HomeMy WebLinkAboutUNDERGROUND TANK (2)RESOURCE MANAGEMENT AGENCY
RANDALL L ABBOTT
DIRECTOR
DAVID PRICE Iil
ASSISTANT DIRECTOR
Environmental Health Sendces Department
STEVE McCALLEY, REH$, DIRECTOR
Air Pollution Control District
WILLIAM J. RODDY, ApCo
Planning & Development Services Department
TED JAMES, AICP, DIRECTOR
RECEIVED
ENVIRONMENTAL HEALTH SERVICES DEPARTMENT
1991
December 19, 1991
HA.Z ~,,4, AT. DIV.
'Michael Stahl
Arco Oil & Gas Company
-' 4550 Caiifo~rnia Ave'nue
Bakersfield, CA 93307
SUBJECT:
Location
Known As
Permit #
: 4121 South "H" Street
Bakersfield, CA
: · Arco Oil & Gas Company
: 310063
Dear Mr. Stahl:
This letter confirms the. completion of site investigation and remedial action at the above site. With
the provision that the information provided to this agency was accurate and representative of
existing conditions, it is the position of this office that no further action is required at this time.
Please be advised that this letter does not relieve you of any liability under the California Health
and Safety Code or Water Code for past, present, or future operations at the site. Nor does it
relieve you of the responsibility to clean up existing, additional, or previously unidentified conditions
at the site which cause or threaten to cause pollution or nuisance or otherwise pose a threat to
water quality or public health.
Additionally, be advised that changes in the present or pr0posgd US9 of.the sj[e_mgy require further
site characterization and mitigation activity. It is the property owner's responsibility to notify this
agency of any changes in report content, future contamination findings, or site usage.
If you have any questions regarding this matter, please contact Joe Cafias at (805) 861-3636,
Extension 588.
Chris Burger;RTE.H.S(.
Hazardous Materials Specialist IV
Hazardous Materials Management Program
CB:JC:cas
~310063.b
2700 "M" STREET, SUITE 300
BAKERSFIELD, CALIFORNIA 93301
(805) 861-3636
FAX: (805) 861-3429
ADDRESS:
FILE CONTENTS SUMMARY
ENV'.
SENSITIVITY:
Activity
Date
#Of Tanks
Comments_.
ARCO Oil and Gas C .pany
~pril 27, 1987
Kern County Health Department
Division of Environmental Health
1700 Flower Street
Bakersfield, California 9330'5
Gentlemen:
On July 10, 1986 ARCO Oil and Gas Company submitted an
application to your agency for temporary closure (2
years) of three underground storage tanks located at
our former headquarters at 4121 Sou'th H Street, Bakers-
field. A response to that application has not been re-
ceived to date. Enclosed is another, ap~.lication for
temporary closure. The City of Bakersfield, Fire Pre-
vention Bureau, is agreeable to a one-year temporary
closure of these tanks.
By submittal of this application, ARCO requests approv-
al for temporary closure for a period not to exceed one
year. These tanks once stored gasoline,, diesel and
solvent. They have been empty since 1984 as a result
of our office relocation. If the property on which the
tanks are located has not changed ownership, within one
year, ARCO intends to permanently abandon the tanks.
Soil borings and lab analysis will be completed upon
receipt of a temporary closure permit from your agency.
Very truly yours,
Corey L. Unfried
Environmental Coordinator
CLU/sb
cc:. Fire Prevention Bureau
Attachment
ARCO Oil and Gaf ~mpany
Western Dis,, ,ct
Post Office Box 147
Bakersfield, California 93302
Telephone 805 321 4000
April 24, 1987
?
Mr. L.. E. Kollenborn
Fire Prevention Bureau
City of Bakersfield
2101 "H" Street
Bakers'field, California 93301
Dear Mr. Kollenborn:
Pursuant to our telephone conversation on April 2,
1987, ARCO Oil and Gas Company is requesting a tempo-
rary (oneyear) closure of three underground storage
tanks at our former headquarters at 4121 South "H"
Street, Bakersfield. A plot plan is' enclosed.
These tanks once stored gasoline, diesel and solvent.
The tanks have been empty since 1984. We anticipate
these tanks will be either returned to service or per-
manently abandoned within one year.
Very truly yours,
Corey L. Unfried
Environmental Coordinator
CLU/sb
Enclosure
cc: Kern County Environmental Health Department
Kern Codnty .qeal~h ~:p~cume~.
