HomeMy WebLinkAboutMITIGATION
'«
1........... ~...
SECOR
International Incorporated
July 31, 2002
Project 77TO.61270.00.0106
Mr. John Whiting
California Regional Water Quality Control Board
3614 East Ashlan Avenue
Fresno, California 93726
Re: Work Plan for Site Assessment
Tosco Station #1270
5634 Stine Road
Bakersfield, California
Dear Mr. Whiting:
This letter has been prepared by SECOR International Incorporated (SECOR) on behalf
of Tosco Corporation (Tosco), a subsidiary of Phillips Petroleum Company, and
presents a work plan for site assessment at the site referenced above (Figures 1 and 2).
The work plan is being submitted in response to Regional Water Quality Control
Board's (RWQCB) letter dated June 3, 2002 (Attachment A). The purpose of this
assessment is to delineate the vertical extent of petroleum hydrocarbons in soil b~neath
the former underground storage tanks (USTs). This work plan also includes a b,nef
discussion of site background and previous investigations, proposed scope of )(1ork,
quality assurance plan, health and safety plan, and schedule. .
SITE BACKGROUND
The site is located at the northeast comer of Harris Road and Stine Road in Bakersfield,
California. The site is currently occupied by an active gasoline service station and
Circle K store with fueling facilities that include one 20,000-gallon gasoline and one
12,000-gallon gasoline USTs, and associated prpduct lines and dispensers.
The former fueling facility consisted of three 1O,000-gallon gasoline USTs and one
dispenser island that were located in the southwest portion of the site (Attachment B,
Figure 2). Initial site assessment was conducted in December 1996. Six soil
borings/vapor wells: SE-1 through SE-5 and SE-7, were installed around the former
UST. Total petroleum hydrocarbons as gasoline(TPHg), benzene, and MtBE were
detected in the soil boring samples collected down to 22.5 feet below grade surface with
a maximum concentration of 3 mg/kg, 0.2 mglkg, and 9 mglkg, respectively. Copies of
the soil sample data table, site plan, cross sections, and one soil boring log are included
in Attachment B.
3017 Kilgore Road, Suite 100, Rancho Cordova, CA 95670 9/6.86/,0400 9/6.86/,0430 Fax www.secor.com
....
~... - .
Phillips 66 Company
Tosco #1270,5634 Stine Road, Bakersfield, CA
2
July 31, 2002
The USTs, dispensers, and associated piping were removed and replaced in 1998. The
two new USTs were installed in common tank pit located in the southeast portion of the
site. Following removal of the USTs, soil samples were collected from beneath the
USTs at depths ranging from 16 to 20 feet below ground surface (bgs) and beneath the
dispenser at 2 and 6 feet bgs. Approximately 150 cubic yards of impacted soil were
excavated and disposed of off-site. TPHg, BTEX, and MtBE were reported in soil
samples collected from beneath the UST at maximum concentrations of 15,300 mglkg,
30.5 mglkg, and 281 mglkg, respectively. Soil analytical results and a map with sample
locations are included in Attachment B.
A request for site closure was submitted on February 1, 1999 to the City of Bakersfield-
Fire Department(CBFD). In a letter dated July 6, 1999, the CBFD determined that
corrective action had been completed, and that no further investigation or remedial
action was required. The RWQCB reviewed the request for closure and, in letter dated
June 3, 2002, requested a work plan be submitted to define the vertical extent of TPHg
and MtBE in soil underlying the former USTs.
PROPOSED SCOPE OF WORK
The scope of work for this site assessment includes drilling three soil to borings to
delineate the vertical extent petroleum hydrocarbons in soil around the former USTs
location. Proposed boring locations are provided on Figure 2. The specific scopes of
work are discussed below:
· Site Safety Plan. As required by the Occupational Health and Safety
Administration (OSHA) Standard "Hazardous Waste Operations and
Emergency Response" guidelines (29 CPR 1910.120), and by
California Occupational Health and Safety Administration
(Cal-OSHA) "Hazardous Waste Operations and Emergency
Response" guidelines (CCR Title 8, Section 5192), SECOR has
prepared a site-specific Health and Safety Plan (HASP) that is
provided as Attachment C. The HASP will be reviewed by field staff
and contractors before beginning field operations at the site.
· Permitting. The applicable permits for soil borings will be obtained
from CBFD prior to drilling activities.
· Soil Borings. Three soil borings will be drilled at the locations shown
on Figure 2. Soil borings will be drilled until two consecutive
subjectively "clean" samples collected at 5-foot intervals are
encountered beneath an impacted soil zone. The depth of these
borings is estimated to be approximately 50 feet below ground surface
(bgs). Based on regional groundwater gradient maps, groundwater is
I:\Tosco Marketing\1270\work plan\WPLAN.doc
--7--'
-
Phillips 66 Company
Tosco #1270,5634 Stine Road, Bakersfield, CA
3
July 31,2002
approximately 160 feet bgs (Kern County Water Agency) and is not
anticipated to be encountered during this investigation.
. Soil Selection and Analysis. Soil samples will be collected at 5-foot
intervals and will be sent under chain-of-custody procedures to a
California state-certified laboratory. Soil showing positive readings on a
PID or at least one sample for every ten feet of drilling will be analyzed
for TPHg, benzene, toluene, ethylbenzene, total xylenes (collectively
BTEX), and MtBE by EPA Method 8260B, single run. Additionally,
select soil samples will also be analyzed for total lead by EP A Method
6010 and fuel oxygenates MtBE, TBA, DIPE, EtBE, TAME, 1,2-DCA,
EDB, and ethanol by EP A Method 8260b, single run.
. Report. A report will be prepared after completion of necessary
fieldwork. The report will include soil boring logs, soil analytical
results, chain-of-custody documentation, and conclusions.
Field and laboratory procedures and a quality assurance plan are included in
Attachment D.
SCHEDULE
SECOR is prepared to initiate fieldwork within four to six weeks following approval of
this work plan by the RWQCB and issuance of soil boring permits for the CBFD.
SECOR will prepare a report including soil boring logs, soil analytical results, and
summarizing the investigation within four to eight weeks following completion of the
assessment.
I:\Tosco Marketing\1270\work plan\WPLAN.doc
·1
Phillips 66 Company
Tosco #1270,5634 Stine Road, Bakersfield, CA
4
July 31, 2002
If there are any questions regarding the contents of this work plan, please call us at (916)
861-0400.
Sincerely,
SECOR International Incorporated
¿:$4~
Clinton Harms
Project Scientist
f0f 07 (LJ
Rusty E. Benkosky,
Senior Engineer
Attachments: Figure l' - Site Location Map
Figure 2 - Site Plan with Proposed Well Locations
Attachment A - RWQCB Letter Dated June 3, 2002
Attachment B - Historical Soil Analytical Data
Attachment C - Health and Safety Plan
Attachment D - Field Practices and Procedures and Quality Assurance Plan
cc: Mr. Ed Ralston, Phillips 66 Company
Mr. Howard Wines, City of Bakersfield Fire Department
I:\Tosco Marketing\1270\work plan\WPLAN.doc
..1,
:'~~;I'¡
~~!~.
. .:·~::t..
=
" 0= .
366
'. <
. ,. ' [_36
:::..... ~
T raiter ìÇ.Tï[ . :::.... . .:r-~T~'lì
"L'- '..'.. I' 'j ~
Park JF:i~Lr ..,.:...~~~~<~:i
. .~
o . .'. ê?
NORTH SCALE
"-
"
"
"
~Q
~
Q:
8
-J
o
W
...
!!
Ü
REFERENCE: U.S. GEOLOGICAL SURVEY. 7.5 MINUTE SERIES
GOSFORD, CAUFORNIA QUADRANGLE.
PHOTOREVlSED 1966 AND 1973.
~
DRAWN
CCR
OEM
18SEP96
50888-015-03
...
CD
C>
C>
IN
...
C>
C>
ao
ao
SECOR
INTERNATIONAL
INCORPOJlATED
DATE
SITE LOCATION MAP
APPR
JOB NO.
. HOS
.. -..
.
I
.
=====1/f
o
2000
4000
I
FEET
FIGURE 1
CIRCLE K UNIT NO. 1270
SaM STINE ROAD
BAKERSRElD. CALIFORNIA
-' ¡
~
0-
(\
~
....
.!Z.
.....
o
w
en
5
w
~
~
o
ci
w
en
o
0-
o
~
~
o
.....
(\
;/
o
u
en
~
./
o
oe(
u
oe(
::i
t
6' CONCRETE WALL
UNPAVED AREA
EDGE OF PAVED AREA
I
~
Q ~
"It a:::
c
0 I
Q::
I
\.oJ I
~ CANOPY
I
.... I
fI) I
:J
~
c
iñ
I
I
I
I
\ PLANTER
,
LEGEND:
...
- DRIVEWAY -
RESIDENTIAL
UNPAVED AREA
PAVED PARKING
.....
~
.;;
~
~
t]
Q:;
CIRCLE K UNIT
NO. 1270
VENTS
FORMER
UST COMPLEX
NEW UST
COMPLEX
HIGH VOLTAGE OVERHEAD
POWER UNES
DRIVEWAY
-SIDEWALK - - - -
HA RRIS
PROPOSED SOIL BORING LOCATION
DRAWN
CCR
CH
SECOR
International
Incorporated
APPR
DATE
10NOV98
JOB NO.
77TO.61270.00.0106
ROAD
o
I
SCALE
40
80
,
FEET
NOTE: DRAWING IS BASED ON FIELD MEASUREMENTS.
FIGURE 2
CIRCLE K STORE NO. 1270
5634 STONE ROAD
BAKERSFIELD, CAUFORNIA
SITE PLAN WITH
PROPOSED SOIL BORING LOCATIONS
..
ATTACHMENT A
RWCQB LETTER DATED JUNE 3, 2002
~UJ1 uo
CUUC o:o'"t....n
..
a CaliCo
htoa B. Hickox
StC,eto.ry fo,
Envirrmtlu!ntal
Protection
3 June 2002
IU~\.;U MHI<KI:.IINl:i
9167743004
p.2
eaRegional Water Quality Control Board
Central Valley Region
Robert Schneider, Chair
Fresno Brauch Oft'Ice
£ntemet Addæss: http://www.swmb.ca..gov/-lWqcbS
3614 East AsbIan Avenue, Fresno, California 93726
Phone (559) 445-51 16 · FAX (S59) 445-59] 0
.
Gray Davis
Governor
RWQCB Case No. 5T15000682
Mr. Edward.Ralston
Pbillips 66 Compan
1380 Lead mll Ro ,Suite 120
Roseville, Califomi 583
UNDERGROUND
BAKERSFIEW,
In a letter dated 6 Ju
further investigation
review of informatio
.) ether (MTBE) and to
former underground
depth of impacted so
extent of affected so'
g and MTBB in soil.
Prolect Summarv
The CHFD provided
Product Lines. and
Intemational. Inc. S
The site is approx'
the Farmers' Canal.
feet east and 2,500
, regional maps inc1u
1 February 2001 and
The site formerly uti .
portion of the site. A
site assessment durin
_ ..., _,pSTs. Soil vapor ex
'.' fgasoline (TPH-g), be
milligrams per kilogr
'K. RELEASE, CIRCLE K STORE #1270, 5634 STINE ROAD,
COUNTY
1999, the City of Bakersfield Fire Department (CBFD) informed you that no
remedial actions were required at the above-referenced site. Unfortunately, our
provided by the ŒFD indicates that high concentrations of methyl tertiary butyl
petroleum hydrocarbons as gasoline (TPH-g) are present in soils beneath the
rage tanks (USTs) to at least 20 feet below ground surface (bgs) and that the
has not been determined. It will be necessary for you to determine the vertical
. We request that you submit a work plan to detennine the vertical extent ofTPH-
summary of the project and our comments follow.
opy of a report of subsurface investigation at the site - Removal of USTs,
enser (Removal Report), dated 10 November 1998 and prepared by SECOR
ento (SECOR). .
ly four-and-one-half miles south of the Kern River and two hundred feet east of
unicipal wells operated by the California Water Service are approximately 1,400
southeast of the site. Depth to groundwater is approximate1y 160 feet based on
in Improvement District No.4 2000 Report On Water Conditions dated
bUshed by tbe Kern County Water Agency, Bakersfield.
three lO,OOO-gallon gasoline USTs and one dispenser island in the southwest
duct line leak was discovered during October 1995. SECOR conducted initial
ber 1996. Six soil borings were samp1ed in the area around the former
ûon weIls were installed in each boring. Total petroleum hydrocarbons as
ne, and MTBB were detected at maximum concentrations of 3.0.2. and 9
(mg/.kg), respectively.
Cølifomia Environmental Protection Agency
I\~
...up UCJ t::uut:: a; ;;J;;Jrl..
~
IU::iLU MHI<Kt:.lll"tu
9167743004
p.3
.:. ~
Mr. ~ward Ralsto
-2-
3 June 2002
The USTst dispens
21 August 1998.
samples were co1l
below ground surl
feet bgs. Approxi
permission, soil ge
, and associated piping were removed under the supervision of the CHFD on
ew UST system was subsequently installed in the southeast portion of the site. Soil
d beneath the ends of each former UST at depths of approximately 16 and 20 feet
,(bgs). Soil samples were also collected beneath the dispenser at depths of 2 and 6
ely 150 cubic yards of excavated soil was disposed of off-site. With the CBFD's
ated ftom the excavation of the new UST pit was used to backfill the excavation,
The soil samples w
xylenes (MTBE) an
were detected in the
respectively. TPH-
and 20 feet bgs ben
TPH-g was also de
end of the southern
concentrations rang'
corrective action wa
ana1yzed for TPH-g by EP A method 8015Mt and benzene, toluenet ethylbenzene,
the fuel oxygenate MTBE by EP A Method 8020. TPH-gt benzene and MTBE
oil samples at maximum concentrations of lS,300t 30.78, and 281 mgIkg,
as detected at concentrations greater than 1,000 mg/kg in samples from both 16
the southwest end of the central UST and the northeast end of the northern UST.
ted at greater than 1,000 mgIkg in the sample from 20 feet bgs from the northeast
T. TPH-g concentrations ranging from It390 to 5,280.mglkg and MTBE
from 22.6 to 123 mglkg were detected in these samples. Further investigation or
ot conducted.
You submitted a req
1999, the CBFD det
or remedial action w
t for case closure dated I Februa:ry 1999 to the CBFD. By a letter dated 6 July
'oed that corrective action had been completed, and that no further investigation
required.
Comments
Based on the analysi
the former USTs has
detected in all soil s
mglkg. Concentratio
from 22.6 to 123 m
USTs, the maximwn
necessary for you to
f soil samples collected during removal of the former UST system, a release from
egraded soil and threatens the beneficial uses of groundwater. MfBE was
pies collected from beneath the former USTs at concentratíons as high as 281
of TPH-g ranging from 1,390 to 5.820 mglkg and MTBE concentrations ranging
were detected in three soil samples collected at 20 feet bgs beneath the fonner
epth explored. The vertical extent of impacted soils is undefined. It will be
termine the vertical extent of impacted soils caused by the release.
Prior to 3 August 2, please submit a work plan to assess the vertical extent of gasoline-range
petroleum hyd.rocar and fuel additives in soils beneath the former USTs. At least one soil boring
should be proposed. e full vertical extent of impacted soils should be demonstrated by the analysis of
two consecutive sam lacking field evidence of petroleum hydrocarbons and fuel oxygenates. The
content of the work p should comply with the enclosed Tri-Regional Board Staff Recommendations
for Preliminary Ev, 'on and Investigation of Underground Storage Tank Sites and Appendix A-
Reports Tri-Regiona"[ oard Staff Recommendations for Preliminary Evaluation and Investigation of
Underground Storag ank Sites. The work plan should include a time schedule to implement the plan
and submit reports. submittals should contain the signature and seal of '8 CaJifornia registered
engineer, certified en . eering geologist, or registered geologist who is responsible for the content of the
submittal.
'ng the investigation should be analyzed for TPH-g by EPA Method 8015Mt
'A Method 8021 or 8260. the lead scavengers l,2-dicloroethane (1,2-DCA) and
Ð), and the fuel oxygenates MTBEt tertiary amyl methyl ether (TAME), di-
. ~oil samples collecte
-, - /ßTBX and MTBE by
ethylene dibromide
,'.,.",.....-........... .-........-
~'ftJ 5-""""'1- U. U...,. ..
I U""''''''U '-II-'''''w;;:., I. .1U
"J. t) ( ("t"'UU"t
p....
Mr. ~dward RaIsto
-3-
3 June 2002
isopropyl ether (D
Method 8260. Sel
). ethyl tertiary butyl ether (BTBB), and tertiary butyl alcohol (TBA) by EP A
soils samples should also be analyzed for total lead.
Our request is bas n our review ofBCFD files. We were unable to discover evidence of additìona1
investigation or rem . at action subsequent to the UST removals. If you have information documenting
such activities, plea contact this office.
ections 2729 and 2729.1 for Underground Storage Tanks were added to the
gulations requiring you to submit analytical and site data electronically. Enclosed
Electronic Deliverable Format for Laboratory and Site Data Submittals to
xplaining bow to obtain information to implement the requirements.
