HomeMy WebLinkAboutES-EMERGENCY PLAN 3/29/1996
·
~.. ~
.~/
4101 Wible Road, B~~ CA, 93308
March 29, 1996
IfW ~ (Ç; ~ ill; ~fiI
tU APR 31996 Pt
By i
='J
Chief Kelly
Bakersfield Fire Dept.
2101 IJH" Street
Bakersfield, CA 93301
Re: PG&E Bakersfield Service Center
4101 Wible Road
Bakersfield, CA 93308
Dear Chief Kelly:
In compliance with section 25505(c) and (d) of the California Health and
Safety Code, PG&E has reviewed its Facility Environmental Emergency
Response Plan for Bakersfield Service Center and made the necessary
changes. This document has been prepared in compliance with planning
requirements described in 40 CFR PART 26~, SARA Title III, AB2185,
AB3777, and California Code of Regulations Titles 19 and 22.
Enclosed is an updated plan for 1996 which is issued to all agencies (Fire
Department, Police Department and Hospital) agreeing to provide response
service. In addition, we would like to offer you the opportunity of visiting our
facility to familiarize yourself with the site and the contents of this plan.
If there are any questions regarding the enclosed, please contact me at
(805) 398-5938.
Thank you for your continued cooperation.
Sincerely,
~1Ú¿iJJt:t;)
DENNIS WHITE
Support Services Director
Enclosures
J"
"
·
FACILITY ENVIRONMENTAL
EMERGENCY PLAN
BAKERSFIELD SERVICE CENTER
·
Pacific Gas and Electric Company
·
.
.
.
FACILITY ENVIRONMENTAL EMERGENCY PLAN
BAKERSFIELD SERVICE CENTER
4101 Wible Road, Bakersfield 93313
Business Telephone: (805)398-5785
24-Hour Emergency Telephone: (805)398-5785
MARCH 1996
This Facility Environmental Emergency Plan will be implemented as herein described:
Signature: (J, ÁALdJ ;¿ II< 7;)
Name: Dennis White
Title: Support Services Director
.
.
.
BAKERSFIELD SERVICE CENTER
ENVIRONMENTAL EMERGENCY TELEPHONE LIST
Company:
Primary Facility Emergency Coordinator:
Dennis White
Support Services Director
Residence Telephone No.:
24-Hour Telephone No.:
Alternate Facility Emergency Coordinator:
Mike Kunz
Construction Supervisor
Residence Telephone No.:
24-Hour Telephone No.:
Additional Company Resources:
PG&E Corporate Environmental Consultant:
PG&E Safety & Health Helpline
PG&E Media Representative:
PG&E Headquarters Telephone Operator:
Federal Agency:
U.S. Coast Guard/National Response Center:
State Agencies:
California Office of Emergency Services (DES):
California Department of Health Services (DOHS)*:
California Department of Fish and Game*:
California State Lands Commission:
Regional Water Quality Control Board (RWQCB)*:
Local Contacts:
Administering Agency: City of Bakersfield
Hazardous Materials Division
Fire Department: (Bakersfield)
Police Department: (Bakersfield)
Hospital: Mercy Hospital
Ambulance/Paramedics:
Public Tel. No.
PG&E No.
(805) 398-5938
(805) 837-1490
(805) 398-5785
874-5938
(805) 398-5842
(805) 832-0954
(805) 398-5785
874-5842
(805) 434-4417 667 -4417
(800) 874-4043 (24 hr)
(415) 973-8700 223-8700
(805) 546-5292 664-5292
(415) 973-5930 (24 hr)
(415) 973-7000 223-7000
(800) 424-8802
(800) 852-7550
(800) 852-7550
(800) 852-7550
(310) 590-5201
(800) 852-7550
911 or (805) 326-3979
911 or (805) 324-4542
911 or (805) 326-3811
911 or (805) 632-5275
911
* DOHS, RWQCB and California Department of Fish and Game have requested that
emergency notifications to these offices be made through the DES 800 number. .
For Facility Coordinators addresses see Section 7 A. Local Contact addresses are found
in Section 4E.
-----
TABLE OF CONTENTS
SECTION Pace
. 1. OVERVIEW 1-1
2. FACILITY DESCRIPTION 2-1
3. HAZARD ASSESSMENT 3-1
4. PREPAREDNESS AND PREVENTION 4-1
A. Prevention Procedures 4-1
B. Emergency Equipment - Location and Maintenance 4-7
C. Security 4-11
D. Training 4-12
E. Arrangements for Outside Assistance 4-15
5. EMERGENCY RESPONSE PROCEDURES 5-1
A. On-Site Fire - Hazardous Substances Not Involved 5-4
B. On-Site Fire - Involving Hazardous Substances 5-5
C. On-Site Spill (Not Oil) - Inside Building 5-8
D, Spill, Non-Transportation Related - No Water Contact 5-11
E. Spill, Non-Transportation Related - Involving Water Contact 5-15
. F. Spill, Transportation Related -Involving Company Vehicle 5-20
G. Spill, Transportation Related - Involving Non-Company Vehicle 5-24
H. Spill, Oil and/or PCBs 5-26
I. Bomb Threat 5-38
J. Flash Flood/Flood/Extremely High Tide 5-40
K. Earthquake 5-41
L. Responding to News Media Inquiries 5-43
M. Natural Gas Releases 5-44
N. Toxic Clouds 5-47
O. Respiratory Hazards 5-48
P. Underground Tank Leak 5-51
6. EVACUATION PLAN AND PROCEDURES 6-1
7. FACILITY EMERGENCY COORDINATORS 7-1
8. SCENE-MANAGEMENT CHECKLISTS 8-1
9, EMERGENCY ASSISTANCE AGREEMENTS 9-1
. 10. WASTE CONSOLIDATION SITE 10-1
ii
TABLE OF CONTENTS
(CONT'D)
. Paae
TABLES:
1-1 Change Log 1-3
3-1 Hazardous Materials Inventory 3-10
3-2 Hazardous Waste Inventory 3-11
4-1 Firefighting Equipment Inventory 4-8
4-2 Spill Control and Personal Protective Equipment 4-9
4-3 First Aid Supplies/Inventory 4-10
FIGURES:
2-1 Facility Layout Map 2-5
6-1 Evacuation Routes 6-3
8-1 Facility Layout 8-5
FORMS:
Oil-Filled Equipment And Hazardous Materials Inspection Log 4-6
. Report of Bomb Threat 5-39
.
III
.
.
.
1. OVERVIEW
The purpose of the Facility Environmental Emergency Plan is to provide the procedures
and other directives to be carried out in the event of fire, explosion, earthquake, accidental
release of hazardous materials or waste, or any other similar emergency. When such an
emergency occurs, the Plan will be implemented by the Facility Emergency Coordinator.
This Plan is designed to minimize hazards to human health, property and the environment
from any unplanned release of hazardous materials and/or wastes into the air, soil, or
water, and has been prepared in accordance with state and federal regulations as set forth
in 40 CFR Part 265 and Titles 19 and 22 of the California Code of Regulations.
The facility Emergency Coordinator or the Alternate are the PG&E employees who are
responsible for coordinating all emergency response measures at the facility, The
Emergency Coordinator or Alternate are available at all times, either at the facility or on an
on-call basis. Each facility has one primary Emergency Coordinator and one or more
alternates, They are thoroughly trained and familiar with:
1. All aspects of the facility's Environmental Emergency Plan;
2. All operations and activities at the facility;
3. The facility layout;
4. The location and characteristics of hazardous material(s) and hazardous
waste(s);
5. The location of all emergency equipment;
6. The location(s) of hazardous materials and waste inventories, and emergency
equipment inventories and inspection records for the facility;
In addition, the Emergency Coordinator has the authority to commit the resources
necessary to carry out the Facility Environmental Emergency Plan. See Section 7 for a
more detailed discussion of Emergency Coordinator responsibilities.
1-1
.
.
.
, Chanaes and Amendments to the Facility Environmental Emeraencv Plan
This Plan will be revised under any of the following conditions:
1. The applicable regulations are revised;
2. The Plan is deemed inadequate or fails in an emergency or a test;
3. The facility changes in its design, construction, operation, or maintenance such
that it increases the potential for environmental incidents or changes the
responses necessary in an emergency;
4. The list of emergency coordinators changes;
5. The list of emergency equipment changes;
6. A 100% increase over the amount reported on the inventory is present at the
facility; or
7. A new hazardous material or waste is present at the facility (which was not
previously disclosed) in amounts which equal or exceed a total volume of 55
gallons, 200 cubic feet at standard temperature and pressure for gases or a total
weight of 500 pounds. If the new material is also listed in 40 CFR 355 as an
"Extremely Hazardous Substance" with a ''Threshold Planning Quantity" less than
500 pounds, then it also must be disclosed on the inventory;
8. The notification procedures change in any way.
Any change to the facility's Environmental Emergency Plan is immediately made by the
Facility Emergency Coordinator and distributed to the appropriate agencies.
Plan Retention:
A copy of the Facility Environmental Emergency Plan and all revisions must be maintained
at the facility for period of three years,
1-2
·
·
·
TABLE 1-1
CHANGE LOG
Instruction: Enter the required information as listed below.
Change Date Page
No. Entered Initials Description of Chance No.
1-3
.
.
.
2. FACILITY DESCRIPTION
A FACILITY NAME:
Bakersfield Service Center
B. TYPE OF FACILITY:
Service Center providing materials and equipment for Gas and Electric Operations.
C. LOCATION OF FACILITY:
4101 Wible Road, Bakersfield, CA 93313
Kern County
State of California Telephone: (805)398-5785
See Facility Layout Map, Figure 2-1
D. OWNER/OPERATOR:
Pacific Gas and Electric Company (PG&E)
P.O. Box 770000
San Francisco, CA 94177
E.
STANDARD INDUSTRIAL CLASSIFICATION: 493
F.
DUN & BRADSTREET NO: 00-691-2877
G. FACILITY MANAGER:
Dennis White
Support Services Director
4101 Wible Road, Bakersfield
Telephone: Work (805)398~5938
H. FACILITY DESCRIPTION:
This service center is used for storing and distributing materials and equipment for the
gas and electric operations work crews. The facility occupies approximately 15 acres
which is owned by PG&E and has been in operation since 1964.
2-1
The following buildings, structures, and areas are located at the service center. Their
locations and areas are shown on the facility layout, Figure 2-1.
Operations Office Building This building houses offices and meeting rooms for
the service center personnel.
.
T&D Office Building
Training Building
Gas and Electric Service
Offices
Fleet Services Building
Tool Storage Building
.
Warehouse Building
Welding Shop
Prefab Office
Prefab Storage Shed
& Work Area Overhang
Aboveground Waste-Oil
Tank
Underground Fuel Tanks
.
This building houses offices and meeting rooms used
by the T&D department personnel.
This building houses offices and meeting rooms used
by Kern Division personnel for training, A trailer is
located immediately east of this building and is
utilized for computer based training.
There are two modular buildings that
house offices for the gas and electric service
departments.
This building houses the office and shop for the
maintenance and repair of fleet vehicles and
equipment.
This building provides storage for miscellaneous
material and houses the gas and electric repair
shops, and dry tool storage.
This building stores material used by the service
center crews in the northern room and is utilized as a
shops building in the balance of the building.
The building is used for welding miscellaneous metal
assemblies and is located south of the Warehouse
Building,
This building houses an office and provides storage
for tools used in prefabrication operations.
This covered area is used for storage, and
prefabrication of materials and equipment needed at
job sites,
There is one aboveground storage tank used to
store waste oil generated from the fleet maintenance
operations located on the east side of the Fleet
Services Building.
There are two underground fuel storage tanks used
to store unleaded fuel and diesel fuel for fleet
vehicles located west of the Fleet Services Building,
2-2
Compressed Natural Gas
Fueling Station
.
Closed Circuit Wash Rack
System
Fuel-Tanker Truck
Hazardous Waste
Storage Area and
Building
I.
Fuel Island
Fence
Workplace Accumulation
.
There are two compressed natural gas fueling
stations, located at the southeast portion of the yard,
which are used to fuel natural gas vehicles. The
public CNG station is located with 24 hr. access to
Wible Road; the company CNG fueling is within the
fenced yard.
A closed circuit wash rack system is located adjacent
to the east end of the Fleet Services Building. This
system is used to wash fleet vehicles and contains an
aboveground clean water tank. An oil water
separator, located at the wash rack area, is also used
to clean dirty water prior to entering the closed circuit
wash rack system.
A fuel-tanker truck used for refueling fleet vehicles is
normally parked south of the Fleet Services Building.
This concrete area is used to temporarily store
hazardous wastes such as: empty paint related
products; batteries, and solid and semi solid wastes.
Signs are posted in accordance with applicable
regulations. This area and building are located west
of the Gas and Electric Service Offices.
The dispensers for the underground tanks containing
motor vehicle fuel are located at the fuel island
located just west of the Fleet Services Building.
The entire yard is surrounded by a chain link fence
topped with barbed wire. There are six vehicle
entrance gates to the facility.
Hazardous waste workplace accumulation containers
are located outside the Fleet Services Building and
Tool Storage Building. At Fleet Services, the
following wastes may be found: 55 gallon drums of
oil filters, aerosol cans, oily solids, solvents,
antifreeze and smaller containers of fuel filters,
carbon zinc batteries, dry cell batteries, and
occasionally, other wastes. In addition, a workplace
accumulation area exists outside the Tool Room
Building. It contains 55 gallon drums of alkaline and
carbon zinc batteries.
2-3
Drainage Pond
An unlined drainage pond is located at the south east
corner of the yard. All surface run-off from the yard
flows into this drainage pond,
·
New and Refurbished
Oil-Filled Storage Areas
New and refurbished oil-filled equipment such as
transformers, reclosures, capacitors, regulators and
switches are stored at locations identified on the
Facility Layout Map, Figure 2-1.
Returned Oil-Filled
Equipment Storage Areas
These areas are used for interim storage of damaged
or replaced oil-filled equipment which crews have
returned to the yard and prepared for shipping, prior
to transport for return under warranty, or to transport
to repair shops for repair and reuse assessment.
I. OPERATING SCHEDULE:
The facility is staffed 24 hours per day, seven days per week. During regular working
hours (7 a.m. to 5 p.m.), approximately 285 employees are headquartered at the
facility.
During weekday evenings, the facility is manned by 8 employees until 1 a.m..
Between I a.m, and 7 a.m. and on weekends, the facility is manned by one employee.
In the event of an emergency at this facility, outside of regular business hours, an
on-call supervisor is available 24 hours per day. (See the title page for the 24-hour
emergency telephone number.)
·
·
2-4
FIGURE 2-1
FACILITY LAYOUT MAP
.
.
.
2-5
10
9
I
I
1IcmaIe~ _ -4
8--~
7
6
~~r
COMMERCIAL
WIBLE
-------1-----
~
.)
2
1
E
o
E~I
koo No.8
(iii-filled Equipment
Sloroge koo No. 1
g
~
8
ROAD
?
B!J1I[LDtG SICP
OrCr
0"
()-~1~:
d.cwæ ~
~
- - - - - t:- ..::. c=- - :=t-..::. -=- --=- ...±. ~ --=- ..::. +- r
I
--+-
s'oiI·
c
USED/R£TIMHD
01. 'fillED EQUNNT
S10RAGE IREA NO. 7
J{; wollt
Sloroge T aNts
I
I
I
I
I
I
I
I
I
I
I
- - --) -w- -
~
. I
Drto:::?'
.... 1Iot.-m. ~
....... :j
Cone. Pod
I ~ I
~
'lRef...blshed
Filled Eq&ip.
age keo '4
line Truck
Po-kÌ19
I
L
w
~
--.J
wi
!:::I
::x:'"
~I
L
I
I
I
u
I
I
I
NJ
E
o
~
:¡j
~
~
<::>
c
ef:
r:
;
¡
1:
i
~
~
i
'¡:
!
i
i
I
¡
e
"
Ii
~
8
A
FEEP
.
FIGURE 2-1
-
10
'!
.
FACILITY JAYOUT
r
\
BAKERSFIELD SERVICE CENTER
PACIFIC GAS NÐ E~ÉC1RIC COMPANY
SAN FRANCISCo,1 CALIFORNIA
I
BAKERSFIELD
SERVICE
CENTER
!
..... Co..... !f"- ,
.......... ¡~~~I
r r.,;,;,;"k~ ~
(""".1'4
,'" ".!' f
, , , , '-4- ,
_ __ ___ =-=0_ _ _ _ -e- _ _ __ _ _ _ __ _ _ _ _W:;:'odl1r1_
~ ~ (iii-Fled Equip.
rUIn..... for Delivor2?-1 'L
1 ruck lNea '9)
, œ-FiIed Equ,,-
Slorogo k.o
"", "
_ t ~=~~;/:;/:': ,/::
~ ~t,~~~~~~~~~
.._.. _ __.... __.. \.._.... ^"'__) .J-'-.... ~JJ-'_LI
fb Crone "'--Open Nt.lRe'wbiIhtd
l- . Work kee Oil-Fled E.µp.
~- ---~ Overhang 7..._~t~~0_~!~:5Z___'l O(~~aW::) '-7-"
I Co. ED: r~':':':':':':':':'X;:::':':' þ~"':':~
~ .~.<¡¡,,~.........,,1 II .. ~....
-------~-------------- --------- - - ,
MOBILE HOME PARK
FEET
SITE MAP
IURU PIll 51 ATOI
FRST 1IJ lilT
EIlERGEHCY EYE WASH
EII:RGEHCY SHOWER
COIft[5S[D CAS INOIHlAIIIAII.E)
COIft[S5[D CAS Iflloll,\l(
CIHIOSIVE
RUCIIV[
IGN T AIIL[
IIAN WATER SltJT-OfF
IIAN ELECTRIC SltJI ·OfF
IiAIN CAS SHin -orr
fLfl I CNG EII:RC£HCY SIfJ1·orF
HALON H.NiII PULL
i
IDI
1&1
t
o
.
<D
II]
[]
mJ
iii
I!I
LEGEND
JESCRl'TIOH
fÆ EXTtG.ISl£R
III rÆ H~I OR I«IS[ STATION
W. SPl.l CONIRII. EQlI>II:NT
-- WALK DOOR
-- Ra.l'lP DOOR
"-- IJRECTIOH or SI£[T flOW
- DlRECTOI or IIIt\f,\C[ flOW
- c/w lllll me:[
- - I'ROi'£RTY lINE
-- STORII CfW
-- SEWER U£
~ CAICH BASIl
UC IN)[RGROltÐ
NJ. AllDVECROUND
HWM HAlN!OOUS WASTE IiCCUIIl.ATOI Nl£A
HWSA HAlNiOOUS WASTE STORNJ.( Nl£A
Þ<I WAIER VALVE
. 10W£R
9
8
........,
BY
7
-,
~
II" 11 ...
6
~
~
ec w, 11 ...
4
3
,
,
,
-'---...
,," OUWoter ... ..... "'-
, ~ T..... Soperatør7 ..
'Dr"" SlÞrogt "'0 wash..
, klO . Oil 1... ,
, ,
, \
IWœII Rod<. \
, E...... \
,
,
, \
, ,
I '
I I
, I
, '
, '
\ 101f1oor ,
\ Ofe' RR ,
\ 2nd floor '
, &.~~,
, ø ,
, '
.. '
.. '
.. '
.......----........--'
8
I
I
i
H
2
CJP2J bakersfd.spc
11-15-94 CPW
-
F4347
1
A
r
I
"
I¡
1\
~¡
I:
¡:
,
e
.
.
.
3. HAZARD ASSESSMENT
A. OBJECTIVE
This section identifies the hazardous materials and wastes that are routinely found at
the facility and their spill potential at the facility.
All personnel involved with handling hazardous materials and wastes have been
trained and are familiar with the hazardous properties of the materials and waste with
which they work.
B. HAZARDOUS MATERIALS AND WASTE INVENTORY
Lists of the hazardous materials and wastes generally handled at the facility are
presented in Tables 3-1 and 3-2, respectively. The inventory reflects 'Threshold
Level" reporting, listing hazardous materials or waste present at the facility in amounts
which exceed a total volume of 55 gallons, 200 cubic feet at standard temperature
and pressure for gases, or a total weight of 500 pounds. Substances present at the
facility below these levels may not be listed, unless the material is listed in 40 CFR
355 as an "Extremely Hazardous Substance" with a "Threshold Planning Quality" of
less than 500 pounds.
Included in the hazardous materials table is the following information:
chemical/common names; physical state; CAS number; DOT number (optional); the
maximum amount handled at anyone time throughout the year; unit; percent
weights of constituent chemicals; identification of how and where handled; the hazard
category(ies); maximum storage capacity and average quantity for each hazardous
material, and the largest container for each material on site.
The list of hazardous wastes also includes for each item: the composition; the three
digit California waste category number; the total estimated amount of hazardous
waste handled throughout the year; physical and health hazard category, largest
container size and maximum amount at anyone time and storage location.
C. FACILITY DRAINAGE
The northern portion of the yard is graded such that surface run-off from this yard
flows toward catch basins and drainage inlet, located throughout the north yard.
Water accumulated in the catch basins and drainage inlet flows through the storm
drain lines into the drainage pond, located at the southwest corner of the yard. The
outlet pipe is equipped with a manually operated valve that would be closed in the
event of an oil spill in the north yard, preventing any spills from entering the drainage
pond.
The southern portion of the yard is graded such that surface run-off flows toward a
drainage inlet, located at the west side of the south yard. Water from this drainage
inlet flows through an underground storm drain line into the drainage pond. The outlet
pipe of this storm drain line is also equipped with a manually operated valve that
would be closed in the event of an oil spill in the south yard preventing any spills from
entering the pond.
3-1
.
.
.
D. ADJOINING LAND USES
The service center is adjoined on the north, east and south by commercial land. The
property to the west is residential.
The nearest residential area is located immediately to the west of the service center.
There are no schools, hospitals, or medical care facilities within 1 mile of the facility.
E.
PREVAILING WIND DIRECTION
The prevailing wind direction is from the northwest.
F. SPILL POTENTIAL
The oil filled equipment, storage containers, spill prevention techniques currently
utilized and the potential for oil spills are described in this section. Small spills
occurring during normal operation will be contained and cleaned up in accordance
with Section 5 of this Emergency Plan.
1. Underaround Fuel Storaae Tanks
a, Double-walled Steel Fuel Tanks:
The facility has two 1 O,OOO-gallon underground tanks used for storing
unleaded motor-vehicle fuel, and diesel fuel, all located west of the Fleet
Services Building, They are double-walled fiberglass-clad steel tanks which
are compatible with the stored fluids. Each tank has a continuous leak-
monitoring system: one located in its annular space; and one located in the
pipe line collection sump. The monitoring system activates an audible and
light alarm located in the Fleet Services Building. If an alarm is activated, an
assessment to determine the cause will begin and may include leak testing.
The tanks fill-pipes are also equipped with an overfill box which is product-
tight to contain spills caused by overfilling. The Fleet Services Supervisor is
responsible for the tanks and their contents.
Possible spill occurrence:
i) Overfilling:
The greatest spill potential is from overfilling during the fuel transfer
process, (i.e. filling the tank). Spill prevention consists of constant
supervision during the filling process. Any fuel spilled during the filling
process would be contained in the overfill box.
ii) Tank Leak:
If a leak occurs, an alarm board would light and an audible alarm would
sound. This alarm is checked weekly for proper operating status.
3-2
.
iii) Overfilling Vehicles:
The dispenser nozzle used to fuel vehicles is equipped with an
automatic shut-off device. Constant supervision is provided during the
fueling process.
2. Abovecround Waste Oil Storace Tank
This facility has one 1 ,ODD-gallon aboveground storage tank used for storing
waste oil from the fleet services maintenance operations. This tank is located on
a concrete slab adjacent to the Fleet Services Building. The tank is double-
walled with a steel inner tank, an annular space, and an outer concrete
containment tank. The doube-walled tank system provides secondary
containment for protection against tank leakage. The Fleet Services Supervisor is
responsible for the tank and its contents.
Possible spill occurrence:
i) Tank leak:
If a leak occurs, it would be discharged into the annular space between the
walls of primary and secondary tanks. A monitoring pipe is connected to the
annular space between the tank walls and routinely monitored for possible
leaks.
.
ii) Overfilling:
The greatest spill potential is from overfilling during the waste oil transfer
process (i.e., filling the tank). The waste oil is pumped by automatic float
operated pumps into this tank from a half barrel tray located in the Fleet
Services Building. Spill prevention consists of constant supervision during
the filling process. The liquid level inside the tank is manually checked
daily. The maximum volume of oil that could reasonably be expected to
discharge due to overfilling is 5 gallons and it would be contained within the
building. '
iii) Oil Removal:
The possibility of a spill during the oil removal process would be minimal.
Constant supervision during the removal process and inspection of oil
removal equipment minimize the possibility of a spill. The maximum
potential spill would be the volume of the hose which is approximately five
gallons.
3.
Abovecround Oil Storace Tanks
Four single wall steel tanks, used for storing 250 gallons of motor oil, 250 gallons
of hydraulic oil, 250 gallons of transmission oil and 150 gallons of gear oil, are
located east of the Fleet Services Building. They are single wall steel tanks
which are compatible with the stored fluid. Automatic pumps and pipe lines
connect these oil containers with the oil hose lines in the Fleet Services Building,
.
3-3
Oil can only be discharged from these containers through these hoses.
Possible spill occurrence:
.
i) Overfilling:
The greatest spill potential is from overfilling during the filling process. Spill
prevention consists of constant supervision during the filling process. A
maximum of two gallons of oil could be spilled and spills would enter the
underground oil water separator, located adjacent to the tank storage area.
ii) Hose Leakage:
Small spills could occur due to rupture of oil hoses. It would crack and seep
before a complete severing would occur. A maximum of three gallons of oil
could be spilled and it would be contained within the Fleet Services Building.
4. Hydraulic Oil Storace Tank (Floor Lift Reservoir):
The facility has one 65-gallon steel tank used to store hydraulic oil. It is located
in the Fleet Services Building. It is a single-walled steel tank which is compatible
with the stored fluid and has been suitably painted to resist corrosion. This tank
is part of the hydraulic system for the floor hoist located in the Fleet Services
Building. Any hydraulic oil spilled would be contained within the building and
cleaned up immediately. The Fleet Maintenance Supervisor is responsible for
the tank and its contents.
.
Possible spill occurrence:
i) Overfilling:
This tank is filled from another tank. The greatest spill potential is from
overfilling during the filling process. Spill prevention consists of constant
supervision during the filling process. The maximum volume of oil that could
reasonably be expected to discharge due to overfilling is 3 gallons, and it
would be contained within the building.
ii) Pipe Rupture:
The tank is connected to a hydraulic system for the floor hoist inside the
Fleet Services Building by aboveground and underground single-walled
steel pipes. Spills due to pipe rupture would be noticed during hoist
operation. The maximum volume of product that could reasonably be
expected to discharge would not exceed 5 gallons and would be contained
within the building,
.
iii) Tank Leak:
Visual inspections are made daily to check for tank leakage. The maximum
volume of oil that could be discharged is 20 gallons before it would be
detected. Any oil leakage would be contained within the building.
3-4
.
.
.
5.
Fuel Tanker Truck:
There is one dual product fuel tanker in the facility. The tanker truck has a
capacity of 600 gallons of diesel fuel and 1,200 gallons of unleaded fuel. During
off-peak hours, it is used to distribute fuel to vehicles which are parked in the
facility yard. The tanker is filled from the underground fuel tanks. The Fleet
Services Supervisor is responsible for the tanker truck and its contents. When
not in use the truck is parked at the Service Center yard.
Possible spill occurrence:
i) Filling Tanker Truck:
The tanker is filled from the underground tanks. Any fuel spilled during the
filling process would be contained within the tank oveñill box and/or buckets
provided for the hose fittings. The maximum amount of fuel that could
reasonably be expected to discharge would be approximately five gallons.
ii) Oveñilling Vehicles:
The dispenser nozzles on the truck are equipped with automatic shutoff
devices. Constant supervision is provided during the fueling process. The
maximum volume of fuel that could reasonably be expected to discharge
would be approximately two gallons.
iii) Tank Leak:
The tank is a single wall steel tank which is compatible with the stored fluid.
