Loading...
HomeMy WebLinkAboutMITIGATION '« 1........... ~... SECOR International Incorporated July 31, 2002 Project 77TO.61270.00.0106 Mr. John Whiting California Regional Water Quality Control Board 3614 East Ashlan Avenue Fresno, California 93726 Re: Work Plan for Site Assessment Tosco Station #1270 5634 Stine Road Bakersfield, California Dear Mr. Whiting: This letter has been prepared by SECOR International Incorporated (SECOR) on behalf of Tosco Corporation (Tosco), a subsidiary of Phillips Petroleum Company, and presents a work plan for site assessment at the site referenced above (Figures 1 and 2). The work plan is being submitted in response to Regional Water Quality Control Board's (RWQCB) letter dated June 3, 2002 (Attachment A). The purpose of this assessment is to delineate the vertical extent of petroleum hydrocarbons in soil b~neath the former underground storage tanks (USTs). This work plan also includes a b,nef discussion of site background and previous investigations, proposed scope of )(1ork, quality assurance plan, health and safety plan, and schedule. . SITE BACKGROUND The site is located at the northeast comer of Harris Road and Stine Road in Bakersfield, California. The site is currently occupied by an active gasoline service station and Circle K store with fueling facilities that include one 20,000-gallon gasoline and one 12,000-gallon gasoline USTs, and associated prpduct lines and dispensers. The former fueling facility consisted of three 1O,000-gallon gasoline USTs and one dispenser island that were located in the southwest portion of the site (Attachment B, Figure 2). Initial site assessment was conducted in December 1996. Six soil borings/vapor wells: SE-1 through SE-5 and SE-7, were installed around the former UST. Total petroleum hydrocarbons as gasoline(TPHg), benzene, and MtBE were detected in the soil boring samples collected down to 22.5 feet below grade surface with a maximum concentration of 3 mg/kg, 0.2 mglkg, and 9 mglkg, respectively. Copies of the soil sample data table, site plan, cross sections, and one soil boring log are included in Attachment B. 3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 9/6.86/,0400 9/6.86/,0430 Fax www.secor.com .... ~... - . Phillips 66 Company Tosco #1270,5634 Stine Road, Bakersfield, CA 2 July 31, 2002 The USTs, dispensers, and associated piping were removed and replaced in 1998. The two new USTs were installed in common tank pit located in the southeast portion of the site. Following removal of the USTs, soil samples were collected from beneath the USTs at depths ranging from 16 to 20 feet below ground surface (bgs) and beneath the dispenser at 2 and 6 feet bgs. Approximately 150 cubic yards of impacted soil were excavated and disposed of off-site. TPHg, BTEX, and MtBE were reported in soil samples collected from beneath the UST at maximum concentrations of 15,300 mglkg, 30.5 mglkg, and 281 mglkg, respectively. Soil analytical results and a map with sample locations are included in Attachment B. A request for site closure was submitted on February 1, 1999 to the City of Bakersfield- Fire Department(CBFD). In a letter dated July 6, 1999, the CBFD determined that corrective action had been completed, and that no further investigation or remedial action was required. The RWQCB reviewed the request for closure and, in letter dated June 3, 2002, requested a work plan be submitted to define the vertical extent of TPHg and MtBE in soil underlying the former USTs. PROPOSED SCOPE OF WORK The scope of work for this site assessment includes drilling three soil to borings to delineate the vertical extent petroleum hydrocarbons in soil around the former USTs location. Proposed boring locations are provided on Figure 2. The specific scopes of work are discussed below: · Site Safety Plan. As required by the Occupational Health and Safety Administration (OSHA) Standard "Hazardous Waste Operations and Emergency Response" guidelines (29 CPR 1910.120), and by California Occupational Health and Safety Administration (Cal-OSHA) "Hazardous Waste Operations and Emergency Response" guidelines (CCR Title 8, Section 5192), SECOR has prepared a site-specific Health and Safety Plan (HASP) that is provided as Attachment C. The HASP will be reviewed by field staff and contractors before beginning field operations at the site. · Permitting. The applicable permits for soil borings will be obtained from CBFD prior to drilling activities. · Soil Borings. Three soil borings will be drilled at the locations shown on Figure 2. Soil borings will be drilled until two consecutive subjectively "clean" samples collected at 5-foot intervals are encountered beneath an impacted soil zone. The depth of these borings is estimated to be approximately 50 feet below ground surface (bgs). Based on regional groundwater gradient maps, groundwater is I:\Tosco Marketing\1270\work plan\WPLAN.doc --7--' - Phillips 66 Company Tosco #1270,5634 Stine Road, Bakersfield, CA 3 July 31,2002 approximately 160 feet bgs (Kern County Water Agency) and is not anticipated to be encountered during this investigation. . Soil Selection and Analysis. Soil samples will be collected at 5-foot intervals and will be sent under chain-of-custody procedures to a California state-certified laboratory. Soil showing positive readings on a PID or at least one sample for every ten feet of drilling will be analyzed for TPHg, benzene, toluene, ethylbenzene, total xylenes (collectively BTEX), and MtBE by EPA Method 8260B, single run. Additionally, select soil samples will also be analyzed for total lead by EP A Method 6010 and fuel oxygenates MtBE, TBA, DIPE, EtBE, TAME, 1,2-DCA, EDB, and ethanol by EP A Method 8260b, single run. . Report. A report will be prepared after completion of necessary fieldwork. The report will include soil boring logs, soil analytical results, chain-of-custody documentation, and conclusions. Field and laboratory procedures and a quality assurance plan are included in Attachment D. SCHEDULE SECOR is prepared to initiate fieldwork within four to six weeks following approval of this work plan by the RWQCB and issuance of soil boring permits for the CBFD. SECOR will prepare a report including soil boring logs, soil analytical results, and summarizing the investigation within four to eight weeks following completion of the assessment. I:\Tosco Marketing\1270\work plan\WPLAN.doc ·1 Phillips 66 Company Tosco #1270,5634 Stine Road, Bakersfield, CA 4 July 31, 2002 If there are any questions regarding the contents of this work plan, please call us at (916) 861-0400. Sincerely, SECOR International Incorporated ¿:$4~ Clinton Harms Project Scientist f0f 07 (LJ Rusty E. Benkosky, Senior Engineer Attachments: Figure l' - Site Location Map Figure 2 - Site Plan with Proposed Well Locations Attachment A - RWQCB Letter Dated June 3, 2002 Attachment B - Historical Soil Analytical Data Attachment C - Health and Safety Plan Attachment D - Field Practices and Procedures and Quality Assurance Plan cc: Mr. Ed Ralston, Phillips 66 Company Mr. Howard Wines, City of Bakersfield Fire Department I:\Tosco Marketing\1270\work plan\WPLAN.doc ..1, :'~~;I'¡ ~~!~. . .:·~::t.. = " 0= . 366 '. < . ,. ' [_36 :::..... ~ T raiter ìÇ.Tï[ . :::.... . .:r-~T~'lì "L'- '..'.. I' 'j ~ Park JF:i~Lr ..,.:...~~~~<~:i . .~ o . .'. ê? NORTH SCALE "- " " " ~Q ~ Q: 8 -J o W ... !! Ü REFERENCE: U.S. GEOLOGICAL SURVEY. 7.5 MINUTE SERIES GOSFORD, CAUFORNIA QUADRANGLE. PHOTOREVlSED 1966 AND 1973. ~ DRAWN CCR OEM 18SEP96 50888-015-03 ... CD C> C> IN ... C> C> ao ao SECOR INTERNATIONAL INCORPOJlATED DATE SITE LOCATION MAP APPR JOB NO. . HOS .. -.. . I . =====1/f o 2000 4000 I FEET FIGURE 1 CIRCLE K UNIT NO. 1270 SaM STINE ROAD BAKERSRElD. CALIFORNIA -' ¡ ~ 0- (\ ~ .... .!Z. ..... o w en 5 w ~ ~ o ci w en o 0- o ~ ~ o ..... (\ ;/ o u en ~ ./ o oe( u oe( ::i t 6' CONCRETE WALL UNPAVED AREA EDGE OF PAVED AREA I ~ Q ~ "It a::: c 0 I Q:: I \.oJ I ~ CANOPY I .... I fI) I :J ~ c iñ I I I I \ PLANTER , LEGEND: ... - DRIVEWAY - RESIDENTIAL UNPAVED AREA PAVED PARKING ..... ~ .;; ~ ~ t] Q:; CIRCLE K UNIT NO. 1270 VENTS FORMER UST COMPLEX NEW UST COMPLEX HIGH VOLTAGE OVERHEAD POWER UNES DRIVEWAY -SIDEWALK - - - - HA RRIS PROPOSED SOIL BORING LOCATION DRAWN CCR CH SECOR International Incorporated APPR DATE 10NOV98 JOB NO. 77TO.61270.00.0106 ROAD o I SCALE 40 80 , FEET NOTE: DRAWING IS BASED ON FIELD MEASUREMENTS. FIGURE 2 CIRCLE K STORE NO. 1270 5634 STONE ROAD BAKERSFIELD, CAUFORNIA SITE PLAN WITH PROPOSED SOIL BORING LOCATIONS .. ATTACHMENT A RWCQB LETTER DATED JUNE 3, 2002 ~UJ1 uo CUUC o:o'"t....n .. a CaliCo htoa B. Hickox StC,eto.ry fo, Envirrmtlu!ntal Protection 3 June 2002 IU~\.;U MHI<KI:.IINl:i 9167743004 p.2 eaRegional Water Quality Control Board Central Valley Region Robert Schneider, Chair Fresno Brauch Oft'Ice £ntemet Addæss: http://www.swmb.ca..gov/-lWqcbS 3614 East AsbIan Avenue, Fresno, California 93726 Phone (559) 445-51 16 · FAX (S59) 445-59] 0 . Gray Davis Governor RWQCB Case No. 5T15000682 Mr. Edward.Ralston Pbillips 66 Compan 1380 Lead mll Ro ,Suite 120 Roseville, Califomi 583 UNDERGROUND BAKERSFIEW, In a letter dated 6 Ju further investigation review of informatio .) ether (MTBE) and to former underground depth of impacted so extent of affected so' g and MTBB in soil. Prolect Summarv The CHFD provided Product Lines. and Intemational. Inc. S The site is approx' the Farmers' Canal. feet east and 2,500 , regional maps inc1u 1 February 2001 and The site formerly uti . portion of the site. A site assessment durin _ ..., _,pSTs. Soil vapor ex '.' fgasoline (TPH-g), be milligrams per kilogr 'K. RELEASE, CIRCLE K STORE #1270, 5634 STINE ROAD, COUNTY 1999, the City of Bakersfield Fire Department (CBFD) informed you that no remedial actions were required at the above-referenced site. Unfortunately, our provided by the ŒFD indicates that high concentrations of methyl tertiary butyl petroleum hydrocarbons as gasoline (TPH-g) are present in soils beneath the rage tanks (USTs) to at least 20 feet below ground surface (bgs) and that the has not been determined. It will be necessary for you to determine the vertical . We request that you submit a work plan to detennine the vertical extent ofTPH- summary of the project and our comments follow. opy of a report of subsurface investigation at the site - Removal of USTs, enser (Removal Report), dated 10 November 1998 and prepared by SECOR ento (SECOR). . ly four-and-one-half miles south of the Kern River and two hundred feet east of unicipal wells operated by the California Water Service are approximately 1,400 southeast of the site. Depth to groundwater is approximate1y 160 feet based on in Improvement District No.4 2000 Report On Water Conditions dated bUshed by tbe Kern County Water Agency, Bakersfield. three lO,OOO-gallon gasoline USTs and one dispenser island in the southwest duct line leak was discovered during October 1995. SECOR conducted initial ber 1996. Six soil borings were samp1ed in the area around the former ûon weIls were installed in each boring. Total petroleum hydrocarbons as ne, and MTBB were detected at maximum concentrations of 3.0.2. and 9 (mg/.kg), respectively. Cølifomia Environmental Protection Agency I\~ ...up UCJ t::uut:: a; ;;J;;Jrl.. ~ IU::iLU MHI<Kt:.lll"tu 9167743004 p.3 .:. ~ Mr. ~ward Ralsto -2- 3 June 2002 The USTst dispens 21 August 1998. samples were co1l below ground surl feet bgs. Approxi permission, soil ge , and associated piping were removed under the supervision of the CHFD on ew UST system was subsequently installed in the southeast portion of the site. Soil d beneath the ends of each former UST at depths of approximately 16 and 20 feet ,(bgs). Soil samples were also collected beneath the dispenser at depths of 2 and 6 ely 150 cubic yards of excavated soil was disposed of off-site. With the CBFD's ated ftom the excavation of the new UST pit was used to backfill the excavation, The soil samples w xylenes (MTBE) an were detected in the respectively. TPH- and 20 feet bgs ben TPH-g was also de end of the southern concentrations rang' corrective action wa ana1yzed for TPH-g by EP A method 8015Mt and benzene, toluenet ethylbenzene, the fuel oxygenate MTBE by EP A Method 8020. TPH-gt benzene and MTBE oil samples at maximum concentrations of lS,300t 30.78, and 281 mgIkg, as detected at concentrations greater than 1,000 mg/kg in samples from both 16 the southwest end of the central UST and the northeast end of the northern UST. ted at greater than 1,000 mgIkg in the sample from 20 feet bgs from the northeast T. TPH-g concentrations ranging from It390 to 5,280.mglkg and MTBE from 22.6 to 123 mglkg were detected in these samples. Further investigation or ot conducted. You submitted a req 1999, the CBFD det or remedial action w t for case closure dated I Februa:ry 1999 to the CBFD. By a letter dated 6 July 'oed that corrective action had been completed, and that no further investigation required. Comments Based on the analysi the former USTs has detected in all soil s mglkg. Concentratio from 22.6 to 123 m USTs, the maximwn necessary for you to f soil samples collected during removal of the former UST system, a release from egraded soil and threatens the beneficial uses of groundwater. MfBE was pies collected from beneath the former USTs at concentratíons as high as 281 of TPH-g ranging from 1,390 to 5.820 mglkg and MTBE concentrations ranging were detected in three soil samples collected at 20 feet bgs beneath the fonner epth explored. The vertical extent of impacted soils is undefined. It will be termine the vertical extent of impacted soils caused by the release. Prior to 3 August 2, please submit a work plan to assess the vertical extent of gasoline-range petroleum hyd.rocar and fuel additives in soils beneath the former USTs. At least one soil boring should be proposed. e full vertical extent of impacted soils should be demonstrated by the analysis of two consecutive sam lacking field evidence of petroleum hydrocarbons and fuel oxygenates. The content of the work p should comply with the enclosed Tri-Regional Board Staff Recommendations for Preliminary Ev, 'on and Investigation of Underground Storage Tank Sites and Appendix A- Reports Tri-Regiona"[ oard Staff Recommendations for Preliminary Evaluation and Investigation of Underground Storag ank Sites. The work plan should include a time schedule to implement the plan and submit reports. submittals should contain the signature and seal of '8 CaJifornia registered engineer, certified en . eering geologist, or registered geologist who is responsible for the content of the submittal. 'ng the investigation should be analyzed for TPH-g by EPA Method 8015Mt 'A Method 8021 or 8260. the lead scavengers l,2-dicloroethane (1,2-DCA) and Ð), and the fuel oxygenates MTBEt tertiary amyl methyl ether (TAME), di- . ~oil samples collecte -, - /ßTBX and MTBE by ethylene dibromide ,'.,.",.....-........... .-........