Division of Envirof~nental Health
.1700 Flower Street, Bakersf~.eld, CA
App[ [cation Date.~3~D/li_]- 17. 1(}87
')33D5 Mo. of Tanks r.o be A~ando(]e,d 3
APPLICATION F~R PERMIT FOR TEMPORARY OR PERMANENT~
CLOSURE/~NMENT OF UNDERGROUND
HAZARDOUS SUBSTANCES STORASE FACILITY
Ao
Do
Type of A__~plication (Fill Out One Application Pe~ Facility)
F~]T~nporary £1osure/Abandonmen--~ [-]Permanent C1osure/Abandonmen~
Project Contact (name, a~ea code,'phone): Days(soS~_~?l_A!77 Nights(805) 832-1848
Facility Name Former District Office - ARCO 0il an~ Gas Compan3
Facility Address 4121 South "H" Street Nearest Cross St. _.White Lane
T. R SEC (Rura--1 Locations Only)
Owner ARCO 0il and Gas Company Teleg~none (805) 321-4000
Address .4550 California Ave~P.~ Box 147', Bakersfield~ CA 'zip 93302
Operator-- Same Telephone
Address Zip
Water to Facility.Provided by 0n~site water well
.Soil Characteristics at Facility Fine sandy 10am
Basis for Soil Type and Groundwater Depth De. terminations
Oepth to Groundwater 150'
SCS,KCWA Report 1984
Tank Removal Contractor
A~dress
N/A
Proposed Starting Date
Worker's Compensation Certifi'cation
CA License ,No.
Zip Telephone
Proposed Ccmpletion Date
Insurer
Environmental Assessment Contractor
Address
Proposed Starting Date
Worker's ComFensation Certification
N/A CA License No.
Zip .Telephone
Prol~osed Completion Date
Insurer
Chemical CompoSition of Materials Stored
Tank ~ Chemical Stored (non-co~ercial name'
BA-01 Motor Vehicle Fuel - Unleaded
BJ_-O2 Mqtor Vehicle Fuel - Diesel
BA-03 Petroleum Distillate - Naphtha
Dates S tot,ed
Unk to 1984
Unk to 1984
Unk to 1982
to
Chemical Previously Store~
(if different)
Motor V~hicle Fuel - reader
Describe Methc~t fo[ Retrieving Samples Samples will be taken at 5, 10, and 15 feet inter-
vals below the tanks and composited for analysis.
Samples Will ~e Analyzed for TO*~I p~frnl¢~lm hyd~n'rarhnnc h¢nTmnm fnll,¢,¢ 'R:vlPn¢:
EDB. lead ' - .................................. '~
Laboratory That Will Perform Analyses.of Samples B.C. Labs
Address 4100 Pierce Road Telephone(805] 327-4911
F. This application for: []removal or [-]a~ndonment in place X temporary closur~
* * pLEASE PROVIDE INFORMATION REQUESTED ON REVERSE SIDE OF THIS SHESq~ BEFORE SUBMITTING
~PPLICATION FOR REVIEW.
This form has be.e.n completed under penalty of perjury and to the best of my knowledge is tru~
and correct. ~,
Kcr'n County He_~lCh
Division of gnvico~nent','~l Health
1700 Flower Street, Bakersfield], CA
Perm.i ~ No. i
Ar)pt [car_ion Date 62'30-8-6 '
No. of Tanks to be .~andoned 3
A~PLICATION FOR PERMIT FOR TEMPORARY OR PER~CkNENT
CLOSURE/A~ OF UNDER~ROUND
HAZARI~US SUBST~ES S~RA~E ..FACILIT~f
Ac
Type 0f A__pplication (Fill Out One Application Per Facility)
[~]Temporary .Closure/Abandonmen--~ , ~ , · [] Permanent Closure/Abandonment.
Project Contact (name, area code, phone): [~/SZ~pC2~e~ry~ ~ Nights ('805~ 832-1848
Facility Name ARCO 0il and Gas Company
Facility ~ldress 4121 South "H" St. - Bakersfield Nearest Cross St. WMte Lane
T 30S R 27E SEC 13 (Rural .Locations Only)
Owner ARCO O~] and 6as Company Telephone' (805) 833-40.42
Address.P. 0. Box 147, Baker§fi~]d, CA zip 93302
Operator-- Same Telephone
Address Zip
Water to Facility Provided by 'On-site water well Depth to Groundwater 150'
.Soil Characteristics at Facility F~ne ~ndy loam
Basis for Soil Type and Groundwater Depth Determinations SCS; KCWA Water Supply Report-l_c
Tank Removal Contractor
Address
N/A
Proposed S~arting Date
Worker's ComFensation Certif'i'cation ,~
CA License No.