A maintenance inspection is performed twice a year. The tanker is checked
visually by the operator before each use.
iv) Hose Leakage:
Hoses on the truck would crack and seep before a complete severing would
occur. The leakage would be noticed during pumping and would stop when
the pump stops. The maximum amount of fuel that could reasonably be
discharged is 3 gallons.
6. Drum StoraQe
55-gallon drums of petroleum products are stored at this facility. All 55-gallon
drums used for storage are DOT Specification 17E and/or 17C drums.
a. Drum Storage Area (Adjacent to the Aboveground Oil Storage Tanks):
Up to four 55-gaJlon drums are stored in this area. The drums contain
hydrocarbon products such as motor oil, hydraulic oil, and other similar
products.
Possible spill occurrence:
i) Oil Transfer:
3-5
Small spills could occur during transfer of oil to a smaller container. A
maximum of 5 gallons could be spilled and the oil would flow into the oil
water separator, adjacent to this storage area.
.
ii) Drum Rupture:
The largest potential spill would be from the rupture of a drum due to
overturning during handling (manually or with a forklift), A maximum of
55 gallons of oil could be spilled, Spills would flow into the oil water
separator, adjacent to this storage area.
b. Hazardous-Waste/Material Storage Building:
Approximately ten 55-gallon drums of miscellaneous liquid wastes generated
by the fleet maintenance operation and electric operation crews are stored in
a metal building. These drums typically contain oil and water mix, mineral oil
and hydraulic fluid. Hazardous wastes are temporarily stored here prior to
shipment to a licensed hazardous waste disposal facility, Occasionally
suspected PCB contaminated oil is also stored in this building. The building
has a sloped floor toward the middle of the building and functions as a
secondary containment. Additionally, up to 10 five-gallon containers of
mineral oil are also stored here,
Possible spill occurrence:
i)
Oil Transfer:
Small spills could occur during transfer of oil from a smaller container, A
maximum of 5 gallons could be spilled and oil would be contained within
the building.
.
ii)
Drum Rupture:
The largest potential spill would be from the rupture of a drum due to
overturning during handling (manually or with a forklift). A maximum of
55 gallons of oil could be spilled. Interior spills would be contained
within the building,
c. Fleet Services Building:
A maximum of four 55-gallon drums of lubricating oil, anti-freeze and solvent
are stored in this building. Additionally, up to ten 5-gallon containers of
hydraulic oil are also stored in this building.
Possible spill occurrence:
.
i) Oil Transfer:
Small spills could occur during transfer of oil to a smaller container. A
maximum of 5 gallons could be spilled and the oil would be confined to
the interior of the building.
3-6
.
ii) Drum Rupture:
The largest potential spill would be from the rupture of a drum due to
overturning during handling (manually or with a forklift). A maximum of
55 gallons of oil could be spilled. Interior spills would be contained
within the building.
7. Oil-Filled EQuipment in Storaae
a. New/refurbished Oil-filled Equipment (Storage Area #1, West of Evidence
Storage Area; Storage Area #2, South Yard, East of the Water Tanks;
Storage Area #3, along the fence, North of the Water Tanks; Storage Area
#4, along the West Fence, West of the Welding Shop; Storage Area #5,
along the West Fence, South of the ASAP Office, East of the Pre-fab and
Storage Shed)
Approximately up to 400 pieces of newlrefurbished oil-filled electrical
equipment are stored in these areas. The amount of oil-filled equipment
stored in this area varies. The volume of oil in the various pieces of
equipment ranges from 2 to 375 gallons,
Possible spill occurrence:
.
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 2-375
gallons. Operations and maintenance personnel are trained in safe
operation of forklifts and boom trucks to avoid such occurrences.
b. Used/Refurbished Oil-filled Equipment (Storage Area #7,South West Corner
of the South Yard; Storage Area #8, Holding Area, North of Storage Area #3)
Up to 95 pieces of new oil-filled electrical equipment are stored in these
areas. The amount of oil-filled equipment stored in these areas varies. The
volume of oil in the various pieces of equipment ranges from 3 to 180
gallons. The returned equipment has been taken out of service for reasons
of failure or replacement and is being returned for repair, disposal or
warranty. Returned equipment that shows signs of leakage is immediately
sealed/plugged to stop the leakage or drained of oil and/or placed in a
covered lined half box or in an appropriate container.
Possible spill occurrence:
i)
Overturning during handling with a forklift or boom truck/jib crane:
The volume of oil that could reasonably be expected to spill is 3-180
gallons. Operations and maintenance personnel are trained in safe
operation of forklifts and boom trucks/jib cranes to avoid such
occurrences,
.
3-7
.
ii) Leakage during storage:
Any large equipment that does not fit in a lined half box and shows
signs of leakage is immediately drained of oil. The storage area is
inspected daily and recorded monthly for signs of leakage. No more
than 5 gallons of oil could reasonably be expected to leak before it
would be discovered.
c. New and Used/Returned Oil-filled Equipment (Storage Area #6 - Evidence
Storage Area, Southern corner of the Yard)
Up to ten pieces of new and used/returned oil-filled equipment are stored in
this area. They are stored in this area as evidence material. Any used
equipment that shows signs of leakage is immediately plugged/sealed to
stop the leakage and placed in a lined half box or in an appropriate
container. The volume of oil in the various pieces of equipment ranges from
25 to 150 gallons.
Possible spill occurrence:
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 25 to 180
gallons. Operations and maintenance personnel are trained in safe
operation of forklifts and boom trucks to avoid such occurrences,
.
ii) Leakage during storage:
Any large equipment that does not fit in a lined half box and shows
signs of leakage is immediately drained of oil. The storage area is
inspected daily and recorded monthly for signs of leakage. No more
than 5 gallons of oil could reasonably be expected to leak before it
would be discovered,
d. Used/Returned PCB-Contaminated Oil-filled Equipment (Hazardous Waste
Storage Building)
Occasionally, up to five pieces of PCB contaminated oil-filled equipment are
stored in this building. The building has a sloped floor toward the middle of
the building, creating a secondary containment in the building. The
equipment has been taken out of service for reasons of failure or
replacement. Returned equipment that shows signs of leakage is
immediately drained of oil and/or placed in a lined half box or appropriate
container. Barricades and placards are posted in accordance with state and
federal regulations. The volume of oil in the various pieces of equipment
ranges from 2 to 100 gallons.
Possible spill occurrence:
.
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 2-100
3-8
gallons, Operations and maintenance personnel are trained in safe
operation of forklifts and boom trucks to avoid such occurrences.
Interior spill would be contained within the depressed floor containment
area.
.
8, Oil-Filled Equipment for Delivery (Storaqe Area #9. North Yard - South of the
ASAP Storaqe Shed and West of the Tool Storaqe Buildinq)
Approximately 20 pieces of oil-filled electrical equipment are stored in these
storage areas for delivery. This equipment is delivered to and temporarily stored
here for up to two weeks. All of the equipment is new or refurbished, and is
inspected prior to placement in this area. This equipment has sealed steel-
casings and is designed and manufactured for outdoor use. The amount of oil-
filled equipment stored in this area varies. The volume of oil in the various
pieces of equipment ranges from 10 to 120 gallons.
Possible spill occurrence:
i) Overturning during handling with a forklift or boom truck:
The volume of oil that could reasonably be expected to spill is 10-120
gallons. Operations and maintenance personnel are trained in safe
operation of forklifts and boom trucks to avoid such occurrences.
9. Operatinq Pad-Mounted Transformer
.
a. There is one operating pad-mounted transformer located northeast of the
T&D Office Building.
Possible spill occurrence:
i) Equipment Leakage:
The greatest spill potential is from leakage of the equipment which
would be detected immediately by a power outage. The maximum
volume of oil that could reasonably be expected to spill due to leakage
is 10 gallons.
G. FIRE POTENTIAL:
All hazardous materials and wastes are stored in regulation containers, minimizing the
possibility of fire. All hazardous waste containers are inspected weekly and an
inspection log is kept by facility personnel. "No Smoking," "Flammable - No Open
Flame Within 25 Feet," and other appropriate signs are posted where
combustiblelffammable materials or wastes are handled, used, or stored. Storage
areas are regularly inspected for compliance with applicable state and local
requirements. Responsible facility personnel have been trained in the use of portable
fire fighting equipment.
.
3-9
.
TABLE 3-1
HAZARDOUS MATERIALS INVENTORY
See following page(s).
.
.
3-10
. HAZARDOUS MATERIAL IN.TORY SERVICE .
- BAKERSFIELD CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location: FLEET SERVICE BLDG//AG TANK E/O BLDG/Grid:C2
[JOT
DOT PHYSICAL NFPA IIIIZIIRD IIAZARD live; MAX L,IIRGP.ST CONT, MAX FROM TO CAS ··IF
TRIIDE NAME !:!Q... STATE DIAMOND CODES· ~ IIMT lIMT CO NT , UNIT CODE*** LBS CHEMICAL COMPONENT -L- 1- NUMBER ---'ill
USED OIL FOR RECYCLING 1270 MIX/LIQ H~2/F-l/R-J uuC 3 500 1000 1000 (;111, A 1 4 7509 LUBRICANTS & OILS
Location: FLEET SERVICE BLDG//AG TANKS/DRUM STOR _AREA/Grid:C1
-
AERO HFA AVIATION HYDRAULIC FLUID 1270 MIX/LIQ H-1/F'l/R-0 ~~-AC q 35 55 55 GilL D J 4 381 HYDROCARBON BASE OILS 15,0 15.0
REFINED MINERAL OILS 85,0 85,0
ANTIFREEZE 1J42 MIX/LIQ H-2/F-J/R-l ---IIC 3 42 55 55 Gill, !J 1 4 51/. ETHYLENE GLYCOL 107-2J~J
DELVAC 1230 HEAVY DUTY MOTOR OIL 1270 MIX/LIQ H-l/F-l/R-O ---IIC 9 J7S 250 /.~)o Gill, 11 1 4 1731 LUBRICANTS & OILS
GREASE liP N/A MIX/SOL H-l/F-1/R-0 -~~IIC 3 300 400 4IJO LBS D 1 4 400 Grease
HYDRAULIC OIL AW 46 1270 MIX/LIQ H-J/F-l/R~O ---AC 9 175 250 2S0 GAL 11 1 4 1731 LUBRICANTS & OILS
LUBE GEAR 1,UBRICANT SAE 80-90 1270 MIX/LIO H-J/F'l/R,O -,-lIC 9 tOO 150 150 GAL A 1 4 1039 LUBRICANTS & OILS
MULTI-PURPOSE ATF 1270 MIX/LIO H-J/F-l/R,IJ ---AC 9 175 250 7.50 GAI~ A 1 4 1731 LUBRICANTS & OILS
Location: FLEET SERVICE BLDG//FUEL ISLAND/Grid:C2
HS DIESEL FUEL 2 1202 PUR/LIQ H-0/F-2/R-0 ----C 3 liOOO 10000 10000 GAL B 1 4 70081 FUELS, DIESEL, NO, 2 100.0 100,0 68476-34-6
MOTOR OIL 1270 MIX/LIQ H-l/F-l/R-O ---AC 9 12 16 1 QTS N 1 4 28 HYDROCARBON BASE OILS
KEY TO HAZARD CODES:F-FIRE, P-SUDDEN RELEASE OF PRESSURE, R~REACTIVE, A'ACIITE HEALTH HAZARD,C-CHRONIC HEALTH HAZARD
EXTREMELY HAZARDOUS SUBSTANCE/ACUTELY HAZARDOUS MATERIAL(PRINTED IF APPLICABLE IN THE FAR RIGHT-HAND COl,UMN)
KEY TO CONTAINER CODES:A-ABOVEGROUND TANK, B-BELOWGROUND TANK, C-TANK INSIDE BUILDING,D-STEEL DRUM,E-PLASTIC OR NON-METALLIC DRUM,F-CAN,G-CARBOY.H-SILO, I-FIBER DRUM
J-BAG,K-BOX,L-CYLINDER,M-GLASS BOTTLE,N-PLASTIC BOTTLE.O-TOTE BIN,P-TANK WAGON,Q-RAIL CAR.R-OTHER
KEY TO STORAGE PRESSURE CODES:1-AMBIENT, 2- > AMBIENT, 3- < AMBIENT
KEY TO STORAGE TEMPERATURE CODES:4-AMBIENT. 5- > AMBIENT, 6- AMBIENT, 7- CRYOGENIC
Page
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location: FLEET SERVICE BLDG//FUEL ISLAND/Grid:C2
1"J0T
DOT PHYSICM" NFPA IIA7.MW IIA7.MW Ave; ~lAX I..ARr;r.ST CONT, MAX FROM TO CAS F
TRADE NAME lliL STATE DIAMOND COUES' CLl\.~~S AM"!" Al'1T CON"!'. UN IT CODE*** LRS CHEMICAL COMPONENT ....!..- 1- NUMBER --Éili
UNIÆADED GASOl.JNE 1203 PUR/L,IQ H-l/F-.3/R 0 F- -AC .3 (loon 1()OOO 1001' CAI. f3 1 ~ 67.57.3 BENZENE 1,9 4,9 71-43-2
CYCLOHEXANE 7.,1 7.,4 110-82-7
ETHYL ALCOHOL 0,9 0,9 61-17-5
ETHYL BENZENE 1.4 1.4 100-41-4
METHYL TERT-B\ITYL ETHE 5,0 15,0 1634-01-4
N-HEXANE 3,0 3,0 110-54-3
TOLUENE 6,5 6,5 108-H8-3
M-XYIÆNE 4,6 4,6 108-.38-.3
O-XYLENE 7.,2 2,2 95-47-6
P-XYLENE 0,9 0,9 106-42-3
Location: FLEET SERVICE BLDG//GARAGE WASH RACK/Grid:C2
COMPRESSED AIR 1002 MIX/GAS H- /F- /R- -P--- 2,2 3no 400 400 CUFT A 2 4 30 NITROGEN (),O 80,0 7727,37--9
OXYGEN 20,0 20,{) 7782-44-7
rURECHLOR SANITIZER 1142 MIX/LIQ H-1/F--0/R-0 ---AC 9 40 57. 52 GAL N 1 4 434 CLEANING COMPOUND, LIQ
QUI CK - KLEEN 1142 MIX/LIQ H-1/F-0/R-0 ---AC 9 25 35 35 GAl. N 1 4 292 CLEANING COMPOUND, LIQ
STEAM AWAY 1142 MIX/LIQ H-l/F-O/R--O ---AC 9 20 /.:) 25 GAL N 1 1 209 CLEANING COMPOUND, LIQ
STEAM AWAY 1142 MIX/LIQ H-l/F-O/R-O ---AC 9 5 5 5 GAL N 1 4 42 CLEANING COMPOUND, LIQ
Location: FLEET SERVICE BLDG//PARTS RM-FLAM CABINET/Grid:C2
-
2 CYCLE MULTI ' PURPOSE LUBRICANT 1993 MIX/LIQ H-2/F-4/R-0 FP-AC 3 6 12 1 QTS N 1 4 23 LUBRICANTS & OILS
BOOM LUBRICANT N/A MIX/LIQ H-l/F-1/R-0 ----C 3 7 12 1 PTS N 1 4 11 I.UBRICANTS & OILS
ENAMEL PAINT 1263 MIX/LIQ H-2/F-3/R-2 F-R-C 7. 3 1 GAL F 1 4 25 PAINT
GREASE HP N/A MIX/SOL H-l/F-1/r 0 ---AC 420 700 14 OZ N 1 4 89 Grease
Page, 2
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA 1D Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:FLEET SERVICE BLDG//PARTS RM-FLAM CABINET/Grid:C2
-
DOT
DOT PHYSICAL NFPA HAZAr!) I!^,~ARD 1\VG Ml\X ¡,1\RGF:ST CONT, MAX FROM TO C1\S **IF
TR1\DE NAME '~ STATE DIAMOND CODE,; . C"I,ASS ~ IIMT CONT, UN IT ~ LBS CHEMICAL COMFONENT -L- .L NUMBER ---11i
LUBF.M1\STER DIESEL MATE DIESEL ADD IT 1993 MIX/LIO H-7./F-4/R-0 F- --C 3 7 l7. 1 OTS F 1 4 25 Solvents and spirits
LUBEM1\STER MI TÆ ,II I 1263 MIX/LIQ H-2/F-3/R-7. FP-1\C -' 12 15 1 QTS F J 4 31 Solvents and spirits
MR,7.8D DIESEL FIIEL STABILIZER 1993 MIX/LIQ H-2/F-4/R-0 F--AC 3 5 5 5 (;1\1. N 1 4 42 Solvents and Hpirits
SINGLE ST1\GE VACUUM PUMP OIL 1270 MIX/LIO H- IF, IR- F---C 1 7. 1 O1'S 1'1 1 4 4 LUBRICANTS ¡¡ I)fLS
SSVJ7. 3082 MIX/LIQ H-I/F-I/R-O ---1\C 9 5 5 5 G^f1 N 1 4 42 Solvents and spirits
Location: FLEET SERVICE BLDG//PARTS ROOM/REPAIR BAYS/Grid:C2
ACETYLENE 1001 MIX/GAS H-I/F-4/R-3 FPR-C 2 7.7.5 300 50 CUFT I. 2 4 20 ACETYLENE: 100,0 100,0 74-86-2
AERO HFA 1\VIATION HYDRAULIC FLUID 1270 PUR/LIQ H-I/F-I/R-O --,AC 9 ] 0 1 :, 5 CAL. 1'1 1 4 104 HYDROCARBON BASE OILS 15,0 15,0
REFINED MINERAI. OILS 85,0 85,0
AEROSOL, HIGH SOLIDS ENN4EL SERIES 1954 MIX/LIQ H-2/F-4/R-1 FPRAC 2 180 240 10 OZ F 2 4 34 METHYL ETHYL KETONE 27,4 27,4 78-93-3
PROPANE 26,7 26,7 74-98-6
XYLENE 9,5 9,5 1330-20-7
DIPROPYLENE GLYCOL MON 1.1 1.1 88917-22-0
ANTIFREEZE 1142 MIX/LIQ H-2/F-I/R-l ---AC 3 48 60 ] G1\L 1'1 1 4 558 ANTIFREEZE 107-21-1
ANTI FREEZE 1142 MIX/LIO H-2/F-I/R-1 ---AC 3 4 6 1 GAL 1'1 1 4 56 ANTIFREEZE 107-21-1
A1n'OMATlC TRANSMISSION FLUID 1268 MIX/LIQ H-I/F-2/R-0 --,1\C 9 12 7.4 1 OTS F ] 4 41 REFINED MINERAL OILS 85,0 85.0
BR1\KE FLUID 1118 MIX/LIQ H-I/F-I/R-1 ---·C 3 2 7. 1 G1\L F 1 4 18 LUBRICANTS & OILS
BRAKl.EEN BULK 1897 MIX/LIQ H-2/F-I/R-l --R1\C 6 35 55 55 GAL. F ] 4 748 PERCHLOROETHYLENE 65,0 94.0 127-18-4
STODDARD SOLVENT 1.0 35,0 8052-41-3
CITRIKLEEN ALKALINE CLEANER 1142 MIX/LIQ H-I/F-o/R-O --AC 9 30 30 30 GAL R 1 4 250 2-BUTOXYETHANOL 111-76-2
SODIUM SILICATE 6834-92-0
SURFACTANT
COMPRESSOR OIL N/A MIX/LIQ H-I/F-I/R-O -C 3 5 5 5 GAL 1'1 1 4 36 LUBRICANTS & OILS
DEI,vAC 1230 HEAVY DUTY MOTOR OIL 1270 MIX/LIQ H-I/F-I/R-O AC 9 24 36 1 QTS F 1 4 62 LUBRICANTS & OILS
Page
, .
. .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:FLEET SERVICE BLDG//PARTS ROOM/REPAIR BAYS/Grid:C2
[)OT
DOT PHYSICAL NF'I'A HAZARD HAZARD AVG MAX r.,ARr;EST CO NT , MAX FROM TO CAS "'*IF
TRADE NAME !iQ... STATE ~ ~ CL.ASS AMT AMT CO NT , UNJT ~ LBS CHEMICAL COMPONENT ....1.-.- .L NUMBER ---Æi
DISC BRAKE WHEEL BEARING GREASE 1270 MIX/SOL H~I/F~1/R'O -~~AC 9 ~) n 70 3S LI3S N 1 4 70 AI,UMlNUM SOAPS 7,0 7,0
MOI,YBDENUM DISULFIDE 2,0 2,0 1317~33-5
PETROLEUM HYDROCARBONS 90,0 90,0
FLUID 424 1270 MIX/LIQ H-l/F-l/R-O --~AC 9 )4 12 16 GAL F 1. 4 222 LUBRICANTS & OILS
GAS TREATMENT 1993 MIX/LIQ H~2/F~4/R'O F---C j 1.S 24 B OZ N J 4 3 Solvents and spirits
GASKET REMOVER 1.142 MIX/LIQ H~2/F~3/R-O F-~AC 3 1-) 12 J2 02 F 2 4 2 ISOBtJTANE 7,0 JO,O 75-28-5
METHYLENE CHLORIDE 70,0 "/5.0 75~09~2
METHYL ALCOHOL 3,0 5,0 1;7-56,1
LIQUEFIED PETROLEUM GA 15,0 20,0 684"/6~85-7
GRRR HEAVY DUTY CLEANER 1142 MIX/LIQ H-1/F~O/R'O ---AC 9 17 23 2,50 GAL N 1 4 lAB CI.EANtNG COMPOUND, LIQ
HYDRAUI,IC On. N/A MIX/LIQ H~I/F-]/R-O -~~-C 3 35 55 55 GAL A 1 4 399 HYDROCARBON BASED OILS
I-OX IONIC PENETRATING FLUID 1263 MIX/LIQ H-2/F-3/R-2 FP~AC 3 ., "/ 7 GAL, N ] 4 58 Solvents and spirits
l,IJBEMASTER 3077 MIX/SOL H~l/F~l/R-O --~AC 9 35 5:' 55 GAL D 1 4 496 Grease
LIJBR I PI,ATE GREASE N/A MIX/SOL H-1/F~1/R-0 --~AC 3 7.5 35 35 LBS F 1 4 35 Grease
MEGA CELL CLASSIC WET CELL BATTERIE 2794 MIX/LIQ H-3/F-0/R~2 --RAC 8 ?S 35 1 GAL R 1 4 377 3,87 LB H2S04 ACID/GAL 7664-93-9
MOBILITH GREASE AW~2 N/A MIX/SOL H-1/F-1/R~0 --~AC 3 3 5 r, GAL N 1 4 42 Grease
NUTO II 32 N/A MIX/LIQ H-1/F~1/R-0 ~--~C 3 5 5 5 GA!, N 1 4 36 LUBRICANTS & OILS
OXYGEN. COMPRESSED 1072 MIX/GAS H~ /F- /R- ~P- -- 2,2 233 3]0 155 CUFT I, 2 4 26 OXYGEN 100,0 100,0 7782~44~7
POWER STEERING FLUID 1268 MIX/LIQ H-l/F-2/R-0 ---AC 9 7 12 1 QTS N I 4 20 LUBRICANTS & OILS
SAF-SOL 20/20 1993 MIX/LIQ H-2/F-3/R-1 F---C 3 7 7 7 GAL F 1 4 46 Solvents and spirits
SUPER LUBE 1270 MIX/SOL H-l/F-1/R-0 ---AC 9 3 5 5 GAL F 1 4 40 Grease
Location: FLEET SERVICE BLDG//REPAIR BAYS-FLAM STR CABS/Grid:C2
- -
AUTOMATIC TRANSMISSION FLUID 1268 MIX/LIQ H-1/F-2/R,O AC 9 6 QTS N 1 4 10 REFINED MINERAL OILS 85.0 85,0
Page: 4
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:FLEET SERVICE BLDG//REPAIR BAYS-FLAM STR CABS/Grid:C2
- -
DOT
DOT PHYSICAl, NPPA HAZARD III\ZARD AVG MAX [,ARGEST CONT, MAX FROM TO CAS ··IF
TRADE NAME ~ STATE DIAMOND CODES' CJ,^SS AMT AMT CONT , UN IT ~ LBS CHEMICAL COMPONENT -L- !... NUMBER EH
B-12 CIIEMTOOL CARBURETOR CHOKE CLEA 1993 MIX/LIQ H-2/F-4/R-0 F--C 3 26 2" 13 OZ F 2 4 3 ISOPROPANOL 67-63-0
ACETONE 23,0 23,0 67-64-1
TOLUENE 17, ° 17,0 108-88-3
2 - BUTOXYETHANOt, 7,0 7,0 111-76-2
METHYl, ETHYL KETONE 5,0 5,0 78-93-3
METHANOL 20.0 20,0 67-56-1
CARBON DIOXIDE 124-38-9
BATTERY CLEANER 1142 MIX/LIQ H-2/F-3/R-0 F--AC 3 77 132 1] OZ F 2 4 17 2-METHYLPROPANE 8.0 15,0 75-28-5
SODIUM BICARBONATE 4,0 8,0 144-55-8
CARBURETOR CHOKE & THROTTLE BODY CL 1950 MIX/LIQ H- /F- /R- PP--C 7.6 26 13 OZ F 2 4 3 Solvents and spirits
CARBURETOR CLEANER 1142 MIX/LIQ H-2/F-3/R-0 F--AC 3 1 1 1 GAL F 1 4 8 Solvents and spirits
EZ-81 SPRAY EPOXY COATING 1956 MIX/LIQ H-2/F-1/R-0 -P-AC 2,2 84 144 12 OZ F 2 4 18 Solvents and spirits
GLOVE SKIN PROTECTION 1270 MIX/LIQ H-2/P-2/R-0 -P-AC 2 98 168 14 02 F 2 4 20 LUBRICANTS & OILS
HS DIESEL FUEL 2 1202 PUR/LIQ H-0/F-2/R-0 ----C 3 15 20 5 GAL F 1 4 140 FUELS, DIESEL, NO, 2 100.0 100,0 68476-34-6
INJECTION CARE 1993 MIX/LIQ H-2/F-4/R-0 F---C 3 144 288 12 OZ N 1 4 37 Solvents and spirits
MACHINE SHOP SUPPLIES 132001 DYE PE 1270 MIX/LIQ H-2/F-2/R-O -P-AC 2 5 5 5 GAL N 1 4 38 Solvents and spirits
MULTI-PURPOSE GEAR OIL SAE 90 1270 MIX/LIQ H-1/F-1/R-0 ---AC 9 1 1 1 GAL N 1 4 7 HYDROCARBON BASE OILS
SOLVENT REFINED PETROL 90.0 90.0 64741-89-5
NO, 7 COOLING SYSTEM CLEANSER (HEAV 1263 PUR/LIQ H-2/F-3/R-2 FP-AC 3 70 120 10 OZ F 1 4 15 Solvents and spirits
PAINT THINNER 1268 MIX/LIQ H-l/F-2/R-0 ---AC 9 1 1 1 GAL N 1 4 7 Solvents and spirits
SPOTCHECK DEVELOPER 1270 MIX/LIQ H-2/F'2/R-0 -P-AC 2 84 168 14 02 F 2 4 20 ACETONE 40,0 40.0 67-64-1
CARBON DIOXIDE 10,0 10.0 124-38-9
ETHYL ACETATE 50.0 50,0 141-78-6
WD-40 BULK LIQUID 1268 MIX/LIQ H-l/F-2/R-0 ---AC 9 1 1 GAL N 1 4 7 STODDARD SOLVENT 70,0 70,0 8052-41-3
PETROLEUM BASE OIL 20,0 20.0 64742-65-0
Page: 5
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:OILFILLED EQUIPMENT//EQ DELIVERY AREA #9/Grid:C4
- -
DOT
DOT PHYSICAL NFPA HAZARD HAZA'W AVG MAX LARGEST CONT, MAX FROM TO CAS ·*IF
TRADE NAME !'!2- STATE DIAMOND CODES' ~ AMT AMT CONT, UNIT ~ LBS CHEMICAL COMPONENT ~L NUMBER -'ill
DJ ALA OIl" AX ]268 MIX/LIQ H~O/F-l/R-O --~-C 1 ]000 1~on 1 fjn GAl" R 1 4 8840 BUTYLATED HYDROXY TOL 0,2 0,2 12R~37-0
HYDROTREATED LIGHT NAP 60,0 70,0 64742-r,3~6
HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
Location:OILFILLED EQUIPMENT//EQ STOR AREA #1/Grid:E9
- -
D1ALA 011. AX 1268 MIX/LIQ H-0/F~1/R~0 --~~c 3 300 4r;o ISO GAL R 1 4 3315 SIITYLATED HYDROXY TOLU 0,2 0,2 1~R~.37-0
HYDROTREATED LIGHT NAP 60,0 70,0 64742~5.3~6
HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
Location:OILFILLED EQUIPMENT//EQ STOR AREA #2/Grid:C8
- -
DIAL.A 01 I. AX 1268 MIX/LIQ H~0/F-1/R-0 ----c 3 2500 3500 17.0 GAL R ] 4 25784 BUTYLATED HYDROXY TOLU 0.2 0,2 128-37-0
HYDROTREATED LIGHT NAP 60,0 70,0 64742-53-6
HYDRO TREATED MIDDLE 01 30,0 40,0 64742-46-7
Location:OILFILLED EQUIPMENT//EQ STOR AREA #3/Grid:C7
- -
DIALA on AX 1268 MIX/LIQ H-0/F-1/R-0 C 9000 10000 375 GAl. R 1 4 73669 BUTYLATED HYDROXY TOLU 0,2 0,2 128-37-0
HYDROTREATED LIGHT NAP 60,0 70,0 64742-53-6
HYDROTREATED MIDDLE 01 30,0 40,0 64742-46,7
Page: 6
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:OILFILLED EQUIPMENT//EQ STOR AREA #4 & #5/Grid:B4,B5
- -
DOT
DOT PHYSICAL, NFI'A IIA7,ARD IIA7,ARP AVG MAX [.ARGEST CaNT, MAX FROM TO CAS ··JF
TRADE NAME ~ STATE ~ CODES' C[.ASS AMT AMT CO NT , UNIT CODE··· !&B CHEMICAL COMPONENT -L- L NUMBER -Æ!