Please be aware tha
California Code of
is our letter (Requir
Regulating Agencies
Please contact,this 0 ce at least five days in advance of fieldwork. If you have any questions regarding
this matter, please c tact me at (559) 445-5504.
~~ td~~
Assoc. Engineering
RG No. 5951
c:
ional Board Staff Recommendations for Preliminary Evaluation and Investigation
rground Storage Tank Sites
. A-Reports
Electronic Deliverable Formatfor Laboratory and Sire Data Submittals...
j Enclosures:
Mr. Howard
Ms. Barbara
Mr. David Vo
es ro, City of Bakersfield Fire Departme:nt, Bakersfield, wlo enclosures
ropel, S'\\'RCB, UST Cleanup Fund, Sacramento, w/o enclosures
ler, Gettler-Ryan, Inc., Petaluma, wI enclosures
--1
rr,lnn"" TOur ..,~.'OV\""...... --, .
,--, --. -...
ATTACHMENT B
HISTORICAL SOIL ANALYTICAL DATA
"
!
RESIDENTIAL
6' CONCRETE WALL
UNPAVED AR!!A
UNPAVED MfA
PAVED PMKING
EDGE OF PAVED ARfA
.....
~
~
~
~
0:::
Q
'"(
<:)
0:::
I
~
~
a:::
o
I
CIRCLE K UNIT
NO. 1270
A
I ~SE-5
l~
~ W:J:
~ PUMP
iñ ISlAND
I
I
I
l
\:
:'-.:
B'
.....
~
VENTS
....
CI)
SE-1/VE-1 ~
B SE-2/VE-2 SE-7
A'
HIGH VOLTAGE OVERHEAD
POWER UNES
DRIVEWAY
- DRIVEWAY -
- SIDEWALK- - - -
HARRIS
ROAD
o
W
l-
()
Õ
...
N
LEGEND:
-+- SE-2/VE-2
o
I
SCALE
FEET
SOIL BORING/VAPOR EXTRACTION WELL
40
80
-
~
w
g
g
;c
A
A' CROSS-SECTION LOCATION
NOTE: DRAWING ./S BASED ON FIELD MEASUREMENTS.
DRAWN
CCR
DEM
16DEC96
50888-015-03
FIGUI~E 2
CIRCLE K UNIT NO.1270
5634 STINE ROAD
BAKERSFIElD" CAlIFORNIA
SITE PLAN ANt. SOIL BORINGI
V APOR EXTRACTIOI~ WELL LOCATIONS
...
<'>
CD
SECOR
INTERNATIONAL -
INCORPORATED
DATE
APPR
N
CD
'"
'"
JOB NO.
-.
TABLE 1 - SOil ANALYTICAL DATA
Circle K Unit No. 1270
5634 Stine Road
Bakersfield, California
SE-l, 9' 9 12113/96 ND<1 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.05 NA
SE-l, 22.5' 22.5 12113/96 ND<1 0.1 0.3 0.05 0.4 7 NA
SE-l, 29' 29 12113/96 ND<l ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<0.OO5 ND<O.05 NA
,SE-l, 34' 34 12113/96 ND<l ND<O.OO5 ND<O,OO5 ND<O,OO5 ND<O,OO5 ND<O.05 NA
SE-2, 8.5' 8,5 12/13/96 ND<1 ND<O,OO5 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.05 NA
SE-2,21' 21 12113/96 ND<1 ND<O.OO5 0.006 ND<O.OO5 0.04 1.6 NA
SE-2, 33.5' 33.5 12113/96 ND<1 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O,OO5 ND<O.05 NA
.SE-2, 39' 39 12113/96 ND<1 ND<0.OO5 ND<0.OO5 ND<0.OO5 ND<O.OO5 ND<0.05 NA
SE-3, 19' 19 12114/96 ND<l ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<0.OO5 ND<O.05 NA
SE-3, 24' 24 12114/96 ND<1 ND<O.OO5 ND<0.OO5 ND<0.OO5 ND<0.OO5 ND<0.05 NA
SB-4, 7.5' 7.5 12113/96 ND<1 ND<O,005 ND<O.005 ND<0.005 ND<0.OO5 ND<0.05 NA
SE-4, 22,5' 22.5 12113/96 3 0.2 0.5 0.07 0.5 9 NA
SE-4, 40' 40 12113/96 ND<l ND<0.OO5 ND<0.OO5 ND<0.005 ND<0.005 ND<0.05 NA
~
SE-4, 44' 44 12113/96 ND<1 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.OO5 ND<O.05 NA
SE-5, 19' 19 12114/96 ND<l ND<0.OO5 ND<0.OO5 ND<0.OO5 ND<0.005 ND<0.05 NA
SE-5, 24 24 12114/96 ND<l ND<O,OO5 ND<0.OO5 ND<O,OO5 ND<O.OO5 ND<O.05 NA
SE-7, 19' 19 12113/96 ND<l ND<O,OO5 ND<O.OO5 ND<0.OO5 ND<O,OO5 ND<O.05 NA
SE-7, 24' 24 12113/96 ND<l ND<O,OO5 ND<O.005 ND<O,OO5 ND<0.OO5 ND<O.05 NA
SP-1 (A-D) - 12114/96 ND<1 ND<O.OO5 ND<O,OO5 ND<O,OO5 ND<O,OO5 ND<O.05 5.5
TPHg
mg/kg
ND
NA
bgs
= Total petroleum hydrocarbons as gasoline.
= Milligrams per kilogram.
= Anatyte not detected at or above the specified reporting limit,
= Not analyzed.
= Below ground surface.
H:\CIRCLEK\1270\SOIL WB2
E'
~ 20
'"
()
~
0:
::>
<II
o
z
5 :so
0:
C>
~
g
'"
m
~40
o
~
(0)
SP UST I
HD' Am Am COMPLEX I
(0) v nv, nv I I WD/ND/ND
~ ~ ~
Jp. ~:____~~~___"':::~~~==~~~=~:::--:..~.~~~ ~~:==1== - - - - - - - - - - - - j--~---~~
~ (77) -------~___~__________________
o
A SE-5
I
I SE-4/VE-3
UST VENT' UNES
PRODUCT UNES
,.
(0)
SP
10
SP
(0) ND/ND/ND
('99)
ß.l š'tl---.---'--~----'-""'----------f.5!!!
-(Ii) ;;;':;;'ÏÑo-~--------------------~---~-
'SP (1H)
- --.--.------.--.---------------(8,)
SP
(0) SM
~-----, ------~~~
S~---~----::====~=======_-;E~=======:~_____--ftæ)
~ ~
(II) ;~~~~~~--~~~~~----:--~~~--... 1 (0)
50
-~-
1 -----~----- (0)
(50)
(16) SP
(16) HD/ND/ND
(2)
(0) HD/ND/ND
?----- šë--------?
?//~ i,f77-72LZ:.z?
?-¿.L-W _I,;L../-..I- -1
60
CROSS-SECTION A-A'
SE-4/VE-3-BORlNG/WEll. NUMBER
I
WEU. CASING
SM - uses SOIL OESCRlPTlON
~ - TPHg/BEHZENE/MTBE CONCENTRATION
IN ŠÒIl (mgfl<9) .
(H)- PlD MEASUREMENTS IN PARTS PER MlWON
, ~-Flll MAlmlAL
P77777I PREDOMINANTLY FINE-GRAlNEO
rLLLLLJ- MATERIAL (SILTS AND CLAYS)
SCREENED INTERVAL INCLUDING FlLlm PACK
r----1 PREDOMINANTLY COARSE-GRAINED
1---.J- MAlmlAL (SILlY SANDS AND SANDS)
SECOR
INTBRNATIONAJ.
INmRPOIATBD
"
I SE-2/VE-2
SE-7 A'
I 0
~ ~
(0)
SP
(0)
10
o·
(0) SP
(0) __
~__:===:=~~=::::::::=:======:::=__::~::~:~ ~M_
SP
(0) ND/NO/ND
E'
20 b
.....
~
0:
::>
<II
o
z
305
a::
C>
~
g
'"
m
SP
S]=:====::::::::::::::::~=::::=~~::-=-:-=:=:~
~__r
.-
..:I~--
1---"
sï.c.
HD/ND/NO
SM
(0)
SP
ND/ND/ND
(0) HD/ND/ND
40~
'"
o
50
60
ti 10
~
~
'"
..J
~
~ 0 10 20
HORIZONTAL SCALE FEET'
APPR
CCR
DEI.!
03JAN97
50888-015-03
FIGURE 3
CIRCLE K UNIT NO. 1270
5630< SI1IŒ ROAD
BÞJ<ERSf\EU). ~
GENERALIZED GEOLOGIC
CROSS-SECTION A-A' ,
DATE
JOB NO.
~
~ 20
'"
<>
~
'"
:;)
en
o
z
ð 30
'"
C>
~
III
~4O
o
¡;
1
"
g
§
K
8
I
SE-3
I
"I SE-4jVE-3
o
.. .. . .. ..
10
I ~
I UST SP
--- -~------.:.J COMPLEX ND/ND/ND
--~~ ND~~___~ r-.----- (0) ____ @L_
'I r--...... .....--.__fD) ~-------~-------------------- SM
-._-._--~) ~._-._-_._---,---------------------~- ~---
L_______J ~ ~
SP (0)
(0)
SP
SP
SM ..----------------....----__
-~ ---::3 -.---.---____ (III)
:J;~ NIiiüï;7 ---~
SP ~:-------------------------------~----;;
L1_fW~~_~~~_:~~~~
SP ~/ND/ND
~ _.____---- (0)
~~~=~~:-=:~~~~~=~~~~~~~:-----:::::~{! i~~
s:_---------------------~--------;; ~---
(}O)
ND/ND/ND
(0)
(0)
(50)
(If) SP
(If) ND/ND/ND
(2J
(0) ND/ND/ND
_---------;¡ Sè----~----?
?-- ?TZ~Z 5'2Z?
?- (~ ?
SP (4!J)
(0)
(0)
50
(0)
60
CROSS-SECTION 8-8'
SECOR
INTBIINA'DONAL
JNCOIIl'O:RATID
8'
o
10
E'
20 ~
w
~
'"
:;)
en
o
Z
30 ð
'"
C>
~
~
III
40 ~
w
c
50
60
!IN
CCR
DEM
03JAN97
50888-015-03
N'P
Do\T[
JOB NO.
LEGEND:
.'
SE-4jVE-3-BORING/WE!J. NUMBER
I
wEll. CASING
SM - uses SOIL DESCRlPT10N
~ - TPHg/BENZENE/MTIIE CONCEN1RAl1ON
IN SOIL (mg/k9)
(28)_ PIC MEASUREMENTS IN PARTS PER MIWON
SCREENED INTERVAL INClUDING ALlER PAC!<
~- AU. MATERIAL
~-=:~~~-=r
r---l PREDOMiNANTlY COARSE-QWNED
L--.J- MAlERlAL (SILlY SANDS AND SANDS)
~ 10
~
'"
ð
¡¡¡ 0
~
10
20
HORIZONTAL SCALE FEET
FIGURE 4
CIRCLE K UNIT NO. 1270
5634 S11NE fIIW)
1WŒRSF1E1D. CAIJfOI<NIA
GENERALIZED GEOLOGIC
CROSS-SECTION 8-8'
~
Log of Boring/Monitoring Well:
Project: CIRCLE K UNIT NO. 1270
Boring Location: 5634 STINE ROAD, BAKERSFIELD, CA
Subcontractor and Equipment: MDE/HSA
Sampling Method: CAL. MOD. SPUT SPOON
Start Dote/Time: 12/13/96//1330
First Water (bgs): NA
L.
CI>
.0
E
:J >.
z: '-
OJ ~
CI> > '"
a..8~
E v
00:::
VJ
o
l.LJ
015
ZCI
<:::>
x<
SE-1-9
SE-1-12
$[-1-14
5(-1-19
........
~ ~
CI>
0 Ê Q)
0 .!:;. >.
~ c- L.
OJ
en 8 :5 >
~ 0
c- u
0 a OJ OJ
ã5 ã: 0 a:::
0
1 -
2-
33
3-
-
o 4-
-
5
-
6-
-
7-
-
8-
9~1
1O-i-
-
11-=1
12-
-
13-
14~_
15-i-
-
>50 0
>50 10
>50 75
>50
16-
-
17-
-
18-
19-: I
20--
-
21-
-
287 22-= I
$[-1-22.5 >50
213 23-
--
24-1
>50 153 25-=
--
26-
-
27-
-
28-
~ $[-1-29 >50 0 29~ I
~ 30-
~
í
~
~
:;:;-
..
~
0:
9-
8
?
,¡¡
SECOR
ë5
.D Q)
~ >
CI>
V1 ..J
V1 '-
V
U ~
V1
:::>
~~
.: ~ :~
. .
.
~ ..:
.....:.
"'~-"':
"'~
" 1--
,'. :t
:"::'!.'~'-:'
:::.::.:':(:::
~:.' ~'5'
~~I~I
:::~.:~~::'
.-
!\,.....
. <.
K
-
·I;I.~..:~I:
I Project No.: 50888-015-03
I Logged By: C.M. I Drown By: C.R.
Monitoring Device: OVM 580B
Finish Dote/Time: 12/13/96//1500
Stabilized Water Level (bgs): NA
Surface Elevation: NA Top Casing Elevation: NA
UTHOLOGIC DESCRIPTION
(color, grain size, consistency, moisture, other)
ASPHALT AND BASEROCK
DARK YELLOWISH BROWN (10YR 4/6) SAND (SP) with
silt, sand is fine-grained, moist (0,90.10,0)
at 14', faint chemical odor
:1 UGHT OUVE BROWN (2.5Y 5/3) SILTY SAND (SM) with :=-
clay, sand is fine-grained, moist, subangular blocky i-
soil structure, moderate chemical odor (0,50,40,10)
YELLOWISH BROWN (10YR 5/4) SAND (SP) sand is fine-
grained, moist, moderate chemical odor (0,100,0,0) r-
I UGHT OLIVE BROWN (2.5Y 5/3) SILTY SAND (SM) with ¡-
clay, sand is fine-grained, moist, subangular blocky
soil structure, moderate chemical odor (0,50,40,10) r-
BROWNISH YELLOW (10YR 6/6) SAND (SP) with trace r-
silt, sand is fine-grained, moist, weak subangular
blocky soil structure, faint chemical odor (0.95.5,0)
YELLOWISH BROWN (10YR 5/6) SANDY SILT (ML) sand ¡-
is fine-grained, moist, low plasticity (0,40,60.0)
Reviewed By:
Revised By:
Dote:
Dote:
Comments:
SE-1/VE-1
Boring Abandonmentj
Well Construction Details
<"
,. .
,. .
.. .
., .
,. .
.. .
-
" .
'~~~~~i
.1.......··.
~:.:.~.!:~
.'.~:; .:~;.:
.:.:....;:.;:
::;..~::~.~:.~
! "...·..¿I
-. .:,,' ::
:.,.;......
~-:.:.. .
~::;.
':, ~.
:~ "DARK GRAYISH BROWN (2.5Y 4/2) SILTY SAND (SM)
If- sand is fine-grained, moist (0,65,35,0)
~l';:,:~ii GRAYISH BROWN (10YR 5/2) SAND (SP) with trace
~%;;:~i~ silt, sand is fine-grained, loose. moist (0,95.5,0)
:;:..:.....-~;.
.......,...
.:~:::-...~.
:':.:~:;
':;;5~~~:'i
r<':<; ~
:':::'::.;'
.:~~~~;:~
..::,..:..
::..,~~ \:.~
. . .: ÿ'"'~~'
:.}\'
.. .
,. ,
.. .
.. ,
., ,
" ,
" .
-
" ,
.. .
.. ,
., ,
.. .
'. .
.. .
-
., .
'. ,
., .
.. .
" .
.' ,
" .
., .
-
l-
I-
t-
l-
I-
I-
., ,
.. .
.. .
... .
., '
.. .
'. ,
,. .
. '
,. .
" ,
.. .
.. .
.. .
'. .
.. '
" .
" .
.. .
" .
,. .
,. .
.. .
" .
'. '
.. .
,. .
.. .
r-
t-
., .
,. ,
.. .
" .
,. .
.. .
,. .
,. .
" ,
.. '
,. .
., .
.. .
., .
.. .
I-
,. ,
.. ,
.. .
'. .
.. .
.. .
.. .
I-
'. '
.. '
'. .
" .
" .
.. .
.. .
,. .
r-
t-
l-
I-
r-
l-
I-
l-
I-
f-
" .
.. ,
.. .
,. .
" .
" .
" ,
.. .
.. .
,. .
.. .
.. '
.. .
" ,
.. .
" '
,. .
" '
,. .
.. .
" .
.. .
.' ,
.. .
.. .
,. .
" .
.. .
.. .
" ,
r-
i-~
.::"~:' - ::"J"
:~::'.... =:,,'''-.;:'
';.'!="'¡'''r.