Zip Telep~qne
Proposed Ccmplet[on Date
Insurer'
Environmental Assessmen~ Contractor
Address
PropoSed Starting Date
~brker's Compensation Certification
N/A CA License No'.
Zzp Telephone
Proposed Complezion Date
Insurer
Chemical Composition of Materials Stored
Tank ~ Chemical Stored (non-corrmercia! name)
RA-~ql
BA-02
Dates Stored
Unk to 1984
Unk to 1984,
Unk to 1982',
to
' BA-03
Motor Vehicle Fuel - Unleaded
Motor Vehicle Fuel - Diesel
Petroleum Distillate - Naphtha
Chemical Previously Storec
(if different)
E. Describe Method for Retrieving Samples Sample~ will be taken at 2' and 6' depths below
tanks and piping. ,
Samples Will be Analyzed for ~l-R~nT~nP: FDR; tnl~mnm~ wyl~h~,- O?-Tnfml hyaror~rbons_
'03-Naphtha, benzene, toluene.
Laboratory That Will Perform Analyses.of Samples, B.C. Labs
Address 4100 Pierce Road~- Bakersfield Telephone ~805) 327-4911
F. This application, for: [2]removal or [~]abandonment in place
* * PLEASE PROVIDE INFORMATION REQUESTED ON REVERSE SIDE OF .THIS SHEET BEFORE SUBMII~ING
APPLICATION FOR REVIEW. -
This form has been completed under penalty of perjury and to the best of my knowledge is true.
and.' correct.
*' '_C, ' .................. ] .....................
SignatLt'e ?it!eEnvironmental Coordoate .... ','",'~:'
.t; 1.
2.
South "H" Pr(
?ANK ~ BA-01 (FZr_n OUT SEPARATE FORM FOR ~ACH TANK)
FOR EACH SECTION, CHECK 'ALL APPROPRIATE BOXES
Tank is: [] ~aul ted [-]Non-Vaulted I-]Double-Wall [~Single-Wal 1
~ Material
[]Carbon Steel [] Stainless Steel []Polyvinyl Chloride [] Fiberglass-Clad Steel
Fiberglass-Reinforced Plastic [] Concrete [] Al~umin~n [] Bronze []Unknown
Other (describe)'
3. Pr imar~ Containment
[~ate Installed Thickness (Inches) Capacity (Gallons) Manufacturer
0nknown Unknown 10,000 Unknown ·
4. Tank Seconclar~' Containment ~ ~
[]Double-Wall ~Synthetic Liner []Lined Vault [-]None IX]Unknown
[]Other (describe): . Manufacturer:
[']Material Thickness (Inches) Capacity (Gals.)
5. Tank Interior Lining
--r~Rubber [] Alkyd [-]Epoxy []Phenolic [~Glass []Clay []Unlined ~]Unkno~n
[-]Other (describe): "
6. Tank Corrosion Protection
--]~Galvanized ~]Fiberglass-Clad []~oly~thylene Wrap ~]Vinyl Wrapping
[-]Tar or Asphalt [~Unkno~n []None []Other (describe"): '~
Cathodic Protection: []None ~[]Impressed Current System ~lSacrt'fict~'l Anod~ System
Desc'ribe System & Equi~ent:
7. Leak Detection, Monitoring, and Interce?tio6
a. Tar]~: [-]Visual (vaulted tanks only) . [2]Groundwater Monitoring' W~ll (s)
[qVadose Zone Monitoring Well(s) '[-]U-Tube WithOut Liner
· []U-Tube with C~npatible Liner Directing Flow to Monitoring Well(s)* -~
[] VapOr Detector* [] Liquid Level Sensor* [] Conductivity Sensor*
[] Pressure Sensor in Annular Space of Doubie Wall Tank- ''
[] Liquid Rstrieval & Inspection From U-Tube, Monitoring.Well or Annular Space
[] Daily Gauging & Inventory Reconciliation [] Periodic 'Tightness Testing
~ [2]None [] Unkno~n [] Other Tank is empty and out of service
b. P{ping: [~Fl°W-Restricting Leak. Detector(s) for Pressurized Piping'
[-]Monitori. rg S~p with Race~y []Sealed Concrete Race~y
[]Half-Cut Compatible Pipe Race~ay []Synthetic Liner Race~ay []None
[] Unknown [] Other
*Describe Make & Model:
8. Tank Tightness
l~is Tan~ Been Tightness Tested?
Date of Last Tightness Test
Test Name
9. Tank Re~air
~ Repaired? []Yes ~No ~Unknown
Date(s) of Repair(s)
Describe Repairs
{'-]Yes ~]No []Unknown
Results of Test
Testing C~npany
Overfill Protection
[X1Operator Fills~~ controls, & Visually Monitors Level
[]Tape Float Gauge. []Float Vent Valves [] Auto ~hut- Off Controls
[-]Capacitance Sensor [qSealed Fill Box []None ~Unknown
[']Other: - List Make & Model For Above Devices
11.
