determined based on R- value tests, the number and location to be determined by the City Engineer, and using traffic index values established by the Traffic Engineer. 9. A storm drain pipeline is in Quantico Avenue. The applicant shall verify that capacity exists in the existing storm drainage facilities to take the drainage from the GPA area prior to connection to these facilities. 10. Sewer service is available in Quantico Avenue from the Mt. Vernon-Panorama Sanitation District. The applicant shall connect to this sewer system and pay all required fees and construct improvements in accordance with the standards and requirements of the Mt. Vernon-Panorama Sanitation District. 11. At least one additional 9500 lumen street light shall be required along the Quantico Avenue frontage. Placement of this street light shall be addressed at the time of site plan review. 12. Circulation within the project area shall be reviewed during the site plan review process. Of particular concern is how to address the mix of residential and industrial traffic on-site. 13. Upon final grading of the industrial property, an 8-foot (eight) high continuous masonry wall shall be constructed on the eastern edge of the industrial site (adjacent to a vacant R-2 lot), and a 6-foot (six) chain-link fence shall be constructed on the northern edge of the industrial site (along the proposed R-2/M-1 zoning boundary). 14. The northern and eastern edges of the residential site shall be allowed to remain unfenced until development of the site, at which time additional fencing may be required. 15. Watering techniques will be utilized during all grading to reduce dust problems associated with the proposed industrial development. No building permit for industrial property (except for masonry wall) shall be issued until said masonry wall is completed. 16. At least one additional fire hydrant would be required for the site at the time of subdivision of the property. Additional fire hydrants may be required as conditions placed on the project at the site plan review stage. The warehouse building must be sprinkled for fire safety. Additional fire safety measures may be requested at the site plan review stage. 17. Outside storage of material is prohibited. vehicles, industrial goods, or any other Exhibit "A" GPA 2-90, Segment II Page 4 18. All air conditioning units, blowers, etc., on the industrial property shall be arranged and designed to shield noise and view from all adjacent streets and residential structures. 19. All lights (indoor and outdoor) along the north, east and south property lines of the industrial site visible from residential property shall be mounted in such a manner that light from them is shielded away from adjacent residential uses. 20. Refuse containers shall not be placed within 24 feet of residential property and shall be shielded from view. EXHIBIT "B" Mitigation ORIGINAL EXHIBIT B Mitigation for Negative Declaration 1. The applicant must submit soils reports and drainage plans to the Building Department prior to issuance of any grading, wall or building permits. The applicant must adhere to applicable building and construction practices, such as water spraying to control fugitive dust, and comply with County Public Works and Health Departments. 2. The applicant shall comply with all provisions of the Metropolitan Bakersfield Habitat Conservation Plan Advisory Notice (attached to Initial Study in Exhibit C). A habitat conservation plan interim mitigation fee shall be paid prior to issuance of a building permit. The fee will be based upon the adopted charges at the time of issuance of a building permit or payment of fee before issuance of the building permit. The current fee is $680.00 per gross acre. 3. The applicant shall utilize project-specific noise-attenuation measures such as brick walls, building siting and use of landscaping to reduce the noise impact of the proposed warehouse and office uses. 4. The applicant shall design the residential and industrial developments to include proper design and placement of angled security, warehouse and parking lights to avoid shining on adjacent properties. Use of high pressure lamps are encouraged to conserve energy. 5. The applicant shall design the project to alleviate potential land use conflicts, such as implementation of pedestrian corridors, building and road placement revisions, limitations to hours of operation, etc., according to conditions of site plan review and the Board of Zoning Adjustment. 6. The applicant shall comply with all conditions placed on the project by the Traffic Engineer and Public Works to alleviate traffic safety and public service issues. The applicant must adhere to General Plan, Municipal Code and Zoning Ordinance requirements. 7. No outside storage of any vehicles, industrial goods, or any other material is allowed. 8. Additional landscaping around the southern site is recommended to screen the industrial storage and loading areas from adjacent properties. ORIGINAL GENERAL PLAN AMENDMENT 2-90, SEGMENT II VIRGNA AVENUE HR LMR SI 34- PNOPOSED ANNEXATION ////////////////////.~ ~/~. ~o u :-///, m HMR · -{. ALLOWAY LANE I C BERGOUIST co~r~ /~/ENUE o 40o GOODWILL INDUSTRIES FROM HMR TO II EAST BRUNDAGE LAK~ 'r29s, R28E 4~016 EXHIBIT ORIGINAL