HomeMy WebLinkAboutMITIGATION 12/28/1995
?-
.'
'.
1\
,¡
SPILL PREVENTION CONTROL,
AND COUNTERMEASURE (SPCC) Pt::(~;;"
BAKERSFIELD SERVICE CENTER
~t'cific Gas ùnd Electric Company
ks072w
'ì
CERTIACATlON OF THE APPUCABIU1Y OF THE SUBSTANTIAl HARM CRITERIA
FACIUTY NAME
BAKERSFIELD SERVICE CENTER
4101 Wible Road. Bakersfield. CA 93301
FACIUTY ADDRESS
Yes No
1. Does the facility transfer oil over water to or from vessels and does the facility have a 0 ŒJ
total oil storage capacity greater than or equal to 42,000 gallons?
2. Does the facility have a total oil storage capacity greater than or equal to 1 million 0 ŒI
gallons and does the facility lack secondary containment that is sufficiently large to
contain tlle capacity of the largest aboveground oil storage tank plus sufficient
freeboard to allow for precipitation within any aboveground oil storage tank area?
3. Does the facility have a total oil storage capacity greater than or equal to 1 million 0 Œ]
gallons and is the facility located at a distance (as calculated using the appropriate
formula in Attachment C-III to this appendix or a comparable formula) such that a
discharge from the facility could cause injury to fish and wildlife and sensitive
environments? For further description of fish and wildlife and sensitive environments,
see Appendices I, II, and III to DOC/NOAA's "Guidance for Facility and Vessel
Response Plans: Fish and Wildlife and Sensitive Environments" (see Appendix E to
this part, section 10, for availability) and the applicable Area Contingency Plan.
4. Does the facility have a total oil storage capacity greater than or equal to 1 million 0 ŒI
gallons and is the facility located at a distance (as calculated using 1t1!! appropriate
formula in Attachment C-III to this appendix or a comparable formula) such that a
discharge from the facility would shut down a public drinking water intake?
5. Does the facility have a total oil storage capacity greater than or equal to 1 million
gallons and has the facility experienced a reportable oil spill in an amount greater than
or equal to 10,000 gallons within the last 5 years?
ŒI
o
Certification
I certify under penalty of law that I have personally examined and am familiar with the infonnation
submitted in this document, and that based on my inquiry of those individuals responsible for obtaining
this infonnation, I believe that the submitted ¡nfoonatio Wtrue, accurate, and complete.
{¿r/ ~.~/~
Ignature
Mike Ameno
Name (please type or print)
Kern Division Manager
Title
Decemberl99S
This certificate must remain at the facility.
SPCC DECISION ANALYSIS
Facility Bakersfield Service Center
Evaluator Frank Kartiwan
Date December 1995
Address 650 "0" Street. Fresno
, '~
STEP 1 - SPCC PLAN REQUIREMENTS
Yes No
1, Does the facility have aboveground oil storage in excess of 660 gallons in a
single container? (includes tanks and equipment)
ŒJ
o
2. Does the facility have an aggregate aboveground oil storage volume in excess
of 1,320 gallons? (includes tanks and equipment)
ŒJ
o
3. Does the facility have underground oil storage volume in excess of 42,000
gallons?
o
ŒJ
4, Does the facility store any containerized PCB-contaminated waste liquids
between 50 and 500 ppm for disposal?
o
ŒJ
(If the answer to ANY of these questions is "Yes," go to Question #5. If "No," a
SPCC plan is not required)
5. Could an oil spill at this facility be expected to discharge harmful quantities to
"navigable" waters, including storm drains and drainage ditches, if left
unattended before it could be cleaned up?
ŒJ
o
(If the answer to Question #5 is "Yes," a SPCC plan must be prepared. Go to Step 2 to determine
the need for secondary containment. If the answer to #5 is "No," an SPCC plan may not be
required)
STEP 2 - SPCC SECONDARY CONTAINMENT RECOMMENDATIONS
1, Are the "navigable" waters within 50 feet of the facility?
Yes No
0 ŒJ
0 ŒJ
0 ŒJ
0 ŒJ
0 ŒJ
2, Is the sensitivity of the site high? (i.e. next to a school, daycare, food
processing plant, or environmentally sensitive areà)
3, Are large volumes of oil transferred three or more times a week?
(i.e, pumping or handling or oil products, excluding vehicle' fueling)
4, Is the total facility aboveground oil volume> 100,000 gallons?
5. Does the spill drainage pathway have an average slope greater than 10 percent,
and does the runoff drainage area have low permeability? (i.e. average runoff
coefficient> 0.6, as for compacted earth, asphalt paving, or concrete paving)
(If anyone of the above questions has a "Yes" answer, secondary containment should be
considered. If two or more have "Yes" answers, secondary containment is strongly
recommended, Keep in mind, however, that the SPCC regulations allow practicability to influence
the final decision)
PACIFIC GAS AND ELECTRIC COMPANY
BAKERSFIELD SERVICE CENTER
'd'J
" .
4101 Wible Road
Bakersfield, CA 93301
SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
(SPCC PLAN)
December 1995
Pacific Gas and Electric Company has prepared this Spill Prevention Control and
Countermeasure Plan for Bakersfield Service Center in order to minimize the potential for
oil spills, prevent accidentally spilled oil from leaving the property, and to provide maximum
efficiency cleanup of spilled oil.
This plan has been prepared pursuant to the Environmental Protection Agency regulations
on oil pollution prevention, 40 CFR, Part 112 and 761. This plan will be reviewed and
evaluated at least once every three years or immediately after a reportable spill event. The
plan will be amended after such review if more effective prevention and control technology
will significantly reduce the likelihood of a spill event from the facility. This plan will be
amended within six months whenever there is a change in facility design, construction,
operation, or maintenance which materially affects the facility's potential for off-site
discharge of oil.
., ',:- ''('... .,..' "", ,", "..~:' ',' ~~ , .. .. '
MANAGEMENT APPROVAL
This SPCC Plan including Part III, Oil Spill Contingency Plan, for Bakersfield Service
Center will be implemented as herein described.
Signature: ç''.¿.~ 4>-"-;..Y-, l/li.1:(:)
Name: Dennis White
Title: Support Services Director
CERTIFICATION
I hereby certify that the facility has been examined by myself and being familiar with the
provisions of 40 CFR Parts 112 and 761 attest that this SPCC Plan has been prepared in
accordance with good engineering practices.
¡~~/í
Registration No.: 036684
State: CA
ii
PART I
PART II
PART III
TABLES
TABLE OF CONTENTS
Page No,
GENERAL INFORMATION .........................................................1-1
1. Facility Name
2. Type of Facility
3. Location of Facility
4. Owner/Operator
5. Designated Person Accountable for
Oil Spill Prevention at Facility
6, Facility Description
7. Spill History
8. Inventory and Spill Potential
9. Facility Modification
DESIGN AND OPERATING INFORMATION .............................,"-1
1 Facility Drainage
2. Bulk Storage
3. Transfer Operations
4. Inspection and Records
5. Security
6. Personnel Training and Spill Prevention Procedures
CONTINGENCY PLAN ...... ...... ......... ........ ......... .......... ............... .111-1
I. Environmental Emergency Telephone List
1. Introduction
2. Authorities and Responsibilities
3. Response Procedures for Oil Spills
4. Response Procedures for Fires
5. Emergency Equipment
6. Evacuation Plan and Procedures
1. ENVIRONMENTAL EMERGENCY RESPONSE FLOW CHART
2. FIREFIGHTING EQUIPMENT INVENTORY
3. SPILL CONTROL AND PERSONAL PROTECTIVE EQUIPMENT
III
.. '
-,
,
ATTACHMENTS
1.
2.
3.
4.
5.
6.
TABLE OF CONTENTS
(CONT"D.)
VICINITY MAP AND FACILITY LAYOUT
INVENTORY AND SPILL PREDICTION TABLE
OIL SPILL REPORT
FACILITY INSPECTION FORMS
FACILITY EMERGENCY COORDINATORS
CLEAN UP/DISPOSAL RESOURCES
IV
.
SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
CHANGE LOG
This log is provided for use in documenting updates of the SPCC plan between
recertifications.
Any changes which will affect the spill potential at the facility must be made by a registered
professional engineer who will recertify the Plan.
Other revisions such as personnel changes or telephone numbers shall be made by the
facility and recorded in the log.
Change Date Page
No. Entered Initials Description of Change No.
0/n - ù! l f7-lc --?
¡ l<ê VI5 Cî) A.TíAc..H11 C~ r \
-
_~c ESS/~
1"/';') _~0 S '7 ~'4( ,
~ ¡- .' ' , ,,-,, .
l b/n - '17 fQ.t.. REl,' \) &1) 1"3 hln~tp ,f~K~ ?~?r~\
..-' ÇI
:.; ,'!: ;'':"'' ~~
' , ... I.,
C~lt ~f\\W'~) ; ',':,...... Wi ;¡;:. 7$
,- - bruL¿ C, :'~;''-. 0'-
. ,!-O .i... í
\ ' ..\~·';.:f>",.t.. "/: I. ~-:;:¡'~7
',,;'... ';'¡' GX~\';' J~A
""''''...:- ~~;:,,~7
,
v
-,
,",--
SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
PART I
GENERAL INFORMATION
PART I
SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
GENERAL INFORMATION
1. FACILITY NAME
Bakersfield Service Center
2. TYPE OF FACILITY
Service Center providing materials and equipment for gas and electric operations,
3. LOCATION OF FACILITY
4101 Wible Road
Kern County
Bakersfield, CA 93313 Telephone: (805) 398-5950
See Vicinity Map and Facility Layout, Attachment 1
4. OWNER/OPERATOR
Pacific Gas and Electric Company (PG&E)
P,O. Box 770000
San Francisco, CA 94177
5. DESIGNATED PERSON ACCOUNTABLE FOR OIL SPILL PREVENTION AT
FACILITY
Dennis White
Support Services Director
4101 Wible Road, Bakersfield, CA 93313
(805) 398-5938
6. FACILITY DESCRIPTION
This facility is used for storing and distributing materials and equipment for the gas
and electric operation work crews. The facility occupies approximately 15 acres which
is owned by PG&E. It has been operating since 1964.
The facility is located between a residential complex on the west, a commercial
complex on the south and Wible Road on the east. The northern neighboring property
is White Lane.
1-1
-The following buildings, structures and areas are located at this facility. Their locations
and areas are shown on the facility layout, Attachment 1.
(b,
, Operation Office Building
"T&D Office Building
Training Building
Gas and Electric Service Offices
Warehouse Building
Fleet Services Building
Tool Storage Building
Prefab Office
Hazardous Waste Storage
Building
SCADA Building
Underground Fuel Storage Tanks
...~, .
This building houses offices and meeting
rooms for the service center personnel.
This building houses offices and meeting
rooms used by the T&D department
personnel.
This building houses offices for meetings
and training.
There are two modular buildings that house
offices for the gas and electric service
departments.
This building stores material used by the
service center crews. The southern portion
of the building is used as a welding shop.
This building houses the office and shop
for the maintenance and repair of fleet
vehicles and equipment.
This building provides storage for
miscellaneous material and houses the gas
and electric repair shops.
This building houses an office and provides
storage for tools used in prefabrication
operations.
This building, located south of the
Warehouse Building, is used to store
used/returned oil-filled equipment which is
awaiting test results. Equipment is
returned to the facility prior to transport for
return under warranty or to transport to
repair shops for repair or reuse
assessment. Used/returned equipment
which is ready for shipping is stored in the
yard, east of the drainage pond.
This metal building is utilized as a shop on
the south and a parking garage on the
north for infrared truck-mounted
equipment.
There are two underground fuel storage
tanks used to store unleaded fuel and
diesel fuel for fleet vehicles.
1-2
Aboveground Waste Oil
StorageTank
Aboveground Water Tanks
Compressed Natural Gas Fueling
Station
Closed Circuit Wash Rack
System
Fuel Tanker Truck
Hazardous Waste Storage Area
New/Refurbished Oil-Filled
Equipment Storage Areas
Fuel Island
Fence
ê
There is one aboveground storage tank
used to store waste oil generated from the
Fleet Services operations.
Two aboveground water tanks, located
adjacent to the west fence, east of the
drainage pond, are no longer in use and
will be removed.
There is a compressed natural gas fueling
station, located in the southeast portion of
the yard, which is used to fuel natural gas
vehicles.
A closed circuit wash rack system is
located adjacent to the south end of the
Fleet Services Building. This system is
used to wash fleet vehicles and contains
an aboveground clean water tank. An oil
water separator, located at the wash rack
area, is also used to clean dirty water prior
to entering the closed circuit wash rack
system.
