Loading...
HomeMy WebLinkAbout5.2-10406 ,:,EWER IMF'ROVEMENT F'LAN GLE I fiDE/ S / P. THE GENERAL NO S FOR SE R 1' CO~"~:Lo'o~ 'LL TURNIP" ALL ~A~E~/AL~ 'OOL~, LABOr, EO~/P~E~A~O ~~'~711~q~ C~= t(Egl CONFOPNIN~ TO CURRENT ASTN SPECIFICAtiON C-700 AND SHALL BE INSTALLED IN CONFORMANCE ~TH THE PROZSIONS OF SECtiON 71 OF THE STANOAPD CURRENT EDItiON AND THE CURRENT ASTM SPEC/F/CAtiONS C-12. ~TH COMPRESSION JO/NFS CONF~MING ~TH ~E CURRENT AS~ SPEC/F/CAF/ON THE PIPE AND FITTINGS FOR 6" 8'~ 10" AND 12" SANITARY SE~R MA/NS MAY BE PLAIN-END ~TH COMPRESSION COUPLINGS CONFORM/NO ~[H ~E CURRENT ASTM SPEC/F/CAtiON C-425. EXCEP~NG THA~ A STAINLESS STEEL SHEAR PING AS ~ ~ANUFAC~UREO BY M/SS/ON CLAY PPOOUCTS CORPORATION FOP THEIR "MAINLINE: , :, ' THE PIPE AND FITTINOS FON PNIVATE SANITARY SE~N HOUSE ON BUILDINO ~ ~ ~ ' LA~NALS MAY BE PLAIN-ENO ~ COWPRESSION COUPLINOS CONFONWINO ~TH THE 5 ABS PIPE INSTALLATION ~ ' ¢ SHEET NO. DESCRIPTION WATENIALS: PIPE AND FITTINGS SHALL WEET rile NEOUINE~ENTS OF rile CUmENr ~ ' ~ HOWOGENEOUS FHROUOHOUT AND FREE FROW CRACKS. HOLES. FOREIGN INCLUSIONS~ COVER SHEET OR OTHER INJURIOUS DEFECF~ F/TflNOS SHALL BE/NJECflON WOLDED AND2 SEWER PLAN PER./SHALLBEINSrALLED/NLINEONNEWP'PEL/NESCUT-/NF/rflNOSA~ENOTFTED. ' JOINTS: USE ONLY SOL.PT ~LDED JOINT~ ~E ASSEMBLY OF JOINTS SHALL BE IN ACCORDANCE ~ ~E WANUFAC~RER'S RECO~WENDATION~ ~ERE ABS ~ ~ ~ PIPE CONNECTS TO VCP. USE COUPUNGS APPRO~D BY ~E OTY OF BAKERSFIELD, , ~ ~ ~ /NSTALLATI~; PIPE AND FITtiNGS SHALL BE INSTALLED IN ACCORDANCE ~TH , THE CURRENT ASTM SPEC/F/CANON 0-2321. ONLY CLASS I, II AND III EEBEDMENT ~A TER/AL S WLL BE CONSIDERED SUITABLE ~ ~ 4. PVC PIPE INSTALLA T/ON ~'~ ~ ~ MAERIALS: PIPE AND F/fDNGS SHALL MEET THE REQUIREMENTS OF THE CURRENT HOMOGENEOUS ~ROUOHOUT AND FREE FROM CRACKS, HOLES, FOREIGN INCLUSIONS . , ~ ,~ ~E CURRENT ASTW SPECIFICAtiON 0-2521. ONLY CLASS I, II AND III ~ E~BEDWENT WATEPIALS ~LL BE CONSIDERED SUITABLE Z'.: EXISTING MANHOLE ~. swsrE~ ~S~NO ~ ~ - /// / GRAPHIC SCALE IN ACCORDANCE ~[H THE CITY OF BAKERSFIELD DESIGN MANUAL AND ~E o RECOMMENDAtiON OF THE MANUFAC TU~EP. 6. EYE FITtiNGS SHALL BE USED FOP ALL LATERAL CONNECtiONS AND SHALL BE ROTATED A WINIEUW OF 2J DEGREES ABO~ THE HORIZONTAL PLANE PUNNING ( TN FEET ) Z ALL SE~N S~BS SMALL