- ~'ftJ 5-""""'1- U. U...,. .. I U""''''''U '-II-'''''w;;:., I. .1U "J. t) ( ("t"'UU"t p.... Mr. ~dward RaIsto -3- 3 June 2002 isopropyl ether (D Method 8260. Sel ). ethyl tertiary butyl ether (BTBB), and tertiary butyl alcohol (TBA) by EP A soils samples should also be analyzed for total lead. Our request is bas n our review ofBCFD files. We were unable to discover evidence of additìona1 investigation or rem . at action subsequent to the UST removals. If you have information documenting such activities, plea contact this office. ections 2729 and 2729.1 for Underground Storage Tanks were added to the gulations requiring you to submit analytical and site data electronically. Enclosed Electronic Deliverable Format for Laboratory and Site Data Submittals to xplaining bow to obtain information to implement the requirements. Please be aware tha California Code of is our letter (Requir Regulating Agencies Please contact,this 0 ce at least five days in advance of fieldwork. If you have any questions regarding this matter, please c tact me at (559) 445-5504. ~~ td~~ Assoc. Engineering RG No. 5951 c: ional Board Staff Recommendations for Preliminary Evaluation and Investigation rground Storage Tank Sites . A-Reports Electronic Deliverable Formatfor Laboratory and Sire Data Submittals... j Enclosures: Mr. Howard Ms. Barbara Mr. David Vo es ro, City of Bakersfield Fire Departme:nt, Bakersfield, wlo enclosures ropel, S'\\'RCB, UST Cleanup Fund, Sacramento, w/o enclosures ler, Gettler-Ryan, Inc., Petaluma, wI enclosures --1 rr,lnn"" TOur ..,~.'OV\""...... --, . ,--, --. -... ATTACHMENT B HISTORICAL SOIL ANALYTICAL DATA " ! RESIDENTIAL 6' CONCRETE WALL UNPAVED AR!!A UNPAVED MfA PAVED PMKING EDGE OF PAVED ARfA ..... ~ ~ ~ ~ 0::: Q '"( <:) 0::: I ~ ~ a::: o I CIRCLE K UNIT NO. 1270 A I ~SE-5 l~ ~ W:J: ~ PUMP iñ ISlAND I I I l \: :'-.: B' ..... ~ VENTS .... CI) SE-1/VE-1 ~ B SE-2/VE-2 SE-7 A' HIGH VOLTAGE OVERHEAD POWER UNES DRIVEWAY - DRIVEWAY - - SIDEWALK- - - - HARRIS ROAD o W l- ( ) Õ ... N LEGEND: -+- SE-2/VE-2 o I SCALE FEET SOIL BORING/VAPOR EXTRACTION WELL 40 80 - ~ w g g ;c A A' CROSS-SECTION LOCATION NOTE: DRAWING ./S BASED ON FIELD MEASUREMENTS. DRAWN CCR DEM 16DEC96 50888-015-03 FIGUI~E 2 CIRCLE K UNIT NO.1270 5634 STINE ROAD BAKERSFIElD" CAlIFORNIA SITE PLAN ANt. SOIL BORINGI V APOR EXTRACTIOI~ WELL LOCATIONS ... <'> CD SECOR INTERNATIONAL - INCORPORATED DATE APPR N CD '" '" JOB NO. -. TABLE 1 - SOil ANALYTICAL DATA Circle K Unit No. 1270 5634 Stine Road Bakersfield, California SE-l, 9' 9 12113/96 ND<1 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.05 NA SE-l, 22.5' 22.5 12113/96 ND<1 0.1 0.3 0.05 0.4 7 NA SE-l, 29' 29 12113/96 ND<l ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<0.OO5 ND<O.05 NA ,SE-l, 34' 34 12113/96 ND<l ND<O.OO5 ND<O,OO5 ND<O,OO5 ND<O,OO5 ND<O.05 NA SE-2, 8.5' 8,5 12/13/96 ND<1 ND<O,OO5 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.05 NA SE-2,21' 21 12113/96 ND<1 ND<O.OO5 0.006 ND<O.OO5 0.04 1.6 NA SE-2, 33.5' 33.5 12113/96 ND<1 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O,OO5 ND<O.05 NA .SE-2, 39' 39 12113/96 ND<1 ND<0.OO5 ND<0.OO5 ND<0.OO5 ND<O.OO5 ND<0.05 NA SE-3, 19' 19 12114/96 ND<l ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<0.OO5 ND<O.05 NA SE-3, 24' 24 12114/96 ND<1 ND<O.OO5 ND<0.OO5 ND<0.OO5 ND<0.OO5 ND<0.05 NA SB-4, 7.5' 7.5 12113/96 ND<1 ND<O,005 ND<O.005 ND<0.005 ND<0.OO5 ND<0.05 NA SE-4, 22,5' 22.5 12113/96 3 0.2 0.5 0.07 0.5 9 NA SE-4, 40' 40 12113/96 ND<l ND<0.OO5 ND<0.OO5 ND<0.005 ND<0.005 ND<0.05 NA ~ SE-4, 44' 44 12113/96 ND<1 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.05 NA SE-5, 19' 19 12114/96 ND<l ND<0.OO5 ND<0.OO5 ND<0.OO5 ND<0.005 ND<0.05 NA SE-5, 24 24 12114/96 ND<l ND<O,OO5 ND<0.OO5 ND<O,OO5 ND<O.OO5 ND<O.05 NA SE-7, 19' 19 12113/96 ND<l ND<O,OO5 ND<O.OO5 ND<0.OO5 ND<O,OO5 ND<O.05 NA SE-7, 24' 24 12113/96 ND<l ND<O,OO5 ND<O.005 ND<O,OO5 ND<0.OO5 ND<O.05 NA SP-1 (A-D) - 12114/96 ND<1 ND<O.OO5 ND<O,OO5 ND<O,OO5 ND<O,OO5 ND<O.05 5.5 TPHg mg/kg ND NA bgs = Total petroleum hydrocarbons as gasoline. = Milligrams per kilogram. = Anatyte not detected at or above the specified reporting limit, = Not analyzed. = Below ground surface. H:\CIRCLEK\1270\SOIL WB2 E' ~ 20 '" () ~ 0: ::> <II o z 5 :so 0: C> ~ g '" m ~40 o ~ (0) SP UST I HD' Am Am COMPLEX I (0) v nv, nv I I WD/ND/ND ~ ~ ~ Jp. ~:____~~~___"':::~~~==~~~=~:::--:..~.~~~ ~~:==1== - - - - - - - - - - - - j--~---~~ ~ (77) -------~___~__________________ o A SE-5 I I SE-4/VE-3 UST VENT' UNES PRODUCT UNES ,. (0) SP 10 SP (0) ND/ND/ND ('99) ß.l š'tl---.---'--~----'-""'----------f.5!!! -(Ii) ;;;':;;'ÏÑo-~--------------------~---~- 'SP (1H) - --.--.------.--.---------------(8,) SP (0) SM ~-----, ------~~~ S~---~----::====~=======_-;E~=======:~_____--ftæ) ~ ~ (II) ;~~~~~~--~~~~~----:--~~~--... 1 (0) 50 -~- 1 -----~----- (0) (50) (16) SP (16) HD/ND/ND (2) (0) HD/ND/ND ?----- šë--------? ?//~ i,f77-72LZ:.z? ?-¿.L-W _I ,;L../-..I- -1 60 CROSS-SECTION A-A' SE-4/VE-3-BORlNG/WEll. NUMBER I WEU. CASING SM - uses SOIL OESCRlPTlON ~ - TPHg/BEHZENE/MTBE CONCENTRATION IN ŠÒIl (mgfl<9) . (H)- PlD MEASUREMENTS IN PARTS PER MlWON , ~-Flll MAlmlAL P77777I PREDOMINANTLY FINE-GRAlNEO rLLLLLJ- MATERIAL (SILTS AND CLAYS) SCREENED INTERVAL INCLUDING FlLlm PACK r----1 PREDOMINANTLY COARSE-GRAINED 1---.J- MAlmlAL (SILlY SANDS AND SANDS) SECOR INTBRNATIONAJ. INmRPOIATBD " I SE-2/VE-2 SE-7 A' I 0 ~ ~ (0) SP (0) 10 o· (0) SP (0) __ ~__:===:=~~=::::::::=:======:::=__::~::~:~ ~M_ SP (0) ND/NO/ND E' 20 b ..... ~ 0: ::> <II o z 305 a:: C> ~ g '" m SP S]=:====::::::::::::::::~=::::=~~::-=-:-=:=:~ ~__r .- ..:I~-- 1---" sï.c. HD/ND/NO SM (0) SP ND/ND/ND (0) HD/ND/ND 40~ '" o 50 60 ti 10 ~ ~ '" ..J ~ ~ 0 10 20 HORIZONTAL SCALE FEET' APPR CCR DEI.! 03JAN97 50888-015-03 FIGURE 3 CIRCLE K UNIT NO. 1270 5630< SI1IŒ ROAD BÞJ<ERSf\EU). ~ GENERALIZED GEOLOGIC CROSS-SECTION A-A' , DATE JOB NO. ~ ~ 20 '" <> ~ '" :;) en o z ð 30 '" C> ~ III ~4O o ¡; 1 " g § K 8 I SE-3 I "I SE-4jVE-3 o .. .. . .. .. 10 I ~ I UST SP --- -~------.:.J COMPLEX ND/ND/ND --~~ ND~~___~ r-.----- (0) ____ @L_ 'I r--...... .....--.__fD) ~-------~-------------------- SM -._-._--~) ~._-._-_._---,---------------------~- ~--- L_______J ~ ~ SP (0) (0) SP SP SM ..----------------....----__ -~ ---::3 -.---.---____ (III) :J;~ NIiiüï;7 ---~ SP ~:-------------------------------~----;; L1_fW~~_~~~_:~~~~ SP ~/ND/ND ~ _.____---- (0) ~~~=~~:-=:~~~~~=~~~~~~~:-----:::::~{! i~~ s:_---------------------~--------;; ~--- (}O) ND/ND/ND (0) (0) (50) (If) SP (If) ND/ND/ND (2J (0) ND/ND/ND _---------;¡ Sè----~----? ?-- ?TZ~Z 5'2Z? ?- (~ ? SP (4!J) (0) (0) 50 (0) 60 CROSS-SECTION 8-8' SECOR INTBIINA'DONAL JNCOIIl'O:RATID 8' o 10 E' 20 ~ w ~ '" :;) en o Z 30 ð '" C> ~ ~ III 40 ~ w c 50 60 !IN CCR DEM 03JAN97 50888-015-03 N'P Do\T[ JOB NO. LEGEND: .' SE-4jVE-3-BORING/WE!J. NUMBER I wEll. CASING SM - uses SOIL DESCRlPT10N ~ - TPHg/BENZENE/MTIIE CONCEN1RAl1ON IN SOIL (mg/k9) (28)_ PIC MEASUREMENTS IN PARTS PER MIWON SCREENED INTERVAL INClUDING ALlER PAC!< ~- AU. MATERIAL ~-=:~~~-=r r---l PREDOMiNANTlY COARSE-QWNED L--.J- MAlERlAL (SILlY SANDS AND SANDS) ~ 10 ~ '" ð ¡¡¡ 0 ~ 10 20 HORIZONTAL SCALE FEET FIGURE 4 CIRCLE K UNIT NO. 1270 5634 S11NE fIIW) 1WŒRSF1E1D. CAIJfOI<NIA GENERALIZED GEOLOGIC CROSS-SECTION 8-8' ~ Log of Boring/Monitoring Well: Project: CIRCLE K UNIT NO. 1270 Boring Location: 5634 STINE ROAD, BAKERSFIELD, CA Subcontractor and Equipment: MDE/HSA Sampling Method: CAL. MOD. SPUT SPOON Start Dote/Time: 12/13/96//1330 First Water (bgs): NA L. CI> .0 E :J >. z: '- OJ ~ CI> > '" a..8~ E v 00::: VJ o l.LJ 015 ZCI <:::> x< SE-1-9 SE-1-12 $[-1-14 5(-1-19 ........ ~ ~ CI> 0 Ê Q) 0 .!:;. >. ~ c- L. OJ en 8 :5 > ~ 0 c- u 0 a OJ OJ ã5 ã: 0 a::: 0 1 - 2- 33 3- - o 4- - 5 - 6- - 7- - 8- 9~1 1O-i- - 11-=1 12- - 13- 14~_ 15-i- - >50 0 >50 10 >50 75 >50 16- - 17- - 18- 19-: I 20-- - 21- - 287 22-= I $[-1-22.5 >50 213 23- -- 24-1 >50 153 25-= -- 26- - 27- - 28- ~ $[-1-29 >50 0 29~ I ~ 30- ~ í ~ ~ :;:;- .. ~ 0: 9- 8 ? ,¡¡ SECOR ë5 .D Q) ~ > CI> V1 ..J V1 '- V U ~ V1 :::> ~~ .: ~ :~ . . . ~ ..: .....:. "'~-"': "'~ " 1-- ,'. :t :"::'!.'~'-:' :::.::.:':(::: ~:.' ~'5' ~~I~I :::~.:~~::' .- !\,..... . <. K - ·I;I.~..:~I: I Project No.: 50888-015-03 I Logged By: C.M. I Drown By: C.R. Monitoring Device: OVM 580B Finish Dote/Time: 12/13/96//1500 Stabilized Water Level (bgs): NA Surface Elevation: NA Top Casing Elevation: NA UTHOLOGIC DESCRIPTION (color, grain size, consistency, moisture, other) ASPHALT AND BASEROCK DARK YELLOWISH BROWN (10YR 4/6) SAND (SP) with silt, sand is fine-grained, moist (0,90.10,0) at 14', faint chemical odor :1 UGHT OUVE BROWN (2.5Y 5/3) SILTY SAND (SM) with :=- clay, sand is fine-grained, moist, subangular blocky i- soil structure, moderate chemical odor (0,50,40,10) YELLOWISH BROWN (10YR 5/4) SAND (SP) sand is fine- grained, moist, moderate chemical odor (0,100,0,0) r- I UGHT OLIVE BROWN (2.5Y 5/3) SILTY SAND (SM) with ¡- clay, sand is fine-grained, moist, subangular blocky soil structure, moderate chemical odor (0,50,40,10) r- BROWNISH YELLOW (10YR 6/6) SAND (SP) with trace r- silt, sand is fine-grained, moist, weak subangular blocky soil structure, faint chemical odor (0.95.5,0) YELLOWISH BROWN (10YR 5/6) SANDY SILT (ML) sand ¡- is fine-grained, moist, low plasticity (0,40,60.0) Reviewed By: Revised By: Dote: Dote: Comments: SE-1/VE-1 Boring Abandonmentj Well Construction Details <" ,. . ,. . .. . ., . ,. . .. . - " . '~~~~~i .1.......··. ~:.:.~.!:~ .'.~:; .:~;.: .:.:....;:.;: ::;..~::~.~:.~ ! "...·..¿I -. .:,,' :: :.,.;...... ~-:.:.. . ~::;. ':, ~. :~ "DARK GRAYISH BROWN (2.5Y 4/2) SILTY SAND (SM) If- sand is fine-grained, moist (0,65,35,0) ~l';:,:~ii GRAYISH BROWN (10YR 5/2) SAND (SP) with trace ~%;;:~i~ silt, sand is fine-grained, loose. moist (0,95.5,0) :;:..:.....-~;. .......,... .:~:::-...~. :':.:~:; ':;;5~~~:'i r<':<; ~ :':::'::.;' .:~~~~;:~ ..::,..:.. ::..,~~ \:.~ . . .: ÿ'"'~~' :.}\' .. . ,. , .. . .. , ., , " , " . - " , .. . .. , ., , .. . '. . .. . - ., . '. , ., . .. . " . .' , " . ., . - l- I- t- l- I- I- ., , .. . .. . ... . ., ' .. . '. , ,. . . ' ,. . " , .. . .. . .. . '. . .. ' " . " . .. . " . ,. . ,. . .. . " . '. ' .. . ,. . .. . r- t- ., . ,. , .. . " . ,. . .. . ,. . ,. . " , .. ' ,. . ., . .. . ., . .. . I- ,. , .. , .. . '. . .. . .. . .. . I- '. ' .. ' '. . " . " . .. . .. . ,. . r- t- l- I- r- l- I- l- I- f- " . .. , .. . ,. . " . " . " , .. . .. . ,. . .. . .. ' .. . " , .. . " ' ,. . " ' ,. . .. . " . .. . .' , .. . .. . ,. . " . .. . .. . " , r- i-~ .::"~:' - ::"J" :~::'.... =:,,'''-.;:' ';.'!="'¡'''r. ;:...:\ ==:...t.... :~~~~~ <t.:.~.:: ,¥H ~~~ ~~~':::: ~~:":' . :~:'~ ·t~; .;~~~ '~i:~, i- I- r- f- .. ...... .., ...... .. ...... .,. ...... .. ...... ... ...... .. ...... ... ..... .. ...... .,. ...... " ...... .., ...... " ...... ... ...... ...,. , . : :: :: 'T roffie-rated :: Christy Box · , · . , . " . .. . ., . " , · . · . · . ,. , · . . . ., . .. . , .. Cement : :: Grout .. . .. . .. . .. . .. . ., . · . · . ,.,... 2-Ø Sch.40 :: pve Blank :: Casing · . , , , . · . · . · . · . ,. . .. . · . · , · . , , · . " , " , ., , .. . , . · . , . .. , " . · . .. . .. , Bentonite Chips 2-Ø Sch.40 pve 0.020- Slot Sereen 13 lonestar Sand Pock End Cop PogcL,of--Z- ~ ~ ;:; "" ~ a: .9- g ;:J- ¡¡¡ Pro ject: CIRCLE K UNIT NO. 1270 Log of Boring/Monitoring Well: Boring Location: 5634 SllNE ROAD, BAKERSFlELD. CA I Project No.: 50888-015-03 SE-1/VE-1 ~ cu Õ .D ..-.. E ..., ..., .D ~ CL> ~ Boring Abandonment! :> ~ 0 - CL> UTHOLOGIC DESCRIPllON :z 0 E .!:::;.. >. CL> ~ v ~ 0.. ~ II) .-I ( color, groin size, consistency, moisture, other) CL> 0.. cu ~ Well Construction õ.. 0 CL> II) ........ :5 > II) Details 0 cu E OlL. ~ 0.. (.) U ..., cu 0 0 cu cu II) ~ 0 a:: ãi ë: 0 0:: ::::> (f) 30 .:~~.~~:i~· - PALE BROWN (10m 6/3) SAND (SP) sand is fine 31- . :~:~":~.' grained, moist (0.100.0.0) ~ .: J.:;;,,;. ~ - ..~.._. 32- ,~{: :::.;~: I- - ;~.~~¿::i 33- ~-:',:,,':: r- 20 34~1 ~:.:-~: ;:'~ '- $£-1-34 0/4 ....::; ".:~ .::..../"......; 0 .' " 35-- ¡..;..::--.:.~ i- - ....~',..:.~ 36- ¡~~~~~~ - - 37- - - ~\'~?:. 38- :'¿:"roo - - ~~;~:. $£-1-39 49 39 -= I :.....·..tj.... '- ~/4 ;:;:~~~:;~: 0 40- ....~ ~.~.: - -- ¡;:..~:,.::: 41- :., ~;.; 1.--: - ~ement - ;.:~::\~ Grout 42- ,,:,,'''-:'..: . - - :..,~,.::': ~~,,::~.~..' 43- " .... - 44~1 ~.~~~~:;: 5£-1-44 ~O/3 0 -¡":'<'" - : ..... ... I ...' '.' 45-- :~ ~..:! ~ ~ - - ~{~~~~~. 46- .~...":'~~ - - :l~~f~ 47- - - 48- "'::i:'~~' - 49-= I .. ..~. $£-1-49 ~/2 0 :~[~~~ - 50 - ....._:.:o.r.. ;::,,::~< '" ;:I¡ iõ ;¡ '" '" ~ SECOR Reviewed By. Revised By: Dote: Date: Page..2_ocL t RESIDENTIAL 6' CONCRETE WALL UNPAVED AREA UNPAVED AREA PAVED PARKING EDGE OF PAVED AREA ..., ~ I ¡..;; ~ ~ ~ £::Ii ~ ~ ~ 0:: Q:; 0 0 I CIRCLE K UNIT Q:: NO. 1270 I 5E-5 L.J I -+= 5E-3. ~ I VENTS ~ I CI) I / :J ~ 0 NEW UST iñ FORMER COMPLEX I UST COMPLEX I . 5E-2/VE-2 I I 5E-7 HIGH VOLTAGE OVERHEAD . POWER UNES \ PLANTER DRIVEWAY , - DRIVEWAY - - SIDEWALK- - - - HARRIS ROAD LEGEND: ~! ~ N' _I Sf I :it . D-1 SOIL SAMPLE LOCATION .5E-2/VE-2 SOIL BORING/VAPOR EXTRACTION WELL 80 , FEET o , SCALE 40 NOTE: DRAWING IS BASED ON FIELD MEASUREMENTS. FIGURE 2 CIRCLE K STORE NO.1270 5634 SßNE ROAD eAKERSF1ELD, CAlIFORNIA APPR CCR CH 10NOV98 7G888-014-01 SOIL SAMPLE LOCATION MAP SECOR INTERNA llONAL IN CORPORA TED ~ ;; i !! DATE JOB NO. Table 1 Soli Analytical Data USTs, Product lines, and Dispensers Circle K Store #1270 5634 Stine Road Bakersfield, California '¢ >. ; ~ Sample Name Sample Depth (feet) Date Sampled ~, ~ ! 15 :r ~ 8/21/98 7,930 11.4 179 129 '<, 8/21/98 1.92 65.3 43.5 8/21/98 2.18 NO 0.0391 0.00956 8/21/98 NO NO 0.0122 NO 16 8/21/98 23.0 0.0808 0.717 0.276 2.19 18.8 '20 8/21/98 4.23 0.0125 0.0982 0.0331 0.268 3.64 30.5 623 277 1,350 281 9.78 245 116 568 123 TPH = Total petroleum hydrocarbons MtBE = Methyl tertiary Butyf Ether - = Not analyzed mglkg = milligrams per kilogram '. ;; ~. ~ i , :L ~ t r \: , ~ ~ ~, i i 7G888-01 ~1 \PULL.xl5 11/10198 ATTACHMENT C HEALTH AND SAFETY PLAN Site-Specific Health & Safety Plan Site: Tosco Service Station #1270 5643 Stine Road Bakersfield, California Prepared for: Tosco Corporation A Subsidiary of Phillips Petroleum Company Prepared by: . ~~OS2~d 3017 Kilgore Road, Suite 100 Rancho Cordova, California 95670 July 16, 2002 SECOR HEALTH AND SAFETY PLAN REVIEW AND APPROV AL CLIENT: Tosco Corporation PROJECT NAME: Tosco 1270 SITE NAME: Tosco #1270 PROJECT NUMBER: 77.TO.61270.00. START DATE: July 16. 2002 END DATE: Jan. 16.2003 PLAN EXPIRATION DATE: Jan. 16.2003 (Last day of expected fieldwork or no longer than 6 months). Clinton Harmsr Signature: Date: Plan Completed By Rusty Benkosky Signature: Date: Project Manager Site Health and Safety Officer Signature: Date: Todd Brown Signature: Date: Office Health & Safety Officer This Health and Safety Plan has been written for the use of SECOR and its employees. It may also be used as a guidance document by properly trained and experienced SECOR subcontractors. However, SECOR does not guarantee the health or safety of any person entering these sites. Due to the potential hazardous nature of these sites and the activities occurring thereon, it is not possible to discover, evaluate, and provide protection for all possible hazards which may be encountered. Strict adherence to the health and safety guidelines set forth herein will reduce, but not eliminate, the potential for injury. The health and safety guidelines in this Plan were prepared specifically for this site and should not be used on any other site without prior research by trained health and safety specialists. SECOR claims no responsibility for its use by others. The Plan is written for the specific site conditions, purposes, dates, and personnel specified and must be amended if these conditions change. This plan will provide useful infonnation to subcontractors which will assist them in developing their own HASP, but it should notbe construed as a substitute for their own plan. Subcontractors should sign this plan as an acknowledgement of hazard infonnation and notice that this Plan does not satisfy their requirement to develop their own plan. TABLE OF CONTENTS Emergency Response Page Injury or Illness................................................................................ .... ...4 Local Emergency Numbers. .... ..... ....... ..... ....... ..... ...... ....... ...... ...... ........ .....5 Project Personnel Numbers. .... ............ ..... .... ..... ................. ....... ............ .... ..8 Government Contact Numbers....... ....... ............................. ............. ...... .... ..8 Contaminants On The Site. .... ..... ......... ............. ... ........ .... ........... .... ..... .... ..10 Detailed List of Steps with Hazard Assessments and Precautions.........................t4 Attachments Attachment 1 - Site Map. ......... ...... ...... ............ ............ .... ...... ...... ............ .17 Attachment 2 - Incident Investigation Form & Root Cause Analysis Flow Chart.....tS Attachment 3 - Subcontractor Training and Medical Surveillance Record........... ..20 Attachment 4 - Utility Clearance Logs. ..... .............. ............. ........ ......... .... .... .21 Attachment 5 - Air Monitoring Log..............................................................22 Attachment 6 - Daily Health & Safety Briefing Log.............................~............ 24 Attachment 7 - Acknowledgment & Agreement Form....................................... 25 Scope of Work: The purpose of this project is to drill three soil borings and collect soil samples. The site is a 150 by 145 foot square-shaped parcel with an active service station. Currently, two underground storage tanks (USTs) of 20,000 and 12,000-gallon capacity and associated product lines and dispensers are present at the site. All work for this project will be scheduled during typical daylight hours. Site plan is in Attachment 1. Emergency Response: A. Injury or Illness: If an injury or illness occurs, take the following action: · Determine if emergency response (fire/ambulance) staff is necessary. If so, dial 911 on cell phone or closest available phone, which is located in the Tosco 5488 station building. If it makes sense to take an individual to the hospital, use the directions on page 2. · Get First Aid for the person immediately. Utilize first aid kit in site safety officer's vehicle. Also utilize the bloodborne pathogen kit. · Notify the Site Health and Safety Officer, Todd Brown, immediately. The Site Health and Safety Officer is responsible for preparing and submitting the Injurymlness Incident Report to the Health and Safety Director within 24 hours, as well as notifying the employee's supervisor and Principal-in-Charge. Use Incident Investigation Fonn in Attachment 2. SECOR International Incorporated 4 · The Site Health and Safety Officer will assume charge during a medical emergency until more qualified emergency response personnel arrive at the site. , LOCAL EMERGENCY NUMBERS· DIRECTIONS AND MAP TO THE HOSPITAL ARE A TT ACHED NAME TELEPHONE NO. Mercy Hospital (661) 632-5275 Hospital 2215 Truxtun Ave., Bakersfield, CA Halls Ambulance 911 Ambulance (661) 327-4111 911 Police/Sheriff Bakersfield Police (661) 327-7111 911 Fire Bakersfield Department (661) 324-4542 DIRECTIONS TO: Mercy Hospital, 2215 Truxtun Ave., Bakersfield, CA 2. Turn Left on HARRIS 1.0 RD 4. Turn Right on WHITE 0.2 LN 6. Merge on CA-99 NORTH 2.6 8. Take the CALIFORNIA A VE exit towards CIVIC 0.3 CENTER SECOR International Incorporated 5 HASP-soil borings.doc 10. Turn Left on OAK ST 0.3 See Hospital Route Map and Summary on the following two pages. SECOR International Incorporated 6 HASP-soil borings.doc , Yahoo ! Yellow Pages hHootVellow Pages Page 1 of 2 Yahoo! - ~ - Address Book Get Cash In 7 Days 'Kith A Home Equity Loan Welcome, Guest User Yahoo! Yellow Pages c~ TIlt EasiesJ: WaJ To 6e Create My Locations - ~ Starting from: 5643 Stine Road, Bakersfield, CA 93313-2800 *Mercy Southwest Hospital Arriving at: 2215 Truxtun Ave, Bakersfield, CA 93301-3602 (661) 632-5281 Distance: 7.0 miles Approximate Travel Time: 10 mins Full Route Directions 1. 2. 3. 4. 5. 6. Start on STINE RD Turn Left on HARRIS RD Turn Left on WffiLE RD Turn Right on WIDTE LN Take the CA-99 NORTH ramp Merge on CA-99 NORTH · Email Directions · Get Reverse Directions · Text Only Driving Direc Destination Miles 0.0 1.0 1.0 0.2 0.3 2.6 ...IddResults.py?Pyt=Typ&tarname=Mercy+Southwest+Hospita1&tardesc=%28661 %29+632-S7116/2002 = ., SECOR International Incorporated 7 HASP-soil borings.doc · '.' PROJECT PERSONNEL NUMBERS: All project sampling teams will be equipped with a cellular phone. Each team will have a vehicle and a supply of portable water. Subcontractors will complete the form in Attachment 3 SUBCONTRACTOR TRAINING AND MEDICAL SURVEILLANCE RECORD NA PROJECT JOB NAME TELEPHONE NO. GENERAL PROJECT TITLE RESPONSmILITIES Implementing this HASP. Has authority to See See Next See Next Page Site Health and Safety (916) 861-0400 stop work. Perform air quality tasks. Take Next Page Officer charge of all incidents. Review HASP. Page Conduct work in accordance with JSA and this HASP. Report all incidents and near misses immediatel to Pro'ect Mana er. Overall financial and logistics. Contact client See See Next See Next See Next Page Project Manager Rusty Benkosky (916) 861-0400 and subs to understand all hazards. Discuss Next Page Page with SHSO. Follow-up all incidents upon Page notice. Provide immediate support at notice of all See See Next See Next See Next Page Principal·in-Charge Jim Grasty (916) 861-0400 incidents Next Page Page Pa e Provide all known analytical data performed NA NA NA NA Client Contact Ed Ralston (916) 774-2910 by others and notice of hazards. Provide access to site and available emergency res onse ca abilities. Respond with corporate resources to all Corporate Health and Philip Platcow (617) 232-7355 Office incidents as appropriate., Assist in HASP Safety crn (617) 828-3564 Cell review. Assist in incident investigation. Assist in follow-up to incidents as NA NA NA NA Human Resources Marguerite (619) 718-9430 appropriate. Director Shuffelton æ ~,I GOVERNMENTAL CONTACT NUMBERS: I ~~ NAME I TELEPHONE NO. SECOR International Incorporated 8 HASP-soil borings.doc !=.- SECOR International Incorporated 9 HASP-soil borings. doc Contaminants On The Site .~¡1 ppm M@!.','.'.'..'......',...,........t12.."....",,'.ww... ,. ~Jd~ 100/100 ppm NO PEL Established TLV=40 m 0.5 - 1 mg/m3 10.5 - 1 mglm3 depending on the species. SECOR International Incorporated 2.5ppm PEL-STEL= 5ppm IDLH=500 ppm lOOppm TW A: 15()Ppm STEL ILDE: = 500ppm maSH REL = 100 ppm NIaSH REL STEL = 100 ppm IDLH = 900 m AIHA WEEL 100 ppm. NIOSH REL 0.001 mg/m3NIOSH considers this material to be a carcino en I ation, dermal, ingestion, eyes Pungent aromatic odor yes, replratory tract, s n, CNS, blood, kidneys, liver. a anon, dermal, ingestion, eyes Throat and skin irritant (dermatitis), headache, nausea, drowsiness, fatigue Flammable liquid with a distinctive, disagreeable odor Inhalation, dermal, ingestion Irritated nose, throat, headache, dizziness, nausea, sleepiness CNS, liver, kidney, gastrointestinal damage, potential carcinogen pale or dark yellow, odorless liquid Inhalation, dermal, ingestion. Absorption through the skin is a significant rnode of ex osure. Eyes, skin, respiratory tract, cWoroacne May cause reproductive, CNS, CVS, skin, eye and liver effects, cancer (leukemia). 10 HASP-soil borings.doc _'iBl41 NIOSH considers Liquid with a pleasant 1 ppml this material a odor at high Inhalation, dermal and weakness; abdominal pain, Gastrointestinal bleeding; Ippm carcinogen concentrations eye contact. pallor or cyanosis of enlarged liver; potential extremities; liquid: frostbite; occupational liver carcinogen; damage also to central nervous system, blood, respiratory system, 1 m hatic s stem. PEL - TWA 100 NlOSH considers Colorless liquid with Inhalation, skin Irritation to eyes, skin; Tremor,sonrnolence ppm C 200 ppm this compound a a cWorofonn-like absorption, ingestion, headache, vertigo (an illusion (sleepiness, unnatural TLV -TWA50 carcinogen odor and/or eye contact of movement); visual drowsiness), cardiac ppm; STEL 100 disturbance, fatigue, arrhythmias, paresthesia; ppm giddiness; nausea, vomiting; liver injury; Potential dermatitis occupational liver and kidney carcinogen 11~~&~~~ª1Ia No PEL or TLV None established Solvent odor Inhalation, skin Typical solvent symptoms Likely liver, kidney, and CNS Established absorption, ingestion, symptoms and/or eye contact No PEL NIOSH considers Colorless liquid or gas Inhalation, skin Irritation to eyes, skin, throat; Liver, kidney dysfunction; this compound a (above 89°F) with a absorption, ingestion, dizziness, headache, nausea, pneumonitis; Potential TLV - 5ppm carcinogen mild, sweet, and/or eye contact dyspnea (breathing difficulty) occupational liver and kidney chlorofonn-like odor carcinogen Target Organs Eyes, skin, respiratory system, central nervous system, liver, kidneys PEL - TWA 350 NIOSH Ceiling 350 Colorless liquid with Inhalation, skin Irritation to eyes, skin; Cardiac arrhythmias; liver ppm; ppm a mild, cWorofonn- absorption, ingestion, headache, lassitude damage Target Organs TLV - 350 like odor and/or eye contact (weakness, exhaustion), Eyes, skin, c~ntral nervous SECOR International Incorporated 11 HASP-soil borings.doc 100 ppm 25 ppm IDLH 5 m m3 PEL Ceiling 200ppm TL V STEL IOOppm IDLH 15Oppm; NIOSH considers this material a carcinogen Inhalation, dennal, ingestion, eyes Colorless liquid with mild cWorofonn odor Irritation to eyes, skin, nose, throat, respiratory system; nausea; flush face, neck; vertigo (an illusion of movement), dizziness, incoordination; headache, skin erythema (skin redness); Sonrnolence (sleepiness, unnatural drowsiness); liver damage; Potential occupational carcinogen; Damage to eyes, skin, respiratory system,liver, kidneys, central nervous system. .E" PEL-TWA 10 ppm (45 mglm3) [skin]; TLV lOppm lImotf'têlfømòrifJe """,",,,,,,,,,,,,,,,,¡1;,,,,,@_~,",,,,",,,,_~ PEL - TWA 10 ppm; Ceiling 25 ppm; TL V - 5ppm; STEL - lOppm No PEL or TLV Established lrøp~.r;'etlii..:, .<w"w,!!'!,!i!'.JfæS!!!i!:mL",,^@,,,,~,,, No PEL or TLV Established 1I1B9lç"~ PEL - TWA 75 ppm; TLV - lOppm PEL-TWA5 pprn (35 mglrn3) [skin] TLV - 1ppm PEL-TWA 100 ppm C 200 ppm TL V - 25ppm STEL - lOOppm SECOR International Incorporated NIOSH considers this compound a carcinogen; REL - TW A 10 ppm (45 mglm3) [skin] NIOSH considers this compound a carcinogen; REL - STEL 2 ppm NIOSH questions if the PEL is sufficient to protect workers NIOSH considers this compound a carcinogen; REL - TWA 1 ppm (7 mglm3) [skin] NIOSH considers this compound a carcinogen Colorless liquid with a sweet, chloroform- like odor Colorless liquid with a characteristic ether- like odor Colorless to pale- yellow, sometimes heavy liquid Colorless liquid Colorless liquid with an almond-like odor Colorless to pale- yellow liquid with a pungent, chloroform- like odor Colorless liquid with a mild, chloroform- like odor 12 Inhalation, skin absorption, ingestion, and/or eye contact Inhalation, skin absorption, ingestion, and/or eye contact Inhalation, ingestion Inhalation, ingestion Inhalation, skin absorption, ingestion, and/or eye contact Inhalation, skin absorption, ingestion, and/or eye contact Inhalation, skin absorption, ingestion, and/or eye contact central nervous system depressant/depression, poor e uilibrium; dermatitis Irritation to eyes, nose; central nervous system depressant/depression; dermatitis Irritation to eyes, skin; central nervous system depressant/depression; nausea, vomiting; drowsiness, dizziness, incoordination Irritation to eyes, respiratory system Irritation to eyes, respiratory system Irritation to eyes, skin, nose; drowsiness, incoordination; central nervous system de ressant/de ression Nausea, vomiting, abdominal pain; tremor fingers; dermatitis Irritation to eyes, skin, nose, throat, respiratory system; nausea; flush face, neck; vertigo (an illusion of movernent), dizziness, incoordination; headache, Liver, kidney damage; Potential occupational liver carcinogen Target Organs Eyes, respiratory system, central nervous system, liver, kidneys Liver, kidney injury; Potential occupational liver carcinogen. Target Organs central nervous system, eyes, lungs, liver, kidneys, skin CNS effects possible. Possible mutagen Suspect carcinogen Liver, lung, kidney injury Target Organs Eyes, skin, respiratory system, central nervous system, liver Jaundice, hepatitis, liver tenderness; monocytosis (increased blood monocytes); kidney damage; Potential occupational liver carcinogen Target Organs Skin, liver, kidneys, central nervous system, gastrointestinal tract Somnolence (sleepiness, unnatural drowsiness); liver damage; Potential occupational liver carcinogen Target Organs Eyes, skin, respiratory system, liver, kidne s, central nervous HASP-soil borings. doc PEL - TWA 350 NIOSH Ceiling 350 Colorless liquid with Inhalation, skin ppm; ppm a mild, cWoroform- absorption, ingestion, TLV - 350 like odor and/or eye contact ppm;STEL - 450ppm PEL - TWA 10 NIOSH considers Colorless liquid with Inhalation, skin ppm (45 mglm3) this compound a a sweet, cWoroform- absorption, ingestion, [skin]; carcinogen; like odor and/or eye contact TLV IOppm REL-TWA 10ppm (45 mg/m3) [skin] PEL - TW A 10 NIOSH considers Colorless liquid with Inhalation, skin ppm; Ceiling 25 this compound a a characteristic ether- absorption, ingestion, ppm; carcinogen; like odor and/or eye contact TL V - 5ppm; REL - STEL 2 ppm STEL - IOppm PEL - TWA 25 NIOSH considers Colorless liquid with Inhalation, skin ppm STEL 125 this compound a a cWoroform-like absorption, ingestion, ppm; carcinogen. odor and/or eye contact TL V - 50ppm 1:~\I!~_il~ 0'·:J~fm"B.tI ~¡§!I.I.;";C'M"~~_ ~~E1Ii1&L NoPELorTLV Established Colorless to pale- yellow, sometimes heavy liquid Colorless liquid No PEL or TLV Established PEL.- TW A 75 ppm; TLV - IOppm NIOSH questions if the PEL is sufficient to protect workers Colorless liquid with an almond-like odor SECOR International Incorporated 13 Inhalation, ingestion Inhalation, ingestion Inhalation, skin absorption, ingestion, and/or eye contact Irritation to eyes, skin; headache, lassitude (weakness, exhaustion), central nervous system depressant/depression, poor e uilibrium; dermatitis Irritation to eyes, nose; central nervous system depressant/depression; dermatitis Irritation to eyes, skin; central nervous system depressant/depression; nausea, vomiting; drowsiness, dizziness, incoordination Irritation eyes, skin; fatigue, weakness, somnolence (sleepiness, unnatural drowsiness), lightheadedness numbness, nausea; Cancer Site [in animals: lung, liver, salivary & mammary gland tumors] Irritation to eyes, respiratory system Irritation to eyes, respiratory system Irritation to eyes, skin, nose; drowsiness, incoordination; central nervous system de ressant/de ression Cardiac arrhythmias; liver damage Target Organs Eyes, skin, central nervous system, cardiovascular system, liver Liver, kidney damage; Potential occupational liver carcinogen Target Organs Eyes, respiratory system, central nervous system, liver, kidneys Liver, kidney injury; Potential occupational liver carcinogen. Target Organs central nervous system, eyes, lungs, liver, kidneys, skin Tingle limbs; Potential occupational carcinogen Target Organs Eyes, skin, cardiovascular system, central nervous system CNS effects possible. Possible mutagen Suspect carcinogen Liver, lung, kidney injury Target Organs Eyes, skin, respiratory system, central nervous system, liver HASP-soil borings. doc PEL = Permissible Exposure Limit; TL V = Threshold Limit Value set by the ACGIH (American Conference of Governmental Industrial Hygienists); SKIN = Skin absorption; STEL = Short Term Exposure Limit; NIOSH = National Institute for Occupation Safety and Health; IDLH = Immediately Dangerous to Life or Health; C = Ceiling limit; CNS = Central Nervous System; CVS = cardiovascular system REL = Recommended exposure limit set by NIOSH; ~ Detailed List of Steps with Hazard Assessments and Precautions Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each workday. Safe Performance Self Assessment (SPSA) procedures must be used throu,ghout the project. Weather conditions (heat, cold, rain,lightning) must also be considered. o Job Steps . Potential Hazard e Critical Actions .