DIALA OIl, AX 1268 MIX/LIQ H-O/F-l/R-O ----C 3 30no 4000 300 GAL R 1 4 29467 BUTYLATED HYDROXY TOW 0,2 0,2 128-37-0
HYDROTREATED LIGHT NAP 60,0 70,0 li4742-53-6
HYDROTREATED MIDDLE DI 30,0 40,0 li4742-46-7
Location:OILFILLED EQUIPMENT//EQ STOR AREA #6/Grid:E9
- -
DIALA OIL AX 1268 MIX/LIQ H-O/F'l/R-O --- C 3 50 300 150 (~AL, R 1 4 2210 BlITYLATED HYDROXY TOLl) 0,2 0,2 128,37-0
HYDROTREATED LIGHT NAP 60,0 70 0 64742-53-6
HYDROTREATED MIDDLE DI 30,0 40 0 li4742-46-7
Location:OILFILLED EQUIPMENT//EQ STOR E/O PREFAB/Grid:C3
- -
DIALA 011. AX 1268 MIX/LIQ H-O/F-J/R-O ---,C 3 450 SOD 35 GAL R 1 4 3683 BUTYLATED HYDROXY TOLl) 0,2 0.2 128-37-0
HYDROTREATED LIGHT NAP 60,0 70,0 64742-53-6
HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
Location:OILFILLED EQUIPMENT//EQ - STOR_W/O OVERHANG AREA/Grid:B3
DIALA OIL AX 1268 MIX/LIQ H-O/F-l/R-O C 3 50 60 1 GAL R 1 4 442 BUTYLATED HYDROXY TOLU 0.2 0,2 128-37-0
HYDROTREATED LIGHT NAP 60.0 70,0 64742-53-6
HYDROTREATED MIDDLE DJ 30,0 40,0 64742-46-7
Page: 7
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:OILFILLED EQUIPMENT//RETURN EQ AREA #7/Grid:C9
-
DOT
DOT PHYSICAL NFPA HI\7.I\IW 1I1\7.I\PD I\ve MI\X l.J\fIr.;':ST CaNT. MJ\X FROM TO CAS F
TRI\DE NIIME !!Q.... STI\TE D111MOND CODE!"* C¡'I\~'S I\MT ~ ~UNIT CODE··· LAS CHEM1CAL COMPONENT -Ì- L NUMBER -1ill
DII\LI\ OTT, AX 1268 MIX/LIQ H'O/F-I/R-O ----C 3 400 600 1 r)o GI\l. R 1 4 4420 BUTYLATED HYDROXY TOLU 0,2 0,2 128-37-0
HYDROTREATED I,IGHT NAP 60.0 70,0 64"142-53-6
HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
Location:OILFILLED EQUIPMENT//RETURN EQ AREA #8/Grid:C7
-
DII\LlI on I\X 1268 MIX/LIQ H-O/F-l/R,O ----C 3 500 "150 11:")(J (;1\1. R 1 4 5525 BlITYLATED HYDROXY TOLU 0,2 0,2 128-37-0
HYDROTREATED LIGHT NAP 60,0 70,0 64742-53-6
HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
Location:OILFILLED EQUIPMENT//RETURN EQ PREFAB AREA/Grid:C3
- -
DIALlI OIL AX 1268 MIX/LIQ H-O/F-t/R-O -C 3 50 100 70 GI\L R 1 4 737 BUTYLlITED HYDROXY TOLU 0,2 0,2 128-37-0
HYDROTREATED LIGHT NAP 60,0 70.0 64742-53-6
HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
]NSULI\TING OIL 50-499 ppM PCB 2315 MIX/LIQ H-3/F-l/R- AC 3 0 150 70 GI\I R 1 4 1139 POLYCHLORINATED BIpHEN 1336-36-3
CHEVRON INSULATING OIL 64741-97-5
Page
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:OPERATIONS BLDG//BATTERY ROOM/Grid:E4
DOT
DOT PHYSICAL NFI'A HAZARD HAZARD Ave; MAX lARGEST CONT, MJ\X FROM TO CAS ·*IF
TRADE NAME ~ STATE DIAMOND CODES' CJ.A,~S AMT AMT CO NT , UN [1' CODE*·* Las CHEMICAL COMPONENT ...:L. 1... NUMBER ~
AßSOLYTE SEALED LEAD ACID CELL 2800 MIX/LIQ H-3/F-l/R-2 --RAC 8 24 2~ ] GAL R 1 ~ 244 ANTIMONY 0,3 0,3 7440-36-0
CADMIUM 0,3 0,3 74~0-43-9
LEAD DIOXIDE 22,0 7.2,0 1309-60-0
LEAD 54,8 54,8 7439-92-1
SULFURIC ACID 13,9 13,9 7664-9.3-9
Location:OPERATIONS BLDG//COMMUNICATIONS RM-SUN RM/Grid:E4
HALON 1J 0 ] 1009 PUR/GAS H-l/F-O/R-O -p--c 2,2 95 91; 9 ~~ LBS L 2 4 95 BROMOTRIFLUOROMETHANE 100,0 100,0 75-63,8
Location:OPERATIONS BLDG//GAS MAPPING/Grid:E4
ISOPROPYL ALCOHOL 1993 PUR/LIQ H-2/F-4/R-0 F--AC 3 1 1 1 rTS N 1 4 1 ISOPROPYL ALCOHOL 100,0 100,0 67-63-0
MPC CLEANER 1993 MIX/LIQ H-0/F-2/R-0 F--AC 3 2S6 384 32 OZ N 1 4 49 Solvents and spirits
NAT[ONAL GUM SOLV 1263 MIX/LIQ H-2/F-3/R-2 FP,AC 3 ] ] ] QTS F 1 4 2 Solvents and spirits
TCM58 CLEAR TONER 1263 MIX/LIQ H-2/F-3/R-2 FP-AC 3 700 BOO BO 02 N 1 4 102 ALIPHATIC HYDROCARBONS 100,0 100,0 64742-48-9
ALIPHATIC HYDROCARBONS 64742-48-9
TONER REPLENISHER RP58 1993 MIX/LIQ H-O/F-2/R-O F--AC 3 12 24 1 PTS R 1 4 25 Solvents and spirits
TONER REP1,ENISHER S85B 1263 MIX/LIQ H-2/F-3/R-2 FP-AC 24 4B 8 02 N 1 4 6 ALIPHATIC HYDROCARBONS 90.0 90,0 64742-48-9
CARBON BLACK OIL [COMB 3,0 3,0 1333-B6-4
TONER REPLENISHER SB58 1263 MIX/LIQ H-2/F-3/R'2 FP-AC 23 37 4,60 OZ R 1 4 5 ALIPHATIC HYDROCARBONS 90,0 90,0 64742-4B-9
CARBON BLACK OIL [COMB 3,0 3.0 1333-86-4
Page: 9
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location: PREFAB AREA//FLAMMABLE CABINETS/Grid:C3
nOT
DOT PHYSJCIIL NFPJI HIIZIIRD IIA7.IIRD AVG MIIX Lllr,GEST CONT, MAX FROM TO CAS F
TRADE NIIME !iQ.... STIITE DIIIMOND CODES' CI_IASS IIMT IIMT CaNT, !lli...!.J: CODE**· loBS CHEMICAL COMPONENT ----L- .L NUMBER ~
(17A) MIIRKING PAINT-ALl, COLORS 1954 MIX/LIQ H-2/P-4/R-J FPRIIC 2 J020 1428 ]7 07. F 2 4 200 PROPANE 15.0 ]5,0 74-99-
XYLENE 14,0 14,0 1330-20-7
BUTANE 5.0 5,0 106-97-8
ISOBUTANE 0,1 5,0 75-28,5
MINERAL SPIRITS 0,1 5,0 64475-85-0
PETROLEUM NAPHTHA 20,0 20,0 8030-30-6
(] 711) MARKING PAINT-ALL COLORS 1954 MIX/LIQ H-2/F-4/R-1 FPRIIC 2 468 624 D OZ F 2 4 87 PROPANE 15,0 15,0 74-98-6
XYLENE 14,0 14,0 1330-20-7
BUTANE 5,0 5,0 106-97-8
ISOBUTANE 0,1 5,0 75-28-5
MINERAL SPIRITS 0,1 5,0 64475-85-0
PETROLEUM NAPHTHA 20,0 20,0 8030-30-6
(20A) SPRAY CHALKS-ALL COLORS 1954 MIX/LIQ H-2/F-4/R-1 FPRAC 2 204 408 17 OZ F 2 4 57 DIMETHYI~ ETHER 25,0 25,0 115-10-6
.,
ISOPROPYI~ ALCOHOL 15,0 15,0 67-63-0
PHTHALO BLUE RS (CONTA 1.0 1.0 147-14-8
IIIAJMII ALUMINUM BRIGHTENER &. DEOXIDI 1142 MIX/LIQ H-1/F-O/R-0 -- 'AC 9 1 1 I GilL N 1 4 8 Solvents and spirits
KWIK-FOAM FOJlM INSUl,ATING SEAI,ANT 1950 MIX/LIQ H- /F- /R- FP--C 288 432 12 OZ F 2 4 55 Solvents and spirits
PEN-10 RUST PENETRANT 1268 MIX/LIQ H-2/F-1/R-0 --C 3 1 1 1 GAL, F 1 4 7 Solvents and spirits 64742-47-8
SPRAY PIIINT 1954 MIX/LIQ H-2/F-4/R-1 FPRJlC 2 1296 1440 12 OZ F 2 4 202 ACETONE 67-64,1
ISOBUTANE 75-28-5
MINERAL SPIRITS 64475-85-0
LIQUEFIED PETROLEUM GA 68476-85-7
TOLUENE 108-88-3
NAPHTHA [COMBUSTIBLE L 8030-30-6
XYLENE 1330-20-7
TREE AND LOG MARKING PAINT 1954 MIX/LIQ H-2/F-3/R-1 FP--C 8 6 GAL F 1 4 50 PAINT
TRU-TEST SUPREME HI-Q ENAMEL 1954 MIX/LIQ H- /F- /R- FP--C QTS F 4 2 PAINT
Page: 10
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date 03/19/96
Location: PREFAB AREA//FLAMMABLE CABINETS/Grid:C3
nOT
DOT PHYSICAl, NPPA IIA7,ARD HA7,ARD AVG MAX ¡,ARGEST CONT, MAX FROM TO CAS **IF
TRADE NAME ~ STATE ~ COD!':S' crASS I\MT ð!::IT ~ UNIT ~ LBS CHEMICAL COMPONENT -L.L NUMBER -Æ!
UNLEADED GASOLINE 1203 MIX/LIQ H-l/P·J/R-O F--AC 3 r, r, r, GAL N 1 4 31 BENZENE 4,9 4,~ 71-43-2
CYCLOHEXANE 2,4 2,4 110-82-7
ETHYL ALCOHOL 0,9 0,9 64-17-5
ETHYL BENZI':NE: 1.4 1.4 100-41-4
METHYL TERT,BUTYL ETHE 15,0 15,0 1634-04,4
N,HEXANE 3,0 3,0 110-54-3
TOLUENE 6,5 6,5 108-88-3
M-XYLENE 4,6 4.6 108-38-3
O-XYLENE 2.2 2,2 95-47-6
P-XYLENE 0,9 0,9 106-42-3
Location: PREFAB AREA//PRE-FAB & STOR SHED/Grid:C3
COMPRESSED AIR 1002 MIX/GAS H- /F- /R- - P- -, 2,2 250 350 350 CUFT A 2 4 26 NITROGEN 80,0 80,0 7727-37'9
OXYGEN 20,0 20,0 7782-44-7
NATURALIZER 1993 MIX/LIQ H'2/F-2/R-0 -,-AC 3 42 55 55 GAL, D 4 367 D-LIMONENE 5989-27-5
HEXYLENE GLYCOL 107-41'5
DIETHANOLAMINE SALT OF 61790-66-7
TRIETHANOLAMINE SALT 0 68132 -46-7
ORANGE OIL DEGREASER 1270 MIX/LIQ H-2/F-2/R-0 -P-AC 2 42 55 55 GAL, n 4 413 INSECTICIDE
Page: 11
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location: PREFAB AREA//S/O WORK AREA OVERHANG/Grid:B3
DOT
DOT PHYSICAL NFPA HAZARD HA7.I\RD AVG MAX LARGEST CaNT, MAX FROM TO CAS **IF
TRADE NAME !:ill-. STATE ~ CODES' ~ AMT AMT CO NT , !l!!U ~ WS CHEMICAL COMPONENT --L- .L ~ -Æ!
OIALA OIL AX 1268 M1X/LIQ H-0/F-1/R,O ----C 3 1~ 55 55 GI\L D 1 4 405 BUTYLATED HYDROXY TOLl! 0.2 0,2 128-37-0
HYDROTREATEO 1,IGHT NAP 60,0 70,0 64742-53-6
HYDROTREATED MIDDLE DI 30,0 40.0 64742-46-7
Location: PREFAB AREA//WORK AREA OVERHANG/Grid:B3
1. I, I-TRICHLOROETHANE 2831 PUR/LIQ H'3/F-l/R2 --RAC 6 (,0 77. 1 rTS F 1 4 101 METHYL CHLOROFORM 100,0 100,0 71-55-6
AEROSOL, HIGII SOLIDS ENAMEL SERIES 1954 MIX/LIQ H-2/F-4/R-l FPRAC 2 120 ~4 0 10 OZ F 2 4 34 METHYL ETHYL KETONE 27,4 27,4 78-93-3
PROPANE 26,7 26.7 74-98-6
XYLENE 9.5 9,5 1330-20-7
DIPROPYLENE GLYCOL MON 1.1 1.1 88917-22-0
CARLON PVC SOLVENT CEMENT 1133 PUR/LIQ H-2/F-.1/R-1 F--,C 3 36 60 1 PTS F 1 4 57 TETRAHYDROFURAN 48.0 48.0 109-99-9
ACETONE 10,0 10,0 67-64-1
POLYVINYL CHLORIDE 10,0 14, ° 9002-86-2
CYCLOHEXANONE 5,0 10.0 108-94-1
CtJrTING OIL (AEROSOL 1954 MIX/LIQ H-2/F-4/R-O FP-AC 2 144 288 12 OZ F 2 4 37 I SO BUTANE 5.0 13,0 75-28-5
HYDROTREATED HEAVY NAP 60.0 70,0 64742-52-5
HIGHLY REFINED BASE 01 4,0 6,0 64742-54-7
PROPANE 5,0 13. ° 74 -98-6
EPOXY 1263 MIX/LIQ H-2/F-3/R-2 FP-AC 3 7 10 1 GAL F 4 83 PAINT
¡,I QUID POWER FUSES 1897 MIX/LIQ H-2/F-l/R-1 RAC 6 800 1200 8 OZ R 4 202 MINERAL OIL 0.1 0.1 8012-95-1
PERCHLOROETHYLENE 93,6 93.6 127-18-4
TRIBUTYLAMINE 102-82-9
TRICHLOROETHYLENE 6.3 6.3 79-01-6
Page: 12
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Numbpr: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:PREFAB AREA//WORK AREA OVERHANG/Grid:B3
DOT
DOT PHYSICAL NPPA HAZAIW HAZARD Ave MAX [,ARGF.ST CO NT , MAX FROM TO CAS ··IF
TRADF. NAME ~ STATE ~ CODES· CLASS AMT AM'!' CON 'I' , UNIT CODE*·* LBS CHEMICAL COMPONENT -L .L NUMBER --lli!
PENETROX-A COMPOtmD 1270 MIX/SOL H-1/F-I/R-0 ---AC 9 192 480 8 OZ N I 4 59 ZINC METAL, POWDER OR 51.0 53,0 7440-66-6
SOINENT-REFINED HEAVY 36,0 36,0 64741-88-4
AL.UMlNUM STEARATE 11,0 13,0 637-12-7
SILICONE DIELECTRIC COMPOUND 1270 MIX/SOL H-I/F-I/R-O -"AC 9 398 530 ,30 OZ F I 4 66 Grease
SPLICF. MASTER CAIJlÆ CLEANER DEGREAS 1142 MIX/LIQ H-1/F-2/R-0 d"AC 3 1 1 ] QTS N 1 4 2 PETROLEUM BASED HYDROC 75,0 90,0 64742-47-8
D-LIMONENE 25,0 5989-27-5
SPRAY PAINT 1954 MIX/LIQ H-2/F-4/R-1 FPRAC 2, ] 324 432 12 OZ I' 2 4 61 ACETONE 67-64-1
ISOBUTANE 75-28-5
MINERAL SPIRITS 64475-85-0
L10UEFIED PETROLEUM GA 68476-85-7
TOLUENE 108 88-3
NAPHTHA [COMBUSTIBLE L 8030-30-6
XYLENE 1330-20-7
TRAFFIC PAINT 1263 MIX/LIO H-2/F-3/R-2 F-R-C 3 25 30 5 GAL N 1 4 250 PAINT
TRAFFIC PAINT 1263 MIX/LIO H-2/F-3/R-2 F-R-C 3 ] 2 ] GAL N 1 4 17 PAINT
Location:TOOL STORAGE BLDG//ELECT T&D (MIDDLE RM)/Grid:D4
-
1409 MEDIUM H,E,T, REDUCER 1142 MIX/LIQ H- /1'- /R- P- --C 1 1 1 GAL F 1 4 8 Solvents and spirits
75 TOLUENE 1294 MIX/LIQ H'2/F-3/R-2 F--AC ] ] 1 GAl, N 1 4 7 TOLUENE 108-88-3
BAR & CHAIN LUBRICANT 1993 MIX/LIQ H-2/F-4/R-0 FP-AC 3 12 1 OTS N 1 4 23 LUBRICANTS & OILS
Page: 13
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:TOOL STORAGE BLDG//ELECT T&D (MIDDLE RM}/Grid:D4
-
nOT
DOT PHYSICAL NFPA HIIZIIRD HM~IIR[J live; MI\X 1.,IIRGEST CONT, MAX FROM TO CAS *. I F
TRADE NIIME tiSL STATE DIAMOND CODES* CLASS IIMT IIMT CONT , UN IT CODE··* LBS CHEMICAL COMPONENT ....L. 1- NUMBER -E!
CLEAR URETHANE SEAL COAT (AEROSOL) 1954 MIX/LIQ H-2/F-4/R,O FP-IIC /,,] 144 288 J/. OZ F 2 4 37 ISOBUTANE 14,0 14,0 75-28-5
POLYURETHANE 13,8 13,8
XYLENE 13,8 13,8 1330-20-7
ACETONE 22,3 22,3 67,64-]
ISOHEXANE 16,0 16,0 107-83-5
PROPANE 14,0 14,0 74-98-6
HEXANE 1.8 1.8 110-54-3
2-PROPANOL, 1-METHOXY, 4,3 4,3 108-65-6
C1ÆARF.EN PLUS GI,ASS CLEANER 1263 MIX/LIQ H-2/F-3/R-7. FP-IIC 3 3 3 2.50 GAr. N 2 4 21 Solvents and spirits
CONQUEST 1760 MIX/LIQ H-2/F-l/R-0 ---IIC 9 ~ 12 ] QTS N 1 4 30 OXAIJIC ACID 144,62-7
TANNIC ACID 1401-55-4
N-PROPOXYPROPANOL 1569-01-3
VINYLIDENE CHLORIDE-ME 54140-78,2
D GREASE 1142 MIX/LIQ H-2/F-3/R-O F..-AC 3 204 408 17 OZ F 2 4 52 TOLUENE 108-88--3
VM&P NAPHTHA 64742-89-8
D,O,A, PLUS WASP SPRAY 1993 MIX/LIQ H-3/F'2/R-l --RAC 3 144 288 12 OZ F 2 4 37 Solvents and spirits
DIALA OIIJ /\X 1268 MIX/LIQ H-O/F-l/R-O ----C 3 1 1 1 GAL F 1 4 7 BUTYLATED HYDROXY TOLU 0,2 0,2 128-37-0
HYDROTREATED LIGHT NAP 60.0 70.0 64742-53-6
HYDROTREATED MIDDLE DI 30.0 40,0 64742-46-7
EXADERM AEROSOL 1270 MIX/LIQ H-2/F-2/R-0 -P-AC 2 42 42 14 OZ F 2 4 5 GLYCERIN 56-81-5
ISOBUTANE 75-28-5
PROPANE 74-98-6
BUTANE 106-97-8
NU-KQTE 1263 MIX/LIQ H-1/F-l/R,O ---AC 9 4 12 1 QTS N 1 4 32 PAINT
OIL-D-GREASE 1950 MIX/LIQ H-2/F-2/R-0 -P--C 2,2 72 144 12 OZ F 2 4 16 Solvents and spirits
ROY MASTI C 1993 MIX/LIQ H-0/F-2/R-0 F--AC 3 1 1 1 GAL F ] 4 8 Solvents and spirits
SAF-SOL 20/20 HIGH TECH SAFETY SOLV 1270 MIX/LIQ H-2/F-2/R-0 -P-AC 2 140 240 20 OZ F 2 4 29 Solvents and spirits
Page: 14
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location: TOOL STORAGE BLDG//ELECT T&D (MIDDLE RM}/Grid:D4
-
DOT
DOT PHYSICAL NFPA HAZARD IIA7,ARD AVr, MAX LARGEST CONT, MAX FROM TO CAS **IF
TRADE NAME ~ STATE ~ CODES' CLASS AMT AMT CO NT , UNIT CODE··· LßS CHEMICAL COMPONENT -L.L NUMBER ~
S1I,A, ClIEM 1270 MIX/LIQ H-2/F-2/R-O -P-AC 2 240 480 20 OZ I' 2 4 58 FREON 113 76-1)-1
SPREZ 1950 MIX/LIO H-2/F-2/R-0 -P--C 2,2 192 3R4 16 02 I' 2 4 44 SolvRnts and spirits
STING-X WASP SPRAY ]270 MIX/LIQ H-2/1'-2/R-0 -P-AC 2 192 184 If, 07. I' 1 4 46 INSECTICIDE
VARATIIANE LIQUID PLASTIC 1263 MIX/LIO 11-2/F'3/R-2 F-R-r, 3 ] 1 1 (:fIl, I' 1 4 8 PAINT
VOLTZ 1993 MIX/LIQ H-2/1'-2/R-O ---AC 3 77 132 11 OZ I' 2 4 15 D-LIMONENE 5989-27-5
HYDROTREATED LIGHT DIS 64742-47-8
WIPEOUT 1142 MIX/LIQ H'l/I"O/R-O ---AC 9 144 144 24 02 N 1 4 18 CLEANING COMPOUND, LIQ
Location: TOOL STORAGE BLDG//GAS TOOL ROOM (NORTH RM}/Grid:D4
DITCH WITCH SUMMER LUBRICANT 1993 MIX/LIQ H-2/1'-4/R-0 I'P,AC 3 11 14 1 QTS N 1 4 26 LUBRICANTS & OILS
HS DIESEL FUEL 2 1202 PUR/LIQ H-0/F-2/R-0 ----C 3 7 10 5 GAL N 1 4 70 FUELS, DIESEL, NO, 2 100.0 100,0 68476-34-6
NATURAl" GAS 1971 MIX/GAS H-l/F-4/R-0 FP--C 2 54 OR lR CUI'T L 2 4 ETHANE 0,0 8,5 74-84-0
METHANE 70,0 99,0 74-82-8
PROPANE 4,7 74-98-6
CARBON DIOXIDE 0,9 124-38-9
BUTANE 3,0 106-97-8
PENTANE 1.5 109-66-0
HEXANE 0,6 110-54-3
Page: 15
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:TOOL STORAGE BLDG//GAS TOOL ROOM (NORTH RM)/Grid:D4
POT
DOT PHYSICAL NFPA HAZARD IfAZAI!f1 AVG MAX LARGEST CONT, MAX FROM TO CAS ·*IF
TRADE NAME t!Q... STATE ~ CODES' CLASS ~ AMT ~ {!NIT ~ !dill CHEMICAL COMPONENT ~.L NUMBER -ª!
UN!ÆADED GASOI,INE 1203 MIX/LIQ H-I/F-J/R-O F--AC :1 (, 12 1 GAL R 1 4 75 BENZENE 4,9 4,9 71-43-2
CYCLOHEXANE 2,4 2,4 110-82-7
ETHYl, AJ£OHOL 0,9 0,9 64-17-5
ETHYL BENZENE 1.4 1,4 100-41-4
METHYL TER1'·BUTYL ETHE 15.0 15,0 1634-04-4
N-HEXANE 3,0 3 ,0 11 0 - 54 - 3
TOLUENE 6,5 6,5 108-88-3
M-XYLENE 4,6 4,6 108-38-3
O-XYLENE 2,2 2,2 95,47-6
P,XYLENE 0,9 0,9 106-42,3
Location:TOOL STORAGE BLDG//GAS TOOL ROOM-FLAM CAB/Grid:D4
-
CHAIN SAW 2 CYCI,E ENGINE OIL 1993 MtX/LIQ H-2/F-4/R-O FP-AC 3 77 154 6,40 OZ N 1 4 19 LUBRICANTS & OILS
ETHYL ALCOHOL, DENATURED 1170 MIX/LIQ H-2/F-3/R-l F-RAC :1 5 12 1 QTS F 1 4 20 Solvents and spirits 64-17-5
HYDRAULIC OIL 1270 MIX/LIQ H-1/F-l/R-0 ---AC 9 1 1 1 GAL N 1 4 7 LUBRICANTS & OILS
MINERAL SPIRITS 1993 PUR/LIQ H-2/F-2/R-0 ---AC 3 3 :1 2,50 GAl, N 1 4 17 STODDARD SOLVENT 100,0 100.0 8052-41'3
MOTOR OIL N/A MIX/LIQ H-1/F-I/R-0 ---'C 3 1 1 0,50 GAL N 1 4 4 HYDROCARBON BASE OILS
MOTOR 011.. N/A MIX/LIQ H-1/F-I/R-0 --C 3 2 2 1 OTS N 1 4 4 HYDROCARBON BASE OILS
RIDGID THREAD CUTTING OIL 1270 MIX/LIQ H'l/F-I/R-O -AC 9 1 1 1 GAL N 4 7 MINERAL OIL 8012-95-1
Page: 16
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:TOOL STORAGE BLDG//GAS TOOL ROOM-FLAM CAB/Grid:D4
-
DOT
DOT PHYSICAL NF!'A HAZARD HAZARD AVG MAX LARGEST CONT, MAX FROM TO CAS *+IF
TRADE NAME ~ STATE DIAMOND CODES* CLASS AMT AMT ~ UNIT ~ LBS CHEMICAL COMPONENT -L- .L NUMBER -ID!