There is a dual product fuel-tanker truck of
unleaded fuel and diesel fuel used for
refueling fleet vehicles.
This concrete area, located east of the
Hazardous Waste/Material Storage
Building, is used to store hazardous wastes
such as: empty paint cans, used mineral
oil, suspected PCB-contaminated oil and
solid and semi solid wastes. The
hazardous waste storage area is clearly
marked as such and is roped off for added
safety.
New/refurbished oil-filled equipment such
as transformers, regulators, switches,
capacitors and reclosers are stored at
several locations in the yard.
The dispensers for the underground tanks
containing motor vehicle fuel are located at
the fuel island.
The entire yard is surrounded by a chain
link fence topped with barbed wire. There
are six vehicle entrance gates to the
facility.
1-3
Drainage Pond
An unlined drainage pond is located at the
south east corner of the ya,rd. All surface
run-off from the yard flows into this
drainage pond.
7. SPILL HISTORY
No Reportable Spills
PG&E's procedures require the reporting of all PCB spills above the reportable quantity
or with concentrations of 500 parts per million or greater, and any oil spills reaching
navigable waters or which may pose a hazard or potential hazard to human health,
property or the environment. If a reportable spill occurs use Attachment 3, Oil Spill
Report and complete when appropriate. Small spills may occur during handling and
maintenance of equipment or transfer operations. These incidental spills are not
reported. All oil spills are confined and cleaned up immediately.
PG&E procedures include spill prevention measures for every aspect of the facility
which involves use of oil-filled equipment or containers. The training for spill prevention
procedures used at this facility are outlined in Part II, Section 5.
8. INVENTORY AND SPILL POTENTIAL
The inventory of oil filled equipment and storage containers is presented in Attachment
2, The equipment and containers are described in detail in the following Section A
(Normal Operation). Spill Prevention techniques currently utilized and the potential for oil
spills are also discussed in Section A. Oil spills occurring during normal operation will be
contained and cleaned up in accordance with the Oil Spill Contingency Plan, Part III of
this SPCC Plan.
To assure that PG&E is in compliance with Sections 40 CFR 112.7 (e) (3&4) in
conjunction with truck movement and tank car and tank truck loading/unloading
procedures, the facility must:
- Comply with all DOT requirements
- Assure that all vehicles entering the facility are warned verbally or by sign of
above ground piping.
- Have a system in place to prevent tank truck departure before product transfer
process is completed
- Assure that drain and product outlets of tank truck are closed and checked for
leakage prior to departure
PG&E personnel will be present during all bulk loading/unloading procedures, and will
have adequate spill equipment on hand to assure a spillage will be confined, not
allowing it to leave the property or enter into a catch basin.
"
1-4
A. Normal Operation
1, Underground Fuel Storage Tanks
a. Double-walled Steel Fuel Tanks:
The facility has two 10,OOO-gallon underground tanks used for storing
unleaded motor-vehicle fuel, and diesel fuel, all located west öf the Fleet
Services Building. They are double-walled fiberglass-clad steel tanks
which are compatible with the stored fluids. Each tank has a continuous
leak-monitoring system: one located in its annular space; and one
located in the pipe line collection sump. The monitoring system
activates the fuel tank audible and light alarm located in the Fleet
Services Building. If an alarm is activated, an assessment to determine
the cause will begin and may include leak testing. The tanks fill-pipes
are also equipped with an overfill box which is product-tight to contain
spills caused by overfilling. The Fleet Services Supervisor is responsible
for the tanks and their contents.
1&
Possible spill occurrence:
i) Overfilling:
The greatest spill potential is from overfilling during the fuel transfer
process, (i.e. filling the tank). Spill prevention consists of constant
supervision during the filling process. Any fuel spilled during the
filling process would be contained in the overfill box.
ii) Tank Leak:
If a leak occurs, the fuel tank alarm board would light and an
audible alarm would sound. This alarm is checked weekly for
proper operating status.
iii) Overfilling Vehicles:
The dispenser nozzle used to fuel vehicles is equipped with an
automatic shut-off device, Constant supervision is provided during
the fueling process.
2. Aboveground Waste Oil Storage Tank
This facility has one 1 ,ODD-gallon aboveground storage tank used for storing
waste oil from the fleet services maintenance operations. This tank is located
on a concrete slab adjacent to the Fleet Services Building. The tank is
double-walled with a steel inner tank, an annular space, and an outer
concrete containment tank. The doube-walled tank system provides
secondary containment for protection against tank leakage. The Fleet
Services Supervisor is responsible for the tank and its contents.
1-5
Possible spill occurrence:
i) Tank leak:
If a leak occurs, it would be discharged into the annular space between
the walls of primary and secondary tanks. A monitoring pipe is
connected to the annular space between the tank walls and routinely
monitored for possible leaks.
ii) Overfilling:
The greatest spill potential is from overfilling during the waste oil
transfer process (Le., filling the tank). The waste oil is pumped by
automatic float operated pumps into this tank from a half barrel tray
located in the Fleet Services Building. Spill prevention consists of
constant supervision during the filling process. The liquid level inside
the tank is manually checked daily. The maximum volume of oil that
could reasonably be expected to discharge due to overfilling is 5 gallons
and it would be contained within the building.
iii) Oil Removal:
The possibility of a spill during the oil removal process would be
minimal. Constant supervision during the removal process and
inspection of oil removal equipment minimize the possibility of a spill.
The maximum potential spill would be the volume of the hose which is
approximately five gallons.
3. Aboveground Oil Storage Tanks
Four single wall steel tanks, used for storing 250 gallons of motor oil, 250
gallons of hydraulic oil, 250 gallons of transmission oil and 150 gallons of
gear oil, are located east of the Fleet Services Building. They are single wall
steel tanks which are compatible with the stored fluid. Automatic pumps and
pipe lines connect these oil containers with the oil hose lines in the Fleet
Services Building. Oil can only be discharged from these containers through
these hoses.
Possible spill occurrence:
i) Overfilling:
The greatest spill potential is from overfilling during the filling process.
Spill prevention consists of constant supervision during the filling
process. A maximum of two gallons of oil could be spilled and spills
would enter the underground oil water separator, located adjacent to the
tank storage area.
1-6
'::,,';', "
. ..' .', ,'.
-~ {~':~,',~.:':, .~'
ii) Hose Leakage:
Small spills could occur due to rupture of oil hoses. It would crack and
seep before a complete severing would occur. A maximum of three
gallons of oil could be spilled and it would be contained within the Fleet
Services Building.
4. Hydraulic Oil Storage Tank (Floor Lift Reservoir):
The facility has one 65-gallon steel tank used to store hydraulic oil. It is
located in the Fleet Services Building. It is a single-walled steel tank which is
compatible with the stored fluid and has been suitably painted to resist
corrosion. This tank is part of the hydraulic system for the floor hoist located
in the Fleet Services Building. Any hydraulic oil spilled would be contained
within the building and cleaned up immediately. The Fleet Maintenance
Supervisor is responsible for the tank and its contents.
Possible spill occurrence:
i) Overfilling:
This tank is filled from another tank. The greatest spill potential is from
overfilling during the filling process. Spill prevention consists of
constant supervision during the filling process. The maximum volume of
oil that could reasonably be expected to discharge due to overfilling is 3
gallons, and it would be contained within the building.
ii) Pipe Rupture:
The tank is connected to a hydraulic system for the floor hoist inside the
Fleet Services Building by aboveground and underground single-walled
steel pipes. Spills due to pipe rupture would be noticed during hoist
operation. The maximum volume of product that could reasonably be
expected to discharge would not exceed 5 gallons and would be
contained within the building.
iii) Tank Leak:
Visual inspections are made daily to check for tank leakage. The
maximum volume of oil that could be discharged is 20 gallons before it
would be detected. Any oil leakage would be contained within the
building.
5. Fuel Tanker Truck:
There is one dual product.fuel tanker in the facility. The tanker truck has a
capacity of 600 gallons of diesel fuel and 1,200 gallons of unleaded fuel.
During off-peak hours, it is used to distribute fuel to vehicles which are
parked in the facility yard. The tanker is filled from the underground fuel
tanks. The Fleet Services Supervisor is responsible for the tanker truck and
its contents. When not in use the truck is parked at the Service Center yard.
1-7
Possible spill occurrence:
i) Filling Tanker Truck:
The tanker is filled from the underground tanks. Any fuel spilled during
the filling process would be contained within the tank overfill box and/or
buckets provided for the hose fittings. The maximum amount of fuel
that could reasonably be expected to discharge would be approximately
five gallons
ii) Overfilling Vehicles:
The dispenser nozzles on the truck are equipped with automatic shutoff
devices. Constant supervision is provided during the fueling process.
The maximum volume of fuel that could reasonably be expected to
discharge would be approximately two gallons.
iii) Tank Leak:
The tank is a single wall steel tank which is compatible with the stored
fluid. A maintenance inspection is performed twice a year. The tanker
is checked visually by the operator before each use.
iv) Hose Leakage:
Hoses on the truck would crack and seep before a complete severing
would occur. The leakage would be noticed during pumping and would
stop when the pump stops. The maximum amount of fuel that could
reasonably be discharged is 3 gallons.
6. Drum Storage
55-gallon drums of petroleum products are stored at this facility. All 55-gallon
drums used for storage are DOT Specification 17E and/or 17C drums.
a. Drum Storage Area (Adiacent to the Aboveground Oil Storage Tanks):
Up to four 55-gallon drums are stored in this area. The drums contain
hydrocarbon products such as motor oil, hydraulic oil, and other similar
products.
Possible spill occurrence:
i) Oil Transfer:
Small spills could occur during transfer of oil to a smaller container.
A maximum of 5 gallons could be spilled and the oil would flow into
the oil water separator, adjacent to this storage area.
ii) Drum Rupture:
The largest potential spill would be from the rupture of a drum due
to overturning during handling (manually or with a forklift). A
1-8
maximum of 55 gallons of oil could be spilled. Spills would flow into
the oil water separator, adjacent to this storage area. !à
b. Hazardous-Waste Storage Area:
Approximately ten 55-gallon drums of miscellaneous liquid wastes
generated by the fleet maintenance operation and electric operation
crews are stored in a metal building. These drums typically contain oil
and water mix, mineral oil and hydraulic fluid. Hazardous wastes are
temporarily stored here prior to shipment to a licensed hazardous waste
disposal facility. Occasionally suspected PCB contaminated oil is also
stored in this area.
Possible spill occurrence:
i) Oil Transfer:
Small spills could occur during transfer of oil from a smaller
container. A maximum of 5 gallons could be spilled and oil would
be contained within the area.
ii) Drum Rupture:
The largest potential spill would be from the rupture of a drum due
to overturning during handling (manually or with a forklift). A
maximum of 55 gallons of oil could be spilled and spills would be
contained within the area.
c. Fleet Services Building:
A maximum of four 55-gallon drums of lubricating oil, anti-freeze and
solvent are stored in this building. Additionally, up to ten 5-gallon
containers of hydraulic oil are also stored in this building.
Possible spill occurrence:
i) Oil Transfer:
Small spills could occur during transfer of oil to a smaller container.
A maximum of 5 gallons could be spilled and the oil would be
confined to the interior of the building.
ii) Drum Rupture:
The largest potential spill would be from the rupture of a drum due
to overturning during handling (manually or with a forklift). A
maximum of 55 gallons of oil could be spilled and spills would be
contained within the building.
1-9
tZ
7. Oil-Filled Equipment in Storage
a. New/refurbished Oil-filled Equipment (Storage Area #1. West of
Evidence Storage Area: Storage Area #2. Middle of the South Yard.
Storage Area #3. along the fence. East of the Drainage Pond. Storage
Area #4. along the West Fence. West of the Welding Shop: Storage
Area #5. 'along the West Fence. Southwest of the SCADA Building.
Storage Area #7. along the fence. South of Storage Area #3)
Approximately up to 540 pieces of new/refurbished oil-filled electrical
equipment are stored in these areas. The amount of oil-filled equipment
stored in this area varies, The volume of oil in the various pieces of
equipment ranges from 2 to 380 gallons.
Possible spill occurrence:
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 2-
380 gallons. Operations and maintenance personnel are trained in
safe operation of forklifts and boom trucks to avoid such
occurrences.
b. Used/Refurbished Oil-filled Equipment - for delivery/awaiting transport
(Storage Area #8, north of Storage Area #3)
Up to 70 pieces of used/refurbished oil-filled electrical equipment, which
is ready for shipping, is stored in this area. The amount of oil-filled
equipment stored in these areas varies. The volume of oil in the various
pieces of equipment ranges from 3 to 180 gallons. The returned
equipment has been taken out of service for reasons of failure or
replacement and is being returned for repair, disposal or warranty.