----. m .. '_··~'~M__·_'M·M"'MM.. ._ Reference Borehole Clearance Review form and coordinate with Clear drilling locations. Traffic hazards, overhead and underground installations, product Station Manger (or designee) to minimize potential conflicts. Review releases, property damage, dealer proposed locations against available construction drawings and known inconvenience utilities, tanks, product lines, etc. Mark out the proposed borehole locations. Call underground utility locating service for public line location clearance and get list of utilities being contacted. If ".................... necessary, coordinate private line locator for private property. Mobilize with proper equipment/supplies for drilling. Vehicle accident. Lifting hazards. Delay Follow safe driving procedures. Employ safe lifting procedures. or improper performance of work due to Make sure sub-contractors are aware of their responsibilities for labor, improper equipment onsite. equipment and supplies. Review HSP and permit conditions and .. ......-.-- gather n~cessary PPE. Visually clear proposed drilling locations. Underground and overhead installations. Complete Pre-Mobilization section of Borehole Clearance Review _m .. .. ....--.- .-- ...-..--...... form and adjust drilling locations as necessary. Set up necessary traffic control. Struck by vehicle during placement. Use buddy system for placing traffic control. Reference traffic control Vehicle accident as a result of improper plan section of HSP (may include specific requirements based on ---- ---........----- .-...----.--........-.- traffi~..£2P.:!1.:0l equipment p'lac~!l!.e..p.~... ...P~!:IDÍts). __, Assist with set up of rig. Vehicle accident during rig movement. Verify clear pathway to drilling location and clearance for raising Damage caused by rig while accessing mast. Provide as-needed hand signals and guidance to driver to place set-up location. Contact with overhead rig. Visually inspect rig (fire extinguisher on board, no oil or other installations. Soft terrain. Rig fluid leaks, cabling and associated equipment in good condition, movement. pressurized hoses secured with whip-checks or adequate substitute, jacks in good condition?). If necessary, use wooden blocks under --.-..- J.acks to spread load. Chock wheels. Set up exclusion zone(s) and work stations (drilling and logging/sample Struck by vehicle during set up. Slip/fall Implement exclusion zone set-up instructions of HSP. Set up work _collection). hazards. stations with clear waIkil!$ paths to and from rig. - Clear upper five feet of direct push location using post-hole digger or bucket Back strain, exposure to chemical Don required PPE and initiate air quality monitoring in accordance auger. hazards, hitting an underground utility, with the HSP. . Use the PID to track the airborne concentration of repetitive motion. contaminants close to potential sources such as the core as it is being raised from the hole, the core is opened, etc. Have respirator ready with organic vapor cartridges on your belt, readily available. Evaluate the sample inside the baggie at arm's length. DO NOT EVALUATE THE SAMPLE IN THE OPEN THIS WILL AVOID _. ....- --.....................-.. .---...-.-....-.. ..YNNECESSARY þXPOSURE. Use pro~~r. Commence drilling. Cross-contamination from previous hole. Decontaminate sampling after collecting a sample and decontaminate back strain, heat or cold, eye injury, drilling equipment after each borehole. Use proper lifting techniques. noise, exposure to chemical,~~!!.!..d.s, ....º-~..PPE and monitoring in accordan~~ with HSP (especially note ear SECOR International Incorporated 14 HASP-soil borings.doc If Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each workday. Safe Performance Self Assessment (SPSA) procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered. o Job Steps . Potential Hazard o Critical Actions ___.n.___ , , n'H"n'_'_"_'''H M'______..___··· hitting an underground utility, trip and protection). Monitor drilling progress. Keep work area clear of fall, equipment failure tripping or slipping hazards. Perform periodic visual inspections of drill ri . - "n" . ,-,-_.~ Collect samples in accordance with sampling plan. Cross-contamination, improper labeling Decontaminate sampling equipment between each sampling run. or storage, exposure to site contaminants. Label samples in accordance with sampling plan. Keep samples stored in proper containers, at correct temperature, and away from - - "......n". ,...---,--- ~2!.k area. Perf~~..~ monitoring, and we?! proper PPE. Store cuttings (if any) properly in accordance with site-specific requirements. Exposure to public. Traffic hazard or Have proper storage containment and labeling available onsite. Place obstruction/inconvenience to station materials in isolated location away from traffic and other site -.---- ~--_._.. operation.._~p"~~per stora~,.2!..~~posal. ~E.£!ions. Coc:>rdinate proper disposa!. offsite (where applicable). Backfill borehole. Improper grouting can lead to future Mix grout to specification and completely fill the hole. Use proper vertical conduit for contaminant lifting techniques and wear proper PPE. Keep work area clear of migration. Back strain, trip hazards, eye tripping hazards. Verify presence or other authorization by required injury from splashing or release of inspectors for grouting. pressurized grout. Unauthorized ---' """_·,_______n . "_'_n_ J?.1!~1.<&!!!.!!.g_~auses eX~!~,~ork. H"_ Dispose or store purge water (if any) onsite. Back strain. Exposure to contaminants. Use proper equipment to transport water (pumps, drum dollies, etc.). If disposing through onsite treatment Wear PPE in accordance with HSP. Review instructions for use of system, damage or injury from improper onsite treatment systems. Label storage containers properly, and use of equipment. Improper storage or locate in isolated area away from traffic and other site functions. - disposal. Coordinate offsite_ disposal (where applicable). Clean site/demobilize. Traffic. Safety hazard left on site. Use buddy system as necessary to remove traffic control. Leave site Lifting hazards. clean of refuse and debris. Clearly marklbarricade any borings that need later topping off or curing. Notify station personnel of departure, final well locations and any cuttings/purge water left onsite. Use M'....__..__._____ n__n__n proper lifting techniques Package and deliver samples to lab. Bottle breakage, back strain. Handle and pack bottle carefully (bubble wrap bags are helpful). Use f-----,-,-- --"'-". ...m. ......._.M_.___ .........--.".-- ...·M..n......""·...·" "'"""M,_ , proper lifting tec~!:!.~,~. --. General Keep SPSA cärd on you at all times. Use it frequently. What can happen? Whä¡'" _............_·m.....".. .....M......_____.. """"____"_.M_ is the worst thing that c!!;n hEP.J?!!l...!.....Planfor it and carry out ),£.':I:.':.plan. ...."'..,_._.. ___"_'M" _M___.____ ..--- Typical work Weather related incidents: automobile Check weather reports daily. Project will visits will not be performed accidents, slips and falls. during inclement weather. Sampling may be performed during light rain mist. Wear raincoats. Drive at speed limit or less as needed to keep safe distance from vehicle in front, avoid short stops. Typical work. MM__·_____._______MM_ ....---.- _...._.ø__...___......__. Cold Stress. For temperatures below 40°F, adequate insulating clothing must be worn. If the temperature is below 20 Op, workers will be allowed to enter a heated shelter at regular intervals. Warm, sweet drinks should be available. Coffee intake should be limited. No one should begin work or returri to work from a heated shelter with wet clothes. Workers should be aware of signs of cold stress, such as heavy shivering, pain in fingers or toes, drowsiness or ,---- __..._._. _ia:it..'1hjJ.ih.t__.Gn.fi'..e!...o.í..!m.1L.L)~ci~-Ìnc1.¡,..<'\t.¡nTlC" :far...itnm.er1~ .",+.0. SECOR International Incorporated 15 HASP-soil borings.doc ·. Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each workday. Safe Performance Self Assessment (SPSA) procedures must be used throughout the project. Weather conditions (heat, cold, rain, liJ!:htninJ!:) must also be considered. o Job Steps 49 Potential Hazard . Critical Actions ---- -. ...---......-- -..... ....-...-..-..-.-..-...."........................... irritability. Onset of any of these signs are indications for immediate return to a heated shelter. Heat Stress For temperatures above 75/F, each person will take their pulse at rest. At breaks, the pulse should be less than 110 beats per minute after one minute. Before returning to work, the pulse should be no more than 10 beats greater than the resting pulse. If the air temperature is greater than 95/F, work should be done for 30 minutes with a rest break of 10 minutes for Level D. For Level C, work should be done for 20 minutes, with a rest break of 10 minutes. At least 8 ounces (1 cup) of cool water, Gatorade-type drink, or dilute fruit juice should be consumed at each rest break or at least one cup every 20 minutes. Work should stop if any of the following symptoms occur: muscle spasm and/or pain in the limbs or abdomen (heat cramps); weak pulse, heavy sweating, dizziness, and/or fatigue (heat exhaustion); or rapid pulse, no sweating, nausea, dizziness, and/or confusion (heat stroke). Provide First Aid immediately. Use sunscreen on unprotected skin to protect against ultraviolet exposure as necessary. . _NO .---.......-.................... ,....-- --......,..."-,---.-....-..,--.-- No eating, drinking, or smoking on-site. No contact lenses on-site. No facial hair that would interfere with respirator fit. ..............- --..............-.......................----....-----.....................---._-- ......-.-..... ....---- A safety meeting will be held each day, even if there is only one person working on the project on any given day. ---,_.._....._- --, - ............-................-. Topics will always include the work scheduled for the day and restatement of the hazards and means to avoid them. Other topics may include sampling in general and advances in technology and how it may be applied to the project. Use Attachment 6 for logging the _.__..__....._ ~i~,S."c!!.s.Eussed. ._ ---..... --...................--..........."'......................- ---..-...... .. SECOR International Incorporated 16 HASP-soil borings. doc Attachment 1 SITE MAP SECOR International Incorporated 17 HASP-soil borings.doc JSA Type: 181 SAR Operations o Transport DOffice o Construction 1181 New o Revised I Date: 03/30/00 Co: Dept: Div: Org Unit: Loc: Work Type: Environmental I Work Activity: Hollow Stem Auger Sampling Personal Protective Equipment cpPE); Minimum PPE is Level D including: safety glasses or goggles, hard hat, steel-toed and shank boots, hearing protection, and gloves (type dependent on job-specific requirements) Additional PPE may be required in the Health & Safety Plan (HSP). Also refer to the HSP for required traffic control, air monitoring, and emergency procedures. Development Team PositionITitle Reviewed By PositionITitle Date --- ------- .- --- -, - --- Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each work day. Safe Performance Self Assessment (SPSA) procedures must be used durin,g field activities. Weather conditions (heat, cold, rain, li,ghtnin,g) must also be considered. o Job Steps 8 Potential Hazard . Critical Actions --- -- Clear drilling locations. Traffic hazards, overhead and Reference Borehole Clearance Review form and underground installations, product coordinate with Station Manger (or designee) to minimize releases, property damage, dealer potential conflicts. Review proposed locations against inconvenience available construction drawings and known utilities, tanks, product lines, etc. Mark out the proposed borehole locations. Call underground utility locating service for public line location clearance and get list of utilities being contacted. If necessary, coordinate private line locator for .. -,--.-,---.----- 1>riv~~,p~. '-.- -- Mobilize with proper Vehicle accident. Lifting hazards. Delay Follow safe driving procedures. Employ safe lifting equipment/supplies for drilling. or improper performance of work due to procedures. Make sure sub-contractors are aware of their improper equipment onsite. responsibilities for labor, equipment and supplies. Review HSP and permit conditions and gather necessary PPE. Visually clear proposed drilling Underground and overhead installations. Complete Pre-Mobilization section of Borehole Clearance locations. Review form and adjust drillinl!; locations as necessary. Set up necessary traffic control. Struck by vehicle during placement. Use buddy system for placing traffic control. Reference Vehicle accident as a result of improper traffic control plan section ofHSP (may include specific traffic control equipment placement. - requirements based on permits). Assist with set up of rig. Vehicle accident during rig movement. Verify clear pathway to drilling location and clearance for Damage caused by rig while accessing set- raising mast. Provide as-needed hand signals and guidance up location. Contact with overhead to driver to place rig. Visually inspect rig (fire installations. Soft terrain. Rig movement. extinguisher on board, no oil or other fluid leaks, cabling and associated equipment in good condition, pressurized hoses secured with whip-checks or adequate substitute, jacks in good condition?). If necessary, use wooden blocks under jacks to spread load. Chock wheels. Set up exclusion zone(s) and work Struck by vehicle during set up. Slip/fall Implement exclusion zone set-up instructions of HSP. Set stations (drilling and logging/sample hazards. up work stations with clear walking paths to and from rig. collection). -- ._--~- ---. Clear upper five feet of boring using Back strain, exposure to chemical hazards, Don required PPE and initiate air quality monitoring in post-hole digger or bucket auger. hitting an underground utility, repetitive accordance with the HSP. Use proper lifting techniques motion. and tools. Complete the Pre-Drilling section of the Borehole Clearance Review form. Contractor Nall1e JS.-\, ¡SA samplJn~ ,!L)C · Critical Actions Decontaminate sampling after collecting a sample añ¡¡-- decontaminate drilling equipment after e.ach borehole. Use proper lifting techniques. Use PPE and monitoring in accordance with HSP (especially note ear protection). Monitor drilling progress - proceed cautiously for first 10 feet - watching for changes in either drilling difficulty or cuttings. Keep work area clear of tripping or slipping .__..___'__,_.._._____..._..__ _,,_,_...._'...._______,_._ ...... haz.~~~.Je1fI?.~~.!Í0~c vi~\.!.~ ins~cti0I1!..I?!,~1l ris,.:......