BE CLOSED ~m A STANDAND PLAStiC PLUO, SOL ~NT ~LDED. 8. ALL MANHOLES SHALL BE CONSTRUCTED m ACCORDANCE mrH THE orY OF QUANtifiES BAKE~SF/ELO STANDARD ORA~NgS S-7 ANO 5-8 AND SECtiON 70-LO2H ANO 7/-L07 OF THE STANOA~O SPEC/F/CAtiONS OF ~E STATE OF CALIFORNIA,t~ t t~mt /2" DEPARTMENT OF TRANSPORTAtiON, CURRENT ED/T/ON. ~rV JJAD 1765 L.R = PVC SE~R ALL CLEANOUTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY OF 600 L.~ = 6" PVC SE~R BAKERSFIELD STANDARD DRA~NG S-20 scole: 200' 8 : S~. ~ANHOLE 9. BACKFILL AND COmPACtiON OF ~ENCHES SHALL BE IN ACCORDANCE ~TH THE CITY OF BAKERSFIELD STANDARD DRA~NG S~-9, EXCEPT AS NOTED ON PLAN~ 5 = S~. CLEANOUT ~0. COWPACflON TESTS ~LL BE ~E RESPONSIBILITY CONTRACTOR. THE NUMBER 2 : 1500 GAL. GREASE INTERCEPTOR AND LOCAtiONS OF THE TESTS SHALL BE DE~RMINED BY ~E PROJECT ENGINEER. ~ ~ 2500 GAL. GREASE INTERCEPTOR ~1 ALL .EXISTING I~PRO~ENFS (CURB, GUTTER, SIDEWALK, CROSS GUTTER, FENCES, ETO) ~AT ARE REMOVED, DAMAGED OR UNDERCUT SHALL BE REPAIRED OR REPLACED AS DIRECTED BY THE PROJECT ENGINEER. ~2. ALL EXIStiNG PA~NG AND SURFACING REMO~D, DAMAGED OR UNDERCUT SHALL BE ~ 16. WATER JETTING AND FLOODING SHALL NOT BE USED FOR BACKFILL COMPACTION FOR FLEXIBLE PIPE BR/~HALL ROAD ~ ~/ ~9. PRIOR TO THE START OF ANY PHASE OF OONSTRUOflON REOU~R~NO OTY ~NSPECflON, PROJECT ~ ~:: NOTICE NOr/FY ~EM BY CALLING 526-5049. ~ ~ c~o: ,~E~ O~.A~ ~:'"' ~ APPRO~D B~' / z THE PROJECT ENGINEER SHALL BE Glen AT LEAST 24 HRS. NOTIC~ NOTIFY ~EM BY . ,..~ .:'/ R.C.E. 59880, REG. EXP. 12-5~-0t CALLING 525-9474 ~' ~, '~ ..... ~ .......... ~' 21. PR/OR TO FINAL ACCEPTANCE, ALL SE~R LINES SHALL BE INSPECTED ~TH ~DEO EQUIPMENT ,'~'-'"'~" ..... STOC~DALE HIGHWAY DESIGNED FOR ~/S PURPOS~ THE TELEVISION CAMERA SHALL HA~ ~E CAPABILITY OF ROTATING~ ~60~ IN ORDER TO ~E~ AND RECORD THE TOP AND SIDES OF THE PIP~ AS REOU/RED. THE ~DEO INSPECtiON SHALL BE ~TNESSED BY ~E OTY'S CONSTRUCtiON INSPECTOR, ~0 ~LL ALSO INITIAL AND DA~ THE "CHAIN OF CUSTODY" FOR~. ~E SUBD/~DER SHALL IWWED/ATELY NOT/FY OTY OF ANY PIPE LOCAtiONS REGALED 70 BE NOT IN COMPLIANCE ~FH ~E SPECIFICAflON~ A RECORDED n. t. s. ~DEO CASSETTE, THE COWPLEFED "CHAIN OF CUSTODY" FORW AND A ~ITTEN LOG(~tCH INCLUDES SE~R S~W IS PRIVA ~L Y WAINTAINED DESIGNER: BENCHWARK: OF JE~TTA