UNLEADED GASOLINE 1203 MIX/LIQ H-l/F-3/R-O F--AC 3 6 6 1 GilL N 1 4 38 BENZENE 4,9 4,9 71-43-2
CYCLOHEXANB 2,4 2,4 110-82,7
ETHYL ALCOHOL 0,9 0,9 64-17-5
ETHYL BENZENE 1.4 1.4 100-41-4
METHYL TERT-BUTYL ETHE 15,0 15.0 1634-04-4
N - HEXANE 3,0 3,0 110-54-3
TOLUENE 6,5 6,5 108-88-3
M-XYLENE 4,6 4,6 108-38-3
O-XYLENE 2,2 2,2 95-47-6
P-XYLENE 0.9 0,9 106-42-3
UNLEADED GASOLINE 1203 MIX/LIQ H-1/F-3/R-0 F--IIC 3 15 15 5 GAl.. N 1 4 94 BENZENE 4,9 4,9 71-43-2
CYCLOHEXANE 2.4 2,4 110-82-7
ETHYL ALCOHOL 0,9 0,964-17'5
ETHYL BENZENE 1.4 1.4 100-41-4
METHYL TERT-BUTYL ETHE 15.0 15,0 1634-04-4
N-HEXANE 3,0 3,0 110-54-3
TOLUENE 6,5 6,5 108-88-3
M-XYLENE 4.6 4,6 108-38-3
O,XYLENE 2.2 2,2 95-47-6
P-XYLENE 0.9 0.9 106-42-3
Location:WAREHOUSE BLDG//GAS T&D/Grid:D5
1,1. I-TRICHLOROETHANE 2831 PUR/LIQ H-3/F-1/R-2 --RAC 6,1 4 5 GAL F 1 4 56 METHYL CHLOROFORM 71-55-6
Page: 17
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date 03/19/96
Location:WAREHOUSE BLDG//GAS T&D/Grid:D5
DOT
DOT PHYSICAL NFl' A HAZARD HAZARD AVG MAX [,ARGEST CO NT , MAX FROM TO CAS **IF
TRADE NAME ~ STATE ~ CODES' CLASS !lMT AMT CO NT , UN IT CODE*·· LBS CHEMICAL COMPONENT -L- .L NUMBER -1lli
1033 VAIJVE SEALANT 1270 MIX/SOL H-1/F-1/R~0 ~--AC ~ 20 25 5 QTS F 1 4 50 HYDROCARBON BASE OILS 5,0 5.0
POLYESTER RESIN 80,0 90,0
SILICA 8,0 12.0
SILICA, TREATED. AMORp 2,0 5.0 68611,44-9
EZE..WAY AEROSOL 1956 MIX/LIQ H-3/F-l/R-0 --~AC 2 144 192 16 02 F 2 4 24 PETROLEUM ETHER 8030~30-6
ETHYL ACETATE 141-7R-6
l,l,l-TRICHLOROETHANE 90.0 90,0 71-55-6
CARBON DIOXIDE 124-38-9
GS-4 SEALER (AEROSOL) 1956 MIX/LIQ H-3/F-l/R-0 ~~-AC 2 20 150 15 02 F 2 4 19 l,l,l-TRICHLOROETHANE 71-55~6
ISOBUTANE 75-28-5
ISOPROPYL ALCOHOL 67~63-0
LIQUEFIED PETROLEUM GA 68476-85~7
NITROGEN 1066 PUR/GAS H- /F~ /11.- -1'-- - 7- 70 230 230 CUFT L 2 4 17 NITROGEN 100,0 100,0 7727-37-9
NO. 5 PIPE THREAD COMPOUND 1993 MIX/LIQ H'2/F-2/R-0 --..!lC 6 12 0,50 PTS F 1 4 10 DIpROPYLENE GLYCOL MET 23,0 23,0 34590-94-8
NO, 5 PIPE THREAD COMPOUND 1993 MIX/LIQ H-2/F-2/R-O ---AC 6 10 1 pTS F 1 4 8 DIpROpYLENE GLYCOL MET 23,0 23,0 34590-94~8
ROOTS METER OJ!, GRADE 100 1993 MIX/LIQ H-2/F-4/R-O FP-AC 1 2 1 QTS N 1 4 4 HYDROCARBON BASE OILS
p-XYLENE 106-42-3
HEAVY NApHTHENIC DISTI 64742-18-3
HIGHLY REFINED BASE 01 64742-54-7
LIGHT NApHTIIENIC DISTI 64742'53-6
ROOTS METER OIL GRADE 100 1993 MIX/LIQ H-2/F-4/R-O Fp-AC 8 8 4 02 N 1 4 HYDROCARBON BASE OILS
P-XYLENE 106-42-3
HEAVY NApHTHENIC DISTI 64742-18-3
HIGHLY REFINED BASE 01 64742-54-7
LIGHT NAPHTHENIC DISTI 64742-53-6
Page: 18
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date 03/19/96
Location:WAREHOUSE BLDG//GAS T&D/Grid:D5
DOT
DOT PHYSICAL NFPA HAZARD HAZAIW Ave; MAX l,ARGEST CONT. MAX FROM TO CAS *·IF
TRADF. NAME !i2- STATE DIAMOND CODES' CI"ASS AMT AMT ~UNIT CODE· Ie. l&§ CHEMICAL COMPONENT --L- .L NUMBER -Ei
SPRAY PAINT 1954 MIX/LIQ "-2/F-4/R-1 FPRAC 2 216 288 12 OZ F 2 4 40 ACETONE 67-64-
ISOBUTANE 75-28-5
MINERAL SPIRITS 64475-85-0
LIQUEFIED PETROLEUM GA 68476-85-7
TOLUENE 108,88-3
NAPHTHA [COMBUSTIBLE I. 8030-30,6
XYLENE 1330-20-7
SWS-290 SILICONE COMPOUND 1270 MIX/SOL H-l/F-l/R-O ---AC 9 95 n 5.30 OZ R 4 24 Grease
THREAD-EZE LUBRICANT 1270 MIX/SOL "-l/F-I/R-O ---AC 9 1 /- I I,AS N 4 2 LUBRICANTS & OILS
VALVE CLEANER COMPOUND N/A MIX/LIQ H-I/F-l/R-O --'-C 3 4 5 5 OTS F 4 9 MOLYBDENUM DISULFIDE 1317-33-5
W/R METER GRAY 1263 MIX/LIQ H-2/F-3/R'/- F-R,C 1 QTS F 4 2 ALKYD RESIN (SOLIDS) 30,0 30,0
AMMONIUM BICHROMATF. 0,5 0,5 7789-09-5
AMMONIUM HYDROXIDE 0.5 0,5 1336-21-6
2-BUTOXYETHANOL 5,0 5,0 111-76-2
ETHYLENE GLYCOL MONOPR 5,0 5.0 02807-30-9
INORGANIC PIGMENTS 12,0 12,0
METAL DRIERS 0.5 0,5
NORMAL BUTYL ALCOHOL 5,0 5,0
PROPYLENE GLYCOL MONOP 5.0 5,0
Page: 19
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:WAREHOUSE BLDG//GAS T&D/Grid:D5
DOT
DOT PHYSICAL NFPA HM:ARD HAZIIRD IIVG MIIX ,IIRGEST CONT, MAX FROM TO CAS F
TRIIDE NAME !:ill- STATE ~ ~ ~ IIMT IIMT ~ UNIT CODE*·· LBS CHEMICAL COMPONENT ~.L NUMBER ----E.!
W/R METER GRAY 1263 MIX/LIQ H-2/F-3/R-2 F-R-C 3 J 2 J GAL, F I 4 17 ALKYD RESIN (SOLIDS 30,0 30,0
AMMONIUM BICHROMATE 0,5 0,5 7789-09-5
AMMONIUM HYDROXIDE 0.5 0,5 1336-21-6
2-BUTOXYETHANOL . 5,0 5,0 111-76-2
ETHYLENE GLYCOL MONOPR 5,0 5.0 02807-30-9
INORGANIC PIGMENTS 12,0 12,0
METAL DRIERS 0.5 0,5
NORMAL BUTYL ALCOHOL 5,0 5,0
PROPYLENE GLYCOL MONO I' 5,0 5,0
foxhoro 1800 ink 1142 MIX/LIQ H..2/F-J/R-l ---IIC 3 2 2 J PTS M 1 4 2 ETHYLENE GIJYCOL 10,0 25,0 107-21-1
FORMALDEHYDE SOLUTION 1. 0 50-00-0
Location:WAREHOUSE BLDG//MTR DPT COV STR FLAM CAB/Grid:D5
- - - - -
C-THRU AEROSOL 1950 MIX/LIQ H-2/F-2/R-0 -P--C 2,2 126 IIi 8 14 OZ F 2 4 19 ISOPROPYL ALCOHOL 67-63-0
COMPRESSED AIR 1002 MIX/GAS H, /F- /R- _1'___ 2,2 200 300 300 CUFT IJ 2 4 23 NITROGEN 80,0 80.0 7727-37-9
OXYGEN 20.0 20,0 7782-44-7
Location:WAREHOUSE BLDG//SCADA SHOP/Grid:D5
AIRCRAFT HYDRAULIC OIL 15 01537 N/A MIX/LIQ H-1/F-1/R-0 --C 3 2 GilL F 4 15 HYDROTREATED MIDDLE DI 95.0 100.0 64742-46-7
Page: 20
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date 03/19/96
Location:WAREHOUSE BLDG//SHIPPING & RECEIVING/Grid:D5
DOT
DOT PHYSICAL NFPA HAlARD HM~ARD AVG MAX LAHGEST CONT, MAX FROM TO CAS **IF
TRADE NAME ~ STATE DIAMOND CODES' CI.ASS AM"!' AMT CONT, UNIT CODE··· LBS CHEMICAL COMPONENT 2-1- NUMBER --Æ!
1. 1. 1-TRICH!.OROETIIANE 2831 PUR/LIQ H-3/F-1/R-2 --HAC 6,1 1 1 I PTS F 1 4 1 METHYL CHLOROFORM 71-55-6
AEROIÆX AEROSOL 1956 MIX/LIQ H-3/F-1/H-0 ---AC 2 96 19~ 16 OZ F 2 4 24 1.l,l-TRICHLOROETHANE 80,0 80,0 71-55,6
ISOBUTANE 75-28-5
PHOPANE 74-98-6
XYLENE 5,0 5,0 1330-20-7
1,2 DIOXOLANE 646-06-0
GREEN P,O, WOOD PHESERVATIVE 10-9-0 1139 MIX/LIQ H-2/F-2/H-0 ---AC 3 10 20 1 PTS N 1 4 21 COPPER NAPHTHENATB 19,3 19,3 1338-02-9
POLY PLX-61 PLASTIC-LEXAN CLf;ANER 1270 MIX/LIQ H-2/F'2/R-0 -P"AC 2 42 84 14 OZ P 2 4 10 Solvents and spirits
Location:WELDING SHOP BLDG//WELDING SHOP/Grid:D6
ACETYLENE 1001 PUR/GAS H-1/F-4/R-3 FPR-C 2,1 217 290 4S CUFT L 2 4 20 ACETYLENE 100,0 100,0 74-86-2
OXYGEN. COMPRESSED 1072 PUR/GAS H- /F- /H- - P- -- 2,2 200 264 32 CUFT I~ 2 4 22 OXYGEN 100.0 100,0 7782-44-7
ROOTS METER LUB, OIL GRADE 50 N/A MIX/LIQ H-1/F-1/R-0 ----C 3 4 6 QTS N 1 4 11 HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
HYDROTREATED LIGHT NAP 60,0 70,0 64742-53-6
BUTYLATED HYDROXY TOLU 0.2 0,2 128-37-0
XYLENE 1330-20-7
ETHYL BENZENE 100-41-4
ROOTS METER LUB. OIL GRADE 50 N/A MIX/LIQ H-1/F-1/R-0 C 3 176 92 OZ N 1 4 23 HYDROTREATED MIDDLE 01 30.0 40.0 64742-46-7
HYDROTREATED LIGHT NAP 60.0 70,0 64742-53-6
BUTYLATED HYDROXY TOLU 0.2 0,2 128-37-0
XYLENE 1330,20-7
ETHYL BENZENE 100-41-4
Page: 21
. . .
HAZARDOUS MATERIAL INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:YARD//ADJACENT TO HWSA/Grid:D6
DOT
DOT PHYSICAL NFPA HAZARD HAZARlJ Avr; MAX LARGEST CON"!', MAX FROM TO CAS ·*IF
TRADE NAME !!<L STATE DIAMOND CODES' CLASS AMT ~ ~ UNIT CODE··· LBS CHEMICAL COMPONENT --L- ~ NUMBER -'ill
DIALA OIL AX 1268 MIX/LIQ H-O/F-l/R-O ----C J 42 5S 55 GAL D 1 4 405 BUTYLATED HYDROXY TOLU 0,2 0,2 128-37-0
HYDROTREATED LIGHT NAP 60,0 70,0 64742-53-6
HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
Location:YARD//AG WATER STORAGE TANKS/Grid:C9
CITRIKI,EEN ALKALINE CLEANER 1142 MIX/LIQ H-l/F-O/R-O ---AC ~ 80 110 55 GAf, D 1 4 918 2-BUTOXYETHANOL 111-76,2
SODIUM SIIJICATE 6834-92-0
SURFACTANT
CITRIKI,EEN ALKALINE CLEANER 1142 MIX/LIQ H-l/F-O/R-O ---AC 9 ] 8 30 6 GAr. F 1 4 250 2-BUTOXYETHANOL 111-76-2
SODIUM SIIJICATE 6834-92-0
SURFACTANT
Location:YARD//CNG FUELING STATION/Grid:E7
NATURAL. GAS 1971 MIX/GAS H-l/F-4/R-O FP--C 2 24000 30000 100no CUFT I.. 2 1116 ETHANE 0.0 8,5 74-84-0
METHANE 70,0 99.0 74-82-8
PROPANE 4.7 74-98-6
CARBON DIOXIDE 0.9 124-38-9
BUTANE 3.0 106-97-8
PENTANE 1.5 109-66-0
HEXANE 0.6 110-54-3
Page, 22
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:YARD//CNG MOB TRAILER-w/o HWSA/Grid:C6
-
DOT
DOT PHYSICAL NFPA HIIZIIHD HIIZIIRD AVG MIIX L.IIRGEST CONT, MAX FROM TO CAS **IF
TRADE NAME ~ STATE ~ CODES' CLASS ~ AMT CONT, UNIT ~ LBS CHEMICAL COMPONENT ---L- 1... NUMBER ~
NATURAlJ GAS 1971 MIX/GAS H-l/F'4/R-0 FP--C ;>,1 5000 5000 2S0 CUFT IJ ;> 4 186 ETHANE 0,0 8,5 74-84-0
METHANE 70,0 99,0 74-82-8
PROPANE 4,7 74-98-6
CARBON DIOXIDE 0,9 124-38-9
BUTANE 3,0 101;-97-8
PENTANE 1.5 109-66-0
HEXANE 0,6 110-54-3
Location:YARD//CNG-LG_ TRAILR-N/O CNG STA/Grid:E7
NATURAL GAS 1971 MIX/GAS H-l/F-4/R-0 FP--C /.,.1 28800 28800 1200 CUFT L 2 4 1071 ETHANE 0,0 8,5 74-84-0
METHANE 70,0 99,0 74-82-8
PROPANE 4.7 74-98-6
CARBON DIOXIDE 0,9 124-38-9
BUTANE 3.0 106-97-8
PENTANE 1.5 109-66-0
HEXANE 0,6 110-54-3
Location:YARD//FUEL TANKER TRUCK/Grid:C3
HS DIESEL FUEL 2 1202 PUR/LIQ H-O/F-2/R-0 -C 400 600 600 GAL R 1 4 4205 FUELS, DIESEL, NO. 2 100,0 100,0 68476-34-6
Page: 23
\
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:YARD//FUEL TANKER TRUCK/Grid:C3
DOT
DOT PHYSICAL NFPA HI\ZI\RD HA7.l\rm Avr: MI\X LARGEST CONT, MAX FROM TO CAS **IF
TRI\DE NAME !iQ.... STATE DIAMOND CODES· CLl\S.l':; ~ I\MT CO NT , UNJT ~ 1&2 CHEMICAL COMPONENT ---L- .L NUMBER -1ili
IJNLEI\DED GASOLJNE 1203 PUR/LIQ H-1/F-J/R-O F--I\C 3 800 1200 1200 GAl., R 1 4 7509 BENZENE 4,9 4,9 71-43-2
CYCLOHEXANE 2,4 2,4 110-82-7
~;THYL ALCOHOL 0,9 0,9 64-17-5
ETHYL BENZENE 1.4 1.4 100-41-4
METHYL TERT-BUTYL ETHE 15,0 15,0 1634-04-4
N-HEXANE 3,0 3,0 110-54-3
TOLUENE 6,5 6,5 108-88-3
M-XYLENE 4,6 4,6 108-38,3
O-XYLENE 2,2 2,2 95-47-6
P-XYLENE 0,9 0,9 106-42-3
Location:YARD//H/C BOT STR-S/O CNG COMPR/Grid:E8
- -
NATURAL GAS 1971 MIXIGAS H-1/F-4/R-0 FP--C " 4S 290 145 CUPT L 2 4 11 ETHANE 0,0 8,5 74-84-0
METHANE 70,0 99,0 74-82-8
PROPANE 4,7 74-98-6
CARBON DIOXIDE 0.9 124-38-9
BUTANE 3.0 106-97-8
PENTANE 1.5 109-61;-0
HEXANE 0.6 110-54-3
Page: 24
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:YARD//H/C_ BOT STR-S/O CNG COMPR/Grid:E8
-
DOT
DOT PHYSICAL NFPA flAZAJ!) I1A7.AJ!D Ave: MAX LAEGEST CaNT, MAX FROM TO ClIS **IP
TRADE NAME ~ STATE DIAMOND CODES' CLASS AMT AMT CaNT, UN IT conE*·· LBS CHEMICAL COMPONENT --L- .L NUMBER -Æ.!
NATURAL GAS 1971 MIX/GAS H'l/F-4/R-0 FP--C 2,1 540 ï211 18 CUFT [, 2 4 27 ETHANE 0,0 8,5 74-84-0
METHANE 70,0 99,0 74-82-8
PROPANE 4,774-98-h
CARBON DIOXIDE 0,9 124-38-9
BlrfANE 3,0 10h,97-8
PENTANE 1. 5 109-66--0
HEXANE 0,6 110-54-3
Location:YARD//HWSA SPILL KITS/Grid:D6
SOLVENT 11 00 1263 MIX/LIQ H-2/F-3/R--2 F-R-C 3 1 2 1 GAL F 1 4 17 CYCLOHEXANE 0,6 2,0 110-82-7
HEPTANE 142-82-5
TOLUENE 6,5 11. 7 108-88-3
METHYLCYCLOHEXANE 108-87-2
ISOPROPYL ACETATE 108,21-4
PROPYLENE GLYCOL METHY 108-65--6
THINNER 225 64742-89-8
Location:YARD//MATERIAL STORAGE BINS/Grid:C7
BLACKTOP PATCH 1999 MIX/SOL H-2/F-2/R--0 ---AC 4,2 9000 15000 60 LBS J 1 4 15000 ASPHALT 6,0 6,0 8052-42-4
CONCRETE MIX 3077 MIX/SOL H-1/F-1/R-O AC 9 1200 3000 60 LBS J 1 4 3000 PORTLAND CEMENT 65997-15-1
SILICA. CRYSTALLINE--QU 14808--60-7
Page: 25
. . .
HAZARDOUS MATERIAL INVENTORY - BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
(All Hazardous Substances on site 365 days per year)
Report Date: 03/19/96
Location:YARD//MATERIAL STORAGE BINS/Grid:C7
DOT
DOT PHYSICAL NFPA HAZARD HAZARD AVG MAX LARGEST CaNT, MAX FROM TO CAS ··IF
TRADE NIIME !ill.- STATE DIIIMOND CODES' C1.ASS AMT IIMT CONT, UNIT CODE*"'* LBS CHEMICAL COMPONENT 2-1- NUMBER ~
MORTAR MIX 3077 MIX/SOL H-1/F-1/R-0 ---AC 9 60n 1000 60 J.BS J 1 4 3000 CALCIUM CARBONATE 1317-65-3
SILICA. CRYSTALLINE-QU 14ROR-60-7
PORTLAND CEMENT 65997-15-1
Location:YARD//MATERIALS OFFICE SHED/Grid:B4
MOTOR OIl, N/A MIX/LIQ H-l/F-1/R-0 ----C 3 Ii 8 1 QTS N 1 4 15 HYDROCARBON BASE OILS
Location:YARD//N/O SUMP EVAPORATION POND/Grid:D8
HYDROGEN 1049 PUR/GAS H-0/F-4/R-O FP--- 2,1 150 200 200 CUFT I. 2 4 1 HYDROGEN 100,0 100,0 1333-74-0
Location:YARD//PAD MT TRANSF E/O T&D OFC/Grid:D5
DIALA OIl, AX 1268 MIX/LIO H-O/F-l/R-O C 3 150 150 50 GilL R 4 nos BUTYLATED HYDROXY TOLU 0,2 0.2 128-37,0
HYDROTREATED LIGHT NAP 60,0 70.0 64742-53-6
HYDROTREATED MIDDLE DI 30,0 40,0 64742-46-7
Page: 26
.
TABLE 3-2
HAZARDOUS WASTE INVENTORY
See following page(s).
.
.
3-11
. HAZARDOUS WASTE INVENA BAKERSFIELD SERVICE CNTR .
EPA ID Number CAD981390198
Report Date: 03/19/96
Location:HWSA//HAZ WASTE STOR _AREA/Grid:D6
- -
DOT l\NNUAL WASTE LGST
STATE DOT PHY:';ICAL HAZARD HAZARD Ava MAX UN IT CONT, lIMOUNT LARGEST CONT DAYS ON
TRADE NAME ~ illL. STATE CODES C[.ASS AMT AMT - CODE* ~ ~ !lli!.L. SITE
WASTE ANTI FREEZE 343 3082 LrQUID ,-C 3 50 400 I..BS D 1 4 400 55 GAL 90
WASTE CAPACITORS (NON PCB) 223 30R2 LIQUID -C 3 0 3080 LHS D I 4 6440 55 GAl" 365
WASTE CONTAMINATED SOIL/DEBRIS (MISC, ) 611 3077 SOLIP ----C 9 0 20000 LBS D I 4 20280 55 LBS 365
WASTE COPY MACHINE TONER 181 3077 SOLID F- --C 9 0 2RO LBS D 1 4 760 55 GAL 365
WASTE DRY CELl, BATTER IES 181 3077 SOL.IP -, -AC 9 ] no ROO LBS ) 1 4 800 55 GAL 365
WASTE EMPTY AEROSOLS CANS L/C FLAMMABLE 343 nR9 SOL.I!) f'- --c 3 0 6no LBS [) 1 4 20IJO 55 GAL 365
WASTE FUEL FILTERS 223 3077 50l,ID f'- --c 3 0 )00 LOS D ] 4 0 55 GAL 365
WASTE INSULATING 01 L (NON - PCB ) 221 9188 LIQUID -, - 'C 0 7280 LBS D I 4 17330 55 GAL 365
WASTE LIGHT BALJ,ASTS NON PCB 181 Lno SOLID -' --c 9 n 680 LBS F 680 55 GAL 365
WASTE LIGHT BALLASTS/CAPACITORS NON-PCB 221 1270 L IQU1IJ -- --C J 0 1200 LBS ) I 4 1320 55 GAL 365
WASTE OIL WITH PCB 5-49 PPM 261 2315 J. IOUI D - - --C 3 0 540 l,BS D 1 4 1280 55 GAL 90
WASTE OIL WITH PCB 50-499 PPM 261 2315 LIQtJID - - --c 3 0 780 l,BS D 1 4 1900 55 GAL 30
WASTE OILY SOLIDS 223 3077 SOLID - --C 9 0 35660 LBS D 1 4 68660 55 GAIJ 365
WASTE OILY SOLIDS 5-49 PPM PCB 261 2315 SOLID - - - - ~ 9 0 2080 LBS D ] 4 2080 55 GAL 90
WASTE OIL.Y WATER 222 1270 LIQUID ----C 3 0 55980 LBS D 1 4 102240 55 GAL 365
WASTE PCR ELECT, EQUIP, (DRAINED) 5-49 P 261 2315 SOUD -- --C 9 0 680 LBS R 1 4 680 2000 LBS 90
WASTE PCB ELECT, EQUIP, (DRA!NED) 50-499 261 23]5 SOLID ---AC 3 I) no l,BS R 1 4 2100 2000 LBS 90
WASTE PCB ELECT, EQUIP, 50-499 PPM 261 2315 SOl,ID ---AC 9 0 560 LBS R 1 4 560 560 LBS 30
WASTE SODIUM VAPOR AND MERCURY VAPOR ELE 181 3077 SOL TO ----C 9 0 260 LBS D 1 4 720 55 GAL 365
WASTE SOLVENT 214 1993 1"IQUID f'- --C 3 0 40 LBS D 1 4 40 55 GAL 365
KEY TO CONTAINER CODES:A-ABOVEGROUND TANK, B-BELOWGROUND TANK. C-TANK INSIDE BUILDING,D-STEEL DRl~.E-PLASTIC OR NON-METALLIC DRUM,F-CAN,G-CARBOY.H-SILO.I-f'IBER DRUM
J-BAG,K-BOX,L,CYLINDER,M-GLASS BOTTLE,N-PLASTIC BOTTLE.O-TOTE BIN,P-TANK WAGON,Q-RAIL CAR,R-OTHER
KEY TO STORAGE PRESSURE CODES:I-AMBIENT, 2- > AMBIENT, 3 - < AMBIENT
KEY TO STORAGE TEMPERATURE CODES:4-AMBIENT, 5- > AMBIENT. 6 AMBIENT, 7- CRYOGENIC
Page
.
.
HAZARDOUS WASTE INVENTORY BAKERSFIELD SERVICE CNTR
EPA ID Number: CAD981390198
Report Date: 03/19/96
.
2
ANNUAL WASTE LGST
UNIT CONT AMOUNT LARGEST CONT, DAYS ON
- CODE* ....!&L ~ !Æ!L SITE
LBS 0 4 27520 10000 LBS 365
Page:
DOT
HAZAIW HAZARD AVG MAX
CODES CLASS AMT AMT
C 9 0 2742
Location:HWSA//HAZ_WASTE_STOR_AREA/Grid:D6
PHYSICAl
SOI"ID
DOT
t!Q..,.
3077
STATE
~
352
WASTE TREATED WOOD
.
.
.
4A. PREVENTION PROCEDURES
This section describes the procedures that are in place at this facility to minimize the
possibility of fire, explosion, or unplanned releases of hazardous substances to the
environment which could threaten human health or the environment.
1. STORAGE IN CONTAINERS
· All containers are identified with their contents.
