Loading...
HomeMy WebLinkAboutRES NO 222-04RESOLUTION A RESOLUTION OF THE COUNCIL OF THE CiTY OF BAKERSFIELD ADOPTING DRAINAGE PLAN FOR THE BRIMHALL PLANNED DRAINAGE AREA AND MAKING FINDINGS RELATIVE THERETO. RECITALS WHEREAS, the City Council by Resolution of Intention No. 1338, adopted July 7, 2004, in the Council chambers in the City Hall, 1501 Truxtun Avenue, Bakersfield, California, identified the Brimhall Planned Drainage Area, and; WHEREAS, the new project will consist of a pipeline system that will drain water to a central basin, and; WHEREAS, the new project will improve the efficiency of the storm water drainage facilities in the benefit area, and; WHEREAS, the City Council finds that the new system is in the best interest for the health, safety and welfare of the community. NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: by reference. The foregoing recitals are true and correct and incorporated herein 2. The Brimhall Planned Drainage Area has been identified as necessary for the removal of surface and storm waters from the local and neighborhood drainage areas. 3. The Council hereby finds that, as to the Brimhall Planned Drainage Area, as described in the plans and maps attached hereto and incorporated herein by reference, subdivision and development of property within each such area will require construction of facilities, described in each such area either on the basis of benefits conferred on property fro subdivision or on the need for such facilities created by the proposed subdivision and development of other property within such area, and that the fees provided within the schedule attached, are fairly apportioned. 4. The Brimhall Planned Drainage Area is hereby adopted. Page 1 of 2 Pages - ORIGINAL I HEREBY CERTIFY that the foregoing Resolution was passed and adopte~l[jJ3y,~tl3,e ~),uncil~,1 L ~Z/_UU", of the City of Bakersfield at a regular meeting thereof held on by the following vote: ABSTAIN: ABSENT: COUNCILMEMBER C,OU~H, CA~_ N, BENHAH, HAG~GAED, HA~SON, SULL~t-VAN, SALVA~GZO COUNClLMEMBER COUNCILMEMBER COUNCILMEMBER PAMELA A. McCARTHY, CM~ CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED: JUL ,~ i 2004 By: ~ Mayor of the City of Bakersfield APPROVED as to form VIRGINIA GENNARO City Attorney By: ROBERT M. SHERFY'~ Assistant City Attorney Attachments: Exhibit "A" Boundary Area Exhibit "B" Fee Schedule Exhibit "C" Cost Estimate - Page 2 of 2 Pages - ~RIGINA~ EXHIBIT "A" BRIMHALL PLANNED DRAINAGE AREA COST ESTIMATE Item Estimated Unit No. Quantit~ Measure Item Extension Unit Price Price 1 1 EA 2 1 EA 3 702.1 CY 4 399 TON 5 420 TON 6 60 LF 7 2 EA 8 2 EA 9 142 LF 10 257 LF 11 39 LF 12 237 LF 13 356 LF 14 8 EA 15 7700 CY 16 1 EA 17 1 LS 18 330 LF 19 1 EA 20 6600 SF 21 1 LS RELOCATE ROADSIDE SIGN(S) $47.43 REMOVE ROADSIDE SIGN(S) $47.43 ROADWAY EXCAVATION $9.01 AGGREGATE BASE (CLASS II) $15.63 ASPHALT CONCRETE (TYPE "B") $40.35 ASPHALT CONCRETE TRENCH PATCH $61.96 CONCRETE STRUCTURES (JUNCTION BOX) $7,150.00 CONCRETE STRUCTURES (CATCH BASIN) $6,820.00 INSTALL 8" SEWER PIPE $78.00 REINFORCED CONCRETE PIPE (18" CLS IV) $55.00 REINFORCED CONCRETE PIPE (30" CLS Ill) $90.00 REINFORCED CONCRETE PIPE (30" CLS IV) $85.00 MISC. CONCRETE (TYPE"B" C&G) $10.50 REMOVE TREES $312.50 ROADWAY EXCAVATION (RETENTION BASIN) $5.70 CONCRETE STRUCTURE (OUTLET STRUCTURE) $7,920.00 ABANDON WATER WELL $5,900.00 MISC. CONCRETE (TYPE"B" C&G) $12.00 DRIVEWAY $2,500.00 PAVEMENT $2.00 WALL/FENCE $15,000.00 $47.00 $47.00 $6,326.00 $6,236.00 $16,947.00 $3,718.00 $14,300.00 $13,640.00 $11,076.00 $14,135.00 $3,510.00 $20,145.00 $3,738.00 $2,500.00 $43,890.00 $7,920.00 $5,900.00 $3,960.0O $2,500.00 $13,200.00 $15,000.00 Construction Total: $208,735.00 EXHIBIT "B" BRIMHALL PLANNED DRAINAGE AREA FEE SCHEDULE Assessor's Parcel Zone Number R-1 110-130-01 R-1 110-130-24 R-1 110-130-29 R-1 110-130-15 R-1 110-130-16 R-1 110-130-20 R-1 110-130-21 R-2 110-130-34 R-2 110-130-22 R-2 110-130-09 R-2 110-130-35 C-1 110-130-06 C- 1 110-130-22 C-1 110-130-09 Acrea~le Cost / Acre PDA Allocation 1.93 $2,803 $5,410.36 9.00 $2,803 $25,229.68 3.98 $2,803 $11,157.12 1.90 $2,803 $5,326.27 1.90 $2,803 $5,326.27 4.27 $2,803 $11,970.08 4.47 $2,803 $12,530.74 0.23 $4,057 $933.20 3.05 $4,057 $12,375.08 2.05 $4,057 $8,317.68 6.63 $4,057 $26,900.59 1.69 $6,639 $11,220.57 4.96 $6,639 $32,931.37 5.89 $6,639 $39,106.00 TOTAL PRICE: $208,735.00 ORIGINAL