A~NUE AND BRIWHALL ROAD. ORATOR: ELEVAtiON = 568.5~ SUBWI~D B~' - ~ SCALE- UNAUTHORIZED CHANGES Grid USE~' THE ENGINEER PREPARING THESE PLANS CONS~UCflON CONTRACTOR AGREES THAT IN ACCORDANCE ~ GENERALLY ACCEPTED CONSTRUCtiON PRACTICES. CONSTRUCtiON WICHAEL ~LLA~~- ~ ~ ~ ~A~E CO~P NO: ~LL NOT BE RESPONSIBLE FOR. OR LIABLE FOR. UNAU~ORIZED CHANGES CONTRACTOR ~LL BE REOUIRED TO ASSUWE SOLE AND COWPLETE RESPONSIBILITY FOR JOB SITE CONDItiONS DURINO THE COURSE OF BENCHWARK: R. oz 562~4 (EXP 6.~0-00) ~o OR USES OF THESE PLANS. ALL CHANGES FO ~E PLANS WUSF BE IN CONSTRUCtiON OF THE PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTy' ~AT FH/S REOUIREWENT SHALL BE WADE TO CHISELED "+" TOP OF CONCRETE HEAD,ALL ~0'~ JOB NO.: ~GING AND WUST BE APPRO~D BY THE PREPARER OF THESE PLAN~ APPLY CONflNUOUSL Y AND NOT BE LIWIFED TO NORMAL WORKING HOURS. AND CONSTRUCtiON CON,ACTOR FURTHER AGREES TO DEFEND. SOU~EAST OF EAST OUARTER COR. SEC. 5L 29/2Z SHEET INDEMNIFY AND HOLD DES/ON PROFESSIONAL HARWLESS FROM ANY AND ALL L/ABILtT~ REAL OR ALLEGED. /N CONNECtiON ~1~ THE ELEVAtiON = 57~.~5 (CITY OF BAKERSFIELD DA~m) PERFORWANCE OF WORK ON THIS PROJEC~ EXCEPTING LIABILITY ARISING FROW THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. / /NV: ]5.9 45~ IO" N S 1500 GAL GREASE INTERCEPTOR / .'SEE BLDG PLANS FOR DETAILS)//~.~/ . / / I I / / I I / / OF SMH = J6~56 SW = 561.72 LATERAL STUB /2 INV SW = 566.00 .120 UNIT ASSISTED FACILITY 7§,826 SO. FT... 20 L.F OF 6"P. VC. 0222% 1174 L.£ OF 6" P. VC. @ 0.42% LATERAL STUB SW = 566.20 PAD "B' ii L.F OF FP = --6" P.I/.C 00.¢2% 142.05 L.F, OF 6" P. YCL @ 0.42% S~H //5 TOP OF SMH = 370 40 INV SW = 562.96 /NY SE = 56306 INV NE = 565.06 PAD 160 BED SKILLED .:.NURSING FACILITY_. 400 SO. FE7 LATERAL STUB /t5 IN~ SE = 565.50 52.00 L.£ OF Z6" P.V.C. @ 2L9 Ld: OF / // 6" °V.C. @ 429%~ / . \ 16Z55 L.F OF 12"PFC ~ 0.20~ ~H ~ TOP OF SMH = 569.22 /NV SW = 564.79 /N~ NE = 564.89 /NY NW = 564.89 /NV N = 564.89 2500 GAL GREASE INTERCEPTOR (SEE BLDG. PLANS FOR DETAILS) LA TERAL S TUB/$ SE= 566.5 / SMH ~7 tOP OF S~H = ~69.70 INV SW = 565.49 /NY NE = 565.59 /5.00 L.F OF ~ ~C. ~ 2.07%~ TOP OF SMH = 570.19 /NV SW = 566.09 /NY NW = 566. 19 / TOP OF S/dH = 569.$9 ~ 125.55 L.F OF '/NV SW = 564.55 BRIMHALL RD.  