· Containers are maintained in good condition. Severely rusted containers or those
with apparent structural defects are not used.
· The contents of leaking containers are immediately transferred into replacement
containers.
· The bungs and lids of all containers are kept closed (hand-tight) except when
materials are being removed from or added to them.
· Containers (less than 30 gallons) are stacked no more than three feet or two
containers high, unless they are on fixed shelving or otherwise secured.
· Containers 30 gallons or larger shall not be stacked,
· Containers do not block exits, stairways, or passageways.
· Flammable and combustible liquids are stored in approved metal cabinets or fire-
rated storage rooms and appropriately labeled. No more than 60 gallons of
Class I and" liquids are stored in any cabinet, and no more than three cabinets
are located in the same room.
· Incompatible hazardous materials are required to be separated by one of the
following methods: (1) segregating such materials storage by a distance of not
less than 20 feet; or (2) Isolating such materials by a noncombustible partition
extending not less than 18 inches above and to the sides of the stored material;
or (3) storing such materials in storage cabinets or gas cabinets.
· PCBs and PCB-contaminated materials and wastes are stored in designated
PCB Storage Areas.
· Hazardous wastes are stored in designated Hazardous Waste Storage Areas.
· Pesticides and herbicides are stored in approved, locked cabinets or storage
rooms located at ground level.
· Wet-acid batteries and other corrosive materials are stored in approved metal
cabinets which are appropriately labeled.
· "No Smoking" and "No Open Flame" signs (or equivalent) are posted wherever
flammable or combustible materials or wastes are stored.
4-1
· Compressed gas cylinders that are not in use outdoors are stored in designated
storage areas. All cylinders, including those in use, are secured from falling by
chains or other means.
. 2. - STORAGE IN TANKS
. All tanks are clearly marked.
· All tanks of greater than 60-gallon capacity containing flammable materials are
vented to limit internal pressure.
· Stationary aboveground tanks are structurally secured to prevent tipping or
rupture due to earthquakes.
· Tank-filling operations are supervised to prevent over-filling.
· All tank valves and openings are kept in a closed position, except when materials
are being added or removed.
· Aboveground tanks are separated from each other by at least 10 feet, and
secondary containment is provided to prevent accidental discharge or leaking of
the stored liquid.
· Hose ends are placed in containers when disconnected to prevent spills by
capturing any remaining fluid.
.
· Flammable and combustible liquids are dispensed from storage tanks by
approved pumps taking suction from the tops of tanks.
· Separator boxes or other approved means are provided, when appropriate, at
loading and unloading points to prevent spillage from entering sewers or floor
drains, and the discharge valve on the separator box is kept in the closed
position.
· A flow cutoff valve, standby diversion tank, or other automatic bypass device is
provided for any tank that receives a continuous or unmonitored flow of
hazardous material or waste.
· Openings for manual gauging have liquid-tight covers, and openings for vapor
recovery are protected against vapor release.
· Tanks containing liquefied petroleum gas (LPG) are separated from combustible
materials by at least 10 feet.
.
4-2
3. WELDING AND CUTTING OPERATIONS
· A fire extinguisher or hose is available where a torch is used inside buildings.
. · No welding or cutting is peñormed on tanks, drums, or other containers that have
contained flammable liquids unless they have been thoroughly purged and tested
inside with a combustible gas detector.
· The area surrounding the cutting or welding operation is free of all flammable or
combustible materials, liquids, or vapors, lint and dust.
· Cylinders, piping, valves, regulators, and hoses are prevented from coming in
contact with oil and oily substances.
· Cylinders in use are placed far enough away from welding to avoid heat by
radiation from heated materials, sparks or slag.
· All cylinders in use have a pressure-regulating device.
· Hoses are regularly inspected for leaks, burns, tears, loose connections, and
other defects. Where two hoses are joined by a web, they are of different colors
or textures.
4. VEHICLE FUELING OPERATIONS
.
· Motor vehicles are fueled only with approved pumps from portable or
underground tanks, or from approved 1-5 gallon safety containers. Open
containers are never used.
· No smoking or open flames are allowed in the area, and permanent fueling
stations are posted with "No Smoking" and other appropriate warning signs.
· All vehicle engines are shut off during fueling operations.
· The manually-operated pump master switch is located 15 to 75 feet from
permanent fueling stations and is appropriately labeled.
· Where applicable, vapor recovery equipment is regularly maintained, tested, and
inspected.
· Fuel tanker trucks are parked at least 25 feet from property lines (except during
fueling operations), and all valves are locked closed when the truck is
unattended.
· Hose ends are placed in containers when disconnected after storage tank-filling
and tanker truck-filling to prevent spills by capturing any remaining fluid.
· Tank-filling and vehicle fueling operations are supervised at all times.
.
4-3
.
.
.
5. TRANSPORTING. LOADING AND UNLOADING
· All loads are securely tied down and incompatible materials are separated in
accordance with Department of Transportation regulations.
· Containers are tested for product tightness by sealing and holding them for 24
hours, and then are inspected for leaks prior to transportation.
· Hazardous materials are not transported within the vehicle cab.
· The vehicle's brakes are securely set, the wheels chocked, and the engine is
shut off while loading or unloading.
· Smoking is not allowed anywhere near tank vehicles holding or transporting
hazardous substances.
· All valves and other discharge openings are securely closed and double-checked
prior to transportation.
· Vehicles carrying hazardous substances are never left unattended during loading
or unloading, or on any residential street.
· Smoking and flame-producing devices are prohibited on any vehicle carrying
explosives or flammable liquids.
· Explosives are clearly marked, metal tools are not used during loading or
unloading, and the cargo area is free of sharp projections.
· Flammable solids are kept dry during transport and loading.
· Fire extinguishers are kept securely mounted on all vehicles.
· Vehicles are properly marked and placarded and shipping papers or hazardous
waste manifests are carried.
· Vehicles are inspected daily, any deficiencies are noted, and appropriate
corrections are made before the vehicle is used.
4-4
.
.
.
6.
INSPECTIONS
The following items are inspected on a schedule as indicated. Logs of the inspections
(Items A through E) are maintained at the facility for three (3) years. Items inspected
are:
A. Hazardous Waste Storage Area( s) Weekly
B. Work Place Accumulation Area(s) Weekly
C. Complete Facility· Monthly
D. Emergency Response Kits (spill kits) Monthly
E. Hazardous Waste Storage Tanks Daily
F. Fire Extinguishers Monthly
Company policy dictates that additional inspections, not requiring documentation, be
conducted at times indicated.
A. Aboveground Tanks Daily
B. Complete Facility Daily
C. First Aid Kits Monthly
*The following form "Oil-Filled Equipment And Hazardous Material Inspection Log", is an
example which may be utilized for facility inspections.
4-5
.
.
.
Oil-FillED EQUIPMENT AND HAZARDOUS MATERIAL INSPECTION lOG
Year Hazardous Materials Storage Tanks I Oil Filled Elect Em ergency Comments
Date Storage Area Tanker Trucks Eqpmt Storage Area Equipm ent Corrective Action Initials
IS ~ 0 j , ,
0 , "tI CIJ
~ ~ ~" ð m 0 ." ~ § j
z CIJ ~ ~ z CIJ Z .a CD ;"
0 õ g 0 õ 0 0 c:
c: 3 - "tI 2 -6' c: DI ~ ~
[ ~ CIJ ::::I a [ ID ~ CIJ [ CIJ ~ ::::I
-g, 8 ~ ~ :: ~ -g, '0 3 3 c: 0
CIJ ~ ~ ID '0 :r 8
- - I ¡¡; ID 3 CIJ ~ i o ª ¡¡; S" ¡¡; '" ~ g. ~ ~ I
¡; 0 r CIJ CD
- 11 11 ~ æ. ~ iil ID - g - r c: a
¡; "tI DI C c: !ã ~
f6 {I ç; r iil !:!: c: o ::::I Ii !!!. a r f6 -g. _. '0 '0 ¡¡¡" S'
II! - !;!: f6 iD ~r ~ - 0 ~ ~ ID ~ -g "2.. ~ 2: _ !!!.
[ 1m DI ::::I õ" 1 DI [ if ID
;><" !t 91 .s 9 , ;><" ;><" CD _ ID rZ! 0 0
'" ¡¡; .::c !!!. 3 ~ '" '" ::::I '" ;;r ID '" iiJ ::::I ...
FACILITY
= Fa
o
= Pass
./
4-6
.
.
I.
4B. EMERGENCY EQUIPMENT - LOCATION AND MAINTENANCE
This section describes the emergency equipment at the facility and the applicable
maintenance and inspection schedules.
Maintain all emergency equipment and inspect regularly according to the schedule
identified in the Tables 4-1 through 4-3.
Inspections involve visually checking rotection systems and equipment to ensure that they
are in place, charged, and ready for use in the event of an emergency.
Maintenance involves a more thorough examination and servicing of equipment.
1. COMMUNICATION AND/OR ALARM SYSTEM:
Commercial telephones and company telephones are located in all buildings. In
addition, most PG&E vehicles are equipped with two-way radios and/or cellular
telephones that can be used to summon assistance in the event that telephone
service is cut. Also, the D.O.'s office, which is manned 24 hours per day, is equipped
with a base radio that can be used to summon assistance. Telephones and radios
are in continual use and are maintained as needed.
A fire siren is mounted on the microwave tower and is audible throughout the yard.
Manual alarm pull boxes, and sensors are located in the Operations Office and Fleet
Services Building. The T&D Office Building has a local alarm which is audible inside
the building.
As a backup, battery-powered bullhorns are available at this facility, for emergency
voice communications.
Alarm systems are inspected quarterly and maintained as needed.
2. FIRE FIGHTING EQUIPMENT:
Fire extinguisher and other firefighting equipment locations, type/capability, and
inspection schedules are listed in Table 4-1. The type of extinguisher placed at each
location depends on the types of fire likely to occur near the location. Location of fire
extinguishers are depicted on Figure 2-1.
3. SPILL CONTROL AND PERSONAL PROTECTIVE EQUIPMENT:
A complete list of spill control and personal protective equipment and their capability,
found at this facility is presented in Table 4-2. Locations of the equipment are
depicted on Figure 2-1.
4.
FIRST-AID SUPPLIES:
A list of first-aid supplies available at this facility, their capability and an inspection
schedule is presented in Table 4-3. Locations of first-aid supplies are depicted on
Figure 2-1.
4-7
.
.
.
TABLE 4-1
FIREFIGHTING EQUIPMENT INVENTORY
*Locations Inspection
Type/Capability Quantity A B C D E F G H I J K Schedule
Drv Chemical
Class ABC 34 12 6 1 1 1 1 2 1 4 1 4 Monthly
Class BC 1 1 Monthly
Halon 1211
Class ABC 6 4 2 Monthly
Class BC 5 2 2 1 Monthly
*LOCATIONS
A=Operations Office Building
B=T&O Office Building
C=Training Building
O=Welding Shop
E=Gas and Electric Services Offices
F=Hazardous Waste Storage Building
G=Warehouse
H=Tool Storage Building
I=Fleet Services Building
J=Prefab Office & Storage Shed
K=CNG Station/Compressor/Fueling Island Area
The buildings and the general locations of this equipment are identified on the Facility
Layout Map, (Figure 2-1).
4-8
TABLE 4-2
. SPILL CONTROL AND PERSONAL PROTECTIVE EQUIPMENT
Minimum Quantities Required
ITEM CAPABILITY TYPE OR DESCRIPTION QTY. LOC. INSP. SCHD.
Containers Hazardous waste disposal 55-gallon steel drum 8 Monthly
Hazardous waste disposal 85-gallon steel drum 2 Monthly
Hazardous waste disposal 5-gallon steel drum 5 Monthly
Hazardous waste disposal 48" dia x 56" Ecopod Monthly
Spill Cleanup 2x4x4 wooden box 10 * Monthly
Spill Cleanup 4x4x4 Wooden box 4 Monthly
Spill Cleanup 10 miV5O"x56" plastic bags 20 Monthly
Spill Cleanup 6 mill38"x65" plastic bags 20 Monthly
Spill Cleanup 6 miV52"x48"x73"plastic bag 20 Monthly
wl3l4"x 1/16"x92" rubber band to
cover PCB boxes
Absorbents Spill Cleanup Oil absorbent compound 30 bags · .. Monthly
.
Spill Cleanup Spill control pillows 4 bales · .. Monthly
,
Spill Cleanup 3M Sorbent type 100 2 rolls * .. Monthly
,
Spill Cleanup 3M Sorbent type 156 2 rolls · .. Monthly
,
Cleanup Materials Spill Cleanup Penetone Power Cleaner(1 gal can) 4 gal. · .. Monthly
,
Spill Cleanup Penetone Power Cleaner (6 gal can) - gal. · .. Monthly
,
Spill Cleanup Rags 150 Ibs. · .. Monthly
,
Spill Cleanup Street broom 2 · .. Monthly
Spill Cleanup Scrub brush 2 · .. Monthly
,
Spill Cleanup Mop 2 · .. Monthly
,
Spill Cleanup Plastic pail 2 · .. Monthly
,
Spill Cleanup Flat-bottomed shovel 2 · .. Monthly
,
Spill Cleanup Flat-bottomed aluminum shovel 2 * **- Monthly
,
Spill Cleanup Waterless hand cleaner 5 tubes · .. Monthly
,
. Coveralls Personal Protection Tyvek vented back 6 pair Monthly
Booties Personal Protection Plastic 6 pair Monthly
Gloves Personal Protection Solvex ór Butyl 6 pair Monthly
Face Shields Personal Protection Universal hard hat/adapter w/face 3 Monthly
shield
Personal Protection Formed 8" visor 3 Monthly
Personal Protection Chemgard Faceshield frame 3 Monthly
Respirators Personal Protection Full Mask as req'd. Monthly
(to be stored and used by Half Mask as req'd. Monthly
trained personnel only)
Filter/Cartridges Personal Protection Type GMCH combination for half and as req'd, Monthly
(to be stored and used by full mask
trained personnel only)
Location Kev
Yard
Tool Storage Building
Substitutions:
95 gallon plastic DOT approved container may replace 85 gallon steel drum or 2x4x4 wooden box box
180 gallon plastic DOT approved container may replace 4x4x4 wooden box
Empty containers and Spill Kits are identified on the Facility Layout Map (Figure 2-1).
.
4-9
TABLE 4-3
FIRST-AID SUPPLlESIINVENTORY
. Item Type or Description Quantity Location(s) Inspection
Schedule
Eye wash: Flushes eyes 1 Fleet Svcs. Bldg. Monthly
1 Haz. Waste Stg Area Monthly
1 AG Water Stg Tanks Monthly
1 Operations Bldg Monthly
Comm. Rm
First Aid Kits First Aid Medical 7 Operations Office Monthly
Treatment 2 T&D Office Monthly
1 Fleet Svcs Bldg Monthly
2 G&E Service Offices Monthly
2 Warehouse Monthly
Emergency Wash skin/remove 1 Fleet Svcs Bldg Monthly
Shower hazardous substances
from body
CONTENTS OF PG&E STANDARD 24 UNIT FIRST AID KIT:
. Quantity Description Code
24 Unit
2 Burn Ointment, 0.11 oz. tube 62-2732
2 Triangular Bandage, 1 per pkg. 62-2706
1 Adhesive Tape, 1/2" x 2-1/2 yds. 62-2734
1 Absorbent gauze Compress, 24" x 72" 62-2709
1 Offset Bandage Compress, 2", 4 per pkg. 62-2711
1 Offset Bandage Compress, 3", 2 per pkg. 62-2712
1 Offset Bandage Compress, 4", 1 per pkg. 62-2713
2 P.V.P. Iodine Swabs, 10 per pkg. 62-2743
3 Plastic Adhesive Bandage 1 "x3" plastic 16 62-2707
per pkg.
2 Neutralizer Insect/Sting Swabs 62-2745
1 Eye Dressing w/sterile pads 03-1584
1 Gloves, Disposable 1 pr/pkg. 02-6390
1 Microshield, rescue breather 03-1585
1 Tweezers 03-1586
.
4-10
.
.
.
4C. SECURITY
The facility is surrounded by a 6-foot-high, chain-link fence topped with barbed wire. The
yard perimeter and interior are fully illuminated at dusk by automatic lights. There are
twelve gates located around the yard's perimeter. Gate 1 is normally closed (all hours),
Gates 2,3,4 and 12 are open 7 a.m. - 5 p.m., Monday - Friday (locked during off hours),
Gates 5 and 6 are walk in gates with security access 24 hours. Gates 7, 8, 9 and 13 are
normally open during working hours. Gates 8 and 9 are locked after 5 p.m. Card access
opens gate #7 during off hours. The CNG station has unrestricted access 24 hours. All
gates are locked after 5:30 p.m. and on weekends and holidays. All buildings are locked
after-hours.
The Training Building has a security alarm which is audible at the site.
The fence perimeter is checked for unauthorized entry by the Support Services Director
each morning. Inspections include checking the integrity of the fence and gates (bent or
cut wires, holes under fence, etc.)
In cases of weekend or after-hours, employees entering or leaving the facility buildings
re-Iock all gates and doors. All employees are instructed to watch for strangers at the
facility and question them regarding any unusual activity.
4-11
.
.
.
4D. TRAINING
PG&E has complimentary training programs that address the proper handling of hazardous
materials and wastes at Company facilities. The training programs meet the employee
training requirements of both federal and state regulations as they apply to hazardous
waste contingency plans and emergency response plans.
1. HAZARDOUS MATERIALS USE AND HANDLING:
In accordance with California regulations (19 CCR "Business Plan and Inventory") and
California Health and Safety Code, PG&E's Safety, Health and Claims Department
oversees training on hazardous materials in use at Company facilities.
Employees in each department or facility receive "Right to Know" or "Hazard
Communication Training" on specific substances or classes of toxic or hazardous
chemicals they use. Training includes topics such as safe methods for storage and
handling of hazardous materials, proper fitting and use of personal protective
equipment, and knowledge of the specific hazards of the chemicals to which
employees are exposed. "Right to Know" instruction is given by the supervisor or
other qualified person. The supervisor documents the training by maintaining a
signed training roster.
2.
HAZARDOUS WASTE MANAGEMENT:
PG&E's hazardous waste management training provides consistent Company-wide
guidance on proper handling of hazardous materials and wastes. Each facility
determines which employees need this training in relation to their job duties.
The level of training that employees receive is commensurate with their work
activities. In general, employees fall into one or two categories. Category 1 consists
of employees who only handle hazardous waste. These employees receive annual
awareness level training on hazardous materials and waste management. Category 2
consists of employees with specific hazardous waste management responsibilities.
These employees receive annual hazardous waste training for Coordinators and
Supervisors. Additionally, these employees are trained within six months of starting a
job assignment that involves hazardous waste management duties.
All employees involved in hazardous waste management participate in annual review
sessions pertinent to their responsibilities.
Employees receive appropriate on-the-job training which includes procedures for spill
prevention and spill cleanup and the handling of hazardous materials and hazardous
wastes. Spill prevention procedures and cleanup procedures are documented in
PG&E CES Standard C- T&CS-S0320, PCB/Oil Spill Response for Electric Distribution
Line Equipment or various Substation Bulletins.
3.
FACILITY ENVIRONMENTAL EMERGENCY RESPONSE:
PG&E's emergency response training is covered in two parts. Part One is given to all
employees within six months of hiring and covers the following topics:
4-12
· Recognizing an emergency situation
· Emergency alarms and signals
. · Notification of emergency responders
· Proper evacuation procedures
· Emergency response plan
· Spill mitigation measures
These topics are included in the Hazardous Materials and Waste Management
General Awareness training.
Facility Emergency Response Coordinators, Emergency response team members and
designated hazardous materials handlers receive further training in Part Two, which
covers these areas:
· Facility's emergency response contingency plan content and location;
· The location, use and hazardous properties of the various materials handled at
the facility;
· Facility operations and activities, and the facility layout;
.
· The location, use and maintenance of all fire and spill control containment
equipment;
· Notification procedures for on-site and off-site emergencies; and
· Proper personal protective equipment which should be worn, depending upon the
type of the spill release;
These topics are included in Hazardous Waste Training for Coordinators and
Supervisors. Refresher training for all employees is given annually.
4. DOCUMENTATION:
Documentation of all training is maintained at the facility and by the Supervisor in
charge of the Section. Documentation includes the type and length of introductory
and continuing training, attendance lists and names of instructors. All records are
maintained at the facility for the life of the facility or three years after an employee
leaves the company or site.
.
4-13
Training records for employees document each of the following:
.
a. The job title for each position at the facility related to hazardous waste
management and the name of the employee filling each job. The date of training.
b. A written job description for each position related to hazardous waste
management.
c. A written description copy, or the location of the type and amount of both
introductory and continuing training given.
If the employee receives specific training related to hazardous materials
transportation, then these additional items are documented.
d. The name and address of the person providing the training.
e. Certification that the employee has been trained and tested.
.
.
4-14
.
.
.
4E. ARRANGEMENTS FOR OUTSIDE ASSISTANCE
1.
NEED FOR OUTSIDE ASSISTANCE:
Based on PG&E's review of the types and quantities of materials and wastes handled,
it has been determined that the services listed below may be called upon in an
emergency.
2.
ENVIRONMENTAL EMERGENCY PLAN RETENTION AND DISTRIBUTION:
Copies of the facility's Environmental Emergency Plan and all revisions, have been
submitted to local police and fire departments, hospitals, and/or state and local
emergency response teams as appropriate (listed below) and required by law. These
agencies are on the distribution list to receive each amended version of the Plan.
Each facility's operating unit also has a current version of the Plan at the facility which
is in a location easily accessible to all employees.
Agency
Arrangements for Assistance
a. Fire Department
Customary Fire and HAZMAT Response; Spill
Containment; Lockouts/Lockins
Name:
Address:
City:
Telephone: Emergency:
Telephone: Business
Bakersfield Fire Department
2101 "H" Street
Bakersfield, CA
911 or (805) 324-4542
(805) 861-2521
b. Police/Sheriff
Security, customary Police Protection:
Investigation; Crowd and Traffic Control and
Barricading
Name:
Address:
City:
Telephone: Emergency
Telephone: Business
Bakersfield Police Department
1601 Truxtun Avenue
Bakersfield, CA
911 or (805) 326-3811
(805) 327-7111
c. Hospital
Customary Public Health Care;
Decontamination;
Name:
Address:
City:
Telephone: Emergency
Telephone: Business
Mercy Hospital
2215 Truxtun Avenue
Bakersfield, CA
911
(805) 632-5275
3. EMERGENCY ASSISTANCE AGREEMENTS
Copies of Emergency Assistance Agreements with these local entities are included in
Section 9 of this plan.
4-15
·
·
·
A copy of this Plan has also been provided to the following Administering Agency:
City of Bakersfield
Hazardous Materials Division
1715 Chester, Suite 300
Bakersfield, CA 93301
(805) 326-3979
Attn: Ralph Huey
4.
CLEANUP/DISPOSAL RESOURCES
The following firms can be utilized and may be called, if needed, to assist with cleanup,
disposal operations and chemical analyses.
a. List of spill cleanup, response, and transportation firms.
¡¡¡l.al:W.C¡:Iß..N:m:R~:¡:¡AIIIINsew.a::¡ilBNSRIBrlt~löÑ¡nÞ¡ili~)¡ ¡illAlNSIMIIJI¡ttWllNl
Name AI/waste Transportation & Remediation, Inc. Hazardous Waste and PCBs -
Address 12475 Llagas Avenue Cleanup and Transportation
City San Martin, CA 95046
Telephone (800) 321-1030
Contract # ZS-3318-003
Name Chemical Waste Management, Inc. Hazardous waste and PCBs
Address 35251 Old Skyline Road cleanup
City Kettleman City, CA 93239
Telephone (209) 386-9711
Contract # ZS-2064-190
ZS-1233-018
Name Resource Renewal Technology Transportation of hazardous
Address P.O. Box 4001 waste/material and clean up
City Bakersfield, CA 93384-0441
Telephone (805) 832-4842
Contract # Z26C-094-95
Name Kern Environmental Emeraencv Oil Spil/
Address P.O. Box 5337 Response, Cleanup,
City Bakersfield, CA 93388 transportation of hazardous
Telephone (805) 589-5220 material/waste
Contract # ZS-3318-043, Z26C-093-95
December 1995
4-16
b. List of laboratories for chemical analysis.
. Name APPL PCB, TPH, BTEX, and general
Address 4203 West Swift lab analyses
City Fresno, CA 93722
Telephone (209) 275-2175
Contract # ZS-3439-074
Name BC Labs PCB, TPH, BTEX, and general
Address 4100 Atlas Court lab analyses
City Bakersfield, CA 93308
Telephone (805) 327-4911
Contract # ZS-3439-084
Name CL Tech PCB, TPH, BTEX, and general
Address 280 North Smith Ave. lab analyses
City Corona, CA 91720
Telephone (909) 734-9600
Contract # ZS-3439-094
Name Lockheed TPH, BTEX, and general lab
Address 975 Kelley Johnson Dr. analyses
City Las Vegas, NV 89119-3705
Telephone (408) 456-0980 or (702) 361-7590
Contract # ZS-3439-184
Name Twining Labs PCB, TPH, BTEX, and general
Address 2527 Fresno St. lab analyses
City Fresno, CA 93721
Telephone (209) 268-7021
Contract # ZS-3439-254
Name PG&E Technical & Ecological Services PCB, Hazardous Waste
. Address 3400 Crow Canyon Road Analyses
City San Ramon, CA 94583
Telephone 251-5203 (Company)
(510) 866-5203 (Pac Bell)
24-Hour: (510) 866-5203
Contract # NotA licable
December 1995
.
4-17
.
.
'.
5. EMERGENCY RESPONSE PROCEDURES
Quick Reference Chart
· In all emergency situations, remain calm.
· If event is a fire, immediately sound alarm and call local fire department.
· If there is a release of a hazardous substance that threatens, or could potentially
threaten human health, property or the environment, certain timely notifications
will need to be made. At a minimum, contact the California Office of Emergency
Services (800-852-7550) and the administering agency as noted on the
Environmental Emergency Telephone List on page i. See Appendix F of the
Hazardous Waste Manual for more details or contact the appropriate
Environmental ConsultanU Coordinator/Specialist.
Section Event
Page
5A
5B
5C
50
5E
5F
5G
5H
51
5J
5K
5L
5M
5N
50
5P
On-Site Fire - Hazardous Substances Not Involved
On-Site Fire - Involving Hazardous Substances
On-Site Spill (Not Oil) - Inside Building
Spill, Non-Transportation Related - No Water Contact
Spill, Non-Transportation Related -Involving Water Contact
Spill, Transportation Related - Involving Company Vehicle
Spill, Transportation Related - Involving Non-Company Vehicle
Spill, Oil and/or PCB's
Bomb Threat
Flash Flood/Flood/Extremely High Tide
Earthquake
Responding to News Media Inquiries
Natural Gas Releases
Toxic Clouds
Respiratory Hazards
Underground Tank Leak
5-4
5-5
5-8
5-11
5-15
5-20
5-24
5-26
5-38
5-40
5-41
5-43
5-44
5-47
5-48
5-51
Emergency situations may include a spill, leak, fire, explosion, equipment failure, vehicle
accident, a chemical reaction, natural disaster and employee exposure, accident, injury or
other incident.
5-1
The emergency procedures presented in this section give, in order, the basic steps to be
followed for the "average" emergency situation. For some "average" emergency situations
and more severe emergencies, arrangements for acquiring outside, additional assistance
will be made by the Facility Emergency Coordinator. (See Section 4E of this plan.)
.
Here is a brief summary of the basic response actions that should be taken in an
emergency situation:
, I
1. In the event of a fire, immediately sound fire alarm and call the local Fire
Department (or 911).
2. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
3. STOP, IDENTIFY AND EVALUATE HAZARDS:
.
a.