Returned equipment that shows signs of leakage is immediately
sealed/plugged to stop the leakage or drained of oil and/or placed in a
covered lined half box or in an appropriate container. Some of the
equipment is also empty/has been drained of oil.
Possible spill occurrence:
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 3-
180 gallons. Operations and maintenance personnel are trained in
safe operation of forklifts and boom trucks to avoid such
occu rrences.
ii) Leakage during storage:
Any large equipment that does not fit in a lined half box and shows
signs of leakage is immediately drained of oil. The storage area is
inspected daily and recorded monthly for signs of leakage. No
1-10
more than 5 gallons of oil could reasonably be expected to leak
before it would be discovered.
&
c. Used/Refurbished Oil-filled Equipment - Test Pending (Hazardous
Waste Storage Building)
Up to 30 pieces of used/refurbished oil-filled equipment are stored in
this building. The amount of oil-filled equipment stored in this building
varies. The volume of oil in the various pieces of equipment ranges
from 3 to 180 gallons. The returned equipment has been taken out of
service for reasons of failure or replacement and is being returned for
repair, disposal or warranty. Returned equipment is stored here
awaiting the oil test results. Returned equipment that shows any signs
of leakage is immediately sealed/plugged to stop the leakage and/or
drained of oil and/or placed in an appropriate container. Additionally,
the building also has a sloped floor toward the middle of the building
and functions as a secondary containment.
I
Possible spill occurrence:
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 3 -
180 gallons. Operations and maintenance personnel are trained in
safe operations of forklifts and boom trucks to avoid such
occurrences. Interior spills would be contained within the building.
ii) Leakage during Storage:
Any large equipment that does not fit in a lined half box or
appropriate container and shows signs of leakage is immediately
drained of oil. No more than 5 gallons would be spilled and spill
would be contained within this building.
d. New and Used/Returned Oil-filled Equipment (Storage Area #6-
Evidence Storage Area. Southern corner of the Yard)
Up to 25 pieces of new and used/returned oil-filled equipment are stored
in this area. They are stored in this area as evidence material. Any
used equipment that shows signs of leakage is immediately
plugged/sealed to stop the leakage and placed in a lined half box or in
an appropriate container. The volume of oil in the various pieces of
equipment ranges from 3 to 300 gallons.
Possible spill occurrence:
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 3 to
300 gallons. Operations and maintenance personnel are trained in
1-11
&
safe operation of forklifts and boom trucks to avoid such
occurrences.
I
ii) Leakage during storage:
Any large equipment that does not fit in a lined half box and shows
signs of leakage is immediately drained of oil. The storage area is
inspected daily and recorded monthly for signs of leakage. No
more than 5 gallons of oil could reasonably be expected to leak
before it would be discovered.
e. Used/Returned PCB-Contaminated Oil-filled Equipment (Hazardous
Waste Storage Area)
Occasionally, up to five pieces of PCB contaminated oil-filled equipment
are stored in this area, All equipment stored in this area is empty or non-
leaking equipment. The equipment has been taken out of service for
reasons of failure or replacement. Equipment is placed in a lined half
box or appropriate container. Barricades and placards are posted in
accordance with state and federal regulations. The volume of oil in the
various pieces of equipment ranges from 2 to 160 gallons.
Possible spill occurrence:
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 2-
160 gallons. Operations and maintenance personnel are trained in
safe operation of forklifts and boom trucks to avoid such
occurrences.
8. Oil-Filled Equipment for Delivery (Storage Area #9. North Yard - sòuth of the
SCADA Building)
Approximately 10 pieces of oil-filled electrical equipment are stored in these
storage areas for delivery. This equipment is delivered to and temporarily
stored here for up to two weeks. All of the equipment is new or refurbished,
and is inspected prior to placement in this area. This equipment has sealed
steel-casings and is designed and manufactured for outdoor use. The
amount of oil-filled equipment stored in this area varies. The volume of oil in
the various pieces of equipment ranges from 10 to 120 gallons.
Possible spill occurrence:
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 10-120
gallons. Operations and maintenance personnel are trained in safe
operation of forklifts and boom trucks to avoid such occurrences.
1-12
&
'I
9. Operating Pad-Mounted Transformer
a. There is one operating pad-mounted transformer located northeast of
the T&D Office Building.
Possible spill occurrence:
i) Equipment Leakage:
The greatest spill potential is from leakage of the equipment which
would be detected immediately by a power outage. The maximum
volume of oil that could reasonably be expected to spill due to
leakage is 10 gallons.
B. Catastrophic Event
Spill volumes associated with a catastrophic event such as an earthquake are of
a much larger magnitude than those accidents previously discussed. These spills
have a much lower probability of occurrence. The largest potential spill due to an
earthquake would involve the destruction of oil-filled equipment and containers in
the buildings, and storage areas. Assuming the largest piece of oil-filled
equipment or aboveground container is destroyed, or 50% of the total oil in all the
equipment and above ground containers at the facility is spilled, the resultant spill
volume would be 21,420 gallons, In the event of a significant earthquake or
similar catastrophe, the Oil Spill Contingency Plan, Part III, would be
implemented immediately.
10. FACILITY MODIFICATION
Based on the attached Decision Analysis Sheet, no modifications are required for this
facility.
1-13
"
'.
SPILL PREVENTION CONTROL AND COUNTERMEASURE
PLAN
PART II
DESIGN AND OPERATING INFORMATION
PART II
SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
DESIGN AND OPERATING INFORMATION
1. FACILITY DRAINAGE
The northern portion of the yard is graded such that surface run-off from this yard
flows toward catch basins and drainage inlet, located throughout the north yard.
Water accumulated in the catch basins and drainage inlet flows through the storm
drain lines into the drainage pond, located at the southwest corner of the yard. The
outlet pipe is equipped with a manually operated valve that would be closed in the
event of an oil spill in the north yard, preventing any spills from entering the drainage
pond.
The southern portion of the yard is graded such that surface run-off flows toward a
drainage inlet, located at the west side of the south yard, Water from this drainage
inlet flows through an underground storm drain line into the drainage pond. The outlet
pipe of this storm drain line is also equipped with a manually operated valve that
would be closed in the event of an oil spill in the south yard preventing any spills from
entering the pond.
2. BULK STORAGE
A. Underground Fuel Storage Tanks
The facility has two 10,OOO-gallon underground gasoline tanks used for storing
unleaded motor-vehicle fuel and diesel fuel, and they are located west of the
Fleet Services Building. They are double-walled fiberglass-clad steel tanks which
are compatible with the stored fluids. See Part I, Section 8A for operating
information.
B. Aboveground Oil Storage Tanks
The facility has four steel tanks, used for storing 250 gallons of motor oil, 250
gallons of hydraulic oil, 250 gallons of transmission oil and 150 gallons of gear oil
and they are located east of the Fleet Services Building. They are single wall
steel tanks and they are compatible with the stored fluid. See Part I, Section 8A
for operating information,
C. Aboveground Waste Oil Storage Tank
The facility has one 1 ,ODD-gallon aboveground tank used for storing waste oil
from fleet services maintenance operations, and it is located on a concrete slab
adjacent to the Fleet Services Building. The tank, which is compatible with the
stored fluid, is double-walled with a steel inner tank, an annular space, and an
outer concrete containment tank. See Part I, Section 8A for operating
information.
II-I
D. Fuel Tanker Truck
The facility has one dual product fuel-tanker truck with a capacity of 600 gallons
of diesel fuel and 1,200 gallons of unleaded gasoline. It is a single wall steel tank
and it is compatible with the stored fluid. See Part I, Section 8A for operating
information.
E. Bulk Drum and Oil Filled Equipment
See Part 1, Section 8A for operating information.
3. INSPECTION AND RECORDS:
Service center maintenance personnel perform inspections of the service center yard
at least once a month.
Inspection results are recorded on the "Oil Filled Equipment and Hazardous Materials
Inspection Log." (Attachment 4)
The Emergency Coordinator is responsible for verifying the scope and adequacy of
the inspection, Inspection records are maintained in the Support Service Director's
office for a period of three years.
4. SECURITY
The facility is surrounded by a six-foot high chain link fence topped with one foot of
barbed wire. The yard perimeter and interior are fully illuminated at dusk by automatic
lights. There are thirteen gates located around the yard's perimeter. Gate 1 is
normally closed at all times; Gates 2, 3, 4,7 and 12 are open between 7 a.m, - 5:00
p.m, on working days; Gates 8, 9 and man gates 5, and 6 are normally closed gates
with access via security card. The CNG station has unrestricted access 24 hours per
day 7 days per week.
J;¡
'Li::...
All buildings, offices, and shop facilities are locked during non working hours. In cases
of weekend and after hours, employees entering or leaving the facility buildings re-Iock
all gates and doors. All employees are instructed to watch for strangers at the facility
and question them regarding any unusual activity.
5. PERSONNEL TRAINING AND SPILL PREVENTION PROCEDURES
PG&E has complimentary training programs that address the proper handling of
hazardous materials and wastes at Company facilities. The training programs meet
the employee training requirements of both federal and state regulations as they apply
to hazardous waste contingency plans and emergency response plans.
A. Hazardous Materials Use and Handling:
In accordance with California regulations (8 CCR "Worker Right-to-Know" and 19
CCR "Business Plan and Inventory") and California Health and Safety Code,
II-2
PG&E's Safety, Health and Claims Department oversees training on hazardous
materials in use at Company facilities.
Employees in each department or facility receive "Right to Know" instruction and
additional training on specific substances or classes of toxic or hazardous
chemicals they use. Training includes safe methods for storage and handling or
hazardous materials, proper fitting and use of personal protective equipment, and
knowledge of the specific hazards of the chemicals to which employees are
exposed. "Right to Know" instruction is given by the supervisor or by the Safety
Engineering Representative. Training on specific toxic or hazardous chemicals is
given by the Safety Engineering Representative, and Industrial Hygienist, or other
technically qualified personnel who, because of education, training, or
experience, understands the health risks and necessary safety precautions
associated with each toxic or hazardous substance.
B. Hazardous Waste Management:
PG&E's hazardous waste management training provides consistent Company-
wide guidance on proper handling of hazardous materials and wastes. Each
facility 'determines which employees need this training in relation to their job
duties.
The level of training that employees receive is commensurate with their work
activities. In general, employees fall into one of two categories. Category 1
consists of employees who only handle hazardous waste. These employees
receive annual awareness level training on hazardous materials and waste
management. Category 2 consists of employees with specific hazardous waste
management responsibilities. These employees receive annual hazardous waste
training for Coordinators and Supervisors. Additionally, these employees are
trained within six months of starting a job assignment that involves hazardous
waste management duties,
All employees involved in hazardous waste management participate in annual
review sessions pertinent to their responsibilities.
Some employees receive on-the-job training which may include procedures for
spill prevention and spill cleanup and the handling of hazardous materials and
hazardous wastes. Spill prevention procedures and cleanup procedures are
documented in PG&E CES Standard C-T&CS-S0320, PCB Oil/Oil Spill Response
for Electric Distribution Line Equipment or various Substation bulletins.
C. Facility Emergency Response:
PG&E's emergency response training is covered in two parts. Part One is given
to all employees within six months of hiring and covers the following topics:
· Recognizing an emergency situation
· Emergency alarms and signals
· Notification of emergency responders
II-3
·
Proper evacuation procedures '
Emergency response plan
Spill mitigation measures
J' .". f
·
·
These topics are included in the Hazardous Materials and Waste Management
General Awareness training.
Facility Emergency Response Coordinators, Emergency response team members and
hazardous materials handlers receive further training in Part Two, which covers these
areas:
· Facility's emergency response contingency plan content and location;
· The location, use and hazardous properties of the various materials handled
at the facility;
· Facility operations and activities, and the facility layout;
· The location, use and maintenance of all fire and spill control containment
equipment;
· Notification procedures for on-site and off-site emergencies;
· Proper personal protective equipment which should be worn, depending
upon the type, of the spill release.
These topics are included in Hazardous Waste Training for Coordinators and
Supervisors. Refresher training for all employees is given annually.
D. DOCUMENTATION:
Documentation of all training is maintained at the facility and by the Supervisor in
charge of the Section. Documentation includes the type and length of introductory and
continuing training, attendance lists and names of instructors. All records are
maintained at the facility for the life of the facility or three years after an employee
leaves the company or site.
Training records for employees include the following:
a. The job title for each position at the facility related to hazardous waste
management and the name of the employee filling each job;
b. A written job description for each position related to hazardous waste
management;
c. A written description of the type and amount of introductory and continuing
training given.