_ Collect samples in accordance with Cross-contamination, improper labeling or Decontaminate sampling equipment between each sampling plan. storage, exposure to site contaminants. sampling run. Label samples in accordance with sampling plan. Keep samples stored in proper containers, at correct temperature, and away trom work area. Perfonn air monitoring and wear proper PPE. Inspect hammer cable __....____, ._.__....____.. ___ ~..to the collection of each core sample.. Store cuttings properly in accordance Exposure to public. Traffic hazard or Have proper storage containment and labeling available with site-specific requirements. obstruction/inconvenience to station onsite. Place materials in isolated location away trom operation. Improper storage or disposal. traffic and other site functions. Coordinate proper disposal .. _ __ ,.£ffsite !wh~~~p'p'licable). .., Improper grouting can lead to future Mix grout to specification and completely fill the hole. vertical conduit for contaminant migration. Use proper lifting techniques and wear proper PPE. Keep Back strain, trip hazards, eye injury trom work area clear of tripping hazards. Verify presence or splashing or release of pressurized grout. other authorization by required inspectors for grouting. Unauthorized backfiUing causes extra work. - .. Back strain. Exposure to contaminants. If disposing through onsite treatment system, damage or injury trom improper use of equipment. Improper storage or disposal. Use proper equipment to transport water (pumps, drum doIlies, etc.). Wear PPE in accordance with HSP. Review instructions for use of onsite treatment systems. Label storage containers properly, and locate in isolated area away trom traffic and other site functions. Coordinate offsite di~sal (where applicable). Use buddy system as necessary to remove traffic control. Leave site clean of refuse and debris. Clearly marklbarricade any borings that need later topping off or curing. Notify station personnel of departure, final well locations and any cuttings/purge water left onsite. Use ____1-,...____..._._.___________ ....£T0per lif!.ing te~hniques .._ Package and deliver samples to lab. Bottle breakage, back strain. Handle and pack bottle carefully (bubble wrap bags are ._____ __.... _ helpful). Use pI:,0per lifti..EK.!.e..chniques. __ ¿ o Job Steps . Potential Hazard ,------- - Commence driIJing. Cross-contamination trom previous hole. back strain, heat or cold, eye injury, noise, exposure to chemical hazards, hitting an underground utility, trip and fall, equipment failure "'~'___"_M Backfill borehole. Dispose or store purge water (if any) onsite. 1----' Clean site/demobilize. .. ,-f--.. Traffic. Safety hazard left on site, Lifting hazards. .. __M_ Contractor Nan1e JSA,IlS,d, s.tmpling d()l' Attachment 2 INCIDENT TYPE 0 Fatality 0 Industrial Non-Recordable 0 SpílllLeak 0 Lost Workday 0 Non-Industrial 0 Product Integrity 0 L W Restricted Duty 0 Off-the-Job Injury 0 Equipment 0 OSHA MedicaÌ or Dlness w/o LW 0 MVA 0 Business Intermpûon 0 FlfSt Aid 0 Fire (TO BE COMPLETED BY HR) Date of Incident: o General Liability o Criminal Acûvity o NOûce ofViolaûon o Near Miss This report must be completed by the employee's supervisor or Site Health and Safety Officer immediately upon learning of the incident. The completed report must be reviewed and signed by the Principal-In-Charge and e-mailed or faxed to the Vice President of Human Resources, Corporate Health and Safety and the Health & Safety Coordinator within 24 hours of the incident, even if employee is not available to review and sign. Employee or employee's doctor must submit a copy of the doctor's report to Human Resources within 24 hours of the initial exam and any subsequent exams. Phone: 619-718-9429, Fax: 619-296-2006, E-Mail: mharris@secor.com. EMPLOYEE Work Location Address where incident occurred: Name: --¡- I How long in present job? INJURY OR ILLNESS INFO Where did incident I near miss occur? (number, street, city, state, zip): County: I Employer's premises? DYes o No Specific activity the employee was engaged in when the incident I near miss occurred: - M'__M All equipment, materials, or chemicals the employee was using when the incident I near miss occurred (e.g., the machine employee struck against or which struck employee; the vapo~ inhaled or material swallowed; what the employee was lifting, pulling, etc,): - ._.__'H Describe the specific injury or illness (e.g., cut, strain, fracture, skin rash, etc.): - Body partes) affected (e.g., back, left wrist, right eye, etc.): . Name and address of Health Care Provider (e.g., physician or clinic): Phone No.: ., If hospitalized, name and address of hospital: Phone No.: Date of injury or onset of ilIness (MMlDDIYYYY) ;--;--1 Time of event or exp~ure: ,-, 0 AM 0 PM Time employee began work: o AM 0 PM J Did employee lose at least one full shift's work? o No 0 Yes, 1st date absent (MMlDDIYYYY) I I -, - ..." Has employee returned to work? o Regular work o Restricted work o No, sû1l off work DYes, date returned (MMlDDIYYYY) I I . ---,.---" Did employee die? 0 No 0 Yes, date (MMlDDIYYYY) I I . --....-..-.. Date employer noûfied of incident I near miss: (MMlDDIYYYY) I I To whom reported: I Other workers injured/made ill in this event? 0 Yes 0 No T Employment Status: 0 Full-Time 0 Part-Time 0 Hourly-As-Needed SECOR International Incorporated 18 I S~~:_, Birthdate: HASP-soil borings. doc Description of Incident / Nenr Miss: (Describe fully the incident / near miss events. Tell what happened nnd how it happel1l'd.) Trnck Transportation: Years with Carrier: Professional Driver? 0 No Operation Type: L Vehic1~ ~;-----_. ~.~-_._- ~ccident Situation: - -~._----- Equipment #: Accident Location (street, city, state): Hazardous Material? 0 Yes Root Cause(s) Analysis (RCA): 1. Lack of skill or knowledge 5. Correct way takes more time and/or requires more effort 2. Lack of or inadequate operational procedures or work standards 6. Short-cutting standard procedures is positively reinforced or tolerated 3. Inadequate communication of expectations regarding procedures or work standards 7. Person thinks there is no personal benefit to always doing the job according to standards 4. Inadequate tools or equipment 8. Uncontrollable RCA# I Closu # Solution(s): How to Prevent Incident I Near Miss From Reoccurring Person Responsible Due Date re Date .- ; lmestigation Tenm Members .Name Job Title Date Name Job Title ~ Date I r------ ..__.___M M_____· First Line Supervisor Other (name) SECOR International Incorporated 19 HASP-soil borings.doc y- ------------------- ----------- --------- ----- Job Factor Uncontrollable Factor o I · 1 1 . I I I 1 I 1 · I I I I 1 , I I I : ,..---- I 1 · I I 1 I I · 1 I 1 I 1 I 1 I 1 I I · 1 I 1 I I 1 1 I I , I 1 I I I · 1 : ~---- I I I _I I 1 · I I 1 I 1 I 1 I I I 1 1 I · 1 I I I 1 , 1 I I 1 I · I I I I I : ...---- I 1 I 1 I . I I L____~______________________________________ I S olutionlR eco m m endation I I I I 1 I I 1 · ~-- I I I I · I 1 , I I I I I 1 I · I 1 I ..-- I I I I 1 I , I I I 1 1 I I · L__ I I I I I 1 I I 1 · I I I I I I I I r Implementation of Solution/Recom m endation SECOR International Incorporated 20 HASP-soil borings.doc Attachment 3 SUBCONTRACTOR TRAINING AND MEDICAL SURVEILLANCE RECORD Subcontractor: Address: Employees Assigned to Project: I certify the above employees assigned to this project have received training and medical surveillance according to the Health and Safety Plan and the Occupational Safety and Health Administration Standard on Hazardous Waste Operations and Emergency Response (29 CFR 1910.120): Name (printed): *Signature: Title: Date: *Subcontractor Field Supervisor or Manager only. SECOR International Incorporated 21 HASP-soil borings,doc Attachment 4 UTILITY CLEARANCE LOGS SITE LOCATION: MAP/GRID: CLOSEST INTERSECTING STREET: WHERE MARKS ARE NEEDED: TYPE OF WORK: WORK TO BE PERFORMED FOR: MARKOUT REQUEST CALLED IN ON: MARKOUT REQUEST CALLED IN BY: TICKET #: REST AKE #S (IF APPLICABLE): STAKING DATE: TIME: ' CURRENT MARKOUT EXPIRES: CALL BY TillS DATE FOR REMARK: UTILITIES NOTIFIED: ***STA Y 2 FEET FROM MARKINGS!! SECOR International Incorporated 22 HASP-soil borings.doc ~ '~ Attachment 5 SECOR Action Level Table For Chemical Monitorin Volatile Organics PID- Mini Rae or OVM Daily with isobutylene All ground During each 10 ppm above background 20 ppm above background calibration gas. water sampling regimen. sustained in breathing zone sustained in breathing zone sampling Note careful of for a minimum of I minute and no benzene tube use of the and benzene tube non-detect. discoloration. instrument described in the step by step procedure table to ensure that the chance of overexposure is reduced. Any tube discoloration Benzene PID- Mini Rae or Leak check pump daily. All ground During each > 2 ppm in breathing zone. OVM- and Dräger 0.5/a Check expiration date of water sampling regimen. benzene tube tube and tube integrity. sam lin AIR MONITORING EQUIPMENT CALIBRATION/CHECK LOG* SECOR International Incorporated 23 HASP-soil borings. doc *Submit copies of logs to Director of Industrial Hygiene & Health and Safety within 24 hours of expiration date of Plan, if a PEL is exceeded, or personal protective equipment level is upgraded. AIR MONITORING LOG *Submit copies of logs to Director of Industrial Hygiene & Health and Safety within 24 hours of expiration date of Plan, if a PEL is exceeded, or personal protective equipment level is upgraded. SECOR International Incorporated 24 HASP-soil borings. doc Attachment 6 DAILY HEALTH AND SAFETY BRIEFING LOG Date: Start Time: Issues Discussed: 1. 2. 3. 4. 5. Meetin Conducted b : Name (Site Health and Safet Coordinator) Si nature SECOR International Incorporated 25 HASP-soil borings.doc Attachment 7 HEALTH AND SAFETY PLAN ACKNOWLEDGMENT AND AGREEMENT FORM (All SECOR and subcontractor personnel must sign.) This Health and Safety Plan has been developed for the purpose of informing SECOR employees of the hazards they are likely to encounter on the project site, and the precautions they should take to avoid those hazards. Sub-contractors and other contractors on the site must develop their own Health and Safety Plan to address the hazards faced by their own employees. SECOR has provided a copy of this Plan to contractors in the interest of full disclosure of hazards of which we may be aware, and to satisfy SECOR's responsibilities under the OSHA Hazard Communication standard. Similarly, contractors are required to inform SECOR of any hazards of which they are aware or that the contractor's work on site might possibly pose to SECOR employees, including (but not limited to) the Material Safety Data Sheets for chemicals the contractor may bring on-site. This plan should NOT be understood by contractors to provide information on all of the hazards to which a contractor's employees may be exposed as a result of their work. All parties conducting site activities are required to coordinate their activities and practices with the Project Health and Safety Coordinator. Your signature below confirms that you have read and understood the hazards discussed in this Plan, and understand that sub- contractors and contractors must develop their own Health and Safety Plan for their employees. I also understand I could be prohibited by the Site Health and Safety Coordinator or other SECOR personnel from working on this project for not complying with any aspect of this Health and Safety Plan. SECOR International Incorporated 27 HASP-soil borings.doc SECOR International Incorporated 28 HASP-soil borings.doc ATTACHMENTD FIELD PRACTICES AND PROCEDURES AND QUALITY ASSURANCE PLAN .l ATTACHMENTD FIELD PRACTICES AND PROCEDURES AND QUALITY ASSURANCE PLAN General procedures used by SECOR International Inc. (SECOR) in site assessments for drilling exploratory brings, collecting samples, installing monitoring wells, sampling monitor wells, analytical procedures, and assessment of data are described herein. These general procedures are used to provide consistent and reproducible results. However, some procedures may be modified based on site conditions. In addition, this attachment presents a quality assurance plan adopted in conducting the activities described here. PRE-FIELD WORK ACTIVITIES Health and Safety Plan Fieldwork performed by SECOR at the site is conducted according to guidelines established in a Site Health and Safety Plan (SHSP). The SHSP is a document which describes the hazards that may be encountered in the field and specifies protective equipment, work procedures, and emergency information. A copy of the SHSP is at the site and available for reference by appropriate parties during work at the site. Locatine: Undere:round Utilities Prior to commencement of any work that is to be below surface grade, the location of the excavation , boring, etc., is marked with white paint as required by law. An underground locating service such as Underground Service Alert (USA) is contacted. The locating company contacts the owners of the various utilities in the vicinity of the site to mark the locations of their underground utilities. Any invasive work is preceded by hand augering to a minimum depth of five feet below surface grade to avoid contact with underground utilities. ). FIELD METHODS AND PROCEDURES Drillinl! Soil borings will be drilled using truck-mounted, hollow stern auger drill rig. Soil samples for logging will be obtained from auger-return materials and by advancing a modified California split-spoon sampler equipped with brass or stainless steel liners into undisturbed soil beyond the tip of the auger. Soils will be logged by a geologist according to the Unified Soil Classification System and standard geological techniques. Soil Sampling equipment will be cleaned with detergent water solution (Liqonox or TCP), rinsed with clean water, and equipped with clean liners between sampling intervals. A consulting geologist will oversee a drilling company steam clean augers and samplers between each boring to reduce the possibility of cross contamination. Steam cleaning effluent will be contained in 55- gallon drums and temporarily stored onsite. The disposal of the effluent will be the responsibility of Atlantic Richfield Company. Soil Classification Samples will be classified onsite by the field geologist in accordance with the Unified Soil Classification System. Representative portions of the samples will be retained for further examination and for verification of field classification. Logs of the borings indicating the depth and identification of the various strata and pertinent infonnation will be prepared for the final written report. Soil Sample Screenin2 Soil samples selected for chemical analysis' will be determined from a head-space analysis using a PID or an FID. The soil will be places in a Ziploc®- type reseal able plastic bag and allowed to reach ambient temperature, at which time the PID probe will be inserted into the bag. The total volatile hydrocarbons present are detected by the PID and reported in parts per million by volume (ppmv). A PID is calibrated by entering the known concentration (in ppmv) of a containerized gas (typically isobutylene) into the display function of the PID machine. The containerized gas release through an inert (plastic) tube into the sensory received of the PID. The PID nonnalizes its volatile organic compounds (VOC) detection sensors to match the known concentration of the gas being input into the PID machine. Soil Samnle Collection During drilling, soil samples will be collected in clean brass, two by six inch tubes, The tubes will be set in an18-Ìnch-Iong split-barrel