Observe from a safe distance;
Try to identify hazardous substance(s) released or spilled. Refer to Material
Safety Data Sheets (MSDSs), if available;
Identify the source and estimated quantity of released or spilled and;
Evaluate the hazards such as:
i) Toxic hazards (i.e., vapors);
ii) Explosive hazards;
iii) Inhalation (asphyxiation) hazards;
iv) Environmental hazards and;
v) Other hazards
b.
c.
d.
If there is any question about the hazards involved, contact your
Environmental ConsultanUCoordinator/Specialist and/or the Safety, Health &
Claims Department for assistance. Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on page
i near the front of this plan.
DO NOT ENTER SCENE OF FIRE UNLESS PROPERLY TRAINED AND FULLY
PROTECTED WITH THE PROPER PERSONAL PROTECTIVE EQUIPMENT.
4. IF IT CAN BE DONE SAFELY, take care of any injured; call paramedics or an
ambulance for help, if necessary.
5. Isolate and restrict access to areas which threaten human health or safety.
6. Call the Facility Emergency Coordinator or Facility Supervisor.
7. IF IT CAN BE DONE SAFELY, take actions to prevent the situation from
worsening.
.
a. Use personal protective clothing and equipment.
5-2
b.
c.
. d.
e.
f.
g.
h.
i.
j.
.
.
Fight only small fires.
Remove sources of ignition.
Close valves, or containers.
Dike, divert, or absorb liquids.
Cover or suppress emissions (using soil, water, foam, plastic, etc.).
Protect storm drains and sewers.
Turn off building ventilation systems.
As appropriate, protect the environment and property.
Mark areas to warn others, restrict access, and prevent accidental
contamination or track-out.
8. As time permits, record notes on the incident (who, what, when, where, why). Use
the Scene-Management Checklist in Section 8 for this purpose.
9. Provide assistance to emergency personnel as appropriate.
10. Notify the appropriate agencies. Contact your Environmental
ConsultanUCoordinatorlSpecialist for assistance in making the proper
notifications.
The emergency procedures presented in this plan cover responses to a fire, spill,
underground tank leak, natural gas releases, toxic clouds, respiratory hazards,
earthquake, flood, and bomb threat. Each procedure contains the required notification and
reporting requirements.
5-3
SA ON-SITE FIRE - HAZARDOUS SUBSTANCES NOT INVOLVED
.
1. Upon discovery of a fire, immediately SOUND FIRE ALARM and CALL the
LOCAL FIRE DEPARTMENT or 911.
2, ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
3. Try to identify the source of the fire. IF HAZARDOUS SUBSTANCES ARE
INVOLVED, STOP HERE and refer to Section 5B for instructions.
4. If hazardous substances are not involved, and the fire is very small, you may try
to extinguish the fire by using available fire extinguishers IF IT CAN BE DONE
SAFEL Y.
5. If the fire cannot be easily extinguished, evacuate all personnel in the area
threatened by the fire or smoke.
6. Take care of any injured. Call ambulance or paramedics if necessary.
7. Isolate the affected area(s) and order all personnel not involved with the incident
to leave the area.
8. Call the Facility Emergency Coordinator or alternate.
. 9. Notify supervisor on call.
10. Take appropriate preventive measures to keep fire from spreading ONLY IF IT
CAN BE DONE SAFELY:
a. Stop processes or operations where necessary.
b. Isolate affected containers or equipment.
c. Remove unaffected, potentially hazardous materials.
11. If facility operations are stopped, monitor for leaks, pressure buildup, gas
generation, or ruptures in valves, pipes, or other equipment.
12. When the fire department arrives, direct firefighters to the scene of the fire.
13. After fire is extinguished, assess damage and complete Scene-Management
Checklist (see Section 8).
14. Isolate damaged area until it is returned to safe working conditions.
15. Replace and restock emergency equipment.
.
5-4
.
.
.
5B ON-SITE FIRE -INVOLVING HAZARDOUS SUBSTANCES
1. Upon discovery of a fire, immediately SOUND FIRE ALARM and CALL the
LOCAL FIRE DEPARTMENT or 911.
2. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
3. Try to identify the source of the fire. If hazardous substances are involved, DO
NOT IMMEDIATELY TRY TO FIGHT THE FIRE.
4. STOP AND EVALUATE HAZARDS.
a. Observe from a safe distance.
b. Try to identify hazardous substance(s) involved in fire. Refer to Material
Safety Data Sheets (MSDSs), if available.
c. Evaluate: Toxic hazards (toxic fumes/vapors);
Explosive hazards;
Inhalation (asphyxiation) hazards;
Environmental hazards and;
Other hazards
If there is any question about the hazards involved, contact your
Environmental ConsultanUCoordinator/Specialist and/or the Safety, Health &
Claims Department for assistance. Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on
page i near the front of this plan.
DO NOT ENTER SCENE OF FIRE UNLESS PROPERLY TRAINED AND FULLY
PROTECTED WITH THE PROPER PERSONAL PROTECTIVE EQUIPMENT.
5.
IF IT CAN BE DONE SAFELY, take care of any injured. Call an ambulance or
paramedics if necessary.
6.
If the fire is very small AND IF SAFE TO DO SO, use good judgment and try to
put out the fire. Following are recommendations:
a. REMEMBER TO ALWAYS FIGHT THE FIRE FROM THE UPWIND SIDE.
b. Based on the material(s) involved, choose the appropriate fire extinguisher
to quench the fire or use a shovel to smother the fire with dirt.
5-5
7. If the fire cannot be put out, evacuate all affected and potentially affected
personnel.
. 8. IF IT CAN BE DONESAFEL V, isolate the affected area(s) and order all
personnel not involved with the incident to leave the area( s). Barricade a wide
area surrounding the fire to protect others from exposure to possible hazardous
vapors. Pay close attention to wind direction at all times.
9. Begin to fill out Scene-Management Checklist (Section 8).
10. Call Facility Emergency Coordinator or Alternate - provide with information
gathered in Scene-Management Checklist.
11. Notify supervisor on call.
12. Take appropriate preventive measures to keep fire from spreading.
IF IT CAN BE DONE SAFEL V:
.
a. Stop processes or operations where necessary.
b. Isolate affected areas or equipment.
c. Remove unaffected, potentially hazardous materials.
13. If facility operations are stopped, monitor for leaks, pressure buildup, gas
generation, or ruptures in valves, pipes, or other equipment.
.
14. When the fire department arrives, direct firefighters to the scene of the fire.
Advise the fire department of any hazardous materials involved, provide MSDS's
and identify to the fire department the appropriate PG&E contact person.
15. If after proper actions are taken to contain it, the fire threatens the health or
safety of people inside or outside the facility, or to property, or the environment,
notify the California Office of Emergency Services (OES) and local emergency
assistance organizations and provide the following information:
a. Date, time, and exact location of the fire.
b. Name and telephone number of person reporting the emergency.
c. The type of hazardous materials involved, if known, and any potential for
release or threatened release.
d. The estimated quantity of released material and/or quantity of material
involved in a threatened release.
e. A description of the potential hazards, if known, presented by the hazardous
material involved in the release or threatened release.
Document the time and date notification is made and the information provided.
Utilize the Scene Management Checklist in Section 8.
5-6
.
16. Once the fire is put out, isolate damaged area(s) until it is returned to a safe
working condition.
17. If the cleanup is beyond facility resources, contact the local emergency response
agency for assistance and/or utilize an outside contractor to perform the cleanup.
(Refer to the list of emergency cleanup contractors presented in Section 4E of
this plan.)
18. IF ABLE TO DO SO SAFEL V, clean up the spill using the following steps:
a. Contain all free-flowing liquids with proper absorbent compound.
b. Spread an application of absorbent compound over spill area(s). Allow a few
minutes for material absorption and then sweep up with stiff brooms.
c" Spread second application of absorbent compound over spill area(s). Allow
a few minutes for material absorption and then sweep up with stiff brooms.
d. Place all contaminated materials used in the cleanup in an approved
container for disposal.
e. Properly label all containers.
19. Decontaminate all equipment used in the cleanup and replace all emergency
supplies.
20. Complete Scene-Management Checklist (Section 8).
.
.
5-7
5C ON-SITE SPILL (NOT OIL) - INSIDE BUILDING
.
Use this response procedure for non-oil spills.
1. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
2. STOP AND EVALUATE HAZARDS.
.
a.
Observe from a safe distance;
Try to identify hazardous substance(s) released or spilled. Refer to Material
Safety Data Sheets (MSDSs), if available;
Identify the source and estimated quantity of released or spilled and;
Evaluate the hazards such as:
i) Toxic hazards (i.e., vapors);
ii) Explosive hazards;
iii) Inhalation (asphyxiation) hazards;
iv) Environmental hazards and;
v) Other hazards
b.
c.
d.
If there is any question about the hazards involved, contact your
Environmental ConsultanUCoordinator/Specialist and/or the Safety, Health &
Claims Department for assistance. Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on page
i near the front of this plan.
DO NOT ENTER THE AREA OF THE SPILL UNLESS PROPERLY TRAINED
AND FULLY PROTECTED WITH THE PROPER PERSONAL PROTECTIVE
EQUIPMENT.
3. IF IT CAN BE DONE SAFELY, take care of any injured. Call an ambulance or
paramedics if necessary.
4. Isolate spill from human and vehicular contact.
Suggested methods:
a, Cones.
b. Stanchions and tape.
c. Post a sign.
5. Begin to fill out Scene-Management Checklist (Section 8).
6. Call Facility Emergency Coordinator or Alternate - provide with information
gathered in Scene-Management Checklist.
.
7. Notify supervisor on call.
5-8
.
8. If the spill threatens facility personnel and evacuation is the appropriate action,
notify affected and/or all personnel for evacuation.
9. Contain the release IF IT CAN BE DONE SAFELY by using one of the following
containment techniques:
.
a. For relatively small spills, apply absorbent to the surface of the spill and
reapply until there is enough to absorb all the liquid.
b. For larger spills, IF SAFE TO DO SO, roll the drum so the bung is rotated
upward to stop liquid from spilling, construct earthen dikes or ditches around
the spill to prevent the discharge from flowing off-site or into waterways.
c. Prevent discharge into storm drains by sealing off with plastic and/or earthen
dikes.
d. If the discharge has or is likely to reach a waterway, call for the assistance of
a cleanup firm (listed in Section 4E) who can deploy booms, sorbent booms,
or underflow dams.
10. IF ABLE TO DO SO SAFELY, clean up the spill using the following steps:
a. Contain all free-flowing liquids with proper absorbent compound.
b. Spread an application of absorbent compound over spill area(s). Allow a few
minutes for material absorption and then sweep up with stiff brooms.
c. Spread second application of absorbent compound over spill area(s). Allow
a few minutes for material absorption and then sweep up with stiff brooms.
d. Place all contaminated materials used in the cleanup in an approved
container for disposal.
e. Properly label all containers.
11. Decontaminate all equipment used in the cleanup and replace all emergency
supplies.
12. If the release or spill is unmanageable, contact the local emergency response
agency for assistance and/or utilize an outside contractor to perform the cleanup.
(Refer to the list of emergency cleanup contractors presented in Section 4E of
this plan.)
13. If after proper actions are taken to contain and cleanup the spill, the release
continues to pose either a present or potential threat to the health and safety of
people inside or outside the facility property, or to property or the environment,
notify the California Office of Emergency Services (OES) and local emergency
assistance organizations and provide the following information:
.
a. Date, time, and exact location of the release or threatened release.
b. Name and telephone number of person reporting the release.
c. The type of hazardous materials involved, if known, and any potential for
release or threatened release.
5-9
.
d. The estimated quantity of released material and/or quantity of material
involved in a threatened release.
e. A description of the potential hazards, if known, presented by the hazardous
material involved in the release or threatened release.
Document the time and date notification is made and the information provided.
14. Complete Scene-Management Checklist (Section 8).
15. A written report to the appropriate office of the California Department of Toxic
Substances Control is required within 15 days after the release of a hazardous
material which posed a hazard or potential hazard to human health and safety,
property, or to the environment.
Contact your Environmental ConsultanUCoordinator/Specialist for assistance in
preparing this report.
a.
b.
c.
d.
. e.
f.
g.
.
The report should include the following information:
Name, address, and telephone number of facility manager.
Name, address, and telephone number of facility.
Date, time, and type of incident (e.g., fire, explosion, spill, etc.).
Name and quantity of waste(s) involved.
The extent of injuries, if any.
An assessment of actual or potential hazards to human health or the
environment, where applicable.
Estimated quantity and disposition of recovered wastes and cleanup
material.
5-10
5D SPill, NON-TRANSPORTATION RELATED - NO WATER CONTACT
.
Use this response procedure for non-oil spills.
1. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
2. STOP AND EVALUATE HAZARDS
a. Observe from a safe distance;
b. Try to identify hazardous substance(s) released or spilled. Refer to Material
Safety Data Sheets (MSDSs), if available;
c. Identify the source and estimated quantity of released or spilled and;
d. Evaluate the hazards such as:
i) Toxic hazards (i.e., vapors);
ii) Explosive hazards;
iii) Inhalation (asphyxiation) hazards;
iv) Environmental hazards and;
v) Other hazards
.
If there is any question about the hazards involved, contact your
Environmental ConsultanUCoordinator/Specialist and/or the Safety, Health &
Claims Department for assistance. Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on page
i near the front of this plan.
DO NOT ENTER AREA OF SPILL UNLESS PROPERLY TRAINED AND FULLY
PROTECTED WITH THE PROPER PERSONAL PROTECTIVE EQUIPMENT.
3. IF IT CAN BE DONE SAFELY, take care of any injured. Call an ambulance or
paramedics if necessary.
4. Isolate the spill from human and vehicular contact. Suggested methods:
.
a. Cones
b. Stanchions and tape
c. Post a sign ,
5. Begin to fill out Scene-Management Checklist (Section 8).
6. Notify the Facility Emergency Coordinator - provide with information gathered in
Scene-Management Checklist.
7. Notify supervisor on call.
5-11
8. If the spill poses either a present or potential threat to the health and safety of
people inside or outside the facility property, start evacuation procedures.
.
9. Contain the release IF IT CAN BE DONE SAFEL V by using one of the following
containment techniques:
a. For relatively small spills, apply absorbent to the surface of the spill and
reapply until there is enough to absorb all the liquid.
b. For larger spills, IF SAFE TO DO SO, roll the drum so the bung is rotated
upward to stop liquid from spilling, construct earthen dikes or ditches around
the spill to prevent the discharge from flowing off-site or into waterways.
c. Prevent discharge into storm drains by sealing off with plastic and/or earthen
dikes.
d. If the discharge has or is likely to reach a waterway, call for the assistance of
a cleanup firm (listed in Section 4E) who can deploy booms, sorbent booms,
or underflow dams.
10. IF ABLE TO DO SO SAFEL V, clean up the spill using the following steps and the
proper personal protective equipment:
a. Contain all free-flowing liquids with proper absorbent compound.
b. Spread an application of absorbent compound over spill area(s). Allow a few
minutes for material absorption and then sweep up with stiff brooms.
c. Spread second application of absorbent compound over spill area(s). Allow
a few minutes for material absorption and then sweep up with stiff brooms.
d. Place all materials used in spill cleanup in approved containers for disposal.
e. Properly label all containers for disposal.
11. Decontaminate all equipment used in the cleanup and replace all supplies used.
12. If the release or spill is unmanageable, contact the local emergency response
agency for assistance and/or utilize an outside contractor to perform the cleanup.
(Refer to the list of emergency cleanup contractors presented in Section 4E of
this plan.)
.
.
13. If after proper actions are taken to contain and clean up the spill, the release
continues to pose either a present or potential hazard to the health and safety of
people inside or outside the facility, or to property or the environment, notify your
Environmental ConsultanUCoordinator/Specialist, who will assist in notifying the
California Office of Emergency Services (OES) and the local emergency
assistance organizations, and provide the following information:
a. Date, time, and exact location of the release or threatened release.
b. Name and telephone number of person reporting the spill.
c. The type of hazardous materials involved, if known, in the release or
threatened release.
5-12
.
d. The estimated quantity of released material and/or quantity of material
involved in a threatened release; and
e. A description of the potential hazards, if known, presented by the hazardous
material involved in the release or threatened release.
Document the time and date notification is made and the information provided.
14. Check if material spilled has a Reportable Quantity (RQ) requirement. (Refer to
Appendix F of the PG&E Hazardous Waste Manual for a comprehensive list of
materials which have RQ requirements.)
15. If material spilled has a Reportable Quantity requirement, determine if this
quantity was exceeded. If so:
.
a. During normal working hours, notify the appropriate Environmental
Consultant/Coordinator/Specialist, who will contact the Environmental
Services Department.
b. If your Environmental Consultant/Coordinator/Specialist cannot be reached,
utilize the Environmental Services Department's 24 hour paging system at
(800) 874-4043. A call to this number will page the appropriate
environmental support person. After selecting the appropriate Business
Unit, please provide the public telephone number (including area code)
where you can be contacted during the hour following your call.
c. If the spill occurs after normal working hours or on a weekend or holiday,
contact the National Response Center (NRC) directly and provide the
following information:
i) Date, time, and location of spill.
ii) Name and telephone number of person reporting the spill.
iii) The type and estimated quantity of the spill.
iv) Response actions taken to contain the spill.
Document date and time of NRC notification and the information provided.
The National Response Center will relay spill information to appropriate
state and federal agencies who will determine whether agency involvement
is required. In most cases, no agency response will be required provided the
company has taken immediate action to contain and clean up the spill.
d. If you contact the National Response Center directly, notify your appropriate
Environmental Consultant/Coordinator/Specialist or the Environmental
Services Department as soon thereafter as possible.
.
5-13
.
16. Complete Scene-Management Checklist (see Section 8).
17. A written report to the appropriate office of the Cal ifornia Department of Toxic
Substances Control is required within 15 days after the release of hazardous
material which posed a hazard or potential hazard to human health and safety,
property, or to the environment.
Contact your appropriate Environmental ConsultanVCoordinatorlSpecialist for
help in preparing this report.
The report should include the following information:
a. Name, address, and telephone number of facility manager
b. Name, address, and telephone number of facility
c. Date, time, and type of incident (e.g., fire, explosion, spill, etc.)
d. Name and quantity of waste(s) involved
e. The extent of injuries, if any
f. An assessment of actual or potential hazards to human health or the
environment, where applicable.
g. Estimated quantity and disposition of recovered wastes and cleanup
material.
.
.
5-14
5E SPILL, NON-TRANSPORTATION RELATED -INVOLVING WATER CONTACT
.
Use this response procedure for non-oil spills.
If a spill occurs at the facility which may impact a nearby water body (creek, river,
pond, marsh, etc.), follow these procedures:
1. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
2. STOP AND EVALUATE HAZARDS.
.
a.
Observe from a safe distance;
Try to identify hazardous substance(s) released or spilled. Refer to Material
Safety Data Sheets (MSDSs), if available;
Identify the source and estimated quantity of released or spilled and;
Evaluate the hazards such as:
i) Toxic hazards (i.e., vapors);
ii) Explosive hazards;
iii) Inhalation (asphyxiation) hazards;
iv) Environmental hazards and;
v) Other hazards
b.
c.
d.
If there is any question about the hazards involved, contact your
Environmental ConsultanUCoordinator/Specialist and/or the Safety, Health &
Claims Department for assistance. Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on page
i near the front of this plan.
DO NOT ENTER AREA OF SPILL UNLESS PROPERLY TRAINED AND FULLY
PROTECTED WITH THE PROPER PERSONAL PROTECTIVE EQUIPMENT.
3. IF IT CAN BE DONE SAFEL V, take care of any injured, Call an ambulance or
paramedics if necessary.
4. Isolate spill from human and vehicular contact. Suggested methods:
a. Cones
b. Stanchions and tape
c. Post a sign
.
5-15
5.
. 6.
7.
8.
Begin to fill out Scene-Management Checklist (Section 8).
Notify the Facility Emergency Coordinator or alternate - provide with information
gathered in the Scene Management Checklist.
Notify supervisor on call.
If the spill poses either a present or potential threat to the health and safety of
people inside or outside the facility property, start evacuation procedures.
9. Try to prevent the situation from worsening by stopping the release and/or
diverting the release away from the water body. DO SO ONLY IF IT CAN BE
DONE SAFELY using the proper personal protective equipment.
Stop the release.
a. Shut valves, stop processes or operations where necessary
b. Divert spill runoff into containers
Prevent release from entering water body.
a. Booms
.
b. Spill pads
c. Absorbent
d. Divert flow
e. Trench
10. Contain the release IF IT CAN BE DONE SAFELY by using one of the following
containment techniques.
a. For relatively small spills, apply absorbent to the surface of the spill and
reapply until there is enough to absorb all the liquid.
b. For larger spills, build earthen dikes or ditches around the spill to prevent
the discharge from flowing off-site or into waterways.
c. Prevent discharge into storm drains by sealing off with plastic and/or earthen
dikes.
d. IF THE DISCHARGE HAS OR IS LIKELY TO REACH A WATERWAY, OR
IS UNMANAGEABLE, go to paragraph 13 (and skip paragraphs 11 and 12).
11. IF ABLE TO DO SO SAFELY, clean up the spill using the following steps:
.
a. Contain all free-flowing liquids with proper absorbent compound.
b. Spread an application of absorbent compound over spill area(s). Allow a few
minutes for material absorption and then sweep up with stiff brooms.
c. Spread second application of absorbent compound over spill area(s). Allow
a few minutes for material absorption and then sweep up with stiff brooms.
5-16
.
d. Place all contaminated materials used in the cleanup in an approved
container for disposal.
e. Properly label all containers.
12. Decontaminate all equipment used in the cleanup and replace all emergency
supplies.
13. If the release or spill is unmanageable, contact the local emergency response
agency for assistance and/or utilize an outside contractor to perform the cleanup.
(Refer to the list of emergency cleanup contractors presented in Section 4E of
this plan.)
14 If the spill has entered or threatens a water body, the Environmental
Consultant/Coordinator/Specialist will assist the Facility Environmental
Coordinator in notifying the nearest Regional Water Quality Control Board office
within 24 hours of becoming aware of the circumstances.
15. If the spilled hazardous material has entered or threatens a body of water, and
the material spilled has a Reportable Quantity (RQ) requirement, determine if this
quantity was exceeded. (Refer to Appendix F of the PG&E Hazardous Waste
Manual for a comprehensive list of materials which have RQ requirements.
.
a. During normal working hours, notify the appropriate Environmental
Consultant/Coordinator/Specialist for your area, who will contact the
Environmental Services Department.
b. If your Environmental Consultant/Coordinator/Specialist cannot be reached,
utilize the Environmental Services Department's 24 hour paging system at
(800) 874-4043. A call to this number will page the appropriate
environmental support person. After selecting the appropriate Business
Unit, please provide the public telephone number (including area code)
where you can be contacted during the hour following your call.
c. If the spill occurs after normal working hours or on a weekend or holiday,
contact the National Response Center (NRC) directly and provide the
following information:
i) Date, time, and location of spill.
ii) Name and telephone number of person reporting the spill.
iii) The type and estimated quantity of spill.
iv) Response actions taken to contain the spill.
Document date and time of NRC notification and the information provided.
.
The National Response Center will relay spill information to appropriate
state and federal agencies who will determine whether agency involvement
is required. In most cases, no agency response will be required provided
the company has taken immediate action to contain and clean up the spill.
5-17
.
d. If you contact the National Response Center directly, notify your
Environmental ConsultanVCoordinator/Specialist or the Environmental
Services Department as soon thereafter as possible.
16. If after proper actions are taken to contain and cleanup the spill, it continues to
pose either a present or potential threat to the health and safety of people inside
or outside the facility property, or to property or the environment, the
Environmental ConsultanVCoordinator/Specialist will assist the Facility
Environmental Coordinator in notifying the California Office of Emergency
Services (OES) and the local emergency assistance organizations, and provide
the following information:
a. Date, time, and exact location of the release or threatened release.
b. Name and telephone number of person reporting the spill.
c. The type of hazardous materials involved, if known, in the release or
threatened release.
d. The estimated quantity of released material and/or quantity of material
involved in a threatened release.
e. A description of the potential hazards, if known, presented by the hazardous
material involved in the release or threatened release.
Document the time and date notification is made and information provided.
17. For procedures on how to handle media inquiries, refer to Section 5L,
. Responding to News Media Inquiries.
18. Complete Scene-Management Checklist (Section 8).
20.
19. If the release of hazardous material has entered or threatens a water body, the
Environmental Services Department will assist the Facility Environmental
Coordinator submit to the Regional Water Quality Control Board a written report
containing the following information:
a. A description of the release and its cause(s).
b. The period of release, including exact dates and times.
c. If the release has not been corrected, the anticipated time it is expected to
continue.
d. Steps taken to reduce, eliminate, and prevent recurrence of the release.
A written report to the appropriate office of the California Department of Toxic
Substances Control is required within 15 days after the release of a hazardous
material which posed a hazard or potential hazard to human health and safety,
property, or to the environment.
.
Contact the appropriate Environmental ConsultanVCoordinator/Specialist for your
area for assistance in preparing this report.
The report should include the following information:
5-18
a.
. b.
c.
d.
e.
f.
g.
.
.
Name, address, and telephone number of facility manager
Name, address, and telephone number of facility
Date, time, and type of incident (e.g., fire, explosion, spill, etc.)
Name and quantity of waste(s) involved
The extent of injuries, if any
An assessment of actual or potential hazards to human health or the
environment, where applicable.
Estimated quantity and disposition of recovered wastes and cleanup
material.
5-19
SF SPill, TRANSPORTATION RELATED -INVOLVING COMPANY VEHICLE
·
NOTE: A transportation incident includes any spill happening during the transport and
the loading or unloading of a hazardous substance onto or from a vehicle.
1. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANV ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
2. STOP AND EVALUATE HAZARDS.
a. Observe from a safe distance;
b. Try to identify hazardous substance(s) released or spilled. Refer to Material
Safety Data Sheets (MSDSs), if available;
c. Identify the source and estimated quantity of released or spilled and;
d. Evaluate the hazards such as:
i) Toxic hazards (Le" vapors);
ii) Explosive hazards;
iii) Inhalation (asphyxiation) hazards;
iv) Environmental hazards and;
v) Other hazards
·
If there is any question about the hazards involved, contact your
Environmental Consultant/Coordinator/Specialist and/or the Safety, Health &
Claims Department for assistance, Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on page
i near the front of this plan.
DO NOT ENTER AREA OF SPILL UNLESS PROPERL V TRAINED AND FULL V
PROTECTED WITH THE PROPER PERSONAL PROTECTIVE EQUIPMENT.
3. If the spilled material is oil and the facility has a Spill Prevention Control and
Countermeasure (SPCC) Plan, refer to it for response instructions and
notification procedures. The SPCC Plan is located at the Facility.
4. IF IT CAN BE DONE SAFEL V, Take care of any injured. Call an ambulance or
paramedics if necessary.
5. If the spill poses either a present or potential threat to the health and safety of
people inside or outside the facility property, start evacuation procedures.
6. Isolate the spill from human or vehicular contact. Suggested methods:
a. Cones
b. Stanchions or tape
· c. Post a sign
5-20
7. Begin to fill out Scene-Management Checklist (Section 8).
8. Call your Facility Emergency Coordinator - provide with information gathered in
· Scene-Management Checklist.
9. Notify the supervisor on call.
10. IF IT CAN BE DONE SAFEL V, isolate the source of the spill and take actions to
prevent further release.
a. Shut valves.
b. Prevent release from entering water body.
·
11. Contain the release IF IT CAN BE DONE SAFEL V by using one of the following
containment techniques:
a. For relatively small spills, apply absorbent to the surface of the hazardous
substance and apply enough to absorb all the liquid.
b. For larger spills, construct earthen dikes or ditches around the spill to
prevent the discharge from flowing off-site or into waterways.
c. Prevent discharge into storm drains by sealing off with plastic and/or earthen
dikes.
d. If the discharge has or is likely to reach a waterway, call for the assistance of
a cleanup firm which is listed in Section 4E, who can deploy booms, sorbent
booms, or underflow dams.