If the employee receives specific training related to hazardous materials
transportation, then these additional items are documented.
11-4
..
;¡-
SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
PART III
OIL SPILL CONTINGENCY PLAN
BAKERSFIELD SERVICE CENTER
4101 Wible Road
Bakersfield, CA 93301
;;¡
BAKERSFIELD SERVICE CENTER
ENVIRONMENTAL EMERGENCY TELEPHONE LIST
Public No.
Company:
Primary Facility Emergency Coordinator:
Dennis White
Support Services Director
Residence Telephone No.:
24-Hour Telephone No.:
(805) 398-5938
(805) 837-1490
(805) 398-5785
Alternate Facility Emergency Coordinator(s):
Mike Westbrook
Construction Supervisor
Residence Telephone No.:
24-Hour Telephone No.:
(805) 398-5854
(805) 861-9815
(805) 398-5785
(805) 434-4417
(415) 973-5930
(415) 973-7000
(415) 973-8700
PG&E Corporate Environmental Consultant:
PG&E Media Representative:
PG&E Headquarters Telephone Operator:
PG&E Safety Health & Claims Helpline
Federal Agency:
U.S. Coast Guard/National Response Center:
(800) 424-8802
State Agencies:
California Office of Emergency Services (OES): (800) 852-7550
California Department of Health Services (DOHS)*:
California Department of Fish and Game*: (800) 852-7550
California State Lands Commission: (310) 590-5201
Regional Water Quality Control Board (RWQCB)*: (800) 852-7550
Local Contacts:
City of Bakersfield, Hazardous Matis. Division
(805) 326-3979
Fire Department: Bakersfield Fire Dept.
Police Department: Bakersfield Police Dept.
Hospital: Mercy Hospital, Bakersfield
Ambulance/Paramedics:
(805) 324-4542 or 911
(805) 326-3811 or 911
(805) 632-5000 or 911
911
12\,
:,1
PG&E No.
874-5938
874-5854
667-4417
223-5930
223-7000
223-8700
(800) 852-7550
* DOHS, RWQCB and California Department of Fish and Game have requested that emergency
notifications to these offices be made through the OES 800 number.
See Attachment 5 for additional facility emergency coordinator information.
llI-i
;¡,
;i'
P ART III
QlL SelL.L COtfilNGENCY PlAN
1. INTRODUCTION:
The purpose of this plan is to promote effective response to potential oil spills, fires,
explosions, and hazardous materials releases to air, soil or surface water which could
occur at the facility. It is also intended to minimize hazards to human health and the
environment. This plan has been prepared according to the guidelines of the National
Response Team Hazardous Materials Emergency Planning Guide (NRT-1/March
1987) and the regulations of the State of California as defined in the California Code
of Regulations, Title 22, Division 4.5, Chapter 15, Article 4, and Title 19, Division 2,
Chapter 3. The CCR Title 22 requirements for contingency plans embody those in40
CFR 112,100,109, and 761.
The provisions of this plan will be carried out immediately whenever there is an
incident which could threaten human health or the environment.
2. AUTHORITIES AND RESPONSIBILITIES:
The following discussion defines the authorities and responsibilities of PG&E
personnel as they pertain specifically to oil spills, hazardous materials releases, and
associated emergencies, Le., fires and explosions.
A. Primary Emergency Coordinator
The Primary Emergency Coordinator is responsible for coordinating all
emergency response measures at the facility. The Primary Emergency
Coordinator is familiar with all aspects of the facility's contingency plan, all
operations and activities at the facility, the characteristics of materials and
wastes handled, the location of all records at the facility including emergency
response records, and the facility layout. This person has the authority to commit
the resources needed to carry out the contingency plan and the responsibility to
respond to environmental emergencies as described in Sections 3 and 4,
Response Procedures.
B. Alternate Emergency Coordinators
The Alternate Emergency Coordinators will coordinate with the Primary
Emergency Coordinator or act in their behalf. The Alternate Emergency
Coordinators are familiar with all aspects of the facility's contingency plan, all
operations and activities at the facility, the characteristics of materials and
wastes handled, the location of all records at the facility including emergency
response records, and the facility layout.
These people have the authority to commit the necessary resources needed to
carry out the contingency plan and the responsibility to respond to the
emergency as described in Sections 3 and 4, Response Procedures. At least
111-'
.,
""
..:,....
·;'·y,-7';;",""
one emergency coordinator will be either on the premises or on call (Le.,
available to respond to an emergency by reaching the facility within a short
period of time).':: ,;,'
C.
Hazardous Waste Coordinator
The responsibility of the Hazardous Waste Coordinator is to ensure that
hazardous waste, waste oil and oily debris is disposed of according to applicable
State and Federal regulations.
D. Emergency Telephone Numbers
Key PG&E personnel, including Emergency Coordinators, and agencies to be
contacted in the event of a spill are identified on the Emergency Telephone List
provided on page III-L
E. Spill Prevention Responsibilities
Procedures in place to prevent oil spills and releases of hazardous materials
include routine inspections of oil and hazardous materials storage areas. Logs of
these inspections are maintained at the facility.
3. RESPONSE PROCEDURES FOR OIL SPILLS
The emergency response procedures in this Section describe the actions to be taken
in the event of an oil spill or release of ~ hazardous material. The procedures are
summarized in the Environmental Emergency Response Flow Chart provided in
Table 1.
A. First Employee at the Scene
The responsibilities of an employee arriving at the scene of an oil spill,
hazardous materials release, or associated emergency are as follows:
1. Observe from a safe distance
2. Identify hazards
3. Restrict access to the spill area
4. Call for assistance. Provide the Emergency Coordinator or exempt
Supervisor or the department on-call supervisor (during working hours) with
the following information:
a. Your name and telephone number
b. Any injuries
c. Location and type of spill
d. Source and cause of spill, if known
e. Fire or explosion risk
f. Actions taken to stop/contain the release
111-2
"
g. Notify fire department if needed
5. If safe to en~er the area, attend to any injured. Administer first aid if you
have been trained and certified. Call an ambulance or paramedic.
6. If safe to do so, stop the source of the discharge. Note: If material is
unknown, can cause immediate hazards to life or health, is producing
fumes, vapors, etc., never enter the area without the proper personal
protective equipment and support persons.
,.;~ Jr.
This may involve:
· shutting off equipment or pumps;
· plugging a hole in operating equipment or a tank;
· closing a valve; and/or
· righting an overturned container or piece of operating equipment.
Simultaneously pursue containment of the discharge with the following
containment techniques:
· For relatively small spills, apply absorbent to the surface of the
spill enough to absorb all the liquid.
· For larger spills, construct earthen dikes or ditches around the spill
to prevent the discharge from flowing off-site or into waterways.
· Prevent discharge into storm drains by sealing off with plastic
and/or earthen dikes.
7. Remain at the scene to prevent other people or vehicles from entering the
emergency area until relieved by the Emergency Coordinator.
B. Initial Emergency Coordinator Action
1 . The Emergency Coordinator or the exempt supervisor/ department on-call
supervisor must gather as much information as possible to assess the
magnitude and severity of the spill in order to initiate appropriate actions.
This may involve telephone calls to operations or maintenance personnel
who may have seen the spill or to office personnel who can assist in
collection of resources such as Material Safety Data Sheets, Facility
Environmental Emergency or Spill Prevention Plans, or Emergency
,Response Guidebook.
2. The Emergency Coordinator or the exempt supervisor/ department on-call
supervisor then goes to the scene of the spill to initiate an appropriate
response plan. (Refer to Environmental Emergency Response Flow Chart,
Table 1.)
C. Response Plan Developed and Implemented
1. Identify if any injuries have occurred and that proper actions have been
taken.
2. Assess the possible hazard to human health, property, or the environment.
111-3
·-
a. Isolate spill from human or vehicular contact. (Use cones, stanchions,
and tape; post signs.) Order all personnel not involved with the cleanup
. operation to leave the ärea.
b. If the emergency threatens human health, activate alarms or
communications systems to notify all persons for evacuation.
c. If the emergency threatens human health outside the facility
boundaries and local areas must be evacuated, notify the state Office
of Emergency Services (OES) and the local emergency assistance
organizations (listed on page III-i).
An immediate verbal report of any release or threatened release which
poses a present or potential danger to human health and safety,
property or the environment must be reported to the city or county
administering agency and the California Office of Emergency Services:
See page III-i, for telephone numbers,
The verbal notification should include the following information:
· Name and telephone number of person reporting release
· Name and address of the facility
· Time and type of incident
· Location of the release
· Hazardous material and estimate of the quantity
· Extent of injuries
· Potential hazards (if known)
Document this notification with the Oil Spill Report, Attachment 3.
d. Arrange to have an emergency response contractor or Safety Health
and Claims representative conduct air monitoring to determine
Permissible Exposure Level (PEL) and Threshold Limit Value (TL V) if
necessary.
e. Stop processes or operations where necessary. Continue to monitor for
leaks, pressure buildup, gas generation or release, ruptures in pipes or
valves.
f. Isolate affected containers or equipment.
g. Remove non-affected, potentially hazardous materials.
111-4
3. Identify what material is involved.
a. If spilled oil is suspected of being contaminated by PCBs, identify the
PCB concentration. If this information is not readily available on the
equipment or from the office records, samples must be taken and sent
immediately for laboratory analysis. All spills of unknown oil from oil-
filled equipment shall be handled as if it is a low concentration PCB
spill (50 to 499 ppm) until test results are available.
b. PCB notification, cleanup, documentation and transportation
requirements:
For any spill, immediately contact the local Environmental Consultant
or the Environmental Services EC on call (1-800-874-4043) who will
determine and make the appropriate external notifications.
In cases where an Environmental Consultant cannot be reached within
24 hours of spill discovery, field personnel or the Division PCB
Coordinator shall notify the following agencies:
National Response Center
State Office of Emergency Services
EPA Region IX (only notify if spill
contains greater than 49 ppm PCB)
Local Regional Water Quality Control
Board
Any additional local agencies where
the division has previously agreed to
provide notification
800-424-8802
800-852-7550
415-745-1001
(209) 445-5116
The local Environmental Consultant will also assist in making external
notification for any spills that enter or threaten to enter surface or
groundwater or onto any grazing land or edible crops.
Property owners/residents should be notified of the spill and the
cleanup activities that the company will be doing.
i) Mineral Oil Spills (PCB less than 5 ppm)
a. Cleanup:
1. Cleanup shall be completed as soon as practical, but
should be initiated within 48 hours of notification.
2. Use absorbent material to collect freestanding liquids for
deposit in approved containers.
3. Remove soil and vegetation to clean up all visible traces
of liquid and deposit in approved containers.
111-5
4. Double wash/rinse all solid surfaces such as walls,
sidewalks, streets, cars, etc., capturing waste liquid with
absorbents for deposit in approved containers.
5. Manage all cleanup material and debris as state
hazardous waste.
6. Post cleanup sampling is not required. However, local
agencies may request additional sampling.
b. Documentation:
Records and test reports shall be retained at each local
headquarters for a minimum of five years (after five years
records should be archived). It is suggested that this
documentation be retained in a file by site address.
Documentation that should be retained includes copies of
PCB/oil spill or Leak Report (Form 623685), site diagrams,
laboratory test reports, emergency job estimates, accident
report forms, and hazardous waste manifests.
c. Transportation:
Waste mineral oil is considered a hazardous waste in
California and is subject to all hazardous waste transportation
requirements. It is required that shipping papers (Shipping
,Notice or Bill of Lading) be used to identify the load when
transporting back to the local service center/headquarters.
For oil shipments greater than 70 gallons a manifest and an
approved hazardous waste hauler is required.
ii) California Regulated PCB Spills (5 ppm or greater but less than 50
1mIIl1
a) Cleanup:
Cleanup procedure for mineral oil spills (PCB less than 5
ppm) also applies to California Regulated PCB spills.
b) Documentation:
Documentation procedures and requirements for mineral oil
spills (PCB below 5 ppm) also applies to California Regulated
PCB spills. '
c) Transportation:
"
PCB Shipping Notice is required for all shipments from the
field to the nearest service center. The vehicle must also
have a copy of the current hazardous material transportation
license issued annually by the CHP, a copy of the
111-6
Department of Transportation Emergency Response Guide
(Guide 31 ), and a copy of the annual PCB Transportation
Variance.