;:...:\ ==:...t....
:~~~~~ <t.:.~.::
,¥H ~~~
~~~':::: ~~:":' .
:~:'~ ·t~;
.;~~~ '~i:~,
i-
I-
r-
f-
.. ......
.., ......
.. ......
.,. ......
.. ......
... ......
.. ......
... .....
.. ......
.,. ......
" ......
.., ......
" ......
... ......
...,.
, .
: :: :: 'T roffie-rated
:: Christy Box
· ,
· .
, .
" .
.. .
., .
" ,
· .
· .
· .
,. ,
· .
. .
., .
.. .
, .. Cement
: :: Grout
.. .
.. .
.. .
.. .
.. .
., .
· .
· .
,.,... 2-Ø Sch.40
:: pve Blank
:: Casing
· .
, ,
, .
· .
· .
· .
· .
,. .
.. .
· .
· ,
· .
, ,
· .
" ,
" ,
., ,
.. .
, .
· .
, .
.. ,
" .
· .
.. .
.. ,
Bentonite
Chips
2-Ø Sch.40
pve 0.020-
Slot Sereen
13 lonestar
Sand Pock
End Cop
PogcL,of--Z-
~
~
;:;
""
~
a:
.9-
g
;:J-
¡¡¡
Pro ject: CIRCLE K UNIT NO. 1270 Log of Boring/Monitoring Well:
Boring Location: 5634 SllNE ROAD, BAKERSFlELD. CA I Project No.: 50888-015-03 SE-1/VE-1
~
cu Õ
.D ..-..
E ..., ..., .D ~
CL> ~ Boring Abandonment!
:> ~ 0 - CL> UTHOLOGIC DESCRIPllON
:z 0 E .!:::;.. >. CL>
~ v ~ 0.. ~ II) .-I ( color, groin size, consistency, moisture, other)
CL> 0.. cu ~ Well Construction
õ.. 0 CL> II) ........ :5 > II) Details
0 cu
E OlL. ~ 0.. (.) U ...,
cu 0 0 cu cu II) ~
0 a:: ãi ë: 0 0:: ::::>
(f)
30 .:~~.~~:i~·
- PALE BROWN (10m 6/3) SAND (SP) sand is fine
31- . :~:~":~.' grained, moist (0.100.0.0) ~
.: J.:;;,,;. ~
- ..~.._.
32- ,~{: :::.;~: I-
- ;~.~~¿::i
33- ~-:',:,,':: r-
20 34~1 ~:.:-~: ;:'~ '-
$£-1-34 0/4 ....::; ".:~
.::..../"......;
0 .' "
35-- ¡..;..::--.:.~ i-
- ....~',..:.~
36- ¡~~~~~~ -
-
37- -
- ~\'~?:.
38- :'¿:"roo -
- ~~;~:.
$£-1-39 49 39 -= I :.....·..tj.... '-
~/4 ;:;:~~~:;~:
0 40- ....~ ~.~.: -
-- ¡;:..~:,.:::
41- :., ~;.; 1.--: - ~ement
- ;.:~::\~ Grout
42- ,,:,,'''-:'..: . -
- :..,~,.::':
~~,,::~.~..'
43- " .... -
44~1 ~.~~~~:;:
5£-1-44 ~O/3 0 -¡":'<'" -
: ..... ...
I ...' '.'
45-- :~ ~..:! ~ ~ -
- ~{~~~~~.
46- .~...":'~~ -
- :l~~f~
47- -
-
48- "'::i:'~~' -
49-= I .. ..~.
$£-1-49 ~/2 0 :~[~~~ -
50 - ....._:.:o.r..
;::,,::~<
'"
;:I¡
iõ
;¡
'"
'"
~
SECOR
Reviewed By.
Revised By:
Dote:
Date:
Page..2_ocL
t
RESIDENTIAL
6' CONCRETE WALL
UNPAVED AREA
UNPAVED AREA
PAVED PARKING
EDGE OF PAVED AREA
...,
~
I ¡..;;
~
~ ~
£::Ii ~ ~
~ 0:: Q:;
0
0 I CIRCLE K UNIT
Q:: NO. 1270
I 5E-5
L.J I -+= 5E-3.
~
I VENTS
~ I
CI)
I /
:J
~
0 NEW UST
iñ FORMER COMPLEX
I UST COMPLEX
I . 5E-2/VE-2
I
I 5E-7 HIGH VOLTAGE OVERHEAD
. POWER UNES
\ PLANTER
DRIVEWAY
, - DRIVEWAY - - SIDEWALK- - - -
HARRIS
ROAD
LEGEND:
~!
~
N'
_I
Sf
I
:it
. D-1 SOIL SAMPLE LOCATION
.5E-2/VE-2 SOIL BORING/VAPOR EXTRACTION WELL
80
,
FEET
o
,
SCALE
40
NOTE: DRAWING IS BASED ON FIELD MEASUREMENTS.
FIGURE 2
CIRCLE K STORE NO.1270
5634 SßNE ROAD
eAKERSF1ELD, CAlIFORNIA
APPR
CCR
CH
10NOV98
7G888-014-01
SOIL SAMPLE LOCATION MAP
SECOR
INTERNA llONAL
IN CORPORA TED
~
;;
i
!!
DATE
JOB NO.
Table 1
Soli Analytical Data
USTs, Product lines, and Dispensers
Circle K Store #1270
5634 Stine Road
Bakersfield, California
'¢
>.
;
~
Sample
Name
Sample
Depth
(feet)
Date
Sampled
~,
~
!
15
:r
~
8/21/98 7,930 11.4 179 129
'<,
8/21/98 1.92 65.3 43.5
8/21/98 2.18 NO 0.0391 0.00956
8/21/98 NO NO 0.0122 NO
16 8/21/98 23.0 0.0808 0.717 0.276 2.19 18.8
'20 8/21/98 4.23 0.0125 0.0982 0.0331 0.268 3.64
30.5 623 277 1,350 281
9.78 245 116 568 123
TPH = Total petroleum hydrocarbons
MtBE = Methyl tertiary Butyf Ether
- = Not analyzed
mglkg = milligrams per kilogram
'.
;;
~.
~
i
,
:L
~
t
r
\:
,
~
~
~,
i
i
7G888-01 ~1 \PULL.xl5
11/10198
ATTACHMENT C
HEALTH AND SAFETY PLAN
Site-Specific
Health & Safety Plan
Site:
Tosco Service Station #1270
5643 Stine Road
Bakersfield, California
Prepared for:
Tosco Corporation
A Subsidiary of Phillips Petroleum Company
Prepared by:
. ~~OS2~d
3017 Kilgore Road, Suite 100
Rancho Cordova, California 95670
July 16, 2002
SECOR
HEALTH AND SAFETY PLAN
REVIEW AND APPROV AL
CLIENT: Tosco Corporation
PROJECT NAME: Tosco 1270
SITE NAME: Tosco #1270
PROJECT NUMBER: 77.TO.61270.00.
START DATE: July 16. 2002 END DATE: Jan. 16.2003
PLAN EXPIRATION DATE: Jan. 16.2003
(Last day of expected fieldwork or no longer than 6 months).
Clinton Harmsr Signature: Date:
Plan Completed By
Rusty Benkosky Signature: Date:
Project Manager
Site Health and Safety Officer Signature: Date:
Todd Brown Signature: Date:
Office Health & Safety Officer
This Health and Safety Plan has been written for the use of SECOR and its employees. It may
also be used as a guidance document by properly trained and experienced SECOR
subcontractors. However, SECOR does not guarantee the health or safety of any person entering
these sites.
Due to the potential hazardous nature of these sites and the activities occurring thereon, it is not
possible to discover, evaluate, and provide protection for all possible hazards which may be
encountered. Strict adherence to the health and safety guidelines set forth herein will reduce, but
not eliminate, the potential for injury. The health and safety guidelines in this Plan were
prepared specifically for this site and should not be used on any other site without prior research
by trained health and safety specialists.
SECOR claims no responsibility for its use by others. The Plan is written for the specific site
conditions, purposes, dates, and personnel specified and must be amended if these conditions
change. This plan will provide useful infonnation to subcontractors which will assist them in
developing their own HASP, but it should notbe construed as a substitute for their own plan.
Subcontractors should sign this plan as an acknowledgement of hazard infonnation and notice
that this Plan does not satisfy their requirement to develop their own plan.
TABLE OF CONTENTS
Emergency Response
Page
Injury or Illness................................................................................ .... ...4
Local Emergency Numbers. .... ..... ....... ..... ....... ..... ...... ....... ...... ...... ........ .....5
Project Personnel Numbers. .... ............ ..... .... ..... ................. ....... ............ .... ..8
Government Contact Numbers....... ....... ............................. ............. ...... .... ..8
Contaminants On The Site. .... ..... ......... ............. ... ........ .... ........... .... ..... .... ..10
Detailed List of Steps with Hazard Assessments and Precautions.........................t4
Attachments
Attachment 1 - Site Map. ......... ...... ...... ............ ............ .... ...... ...... ............ .17
Attachment 2 - Incident Investigation Form & Root Cause Analysis Flow Chart.....tS
Attachment 3 - Subcontractor Training and Medical Surveillance Record........... ..20
Attachment 4 - Utility Clearance Logs. ..... .............. ............. ........ ......... .... .... .21
Attachment 5 - Air Monitoring Log..............................................................22
Attachment 6 - Daily Health & Safety Briefing Log.............................~............ 24
Attachment 7 - Acknowledgment & Agreement Form....................................... 25
Scope of Work: The purpose of this project is to drill three soil borings and collect soil samples.
The site is a 150 by 145 foot square-shaped parcel with an active service station. Currently, two underground
storage tanks (USTs) of 20,000 and 12,000-gallon capacity and associated product lines and dispensers are
present at the site.
All work for this project will be scheduled during typical daylight hours.
Site plan is in Attachment 1.
Emergency Response:
A. Injury or Illness:
If an injury or illness occurs, take the following action:
· Determine if emergency response (fire/ambulance) staff is necessary. If so, dial 911 on cell phone or
closest available phone, which is located in the Tosco 5488 station building. If it makes sense to take an
individual to the hospital, use the directions on page 2.
· Get First Aid for the person immediately. Utilize first aid kit in site safety officer's vehicle. Also utilize
the bloodborne pathogen kit.
· Notify the Site Health and Safety Officer, Todd Brown, immediately. The Site Health and Safety Officer is
responsible for preparing and submitting the Injurymlness Incident Report to the Health and Safety
Director within 24 hours, as well as notifying the employee's supervisor and Principal-in-Charge. Use
Incident Investigation Fonn in Attachment 2.
SECOR International Incorporated
4
· The Site Health and Safety Officer will assume charge during a medical emergency until more qualified emergency response personnel arrive at the
site.
,
LOCAL EMERGENCY NUMBERS· DIRECTIONS AND MAP TO THE HOSPITAL ARE A TT ACHED
NAME TELEPHONE NO.
Mercy Hospital (661) 632-5275
Hospital 2215 Truxtun Ave., Bakersfield, CA
Halls Ambulance 911
Ambulance (661) 327-4111
911
Police/Sheriff Bakersfield Police (661) 327-7111
911
Fire Bakersfield Department (661) 324-4542
DIRECTIONS TO: Mercy Hospital, 2215 Truxtun Ave., Bakersfield, CA
2. Turn Left on HARRIS 1.0
RD
4. Turn Right on WHITE 0.2
LN
6.
Merge on CA-99
NORTH
2.6
8.
Take the CALIFORNIA
A VE exit towards CIVIC 0.3
CENTER
SECOR International Incorporated
5
HASP-soil borings.doc
10.
Turn Left on OAK ST
0.3
See Hospital Route Map and Summary on the following two pages.
SECOR International Incorporated
6
HASP-soil borings.doc
, Yahoo ! Yellow Pages
hHootVellow Pages
Page 1 of 2
Yahoo! - ~ - Address Book
Get Cash In 7 Days 'Kith A Home Equity Loan
Welcome, Guest User
Yahoo! Yellow Pages
c~
TIlt EasiesJ: WaJ To 6e
Create My Locations - ~
Starting from: 5643 Stine Road, Bakersfield, CA 93313-2800
*Mercy Southwest Hospital
Arriving at: 2215 Truxtun Ave, Bakersfield, CA 93301-3602
(661) 632-5281
Distance: 7.0 miles Approximate Travel Time: 10 mins
Full Route
Directions
1.
2.
3.
4.
5.
6.
Start on STINE RD
Turn Left on HARRIS RD
Turn Left on WffiLE RD
Turn Right on WIDTE LN
Take the CA-99 NORTH ramp
Merge on CA-99 NORTH
· Email Directions
· Get Reverse Directions
· Text Only Driving Direc
Destination
Miles
0.0
1.0
1.0
0.2
0.3
2.6
...IddResults.py?Pyt=Typ&tarname=Mercy+Southwest+Hospita1&tardesc=%28661 %29+632-S7116/2002
=
.,
SECOR International Incorporated
7
HASP-soil borings.doc
·
'.'
PROJECT PERSONNEL NUMBERS:
All project sampling teams will be equipped with a cellular phone. Each team will have a vehicle and a supply of portable water.
Subcontractors will complete the form in Attachment 3 SUBCONTRACTOR TRAINING AND MEDICAL SURVEILLANCE RECORD
NA
PROJECT JOB NAME TELEPHONE NO. GENERAL PROJECT
TITLE RESPONSmILITIES
Implementing this HASP. Has authority to See See Next See Next Page
Site Health and Safety (916) 861-0400 stop work. Perform air quality tasks. Take Next Page
Officer charge of all incidents. Review HASP. Page
Conduct work in accordance with JSA and
this HASP. Report all incidents and near
misses immediatel to Pro'ect Mana er.
Overall financial and logistics. Contact client See See Next See Next See Next Page
Project Manager Rusty Benkosky (916) 861-0400 and subs to understand all hazards. Discuss Next Page Page
with SHSO. Follow-up all incidents upon Page
notice.
Provide immediate support at notice of all See See Next See Next See Next Page
Principal·in-Charge Jim Grasty (916) 861-0400 incidents Next Page Page
Pa e
Provide all known analytical data performed NA NA NA NA
Client Contact Ed Ralston (916) 774-2910 by others and notice of hazards. Provide
access to site and available emergency
res onse ca abilities.
Respond with corporate resources to all
Corporate Health and Philip Platcow (617) 232-7355 Office incidents as appropriate., Assist in HASP
Safety crn (617) 828-3564 Cell review. Assist in incident investigation.
Assist in follow-up to incidents as NA NA NA NA
Human Resources Marguerite (619) 718-9430 appropriate.
Director Shuffelton
æ
~,I
GOVERNMENTAL CONTACT NUMBERS:
I ~~ NAME I
TELEPHONE NO.
SECOR International Incorporated
8
HASP-soil borings.doc
!=.-
SECOR International Incorporated
9
HASP-soil borings. doc
Contaminants On The Site
.~¡1
ppm
M@!.','.'.'..'......',...,........t12.."....",,'.ww... ,.
~Jd~
100/100 ppm
NO PEL
Established
TLV=40 m
0.5 - 1 mg/m3
10.5 - 1 mglm3
depending on the
species.
SECOR International Incorporated
2.5ppm
PEL-STEL= 5ppm
IDLH=500 ppm
lOOppm TW A:
15()Ppm STEL
ILDE: = 500ppm
maSH REL =
100 ppm
NIaSH REL
STEL = 100 ppm
IDLH = 900 m
AIHA WEEL 100
ppm.
NIOSH REL 0.001
mg/m3NIOSH
considers this
material to be a
carcino en
I ation,
dermal, ingestion,
eyes
Pungent aromatic
odor
yes, replratory tract, s n,
CNS, blood, kidneys,
liver.
a anon,
dermal, ingestion,
eyes
Throat and skin irritant
(dermatitis), headache,
nausea, drowsiness, fatigue
Flammable liquid
with a distinctive,
disagreeable odor
Inhalation, dermal,
ingestion
Irritated nose, throat,
headache, dizziness, nausea,
sleepiness
CNS, liver, kidney,
gastrointestinal damage,
potential carcinogen
pale or dark yellow,
odorless liquid
Inhalation, dermal,
ingestion. Absorption
through the skin is a
significant rnode of
ex osure.
Eyes, skin, respiratory tract,
cWoroacne
May cause reproductive,
CNS, CVS, skin, eye and
liver effects, cancer
(leukemia).
10
HASP-soil borings.doc
_'iBl41 NIOSH considers Liquid with a pleasant
1 ppml this material a odor at high Inhalation, dermal and weakness; abdominal pain, Gastrointestinal bleeding;
Ippm carcinogen concentrations eye contact. pallor or cyanosis of enlarged liver; potential
extremities; liquid: frostbite; occupational liver
carcinogen; damage also to
central nervous system,
blood, respiratory system,
1 m hatic s stem.