sampler. The sampler will be conveyed to the bottom of the borehole attached to a wire-line hammer device drill rig. When possible, the split-barrel sampler will be driven its entire length, either hydraulically or by repeatedly pounding a 140- pound hammer using a 30-inch drop. The number of drops (blows) used to drive the sampler will be recorded on the boring log. The sampler will be extracted from the borehole, and the tubes containing the soil samples will be removed. Upon removal, the ends of the lowermost tube will be sealed with Teflon TM sheets and plastic caps. Soil Samples for chemical analysis will be labeled, placed on ice, and delivered to a state-certified analytical laboratory, along with the appropriate chain-of-custody documentation. Label information includes a unique sample identification number, job identification number, date, and time. After labeling, all soil and water samples are placed in a Ziploc® type bag and placed in an ice chest cooled to approximately 4°C. Upon arriving at SECOR's office, these samples are transferred to a locked refrigerator cooled to approximately 40 Celsius. Chemical preservation is controlled by the required analysis and is noted on the chain-of custody. The number of samples collected to evaluate impact to soil is determined by the overseeing registered geologist. This information and rationale is typically presented in the work plan. Stockpiled Drill Cuttin2s and Soil Samplin2 Soil generated during drilling operations will be stockpiled onsite. The stockpile will be set on and covered by plastic sheeting in a manner to prevent rain water from coming in contact with the soil. Prior to collècting soil samples, SECOR personnel will calculate the approximate volume of soil in the stockpile. The stockpile will then be divided into 50 cubic yard (volume) sections, if warranted, for sampling. Soil samples will be collected at 0.5 and 2 feet below the surface of the stockpile. Four soil samples will be collected from the stockpile and composited into one sample by the laboratory prior to analysis. The soil samples will be collected in clean brass, two by six inch tubes using a hand driven sampling device. To reduce the potential for cross-contamination between samples, the sampler will be cleaned between each sampling event. Upon recovery, the sample container will be sealed at each end with Teflon™ sheeting and plastic caps to minimize the potential of volatilization and cross-contamination prior to chemicalqanalysis. The soil sample will be labeled, placed in an ice chest cooled to 40 Celsius, and delivered to a state-certified analytical laboratory, along with the appropriate chain-of custody documentation. <. Sample Identification and Chain-of Custody Sample identification and chain-of-custody procedures document sample possession from the time of collection to ultimate disposal. Each sample container submitted for analysis has a label affixed to it to identify the job number, sampler, date and time of the sample collection, and the sample number unique to that sample. This information, in addition to a description of the sample, field measurements made, sampling methodology, names of onsite personnel, and any other pertinent field observations, are recorded on the borehole log or in the field records. A chain-of-custody form is used to record possession of the sample from the time of collection to its arrival at the laboratory. When samples are shipped, the person in custody of them relinquishes the samples by signing the chain-of custody form and noting the time. Monitorin2 Well Installation Monitoring wells will be completed by installing one two-inch-diameter Schedule 40 polyvinyl chloride (PVC) casing. The two-inch diameter monitoring wells will be installed using 8-inch diameter hollow stem augers. Monitoring wells will be constructed using threaded, factory-perforated and blank Schedule 40 PVC. The perforated interval consists of slotted casing, 0.01 or 0.02 inches wide by 1.5-inch long slots, with 42 slots per foot. The screened interval wíll allow for seasonal fluctuation in water level and for monitoring floating product. A threaded PVC cap is secured to the bottom of the casing. The well casing is thoroughly washed and/or steam cleaned, or may be purchased as pre-cleaned, prior to completion. A filter pack of graded sand will be placed in the annular space between the PVC casing and the borehole wall. Sand will be added to the borehole through the hollow stem of the augers provide a uniform filter pack around the casing and to stabilize the borehole. The sand pack will be placed to a maximum of 2 feet abÇ>ve the screens, followed by a minimum I-foot seal consisting of bentonite pellets. Cement grout containing 5 percent bentonite will be placed above the bentonite seal to the grout surface. A concrete traffic-rated vault box will be installed over the monitoring wells. A water tight locking cap will be installed over the top of the well casing. Monitoring well elevations will be surveyed by a state-certified land surveyor to the nearest 0.01 vertical feet relative to mean sea level (MSL). Horizontal coordinates of the wells will also be obtained at the same time. EQuipment Cleanin2 Sample bottles, caps, and septa used in sampling for volatile and semi volatile organics will be triple rinsed with high-purity deionized water. After being rinsed, sample bottles will be dried overnight at a temperature of 200°C. Sample caps and septa will be dried overnight at a temperature of 60°C. Sample bottles, caps, and septa will be protected from solvent contact between drying and actual use at the sampling site. Sampling containers will be used only once and discarded after analysis is complete. Plastic bottles and caps used in sampling for metals will be soaked overnight in a 1 percent nitric acid solution. Next, the bottles and caps will be triple rinsed with deionized water. Finally, the bottles and caps will be air dried before being used at the site. Plastic bottles and caps will be constructed of linear polyethylene or polypropylene. Sampling containers will be used only once and di~carded after analysis is complete. Glass and plastic bottles used by SECOR to collect groundwater samples are supplied by the laboratory. Before the sampling event is started, equipment that will be placed in the well, or will come in contact with the groundwater, will be disassembled and cleaned thoroughly with detergent water, and then steam cleaned with deionized water. Any parts that may absorb contaminants, such as plastic pump valves, etc., will be cleaned as described above or replaced. During field sampling, equipment surfaces that are placed in the well or contact groundwater will be steam cleaned with deionized water before the next well is purged or sampled. Soil samples are collected in new, pre-cleaned brass liners. These sample liners are either used by themselves, or are inserted in the sampling equipment. Soil samples are not collect with or in reusable equipment. Cone Penetrometer Tool (CPr) Testine; The CPT method consists of advancing a cone-tipped cylindrical probe (1.7 inches in diameter) into the ground while simultaneously measuring resistance to the penetration. The CPT method determines soil lithology by comparing the force (cone bearing pressure) required to advance the probe (Qt) to the friction ration (Rf) (Rf equals sleeve friction [Fs] divided by the probe tip load, times the penetration pore pressure [Ud]). Computer generated CPT logs will be plotted in the filed, providing the field representative a graphical log of subsurface soil lithology. A CPT test data report, which will include logs of all CPT technique, will submitted with the final report. CPT testing will be perfonned in accordance with American Society of Testing and Materials (ASTM) Method D3441. The cone testing will be perfonned inside of a grout collar installed at the ground surface. The grout collar will allow the CPT contractor to backfill the boring as the steel rods are retracted from the hole. Continuous grouting will prevent cross-contamination of water bearing zones that can occur through an open borehole. The boring will be backfilled to surface grade. An asphalt patch will be placed over the borehole. Direct Push Technology. Water Sampling A well-known example of the direct push technology for water sampling if the Hydropunch®. For the purpose of this field method, the tenn hydropunch will be used instead of direct push technology for water sampling. Hydropunch samples will be collected by placing a disposable steel tip on the end of a two-inch diameter rod containing five feet of disposable I-inch diameter slotted PVC casing. The sampling rods are pushed to the desire depths using the CPT truck. Depth discreet samples are obtained by retracting the rods four feet, exposing the screen at the desired sampling interval. Samples are collected by lowering a bailer inside the steel rods and recovering groundwater. Groundwater is poured from the bailer into laboratory supplied glass vials. The water samples will be labeled, placed on ice, and delivered to a state-certified laboratory along with the appropriate chain-of-custody documentation. The inside and outside of the two-inch diameter steel rods are steam cleaned between sampling events to prevent cross- contaminating groundwater samples. Soil Sampling Soil samples will be collected at the CPT locations using a retractable sampler equipped with two 1.25-inch by 6-inch brass sleeves. Soil sampling is conducted by advancing the sampler to the top of the desired sampling depth. The CPT operator subsequently retracts the rods approximately 12 inches, exposing the brass sleeves in the borehole. The sampler is then driven into the native soil. Groundwater and Liauid-Phase Petroleum Hvdrocarbon Depth Assessment A waterlhydrocarbon interface probe is used to assess the liquid-phase petroleum hydrocarbon (LPH) thickness, if present, and a water level indicator is used to measure the groundwater depth in monitoring wells that do not contain LPH. Depth to groundwater or LPH is measured from a datum point at the of each monitoring well casing. The datum point is typically a notch cut in the north side of the casing edge. If a water level indicator is used, the tip is subjectively analyzed for hydrocarbon sheen. Subiective Analvsis of Groundwater Prior to purging, a water sample is collected from the monitoring well for subjective assessment. The sample is retrieved by gently lowering a clean, disposable bailer to approximately one-half the bailer length past the air/liquid interface. The bailer is then retrieved, and the sample contained within the bailer is examined for floating LPH and the appearance of a LPH sheen. Monitorin2 Well Pur2Ín2 and Samplin2 If the depth to groundwater is above the top of the screens of the monitoring well, then the wells are purged. Monitoring wells are purged using an electrical submersible pump or bailer until pH, temperature, and conductivity of the [urge water has stabilized and a minimum of three well volumes of water have been removed. Wells are typically purged at a rate of I gallon per minute (gpm), though will not exceed 2 gpm. If three well volumes can not be removed in one half hour's time the well is allowed to recharge to 80% of the original level. After recharging, a groundwater sample is then removed from each of the wells using a disposable bailer. Groundwater purged from the monitoring wells typically transported to a holding facility in West Sacramento. A Teflon bailer will be the only equipment used for well sampling. When samples for volatile organic analysis are being collected, the flow of groundwater from the bailer will be regulated to minimize turbulence and aeration. Glass bottles of at least 40-milliliters volume and fitted with Teflon TM_ lined septa will be used is sampling volatile organics. These bottles will be filled completely to prevent air from remaining in the bottle. A positive meniscus forms when the bottle is full. A convex Teflon™ septum will be placed over the positive meniscus to eliminate air. After the bottle is capped, it is inverted and tapped to verify that it contains no air bubbles. The sample containers for other parameters will be filled, filtered as required, and capped. The water sample is collected, labeled, and handled according to the Quality Assurance Plan. Water generated during the monitoring events is disposed of at approved water recycling facilities. Quality Assurance Plan Procedures to provide data quality have been established and documented so that conditions adverse to quality, such as deficiencies, deviations, defective material, services, and/or equipment, can be identified and corrected. Internal Qualitv Assurance Checks Internal quality assurance procedures will be used to provide reliability of monitoring and measurement of data. Both field and laboratory quality assurance checks as listed below will be used to evaluate the reliability of sampling and analysis results. Tables 1 through 7 present data qualìty indicators (DQI) used by the laboratory to meet internal quality assurance procedures. Internal quality assurance procedures generally include: Laboratory Quality Assurance · Documentation of instrument performance checks, Documentation of instrument calibration, · · Documentation of traceability of instrument standards, samples, and data, and · Documentation of analytical and QC methodology (QC methodology includes use of spiked samples, duplicate samples, split samples, use of reference blanks, and checked standards to check method accuracy and precision). Field Quality Assurance SECOR has developed field DQIs which are attached. In addition to the DQIs the following internal checks will also be conducted: . Documentation of sample preservation and transportation, and . Documentation of field instrument calibration and irregularities III performance. General Sample Collection and Handlin2 Procedures Proper collection and handling are essential to ensure the quality of the sample. Each sample is collected in a suitable container, preserved correctly for the intended analysis, and stored prior to analysis for no longer than the maximum allowable holding time. Details on the procedures for collection and handling of samples used on this project can be found in this section and in the attached DQI tables. Soil and Water Sample Labelin2 and Preservation Label information includes a unique sample identification number, job identification number, date, and time. After labeling, all soil and water samples are placed in a Ziploc® type bag and placed in an ice chest cooled to approximately 4°C. Chemical preservation is controlled by the required analysis and is noted on the chain-of-custody form. Trip blanks supplied by the laboratory accompany the groundwater sample containers and groundwater samples. Upon recovery, the sample container is sealed to minimize the potential volatilization and cross- contamination prior to chemical analysis. Soil sampling tubes are typically closed at each end with Teflon TM sheeting and plastic caps. The sample is then placed in a Ziploc® type bag and sealed. The sample is labeled and refrigerated at approximately 4° Celsius for delivery, under strict chain-of-custody, to the analytical laboratory. Chain of Custody The chain-of-custody form is used to record possession of the sample from the time of collection to its arrival at the laboratory. When samples are shipped, the person in custody of