Iffy SE = 561.82 " '~ 8"P.V~ ~0.94%~ ~P /NV NE = 564.45 SITE / ~ // ...~...~_..:.:._.. ..... CROSS VALLEY CANAL /~/ r'.-:]5 ...... x . /v = O00. UU ~..~ .~.~...~....L.4 -~.-.4--4~ ~ ~1 ~ ~RE APARTMENT BUILDING~ ...... ~ .~.~ ....... L ~' [~ ~; ]/Z -~ ~ ,--~-4 ~-, ¢ * ~']:~'"~'~--~-~-'~ ~nnn ~nFT ;.~. '~ ~_ 'LATERAL STUB ff4 f ~" ~ SMH fi4 ~,~.,~.j. ......... ,.- ~ ~ ~ ~ .... , ........ ~~= ~CINITY MAP , ~ ; :-~-?.~ ...... ~--,--t .......... t-~-~.------, ~.-+-.~..' ..---~--4. 'L~ ........ /NV N - 565.00 ' ~ tOP OF SMH = 56912 ~ '~'~ ,~ ...,....~ ......... ,..,...,..?........,....,, ........ ....~.,..~.... ,..~ ...... , ~.~ ...... . _ . I.~...,..~.~.~__~...,....~..~, ni...~..~..~i..4~ ..,~= ~u. K ,~ ~ ~ ~ / IN~ NE= 56575 , ..... ~.~..~......~,~ ~ ~ ~~..~: .h..~.'.. L~...~. .i: ~ x ( ~ ] TA .......... ~ CL S . 22+00.05, 75.39R~ A' · ,~1~ ~ ~ ~ CL S~A. 22+00.05 65.39R~ r ~._J.~ ~1 ,, ,, ~ ~ ~ ~ ~'".~ ' .'SEE BLD~ PLAN5 FOR DETAILS) ...%- o = ~o~o~ ~ ~ ~ reACT ~0. 5836, SEWER StUB ['iT.~.~..~-I / ~ = PROPOSED GREASE TRAP ~EN~ EXIST ~6" ' '~.'~7'J~ ~ / ~ :: ....... EXISflN~ 5E~R LINE ............................................... ~,.~_~ .................. ~ ~ ~ ,t.~' = EX/STING SE~R MANHOLE ~ ,~" ............................................... ,.?_.._,, ................................................................................................... :-~ '-~ /'"' NOTE .,,, .:~ ~ ~.' / ( IN F~r ) 2. PRIVAmY MAINTAINED SEWER SYSTE~. -, ..... ~-' _,'' / ~ 1 inch = 60 ft. ...... .... " ~ ~LL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANOES TO CON.ACTOR ~LL BE REOUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS OURINO THE COURSE OF CONSTRUCTION OF ~E PROJECT INCLUDINO SAFETY OF ALL PERSONS AND PROPERTy' THAT THIS REOUIREMENT SHALL ~E MADE OR USES OF ~ESE PLANS. ALL CHANCES ~0 THE PLANS ~UST BE IN APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKINO HOURS, AND CONSTRUC~ON CONTRACTOR FURTHER AC~EES TO DEFEND. ~ITINO AND MUST ~E APPRO~O BY ~E PREPARER OF ~ESE PLANS. INDEMNIFY ANO HOLD OESICN PROFESSIONAL HARMLESS FRO~ ANY ANO ALL LIABILIT~ REAL OR A~LECEO. IN CONNECTION ~FH THE PErFORmANCE OF WORK ON THIS PROJEC~ EXCEP~NO LIABILITY ARISINO FRO~ THE SO~E NECLIOENCE OF OESICN PROFESSIONAL DA YE- 09-MAR-98 SCALE- /" = 60' 1.5 ~ 96144SI44~.DWG