Pipzr~u
a. Undergro~Und Piping:
be
Ce
~Yes -[]No' []Unknown Material Unkn0wn~
Thickness (inches) Diameter Manufacturer
[2]Pressure ~lSuction ~Gravity Approximate Length of Pipe
Underground Pipirg Corrosion Protection : - ,
[]Galvanized [-]Fiberglass-Clad~ []Impressed Current [2]Sacrificial Anode
[-]Polyethylene Wrap F1Electrical Isolatio~ []Vinyl Wrap []Tar or Asphalt
~]Unknown []None []Other (describe) :'
Underground, Piping, Secondary Contai~nent.:
~]Double-Wall ~]Synthettc Liner b~yste~ [~bne [~L~known
e
e
South "H" Pro[
·
TAN~ ~ BA-02 FZLL OUT ,qEP.~RATE FOP~M FOR
-~R EA~ SE~ION, '~ECK ~ ~PROPR.I~E ~XES
Tank is: ~ Vault~ ~n-Vaul ~ ~uble-Wal 1 ~Si~le~all
~ ~terial
~Car~n st~i ~S~inless Steel ~l~inyl C~oride ~Fi~rglass~l~ Steel
Fi~rglass-Reinforc~ Plastic ~Concrete ~ ~in~ ~Bronze ~k~
Other (de~ri~)
Pr i~ry Con~ai~nt -
~te Install~ ~ic~ess (Inches) Ca,city (~llons) ~nufacturer '
Unknown' Unknown 4~000 Unknown
Tank Secondary Co~t'ai~ent
~le-Wall ~thetic Liner ~Lin~ Vault ~ne ~o~
~-~Other (describe):
[[]Material
5. Tank Interior Lining.
~Rubber [-]Alk. yd [-]Epoxy
[']Other (describe):
6. Tank Corrosion Protection
'8.
e
11.
Thickness (Inches)
[]Phenolic []Glass
Manufacturer:
Capacity (Gals.)
[][]Clay []Unlined ~]Unkno~n
--]~Galvanized '[qFiberglass-Clad []]]Polyethylene Wrap []]Vinyl Wrappipg
[~Tar or Asphalt ~iqUnknown []]]None []-]Other (describe):
Cathodic Protection: []None .[]Impressed Current System ~lSacrt'fict~l ~ System
Desc'ribe System & Egui.~ment:
Leak Detection, Monitoring,, and Interce.Dtion
a. Tank: []]Visual (vaulted tanks Only) [2]Grour~water Monitorirg Well(s) []Vadose Zone Monitoring Well(s) ~[]U-Tube Without Liner
[]]]U-Tube with C~npatible Liner Directing Flow to Monitorirg We.ll(s)*
[] VaPOr Detector* [] Liquid L~vel Sensor* [] Conductivity .Sensor'
[] Pressure Sensor in Annular Space of Double Wall Tank
[] Liquid Retrieval & Inspection Frcm U-Tube, Monitoring' Well or Annular Space
[] Daily Gaugirg & Inventory Reconciliation []]Periodic Tightness Testing
.~]None F]Unkno~n ~]Other Tank J$ .empty and out of service
b. Pipirg: [~FloW-Restrictirg Leak Detector(s) for Pressurized Piping,
[]Monitoring S~p with Race~y []Sealed Concrete Race~ay
[]Half-Cut Ccmpatible Pipe Race~ay ~Synthetic Liner Race~ay []None
[] Unknown [] Ot~her
*Describe Mak~ & Model:
Tank Tightness '
l~is Tan~ Been Tightness Tested?
Date of Last Tightness Test
Test Name
Tank~Re i r
~ Repaired? ~qYes [~No
Date(s) of R~pair(s)
[] Yes []No []Unknown
Results of Test
Testing C~npany
[]Unknown
Describe Repairs
Overfill Protection
[~Operator Fills, Controls, & Visually Monitors Level ·
[]Tape Float Gauge. ~Float Vent Valves []]Auto Shut- Off Controls
[[]Capacitance Sensor []Sealed Fill Box []None []Unknown
[[]Other: List Make & Model For Above 'Devices
Piping
a. Underground Piping: ~Yes ·[]No []]Unknown 'Material Unknown
ThickneSS (i~ches) Di~neter Manufacturer
[]]Pressure F~Suction []Gravity ~proximate Length ~f Pipe.Run 20'
b. Underground Pipirg Corrosion Protection :
[]~alvanized []Fiberglass-Clad []Impressed current []sacrificial Anode
[]Polyethylene Wrap [-]Electrical Isolati~ [2]Vinyl Wrap []Tar or Asphalt
~]Unknown []None []Other (descr.ibe):
c. Undergrour~ Piping, SecorJary Contairm%ent:
._[~,,Po!~!e-~al! _[~,S~mtbetic Liner ~vstem.