them relinquishes the samples by signing the chain-of-custody form and noting the time. The sample- control officer at the laboratory verifies sample integrity and conforms that the samples are collected in the proper containers, preserved correctly, and contain adequate volumes for analysis. These conditions are noted on a Laboratory Sample Receipt Checklist (see attached) which will be included in the laboratory report. If these conditions are met, each sample is assigned a unique log number for identification throughout analysis and reporting. The log number is recorded on the chain-of-custody fonn and in the legally-required log book maintained by the laboratory. The sample description, date received, client's name, and other relevant infonnation is recorded. Analvtical Methods Soil and groundwater samples collected during exploratory sire investigation activities and development and sampling of monitoring wells, will be analyzed under a standard lO-day turnaround time. Samples are analyzed using analytical methods outlined in EP A Manual SW 846 and approved by the California Regional Water Quality Control Board- Central Coast Region in the Leaking Underground Fuel Tanks (LUFT) manual and appendices. Samples collected during the investigation of petroleum hydrocarbon impacted sites are typically analyzed for total petroleum hydrocarbons ([CZ-C12 range] TPHG by U.S. EPA Method 8015. Benzene, Toluene, ethyl benzene, and total xylenes (BTEX) are analyzed using U.S. EPA Method 8020/8021. The attached DQI tables present the state-certified laboratory's calibration and quality assurance procedures for the above mentioned analytical methods. Internal laboratory quality assurance checks will be the responsibility of the contract laboratories. Data and reports submitted by field personnel and the contract laboratory will be reviewed and maintained in the project files. Data Review and Verification Data quality indicator parameters will be evaluated by the contract state-certified laboratory against the frequency and acceptance criteria described in the Lab DQI Tables. Data that are out of compliance with the laboratory criteria will be flagged in the laboratory analytical report and will be identified in the report summary table. SECOR will evaluate the field procedures against the frequency and acceptance criteria identified in the field DQI, Table. The overseeing registered professional will review field documentation (boring logs, sampling sheets, Chain-of- Custody documents, lab sample receipt fonns, etc.,) and identify relevant issues/problems that effect data and overall applicability. DATA QUALITY INDICATORS FOR TOTAL PETROLEUM HYDROCARBONS (TPH) as Gasoline and Diesel SW-846 Method 8015B Table IA. Summary of Required Quantitation Limits. Holding Times. and Preservation for Total Petroleum Hydrocarbons (TPH) as Gasoline and Diesel Analytical Parameter a Technical Holding Times Preservation Total Petrolewn 14 days from collection HCI or H2S04 to pH<2; Hydrocarbons (TPH) as Cool to 4°C ±2°C Gasoline in Water Samples TPH as Gasoline in Soil 14 days fÌ'om collection Cool to 4°C ±2°C; sealed zero Samples headspace containers TPH as Diesel in Water Extraction: 14 days fÌ'om collection; HCI or H2S04 to pH<2; Samples Analvsis: 40 days fÌ'om extraction Cool to 4°C ±2°C TPH as Diesel in Soil Extraction: 14 days from collection; Cool to 4°C ±2°C Samples Analvsis: 40 days from extraction ~ Individual target compounds are listed in Table lB. Data Calculations and Reporting Units: Calculate the sample results using calibration factors determined according to Sections 7.7.2 of Method 80lSB and 7.4.2 and 7.8.1 ofSW-846 Method 8000A. Report water sample results in concentration units ofmiUigrams per liter (mgIL). Report soil sample results on a dry- weight basis in mimgrams per kilogram (mglkg). For rounding results, adhere to the following rules: a) If the number following those to be retained is less than 5, round down; b) If the number following those to be retained is greater than 5, round up; or c) If the number following the last digit to be retained is equal to 5, round down if the digit is even, or round up if the digit is odd. All records of analysis and calculations must be legible and sufficient to recalculate all sample concentrations and QC results. 8015DQI 08/10/01 lof3 Table 1 b. Target Compound List and Required Detection Limits (RQL) for SW-846 Method 8015B COMPOUND RQL Water mg/L RQL Soil mglkg Gasoline - Purge and Trap 0.5 10 Gasoline - Headspace 5.0 5 Diesel 0.5 10 Table 2. Summary of Calibration Procedures for Tetal Petroleum Hydrecarbens (TPH) as Gaseline and Diesel by SW-846 Method 8015B Calibration Element Frequen~y A~~eptan~e Criteria Corrective Action Initial Calibration (nùnimum Initially; whenever RSD for CFs S20%; 1. Tenninate analysis blank + 5 points for each required, due to failure of or, ifusing a linear calibration 2. Re-calibrate and verify before sample analysis analyte) (ICAL) ..b.c CCV curve, a correlation coefficient (r) of~.99 for each compound Continuing Calibration Beginning of each 12 hour %D between calculated amount 1. Re-calibrate and verify Verification (CCV)at midpoint time period, after every 10 and nominal amount within ±25% 2. Re-analyze samples back to last good CCV ofICAL samples and end of run Retention time evaluation CCV Each analysis of CCV ±3 x the SD of the avg ICAL RT 1. Re-calibrate and verify standards standards for surrogate, See footnote C for 2. Re-analyze samples back to last good IPC GRO and DRO a ThelCAL low standard must be above but near the RQL. The low ICAL standard must have a signal to noise ratio of~5:1. If this requirement cannot be met, the laboratory must submit a MDL study as part of the data package. b Gasoline Range Organics (GRO): C6-C10; Diesel Range Organics (DRO): Cto-C28 C Establish and report retention tit.ne (RT) windows for GRO and DRO as described in Section 7.4 of Method 8015B and 7.6 of Method 8000B. Calculate RT windows for GRO and DRO based on the lower lioút of the RT window for the first eluting component and the upper limit of the RT window for the last eluting component. Detennine RT windows for surrogate compounds as ±3 x the standard deviation (SD) of the average ICAL RT for each analyte. 8015DQI 08/1 % 1 2of3 Table 3. Summary of Internal Quality Control Procedures for Total Petroleum Hydrocarbons (TPH) as Gasoline and Diesel by SW-846 Method 801 5B QC Element Frequency Acceptance Criteria Corrective Action Method Blank (MB) Gasoline: One per each 12 hour < RQL for each compound 1. Investigate/correct the source of contamination and , time period and after unusually document. concentrated samples 2. Reanalyze all samples with analytes > RQL processed Diesel: One per Batch or SDGa (1 with a blank that is out of control. per 20 samples minimum) and for each instrument used Instrument Blank (IB) After any sample exceeds the < RQL for each compound 1. Correct memory effects prior to continuing analyses. caJibration range Surrogate Spike b Every sample and MB at midpoint Water Samoles: 1. Re-analyze all samples with non-compliant surrogate of caJibration range 75-125% of expected value recoveries Soil Samples: 60-125% of expected value Matrix Spike and Matrix One MS/MSD set per batch or 65-135% of expected value; 1. Report in case narrative Spike Duplicate SDG (1 MS/MSD set per 20 30 RPD between MS and (MS/MSD) samples minimum) MSD Laboratory Control Gasoline: one each 12-hour 80-120% of expected value 1. Investigate the source of problem and document. Sample (LCS) period; 2. IfLCS is high. reanalyze all samples with analytes > Diesel: one per Batch or SDG RQL processed with a LCS that is out of control. 3. IfLCS is low, reanalyze all samples processed with a LCS that is out of control. · SDG - Sample Delivery Group - each case offield samples received; or each 20 field samples within a case; or each 14 calendar day period during which field samples in a case are received. b Surrogates for ORO: 4-bromofluorobenzene and 1,1, I-trifluorotoluene; Surrogate for DRO: hexacosane or ortbo-terphenyl Dilute and reanalyze samples with oile or more analytes at concentrations exceeding the range of the calibration curve. Results for such reanalyses should fall within the mid-range of the calibration curve. Report results and submit documentation for both analyses. 801SDQI 08/10/01 30f3 DATA QUALITY INDICATORS FOR HALOGENATED AND AROMATIC VOLA TILE ORGANIC COMPOUNDS (VOCs) BY GAS CHROMATOGRAPHY SW -846 MethodS 801 OA and 8020A or Method 8021A Table lA. Summary of Holding Times and Preservation for Halogenated and Aromatic Volatile Organic Compounds by Gas Chromatography Analytical Parameter I Technical Holding Times Preservation . Volatile Organic 14 days nom collection HCl to pH <2; Compounds (VOCs) in Cool to 4°C ±2°C Water VOCs in Soil 14 days from collection Cool to 4°C ±2°C; sealed zero headspace containers I Individual target compounds are listed in Table lB. Data Calculations and Reporting Units: Calculate the calibration factors (CFs) and the concentration of individual analytes according to the equations specified in Sections 7.4.2 and 7.10.1, respectively, of Method 8000B. Report water sample results in concentration units ofmicrograms per liter (µgIL). Report soil sample results on a dry~weight basis in micrograms per kilogram (µglkg). Report percent solid and percent moisture to the nearest whole percentage point. For rounding results, adhere to the following rules: a) If the number follovlÍng those to be retafued is less than 5, round down; b) If the number following those to be retained is greater than 5, round up; or c) If the number following the last digit to be retained is equal to 5, rQund down if the digit is even, or round up if the digit is odd. All records of analysis and calculations must be legible and sufficient to recalculate all sample concentrations and QC results. 8021DQI 08/1 % 1 lofS I ' Table lB. Target Compound List. CAS Numbers. and Required Quantitation Limits for Halogenated Volatile Organic Compounds by Gas Chromatography SW-846 Method 80lOA or8021A , Compound CAS Number RQLµgIL RQL µg/Kg Benzyl chloride 100-44-7 1 5 Bromobenzene 108-86-1 1 5 BromodicWoromethane 75-27-4 1 5 Bromoform 75-25-2 1 5 Bromomethane 74-83-9 1 5 Carbon tetrachloride 56-23-5 1 5 Chloroethane 75-00-3 1 5 2-Chloroethylvinylether 110-75-8 1 5 Chloroform 67-66-3 1 5 Chloromethane 74-87-3 1 5 DibromochIoromethane 124-48-1 1 5 Dibromomethane 74-95-3 1 5 Dicblorodifluoromethane 75-71-8 1 5 1,I-DichIoroethane 75-34-3 1 5 1,2-Dichloroethane 107-06-2 1 5 1,I-Dichloroethene 75-35-4 1 5 trans-l,2-DichIoroethene 156-60-5 1 5 1,2-Dichloropropane 78-87-5 1 5 cis-I,3-Dichloropropene 10061-01-5 1 5 trans-l,3-Dichloropropene 10061-02-6 1 5 Methylene chloride 75-09-2 5 25 1,1,2,2- Tetrachloroethane 79-34-5 1 5 1,1,1,2- Tetrachloroethane 630-20-6 1 5 Tetrachloroethene 127-18-4 I 5 1,1,1- Trichloroethane 71-55-6 1 5 8021DQI 08/10/01 2of5 Table lB. (Cont) Compound CAS Number RQLµg/L RQL µg/Kg' 1,1,2- Trichloroethane 79-00-5 1 5 Trichloroethene 79-01-6 1 5 Trichlorofluoromethane 75-69-4 1 5 1,2,3- Trich1oropropane 96-18-4 1 5 Vinyl chloride 75-01-4 1 5 , Additional Compounds: 1,2-Dibromo-3-chloropropane 96-12-8 1 5 1,2-Dibromoethane 106-93-4 1 5 1,3-Dichloropropane 142-28-9 1 5 Dichlorofluoromethane 75-43-4 1 5 Table Ie. Target Compound List. CAS Numbers. and Required Quantitation Limits for Aromatic Volatile Organic Compounds by Gas Chromatography SW-846 Method 8020A or 802 I A Compound CAS Number RQLµgIL RQL µglKg Benzene 71-43-2 1 5 Chlorobenzene 108-90-7 1 5 1.2-Dichlorobenzene 95-50-1 I 5 1.3-Dichlorobenzene 541-73-1 I 5 lA-Dichlorobenzene 106-46-7 1 5 Ethvlbenzene 100-41-4 1 5 Toluene 108-88-3 1 5' Xvlenes. mixed 1330-20-7 1 5 8021DQI 08/10/01 30f5 ~ Table 2. Summary of Calibration Procedures for Halogenated and Aromatic Volatile Organic Compounds by Gas Chromatography Calibratio.n Element Acce tance Criteria Corrective Action Initial Calibration (minimum blank + 5 points for each analyte) (ICAL)a.b,e Initially; whenever required, due to failure of CCV RSD for CFs ~30%; or, correlation coefficient (r) oflinear regression 2:0.99 1. Tenninate analysis 2. Reca1ibrate and verify before sample analysis Continuing Calibration Verification CC Daily, every 12-hour, every ten s 'les, and end of run %D between CF of CCV and avg CFs from ICAL <±25% 1. Recalibrate and verify 2. Reanal s les back to last ood CCV Retention time evaluation of CCVstandards Each analysis of CCV standard ±3 x the SD of the avg ICAL RT for each anal e I. Re-calibrate and verify 2. Re-anal e sa les back to last ood CCV a The ICAL low standard must be above but near the RQL. The low ICAL standard must have a signal to noise ratio of ~5: 1. If this requirement cannot be met, the laboratory must submit a MDL study as part of the data package. b ICAL and continuing CAL standards must contain all target analytes listed in Table IB. e Report the retention time window for each analyte. Determine retention time windo~ as ±3 x the standard deviation of the average initial calibration retention time for each analyte. 8021DQI 08/10/01 40f5 Table 3. Summary of Internal Quality Control Procedures for Halogenated and Aromatic Volatile Organic Compounds by Gas Chromatography QC Element Frequency Acceptance Criteria Corrective Action Method Blank (MB) Each 12·hour túne period, < RQL for each compound I. Investigate/correct the source of contamination minimum of one per SDG a and document. 2. Reanalyze aU samples with analytes > RQL processed with a blank that is out of control. Instrument Blank After any sample which < RQL for each compound I. Correct memory effects prior to continuing contains a target compound analyses concentration >50 ppb Matrix Spike and One MS/MSD set per batch Water Sample: 75-125% of expected value; I. Report in case narrative Matrix Spike Duplicate or SDG (I MS/MSD set per (MS/MSD) C 20 samples minimum) Soil Sample: 65-135% of expected value; ~O% RPD between MS and MSD Surrogate Spikes b Every sample, standard and Water Sample: 75-125% of expected value 1. Reanalyze all samples with non-compliant method blank surrogate recoveries unless there is obvious matrix Soil Sample: 65-135% of expected value interference Laboratory. Control One per SDG Water Sample: 70-130% of expected value 1. Investigate the source of problem and Sample (LCS) document. Soil Sample: 65-135% of expected value 2. If LCS is high, reanalyze all samples with analytes > RQL processed with a LCS that is out of control. 3. IfLCS is low, reanalyze all samples processed with a LCS that is out of control. a SDG - Sample Delivery Group - each case offield samples received; or each 20 field samples within a case; or each 14 calendar day period during which field samples in a case are received. b Surrogates for halogenated compounds: 50 ng of one of the following three compounds: bromochlormethane, 2-bromo-I-chloropropane, or 1,4-dichlorobutam:. Surrogates for aromatic compoWlds: SO ng of one of the following two compoun~: l,I,I-trifluorotoluene and 4-bromofluorobenzene (BFB). C Spike MS/MSD with 10 ppb of the following halogenated and aromatic VOCs: 1,I-dich1oroethene, trichloroethene, chlorobenzene, toluene, and benzem:. Dilute and reanalyze samples which contain one or more target analytes at concentrations above the initial calibration range. Results for such reanalyses should fall within the mid-range of the calibration curve. Report results and submit documentation for both analyses. Second column confumation is required for all positive results. Confumation must be performed on a column of a phase different fÌom that used for quantitation. Confinnation analyses must meet all calibration criteria specified in Table 2 and blank acceptance criteria specified in Table 3. 