PEL - TWA 100 NlOSH considers Colorless liquid with Inhalation, skin Irritation to eyes, skin; Tremor,sonrnolence
ppm C 200 ppm this compound a a cWorofonn-like absorption, ingestion, headache, vertigo (an illusion (sleepiness, unnatural
TLV -TWA50 carcinogen odor and/or eye contact of movement); visual drowsiness), cardiac
ppm; STEL 100 disturbance, fatigue, arrhythmias, paresthesia;
ppm giddiness; nausea, vomiting; liver injury; Potential
dermatitis occupational liver and kidney
carcinogen
11~~&~~~ª1Ia No PEL or TLV None established Solvent odor Inhalation, skin Typical solvent symptoms Likely liver, kidney, and CNS
Established absorption, ingestion, symptoms
and/or eye contact
No PEL NIOSH considers Colorless liquid or gas Inhalation, skin Irritation to eyes, skin, throat; Liver, kidney dysfunction;
this compound a (above 89°F) with a absorption, ingestion, dizziness, headache, nausea, pneumonitis; Potential
TLV - 5ppm carcinogen mild, sweet, and/or eye contact dyspnea (breathing difficulty) occupational liver and kidney
chlorofonn-like odor carcinogen
Target Organs Eyes, skin,
respiratory system, central
nervous system, liver,
kidneys
PEL - TWA 350 NIOSH Ceiling 350 Colorless liquid with Inhalation, skin Irritation to eyes, skin; Cardiac arrhythmias; liver
ppm; ppm a mild, cWorofonn- absorption, ingestion, headache, lassitude damage Target Organs
TLV - 350 like odor and/or eye contact (weakness, exhaustion), Eyes, skin, c~ntral nervous
SECOR International Incorporated 11 HASP-soil borings.doc
100 ppm
25 ppm
IDLH 5 m m3
PEL Ceiling 200ppm
TL V STEL IOOppm
IDLH 15Oppm;
NIOSH considers
this material a
carcinogen
Inhalation, dennal,
ingestion, eyes
Colorless liquid with
mild cWorofonn odor
Irritation to eyes, skin, nose,
throat, respiratory system;
nausea; flush face, neck;
vertigo (an illusion of
movement), dizziness,
incoordination; headache,
skin erythema (skin redness);
Sonrnolence (sleepiness,
unnatural drowsiness); liver
damage; Potential
occupational carcinogen;
Damage to eyes, skin,
respiratory system,liver,
kidneys, central nervous
system.
.E"
PEL-TWA 10
ppm (45 mglm3)
[skin];
TLV lOppm
lImotf'têlfømòrifJe
""",",,,,,,,,,,,,,,,,¡1;,,,,,@_~,",,,,",,,,_~
PEL - TWA 10
ppm; Ceiling 25
ppm;
TL V - 5ppm;
STEL - lOppm
No PEL or TLV
Established
lrøp~.r;'etlii..:,
.<w"w,!!'!,!i!'.JfæS!!!i!:mL",,^@,,,,~,,,
No PEL or TLV
Established
1I1B9lç"~
PEL - TWA 75
ppm;
TLV - lOppm
PEL-TWA5
pprn (35 mglrn3)
[skin]
TLV - 1ppm
PEL-TWA 100
ppm C 200 ppm
TL V - 25ppm
STEL - lOOppm
SECOR International Incorporated
NIOSH considers
this compound a
carcinogen;
REL - TW A 10 ppm
(45 mglm3) [skin]
NIOSH considers
this compound a
carcinogen;
REL - STEL 2 ppm
NIOSH questions if
the PEL is sufficient
to protect workers
NIOSH considers
this compound a
carcinogen;
REL - TWA 1 ppm
(7 mglm3) [skin]
NIOSH considers
this compound a
carcinogen
Colorless liquid with
a sweet, chloroform-
like odor
Colorless liquid with
a characteristic ether-
like odor
Colorless to pale-
yellow, sometimes
heavy liquid
Colorless liquid
Colorless liquid with
an almond-like odor
Colorless to pale-
yellow liquid with a
pungent, chloroform-
like odor
Colorless liquid with
a mild, chloroform-
like odor
12
Inhalation, skin
absorption, ingestion,
and/or eye contact
Inhalation, skin
absorption, ingestion,
and/or eye contact
Inhalation, ingestion
Inhalation, ingestion
Inhalation, skin
absorption, ingestion,
and/or eye contact
Inhalation, skin
absorption, ingestion,
and/or eye contact
Inhalation, skin
absorption, ingestion,
and/or eye contact
central nervous system
depressant/depression, poor
e uilibrium; dermatitis
Irritation to eyes, nose;
central nervous system
depressant/depression;
dermatitis
Irritation to eyes, skin; central
nervous system
depressant/depression;
nausea, vomiting; drowsiness,
dizziness, incoordination
Irritation to eyes, respiratory
system
Irritation to eyes, respiratory
system
Irritation to eyes, skin, nose;
drowsiness, incoordination;
central nervous system
de ressant/de ression
Nausea, vomiting, abdominal
pain; tremor fingers;
dermatitis
Irritation to eyes, skin, nose,
throat, respiratory system;
nausea; flush face, neck;
vertigo (an illusion of
movernent), dizziness,
incoordination; headache,
Liver, kidney damage;
Potential occupational liver
carcinogen Target Organs
Eyes, respiratory system,
central nervous system, liver,
kidneys
Liver, kidney injury;
Potential occupational liver
carcinogen. Target Organs
central nervous system, eyes,
lungs, liver, kidneys, skin
CNS effects possible.
Possible mutagen
Suspect carcinogen
Liver, lung, kidney injury
Target Organs Eyes, skin,
respiratory system, central
nervous system, liver
Jaundice, hepatitis, liver
tenderness; monocytosis
(increased blood monocytes);
kidney damage; Potential
occupational liver carcinogen
Target Organs Skin, liver,
kidneys, central nervous
system, gastrointestinal tract
Somnolence (sleepiness,
unnatural drowsiness); liver
damage; Potential
occupational liver carcinogen
Target Organs Eyes, skin,
respiratory system, liver,
kidne s, central nervous
HASP-soil borings. doc
PEL - TWA 350 NIOSH Ceiling 350 Colorless liquid with Inhalation, skin
ppm; ppm a mild, cWoroform- absorption, ingestion,
TLV - 350 like odor and/or eye contact
ppm;STEL -
450ppm
PEL - TWA 10 NIOSH considers Colorless liquid with Inhalation, skin
ppm (45 mglm3) this compound a a sweet, cWoroform- absorption, ingestion,
[skin]; carcinogen; like odor and/or eye contact
TLV IOppm REL-TWA 10ppm
(45 mg/m3) [skin]
PEL - TW A 10 NIOSH considers Colorless liquid with Inhalation, skin
ppm; Ceiling 25 this compound a a characteristic ether- absorption, ingestion,
ppm; carcinogen; like odor and/or eye contact
TL V - 5ppm; REL - STEL 2 ppm
STEL - IOppm
PEL - TWA 25 NIOSH considers Colorless liquid with Inhalation, skin
ppm STEL 125 this compound a a cWoroform-like absorption, ingestion,
ppm; carcinogen. odor and/or eye contact
TL V - 50ppm
1:~\I!~_il~
0'·:J~fm"B.tI
~¡§!I.I.;";C'M"~~_
~~E1Ii1&L
NoPELorTLV
Established
Colorless to pale-
yellow, sometimes
heavy liquid
Colorless liquid
No PEL or TLV
Established
PEL.- TW A 75
ppm;
TLV - IOppm
NIOSH questions if
the PEL is sufficient
to protect workers
Colorless liquid with
an almond-like odor
SECOR International Incorporated
13
Inhalation, ingestion
Inhalation, ingestion
Inhalation, skin
absorption, ingestion,
and/or eye contact
Irritation to eyes, skin;
headache, lassitude
(weakness, exhaustion),
central nervous system
depressant/depression, poor
e uilibrium; dermatitis
Irritation to eyes, nose;
central nervous system
depressant/depression;
dermatitis
Irritation to eyes, skin; central
nervous system
depressant/depression;
nausea, vomiting; drowsiness,
dizziness, incoordination
Irritation eyes, skin; fatigue,
weakness, somnolence
(sleepiness, unnatural
drowsiness), lightheadedness
numbness, nausea;
Cancer Site [in animals:
lung, liver, salivary &
mammary gland tumors]
Irritation to eyes, respiratory
system
Irritation to eyes, respiratory
system
Irritation to eyes, skin, nose;
drowsiness, incoordination;
central nervous system
de ressant/de ression
Cardiac arrhythmias; liver
damage Target Organs
Eyes, skin, central nervous
system, cardiovascular
system, liver
Liver, kidney damage;
Potential occupational liver
carcinogen Target Organs
Eyes, respiratory system,
central nervous system, liver,
kidneys
Liver, kidney injury;
Potential occupational liver
carcinogen. Target Organs
central nervous system, eyes,
lungs, liver, kidneys, skin
Tingle limbs;
Potential occupational
carcinogen Target Organs
Eyes, skin, cardiovascular
system, central nervous
system
CNS effects possible.
Possible mutagen
Suspect carcinogen
Liver, lung, kidney injury
Target Organs Eyes, skin,
respiratory system, central
nervous system, liver
HASP-soil borings. doc
PEL = Permissible Exposure Limit;
TL V = Threshold Limit Value set by the ACGIH (American Conference of Governmental Industrial Hygienists);
SKIN = Skin absorption;
STEL = Short Term Exposure Limit;
NIOSH = National Institute for Occupation Safety and Health;
IDLH = Immediately Dangerous to Life or Health;
C = Ceiling limit;
CNS = Central Nervous System;
CVS = cardiovascular system
REL = Recommended exposure limit set by NIOSH;
~
Detailed List of Steps with Hazard Assessments and Precautions
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, permitting,
access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of
each workday. Safe Performance Self Assessment (SPSA) procedures must be used throu,ghout the project. Weather conditions (heat, cold, rain,lightning) must also be considered.
o Job Steps . Potential Hazard e Critical Actions
.----. m .. '_··~'~M__·_'M·M"'MM.. ._ Reference Borehole Clearance Review form and coordinate with
Clear drilling locations. Traffic hazards, overhead and
underground installations, product Station Manger (or designee) to minimize potential conflicts. Review
releases, property damage, dealer proposed locations against available construction drawings and known
inconvenience utilities, tanks, product lines, etc. Mark out the proposed borehole
locations. Call underground utility locating service for public line
location clearance and get list of utilities being contacted. If
".................... necessary, coordinate private line locator for private property.
Mobilize with proper equipment/supplies for drilling. Vehicle accident. Lifting hazards. Delay Follow safe driving procedures. Employ safe lifting procedures.
or improper performance of work due to Make sure sub-contractors are aware of their responsibilities for labor,
improper equipment onsite. equipment and supplies. Review HSP and permit conditions and
.. ......-.-- gather n~cessary PPE.
Visually clear proposed drilling locations. Underground and overhead installations. Complete Pre-Mobilization section of Borehole Clearance Review
_m .. .. ....--.- .-- ...-..--...... form and adjust drilling locations as necessary.
Set up necessary traffic control. Struck by vehicle during placement. Use buddy system for placing traffic control. Reference traffic control
Vehicle accident as a result of improper plan section of HSP (may include specific requirements based on
---- ---........----- .-...----.--........-.- traffi~..£2P.:!1.:0l equipment p'lac~!l!.e..p.~... ...P~!:IDÍts). __,
Assist with set up of rig. Vehicle accident during rig movement. Verify clear pathway to drilling location and clearance for raising
Damage caused by rig while accessing mast. Provide as-needed hand signals and guidance to driver to place
set-up location. Contact with overhead rig. Visually inspect rig (fire extinguisher on board, no oil or other
installations. Soft terrain. Rig fluid leaks, cabling and associated equipment in good condition,
movement. pressurized hoses secured with whip-checks or adequate substitute,
jacks in good condition?). If necessary, use wooden blocks under
--.-..- J.acks to spread load. Chock wheels.
Set up exclusion zone(s) and work stations (drilling and logging/sample Struck by vehicle during set up. Slip/fall Implement exclusion zone set-up instructions of HSP. Set up work
_collection). hazards. stations with clear waIkil!$ paths to and from rig.
-
Clear upper five feet of direct push location using post-hole digger or bucket Back strain, exposure to chemical Don required PPE and initiate air quality monitoring in accordance
auger. hazards, hitting an underground utility, with the HSP. . Use the PID to track the airborne concentration of
repetitive motion. contaminants close to potential sources such as the core as it is being
raised from the hole, the core is opened, etc. Have respirator ready
with organic vapor cartridges on your belt, readily available. Evaluate
the sample inside the baggie at arm's length. DO NOT EVALUATE
THE SAMPLE IN THE OPEN THIS WILL AVOID
_. ....- --.....................-.. .---...-.-....-.. ..YNNECESSARY þXPOSURE. Use pro~~r.
Commence drilling. Cross-contamination from previous hole. Decontaminate sampling after collecting a sample and decontaminate
back strain, heat or cold, eye injury, drilling equipment after each borehole. Use proper lifting techniques.
noise, exposure to chemical,~~!!.!..d.s, ....º-~..PPE and monitoring in accordan~~ with HSP (especially note ear
SECOR International Incorporated
14
HASP-soil borings.doc
If
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, permitting,
access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of
each workday. Safe Performance Self Assessment (SPSA) procedures must be used throughout the project. Weather conditions (heat, cold, rain, lightning) must also be considered.
o Job Steps . Potential Hazard o Critical Actions
___.n.___ , , n'H"n'_'_"_'''H M'______..___···
hitting an underground utility, trip and protection). Monitor drilling progress. Keep work area clear of
fall, equipment failure tripping or slipping hazards. Perform periodic visual inspections of
drill ri .
- "n" . ,-,-_.~
Collect samples in accordance with sampling plan. Cross-contamination, improper labeling Decontaminate sampling equipment between each sampling run.
or storage, exposure to site contaminants. Label samples in accordance with sampling plan. Keep samples
stored in proper containers, at correct temperature, and away from
- - "......n". ,...---,--- ~2!.k area. Perf~~..~ monitoring, and we?! proper PPE.
Store cuttings (if any) properly in accordance with site-specific requirements. Exposure to public. Traffic hazard or Have proper storage containment and labeling available onsite. Place
obstruction/inconvenience to station materials in isolated location away from traffic and other site
-.---- ~--_._.. operation.._~p"~~per stora~,.2!..~~posal. ~E.£!ions. Coc:>rdinate proper disposa!. offsite (where applicable).
Backfill borehole. Improper grouting can lead to future Mix grout to specification and completely fill the hole. Use proper
vertical conduit for contaminant lifting techniques and wear proper PPE. Keep work area clear of
migration. Back strain, trip hazards, eye tripping hazards. Verify presence or other authorization by required
injury from splashing or release of inspectors for grouting.
pressurized grout. Unauthorized
---' """_·,_______n . "_'_n_ J?.1!~1.<&!!!.!!.g_~auses eX~!~,~ork. H"_
Dispose or store purge water (if any) onsite. Back strain. Exposure to contaminants. Use proper equipment to transport water (pumps, drum dollies, etc.).
If disposing through onsite treatment Wear PPE in accordance with HSP. Review instructions for use of
system, damage or injury from improper onsite treatment systems. Label storage containers properly, and
use of equipment. Improper storage or locate in isolated area away from traffic and other site functions.
- disposal. Coordinate offsite_ disposal (where applicable).
Clean site/demobilize. Traffic. Safety hazard left on site. Use buddy system as necessary to remove traffic control. Leave site
Lifting hazards. clean of refuse and debris. Clearly marklbarricade any borings that
need later topping off or curing. Notify station personnel of departure,
final well locations and any cuttings/purge water left onsite. Use
M'....__..__._____ n__n__n proper lifting techniques
Package and deliver samples to lab. Bottle breakage, back strain. Handle and pack bottle carefully (bubble wrap bags are helpful). Use
f-----,-,-- --"'-". ...m. ......._.M_.___ .........--.".-- ...·M..n......""·...·" "'"""M,_ , proper lifting tec~!:!.~,~. --.
General
Keep SPSA cärd on you at all times. Use it frequently. What can happen? Whä¡'" _............_·m.....".. .....M......_____.. """"____"_.M_
is the worst thing that c!!;n hEP.J?!!l...!.....Planfor it and carry out ),£.':I:.':.plan. ...."'..,_._.. ___"_'M" _M___.____ ..---
Typical work Weather related incidents: automobile Check weather reports daily. Project will visits will not be performed
accidents, slips and falls. during inclement weather. Sampling may be performed during light
rain mist. Wear raincoats. Drive at speed limit or less as needed to
keep safe distance from vehicle in front, avoid short stops.
Typical work. MM__·_____._______MM_ ....---.- _...._.ø__...___......__.
Cold Stress. For temperatures below 40°F, adequate insulating clothing must be
worn. If the temperature is below 20 Op, workers will be allowed to
enter a heated shelter at regular intervals. Warm, sweet drinks should
be available. Coffee intake should be limited.