,:.,:;
iii) Federal Low Concentration PCB Spills (50 ppm or greater but less
than 500 ppm and less than one pound of pure PCBs by weight)
a. Cleanup:
1. Cleanup shall be completed within 48 hours of when the
Company js first made aware of the spill. "Completion of
cleanup may only be delayed beyond 48 hours incase of
civil emergency, adverse weather conditions, lack of
access or emergency operating conditions. The
occurrence of a spill on a weekend or overtime cost are
not acceptable reasons to delay cleanup.
2. Use absorent material to collect freestanding liquids for
deposit in approved containers.
3. Remove soil and vegetation to clean up all visible traces
of liquid or stains plus a one foot lateral buffer and
deposit in approved containers. Restore property to its
original condition.
4. Double wash/rinse all solid surfaces such as walls,
sidewalks, streets, cars, etc., capturing waste liquid with
absorbents for deposit in approved containers.
5. When easily replaceable property such as furniture, toys,
clothes, etc. are contaminated, it is recommended that
these items be replaced rather than decontaminated,
6. Manage all cleanup material and debris as federal
hazardous waste.
7. Post cleanup sampling is not required. However, local
agencies may request additional sampling.
8. For known spills where it is difficult to determine the spill
boundaries by visible traces, the Company is required to
use a statistical sampling method to determine the spill
boundaries. Contact your local Environmental Consultant
for advice on how to do the sampling. Examples of where
this situation may occur are spills on wet ground or where
oil is sprayed under high pressure. If statistical sampling
is used to determine the spill boundaries, then it must
also be used for post cleanup testing.
b. Documentation:
The documentation procedures and requirements for mineral
oil spills (PCB less than 5 ppm) also applies to Federal low
111-7
concentration PCB spills. Additionally, the PCB/Oil Spill or
Leak Report (Form 62-3685) shall be completed and must
include a signature of the responsible supervisor in the
Cleanup Certification block. This form shall be included in the
documentation retained.
c. Transportation:
1) PCB Shipping Notice is required for all shipments from
the field to the nearest service center. The vehicle must
also have a copy of the current Hazardous Material
Transportation License issued annually by the CHP, a
copy of the Department of Transportation Emergency
Response Guide (Guide 31), and a copy of the annual
PCB Transportation Variance. All approved containers
(holding waste equipment, insulating fluid or spill debris of
unknown concentration) known to contain 50 ppm or
greater PCB shall be marked with an EPA "Caution PCB"
adhesive label (ML label). Non-leaking, in-service
electrical equipment with less than 500 ppm PCB are not
required to be marked with the ML label.
2) Transport vehicles loaded with PCB containers (not
transformers) with 45 kg or 99.4 Ibs (13-1/2 gallons) or,
more of PCBs (50 ppm or greater) in the liquid phase or
one or more PCB transformer(s) (500 ppm or greater)
must display the EPA "Caution PCB" label on the front,
rear, and sides of the vehicle.
iv) Federal High Concentration PCB Spills (500 ppm or greater. or
one pound or more PCBs by weight)
a. Cleanup:
1 . Cleanup shall be initiated within 24 hours of when the
Company is first made aware of the spill. It is expected
that every effort will be made to clean up high
concentration spills expeditiously, Initiation of cleanup
may only be delayed behond 24 hours in case of civil
emergency, adverse weather conditions, lack of access
or emergency operating conditions. If start of cleanup is
delayed beyond 24 hours, records must be kept that
indicate the type and duration of circumstances that
precluded rapid response. The occurrence of a spill on a
weekend or overtime cost are not acceptable reasons to
delay cleanup.
111-8
'-<;',
"
2. For spills in this category, the first company
representative at the spill site must barricade and restrict
an area encompassing all visible traces plus at ¡east a 3
foot lateral buffer and place a clear visible sign advising
persons to avoid the area.
3. Use absorbent material to collect freestanding liquids for
deposit in approved containers.
4. Remove soil and vegetation to clean up all visible traces
of liquid or stains plus a three foot lateral buffer and a
minimum ten inches depth. Deposit contaminated
material and debris in approved containers. Restore
property to its original condition.
5. Double wash/rinse all solid surfaces such as walls,
sidewalks, streets, cars, etc., capturing waste liquid with
absorbents for deposit in approved containers.
6. When easily replaceable property such as furniture, toys,
clothes, etc. are contaminated, it is recommended that
these items be replaced rather than decontaminated.
7. Manage all cleanup material and debris as federal
hazardous waste.
8. Post cleanup testing is necessary to verify that PCB
contamination is below 10 ppm for soil and 10 microgram
per 100 square centimeters for solid surfaces. Because
of the complexity of post cleanup test sampling, this
activity shall be coordinated by the PCB coordinator using
the local Environmental Consultant and resources from
Technical and Ecological Services or a qualified PCB spill
cleanup contractor.
9. For known spills where it is difficult to determine the spill
boundaries by visible traces, the Company is required to
use a statistical sampling method to determine the spill
boundaries. Contact your local Environmental Consultant
for advice on how to do the sampling. Examples of where
this situation may occur are spills on wet ground or where
oil is sprayed under high pressure. If statistical sampling
is used to determine the spill boundaries, then it must
also be used for post cleanup testing.
b. Documentation:
The documentation procedures and requirements for mineral
oil spills (PCB less than 5 ppm) also applies to Federal high
concentration PCB spills. Additionally, the PCB/Oil Spill or
Leak Report (Form 623685) shall be completed and must
include a signature of the responsible supervisor in the
111-9
Cleanup Certification block. This form shall be included in the
documentation retained.
,"',,""
c. Transportation:
1) PCB Shipping Notice is required for all shipments from
the field to the nearest service center. The vehicle must
also have a copy of the current hazardous material
license issued annually by the CHP, a copy of the DOT
annual PCB Emergency Response Guide (Guide 31), and
a copy of the annual PCB Transportation Variance. All
approved containers that hold waste equipment, leaking
in-service equipment, insulating fluid or spill debris known
to contain 50 ppm o~ greater PCB shall be marked with
an EPA "Caution PCB" adhesive label (ML label). Non-
leaking, in-service transformers are not required to be
marked with the ML label unless their PCB concentration
is 500 ppm or greater.
2) Transport vehicles loaded with PCB containers (not
transformers) with 45 kg or 99.4 Ibs (13-1/2 gallons) or
more of PCBs (50 ppm or greater) in the liquid phase or
one or more PCB transformer(s) (500 ppm or greater)
must display the EPA "Caution PCB" label on the front,
rear, and sides of the vehicle.
c. Sampling Requirements
Spill classification is based on the PCB concentration in an oil sample
taken from the source of the spill, not the concentration of PCBs in the
material onto which the PCBs were spilled. Only random post cleanup
samples are to be taken for low federal concentration PCB spills but
rigorous sampling is required by the EPA for (1) pre cleanup sampling
data when necessary to establish spill boundaries or (2) post cleanup
samples for high federal concentration PCB spills. PG&E's approach to
the EPA's recommended rigorous sampling procedure is detailed in
Appendix C of PG&E's "PCB/Oil Cleanup Manual". The complete
rigorous sampling procedure manuals issued by the EPA are available
upon request from the Electric Distribution Department or the Technical
and Ecological Services (TES) Department in San Ramon. For
assistance in taking rigorous samples, phone the TES Department at
(510) 820-2000 and state that a chemical spill has occurred.
4. Identify personal protective equipment which may be required in the area.
111-10
5. Evaluate the resources needed, such as manpower, equipment, and
cleanup materials, and call for outside contractor assistance if needed.
Cleanup/Disposal Resources are listed in Attachment 6. Field personnel
must coordinate with the local Environmental Coordinator prior to calling out
a cleanup contractor. Emergency cleanup contractors must have a
supervisor on site throughout all cleanup operations.
The Emergency Coordinator is responsible for determining when a cleanup
is complete. Depending on the nature and magnitude of the spill, this
decision may be made in consultation with state/local agencies having
jurisdiction in the affected area.
6, Determine actions needed to successfully complete containment and
cleanup efforts. Establish an exclusion zone (work area where spill has
been identified), a contamination reduction zone (where decontamination
procedures are conducted and contaminated protective clothing can be
removed), and a support zone (where persons can wait in a clean
environment).
Assemble the emergency response personnel and provide a briefing
detailing the cleanup procedures, protective clothing to be worn, and
equipment to be used. Cleanup efforts must be undertaken to restore the
affected area to its pre-spill condition to the maximum extent possible.
a. For relatively small spills, absorbent will be applied and re-applied until
there is enough to absorb all the liquid. This material will be picked up
with stiff brooms and shovels and placed in approved waste containers
for disposal in accordance with applicable regulations.
b. For spills in buildings or on paved areas, a second application of
absorbent will be spread over the contaminated area and swept with
stiff brooms to remove residues which may remain. Spill debris and
cleanup materials will be placed in approved containers for disposal in
accordance with applicable regulations.
c. For spill on soil, the contaminated soil will be removed until there is no
visual evidence of contamination. Spill debris and cleanup materials will
be placed in approved containers for disposal in accordance with
applicable regulations. Soil which has been removed will be placed in
approved waste containers for disposal in accordance with applicable
regulations.
d. For spills in catchment basins or oil retention ponds, the oil will be
removed by using absorbents or with the assistance of a cleanup
company. If the spill is relatively small, rolls of 3M "Sorbent" Type 100
will be cut into manageable lengths and floated on the surface of the
water to absorb the oil. For larger spills, cleanup companies may use
skimming and separation devices or sorbents.
After the surface of the water has been cleaned, 3M "Sorbent" Type
156 sheets will be used to scrub the walls of the basin at the water \ine.
111- 1 1
,
j
Oil and oily water will be collected for disposal in accordance with
applicable regulations.
e. Decontaminate all equipment and surfaces.
7. Obtain general release information and record it using the Oil Spill Report
provided in Attachment 3.
8. Identify appropriate company and agency notification requirements.
D. Proper Handling of Hazardous Waste
After completion of cleanup, contaminated disposable protective clothing will be
removed by cleanup personnel immediately and placed in an approved waste
, container for disposal. Gloves will be removed, and hands will be thoroughly
cleaned with waterless hand cleaner or soap and water and wiped with rags and
paper towels. Rags and other waste material will be placed in approved waste
containers for disposal in accordance with federal, state, and local regulations.
All oil, hazardous materials, and cleanup debris recovered from a spill will be
considered hazardous waste unless it is demonstrated to be non hazardous and
must be disposed of according to applicable state and federal regulations.
Contact the Materials Department, Hazardous Waste Coordinator, or Corporate
Environmental Consultant for determination of proper waste disposal methods.
E. Follow-up Actions
1. Decontaminate all equipment or other contaminated surfaces.
2. Restock all emergency spill èontrol equipment and supplies to maintain the
inventory listed in Table 3.
3. Critique spill response actions to identify measures to avoid future incidents
and to improve the efficiency of future spill cleanup actions.
F. Document Response Actions
Reportable oil spills and hazardous materials releases must be carefully
documented so that sufficient information is available to concerned agencies.
Information concerning the spill should be recorded on the Oil Spill Report
provided in Attachment 3 and should include photographs for major spills when
appropriate.
Send a copy of the completed Spill Report to the Corporate Environmental
Consultant and file the original in the Facility Records.
111-1 2
,r_..- ,-'~ " ,-"-,-,,.-,,' '~'-"
G. Follow-up Reporting
Notify the Corporate Law Department of any environmental release (air, ground
or water) that must be reported to a federal, state or local agency; any
environmental release which attracts media attention; or any discovery of
significant historic contamination at a PG&E site. This information must be
reported verbally as soon as possible with written follow up notification no later
than one work day after the incident.
Contact the Corporate Environmental Consultant for assistance in filing the
required written agency notifications described below.
1. Notify the California Department of Toxic Substances Control and the local
authorities that the cleanup has been completed and that all emergency
response equipment is cleaned. ready for reuse, and restocked for future
use.
2, A written report must be submitted to the Environmental Protection Agency
(EPA) within 60 days whenever a facility has:
a. Discharged more than 1,000 gallons of oil into navigable waters in a
single spill event, or
b. Discharged oil in two reportable events within any 12-month period.
The report must be submitted to the Region IX Administrator at the
following address:
Environmental Protection Agency
75 Hawthorne Street
San Francisco, CA 94105
3, A written report must be submitted to the appropriate Regional Water
Quality Control Board when a spill has entered or threatened a water body.