8021DQI 08/10/01 SofS DATA QUALITY INDICATORS FOR VOLATILE ORGANIC COMPOUNDS (VOCs) SW -846 Method 8260 Table J A. Summary of Holding Times and Preservation for Volatile Organic Compounds by Gas Chromatography/Mass Spectrometry Analytical Parameter a Technical Holding Times Preservation Volatile Organic 14 days from collection HCI to pH <2; Compounds (VOCs) in Cool to 4°C ±2°C Water VOCs in Soil 14 days ftom col1ection Cool to 4°C ±2°C; sealed zero headspace containers a Individual target compounds are listed in Table lB. Data Calculations and Reporting Units: Calculate the response factor (RF) and the concentration of individual analytes according to the equations specified in Sections 7.3.4 of Method 8260. Report water sample results in concentration units ofnúcrograms per liter (µgIL). Repon soil sample results on a dry-weight basis in nùcrograms per kilogram (µg/kg). Report percent solid and percent moisture to the nearest whole percentage point. For rounding results, adhere to the fol1owing rules: a) If the number following those to be retained is less than 5, round down; b) If the number following those to be retained is greater than 5, round up; or c) If the number following the last digit to be retained is equal to 5, round down if the digit is even, or round up if the digit is odd. All records of analysis and calculations must be legible and sufficient to recalculate aU sample concentrations and QC results. 8260DQI 08/10/01 10f6 Table lB. Target Compound List, CAS Numbers. and Required Quantitation Limits for Volatile Organic Compounds by Method 8260 Analyte CAS Number RQLµg/L RQL µg/Kg Benzene 71-43-2 1 5 Bromobenzene 108-86-1 1 5 Bromochloromethane 74-97-5 1 5 Bromodichloromethane 75-27-4 1 5 Bromofonn 75-25-2 1 5 Bromomethane 74-83-9 1 5 n-Butylbenzene 104-51-8 1 5 sec-Butylbenzene 135-98-8 1 5 tert-Butylbenzene . 98-06-6 1 5 Carbon tetrachloride 56-23-5 1 5 Chlorobenzene 108-90-7 1 5 Chlorodibromomethane 124-48-1 1 5 Chloroethane 75-00-3 1 5 Chlorofonn 67-66-3 l' 5 Chloromethane 74-87-3 1 5 2-Chlorotoluene 95-49-8 1 5 4-Ch1orotoluene 106-43-4 1 5 1.2-Dibromo-3-chloropropane 96-12-8 1 5 1,2-Dibromoethane 106-93-4 1 5 Dibromomethane 74-95-3 1 5 1.2-Dichlorobenzene 95-50-1 1 5 1.3-Dichlorobenzene 541-73-1 1 5 1,4-Dichlorobenzene 106-46-7 1 5 Dichlorodifluorometbane 75-71-8 1 5 l,l-Dichloroetbane 75-34-3 1 5 l,2-Dich1oroethane 107-06-2 1 5 8260DQI 08/10/01 20f6 Analyte CAS Number RQLµg/L RQL µglKg 1,I-Diclùoroethene 75-35-4 I 5 cis-l,2-Dichloroethene 156-59-2 1 5 trans-l,2-Dichloroethene 156-60-5 1 5 Dichlorofluoromethane 75-43-4 I 5 1,2- Dichloropropane 78-87·5 1 5 '2,2-Dichloropropane 594-20-7 1 5 1,3-Dichloropropane 142-28-9 1 5 1,I-Dichloropropene 563-58-6 1 5 Diisopropyl ether 108-20-3 1 5 Ethylbenzene 100-41-4 I 5 , Hexachlorobutadiene . 87-68-3 1 5 Isopropylbenzene 98-82-8 1 5 p-Isopropyltoluene 99..;87 -8 1 5 Methyl-t-butyl ether 163-40-44 1 5 Methylene chloride 75-09-2 1 5 Naphthalene 91-20-3 1 5 n-Propylbenzene 103-65-1 1 5 Styrene 100-42-5 1 5 tert-Amyl methyl ether 994-05-8 1 5 tert-Butyl alcohol 75-65-0 SO 250 tert-Butyl ethyl ether 637-92-3 1 5 1,1,1,2- Tetrachloroethane 630-20-6 1 5 1,I,2,2-Tetrachloroetbane 79-34-5 1 5 Tetrachloroethene 127-18-4 1 5 Toluene 108-88-3 1 5 1,2,4- Trichlorobenzene 120-82-1 1 5 1,2,3- Trichlorobenzene 87-61-6 1 5 1,1,1- Trichloroethane 71-55-6 1 5 8260DQI 08/10/0 I 30f6 Aoalyte CAS Number RQLµgIL RQL µg/Kg 1,1,2- Trichloroethane 79-00-5 1 5 Trichloroethene 79-01-6 1 5 Trichlorofluoromethane 75-69-4 1 5 1,2,3- Trich1oropropane 96-18-4 1 5 1,2,4- Trimethylbenzene 95-63-6 1 5 1,3,5- Trimethylbenzene 108-67 -8 1 5 Vinyl chloride 75-01-4 1 5 o-Xylene 95-47-6 1 5 m-Xylene 108-38-3 1 5 p-Xylene 106-42-3 1 5 Xylenes, mixed 1330-20-7 1 5 8260DQI 08/10/01 40f6 Table 2. Summary of Calibration Procedures for roes by SW-846 Method 8260 . Calibration Element FreQuency Acceptance Criteria Corrective Action GC/MS Tuning with BFB Beginning of each 12 hour Ion abundance criteria in Table 4 of I. Identify the problem. period during which standards Method 8260 2. MS tune criteria must be met before any samples are analyzed calibration standards, samples, blanks, or QC samples are analyzed Initial Calibration (minimum Initially; whenever required, due RSD for RFs $20%; I. Terminate analysis blank + 5 points for each to failure of cev 2. Recalibrate and verify before sample analyte) (ICALt·b.c analvsis Continuing Calibration Following lev, every 12-hour, %D between RF ofCev and avg RFs 1. Recalibrate and verify Verification (CCV) and end of roo from ICAL ~IS% 2. Reanalyze samples back to last good CCV System Performance Check With ICAL or CCV RF for chloromethane, I,l- l. Terminate analysis Compound (SPCC) dichloroethane, bromofonn, ~O.l 0; 2. Recalibrate and verify before sample chlorobenzene, 1,1,2,2- analysis tetrachloroethane, ~.30 Calibration Check Compounds With ICAL or CCV RSD for RFs s30% 1. Terminate analysis (CCC) 2. Recalibrate and verify before sample analysis Internal Standards Each analysis of CCV -so to +100% I. Re-analyze all samples analyzed while system was out-of-control Retention:time evaluation of Each analysis of cev standard ±3 x the SD of the avg ICAL RT for I. Re-calibrate and verify cev standards each ånalvte 2. Re-analvze samples back to last good CCV · The ICALlowstandard must be above but near the RQL. The low ICAL standard must have a signal to noise ratio of~5:1. If this requirement cannot be met, the laboratory must submit a MDL study as part of the data package. b ICAL and continuing CAL standards must contain all target analytes listed in Table lB. c Report the retention time window for each analyte. Determine retention time windows as ±3 x the standard deviation of the average initial calibration retention time for each analyte. 8260DQI 08/10/0 I Sof6 " Table 3. Summary of Internal Quality Control Procedures for VOCS by SW-846 Method 8260 QC Element Frequency Acceptance Criteria Corrective Action Method Blank (MB) Each 12-hour time period, < RQL for each compound I. Investigate/correct the source of contamination minimum of one per SDG · and document. 2. Reanalyze all samples with analytes > RQL processed with a blank that is out of control. Instnunent Blank (m) After any sample exceeds < RQL for each compound I. Correct memory effects prior to continuing the calibration range analyses Matrix Spike and One MSIMSD set per batch Water Sample: 65-135% of expected value; I. Report in case narrative Matrix Spike Duplicate or SDG (1 MSIMSD set per ~O% RPD between MS and MSD (MSIMSD) 20 samples minimum) Soil Sample: 50-] 50% of expected value; S500.4 RPD between MS and MSD Surrogate Spikes b Every sample, standard and Water Sample: 85-115% except for . 1. Reanalyze all samples with non-compliant method blank 1,2-dichloroethane (75-115%) of expected surrogate recoveries unless there is obvious matrix value interference Soil Samnle: 70-]25% of expected value Laboratory Control One per SDG Water Sample: 70-130% of expected value I. Investigate the source of problem and Sample (LCS) document. Soil Sample: 65-135% of expected value 2. IfLCS is high, reanalyze all samples with analytes > RQL processed with a LCS that is out of control. 3. IfLCS is low, reanalyze all samples processed with a LCS that is out of control. · SDG - Sample Delivery Group - each case offield samples received; or each 20 field samples within a case; or each 14 calendar day period during which field samples in a case are received. b Toluene-ds, BFB, 1,2-dichloroetbane-d., and Dibromofluorometbane Dilute and reanalyze samples which contain one or more target analytes at concentrations above the initial calibration range. Results for such reanalyses should faU within the mid-range of the cah"bration curve. Report results and submit documentation for both analyses. 8260DQI 08/10/01 6of6 a . . DATA QUALITY INDICATORS FIELD PROCEDURES AND CONDmONS Table 1 Summary of Field Data Quality IndicaJors QC Element Frequency Acceptance Criteria Corrective Action Equipment (Rinsate) One per 20 samples; minimum of 1 < RQL for each compound Investigate the source of contamination and document. Blank (EB) per sample matrix Correct samplinglhandling protocols. Resample if associated data validation action is not acceptable for affected samples. Trip Blank (TB) One per VOC cooler. Analyze if < RQL for each compound Investigate the source of contamination and document. contamination is dðtected in EB. Correct samplinglhandling protocols. Resample if associated data validation action is not acceptable for affected samnles. Bottle Blank (BB) One per lot of sample bottles. < RQL for each compound Investigate the source of contamination and document. Analyze if contamination is detected Correct samplinglhandling protocols. Resa01ple if inEB. associated data validation action is not acceptable for affected sanmles. Field Duplicate One per 20 samples; minimum of 1 a Investigate source of variability and document. Correct per sample matrix. Water Sa1I1P1e: S;30% RPD sampling protocols, unless a matrix effect is indicated. Soil Sample: s;50% RPD Resample if a matrix effect is not indicated and associated data validation action is not acceptable for affected samnles. Review of field NA ProfessioÌ1al Judgment Investigate, document, and correct samplinglhandling noteslboring logs, protocols, as appropriate. Resample if associated data chain of custody validation action is not acceptable for affected documentation, and samples. laboratory sample receipt documentation a RPD=lOOx XI -X2 (XI + x2)/2 FieldDQI 08/tO/Ot 10ft \ '. VALIDATION TABLES ., ~ DATA VALIDATION PARAMETERS AND CRITERIA Table I Summary of Data Validation Parameters Data Validation Means of Assessment Acceptance Criteria Validation Action Parameter Preservation and Holding Check chain of custo~y records, See DQI Tables 1. If improperly preserved, qualify as estimated Times field records, and lab records (indicated by a "J" following the value in the data summary table) all positive detects (+) and reject (R) all nondetect (-) results. 2. Ifholding times exceeded, but sample properly preserved, J all (+) and UJ all (-) results if analyzed in 28 days; if> 28 days, RaIl (-) results. Lab Blanks: Check that blanks were analyzed < Required Quantitation Limit 1. If result > 5x blank, no action. 1. Method Biank (MB) at the appropriate frequency (see (RQL) for each compound 2. If result < 5x blank, but> required quantitation limit 2. Instrument Blank (IB) DQI Tables); compare results to (RQL), report as undetected (U) at result level. acceptance criteria 3. Use lOx for common laboratory contaminants (acetone, methylene chloride). 4. If gross contamination> lOx RQL exists, R all affected compounds in samples associated with that blank. Surrogate Spikes Check that all samples and blanks See DQI Tables I. If any percent recovery> acceptance criteria, J (+) were properly spiked; compare results and accept (-) results. results to acceptance criteria 2. If any percent recovery < acceptance criteria but> 10%, J (+) results and UJ (-) results. 3. If any percent recovery < 10%, J (+) results and R (-) results. Validation 8/1 % 1 lof4 .. ~ Data Validation Means of Assessment Acceptance Criteria Validation Action Parameter Matrix SpikelMatrix Check that MSIMSDs were See DQI Tables 1. If any percent recovery> acceptance criteria, J (+) Spike Duplicate analyzed at the appropriate results and accept ( -) results associated with the (MSIMSD) frequency (see DQI Tables); MSIMSD. compare results to acceptance 2. If any percent recovery < acceptance criteria but> criteria 10%, J (+) results and UJ (-) results associated with the MSIMSD. 3. If any percent recovery < 10%, J (+) results and R (-) results associated with the MSIMSD. 4. IfRPD outside limits, J (+) results and UJ (-) results associated with the MSIMSD. Laboratory Control Check that LCSs were analyzed at See DQI Tables 1. If any percent recovery> acceptance criteria, J (+) Sample (LCS) the appropriate frequency (see results and accept (-) results associated with the LCS. DQI Tables); compare results to 2. If any percent recovery < acceptance criteria but> acceptance criteria 10%, J (+) results and UJ (-) results associated with the LCS. 3. If any percent recovery < 10%, J (+) results and R (-) results associated with the LCS. Validation 8/10/0 I 20f4 .; -v Data Validation Means of Assessment Acceptance Criteria Validation Action Parameter Field Blanks: Check that blanks were analyzed < RQL for each compound Water Sample: 1. Equipment (Rinsate) at the appropriate frequency (see 1. If result > 5x blank, no action. Blank (EB) DQI Tables); compare resulls to 2. Ifresult < 5x blank, but> RQL, report associated 2. Trip Blank (TB) acceptance criteria samples as undetected (U) at result level. 3. Bottle Blank (BB) 3. Use lOx for common laboratory contaminants (acetone, methylene chloride). 4. If gross contamination> lOx RQL exists, R all affected compounds in samples associated with that blank. Soil Sample: 1. Ifcontamination exists, flag (EB, TB, or BB) all affected compounds in samples associated with that blank. 2. The degree of "sampling error" that this flagged sample result represents will be left to the detennination of the end user. Field Duplicates Check that field duplicates were a Detection in Both Samples: Water Sample: ~O% RPD analyzed at the appropriate 1. If results ~ 2X quantitation limit (QL) in both, and frequency (see DQI Tables); Soil Sample: ~50% RPD RPD > acceptance criteria, J the result in both compare results to acceptance samples. criteria 2. Ifresult < 2X QL in one or both samples, and RPD > acceptance criteria, use professional judgment to accept (A) or qualify (J or UJ) results, taking into consideration the increased variability of data near QL. 3. If precision data for the field duplicate pair, surrogate compound recoveries, and laboratory MS/MSD indicate an extremely heterogeneous matrix at the site or potential sampling error, professional judgment should be utilized to apply field duplicate actions to all samples of the same matrix. Validation 8/10/01 30f4 I '- Data Validation Means of Assessment Acceptance Criteria Validation Action Parameter Detection in Only One Sample: 1. Do not evaluate based on RPDs. 2. Ifresult of(+) result ~ 2X QL, qualify (J or VJ) results in both samples. 3. Ifresult of(+) result < 2X QL, use professional judgment to accept (A) or qualify (J or UJ) results, taking into consideration the increased variability of data near QL. 4. If precision data for the field duplicate pair, surrogate compound recoveries, and laboratory MSIMSD indicate an extremely heterogeneous matrix at the site or potential sampling error, professional judgment should be utilized to apply field duplicate actions to an samoles of the same matrix. Review offield NA Professional Judgment I. Accept (A), qualify (1), or reject (R) results, as noteslboring logs, chain appropriate. of custody 2. Examples of situations where qualification or documentation, and rejection of results should be considered include, but laboratory sample receipt are not limited to: volatile analysis of coarse-grained documentation ,- materials, compromised sample containers, sample headspace, etc. a RPD= 100x XI - X2 (XI + x2)/2 Validation 8/10/01 40f4