No one should begin work or returri to work from a heated shelter
with wet clothes. Workers should be aware of signs of cold stress,
such as heavy shivering, pain in fingers or toes, drowsiness or
,---- __..._._. _ia:it..'1hjJ.ih.t__.Gn.fi'..e!...o.í..!m.1L.L)~ci~-Ìnc1.¡,..<'\t.¡nTlC" :far...itnm.er1~ .",+.0.
SECOR International Incorporated
15
HASP-soil borings.doc
·.
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting work including, but not limited to, permitting,
access agreements, and notification to required contacts (e.g. site managers, inspectors, clients, subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of
each workday. Safe Performance Self Assessment (SPSA) procedures must be used throughout the project. Weather conditions (heat, cold, rain, liJ!:htninJ!:) must also be considered.
o Job Steps 49 Potential Hazard . Critical Actions
---- -. ...---......-- -..... ....-...-..-..-.-..-...."...........................
irritability. Onset of any of these signs are indications for immediate
return to a heated shelter.
Heat Stress
For temperatures above 75/F, each person will take their pulse at rest.
At breaks, the pulse should be less than 110 beats per minute after one
minute. Before returning to work, the pulse should be no more than
10 beats greater than the resting pulse.
If the air temperature is greater than 95/F, work should be done for
30 minutes with a rest break of 10 minutes for Level D. For Level C,
work should be done for 20 minutes, with a rest break of 10 minutes. At
least 8 ounces (1 cup) of cool water, Gatorade-type drink, or dilute fruit
juice should be consumed at each rest break or at least one cup every 20
minutes.
Work should stop if any of the following symptoms occur: muscle
spasm and/or pain in the limbs or abdomen (heat cramps); weak pulse,
heavy sweating, dizziness, and/or fatigue (heat exhaustion); or rapid
pulse, no sweating, nausea, dizziness, and/or confusion (heat stroke).
Provide First Aid immediately.
Use sunscreen on unprotected skin to protect against ultraviolet
exposure as necessary.
. _NO
.---.......-....................
,....-- --......,..."-,---.-....-..,--.--
No eating, drinking, or smoking on-site.
No contact lenses on-site.
No facial hair that would interfere with respirator fit.
..............- --..............-.......................----....-----.....................---._--
......-.-.....
....----
A safety meeting will be held each day, even if there is only one person working
on the project on any given day.
---,_.._....._-
--,
-
............-................-.
Topics will always include the work scheduled for the day and
restatement of the hazards and means to avoid them. Other topics
may include sampling in general and advances in technology and how
it may be applied to the project. Use Attachment 6 for logging the
_.__..__....._ ~i~,S."c!!.s.Eussed. ._
---.....
--...................--..........."'......................- ---..-......
..
SECOR International Incorporated
16
HASP-soil borings. doc
Attachment 1
SITE MAP
SECOR International Incorporated
17
HASP-soil borings.doc
JSA Type: 181 SAR Operations o Transport DOffice o Construction 1181 New o Revised I Date: 03/30/00
Co: Dept: Div: Org Unit: Loc:
Work Type: Environmental I Work Activity: Hollow Stem Auger Sampling
Personal Protective Equipment cpPE);
Minimum PPE is Level D including: safety glasses or goggles, hard hat, steel-toed and shank boots, hearing protection, and gloves (type dependent
on job-specific requirements)
Additional PPE may be required in the Health & Safety Plan (HSP). Also refer to the HSP for required traffic control, air monitoring, and
emergency procedures.
Development Team PositionITitle Reviewed By PositionITitle Date
--- -------
.- --- -, - ---
Field staff must review job-specific work plan and coordinate with project manager to verify that all up-front logistics are completed prior to starting
work including, but not limited to, permitting, access agreements, and notification to required contacts (e.g. site managers, inspectors, clients,
subcontractors, etc.). A tailgate safety meeting must be performed and documented at the beginning of each work day. Safe Performance Self
Assessment (SPSA) procedures must be used durin,g field activities. Weather conditions (heat, cold, rain, li,ghtnin,g) must also be considered.
o Job Steps 8 Potential Hazard . Critical Actions
--- --
Clear drilling locations. Traffic hazards, overhead and Reference Borehole Clearance Review form and
underground installations, product coordinate with Station Manger (or designee) to minimize
releases, property damage, dealer potential conflicts. Review proposed locations against
inconvenience available construction drawings and known utilities, tanks,
product lines, etc. Mark out the proposed borehole
locations. Call underground utility locating service for
public line location clearance and get list of utilities being
contacted. If necessary, coordinate private line locator for
.. -,--.-,---.----- 1>riv~~,p~. '-.- --
Mobilize with proper Vehicle accident. Lifting hazards. Delay Follow safe driving procedures. Employ safe lifting
equipment/supplies for drilling. or improper performance of work due to procedures. Make sure sub-contractors are aware of their
improper equipment onsite. responsibilities for labor, equipment and supplies. Review
HSP and permit conditions and gather necessary PPE.
Visually clear proposed drilling Underground and overhead installations. Complete Pre-Mobilization section of Borehole Clearance
locations. Review form and adjust drillinl!; locations as necessary.
Set up necessary traffic control. Struck by vehicle during placement. Use buddy system for placing traffic control. Reference
Vehicle accident as a result of improper traffic control plan section ofHSP (may include specific
traffic control equipment placement. - requirements based on permits).
Assist with set up of rig. Vehicle accident during rig movement. Verify clear pathway to drilling location and clearance for
Damage caused by rig while accessing set- raising mast. Provide as-needed hand signals and guidance
up location. Contact with overhead to driver to place rig. Visually inspect rig (fire
installations. Soft terrain. Rig movement. extinguisher on board, no oil or other fluid leaks, cabling
and associated equipment in good condition, pressurized
hoses secured with whip-checks or adequate substitute,
jacks in good condition?). If necessary, use wooden
blocks under jacks to spread load. Chock wheels.
Set up exclusion zone(s) and work Struck by vehicle during set up. Slip/fall Implement exclusion zone set-up instructions of HSP. Set
stations (drilling and logging/sample hazards. up work stations with clear walking paths to and from rig.
collection). -- ._--~- ---.
Clear upper five feet of boring using Back strain, exposure to chemical hazards, Don required PPE and initiate air quality monitoring in
post-hole digger or bucket auger. hitting an underground utility, repetitive accordance with the HSP. Use proper lifting techniques
motion. and tools. Complete the Pre-Drilling section of the
Borehole Clearance Review form.
Contractor Nall1e JS.-\, ¡SA samplJn~ ,!L)C
· Critical Actions
Decontaminate sampling after collecting a sample añ¡¡--
decontaminate drilling equipment after e.ach borehole. Use
proper lifting techniques. Use PPE and monitoring in
accordance with HSP (especially note ear protection).
Monitor drilling progress - proceed cautiously for first 10
feet - watching for changes in either drilling difficulty or
cuttings. Keep work area clear of tripping or slipping
.__..___'__,_.._._____..._..__ _,,_,_...._'...._______,_._ ...... haz.~~~.Je1fI?.~~.!Í0~c vi~\.!.~ ins~cti0I1!..I?!,~1l ris,.:......_
Collect samples in accordance with Cross-contamination, improper labeling or Decontaminate sampling equipment between each
sampling plan. storage, exposure to site contaminants. sampling run. Label samples in accordance with sampling
plan. Keep samples stored in proper containers, at correct
temperature, and away trom work area. Perfonn air
monitoring and wear proper PPE. Inspect hammer cable
__....____, ._.__....____.. ___ ~..to the collection of each core sample..
Store cuttings properly in accordance Exposure to public. Traffic hazard or Have proper storage containment and labeling available
with site-specific requirements. obstruction/inconvenience to station onsite. Place materials in isolated location away trom
operation. Improper storage or disposal. traffic and other site functions. Coordinate proper disposal
.. _ __ ,.£ffsite !wh~~~p'p'licable). ..,
Improper grouting can lead to future Mix grout to specification and completely fill the hole.
vertical conduit for contaminant migration. Use proper lifting techniques and wear proper PPE. Keep
Back strain, trip hazards, eye injury trom work area clear of tripping hazards. Verify presence or
splashing or release of pressurized grout. other authorization by required inspectors for grouting.
Unauthorized backfiUing causes extra
work.
- ..
Back strain. Exposure to contaminants. If
disposing through onsite treatment system,
damage or injury trom improper use of
equipment. Improper storage or disposal.
Use proper equipment to transport water (pumps, drum
doIlies, etc.). Wear PPE in accordance with HSP. Review
instructions for use of onsite treatment systems. Label
storage containers properly, and locate in isolated area
away trom traffic and other site functions. Coordinate
offsite di~sal (where applicable).
Use buddy system as necessary to remove traffic control.
Leave site clean of refuse and debris. Clearly
marklbarricade any borings that need later topping off or
curing. Notify station personnel of departure, final well
locations and any cuttings/purge water left onsite. Use
____1-,...____..._._.___________ ....£T0per lif!.ing te~hniques .._
Package and deliver samples to lab. Bottle breakage, back strain. Handle and pack bottle carefully (bubble wrap bags are
._____ __.... _ helpful). Use pI:,0per lifti..EK.!.e..chniques. __
¿
o Job Steps . Potential Hazard
,------- -
Commence driIJing. Cross-contamination trom previous hole.
back strain, heat or cold, eye injury, noise,
exposure to chemical hazards, hitting an
underground utility, trip and fall,
equipment failure
"'~'___"_M
Backfill borehole.
Dispose or store purge water (if any)
onsite.
1----'
Clean site/demobilize.
..
,-f--..
Traffic. Safety hazard left on site, Lifting
hazards.
..
__M_
Contractor Nan1e JSA,IlS,d, s.tmpling d()l'
Attachment 2
INCIDENT TYPE
0 Fatality 0 Industrial Non-Recordable 0 SpílllLeak
0 Lost Workday 0 Non-Industrial 0 Product Integrity
0 L W Restricted Duty 0 Off-the-Job Injury 0 Equipment
0 OSHA MedicaÌ or Dlness w/o LW 0 MVA 0 Business Intermpûon
0 FlfSt Aid 0 Fire (TO BE COMPLETED BY HR)
Date of Incident:
o General Liability
o Criminal Acûvity
o NOûce ofViolaûon
o Near Miss
This report must be completed by the employee's supervisor or Site Health and Safety Officer immediately upon learning of the incident. The
completed report must be reviewed and signed by the Principal-In-Charge and e-mailed or faxed to the Vice President of Human Resources,
Corporate Health and Safety and the Health & Safety Coordinator within 24 hours of the incident, even if employee is not available to review and
sign. Employee or employee's doctor must submit a copy of the doctor's report to Human Resources within 24 hours of the initial exam and any
subsequent exams. Phone: 619-718-9429, Fax: 619-296-2006, E-Mail: mharris@secor.com.
EMPLOYEE
Work Location Address where incident occurred:
Name:
--¡-
I How long in present job?
INJURY OR ILLNESS INFO
Where did incident I near miss occur? (number, street, city, state, zip):
County: I Employer's premises? DYes o No
Specific activity the employee was engaged in when the incident I near miss occurred:
- M'__M
All equipment, materials, or chemicals the employee was using when the incident I near miss occurred (e.g., the machine employee struck against or which struck
employee; the vapo~ inhaled or material swallowed; what the employee was lifting, pulling, etc,):
- ._.__'H
Describe the specific injury or illness (e.g., cut, strain, fracture, skin rash, etc.):
-
Body partes) affected (e.g., back, left wrist, right eye, etc.):
.
Name and address of Health Care Provider (e.g., physician or clinic): Phone No.:
.,
If hospitalized, name and address of hospital: Phone No.:
Date of injury or onset of ilIness (MMlDDIYYYY) ;--;--1 Time of event or exp~ure: ,-,
0 AM 0 PM
Time employee began work: o AM 0 PM J Did employee lose at least one full shift's work?
o No 0 Yes, 1st date absent (MMlDDIYYYY) I I
-, - ..."
Has employee returned to work? o Regular work o Restricted work o No, sû1l off work DYes, date returned (MMlDDIYYYY) I I
. ---,.---"
Did employee die? 0 No 0 Yes, date (MMlDDIYYYY) I I
. --....-..-..
Date employer noûfied of incident I near miss: (MMlDDIYYYY) I I
To whom reported: I
Other workers injured/made ill in this event? 0 Yes 0 No T
Employment Status: 0 Full-Time 0 Part-Time 0 Hourly-As-Needed
SECOR International Incorporated
18
I S~~:_,
Birthdate:
HASP-soil borings. doc
Description of Incident / Nenr Miss: (Describe fully the incident / near miss events. Tell what happened nnd how it happel1l'd.)
Trnck Transportation:
Years with Carrier:
Professional Driver? 0
No Operation Type:
L Vehic1~ ~;-----_.
~.~-_._-
~ccident Situation:
- -~._-----
Equipment #:
Accident Location (street, city, state):
Hazardous Material? 0 Yes
Root Cause(s) Analysis (RCA):
1. Lack of skill or knowledge 5. Correct way takes more time and/or requires more effort
2. Lack of or inadequate operational procedures or work standards 6. Short-cutting standard procedures is positively reinforced or tolerated
3. Inadequate communication of expectations regarding procedures or work standards 7. Person thinks there is no personal benefit to always doing the job according
to standards
4. Inadequate tools or equipment 8. Uncontrollable
RCA# I Closu
# Solution(s): How to Prevent Incident I Near Miss From Reoccurring Person Responsible Due Date re
Date
.-
;
lmestigation Tenm Members
.Name
Job Title
Date
Name
Job Title
~ Date
I
r------
..__.___M
M_____·
First Line Supervisor
Other (name)
SECOR International Incorporated
19
HASP-soil borings.doc
y-
-------------------
----------- --------- -----
Job Factor
Uncontrollable
Factor
o
I
· 1
1 .
I I
I 1
I 1
· I
I I
I 1
, I
I I
: ,..----
I 1
· I
I 1
I I
· 1
I 1
I 1
I 1
I 1
I I
· 1
I 1
I I
1 1
I I
, I
1 I
I I
· 1
: ~----
I I
I _I
I 1
· I
I 1
I 1
I 1
I I
I 1
1 I
· 1
I I
I 1
, 1
I I
1 I
· I
I I
I I
: ...----
I 1
I 1
I .
I I
L____~______________________________________
I
S olutionlR eco m m endation
I
I
I
I
1
I
I
1
·
~--
I
I
I
I
·
I
1
,
I
I
I
I
I
1
I
·
I
1
I
..--
I
I
I
I
1
I
,
I
I
I
1
1
I
I
·
L__
I
I
I
I
I
1
I
I
1
·
I
I
I
I
I
I
I
I
r Implementation of
Solution/Recom m endation
SECOR International Incorporated
20
HASP-soil borings.doc
Attachment 3
SUBCONTRACTOR TRAINING AND MEDICAL SURVEILLANCE RECORD
Subcontractor:
Address:
Employees Assigned to Project:
I certify the above employees assigned to this project have received training and medical surveillance
according to the Health and Safety Plan and the Occupational Safety and Health Administration Standard
on Hazardous Waste Operations and Emergency Response (29 CFR 1910.120):
Name (printed):
*Signature:
Title:
Date:
*Subcontractor Field Supervisor or Manager only.
SECOR International Incorporated
21
HASP-soil borings,doc
Attachment 4
UTILITY CLEARANCE LOGS
SITE LOCATION:
MAP/GRID:
CLOSEST INTERSECTING
STREET:
WHERE MARKS ARE NEEDED:
TYPE OF WORK:
WORK TO BE PERFORMED
FOR:
MARKOUT REQUEST CALLED
IN ON:
MARKOUT REQUEST CALLED
IN BY:
TICKET #:
REST AKE #S (IF APPLICABLE):
STAKING DATE:
TIME: '
CURRENT MARKOUT EXPIRES:
CALL BY TillS DATE FOR
REMARK:
UTILITIES NOTIFIED:
***STA Y 2 FEET FROM MARKINGS!!
SECOR International Incorporated
22
HASP-soil borings.doc
~
'~
Attachment 5
SECOR
Action Level Table For Chemical Monitorin
Volatile Organics PID- Mini Rae or OVM Daily with isobutylene All ground During each 10 ppm above background 20 ppm above background
calibration gas. water sampling regimen. sustained in breathing zone sustained in breathing zone
sampling Note careful of for a minimum of I minute and no benzene tube
use of the and benzene tube non-detect. discoloration.
instrument
described in the
step by step
procedure table to
ensure that the
chance of
overexposure is
reduced.
Any tube discoloration
Benzene PID- Mini Rae or Leak check pump daily. All ground During each > 2 ppm in breathing zone.
OVM- and Dräger 0.5/a Check expiration date of water sampling regimen.
benzene tube tube and tube integrity. sam lin
AIR MONITORING EQUIPMENT CALIBRATION/CHECK LOG*
SECOR International Incorporated
23
HASP-soil borings. doc
*Submit copies of logs to Director of Industrial Hygiene & Health and Safety within 24 hours of expiration date of Plan, if a PEL is exceeded, or
personal protective equipment level is upgraded.