The address is:
Regional Water Quality Board, Region 5P
3614 E, Ashlan Ave.
Fresno, CA 93726
4. A written report must be submitted to the California Department of Toxic
Substances Control within 15 days of a spill that posed a hazard or potential
hazard to human health, property, or the environment. The address is:
California Department of Toxic Substances Control
Chief Northern Calif. Section, Region 1
10151 Croydon Way, Suite 3
Sacramento, CA 95827
5. The California Office of Emergency Services form entitled "Emergency
Release Follow-Up Notice Reporting Form" must be prepared and
submitted within 30 days of the date of the release to:
111-1 3
Chemical Emergency Planning and Response Commission'
2800 Meadowview Road
Sacramento, CA 95832
a. In addition, report spills greater than 42 gallons onto land or any
amount entering or threatening to enter waters of the State to,
California Office of Emergency Services. A written follow-up report is
required.
4. RESPONSE PROCEDURES FOR FIRES
A. Evaluation and Initiation of Action
In the event of a fire or explosion, immediately notify the local fire department by
calling 911. The Emergency Coordinator must then gather as much information
as possible to assess the magnitude and severity of the fire or explosion to
initiate emergency action.
1. Identify the source of the fire or explosion.
2. Assess the possible hazard to human health and take appropriate actions:
a, Isolate the fire area. Order all personnel not involved with the
emergency to leave the area.
b. If the emergency threatens them, notify all facility personnel for
evacuation. (See Section 6 for evacuation plan.)
c. If the emergency threatens human health outside the facility
boundaries and local areas must be evacuated, the state Office of
Emergency Services (OES) and the local emergency assistance
organizations must be notified.
3, Assemble the emergency response personnel and provide a briefing
detailing the fire fighting procedures, protective clothing to be worn, and
equipment to be used.
4, Assess the potential for the fire spreading or explosion occurring and take
appropriate actions:
a. Stop processes or operations where necessary.
b. Isolate affected containers or equipment.
c. Remove non-affected, potentially hazardous materials.
5. If facility operations are stopped, monitor for leaks, pressure build-up, gas
generation, or ruptures in valves, pipes, or other equipment.
6. If the fire is accompanied by an oil spill or hazardous material release,
initiate emergency response as described in Section 3.
111- 1 4
B. Containment. Termination. and Cleanup
1. When it is safe to do so, facility personnel may attempt to contain the fire
with fire extinguishers until local fire authorities arrive on the scene. If the
fire involves hazardous fumes, the proper personal protective equipment
must be worn. Trained personnel must be identified and called in to fight the
fire.
2. If the fire is accompanied by an oil spill, contain the spill and follow clean-up
procedures in Section 3.
5. EMERGENCY EQUIPMENT
This section describes the emergency equipment at the facility and the applicable
maintenance and inspection schedules.
Inspections involve visually checking emergency protection systems and equipment
to ensure that they are in place, charged, and ready for use in the event of an
emergency. See Table 2.
Maintenance involves a more thorough examination and servicing of equipment.
A. Communication and/or Alarm System:
Commercial telephones are located in buildings where provided. In addition,
most PG&E vehicles are equipped with two-way radios that can be used to
summon assistance in the event that telephone service is cut. The Training
Building has security alarms which are audible at the site.
B. Fire Fighting Equipment:
Fire extinguisher and other firefighting equipment locations, type/capability, and
inspection schedules are listed in Table 2. The type of extinguisher placed at
each location depends on the types of fire likely to occur near the location.
Location of fire extinguishers are depicted in Attachment 1, Facility Layout Map.
C. Spill Control Equipment:
A list of spill control equipment found at this facility is presented in Table 3.
6. EVACUATION PLAN AND PROCEDURES
Evacuation of the facility will occur as a response to an incident with known or
unknown hazards that could pose a threat to the health and/or safety of facility
personnel. '
The decision to evacuate is the responsibility of the Facility Emergency Coordinator
or the shift supervisor. He/she will determine the extent of evacuation. The local fire
department or other emergency response personnel might have the authority to make
this decision depending upon the situation,
111-15
All facility personnel have been trained in the evacuation routes for their work stations
and the other areas of the facility. An assembly point is designated and will provide
for personnel accountability and serve as a staging area for the emergency response.
111- 16
;";"'~', ,', ',' ~
. ..,-',
TABLE 1
ENVIRONMENTAL EMERGENCY RESPONSE FLOW CHART
Notify Emergency Coordinator of the
following:
a, Your name and telephone number.
b, Any injuries,
c, Location and type of spill.
d, Source and type of spill.
e, Fire or explosion risk,
f, Actions taken.
g, Notify fire department if needed.
Refer to:
a, Facility Environmental Emergency Plan
b, Spill Prevention Plan (SPCC)
c, Emergency Response Guide Book
( ,
\
'-.
SPILL INCIDENT OCCURS
1. Initial discovery or reporting of spill.
U
FIRST ON SCENE
1. Observe from a safe distance.
2. Identify hazards.
3. Restrict access to the spill area.
4. Call for assistance.
5, If safe to enter the area, attend to any injured.
6, If safe to do so, stop the source of the discharge
and contain the spill.
7. Remain at the scene until relieved by Emergency
Coordinator or Supervisor.
U
INITIAL EMERGENCY COORDINATOR ACTION
1, Assemble resources,
2, Go to scene.
U
RESPONSE PLAN DEVELOPED BY
EMERGENCY COORDINATOR
1. Identify if any injuries have occurred and proper
actions required,
2. Assess hazards or potential hazards to human
health, property, or the environment. (Conduct air
monitoring if required.)
3. Identify what material is involved - type, quantity,
PCB concentration, etc.
4. Identify personal protective equipment which may
be required in the area,
5. Evaluate the resources needed, such as materials,
equipment, manpower, outside contractor
assistance.
6, Determine corrective actions needed for central
containment, mitigation, cleanup, etc.
7. Obtain general information - location, on-site or off-
site, release to waterway, etc.
8. Identify company and agency notification
requirements.
111- 1 7
ENVIRONMENTAL EMERGENCY RESPONSE FLOW CHART
(CONT'D.)
IMPLEMENTATION OF EMERGENCY RESPONSE PLAN
PROPER HANDLING OF HAZARDOUS WASTE
Contact the following personnel for assistance:
1, Materials Department,
2, Facility Hazardous Waste Coordinator, or
3, Environmental Coordinator/Consultant
JJ
FOLLOW·UP ACTIONS
1, Decontaminate all equipment. ,
2, Restore all safety and cleanup supplies,
3, Critique spill response actions,
4, Contact Environmental Coordinator/Consultant to have SPCC Plan reviewed and
evaluated.
JJ
DOCUMENT RESPONSE ACTIONS
1, Complete the Oil Spill Report including:
a, Release information
b, Corrective action
c, Hazard assessment
d, Agency notifications
File the Spill Report in the Facility Records and SPCC Plan.
U
FOLLOW-UP REPORTING
Contact the Environmental Coordinator for assistance in filing follow-up reports for the following types of
spills:
1, The spill posed a hazard or potential hazard to human health or the environment.
2, The release entered any type of waterway, such as a creek or storm drain.
3, Fuel or oil was discharged in 2 reportable incidents within the last 12 months,
The Flow Chart outlines PG&E's Environmental Emergency Response Procedures as
described in the Spill Prevention, Control, and Countermeasure (SPCC) Plan.
111- 1 8
"
TABLE 2
FIRE FIGHTING EQUIPMENT INVENTORY
* Locations Inspection
Type/Capability Quantity A B C D E F G H I J K Schedule
Drv Chemical
Class AS C 37 12 6 1 3 1 1 - 2 4 3 4 Monthly
Class BC 1 1 - - - - - - - - - - Monthly
Halon 1211
Class ABC 6 - - - 2 4 - - - - - - Monthly
Class BC 4 2 - - 2 - - - - - - - Monthly
*LOCA TIONS
A=Operation Office Building
B=T&D Office Building
C=Traihing Building
D=Warehouse Building
E=Gas and Electric Services Offices
F=Hazardous Waste Storage Building
G=SCADA Building
H=Tool Storage Building
I=Fleet Services Building
J=Prefab Office and Storage Shed
K=CNG Station/Compressor/Fueling Island Area
The buildings and the general locations of this equipment are identified on the Facility
Layout and Location Map (Attachment 1).
111-1 9
"
.
TABLE 3
SPILL CONTROL AND PERSONAL PROTECTIVE EQUIPMENT
I
I
Minimum Quantities Required
ITEM CAPABILITY TYPE OR DESCRIPTION QTY. LOC. INSP. SCHD,
Containers Hazardous waste disposal 55-gallon steel drum 8 Monthly
Hazardous waste disposal 85-gallon steel drum 2 Monthly
Hazardous waste disposal 5-gallon steel drum 5 Monthly
Hazardous waste disposal 48" dia x 56" Ecopod Monthly
Spill Cleanup 2x4x4 wooden box 10 Monthly
Spill Cleanup 4x4x4 Wooden box 4 Monthly
Spill Cleanup 10 mil/50·x56" plastic bags 20 Monthly
Spill Cleanup 6 mil/38"x65" plastic bags 20 Monthly
Spill Cleanup 6 mil/52"x48"x73"plastic bag 20 Monthly
w/3/4"x 1/16"x92" rubber band to
cover PCB boxes
Absorbents Spill Cleanup Oil absorbent compound 30 bags Monthly
Spill Cleanup Spill control pillows 4 bales · .. Monthly
Spill Cleanup 3M Sorbent type 100 2 rolls · .. Monthly
.
Spill Cleanup 3M Sorbent type 156 2 rolls · .. Monthly
,
Cleanup Materials Spill Cleanup Penetone Power Cleaner(1 gal can) 4 gal. Monthiy
Spill Cleanup Penetone Power Cleaner (6 gal . gal. · .. Monthly
can)
Spill Cleanup Rags 150 Ibs, · .. Monthly
Spill Cleanup Street broom 2 Monthly
Spill Cleanup Scrub brush 2 · .. Monthly
Spill Cleanup Mop 2 Monthly
Spill Cleanup Plastic pail 2 Monthly
Spill Cleanup Flat-bottomed shovel 2 Monthly
Spill Cleanup Flat-bottomed aluminum shovel 2 Monthly
Spill Cleanup Waterless hand cleaner 5 tubes Monthly
Coveralls Personal Protection Tyvek vented back 6 pair Monthly
Booties Personal Protection Plastic 6 pair Monthly
Gloves Personal Protection Solvex or Butyl 6 pair Monthly
Face Shields Personal Protection Universal hard hat/adapter wlface 3 Monthly
shield
Personal Protection Formed 8" visor 3 Monthly
Personal Protection Chemgard Faceshield frame 3 Monthly
Respirators Personal Protection Full Mask as req'd, Monthly
(to be stored and used Half Mask as req'd, Monthly
....
"'1
trained personnel only)
Filter/Cartridges Personal Protection Type GMCH combination for half as req'd, Monthly
(to be stored and used and full mask
by
trained personnel only)
Location Kev
Yard
Tool Storage Building
Substitution:
A 95 gallon plastic DOT approved container may replace 85 gallon steel drum or 2x4x4 box.
A 180 gallon plastic DOT approved container may replace 4x4x4 box.
111-20
I
Q¡U.l f"~
¡
I !
r I
(IT
T I
L _i!!- - - - - - - -
i
I
!
I
I
,
I
E
o
c
OiH~"d (qu;ø,nenl
Sloroqe Þuo No. 6
oa·rillad (quiømenl
'Sloroqe ''110 No.1
:;;¿
~
1W
~ -
~ --
a -
u
01. ·FUED (QIJP\(NT
STORAGE ÞRf.A NO.7
N:; .oler
Sloroqe Tanks
1
,
I".
Drainoqe
PonS
~ Yol..iaII i
Sloroge an.
~
Cone. Pod
I I
~
Ne./Rafll'bÎIIIeO
b OHìIed (quip.
, -7-0--- ____~~_~ Ina '4
.:' ,',',', ,',',',',',','~
~ ..'~'~' ,,-;"·~',,'·M'~',,"
--------
ala BIocJt 'fall
~
01-..... t_
f. o.trerJ .
I.Ine '91
~
W
NnlRarll'bisNcI
OHJed EM.~
,"O__ 3~~~~;~...'~ - --..-...", n,
, """",' """"'"
t,',',',', ',', ',' /,',' ,', ','/,', ",'~'þ" ',¡
7;,;'7 ~
" /,' ",1
'!.L ~".
-'1- - "li"-
ST'n-
I
I
I
- '\.:.:. Open
Work N80
Overhonq
T ankw
Truck
~
- - - - -- - - -
_I::;;
.....
.....
.....
.....
.....
.....
.....
.....
.....
.....
.....
.....
......
......
......
......
......
......
~
......
......
......
......
.......
~
...
-'
\\'
'an
8
A
SPCC
I
BAKERSFIELD
SERVICE
CENTER
~
¡¡:
47
rEET
(,~1 T
.