12. IF ABLE TO DO SO SAFEL V, clean up the spill using the following steps:
a. Contain all free-flowing liquids with proper absorbent compound.
b. Spread an application of absorbent compound over spill area(s). Allow a few
minutes for material absorption and then sweep up with stiff brooms.
c. Spread second application of absorbent compound over spill area(s). Allow
a few minutes for material absorption and then sweep up with stiff brooms.
d. Place all materials used in spill cleanup in approved containers for
disposal..
e. Properly label all containers for disposal.
f. Decontaminate all equipment used in the cleanup and replace all supplies
used.
13. If the release or spill is unmanageable, contact the local emergency response
agency for assistance and/or utilize an outside contractor to perform the cleanup.
(Refer to the list of emergency cleanup contractors presented in Section 4E of
this plan.)
·
5-21
·
14. If the spill occurs on a public road or highway, notify the California Highway
Patrol (CHP), Sacramento, utilizing the 911 telephone number. NOTE THE TIME
NOTIFICATION IS MADE. If the spill occurs on a public road within city limits,
notify the fire department or 911.
15. If the spill has entered or threatens a water body, the Environmental
ConsultanUCoordinator/Specialist will assist the Facility Environmental
Coordinator in notifying the nearest Regional Water Quality Control Board office
within 24 hours of becoming aware of the circumstances.
16.
If after proper actions are taken to contain and cleanup the spill, it continues to
pose either a present or potential threat to the health and safety of people inside
or outside the facility property, or to property or the environment, notify the
California Office of Emergency Services (OES) and local emergency response
organizations and provide the following information:
a. Date, time, and exact location of the release or threatened release.
b. Name and telephone number of person reporting the spill.
c. The type of hazardous materials involved, if known, in the release or
threatened release.
d. The estimated quantity of released material and/or quantity of material
involved in a threatened release.
e. A description of the potential hazards, if known, presented by the hazardous
material involved in the release or threatened release.
Document the time and date notification is made and information provided.
·
17. Check if the material spilled has a Reportable Quantity (RQ) requirement. (Refer
to Appendix F of PG&E's Hazardous Waste Manual for a comprehensive list of
materials which have RQ requirements.)
18. If the material spilled has a Reportable Quantity requirement, determine if this
quantity was exceeded. If so:
a. During normal working hours, notify your Environmental ConsultanU
Coordinator/Specialist, who will contact the Environmental Services
Department.
b. Contact your appropriate Environmental ConsultanUCoordinator/Specialist.
If your Environmental Consultant or Coordinator cannot be reached, utilize
the Environmental Services Department's 24 hour paging system at (800)
874-4043. A call to this number will page the appropriate environmental
support person. After selecting the appropriate Business Unit, please
provide the public telephone number (including area code) where you can
be contacted during the hour following your call.
·
5-22
·
c. If the spill occurs after normal working hours or on a weekend or holiday,
contact the National Response Center (NRC) directly and give the NRC the
following information:
i) Date. time. and location of spill.
ii) Name and telephone number of person reporting the spill.
iii) The type and estimated quantity of spill.
iv) Response actions taken to contain the spill.
Document the date and time notification is made and the information
provided.
The National Response Center will relay spill information to appropriate
state and federal agencies who will determine whether agency involvement
is required.
In most cases. no agency response will be required provided the company
has taken immediate action to contain and clean up the spill.
d. If you contact the National Response Center directly, notify your
Environmental ConsultanUCoordinatorlSpecialist or the Environmental
Services Department as soon thereafter as possible.
19. Complete the Scene-Management Checklist (Section 8).
·
20. A written report to the appropriate office of the California Department of Toxic
Substances Control is required within 15 days after the release of a hazardous
material which posed a hazard or potential hazard to human health and safety,
property, or to the environment.
Contact the appropriate Environmental ConsultanUCoordinatorlSpecialist for your
area for assistance in preparing this report.
·
The report should include the following information:
a. Name, address, and telephone number of facility manager;
b. Name, address, and telephone number of facility;
c. Date, time. and type of incident (e.g., fire, explosion, spill, and other
incidents);
d. Name and quantity of waste(s) involved;
e. The extent of injuries, if any;
f. An assessment of actual or potential hazards to human health or the
environment, where applicable;
g. Estimated quantity and disposition of recovered wastes and cleanup
material.
5-23
·
·
·
5G SPill, TRANSPORTATION RELATED -INVOLVING NON-COMPANY VEHICLE
If the non-Company vehicle is carrying hazardous substances either to or from a
PG&E facility and a spill occurs, a PG&E employee is to monitor the incident and
remain on the scene to provide information on the material(s) involved to emergency
response teams.
1. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
2. STOP, IDENTIFY AND EVALUATE HAZARDS:
a. Observe from a safe distance;
b. Try to identify hazardous substance(s) released or spilled. Refer to Material
Safety Data Sheets (MSDSs), if available;
c. Identify the source and estimated quantity of released or spilled and;
d. Evaluate the hazards such as:
i) Toxic hazards (i.e., vapors);
ii) Explosive hazards;
iii) Inhalation (asphyxiation) hazards;
iv) Environmental hazards and;
v) Other hazards
If there is any question about the hazards involved, contact your
Environmental Consultant/Coordinator/Specialist and/or the Safety, Health &
Claims Department for assistance. Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on page
i near the front of this plan.
DO NOT ENTER AREA OF SPILL UNLESS PROPERLY TRAINED AND FULLY
PROTECTED WITH THE PROPER PERSONAL PROTECTIVE EQUIPMENT.
3.
IF SAFE TO DO SO, take care of any injured. Call an ambulance or paramedics
if necessary.
4.
IF IT CAN BE DONE SAFELY, attempt to isolate the spill from human or other
vehicular traffic. Suggested methods:
a. Cones
b. Stanchions and tape
c. Post a sign
5-24
5. Begin to fill out Scene-Management Checklist (Section 8).
.
6. Call your Facility Emergency Coordinator (or alternate) and provide information
gathered in Scene-Management Checklist.
7. Notify the supervisor on call.
8. If spill occurs on a public road or highway, make sure that the vehicle operator
notifies the California Highway Patrol (CHP), Sacramento utilizing the 911
emergency telephone number. If spill occurs on a public road within city limits,
notify the local Fire Department or 911.
NOTE THE TIME THIS NOTIFICATION IS MADE.
If vehicle operator is injured and is unable to make this notification, the PG&E
employee on the scene places the call to the CHP or local fire department.
9. Notify the vehicle operator's company headquarters (if known) of incident.
10. Stay on the scene until the spill has been controlled and/or cleaned up and
provide information as needed to assist emergency response teams.
11. Complete Scene-Management Checklist (Section 8). Note particularly the
vehicle's company name, driver's name, and cause of incident.
.
.
5-25
5H SPill, Oil ANDIOR PCBS
.
This response procedure is to be followed (1) in the event of an oil spill at this facility, and
(2) if a facility does not have a Spill Control and Countermeasure (SPCC) Plan on file. Oil
spills include spills involving PCB's, aasoline, diesel and fuel oil, hydraulic, lubricatina and
insulatina oils, condensate, pipeline liquids, turbine oil, solvents and other similar
petroleum products. In the case of a spill involving oil that could or does contain PCB's,
consult the appropriate Substation Bulletin and the CES Standard C- T&CS-S0320 for
further detail on how to handle this type of scenario.
.
1. First Employee at the Scene
a. The responsibilities of an employee arriving at the scene of an oil spill, or
associated emergency are as follows:
i) Observe from a safe distance.
ii) Identify hazards.
iii) Restrict access to the spill area.
iv) Call for assistance. Provide the Emergency Coordinator or Supervisor
with the following information:
a) Your name and telephone number.
b) Any injuries.
c) Location and type of spill.
d) Source and cause of spill, if known.
e) Fire or explosion risk.
f) Actions taken to stop/contain the release.
g) Notify fire department if needed.
v) If safe to enter the area, take care of any injured. Call an ambulance or
paramedic if necessary.
vi) If safe to do so, stop the source of the discharge. Note: If material is
unknown, can cause immediate hazards to life or health, is producing
fumes, vapors, etc. never enter the area without the proper personal
protective equipment and support persons.
This may involve:
shutting off equipment or pumps;
plugging a hole in operating equipment or a tank;
closing a valve; and/or
righting an overturned container or piece of operating equipment.
.
Simultaneously pursue containment of the discharge with the following
containment techniques:
5-26
·
·
·
For relatively small spills, apply absorbent to the surface of the spill
enough to absorb all the liquid.
For larger spills, construct earthen dikes or ditches around the spill
to prevent the discharge from flowing off-site or into waterways.
Prevent discharge into storm drains by sealing off with plastic
and/or earthen dikes.
2.
vii) Remain at the scene to prevent other people or vehicles from entering
the emergency area until relieved by the Emergency Coordinator.
Initial Emergency Coordinator Action
3.
a. The Emergency Coordinator must gather as much information as possible to
assess the magnitude and severity of the spill in order to initiate appropriate
actions. This may involve telephone calls to operations or maintenance
personnel who may have seen the spill or to office personnel who can assist
in collection of resources such as Material Safety Data Sheets, Facility
Environmental Emergency or Spill Prevention Plans, or Emergency
Response Guidebook.
b. The Emergency Coordinator then goes to the scene of the spill to initiate an
appropriate response plan.
Response Plan Developed and Implemented
a. Identify if any injuries have occurred and that proper actions have been
taken.
b. Assess the possible hazard to human health, property, or the environment.
i) Isolate spill from human or vehicular contact (use cones, stanchions,
and tape; post signs). Order all personnel not involved with the cleanup
operation to leave the area.
ii) If the emergency threatens human health and evacuation is the
appropriate action, activate alarms or communications systems to notify
effected and/or all personnel.
iii) If the emergency threatens human health outside the facility boundaries
and local areas must be evacuated, notify the state Office of Emergency
Services (OES) and the local emergency assistance organizations
(listed on page i).
An immediate verbal report of any release or threatened release which
poses a present or potential danger to human health and safety, property or
the environment must be reported to the Administering Agency and the
California Office of Emergency Services; See page i, for telephone numbers.
The verbal notification should include the following information:
Name and telephone number of person reporting release
Name and address of the facility
Time and type of incident
Location of the release
5-27
·
Hazardous material and estimate of the quantity
Extent of injuries
Potential hazards (if known)
Document this notification in Section 8.
iv) Arrange to have an emergency response contractor or Safety Health
and Claims representative conduct air monitoring (if required) to
determine Permissible Exposure Level (PEL) and Threshold Limit Value
(TL V).
v) Stop processes or operations where necessary. Continue to monitor for
leaks, pressure buildup, gas generation or release, ruptures in pipes or
valves.
vi) Isolate affected containers or equipment.
vii) Remove non-affected, potentially hazardous materials.
·
c. Identify what material is involved.
i) If spilled oil is suspected of being contaminated by PCB's, identify the
PCB concentration. If this information is not readily available on the
equipment or from the office records, samples must be taken and sent
immediately for laboratory analysis. All spills of unknown oil from oil-
filled equipment shall be handled as if it is a low concentration PCB spill
(50 to 499 ppm) until test results are available.
ii) PCB notification, cleanup, documentation and transportation
requirements:
For any spill, immediately contact your appropriate Environmental
ConsultanUCoordinatorlSpecialist. If your Environmental Consultant or
Coordinator cannot be reached, utilize the Environmental Services
Department's 24 hour paging system at (800) 874-4043. A call to this
number will page the appropriate environmental support person. After
selecting the appropriate Business Unit, please provide the public
telephone number (including area code) where you can be contacted
during the hour following your call.
In cases where an Environmental Consultant cannot be reached within
24 hours of spill discovery, field personnel or the Division PCB
Coordinator shall notify the following agencies:
National Response Center
800-424-8802
State Office of Emergency Services
800-852-7550
·
EPA Region IX (only notify if spill contains
greater than 49 ppm PCB)
415-744-2000
Local Regional Water Quality Control Board
209-445-5116
5-28
·
Any additional local agencies where the
division has previously agreed to provide
notification
The local Environmental Consultant will also assist in making external
notification for any spills that enter or threaten to enter surface or
groundwater or onto any grazing land or edible crops.
Property owners/residents should be notified of the spill and the
cleanup activities that the company will be doing.
iii) Mineral Oil Spills (PCB less than 5 ppm)
a) Cleanup:
·
1) Cleanup shall be completed as soon as practical, but
should be initiated within 48 hours of notification.
2) Use absorbent material to collect freestanding liquids for
deposit in approved containers.
3) Remove soil and vegetation to clean up all visible traces
of liquid and deposit in approved containers.
4) Double wash/rinse all solid surfaces such as walls,
sidewalks, streets, cars, etc., capturing waste liquid with
absorbents for deposit in approved containers.
5) Manage all cleanup material and debris as state
hazardous waste.
6) Post cleanup sampling is not required. However, local
agencies may request additional sampling.
b) Documentation:
Records and test reports shall be retained at each local
headquarters for a minimum of five years (after five years
records should be archived). It is suggested that this
documentation be retained in a file by site address.
Documentation that should be retained includes copies of
PCB/oil spill or Leak Report (Form 623685), site diagrams,
laboratory test reports, emergency job estimates, accident
report forms, and hazardous waste manifests.
c)
Transportation:
·
Waste mineral oil is considered a hazardous waste in California
and is subject to all hazardous waste transportation
requirements. It is required that shipping papers (Shipping
Notice or Bill of Lading) be used to identify the load when
5-29
·
transporting back to the local service center/headquarters. For
oil shipments greater than 70 gallons a manifest and an
approved hazardous waste hauler is required.
iv) California Regulated PCB Spills (5 ppm or greater but less than 50
ppm):
a) Cleanup:
Cleanup procedure for mineral oil spills (PCB less than 5 ppm)
also applies to California Regulated PCB spills.
b) Documentation:
Documentation procedures and requirements for mineral oil
spills (PCB below 5 ppm) also applies to California Regulated
PCB spills.
c)
Transportation:
·
PCB Shipping Notice is required for all shipments from the
field to the nearest service center. The vehicle must also have
a copy of the current hazardous material transportation license
issued annually by the CHP, a copy of
the Department of Transportation Emergency Response Guide
(Guide 31), and a copy of the annual PCB Transportation
Variance.
v) Federal Low Concentration PCB Spills (50 ppm or greater, but less than
500 ppm and less than one pound of pure PCBs by weight)
a) Cleanup:
·
1) Cleanup shall be completed within 48 hours of when the
Company is first made aware of the spill. Completion of
cleanup may only be delayed beyond 48 hours in case of
civil emergency, adverse weather conditions, lack of
access or emergency operating conditions. The
occurrence of a spill on a weekend or overtime cost are
not acceptable reasons to delay cleanup.
2) Use absorbent material to collect freestanding liquids for
deposit in approved containers.
3) Remove soil and vegetation to clean up all visible traces
of liquid or stains plus a one foot lateral buffer and deposit
in approved containers. Restore property to its original
condition.
5-30
.
b)
.
c)
.
4) Double wash/rinse all solid surfaces such as walls,
sidewalks, streets, cars, etc., capturing waste liquid with
absorbents for deposit in approved containers.
5) When easily replaceable property such as furniture, toys,
clothes, etc. are contaminated, it is recommended that these
items be replaced rather than decontaminated.
6) Manage all cleanup material and debris as federal
hazardous waste.
7) Post cleanup sampling is not required. However, local
agencies may request additional sampling.
8) For known spills where it is difficult to determine the spill
boundaries by visible traces, the Company is required to
use a statistical sampling method to determine the spill
boundaries. Contact your local Environmental Consultant
for advice on how to do the sampling. Examples of where
this situation may occur are spills on wet ground or where
oil is sprayed under high pressure. If statistical sampling
is used to determine the spill boundaries, then it must also
be used for post cleanup testing.
Documentation:
The documentation procedures and requirements for mineral oil
spills (PCB less than 5 ppm) also applies to Federal low
concentration PCB spills. Additionally, the PCB/Oil Spill or
Leak Report (Form 623685) shall be completed and must
include a signature of the responsible supervisor in the Cleanup
Certification block. This form shall be included in the
documentation retained.
Transportation:
1) PCB Shipping Notice is required for all shipments from the
field to the nearest service center. The vehicle must also
have a copy of the current Hazardous Material
Transportation License issued annually by the CHP, a
copy of the Department of Transportation Emergency
Response Guide (Guide 31), and a copy of the annual
PCB Transportation Variance. All approved containers
(holding waste equipment, insulating fluid or spill debris of
unknown concentration) known to contain 50 ppm or
greater PCB shall be marked with an EPA "Caution PCB"
adhesive label (ML label). Non-leaking, in-service
electrical equipment with less than 500 ppm PCB are not
required to be marked with the ML label.
5-31
.
2) Transport vehicles loaded with PCB containers (not
transformers) with 45 kg or 99.4 Ibs. (13-1/2 gallons) or
more of PCB's (50 ppm or greater) in the liquid phase or
one or more PCB transformer(s) (500 ppm or greater)
must display the EPA "Caution PCB" label on the front,
rear, and sides of the vehicle.
vi) Federal High Concentration PCB Spills (over 500 ppm or greater or one
pound or more of pure PCBs by weight)
a) Cleanup:
.
1) Cleanup shall be initiated within 24 hours of when the
Company is first made aware of the spill. It is expected
that every effort will be made to clean up high
concentration spills expeditiously. Initiation of cleanup
may only be delayed beyond 24 hours in case of civil
emergency, adverse weather conditions, lack of access or
emergency operating conditions, If start of cleanup is
delayed beyond 24 hours, records must be kept that
indicate the type and duration of circumstances that
precluded rapid response. The occurrence of a spill on a
weekend or overtime cost are not acceptable reasons to
delay cleanup.
2) For spills in this category, the first company representative
at the spill site must barricade and restrict an area
encompassing all visible traces plus at least a 3 foot
lateral buffer and place a clear visible sign advising
persons to avoid the area.
3) Use absorbent material to collect freestanding liquids for
deposit in approved containers.
4) Remove soil and vegetation to clean up all visible traces
of liquid or stains plus a three foot lateral buffer and a
minimum ten inches depth. Deposit contaminated material
and debris in approved containers. Restore property to its
original condition.
5) Double wash/rinse all solid surfaces such as walls,
sidewalks, streets, cars, etc., capturing waste liquid with
absorbents for deposit in approved containers.
6) When easily replaceable property such as furniture, toys,
clothes, etc. are contaminated, it is recommended that
these items be replaced rather than decontaminated.
7) Manage all cleanup material and debris as federal
hazardous waste.
.
5-32
.
8) Post cleanup testing is necessary to verify that PCB
contamination is below 10 ppm for soil and 10 microgram
per 100 square centimeters for solid surfaces. Because of
the complexity of post cleanup test sampling, this activity
shall be coordinated by the PCB coordinator using the
local Environmental Consultant and resources from
Technical and Ecological Services or a qualified PCB spill
cleanup contractor.
9) For known spills where it is difficult to determine the spill
boundaries by visible traces, the Company is required to
use a statistical sampling method to determine the spill
boundaries. Contact your local Environmental Consultant
for advice on how to do the sampling. Examples of where
this situation may occur are spills on wet ground or where
oil is sprayed under high pressure. If statistical sampling
is used to determine the spill boundaries, then it must also
be used for post cleanup testing.
b) Documentation:
.
The documentation procedures and requirements for mineral oil
spills (PCB less than 5 ppm) also applies to Federal high
concentration PCB spills. Additionally, the PCB/Oil Spill or
Leak Report (Form 623685) shall be completed and must
include a signature of the responsible supervisor in the Cleanup
Certification block. This form shall be included in the
documentation retained.
c) Transportation:
1) PCB Shipping Notice is required for all shipments from the
field to the nearest service center. The vehicle must also
have a copy of the current hazardous material license
issued annually by the CHP, a copy of the DOT annual
PCB Emergency Response Guide (Guide 31), and a copy
of the annual PCB Transportation Variance. All approved
containers that hold waste equipment, leaking in-service
equipment, insulating fluid or spill debris known to contain
50 ppm or greater PCB shall be marked with an EPA
"Caution PCB" adhesive label (ML label). Non-leaking, in-
service transformers are not required to be marked with
the ML label unless their PCB concentration is 500 ppm or
greater.
.
5-33
.
2) Transport vehicles loaded with PCB containers (not
transformers) with 45 kg or 99.4 Ibs (13-1/2 gallons) or
more of PCB's (50 ppm or greater) in the liquid phase or
one or more PCB transformer(s) (500 ppm or greater)
must display the EPA "Caution PCB" label on the front,
rear, and sides of the vehicle.
vii)
Sampling Requirements
Spill classification is based on the PCB concentration in an oil sample
taken from the source of the spill, not the concentration of PCB's in the
material onto which the PCB's were spilled. Only random post cleanup
samples are to be taken for low federal concentration PCB spills but
rigorous sampling is required by the EPA for (1) pre cleanup sampling
data when necessary to establish spill boundaries or (2) post cleanup
samples for high concentration PCB spills. PG&E's approach to the
EPA's recommended rigorous sampling procedure is detailed in
Appendix C of PG&E's "PCB/Oil Cleanup Manual". The complete
rigorous sampling procedure manuals issued by the EPA are available
upon request from the Electric Distribution Department or the Technical
and Ecological Services (TES) Department in San Ramon. For
assistance in taking rigorous samples, phone the TES Department at
(510) 820-2000 and state that a chemical spill has occurred.
.
viii) Identify personal protective equipment which may be required in the
area.
ix) Evaluate the resources needed, such as manpower, equipment, and
cleanup materials, and call for outside contractor assistance if needed.
Cleanup/Disposal Resources are listed in Section 4E.
The Emergency Coordinator is responsible for determining when a
cleanup is complete. Depending on the nature and magnitude of the
spill, this decision may be made in consultation with statellocal
agencies having jurisdiction in the affected area.
.
x) Determine actions needed to successfully complete containment and
cleanup efforts. Establish an exclusion zone (work area where spill has
been identified), a contamination reduction zone (where
decontamination procedures are conducted and contaminated
protective clothing can be removed), and a support zone (where
persons can wait in a clean environment).
Assemble the emergency response personnel and provide a briefing
detailing the cleanup procedures, protective clothing to be worn, and
equipment to be used. Cleanup efforts must be undertaken to restore
the affected area to its pre-spill condition to the maximum extent
possible.
5-34
.
.
.
a) For relatively small spills, absorbent will be applied and re-applied
until there is enough to absorb all the liquid. This material will be
picked up with stiff brooms and shovels and placed in approved
waste containers for disposal in accordance with applicable
regulations.
b) For spills in buildings or on paved areas, a second application of
absorbent will be spread over the contaminated area and swept
with stiff brooms to remove residues which may remain. Spill debris
and cleanup materials will be placed in approved containers for
disposal in accordance with applicable regulations.
c) Spill debris and cleanup materials will be placed in approved
containers for disposal in accordance with applicable regulations.
Soil which has been removed will be placed in approved waste
containers for disposal in accordance with applicable regulations.
d) For spills in catchment basins or oil retention ponds, the oil will be
removed by using absorbents or with the assistance of a cleanup
company. If the spill is relatively small, rolls of 3M "Sorbent" Type
1 00 will be cut into manageable lengths and floated on the surface
of the water to absorb the oil. For larger spills, cleanup companies
may use skimming and separation devices or sorbents.
After the surface of the water has been cleaned, 3M "Sorbent"
Type 156 sheets will be used to scrub the walls of the basin at the
water line. Oil and oily water will be collected for disposal in
accordance with applicable regulations.
e) Decontaminate all equipment and surfaces.
xi) Obtain general release information and record it using the Scene
Management Checklist in Section 8.
xii) Identify appropriate company and agency notification requirements.
4.
Proper Handling of Hazardous Waste
After completion of cleanup, contaminated disposable protective clothing will be
removed by cleanup personnel immediately and placed in an approved waste
container for disposal. Gloves will be removed, and hands will be thoroughly
cleaned with waterless hand cleaner or soap and water and wiped with rags and
paper towels. Rags and other waste material will be placed in approved waste
containers for disposal in accordance with federal, state, and local regulations.
All oil, hazardous materials, and cleanup debris recovered from a spill will be
considered hazardous waste unless it is demonstrated to be non hazardous and
must be disposed of according to applicable state and federal regulations.
Contact the Materials Department, Hazardous Waste Coordinator, or your
Environmental ConsultanUCoordinatorlSpecialist for determination of proper
waste disposal methods.
5-35
·
5. Follow-up Actions
a. Decontaminate all equipment or other contaminated surfaces.
b. Restock all emergency spill control equipment and supplies to maintain the
inventory listed.
c. Critique spill response actions to identify measures to avoid future incidents
and to improve the efficiency of future spill cleanup actions.
6. Document Response Actions
Reportable oil spills and hazardous materials releases must be carefully
documented so that sufficient information is available to appropriate agencies.
Information concerning the spill should be recorded on the Oil Spill Report and
should include photographs for major spills when appropriate.
Send a copy of the completed Spill Report to the appropriate Environmental
ConsultanUCoordinatorlSpecialist and file the original in the Facility Records.
7.
Follow-up Reporting
·
Notify the Corporate Law Department of any environmental release (air, ground
or water) that must be reported to a federal, state or local agency; any
environmental release which attracts media attention; or any discovery of
significant historic contamination at a PG&E site. This information must be
reported verbally as soon as possible with written follow up notification no later
than one work day after the incident.
Contact your Environmental ConsultanUCoordinatorlSpecialist for assistance in
filing the required written agency notifications described below.
b.
Immediately telephone the California Department of Toxic Substances
Control and the local authorities that the cleanup has been completed and
that all emergency response equipment is cleaned, ready for reuse, and
restocked for future use.
A written report must be submitted to the Environmental Protection Agency
(EPA) within 60 days whenever a facility has:
i) Discharged more than 1,000 gallons of oil into navigable waters in a
single spill event, or
ii) Discharged oil in two reportable events within any 12-month period.
The report must be submitted to the Region IX Administrator at the
following address:
a.
·
Environmental Protection Agency
75 Hawthorne Street
San Francisco, CA 94105
5-36
.
c. A written report must be submitted to the appropriate Regional Water Quality
Control Board when a spill has entered or threatened a water body. The
address is:
Regional Water Quality Control Board
Central Valley Region (5)
Fresno Branch Office
3614 East Ashlan
Fresno, CA 93726-3595
d. A written report must be submitted to the California Department of Toxic
Substances Control within 15 days of a spill that posed a hazard or potential
hazard to human health, property, or the environment. The address is:
California Department of Toxic Substances Control
Chief Northern Calif. Section, Region 1
10151 Croydon Way, Suite 3
Sacramento, CA 95827
.
e. The California Office of Emergency Services form entitled "Emergency
Release Follow-Up Notice Reporting Form" must be prepared and submitted
within 30 days of the date of the release to:
Chemical Emergency Planning and Response Commission
2800 Meadowview Road
Sacramento, CA 95832
f. In addition, a written follow-up report is required for spills greater than 42
gallons onto land or any amount entering or threatening to enter waters of
the State to, California Office of Emergency Services..
.
5-37
.
.
.
51 BOMB THREAT
Anonymous bomb threats are generally intended to disrupt normal business activities
rather than to warn employees of the existence of an actual bomb. Each facility should
have a bomb threat plan which provides for an orderly and systematic search of the facility
and identifies the official who will evaluate the threat and make the decision whether or not
to carry out an evacuation. (See PG&E Corporate Security Manual.)
If you receive a bomb threat on the telephone, follow these procedures:
1. Do not panic.
2. Keep the caller on the phone as long as possible.
3. Take careful notes of the call utilizing the Report of Bomb Threat form on the
following page.
The following reporting procedures are to be followed in the event of a bomb threat:
1. Bomb threats made against facilities such as Service Centers and Offices should
be handled as follows:
a. Call the local law enforcement agency (see page i).
b. Through channels, notify the Division/Department Manager or his/her
delegate.
c. If possible, conduct an orderly search of the facility to find any suspicious
articles. This should be done by persons familiar with the work area. Do not
touch any articles found.
d. Assist law enforcement as requested.
e. Notify your local security representative directly, or if unavailable, call the
Security Department at 223-6927 as soon as practical.
f. Complete Bomb Threat Report, Form No. 87-52. A copy of this form is on
the next page.