AIR MONITORING LOG
*Submit copies of logs to Director of Industrial Hygiene & Health and Safety within 24 hours of expiration date of Plan, if a PEL is exceeded, or
personal protective equipment level is upgraded.
SECOR International Incorporated
24
HASP-soil borings. doc
Attachment 6
DAILY HEALTH AND SAFETY BRIEFING LOG
Date:
Start Time:
Issues Discussed:
1.
2.
3.
4.
5.
Meetin Conducted b :
Name (Site Health and Safet Coordinator)
Si nature
SECOR International Incorporated
25
HASP-soil borings.doc
Attachment 7
HEALTH AND SAFETY PLAN ACKNOWLEDGMENT AND AGREEMENT FORM
(All SECOR and subcontractor personnel must sign.)
This Health and Safety Plan has been developed for the purpose of informing SECOR employees of the hazards they are
likely to encounter on the project site, and the precautions they should take to avoid those hazards. Sub-contractors and
other contractors on the site must develop their own Health and Safety Plan to address the hazards faced by their own
employees. SECOR has provided a copy of this Plan to contractors in the interest of full disclosure of hazards of which
we may be aware, and to satisfy SECOR's responsibilities under the OSHA Hazard Communication standard. Similarly,
contractors are required to inform SECOR of any hazards of which they are aware or that the contractor's work on site
might possibly pose to SECOR employees, including (but not limited to) the Material Safety Data Sheets for chemicals
the contractor may bring on-site. This plan should NOT be understood by contractors to provide information on all of
the hazards to which a contractor's employees may be exposed as a result of their work. All parties conducting site
activities are required to coordinate their activities and practices with the Project Health and Safety Coordinator. Your
signature below confirms that you have read and understood the hazards discussed in this Plan, and understand that sub-
contractors and contractors must develop their own Health and Safety Plan for their employees. I also understand I could
be prohibited by the Site Health and Safety Coordinator or other SECOR personnel from working on this project for not
complying with any aspect of this Health and Safety Plan.
SECOR International Incorporated
27
HASP-soil borings.doc
SECOR International Incorporated
28
HASP-soil borings.doc
ATTACHMENTD
FIELD PRACTICES AND PROCEDURES
AND QUALITY ASSURANCE PLAN
.l
ATTACHMENTD
FIELD PRACTICES AND PROCEDURES
AND QUALITY ASSURANCE PLAN
General procedures used by SECOR International Inc. (SECOR) in site assessments for drilling
exploratory brings, collecting samples, installing monitoring wells, sampling monitor wells,
analytical procedures, and assessment of data are described herein. These general procedures are
used to provide consistent and reproducible results. However, some procedures may be modified
based on site conditions. In addition, this attachment presents a quality assurance plan adopted in
conducting the activities described here.
PRE-FIELD WORK ACTIVITIES
Health and Safety Plan
Fieldwork performed by SECOR at the site is conducted according to guidelines established in a
Site Health and Safety Plan (SHSP). The SHSP is a document which describes the hazards that
may be encountered in the field and specifies protective equipment, work procedures, and
emergency information. A copy of the SHSP is at the site and available for reference by
appropriate parties during work at the site.
Locatine: Undere:round Utilities
Prior to commencement of any work that is to be below surface grade, the location of the
excavation , boring, etc., is marked with white paint as required by law. An underground
locating service such as Underground Service Alert (USA) is contacted. The locating company
contacts the owners of the various utilities in the vicinity of the site to mark the locations of their
underground utilities. Any invasive work is preceded by hand augering to a minimum depth of
five feet below surface grade to avoid contact with underground utilities.
).
FIELD METHODS AND PROCEDURES
Drillinl!
Soil borings will be drilled using truck-mounted, hollow stern auger drill rig. Soil samples for
logging will be obtained from auger-return materials and by advancing a modified California
split-spoon sampler equipped with brass or stainless steel liners into undisturbed soil beyond the
tip of the auger. Soils will be logged by a geologist according to the Unified Soil Classification
System and standard geological techniques.
Soil Sampling equipment will be cleaned with detergent water solution (Liqonox or TCP), rinsed
with clean water, and equipped with clean liners between sampling intervals. A consulting
geologist will oversee a drilling company steam clean augers and samplers between each boring
to reduce the possibility of cross contamination. Steam cleaning effluent will be contained in 55-
gallon drums and temporarily stored onsite. The disposal of the effluent will be the
responsibility of Atlantic Richfield Company.
Soil Classification
Samples will be classified onsite by the field geologist in accordance with the Unified Soil
Classification System. Representative portions of the samples will be retained for further
examination and for verification of field classification. Logs of the borings indicating the depth
and identification of the various strata and pertinent infonnation will be prepared for the final
written report.
Soil Sample Screenin2
Soil samples selected for chemical analysis' will be determined from a head-space analysis using
a PID or an FID. The soil will be places in a Ziploc®- type reseal able plastic bag and allowed to
reach ambient temperature, at which time the PID probe will be inserted into the bag. The total
volatile hydrocarbons present are detected by the PID and reported in parts per million by volume
(ppmv).
A PID is calibrated by entering the known concentration (in ppmv) of a containerized gas
(typically isobutylene) into the display function of the PID machine. The containerized gas
release through an inert (plastic) tube into the sensory received of the PID. The PID nonnalizes
its volatile organic compounds (VOC) detection sensors to match the known concentration of the
gas being input into the PID machine.
Soil Samnle Collection
During drilling, soil samples will be collected in clean brass, two by six inch tubes, The tubes
will be set in an18-Ìnch-Iong split-barrel sampler. The sampler will be conveyed to the bottom of
the borehole attached to a wire-line hammer device drill rig. When possible, the split-barrel
sampler will be driven its entire length, either hydraulically or by repeatedly pounding a 140-
pound hammer using a 30-inch drop. The number of drops (blows) used to drive the sampler
will be recorded on the boring log. The sampler will be extracted from the borehole, and the
tubes containing the soil samples will be removed. Upon removal, the ends of the lowermost
tube will be sealed with Teflon TM sheets and plastic caps. Soil Samples for chemical analysis will
be labeled, placed on ice, and delivered to a state-certified analytical laboratory, along with the
appropriate chain-of-custody documentation.
Label information includes a unique sample identification number, job identification number,
date, and time. After labeling, all soil and water samples are placed in a Ziploc® type bag and
placed in an ice chest cooled to approximately 4°C. Upon arriving at SECOR's office, these
samples are transferred to a locked refrigerator cooled to approximately 40 Celsius. Chemical
preservation is controlled by the required analysis and is noted on the chain-of custody.
The number of samples collected to evaluate impact to soil is determined by the overseeing
registered geologist. This information and rationale is typically presented in the work plan.
Stockpiled Drill Cuttin2s and Soil Samplin2
Soil generated during drilling operations will be stockpiled onsite. The stockpile will be set on
and covered by plastic sheeting in a manner to prevent rain water from coming in contact with
the soil. Prior to collècting soil samples, SECOR personnel will calculate the approximate
volume of soil in the stockpile. The stockpile will then be divided into 50 cubic yard (volume)
sections, if warranted, for sampling. Soil samples will be collected at 0.5 and 2 feet below the
surface of the stockpile. Four soil samples will be collected from the stockpile and composited
into one sample by the laboratory prior to analysis. The soil samples will be collected in clean
brass, two by six inch tubes using a hand driven sampling device. To reduce the potential for
cross-contamination between samples, the sampler will be cleaned between each sampling event.
Upon recovery, the sample container will be sealed at each end with Teflon™ sheeting and plastic
caps to minimize the potential of volatilization and cross-contamination prior to chemicalqanalysis. The soil sample will be labeled, placed in an ice chest cooled to 40 Celsius, and
delivered to a state-certified analytical laboratory, along with the appropriate chain-of custody
documentation.
<.
Sample Identification and Chain-of Custody
Sample identification and chain-of-custody procedures document sample possession from the
time of collection to ultimate disposal. Each sample container submitted for analysis has a label
affixed to it to identify the job number, sampler, date and time of the sample collection, and the
sample number unique to that sample. This information, in addition to a description of the
sample, field measurements made, sampling methodology, names of onsite personnel, and any
other pertinent field observations, are recorded on the borehole log or in the field records. A
chain-of-custody form is used to record possession of the sample from the time of collection to
its arrival at the laboratory. When samples are shipped, the person in custody of them
relinquishes the samples by signing the chain-of custody form and noting the time.
Monitorin2 Well Installation
Monitoring wells will be completed by installing one two-inch-diameter Schedule 40 polyvinyl
chloride (PVC) casing. The two-inch diameter monitoring wells will be installed using 8-inch
diameter hollow stem augers.
Monitoring wells will be constructed using threaded, factory-perforated and blank Schedule 40
PVC. The perforated interval consists of slotted casing, 0.01 or 0.02 inches wide by 1.5-inch
long slots, with 42 slots per foot. The screened interval wíll allow for seasonal fluctuation in
water level and for monitoring floating product. A threaded PVC cap is secured to the bottom of
the casing. The well casing is thoroughly washed and/or steam cleaned, or may be purchased as
pre-cleaned, prior to completion.
A filter pack of graded sand will be placed in the annular space between the PVC casing and the
borehole wall. Sand will be added to the borehole through the hollow stem of the augers provide
a uniform filter pack around the casing and to stabilize the borehole. The sand pack will be
placed to a maximum of 2 feet abÇ>ve the screens, followed by a minimum I-foot seal consisting
of bentonite pellets.
Cement grout containing 5 percent bentonite will be placed above the bentonite seal to the grout
surface. A concrete traffic-rated vault box will be installed over the monitoring wells. A water
tight locking cap will be installed over the top of the well casing. Monitoring well elevations
will be surveyed by a state-certified land surveyor to the nearest 0.01 vertical feet relative to
mean sea level (MSL). Horizontal coordinates of the wells will also be obtained at the same
time.
EQuipment Cleanin2
Sample bottles, caps, and septa used in sampling for volatile and semi volatile organics will be
triple rinsed with high-purity deionized water. After being rinsed, sample bottles will be dried
overnight at a temperature of 200°C. Sample caps and septa will be dried overnight at a
temperature of 60°C. Sample bottles, caps, and septa will be protected from solvent contact
between drying and actual use at the sampling site. Sampling containers will be used only once
and discarded after analysis is complete.
Plastic bottles and caps used in sampling for metals will be soaked overnight in a 1 percent nitric
acid solution. Next, the bottles and caps will be triple rinsed with deionized water. Finally, the
bottles and caps will be air dried before being used at the site. Plastic bottles and caps will be
constructed of linear polyethylene or polypropylene. Sampling containers will be used only once
and di~carded after analysis is complete. Glass and plastic bottles used by SECOR to collect
groundwater samples are supplied by the laboratory.
Before the sampling event is started, equipment that will be placed in the well, or will come in
contact with the groundwater, will be disassembled and cleaned thoroughly with detergent water,
and then steam cleaned with deionized water. Any parts that may absorb contaminants, such as
plastic pump valves, etc., will be cleaned as described above or replaced. During field sampling,
equipment surfaces that are placed in the well or contact groundwater will be steam cleaned with
deionized water before the next well is purged or sampled.
Soil samples are collected in new, pre-cleaned brass liners. These sample liners are either used
by themselves, or are inserted in the sampling equipment. Soil samples are not collect with or in
reusable equipment.
Cone Penetrometer Tool (CPr) Testine;
The CPT method consists of advancing a cone-tipped cylindrical probe (1.7 inches in diameter)
into the ground while simultaneously measuring resistance to the penetration. The CPT method
determines soil lithology by comparing the force (cone bearing pressure) required to advance the
probe (Qt) to the friction ration (Rf) (Rf equals sleeve friction [Fs] divided by the probe tip load,
times the penetration pore pressure [Ud]). Computer generated CPT logs will be plotted in the
filed, providing the field representative a graphical log of subsurface soil lithology. A CPT test
data report, which will include logs of all CPT technique, will submitted with the final report.
CPT testing will be perfonned in accordance with American Society of Testing and Materials
(ASTM) Method D3441.
The cone testing will be perfonned inside of a grout collar installed at the ground surface. The
grout collar will allow the CPT contractor to backfill the boring as the steel rods are retracted
from the hole. Continuous grouting will prevent cross-contamination of water bearing zones that
can occur through an open borehole. The boring will be backfilled to surface grade. An asphalt
patch will be placed over the borehole.
Direct Push Technology. Water Sampling
A well-known example of the direct push technology for water sampling if the Hydropunch®.
For the purpose of this field method, the tenn hydropunch will be used instead of direct push
technology for water sampling. Hydropunch samples will be collected by placing a disposable
steel tip on the end of a two-inch diameter rod containing five feet of disposable I-inch diameter
slotted PVC casing. The sampling rods are pushed to the desire depths using the CPT truck.
Depth discreet samples are obtained by retracting the rods four feet, exposing the screen at the
desired sampling interval. Samples are collected by lowering a bailer inside the steel rods and
recovering groundwater. Groundwater is poured from the bailer into laboratory supplied glass
vials. The water samples will be labeled, placed on ice, and delivered to a state-certified
laboratory along with the appropriate chain-of-custody documentation. The inside and outside of
the two-inch diameter steel rods are steam cleaned between sampling events to prevent cross-
contaminating groundwater samples.
Soil Sampling
Soil samples will be collected at the CPT locations using a retractable sampler equipped with two
1.25-inch by 6-inch brass sleeves. Soil sampling is conducted by advancing the sampler to the
top of the desired sampling depth. The CPT operator subsequently retracts the rods
approximately 12 inches, exposing the brass sleeves in the borehole. The sampler is then driven
into the native soil.
Groundwater and Liauid-Phase Petroleum Hvdrocarbon Depth Assessment
A waterlhydrocarbon interface probe is used to assess the liquid-phase petroleum hydrocarbon
(LPH) thickness, if present, and a water level indicator is used to measure the groundwater depth
in monitoring wells that do not contain LPH. Depth to groundwater or LPH is measured from a
datum point at the of each monitoring well casing. The datum point is typically a notch cut in the
north side of the casing edge. If a water level indicator is used, the tip is subjectively analyzed
for hydrocarbon sheen.
Subiective Analvsis of Groundwater
Prior to purging, a water sample is collected from the monitoring well for subjective assessment.
The sample is retrieved by gently lowering a clean, disposable bailer to approximately one-half
the bailer length past the air/liquid interface. The bailer is then retrieved, and the sample
contained within the bailer is examined for floating LPH and the appearance of a LPH sheen.
Monitorin2 Well Pur2Ín2 and Samplin2
If the depth to groundwater is above the top of the screens of the monitoring well, then the wells
are purged. Monitoring wells are purged using an electrical submersible pump or bailer until pH,
temperature, and conductivity of the [urge water has stabilized and a minimum of three well
volumes of water have been removed. Wells are typically purged at a rate of I gallon per minute
(gpm), though will not exceed 2 gpm. If three well volumes can not be removed in one half
hour's time the well is allowed to recharge to 80% of the original level. After recharging, a
groundwater sample is then removed from each of the wells using a disposable bailer.
Groundwater purged from the monitoring wells typically transported to a holding facility in West
Sacramento.
A Teflon bailer will be the only equipment used for well sampling. When samples for volatile
organic analysis are being collected, the flow of groundwater from the bailer will be regulated to
minimize turbulence and aeration. Glass bottles of at least 40-milliliters volume and fitted with
Teflon TM_ lined septa will be used is sampling volatile organics. These bottles will be filled
completely to prevent air from remaining in the bottle. A positive meniscus forms when the
bottle is full. A convex Teflon™ septum will be placed over the positive meniscus to eliminate
air. After the bottle is capped, it is inverted and tapped to verify that it contains no air bubbles.
The sample containers for other parameters will be filled, filtered as required, and capped.
The water sample is collected, labeled, and handled according to the Quality Assurance Plan.
Water generated during the monitoring events is disposed of at approved water recycling
facilities.
Quality Assurance Plan
Procedures to provide data quality have been established and documented so that conditions
adverse to quality, such as deficiencies, deviations, defective material, services, and/or
equipment, can be identified and corrected.
Internal Qualitv Assurance Checks
Internal quality assurance procedures will be used to provide reliability of monitoring and
measurement of data. Both field and laboratory quality assurance checks as listed below will be
used to evaluate the reliability of sampling and analysis results. Tables 1 through 7 present data
qualìty indicators (DQI) used by the laboratory to meet internal quality assurance procedures.
Internal quality assurance procedures generally include:
Laboratory Quality Assurance
·
Documentation of instrument performance checks,
Documentation of instrument calibration,
·
·
Documentation of traceability of instrument standards, samples, and data,
and
· Documentation of analytical and QC methodology (QC methodology
includes use of spiked samples, duplicate samples, split samples, use of reference
blanks, and checked standards to check method accuracy and precision).
Field Quality Assurance
SECOR has developed field DQIs which are attached. In addition to the DQIs the
following internal checks will also be conducted:
. Documentation of sample preservation and transportation, and
. Documentation of field instrument calibration and irregularities III
performance.