I
&
MÞP
SITE
MOBILE HOME PARK
LEGEND
JIm )( SCRPT()H
a) FRE EX1~R
iD r RE HYDRANT 011 H05( ST AU)..
t:õII SJ'll CONTRa. (QI.A[NT
-'- Wit( DOOR
-- ROll'lP DOOR
"'-- OfI(CTICH or SH:[ T n.ow
- OfI(CTICH or 0RAIU4:( rlOW
- OIÞII lHe F[NIX
- - PIIŒ'£RTY lM:
- ST~ OIUII
- S(w(R lM:
eI CATCH BASIl
UC lIIC(RCRC\.tIO
ÞG ABOVECAOIHJ
HW M HAZÞ111n.5 wAS TE ACa.II.lA TICH Hff.A
~ HAZÞ111n.5 wASTE STOIIHX ÞR(A
!XI WAIER Vlt V(
II TowtR
~
\
\
\
,
I
I
,
I
I
I
...
....
...
we Weal)
Oi T cr« ...
...
,
\
Cone.
Pod
'""-..-
1slfloor
Of c. RR
-
N:;
oHanl!
~
.,
-- ------~-'- --
::-'" _:,_'.',~',r"I;"· .';.',. .'''~';'~.:.'''' ,':~-,~-"i
,-'" "
ATTACHMENT 2
BAKERSFIELD SERVICE CENTER
INVENTORY AND SPILL PREDICTION TABLE
MAJOR
VOLUME CAUSE
TYPE PER TOTAL TYPE OF SPILL AMOUNT
OF NO,OF CONTAINER VOLUME OF OR OF SPILL
CONTAINER ITEMS (GAL) (GAL) FLUID PURPOSE FAILURE (GAL)
Underground 1 10,000 10,000 Diesel Fleet fuel Overfilling/ 0-2
Fuel Tank Tank leak
1 10,000 10,000 Unleaded Fleet fuel Overfilling/ 0-2
gasoline Tank leak
Aboveground 1 1,000 1,000 Waste oil Temporary Pumping 0-5
Tank storage/
accumulation
1 250 250 Motor oil Fleet Overfilling/ 0-3
maintenance pumping
1 250 250 Hydraulic oil Fleet Overfilling/ 0-3
maintenance pumping
1 250 250 Transmission Fleet Overfilling/ 0-3
oil maintenance pumping
1 150 150 Gear oil Fleet Overfilling/ 0-3
maintenance pumping
Floor lift 1 65 65 Hydraulic oil Equipment Tank leak! 0-20
oil reservoir maintenance pipe rupture
Tanker truck 1 600 600 Diesel Fleet fuel Overfilling/ 0-5
Tank leak
1 1,200 1,200 Unleaded Fleet fuel Overfilling/ 0-5
gasoline Tank leak
Drums 8 55 440 Lube oil, Equipment Drum upset! 0-55
solvent maintenance pumping
hydraulic oil,
transmission
oil, mineral oil
10 55 550 Waste oil Temporary Spilling from 0-55
such as: storage/ a second
diesel-water accumulation containerl
mix, drum upset
gasoline-
water mix,
solvent mix,
brake fluid,
hydraulic
fluid,
transmission
fluid,
suspected
PCB
contaminated
oil
Container 20 5 100 Mineral oil, Equipment Container 0-5
hydraulic oil maintenance rupture
Electrical 670 2 - 380 37,865 Mineral oil Stored Droppingl O· 380
Equipment equipment & leakage
e,g, retumed
Transformers equipment
Regulators,
Reclosers,
Service
Transformers
Switches,
Capacitors
Operating 1 120 120 Mineral oil Equipment Leakage 0-10
Transformer maintenance
Footnote:
¡LZ:
See Attachment 1 for direction of flow.
ATTACHMENT 3
(PCB/OIL SPILL OR LEAK REPORT)
CES STANDARD
SPCC PLAN - ATTACHMENT 3
Issuing Department: T&CS DISTRIBUTION
CES Officer: V.P.T&CS
TITLE:
Pacific Gas and Electric Company (62-3685)
STANDARD: C-T&CS-S0320. Attachment 2
GENERAL IDENTIFICATION:
Region Division
Headquarters Substation
SPILL INFORMATION:
C~ ~un~
PCB/OIL SPILL OR LEAK REPORT
AJR# D&C#
District
Circuit
Page No.:
Effective Date:
Review Date:
PCB/OIL Spill Response for Electric Distribution Line Equipment
Attachment 2. Effective 7-94
PCB/Oil Spill or Leak Report
Form 623685
1
7-94
1-96
of
6
Page 1 of 6
Job Est.#
Specific Location of Spill (address)
General Description of Spill Area:
o Private Property 0 Major Freeway/Highway/Road
U t-arm/Kancn 0 Residential Neighborhood (Rear Lot Line)
o Shopping Center 0 Residential Neighborhood (Street Area)
o Medical Facili~/Rest Home 0 Rural Highway/Road
o Public Property 0 PG&E Property
o Waterways (river, drainage ditch, creek, canal, pond, pool, etc,)
o Other Areas (Describe)
o Decorative Rock
o Pole and Hardware
o Vegetable Gardens
o Gravel
Telephone
Telephone
Telehone
Date of Spill Time of Spill
Person reporting spill to PG&E (name)
PG&E Employee receiving initial spill notification (name)
PG&E Supervisor in charge of cleanup (name)
Fluid Identification:
o Manufacturer's Non-PCB Nameplate
o PG&E Analysis Tag w/supporting report
(Attach copies of Laboratory Analysis Reports)
o Sample Analysis by a Certified Lab
Spill Classification: (See page 2 fõrPCB weighfcalculations)
o High Concentration PCB's (500 ppm or greater) or Low Concentration PCB's involving one (1) pound or more of PCB by weight.
o Low Concentration PCB's (50-499 ppm) 0 California Regulated PCB's (5-49 ppm) 0 Non-PCB Oil Spill (less than 5 ppm)
Spill Boundaries:
o Clearly Visible
** 0 Involves water, grazing land, vegetable gardens, sewer
or other sensitive conditions.
A Pre cleanup Statistical Sampling Plan is required to identify spill boundaries for 50 ppm or greater PCB spills,
Agency Notification is Required (see page 3 of this form and CES Standard C-T&CS-S0320 instructions),
. 0 Can't be determined
o School/Playground or Park. Area
o Business District
o Industrial Area
o Residential Street/Sidewalk
Types of Surfaces/Media Involved:
o Asphalt 0 Concrete
o Shade Trees 0 Shrubs
o People 0 Wildlife
o Fruit Trees 0 Dirt
o Other (Describe)
CES Standard
o Domestic Animals
o Buildings/Structures
o Agricultural Crops
o Grazing Land
o Flower Beds 0 Lawn
o Fence or Wall 0 Vehicles
o Water 0 Ground Cover
June 29.1994
SPCC PLAN - ATTACHMENT 3
CES STANDARD
STANDARD: C-T&CS-S0320. Attachment 2
Page No.:
Effective Date:
Review Date:
TITLE: PCB/Oil Spill Response for Electric Distribution Line Equipment
Issuing Department: T&CS DISTRIBUTION
CES Officer: V.P.T&CS
2
of
7-94
1-96
6
Pacific Gas and Electric Company (62"3685)
-'
Page 2 of6
PCB/OIL SPILL OR LEAK REPORT
o Weather Conditions:
o Rain, Moderate
o Other
o WindyO Lightning 0 Fog Cloudy Drizzle
o Rain, Heavy 0 Clear 0 Snow
IMMEDIATE ACTIONS TAKEN TO MINIMIZE HUMAN EXPOSURE, ENVIRONMENTAL IMPACTS AND PROPERTY DAMAGE:
o Barricades 0 Absorbents 0 Dirt berms or Dikes 0 Cover Storm or Sewer Drains 0 Other (Describe)
PROPERTY OWNER NOTIFICATION:
Property Owner's Name:
Telephone Address
Property Owner Notified? 0 Yes By (Name)
o No (explain)
Date Time
REPORTING ASSESSMENT
PCB Weight (RQ) calculations (Calculations required for all spills involving 50 ppm or greater PCB),
Quantity of fluid released (Required for all Spills) gallons PCB concentration ppm
Calculation: Quantity of fluid released gallons x ppm = Ibs, PCB or 0 Calculations not required,
135,(XX)
Federal EPA - (Spills of fluids containing 50 ppm or greater PCB Concentrations):
o Involves vegetable gardens '0 Involves Surface or Drinking Water 0 Involves Sewers or Sewage Treatment Systems
o Involves grazing land 0 Involves special cleanup (i.e. fire, humans, animals, etc.)
o Involves a spill of one (1) pound or more of PCB by weight
Any or all of the above conditions must be reported to the National Response Center (NRC), EPA Region IX,
California OES and the County Environmental Health Services Department. If water is involed, the Regional Water
Quality Board must also be notified, Other agencies may also need to be notified as circumstances dictate: i.e, Fire
Depts" Cal-EPA, Police, Sheriff, CHP, etc,
California Regulated - (Releases or Threatened Releases of Hazardous Materials)
o Involves a Release of 42 gallons or more of oil or petroleum products
o invûives sensitive areas such as schools and medical facilities
o Involves a spill of fluids containing 5 ppm or greater PCB off PG&E property
o Involves wildlife or domestic animals
o Involves Release of a Hazardous Material to water or vegetable gardens
o Attracts public and or media attention
o Presents a significant threat to human health or the environment even if below RQ values
Any or all of the above conditions must be reported to California OES and the County Environmental Health Services
Department: The NRC and the Regional Water Quality Control Board must be notified of releases that involve water,
Other agencies may also need to be notified as circumstances dictate: i,e, Fire Depts., Cal-EPA, Police, Sheriff, CHP,
etc,
o SPILL CONDITIONS DO NOT MEET ANY OF THE AGENCY NOTIFICATION REQUIREMENTS DESCRIBED ABOVE
AND IS NOT REPORTABLE.
CES Standard
June 29.1994
SPCC PLAN - ATTACHMENT 3
CES STANDARD
STANDARD: C-T&CS-S0320. Attachment 2
Issuing Department: T&CS DISTRIBUTION
CES Officer: V.P.T&CS
Page No.:
Effective Date:
Review Date:
3
of 6
7-94
1-96
-,
TITLE: PCB/OIL Spill Response for Electric Distribution Line Equipment
Pacific Gas and Electric Company (62·3685) Page 3 of 6
PCB/Oil SPILL OR lEAK REPORT
AGENCY NOTIFICATIONS (Telephone notifications should be made as soon as possible. but must be made within 24 hours)
(IF REQUIRED):
National Response Center Date Time Report # or Name By (Name)
Phone (800)424-8802
EPA Region IX Date Time Report # or Name By (Name)
Phone (415) 744·1001
AGENCY NOTIFICATIONS (cont.)
California OES Date Time Report # or Name By (Name)
Phone (800) 852-7550 or (916) 262·1621
,--"-' .- Time Report # or Name By (Name) -..'
County Environmental Health Date
RWQCB Date Time Report # or Name By (Name)
Other Date Time Report # or Name By (Name)
Phone
Other Date Time Report # or Name By (Name)
Phone
Written Follow-up Report (within 30 days) sent to Cal-OES (attach copy) Date By (Name)
Is a Pre-cleanup Statistical Sampling Plan Required? o No o Yes (Complete below, sketch on separate page,
anu élLlélCi¡ a copy of the plan and of laboratory analysis results)
Are Special Cleanup Efforts Required by Spill Conditions or Regulatory Agencies? o No o Yes (describe)
CES Standard
June 29, 1994
Î
SPCC PLAN - ATTACHMENT 3
CES STANDARD
Issuing Department: T&CS DISTRIBUTION
CES Officer: V.P.T&CS
STANDARD: C-T&CS-S0320. Attachment 2
Page No.: 4 of 6
Effective Date: 7 -94
Review Date: 1-96
TITLE: PCB/Oil Spill Response for Electric Distributi.on Line Equipment
Pacific Gas and Electric Company (62-3685) Page 4 of 6
PCB/OIL SPILL OR LEAK REPORT
CLEANUP ACTIVITIES:
Describe in detail the cleanup process used for each type of surface involved:
SURFACE DESCRIPTION OF CLEANUP PROCESS
Asphalt DNA
Concrete DNA
Pole/Hardware/Equipment DNA
Buildings/Structures DNA
Dirt DNA
Depth of Excavation: inches
Lawn DNA (
Depth of Excavation: inches
Trees DNA
Shrubs .. . .,~.. .. DNA" ..