'ac~',i blame South "H" Pr, P:.~m:~ .'~o.
~ TANK ~ BA-03 (~L OUT ~EPA~TE FO~ FOR ~ T~K)
~ --~R EA~ SE~ION, ~ECK ~r.~. ~PROPRIATE ~XES
!$ .'1. Tank is: ~aulted ~n-Vault~ ~uble-Wall ~Si~le~all
2. .~ ~terial
~Car~n Stol ~S~i. nless Steel ~l~inyl C~oride ~Fi~rglass~l~. Steel
Fi~rglass-Reinforc~ Plastic ~Conc[et~ ~in~ ~Bronze ~k~
Other (de~ri~)'
3. Primary Containment
Date Installed Thickness (.Inches)
Unknown Unknown
4. Tank Seconc?ary Contair~nent
[~]Double-Wall ~Synthetic Liner
J~Other (describe):
Capacity (Gallons)
1,000
Manufacturer
Unknown,
[]Lined Vault []None [~Unknown
Manufacturer:
[-1Material Thickness (Inches) Capacity (Gals.)'
5. Tank interior Lining
7'-~Rubbet~ []Alkyd []Epoxy []Phenolic [2]Glass rqclay []Unlined []Unknown
r~other (describe):
6. Tank Corrosion Protection
---~GalvaJized' ~]Fib~rglass-Clad [2]Polyethylene Wrap ~]Vinyl Wrapping
rlTar or Asphalt rXlUnknown []None r~other (describe): '
Cathodic Protection: []None []Impressed Current System ['1Sacrificial Anode Syst~
Desc'rike System & EquiUnent:
7. Leak Detection,. Monitoring, and Interception
a.. Tank: C]Visual (vaulted tanks Only) [2]Groundwater Monitoring' Well(s)
'rqvadose Zone Monitoring Well(s) [-]U-Tube Without Liner
[]U-Tube with C~patible Liner Directing Flow to Monitoring Well(s) .~
[-I VaPOr Detector* [] Liquid Level Sensor* [] Conductivit~ Sensor*
. []Pressure Sensor in Annular Space of Double Wall Tank- ' ·
[]Liquid Bstrieval & Insgection Frcm U-Tube, Monitoring/Well or Annular Space
[]Daily Gauging & Inventory Reconciliation J~Periodic.'Tiqhtness Testing
rqNone [2]Unknown ~]Other Tank is empty and out of service
b. P~Ptng: J'1Flc~-Restrtcttng Leak Detector(s) for Pressurized Piping'
[-]Monitoring SLm~pwith Race~ay []Sealed Concrete Race~y
~'lHalf-Oat. Ccmpatible Pipe Raceway r~/nthetic Liner Race~y [-]None
[] Unknown [] Other
*Describe Make & Model:
8. Tank Tightness
l~is Tan~ Been Tightness T~sted?
Date of Last Tightness Test
Test 'Name
9. Tank Repair
~ Repaired? [~]Yes r~No
Date(s) of Repair(s)
Describe Repairs
,10. Overfill Protection
~-IYes ~'INO []Unknown
Results of Test
Testing C~pany
I
i.
[]Unknown
[~]Operator Fills, Controls, & Visually Monitors L~vel
~Tape Float Gauge. [2]Float Vent Valves ~]Auto Shut' Off Controls
[[[]Capacitanc9 Sensor [[]Sealed Fill Box ~]None [-]Unkno~
[[]Other: List Make & Model For Above Devices
11.
Pipzng
a. Underground. Piping:
~Yes '~No ~Unknown Material Unknown
'Thickness (inches) Diameter Manufacturer ..
r~Pressure ~Suction ~Gravity Approximate Length of Pipe Run 4'5'
Underground Piping Corrosion Protection :
[2]~alvanized ~Fiberglass-Clad []ImpreSsed Current ~Sacrificiai Anode
[]Polyethylene Wrap ~Elec.trical Isolatio~ ~Vinyl Wrap ~Tar or Asptmalt
~Unknown []None ~Other (describe):
Underground Piping, Secondary Contair~nent:
~Double-Wall []Synthetic Liner b~ystem []None ~Unkno~