General Sample Collection and Handlin2 Procedures
Proper collection and handling are essential to ensure the quality of the sample. Each sample is
collected in a suitable container, preserved correctly for the intended analysis, and stored prior to
analysis for no longer than the maximum allowable holding time. Details on the procedures for
collection and handling of samples used on this project can be found in this section and in the
attached DQI tables.
Soil and Water Sample Labelin2 and Preservation
Label information includes a unique sample identification number, job identification number,
date, and time. After labeling, all soil and water samples are placed in a Ziploc® type bag and
placed in an ice chest cooled to approximately 4°C. Chemical preservation is controlled by the
required analysis and is noted on the chain-of-custody form. Trip blanks supplied by the
laboratory accompany the groundwater sample containers and groundwater samples.
Upon recovery, the sample container is sealed to minimize the potential volatilization and cross-
contamination prior to chemical analysis. Soil sampling tubes are typically closed at each end
with Teflon TM sheeting and plastic caps. The sample is then placed in a Ziploc® type bag and
sealed. The sample is labeled and refrigerated at approximately 4° Celsius for delivery, under
strict chain-of-custody, to the analytical laboratory.
Chain of Custody
The chain-of-custody form is used to record possession of the sample from the time of collection
to its arrival at the laboratory. When samples are shipped, the person in custody of them
relinquishes the samples by signing the chain-of-custody form and noting the time. The sample-
control officer at the laboratory verifies sample integrity and conforms that the samples are
collected in the proper containers, preserved correctly, and contain adequate volumes for
analysis. These conditions are noted on a Laboratory Sample Receipt Checklist (see attached)
which will be included in the laboratory report.
If these conditions are met, each sample is assigned a unique log number for identification
throughout analysis and reporting. The log number is recorded on the chain-of-custody fonn and
in the legally-required log book maintained by the laboratory. The sample description, date
received, client's name, and other relevant infonnation is recorded.
Analvtical Methods
Soil and groundwater samples collected during exploratory sire investigation activities and
development and sampling of monitoring wells, will be analyzed under a standard lO-day
turnaround time. Samples are analyzed using analytical methods outlined in EP A Manual SW
846 and approved by the California Regional Water Quality Control Board- Central Coast
Region in the Leaking Underground Fuel Tanks (LUFT) manual and appendices.
Samples collected during the investigation of petroleum hydrocarbon impacted sites are typically
analyzed for total petroleum hydrocarbons ([CZ-C12 range] TPHG by U.S. EPA Method 8015.
Benzene, Toluene, ethyl benzene, and total xylenes (BTEX) are analyzed using U.S. EPA Method
8020/8021.
The attached DQI tables present the state-certified laboratory's calibration and quality assurance
procedures for the above mentioned analytical methods. Internal laboratory quality assurance
checks will be the responsibility of the contract laboratories. Data and reports submitted by field
personnel and the contract laboratory will be reviewed and maintained in the project files.
Data Review and Verification
Data quality indicator parameters will be evaluated by the contract state-certified laboratory
against the frequency and acceptance criteria described in the Lab DQI Tables. Data that are out
of compliance with the laboratory criteria will be flagged in the laboratory analytical report and
will be identified in the report summary table. SECOR will evaluate the field procedures against
the frequency and acceptance criteria identified in the field DQI, Table. The overseeing
registered professional will review field documentation (boring logs, sampling sheets, Chain-of-
Custody documents, lab sample receipt fonns, etc.,) and identify relevant issues/problems that
effect data and overall applicability.
DATA QUALITY INDICATORS FOR
TOTAL PETROLEUM HYDROCARBONS (TPH) as Gasoline and Diesel
SW-846 Method 8015B
Table IA.
Summary of Required Quantitation Limits. Holding Times. and Preservation for Total Petroleum
Hydrocarbons (TPH) as Gasoline and Diesel
Analytical Parameter a Technical Holding Times Preservation
Total Petrolewn 14 days from collection HCI or H2S04 to pH<2;
Hydrocarbons (TPH) as Cool to 4°C ±2°C
Gasoline in Water
Samples
TPH as Gasoline in Soil 14 days fÌ'om collection Cool to 4°C ±2°C; sealed zero
Samples headspace containers
TPH as Diesel in Water Extraction: 14 days fÌ'om collection; HCI or H2S04 to pH<2;
Samples Analvsis: 40 days fÌ'om extraction Cool to 4°C ±2°C
TPH as Diesel in Soil Extraction: 14 days from collection; Cool to 4°C ±2°C
Samples Analvsis: 40 days from extraction
~ Individual target compounds are listed in Table lB.
Data Calculations and Reporting Units:
Calculate the sample results using calibration factors determined according to Sections 7.7.2 of Method 80lSB and
7.4.2 and 7.8.1 ofSW-846 Method 8000A.
Report water sample results in concentration units ofmiUigrams per liter (mgIL). Report soil sample results on a dry-
weight basis in mimgrams per kilogram (mglkg).
For rounding results, adhere to the following rules:
a) If the number following those to be retained is less than 5, round down;
b) If the number following those to be retained is greater than 5, round up; or
c) If the number following the last digit to be retained is equal to 5, round down if the digit is even, or round up if the
digit is odd.
All records of analysis and calculations must be legible and sufficient to recalculate all sample concentrations and
QC results.
8015DQI
08/10/01
lof3
Table 1 b.
Target Compound List and Required Detection Limits (RQL) for SW-846 Method 8015B
COMPOUND RQL Water mg/L RQL Soil mglkg
Gasoline - Purge and Trap 0.5 10
Gasoline - Headspace 5.0 5
Diesel 0.5 10
Table 2. Summary of Calibration Procedures for Tetal Petroleum Hydrecarbens (TPH) as Gaseline and Diesel by SW-846 Method 8015B
Calibration Element Frequen~y A~~eptan~e Criteria Corrective Action
Initial Calibration (nùnimum Initially; whenever RSD for CFs S20%; 1. Tenninate analysis
blank + 5 points for each required, due to failure of or, ifusing a linear calibration 2. Re-calibrate and verify before sample analysis
analyte) (ICAL) ..b.c CCV curve, a correlation coefficient (r)
of~.99 for each compound
Continuing Calibration Beginning of each 12 hour %D between calculated amount 1. Re-calibrate and verify
Verification (CCV)at midpoint time period, after every 10 and nominal amount within ±25% 2. Re-analyze samples back to last good CCV
ofICAL samples and end of run
Retention time evaluation CCV Each analysis of CCV ±3 x the SD of the avg ICAL RT 1. Re-calibrate and verify
standards standards for surrogate, See footnote C for 2. Re-analyze samples back to last good IPC
GRO and DRO
a ThelCAL low standard must be above but near the RQL. The low ICAL standard must have a signal to noise ratio of~5:1. If this requirement cannot be met,
the laboratory must submit a MDL study as part of the data package.
b Gasoline Range Organics (GRO): C6-C10; Diesel Range Organics (DRO): Cto-C28
C Establish and report retention tit.ne (RT) windows for GRO and DRO as described in Section 7.4 of Method 8015B and 7.6 of Method 8000B. Calculate RT
windows for GRO and DRO based on the lower lioút of the RT window for the first eluting component and the upper limit of the RT window for the last eluting
component. Detennine RT windows for surrogate compounds as ±3 x the standard deviation (SD) of the average ICAL RT for each analyte.
8015DQI
08/1 % 1
2of3
Table 3. Summary of Internal Quality Control Procedures for Total Petroleum Hydrocarbons (TPH) as Gasoline and Diesel by SW-846 Method 801 5B
QC Element Frequency Acceptance Criteria Corrective Action
Method Blank (MB) Gasoline: One per each 12 hour < RQL for each compound 1. Investigate/correct the source of contamination and
, time period and after unusually document.
concentrated samples 2. Reanalyze all samples with analytes > RQL processed
Diesel: One per Batch or SDGa (1 with a blank that is out of control.
per 20 samples minimum) and for
each instrument used
Instrument Blank (IB) After any sample exceeds the < RQL for each compound 1. Correct memory effects prior to continuing analyses.
caJibration range
Surrogate Spike b Every sample and MB at midpoint Water Samoles: 1. Re-analyze all samples with non-compliant surrogate
of caJibration range 75-125% of expected value recoveries
Soil Samples:
60-125% of expected value
Matrix Spike and Matrix One MS/MSD set per batch or 65-135% of expected value; 1. Report in case narrative
Spike Duplicate SDG (1 MS/MSD set per 20 30 RPD between MS and
(MS/MSD) samples minimum) MSD
Laboratory Control Gasoline: one each 12-hour 80-120% of expected value 1. Investigate the source of problem and document.
Sample (LCS) period; 2. IfLCS is high. reanalyze all samples with analytes >
Diesel: one per Batch or SDG RQL processed with a LCS that is out of control.
3. IfLCS is low, reanalyze all samples processed with a
LCS that is out of control.
· SDG - Sample Delivery Group - each case offield samples received; or each 20 field samples within a case; or each 14 calendar day period during which field
samples in a case are received.
b Surrogates for ORO: 4-bromofluorobenzene and 1,1, I-trifluorotoluene;
Surrogate for DRO: hexacosane or ortbo-terphenyl
Dilute and reanalyze samples with oile or more analytes at concentrations exceeding the range of the calibration curve. Results for such reanalyses should fall
within the mid-range of the calibration curve. Report results and submit documentation for both analyses.
801SDQI
08/10/01
30f3
DATA QUALITY INDICATORS FOR
HALOGENATED AND AROMATIC VOLA TILE ORGANIC COMPOUNDS (VOCs)
BY GAS CHROMATOGRAPHY
SW -846 MethodS 801 OA and 8020A or Method 8021A
Table lA.
Summary of Holding Times and Preservation for Halogenated and Aromatic Volatile Organic
Compounds by Gas Chromatography
Analytical Parameter I Technical Holding Times Preservation
. Volatile Organic 14 days nom collection HCl to pH <2;
Compounds (VOCs) in Cool to 4°C ±2°C
Water
VOCs in Soil 14 days from collection Cool to 4°C ±2°C; sealed zero
headspace containers
I Individual target compounds are listed in Table lB.
Data Calculations and Reporting Units:
Calculate the calibration factors (CFs) and the concentration of individual analytes according to the equations
specified in Sections 7.4.2 and 7.10.1, respectively, of Method 8000B. Report water sample results in concentration
units ofmicrograms per liter (µgIL). Report soil sample results on a dry~weight basis in micrograms per kilogram
(µglkg). Report percent solid and percent moisture to the nearest whole percentage point.
For rounding results, adhere to the following rules:
a) If the number follovlÍng those to be retafued is less than 5, round down;
b) If the number following those to be retained is greater than 5, round up; or
c) If the number following the last digit to be retained is equal to 5, rQund down if the digit is even, or round up if the
digit is odd.
All records of analysis and calculations must be legible and sufficient to recalculate all sample concentrations and
QC results.
8021DQI
08/1 % 1
lofS
I '
Table lB.
Target Compound List. CAS Numbers. and Required Quantitation Limits for Halogenated Volatile
Organic Compounds by Gas Chromatography
SW-846 Method 80lOA or8021A
,
Compound CAS Number RQLµgIL RQL µg/Kg
Benzyl chloride 100-44-7 1 5
Bromobenzene 108-86-1 1 5
BromodicWoromethane 75-27-4 1 5
Bromoform 75-25-2 1 5
Bromomethane 74-83-9 1 5
Carbon tetrachloride 56-23-5 1 5
Chloroethane 75-00-3 1 5
2-Chloroethylvinylether 110-75-8 1 5
Chloroform 67-66-3 1 5
Chloromethane 74-87-3 1 5
DibromochIoromethane 124-48-1 1 5
Dibromomethane 74-95-3 1 5
Dicblorodifluoromethane 75-71-8 1 5
1,I-DichIoroethane 75-34-3 1 5
1,2-Dichloroethane 107-06-2 1 5
1,I-Dichloroethene 75-35-4 1 5
trans-l,2-DichIoroethene 156-60-5 1 5
1,2-Dichloropropane 78-87-5 1 5
cis-I,3-Dichloropropene 10061-01-5 1 5
trans-l,3-Dichloropropene 10061-02-6 1 5
Methylene chloride 75-09-2 5 25
1,1,2,2- Tetrachloroethane 79-34-5 1 5
1,1,1,2- Tetrachloroethane 630-20-6 1 5
Tetrachloroethene 127-18-4 I 5
1,1,1- Trichloroethane 71-55-6 1 5
8021DQI
08/10/01
2of5
Table lB.
(Cont)
Compound CAS Number RQLµg/L RQL µg/Kg'
1,1,2- Trichloroethane 79-00-5 1 5
Trichloroethene 79-01-6 1 5
Trichlorofluoromethane 75-69-4 1 5
1,2,3- Trich1oropropane 96-18-4 1 5
Vinyl chloride 75-01-4 1 5
,
Additional Compounds:
1,2-Dibromo-3-chloropropane 96-12-8 1 5
1,2-Dibromoethane 106-93-4 1 5
1,3-Dichloropropane 142-28-9 1 5
Dichlorofluoromethane 75-43-4 1 5
Table Ie.
Target Compound List. CAS Numbers. and Required Quantitation Limits for Aromatic Volatile
Organic Compounds by Gas Chromatography
SW-846 Method 8020A or 802 I A
Compound CAS Number RQLµgIL RQL µglKg
Benzene 71-43-2 1 5
Chlorobenzene 108-90-7 1 5
1.2-Dichlorobenzene 95-50-1 I 5
1.3-Dichlorobenzene 541-73-1 I 5
lA-Dichlorobenzene 106-46-7 1 5
Ethvlbenzene 100-41-4 1 5
Toluene 108-88-3 1 5'
Xvlenes. mixed 1330-20-7 1 5
8021DQI
08/10/01
30f5
~
Table 2. Summary of Calibration Procedures for Halogenated and Aromatic Volatile Organic Compounds by Gas Chromatography
Calibratio.n Element
Acce tance Criteria
Corrective Action
Initial Calibration (minimum
blank + 5 points for each
analyte) (ICAL)a.b,e
Initially; whenever required, due
to failure of CCV
RSD for CFs ~30%;
or, correlation coefficient (r) oflinear
regression 2:0.99
1. Tenninate analysis
2. Reca1ibrate and verify before sample
analysis
Continuing Calibration
Verification CC
Daily, every 12-hour, every ten
s 'les, and end of run
%D between CF of CCV and avg CFs
from ICAL <±25%
1. Recalibrate and verify
2. Reanal s les back to last ood CCV
Retention time evaluation of
CCVstandards
Each analysis of CCV standard
±3 x the SD of the avg ICAL RT for
each anal e
I. Re-calibrate and verify
2. Re-anal e sa les back to last ood CCV
a The ICAL low standard must be above but near the RQL. The low ICAL standard must have a signal to noise ratio of ~5: 1. If this requirement cannot be met,
the laboratory must submit a MDL study as part of the data package.
b ICAL and continuing CAL standards must contain all target analytes listed in Table IB.
e Report the retention time window for each analyte. Determine retention time windo~ as ±3 x the standard deviation of the average initial calibration retention
time for each analyte.
8021DQI
08/10/01
40f5
Table 3. Summary of Internal Quality Control Procedures for Halogenated and Aromatic Volatile Organic Compounds by Gas Chromatography
QC Element Frequency Acceptance Criteria Corrective Action
Method Blank (MB) Each 12·hour túne period, < RQL for each compound I. Investigate/correct the source of contamination
minimum of one per SDG a and document.
2. Reanalyze aU samples with analytes > RQL
processed with a blank that is out of control.
Instrument Blank After any sample which < RQL for each compound I. Correct memory effects prior to continuing
contains a target compound analyses
concentration >50 ppb
Matrix Spike and One MS/MSD set per batch Water Sample: 75-125% of expected value; I. Report in case narrative
Matrix Spike Duplicate or SDG (I MS/MSD set per
(MS/MSD) C 20 samples minimum) Soil Sample: 65-135% of expected value;
~O% RPD between MS and MSD
Surrogate Spikes b Every sample, standard and Water Sample: 75-125% of expected value 1. Reanalyze all samples with non-compliant
method blank surrogate recoveries unless there is obvious matrix
Soil Sample: 65-135% of expected value interference
Laboratory. Control One per SDG Water Sample: 70-130% of expected value 1. Investigate the source of problem and
Sample (LCS) document.
Soil Sample: 65-135% of expected value 2. If LCS is high, reanalyze all samples with
analytes > RQL processed with a LCS that is out
of control.
3. IfLCS is low, reanalyze all samples processed
with a LCS that is out of control.
a SDG - Sample Delivery Group - each case offield samples received; or each 20 field samples within a case; or each 14 calendar day period during which field
samples in a case are received.
b Surrogates for halogenated compounds: 50 ng of one of the following three compounds: bromochlormethane, 2-bromo-I-chloropropane, or 1,4-dichlorobutam:.
Surrogates for aromatic compoWlds: SO ng of one of the following two compoun~: l,I,I-trifluorotoluene and 4-bromofluorobenzene (BFB).