Depth of Excavation: inches
Ground Cover DNA
Depth of Excavation: inches
Flower Beds DNA
Depth of Excavation: inches
Vehicles DNA
Agricultural CropNegetable Garden/F DNA
Trees Depth of Excavation: inches
Grazing Land DNA
Depth of Excavation: inches
Sewer DNA
Storm Drain DNA
Water (Describe) DNA
Other (Describe DNA
Depth of Excavation:_ inches
Volume or Material Removed:
Equipment: - Drums _ Ecopods Other (Describe)
Solids - soil/debris - Drums _ Ecopods
Bulk Loads
(Describe) Units (ydsltons/kg)
Liquids - Oil/water: - Drums Bulk Loads (Describe) Units (gals x kg)
CES Stand?rd
June 29, 1994
"
r,
SPCC PLAN - ATTACHMENT 3
CES STANDARD
STANDARD: C-T&CS-S0320. Attachment 2
Page No.: 5 of 6
Effective Date: 7 -94
Review Date: 1-96
TITLE: PCB/OIL Spill Response for Electric Distribution Line Equipment
Issuing Department: T&CS DISTRIBUTION
CES Officer: V.P.T&CS
..
Pacific Gas and Electric Company (62-3685)
PCB/OIL SPILL OR LEAK REPORT
Page 5 of 6
Cleanup Performed by PG&E Crews? DYes
D No (Name of Contractor)
Number of people involved in cleanup: PG&E Employees _
Contractor Employees _ Other (Describe)
Protective Clothing Used During Cleanup: D Coveralls
D Plastic Booties
D Solvex Gloves D Respirators
D Other (Describe)
Post cleanup Samping Required? Yes (Attach a copy of the sampling Sketch/Grid and of laboratory analysis results)
D No (Explain why)
Post cleanup Laboratory Analysis Results: Number of soil samples analyzed _ Highest level Reported -ppm (TILC)
Number of wipe samples analyzed _ Highest level Reported _ug/1 00 sq, cm,
".... "..'~...~¥.-
Number of liquid samples analyzed_ Highest level Reported -ppm
(copies of all Laboratory Analysis Reports and sampling sketches should be attached to this form)
Were adverse conditions encountered that delayed the start of cleanup for a High Concentration PCB's (500 ppm or greater)
or Low Concentration PCB's involving one (1) pound or more of PCB spill for more than 24 hours or the completion of cleanup
for a Low Concentration PCB's (50-500 ppm) spill within 48 hours? D NoD Yes (Describe the delay)
Date of Delay Time of Delay Length of Delay
Certification: (Certification is required for all Federal low and high concentration PCB spills)
CLEANUP CERTIFICATION
Under civil and criminal penalties fo law for the making or submission of false or fraudulent statements or representations (18
U,S,C, 1001 and 15 U,S,C.2615) I certify that the information contained in or accompanying this document is true, accurate and
complete, As to the identified section(s) of this document for which I cannot personally verify truth and accuracy, I certify as the
company official having supervisory responsibility for the persons who, acting under my direct instructions, made the verification
that this information is true, accurate and complete,
Cleanup has been completed in accordance with the requirements of 40 CFR 761 andlor CAC Title 19 as described above on
(enter date) at (enter time)
Certified by:
(type or print certifying supervisor's name
(signature)
CES Standard
June 29, 1994
TITLE: PCB/OIL Spill Response for Electric Distribution Line Equipment
Pacific Gas and Electric Company (62-3685) Page 6 of 6
PCB/OIL SPILL OR LEAK REPORT
FINANCIAL COSTS OF CLEANUP:
PG&E Labor $- PG&E Equip $ PG&E Material $- Subtotal $
Contract Labor $ Contract Equip, $ Contract Mat. $ Subtotal $
Transportation $ Disposal $ Other $ Subtotal $
Grand Total of Cleanup Costs $
LIST OF ATTACHMENTS:
o Pre cleanup sampling Sketch/Grid o Post cleanup sampling Sketch/Grid o Cal-EPA Written Follow-up Report
o Laboratory Analysis Reports for Fluid Identification/Classification (Lab name )
o Pre cleanup Laboratory Analysis Reports (Lab name )
o Post cleanup Laboratory Analysis Reports (Lab name )
o Photograph Identification Sheets o Other Documents (Describe)
INVOLVED EQUIPMENT (SOURCE OF SPILL)
TECHNICAL DATA
OPERATING NUMBER MANUFACTURER M
CODE(S)* SERIAL NUMBERS EQUIPMENT TYPE AND SIZE
Identify the cause of Spill from the Following:
*Code TVDe of soil
UF Unit Failure (other than by lighting)
CP Unit Damaged by Car-Pole Accident or Other Third-Party Action
DU Unit Damage (rust, tracking, etc.)
LI Unit Failure Caused by Lightning
PF Unit Damaged by Pole Fire
SF Switch Failure (such as grounding switch on network transformer)
CH Unit Damaged During Handling
UL Unit Leaking Dr Sweating (Bushing), Gaskets Leaking or Sweating, but Fluid no
Reaching Ground
PLEASE NOTE: THIS RECORD MUST BE MAINTAINED FOR AT LEAST 5 YEARS
Report Prepared by: Phone
SPCC PLAN - ATTACHMENT 3
CES STANDARD
Issuing Department: T&CS DISTRIBUTION
CES Officer: V.P.T&CS
STANDARD: C-T&CS-S0320. Attachment 2
Page No.: 6 of 6
Effective Date: 7 -94
Review Date: 1-96
CES Standard
June 29, 1994
I '-,
I
ATTACHMENT 4
(FACILITY INSPECTION FORMS)
OIL-FILLED EQUIPMENT AND HAZARDOUS MATERIAL INSPECTION LOG
Year Hazardous Materials Storage Tanks I Oil Filled Elect Emergency Comments
Date Storage Area Tank'3r Trucks Eqpm t Storage Area Equipm ent Corrective Action Initials
!: r 0 . ' en
en º ~Q m' õ1 ~ \I)
m Z en ~a Z (¡ Z .0 º", 0 iiì
g 0 _ õ ~ (f 0 ç 0 0 s, m m ¡¡j .:¿
¡¡; en :;; ~", ~ õ' ~ en ëiJ en 2 U ::J m!l ~
a. 12, en 0.g ~ 0 ::J U Ö U 3 ~ .§ ~ <' ~ g
-_ f¡m§ menu - üï ::;- (f:J»::Jm 0 5'
r 0 U .,;;'" m m " - 0 Or -> (f r ~ < en <D 0 A.", (f
\I) - \I) ¡¡; r ¡¡¡.~ ::J ", - 1: - \I) \I) c: c: - U
g ~ ~ !Ð ¡¡¡ ~ ~ g g ..c~:!1 ~ !Ð ~ a !Ð g ~ iiï :g ~ £t ~' !lm
- U \I) - :;: m m \I) ~ \I) -, 12 \I) - ~,O' m ::r -
~ ~ ^ ~ m üï -< ~ 0 ::J ~ ^ g ~ ^ m <g. ro ro' ü! 5' Q Q
, -
= Fa
o
= Pass
./
FACILITY
'e',:', '.' ';.. ~
.
ATTACHMENT 5
FACILITY EMERGENCY COORDINATORS
In the event of an emergency, contact the Facility Emergency Coordinator or alternate.
If the Facility Emergency Coordinator and the alternate(s) are not available, contact the
on-call supervisor at th~ listed 24-hour telephone number.
Residence Telephone No.:
Dennis White
Support Services Director
(805) 398-5938
Bakersfield Service Center
(805) 398-5785
3319 Bathurst Ave.
Bakersfield, CA 93313
(805) 837-1490
Facility Emergency Coordinator:
Title:
Work Telephone No.:
Work Location:
24-Hour Telephone No.:
Residence Address:
Residence Telephone No.:
Mike Westbrook
Construction Supervisor
(805) 398-5854
Bakersfield Service Center
(805) 398-5785
6112 Cochran Drive
Bakersfield, CA 93309
(805) 861-9815
Ð
Alternate No.1:
Title:
Work Telephone No.:
Work Location:
24-Hour Telephone No.:
Residence Address:
,
ATTACHMENT 6
CLEANUP/DISPOSAL RESOURCES
"
. ,
"
ATTACHMENT 6
nV-ì
Ii
,::~;;~;;:';~-.;r.::..~ ;-~~~i~~r~1 {ìt~:¡ ê \ ::;~~F.i~ .:, :;;~ò"fí:}~;·:í',::\;;;..·;;:;.,7,~
, ',~~.ia~~l-::~;1~:L?~~~!'_ :._A~?:¿;'~~Þ~-t:?~=!·~~r~jf~4ii~Ji~_
The following firms can be utilized and will be called, if needed, to assist with cleanup,
disposal operations ,and chemical analyses.
a. List of spill cleanup, response, and transportation firms.
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Altamont LF/Resource Recovery
10840 Altamont Pass Rd,
Livermore, CA 94550
(800) 449-6349
4600005964
Allwaste Transportation & Remediation, Inc,
12475 Llagas Avenue
San Martin, CA 95046
(800) 321-1030
Z26C-103-95 & 4600005687
Chemical Waste Management, Inc,
35251 Old Skyline Road
Kettleman City, CA 93239
(209) 386-9711
4600005429 &
4600005428
Erickson, Inc.
255 Parr Boulevard
Richmond, CA 94801
(510) 235-1393
2S-3318-033 & 4600005423
Evergreen Environmental
5000 Birch Street, Suite 500
Newport Beach, CA 92660
(510) 795-4400
4600005595
IT Corp,
2055 Junction Avenue
San Jose, CA 95131
(800) 262-1900
4600005684
Kern Environmental
P.O, Box 5337
Bakersfield, CA 93388
(805) 589-5220
4600005686
Romic Chemical
2081 Bay Road
East Palo Alto, CA 94303
(415) 324-1638
460005257
U S Ecology
3860 Blackhawk Rd., #160
Danville, CA 94506
(800) 736-3860
4600005419
Emeroency Oil Spill Response
and Hazardous Waste and
PCBs - Cleanup and
Transportation
Hazardous waste and PCBs
disposal
Hazardous waste and PCB
cleanup
Waste Oil Recycling
Emeroency Oil Spill Response
Emeroency Oil Spill
Response, Cleanup,
transportation of hazardous
material/waste
Hazardous Waste Recycling
PCB, Hazardous Waste
Disposal
r'
April 1997
"
..
ATTACHMENT 6 (cont'd)
b. List of laboratories for chemical analysis.
~
¡¿
.~~ª,~~IØf{'Þ$iF~ ' ~,~~, .~ .
Name Anamatrix/lnchape Testing Service
Address 1961 Concourse Dr., Suite E
City San Jose, CA 95131
Telephone (408) 432-8192
Contract # 25-3439-174
Name BC Labs
Address 4100 Atlas Court
City Bakersfield, CA 93308
Telephone (805) 327-4911
Contract # 4600001863
Name Chromalab, Inc. t-....
Address 1220 Quarry Lane 'J?
City Pleasanton, CA 94566
Telephone (510) 831-1788
Contract # ZS-3439-114
Name Clayton Environmental Consultants
Address 1252 Quarry Lane
City Pleasanton, CA 94566
Telephone (510) 426-2600
Contract # ZS-3439-124
Name FGL Environmental
Address 853 Corporation St. or P,O, Box 272
City Santa Paula, CA 93060/93061
Telephone (805) 659-0910
Contract # 4600001677
Name Pace Inc,
Address 1455 McDowell Blvd, North Suite D
City Petaluma, Ca 94954
Telephone (707)792-1865
Contract # ZS-3439-214
In Camarillo:
4765 Calle Quetzal
Camarillo, CA 93012
(805) 543-2553
Sherwood Labs Corp,
8071 North Lander Avenue
Hilmar, CA 95324
(209) 667-5258
ZS-3439-234
Twining Labs
2527 Fresno St.
Fresno, CA 93721
(209) 268-7021
4600001027
PG&E Technical & Ecological Services
3400 Crow Canyon Road
San Ramon, CA 94583
251-5203 (Company)
(510) 866-5203 (Pac Bell)
24-Hour: (510) 866-5203
Not Applicable
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
Name
Address
City
Telephone
Contract #
PCB, TPH, BTEX, and general
lab analyses
PCB, TPH, BTEX, and general
lab analyses
PCB, TPH, BTEX, and general
lab analyses
TPH and general lab analyses
PCB, TPH, BTEX, and general
lab analyses
PCB, TPH, BTEX, and general
lab analyses
PCB, TPH, BTEX, and general
lab analyses
PCB, TPH, BTEX, and general
lab analyses
PCB, Hazardous Waste
Analyses
April 1997
___0..--.
~