C Spike MS/MSD with 10 ppb of the following halogenated and aromatic VOCs: 1,I-dich1oroethene, trichloroethene, chlorobenzene, toluene, and benzem:.
Dilute and reanalyze samples which contain one or more target analytes at concentrations above the initial calibration range. Results for such reanalyses should
fall within the mid-range of the calibration curve. Report results and submit documentation for both analyses.
Second column confumation is required for all positive results. Confumation must be performed on a column of a phase different fÌom that used for quantitation.
Confinnation analyses must meet all calibration criteria specified in Table 2 and blank acceptance criteria specified in Table 3.
8021DQI
08/10/01
SofS
DATA QUALITY INDICATORS FOR
VOLATILE ORGANIC COMPOUNDS (VOCs)
SW -846 Method 8260
Table J A.
Summary of Holding Times and Preservation for Volatile Organic Compounds by Gas
Chromatography/Mass Spectrometry
Analytical Parameter a Technical Holding Times Preservation
Volatile Organic 14 days from collection HCI to pH <2;
Compounds (VOCs) in Cool to 4°C ±2°C
Water
VOCs in Soil 14 days ftom col1ection Cool to 4°C ±2°C; sealed zero
headspace containers
a Individual target compounds are listed in Table lB.
Data Calculations and Reporting Units:
Calculate the response factor (RF) and the concentration of individual analytes according to the equations specified
in Sections 7.3.4 of Method 8260. Report water sample results in concentration units ofnúcrograms per liter (µgIL).
Repon soil sample results on a dry-weight basis in nùcrograms per kilogram (µg/kg). Report percent solid and
percent moisture to the nearest whole percentage point.
For rounding results, adhere to the fol1owing rules:
a) If the number following those to be retained is less than 5, round down;
b) If the number following those to be retained is greater than 5, round up; or
c) If the number following the last digit to be retained is equal to 5, round down if the digit is even, or round up if the
digit is odd.
All records of analysis and calculations must be legible and sufficient to recalculate aU sample concentrations and
QC results.
8260DQI
08/10/01
10f6
Table lB.
Target Compound List, CAS Numbers. and Required Quantitation Limits for Volatile Organic
Compounds by Method 8260
Analyte CAS Number RQLµg/L RQL
µg/Kg
Benzene 71-43-2 1 5
Bromobenzene 108-86-1 1 5
Bromochloromethane 74-97-5 1 5
Bromodichloromethane 75-27-4 1 5
Bromofonn 75-25-2 1 5
Bromomethane 74-83-9 1 5
n-Butylbenzene 104-51-8 1 5
sec-Butylbenzene 135-98-8 1 5
tert-Butylbenzene . 98-06-6 1 5
Carbon tetrachloride 56-23-5 1 5
Chlorobenzene 108-90-7 1 5
Chlorodibromomethane 124-48-1 1 5
Chloroethane 75-00-3 1 5
Chlorofonn 67-66-3 l' 5
Chloromethane 74-87-3 1 5
2-Chlorotoluene 95-49-8 1 5
4-Ch1orotoluene 106-43-4 1 5
1.2-Dibromo-3-chloropropane 96-12-8 1 5
1,2-Dibromoethane 106-93-4 1 5
Dibromomethane 74-95-3 1 5
1.2-Dichlorobenzene 95-50-1 1 5
1.3-Dichlorobenzene 541-73-1 1 5
1,4-Dichlorobenzene 106-46-7 1 5
Dichlorodifluorometbane 75-71-8 1 5
l,l-Dichloroetbane 75-34-3 1 5
l,2-Dich1oroethane 107-06-2 1 5
8260DQI
08/10/01
20f6
Analyte CAS Number RQLµg/L RQL
µglKg
1,I-Diclùoroethene 75-35-4 I 5
cis-l,2-Dichloroethene 156-59-2 1 5
trans-l,2-Dichloroethene 156-60-5 1 5
Dichlorofluoromethane 75-43-4 I 5
1,2- Dichloropropane 78-87·5 1 5
'2,2-Dichloropropane 594-20-7 1 5
1,3-Dichloropropane 142-28-9 1 5
1,I-Dichloropropene 563-58-6 1 5
Diisopropyl ether 108-20-3 1 5
Ethylbenzene 100-41-4 I 5
,
Hexachlorobutadiene . 87-68-3 1 5
Isopropylbenzene 98-82-8 1 5
p-Isopropyltoluene 99..;87 -8 1 5
Methyl-t-butyl ether 163-40-44 1 5
Methylene chloride 75-09-2 1 5
Naphthalene 91-20-3 1 5
n-Propylbenzene 103-65-1 1 5
Styrene 100-42-5 1 5
tert-Amyl methyl ether 994-05-8 1 5
tert-Butyl alcohol 75-65-0 SO 250
tert-Butyl ethyl ether 637-92-3 1 5
1,1,1,2- Tetrachloroethane 630-20-6 1 5
1,I,2,2-Tetrachloroetbane 79-34-5 1 5
Tetrachloroethene 127-18-4 1 5
Toluene 108-88-3 1 5
1,2,4- Trichlorobenzene 120-82-1 1 5
1,2,3- Trichlorobenzene 87-61-6 1 5
1,1,1- Trichloroethane 71-55-6 1 5
8260DQI
08/10/0 I
30f6
Aoalyte CAS Number RQLµgIL RQL
µg/Kg
1,1,2- Trichloroethane 79-00-5 1 5
Trichloroethene 79-01-6 1 5
Trichlorofluoromethane 75-69-4 1 5
1,2,3- Trich1oropropane 96-18-4 1 5
1,2,4- Trimethylbenzene 95-63-6 1 5
1,3,5- Trimethylbenzene 108-67 -8 1 5
Vinyl chloride 75-01-4 1 5
o-Xylene 95-47-6 1 5
m-Xylene 108-38-3 1 5
p-Xylene 106-42-3 1 5
Xylenes, mixed 1330-20-7 1 5
8260DQI
08/10/01
40f6
Table 2. Summary of Calibration Procedures for roes by SW-846 Method 8260 .
Calibration Element FreQuency Acceptance Criteria Corrective Action
GC/MS Tuning with BFB Beginning of each 12 hour Ion abundance criteria in Table 4 of I. Identify the problem.
period during which standards Method 8260 2. MS tune criteria must be met before any
samples are analyzed calibration standards, samples, blanks, or QC
samples are analyzed
Initial Calibration (minimum Initially; whenever required, due RSD for RFs $20%; I. Terminate analysis
blank + 5 points for each to failure of cev 2. Recalibrate and verify before sample
analyte) (ICALt·b.c analvsis
Continuing Calibration Following lev, every 12-hour, %D between RF ofCev and avg RFs 1. Recalibrate and verify
Verification (CCV) and end of roo from ICAL ~IS% 2. Reanalyze samples back to last good CCV
System Performance Check With ICAL or CCV RF for chloromethane, I,l- l. Terminate analysis
Compound (SPCC) dichloroethane, bromofonn, ~O.l 0; 2. Recalibrate and verify before sample
chlorobenzene, 1,1,2,2- analysis
tetrachloroethane, ~.30
Calibration Check Compounds With ICAL or CCV RSD for RFs s30% 1. Terminate analysis
(CCC) 2. Recalibrate and verify before sample
analysis
Internal Standards Each analysis of CCV -so to +100% I. Re-analyze all samples analyzed while
system was out-of-control
Retention:time evaluation of Each analysis of cev standard ±3 x the SD of the avg ICAL RT for I. Re-calibrate and verify
cev standards each ånalvte 2. Re-analvze samples back to last good CCV
· The ICALlowstandard must be above but near the RQL. The low ICAL standard must have a signal to noise ratio of~5:1. If this requirement cannot be met,
the laboratory must submit a MDL study as part of the data package.
b ICAL and continuing CAL standards must contain all target analytes listed in Table lB.
c Report the retention time window for each analyte. Determine retention time windows as ±3 x the standard deviation of the average initial calibration retention
time for each analyte.
8260DQI
08/10/0 I
Sof6
"
Table 3. Summary of Internal Quality Control Procedures for VOCS by SW-846 Method 8260
QC Element Frequency Acceptance Criteria Corrective Action
Method Blank (MB) Each 12-hour time period, < RQL for each compound I. Investigate/correct the source of contamination
minimum of one per SDG · and document.
2. Reanalyze all samples with analytes > RQL
processed with a blank that is out of control.
Instnunent Blank (m) After any sample exceeds < RQL for each compound I. Correct memory effects prior to continuing
the calibration range analyses
Matrix Spike and One MSIMSD set per batch Water Sample: 65-135% of expected value; I. Report in case narrative
Matrix Spike Duplicate or SDG (1 MSIMSD set per ~O% RPD between MS and MSD
(MSIMSD) 20 samples minimum)
Soil Sample: 50-] 50% of expected value;
S500.4 RPD between MS and MSD
Surrogate Spikes b Every sample, standard and Water Sample: 85-115% except for . 1. Reanalyze all samples with non-compliant
method blank 1,2-dichloroethane (75-115%) of expected surrogate recoveries unless there is obvious matrix
value interference
Soil Samnle: 70-]25% of expected value
Laboratory Control One per SDG Water Sample: 70-130% of expected value I. Investigate the source of problem and
Sample (LCS) document.
Soil Sample: 65-135% of expected value 2. IfLCS is high, reanalyze all samples with
analytes > RQL processed with a LCS that is out
of control.
3. IfLCS is low, reanalyze all samples processed
with a LCS that is out of control.
· SDG - Sample Delivery Group - each case offield samples received; or each 20 field samples within a case; or each 14 calendar day period during which field
samples in a case are received.
b Toluene-ds, BFB, 1,2-dichloroetbane-d., and Dibromofluorometbane
Dilute and reanalyze samples which contain one or more target analytes at concentrations above the initial calibration range. Results for such reanalyses should
faU within the mid-range of the cah"bration curve. Report results and submit documentation for both analyses.
8260DQI
08/10/01
6of6
a
. .
DATA QUALITY INDICATORS
FIELD PROCEDURES AND CONDmONS
Table 1
Summary of Field Data Quality IndicaJors
QC Element Frequency Acceptance Criteria Corrective Action
Equipment (Rinsate) One per 20 samples; minimum of 1 < RQL for each compound Investigate the source of contamination and document.
Blank (EB) per sample matrix Correct samplinglhandling protocols. Resample if
associated data validation action is not acceptable for
affected samples.
Trip Blank (TB) One per VOC cooler. Analyze if < RQL for each compound Investigate the source of contamination and document.
contamination is dðtected in EB. Correct samplinglhandling protocols. Resample if
associated data validation action is not acceptable for
affected samnles.
Bottle Blank (BB) One per lot of sample bottles. < RQL for each compound Investigate the source of contamination and document.
Analyze if contamination is detected Correct samplinglhandling protocols. Resa01ple if
inEB. associated data validation action is not acceptable for
affected sanmles.
Field Duplicate One per 20 samples; minimum of 1 a Investigate source of variability and document. Correct
per sample matrix. Water Sa1I1P1e: S;30% RPD sampling protocols, unless a matrix effect is indicated.
Soil Sample: s;50% RPD Resample if a matrix effect is not indicated and
associated data validation action is not acceptable for
affected samnles.
Review of field NA ProfessioÌ1al Judgment Investigate, document, and correct samplinglhandling
noteslboring logs, protocols, as appropriate. Resample if associated data
chain of custody validation action is not acceptable for affected
documentation, and samples.
laboratory sample
receipt documentation
a RPD=lOOx XI -X2
(XI + x2)/2
FieldDQI
08/tO/Ot
10ft
\ '.
VALIDATION TABLES
.,
~
DATA VALIDATION PARAMETERS AND CRITERIA
Table I
Summary of Data Validation Parameters
Data Validation Means of Assessment Acceptance Criteria Validation Action
Parameter
Preservation and Holding Check chain of custo~y records, See DQI Tables 1. If improperly preserved, qualify as estimated
Times field records, and lab records (indicated by a "J" following the value in the data
summary table) all positive detects (+) and reject (R)
all nondetect (-) results.
2. Ifholding times exceeded, but sample properly
preserved, J all (+) and UJ all (-) results if analyzed in
28 days; if> 28 days, RaIl (-) results.
Lab Blanks: Check that blanks were analyzed < Required Quantitation Limit 1. If result > 5x blank, no action.
1. Method Biank (MB) at the appropriate frequency (see (RQL) for each compound 2. If result < 5x blank, but> required quantitation limit
2. Instrument Blank (IB) DQI Tables); compare results to (RQL), report as undetected (U) at result level.
acceptance criteria 3. Use lOx for common laboratory contaminants
(acetone, methylene chloride).
4. If gross contamination> lOx RQL exists, R all
affected compounds in samples associated with that
blank.
Surrogate Spikes Check that all samples and blanks See DQI Tables I. If any percent recovery> acceptance criteria, J (+)
were properly spiked; compare results and accept (-) results.
results to acceptance criteria 2. If any percent recovery < acceptance criteria but>
10%, J (+) results and UJ (-) results.
3. If any percent recovery < 10%, J (+) results and
R (-) results.
Validation
8/1 % 1
lof4
..
~
Data Validation Means of Assessment Acceptance Criteria Validation Action
Parameter
Matrix SpikelMatrix Check that MSIMSDs were See DQI Tables 1. If any percent recovery> acceptance criteria, J (+)
Spike Duplicate analyzed at the appropriate results and accept ( -) results associated with the
(MSIMSD) frequency (see DQI Tables); MSIMSD.
compare results to acceptance 2. If any percent recovery < acceptance criteria but>
criteria 10%, J (+) results and UJ (-) results associated with
the MSIMSD.
3. If any percent recovery < 10%, J (+) results and
R (-) results associated with the MSIMSD.
4. IfRPD outside limits, J (+) results and UJ (-) results
associated with the MSIMSD.
Laboratory Control Check that LCSs were analyzed at See DQI Tables 1. If any percent recovery> acceptance criteria, J (+)
Sample (LCS) the appropriate frequency (see results and accept (-) results associated with the LCS.
DQI Tables); compare results to 2. If any percent recovery < acceptance criteria but>
acceptance criteria 10%, J (+) results and UJ (-) results associated with
the LCS.
3. If any percent recovery < 10%, J (+) results and
R (-) results associated with the LCS.
Validation
8/10/0 I
20f4
.;
-v
Data Validation Means of Assessment Acceptance Criteria Validation Action
Parameter
Field Blanks: Check that blanks were analyzed < RQL for each compound Water Sample:
1. Equipment (Rinsate) at the appropriate frequency (see 1. If result > 5x blank, no action.
Blank (EB) DQI Tables); compare resulls to 2. Ifresult < 5x blank, but> RQL, report associated
2. Trip Blank (TB) acceptance criteria samples as undetected (U) at result level.
3. Bottle Blank (BB) 3. Use lOx for common laboratory contaminants
(acetone, methylene chloride).
4. If gross contamination> lOx RQL exists, R all
affected compounds in samples associated with that
blank.
Soil Sample:
1. Ifcontamination exists, flag (EB, TB, or BB) all
affected compounds in samples associated with that
blank.
2. The degree of "sampling error" that this flagged
sample result represents will be left to the
detennination of the end user.
Field Duplicates Check that field duplicates were a Detection in Both Samples:
Water Sample: ~O% RPD
analyzed at the appropriate 1. If results ~ 2X quantitation limit (QL) in both, and
frequency (see DQI Tables); Soil Sample: ~50% RPD RPD > acceptance criteria, J the result in both
compare results to acceptance samples.
criteria 2. Ifresult < 2X QL in one or both samples, and RPD
> acceptance criteria, use professional judgment to
accept (A) or qualify (J or UJ) results, taking into
consideration the increased variability of data near QL.
3. If precision data for the field duplicate pair,
surrogate compound recoveries, and laboratory
MS/MSD indicate an extremely heterogeneous matrix
at the site or potential sampling error, professional
judgment should be utilized to apply field duplicate
actions to all samples of the same matrix.
Validation
8/10/01
30f4
I
'-
Data Validation Means of Assessment Acceptance Criteria Validation Action
Parameter
Detection in Only One Sample:
1. Do not evaluate based on RPDs.
2. Ifresult of(+) result ~ 2X QL, qualify (J or VJ)
results in both samples.
3. Ifresult of(+) result < 2X QL, use professional
judgment to accept (A) or qualify (J or UJ) results,
taking into consideration the increased variability of
data near QL.
4. If precision data for the field duplicate pair,
surrogate compound recoveries, and laboratory
MSIMSD indicate an extremely heterogeneous matrix
at the site or potential sampling error, professional
judgment should be utilized to apply field duplicate
actions to an samoles of the same matrix.
Review offield NA Professional Judgment I. Accept (A), qualify (1), or reject (R) results, as
noteslboring logs, chain appropriate.
of custody 2. Examples of situations where qualification or
documentation, and rejection of results should be considered include, but
laboratory sample receipt are not limited to: volatile analysis of coarse-grained
documentation ,- materials, compromised sample containers, sample
headspace, etc.
a RPD= 100x XI - X2
(XI + x2)/2
Validation
8/10/01
40f4