5-38
.
.
.
m
Pacific Gas and Electric Company
R rt f B b Th t
87-52 8/88
epo 0 om rea Security
DO NOT INTERRUPT THE CALLER EXCEPT TO ASK:
When is it set to explode? What kind is it?
What building? What area or floor?
What does it look like? Why are you doing this?
Who are you?
EXACT LANGUAGE OF THREAT: Use reverse side if necessary.
Date: Time: A.M,/P.M. Approximate Length of Call:
Received By: Department: Ext,:
Business Unit: Division Location
DESCRIPTION OF CALLER: Male - Female_ Adult_ Juvenile_
Voice Characteristics Speech
o Loud o Soft o Fast o Slow
o High Pitched o Deep o Stutter o Distorted
o Raspy o Pleasant o Slurred o Nasal
o Intoxicated
Accent Manner Background Noises
o Local o Calm o Angry o Office Machines o Airplanes
o Foreign (Specify) o Coherent o Irrational o Factory o Trains
o Race (Specify) o Emotional o Incoherent o Animals o Voices
o Other (Specify) o Laughing o Quiet o Music
o Party Atmosphere o Other (Specify)
o Street Noise
PERSONS TO NOTIFY IMMEDIATELY:
Supervisor or Manager Corporate Security
Police Department/Sheriffs Office
NOTE: Send Copy To: Corporate Security Department
123 Mission Street
Room H1922
San Francisco
5-39
·
·
·
5J FLASH FLOOD/FLOOD/EXTREMELY HIGH TIDE
FLASH FLOOD
1. If there is time, securely fasten lids and bungs of all hazardous substance
containers at the facility.
2. If there is time, try to securely fasten all equipment and hazardous substance
containers firmly in place or move them into buildings to keep them from floating
away in the rising water.
3. If necessary, EVACUATE all personnel to higher ground. Follow the instructions
of local emergency departments for best evacuation routes.
FLOOD/HIGH TIDE
1. Notify the Facility Emergency Coordinator or alternate and on call supervisor.
2. Make arrangements to transport hazardous wastes to a licensed treatment,
storage, and disposal (TSD) facility by a registered hauler.
3. Transport all hazardous materials to the nearest PG&E facility unaffected by the
approaching flood/high tide.
4. If unable to transport hazardous wastes to a licensed TSD facility, arrange to
transfer your hazardous waste in addition to hazardous materials to the nearest
PG&E facility unaffected by the approaching flood/high tide.
5. Carefully record the following information:
a. Transporter's name
b. Volume of hazardous waste/materials
c. Name of facility receiving hazardous waste/materials
d. Type and description of hazardous waste/materials
6. As a last resort, securely fasten all equipment, hazardous waste containers, and
hazardous material containers in place and tighten all lids and bungs, Try to
transfer containers and other items into facility buildings.
7. If necessary, evacuate all personnel. Follow the instructions of local emergency
departments for evacuation routes.
5-40
.
.
.
5K EARTHQUAKE
DURING AN EARTHQUAKE
1. Keep calm, don't run or panic.
2. Stay where you are. If you are indoors when an earthquake hits, stay indoors.
DO NOT RUN OUTSIDE.
3. If you are indoors, take cover under a desk, table, bench, or against inside walls
or doorways. Stay away from glass, windows, and outside doors.
4. Don't use candles, matches, or other open flames unless you are sure there is no
danger from escaping gas.
5. If you are outside, move away from buildings, utility wires, overpasses, and trees.
Once in the open, stay there until the shaking stops.
6. DO NOT RUN THROUGH OR NEAR BUILDINGS. The greatest danger from
falling debris is just outside doorways and close to outer walls.
7. If you are in a moving vehicle, stop as quickly as safety permits. Stay in the
vehicle until the shaking stops.
AFTER AN EARTHQUAKE
1. Check for injuries. Do not attempt to move seriously injured persons unless they
are in immediate danger of further injury.
2. If structural damage to the building is suspected, or visually noticed, and/or other
damage to the building which may cause personal injury is noticed, DO NOT
ENTER THE BUILDING until clearance is given by authorized personnel. Local
Officials or the Building Supervisor may require a post-earthquake inspection
prior to re-occupying the building.
3. If quake is severe, shut down all operations as soon as possible.
4. Check utility lines and appliances for damage. If you smell gas, open windows
and shut off the main gas valve. See Facility Layout Map, Figure 2-1. Leave the
building and report gas leakage to the Facility Emergency Coordinator or Facility
Supervisor.
5. In the event of FIRE, immediately call the local Fire Department for assistance.
Procedures for responding to a fire are in Sections SA and 5B of this plan.
6. Check all storage tanks, aboveground and below ground, and associated piping
for damage. Report damage to the Facility Emergency Coordinator or Facility
Supervisor.
7. Check all hazardous materials and hazardous waste storage containers for
damage. Report damage to the Facility Emergency Coordinator or Facility
5-41
Supervisor.
.
8. In the event of a spill of a known or suspected hazardous substance, try to
contain the spill. Procedures for responding to a spill involving a non-vehicle
related hazardous substance are in Sections 5C, 5D, 5E and 5H of this plan.
Response to transportation-related spills are in Section 5F and 5G.
9. Check all gas storage areas, such as CNG refueling stations, for damage or
leakage. Report damage to the Facility Emergency Coordinator or Facility
Supervisor. Supervisor shall notify appropriate local agencies of releases and/or
the potential fire danger as required.
10. Conduct a complete inspection of the facility to assess extent of damage and the
damage potential of the hazardous materials handled at the facility. Notify the
appropriate local agencies of releases and/or the potential fire danger as
required.
11. If water pipes are damaged, shut off the supply at the main valve. See Facility
Layout Map, Figure 2-1. In addition to drinking water stored in emergency
supplies, water may be obtained from such sources as hot water tanks, toilet
tanks, and melted ice cubes.
12. If electrical wiring is shorting out, de energize power source at the main service
panel. See Facility Layout Map, Figure 2-1.
.
13. All PG&E personnel will cooperate with local emergency response officials, and
follow their directions in relation to conditions existing in the community (e.g.,
streets clogged by debris, downed wires, and broken roadways).
14. Check all hazardous materials containers that may contain any dangerous
material such as blasting caps or detonators for damage. Report damage to the
Facility Emergency Coordinator or Facility Supervisor.
.
5-42
5L RESPONDING TO NEWS MEDIA INQUIRIES
.
The media will arrive on the scene immediately following an explosion, spill, fire, gas main
rupture or other catastrophe. An emergency intensifies events for everyone. Therefore,
responding to news media inquiries requires special attention.
Reporters arriving on the scene of an emergency will try to gather information from any
available source. The onlv authorized spokespersons for PG&E are News Department
personnel. All media inquiries are to be immediately directed to the appropriate News
Department person (i.e.: Media representative).
1. Anyone receiving an inquiry from the media regarding environmental aspects of
Company business should immediately direct the inquiry to the Media
Representative or, if unavailable, contact the on-call Corporate Communications
Media Representative at (415)973-5930.
2. Notify your shift supervisor or department head of the inquiry.
The following are recommendations on how to deal with media representatives.
What YOU SHOULD do:
a.
. b.
c.
d.
Do name a specific person as key contact with the PG&E Corporate
Communications Department (Media Representative) and the media.
Do call the PG&E Media Representative immediately.
Do keep the Media Representative informed of all developments at all times.
Do rely on the Media Representative to coordinate with the media at all
times.
e. Do maintain a friendly, cooperative relationship with reporters.
f. Do note all questions asked by the media so that answers can be obtained.
What YOU should NOT do:
a. Do not "wing it." Respond only if you know the answer.
b. Do not play down the seriousness of the situation.
c. Do not be falsely optimistic.
.
5-43
5M NATURAL GAS RELEASES
.
Use this response procedure for releases involving High and Low Pressure Gas Lines,
Gas Manifolds and Compressed Natural Gas (CNG) Fueling Stations.
1. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
2. STOP AND EVALUATE HAZARDS
a. Observe from a safe distance;
b. Try to identify hazardous substance(s) released or spilled. Refer to Material
Safety Data Sheets (MSDSs), if available;
c. Identify the source and estimated quantity of released or spilled and;
d. Evaluate the hazards such as:
i) Toxic hazards (i.e., vapors);
ii) Explosive hazards;
iii) Inhalation (asphyxiation) hazards;
iv) Environmental hazards and;
v) Other hazards
.
If there is any question about the hazards involved, contact your
Environmental Consultant/Coordinator/Specialist and/or the Safety, Health &
Claims Department for assistance. Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on page
i near the front of this plan.
DO NOT ENTER THE RELEASE AREA UNLESS PROPERLY TRAINED AND
FULLY PROTECTED WITH THE PROPER PERSONAL PROTECTIVE
EQUIPMENT.
3.
IF IT IS SAFE TO DO SO, take care of any injured and call an ambulance or
paramedics if necessary.
Isolate the release from human and vehicular contact. Suggested methods:
a. Cones
b. Stanchions and tape
c. Post a sign
PERSONNEL AND EQUIPMENT SHOULD BE KEPT UPWIND FROM THE
RELEASE.
4.
5.
Notify supervisor on call and the Facility Emergency Coordinator.
.
6. IF IT IS SAFE TO DO SO, reduce or eliminate the source of the release by
actions such as:
a. Pushing the CNG Station shutdown button
5-44
b. Contact Gas operations for assistance with closing the upstream gas valves
c. IF IT IS SAFE TO DO SO, remove any potential sources of ignition from the
area.
7. Begin to fill out Scene-Management Checklist (Section 8).
8. If the release poses either a present or potential threat to the health and safety of
people inside or outside the facility property, start evacuation procedures.
.
9. If the release poses either a present or potential hazard to the health and safety
of people inside or outside the facility, or to property or the environment, notify
your Environmental Coordinator/Consultant/Specialist who will assist in notifying
the California Office of Emergency Services (OES), local emergency assistance
organizations and the proper air quality authority, and provide the following
information:
a.
b.
c.
d.
. e.
f,
.
Date, time, and exact location of the release or threatened release;
Name and telephone number of person reporting the release;
The type of hazardous materials involved, if known, in the release or
threatened release;
The estimated quantity of released material and/or quantity of material
involved in a threatened release; and
A description of the potential hazards, if known, presented by the hazardous
material involved in the release or threatened release. Document the time
and date notification is made and the information provided.
During normal working hours, notify the appropriate Environmental
Consultant/Coordinator/Specialist, who will contact the Environmental
Services Department.
g. Contact your appropriate Environmental Consultant/Coordinator/Specialist.
If your Environmental Consultant or Coordinator cannot be reached, utilize
the Environmental Services Department's 24 hour paging system at (800)
874-4043. A call to this number will page the appropriate environmental
support person. After selecting the appropriate Business Unit, please
provide the public telephone number (including area code) where you can
be contacted during the hour following your call.
5-45
10. Contact the appropriate Gas Load Center (Sacramento or San Jose) for PUC
reporting evaluation and reporting assistance. The Gas Load Center will provide
PUC reporting services for natural gas releases that may attract media or public
attention and they will also notify the Gas Distribution Department.
·
11. Complete Scene-Management Checklist (see Section 8).
12. A written report to the appropriate office of the California Department of Toxic
Substances Control is required within 15 days after the release of a hazardous
material which posed a hazard or potential hazard to human health and safety,
property, or to the environment.
a.
b.
c.
d.
e.
· f.
g.
·
Contact your appropriate Environmental ConsultanUCoordinator/Specialist for
help in preparing this report.
The report should include the following information:
Name, address, and telephone number of facility manager;
Name, address, and telephone number of facility;
Date, time, and type of incident (e.g., fire, explosion, release, spill, etc.);
Name and quantity of waste(s) involved (if any);
The extent of injuries, if any;
An assessment of actual or potential hazards to human health or the
environment, where applicable;
Estimated quantity and disposition of recovered wastes and cleanup
material.
5-46
.
.
.
5N TOXIC CLOUDS
Use this response procedure for releases involving chemicals that develop into toxic
clouds.
1. Move all personnel indoors immediately or as soon as possible.
2. STOP AND EVALUATE HAZARDS
a. Explosive hazards;
b. Inhalation hazards and;
c. Skin exposure hazards.
3. Close and lock all windows and doors (locking strengthens seals).
4. Turn off heating, air conditioning and/or any other ventilation systems.
5. Take care of any injured and call an ambulance or paramedics if necessary.
6. If there are gaps in the windows or doors, they should be sealed with tape or wet
cloths. Larger gaps such as vents, should be sealed with plastic sheeting or foil
and tape.
7. If it is suspected that chemicals are present in the air indoors, respirators with
appropriate cartridges for the chemical of concern should be used if available or
damp cloths should be held over people's nose and mouth.
8. Notify supervisor on call and the Facility Emergency Coordinator.
9. Tune into emergency radio and/or television broadcasts and follow instructions
given by emergency response agencies.
10. Contact Safety Health & Claims Department for further guidance.
11. Evacuate all personnel to an area outside of and upwind of the toxic cloud plume
only if advised to do so by the Emergency Response Agency or the Safety Health
& Claims Department.
12. Contact your appropriate Environmental ConsultanUCoordinator/Specialist. If
your Environmental Consultant or Coordinator cannot be reached, utilize the
Environmental Services Department's 24 hour paging system at (800) 874-4043.
A call to this number will page the appropriate environmental support person.
After selecting the appropriate Business Unit, please provide the public
telephone number (including area code) where you can be contacted during the
hour following your call.
5-47
50 RESPIRATORY HAZARDS
Use this response procedure for releases or spills that involve chemicals or materials that
have the potential to generate toxic vapors or act as asphyxiates. Materials with the
potential to generate toxic vapors typically found at PG&E facilities may include sulfuric
acid (battery electrolyte), mercury, paints and solvents. Materials with known
asphyxiate hazards typically found at PG&E facilities include natural gas (also an
explosion/fire hazard), acetylene gas (also an extreme explosionlfire hazard), vehicle
exhaust gases (carbon monoxide), nitrogen gas and enclosed space containers
(including tanks and large pieces of electrical equipment that have previously contained
hazardous materials). Hazards associated with toxic vapors or asphyxiates are generally
greater when releases occur indoors or in enclosed spaces.
.
1. ASSESS YOUR OWN SAFETY PRIOR TO TAKING ANY ACTION.
DO NOT attempt any action which may cause personal injury or
exceeds/contradicts your training in emergency response procedures.
2. STOP, IDENTIFY AND EVALUATE HAZARDS:
Observe from a safe distance;
Try to identify hazardous substance(s) released or spilled. Refer to Material
Safety Data Sheets (MSDSs), if available;
Identify the source and estimated quantity of released or spilled and;
Evaluate the hazards such as:
i) Toxic hazards (i.e., vapors);
ii) Explosive hazards;
iii) Inhalation (asphyxiation) hazards;
iv) Environmental hazards and;
v) Other hazards
a.
b.
c.
. d.
If there is any question about the hazards involved, contact your
Environmental Consultant/Coordinator/Specialist and/or the Safety, Health &
Claims Department for assistance. Telephone numbers for the
Environmental contact and the Safety and Health Helpline are listed on page
i near the front of this plan.
DO NOT ENTER THE RESTRICTED AREA OF THE RELEASE UNLESS YOU
ARE PROPERLY TRAINED IN THE MATERIAL INVOLVED OR SITUATION AT
HAND AND YOU ARE FULLY PROTECTED WITH THE PROPER PERSONAL
PROTECTIVE EQUIPMENT.
3. IF IT CAN BE DONE SAFELY, Take care of any injured. Call an ambulance or
paramedics if necessary.
.
4. Isolate the release or spill from human and vehicular contact. Suggested
methods of isolation include:
a. Cones;
5-48
.
b. Stanchions and tape and;
c. Posting signs.
5. Notify the supervisor on call and the Facility Emergency Coordinator or Alternate.
6. If the release or spill threatens facility personnel, the Emergency Coordinator
should notify affected and/or all personnel for evacuation.
.
7. IF IT CAN BE DONE SAFELY, try to keep the release or spill of a hazardous
substance from worsening if possible and/or practical by one or more of the
following:
a. Avoiding skin contact;
b. Isolating the release or spill;
c. Preventing runoff and;
d. Identifying the source(s) and stopping further release(s)
8. If the release or spill occurs indoors or an enclosed space:
a. If there is a threat of toxic vapors or asphyxiates moving to other occupied
areas of the building, shut down heating, air-conditioning and other
ventilating systems. Shut doors and windows and seal other openings with
rags, tape and/or plastic sheets. PERFORM THESE ACTIONS ONLY IF IT
IS SAFE TO DO SO and;
b. WHEN AND IF IT IS SAFE TO DO SO, ventilate the area or space before
beginning cleanup activities.
9. Prevent discharge of liquids into yard and/or floor drains by diverting flow or by
sealing off with plastic, or containing liquids with absorbents, pillows and/or pigs,
IF IT CAN BE DONE SAFELY.
10. Begin to fill out Scene-Management Checklist (Section 8).
.
11. If the release or spill is unmanageable, contact the local emergency response
agency for assistance and/or utilize an outside contractor to perform the cleanup.
(Refer to the list of emergency cleanup contractors presented in Section 4E of
this plan.)
12. IF IT CAN BE DONE SAFEL Y, cleanup liquid spills as follows:
a. Contain all free-flowing liquids with proper absorbent compound.
b. Spread an application of absorbent compound over spill area(s). Allow a few
minutes for material absorption and then sweep up with stiff brooms.
c. Spread second application of absorbent compound over spill area(s). Allow
a few minutes for material absorption and then sweep up with stiff brooms.
d. Place all contaminated materials used in the cleanup in an approved
container for disposal.
e. Properly label all containers.
5-49
.
f. Decontaminate all equipment used in the cleanup and replace all emergency
supplies.
13. If, after actions were taken to contain and cleanup the release or spill, conditions
still pose either a present or potential threat to the health and safety of people
inside or outside the facility property, or to property or the environment, notify the
California Office of Emergency Services (OES) and local emergency assistance
organizations and give the following information:
a. Date, time, and exact location of the release or threatened release;
b. Name and telephone number of person reporting the release;
c. The type of hazardous materials involved, if known, in the release or
threatened release;
d. The estimated quantity of released material and/or quantity of material
involved in a threatened release and;
e. A description of the potential hazards, if known, presented by the hazardous
material involved in the release or threatened release.
Document the time and date notification is made and the information provided.
.
14. Complete Scene-Management Checklist (Section 8).
15. A written report to the appropriate office of the California Department of Toxic
Substances Control is required within 15 days after the release of a hazardous
material which posed a hazard or potential hazard to human health and safety,
property, or to the environment.
Contact your Environmental ConsultanUCoordinator/Specialist for assistance in
preparing this report.
The report should include the following information:
a. Name, address, and telephone number of facility manager;
b. Name, address, and telephone number of facility;
c. Date, time, and type of incident (e.g., fire, explosion, spill, etc.);
d. Name and quantity of waste(s) involved;
e. The extent of injuries, if any;
f. An assessment of actual or potential hazards to human health or the
environment, where applicable and;
g. Estimated quantity and disposition of recovered wastes and cleanup
material.
.
5-50
.
.
.
SP UNDERGROUND TANK LEAK
This procedure should be used for suspected and actual spills and/or releases (leaks) from
underground tanks.
SUSPECTED LEAKS:
1. This procedure applies to cases where a tank leak is suspected due to any of the
following:
a. An electronic monitoring system alarm;
b. Evidence of product or waste in the tank containment systems or double wall
tank interstitial space;
c. An inventory loss of greater than 0.5 percent of product or waste as
indicated by level monitoring or inventory calculation records over a three
month period;
d. Failure of an initial annual precision test.
e. Evidence of contaminated soil and/or ground water or surface water
contamination in the surrounding area.
2. Evaluate the hazards and take appropriate steps to minimize danger to human
health and the environment such as isolating the area from human and vehicular
contact and removing sources of ignition. ASSESS YOUR OWN SAFETY PRIOR
TO TAKING ANY ACTION. DO NOT attempt any action which may cause
personal injury or exceeds/contradicts your training in emergency response
procedures.
3. Remove the tank from service.
4. Check level monitoring or inventory calculation records.
5. If the monitoring system has failed or is found to be out of calibration or the
calculation records are in error, repair and/or recalibrate the monitoring system
and/or correct inventory records.
6. Perform a second precision test if the tank system has previously failed an initial
test.
Return the tank to service after resolving monitoring system or records issues
and (if necessary) after successfully completing a precision test.
If after checking the n'lonitoring system and/or inventory records and/or
performing a precision test, the tank is still suspected of leaking, keep the tank
system out of service and continue with the CONFIRMED LEAKS actions
described below.
5-51
CONFIRMED LEAKS
.
Unexplained product loss and/or failed precision tests must be considered a confirmed
leak. Follow the steps below for tank systems with confirmed leaks.
1. Begin to fill out a Scene-Management Checklist (Section 8).
.
2. Notify the Facility Emergency Coordinator - provide him/her with the information
gathered in the Scene - Management Checklist (Section 8).
3. During normal working hours, notify the appropriate Environmental
Consultant/Coordinator/Specialist, who will contact the Environmental Services
Department.
4. If your Environmental Consultant/Coordinator/Specialist cannot be reached,
utilize the Environmental Services Department's 24 hour paging system at (800)
874-4043. A call to this number will page the appropriate environmental support
person. After selecting the appropriate Business Unit, please provide the public
telephone number (including area code) where you can be contacted during the
hour following your call.
5. Notify the local administering agency by telephone of the conditions found and
document the notification. Send a confirming written notification to the local
agency within 5 working days. (Contact your Environmental Consultant/
Coordinator/Specialist or the Environmental Services Department for assistance
with agency notifications.)
6. Remove or lower the level of liquid in the tank to minimize the potential for further
release as follows:
a. If tests indicate the piping (rather than the tank) is leaking, lower the liquid
level in the tank and take the pumps out of service.
b. If the tank body is leaking, remove the contents of the tank As soon as
possible with a tanker truck. If the proauct stored is gasoline, leave a 4- to
6-inch layer in the tank to assure a rich, non-explosive vapor mixture and to
avoid contaminating the product with sludge. This will be removed before
excavating the tank.
.
7. When the contents of the tank are lowered or removed and regulatory reports
completed, immediate threats to human health and the environment should have
been mitigated and emergency conditions should no longer exist. However,
additional actions will be required to resolve soil and water issues associated
with leakage of product or waste. Some of the actions that may be required
include subsurface investigations, piping and/or tank repairs, piping and/or tank
removal, soil and water remediation, and written investigation and closure plans
approved by administering agencies. Contact your Environmental
Consultant/Coordinator/Specialist or the Environmental Services Department for
assistance with underground tank leak issues.
5-52
.
8. If the release poses either a present or potential hazard to the health and safety
of people inside or outside the facility, or to property or the environment, (this is
usually 42 gallons or more of a petroleum product) notify the California Office of
Emergency Services (OES) and local emergency assistance organizations and
give the following information:
a. Date, time, and exact location of the release or threatened release.
b. Name and telephone number of person reporting the release.
c. The type of hazardous materials involved, if known, in the release or
threatened release.
d. The estimated quantity of released material and/or quantity of material
involved in a threatened release; and
e. A description of the potential hazards, if known, presented by the hazardous
material involved in the release or threatened release.
Document the time and date notification is made and the information
provided.
.
f. If the release occurs after normal working hours or on a weekend or holiday,
contact the National Response Center (NRC) directly and provide the
following information:
i) Date, time, and location of the release.
ii) Name and telephone number of person reporting the release.
iii) The type and estimated quantity of the release.
iv) Response actions taken to reduce or eliminate the release.
Document date and time of NRC notification and the information provided.
The National Response Center will relay release information to appropriate state
and federal agencies who will determine whether agency involvement is required.
In most cases, no agency response will be required provided the company has
taken immediate action to minimize the release.
If you contact any agency directly, notify your appropriate Environmental
ConsultanUCoordinator/Specialist or the Environmental Services Department as
soon thereafter as possible.
9. A written report to the appropriate office of the California Department of Toxic
Substances Control is required within 15 days after the release of a hazardous
material which posed a hazard or potential hazard to human health and safety,
property, or to the environment.
Contact your appropriate Environmental ConsultanUCoordinator/Specialist for
. help in preparing this report.
The report should include the following information:
5-53
Name, address, and telephone number of facility manager
Name, address, and telephone number of facility
Date, time, and type of incident (e.g., fire, explosion, spill, etc.)
Name and quantity of waste(s) involved
The extent of injuries, if any
An assessment of actual or potential hazards to human health or the
environment, where applicable.
Estimated quantity and disposition of recovered wastes and cleanup
material.
10. Complete Scene-Management Checklist (see Section 8).
a.
b.
. c.
d.
e.
f.
g.
.
I.
5-54
6. EVACUATION ROUTES AND PROCEDURES
A.
When to Evacuate:
.
Evacuation of the facility will occur as a response to an incident with known or
unknown hazards that could pose a threat to the health and/or safety of facility
personnel.
The decision to evacuate is the responsibility of the Facility Emergency Coordinator or
the shift supervisor. He/she will determine the extent of evacuation. The local fire
department or other emergency response personnel might have the authority to make
this decision depending upon the situation.
Incidents that may require evacuation:
1. Fire or explosion.
2. Hazardous substance spill.
3. Flood.
4. Bomb threat.
5. Any other potentially dangerous situation.
. B. Evacuation Procedures:
When the signal for evacuation is sounded:
1. DO NOT PANIC.
2. Shut down any machinery or apparatus.
3. Escort/help handicapped or injured personnel to the nearest exit as identified on
the Facility Evacuation Map, Figure 6-1.
4. Walk, as diagrammed, to the designated assembly point and wait for instructions
from the Facility Emergency Coordinator.
5. Supervisors must account for all persons in their units and will report any missing
persons to Facility Emergency Coordinator.
6. The Facility Emergency Coordinator will decide when it is safe to re-enter.
.
6-1
.
.
.
C. Communications:
The facility has both an evacuation and all-clear signal which are understood by all facility
personnel.
The signal for evacuation at this facility is provided by alarm systems in the buildings. The
alternate evacuation signal is verbal.
The all-clear signal is verbal.
D. Evacuation Routes:
All facility personnel have been trained in the evacuation routes for their work stations
and the other areas of the facility. An assembly point is designated.
Evacuation routes and assembly points are depicted on the Facility Evacuation Map,
Figure 6-1.
6-2
FIGURE 6-1
FACILITY EVACUATION MAP
.
.
.
6-3
I
I
I
>Ii
I
-'.1_ -W- _ _ .... _
I s,~~
I -U-
I
.i ; to ....
-et .... ..... l~r- J
I.... {CNJt.E
Cone Wash I ........ STOll. I
- Råck 4 .... ..... (') t ~
to.... , , f;';";~', ..,-.
y. (,'~/,',',' ',~
" 00 !,:,~.:¿t\ _ WGate Wood Bin
'~----~--~---~--------------~--
,Ñ' ... I' ~uelTank. Oir~~i!2'1'?J '1.
U'" Truck (Area '91
, / , Oil-Fled EM.
-,-,~ S(arage kea
r Pr.-F . I 7,:~;;;/;':,; ,~
rF'~ ~-~ Stor. d ~ II!L (,""""'"
UIIA......'" I -r """""
-...---------,.--- ...J_iL4...."'JJ-'_iLl
\.. r Clone "'--Open NtwIR.f"biehed
Prefab. Work Area Oì-flIed EM.
I I I I I I ~fr:ee~_~___~Ov.rhang 1"'_~I~~~_~!a..:5Z___~
: ..=':':';,;':':';': :;J;;;::':':~1
----------------------
E
o
10
OHiIIed Equipment
Slorage Area No. 1
;;I
~
~
~
9
I
~~-~
17(
Corx:. Pod
IZI
E......,..
ParkÏ1>9
r
~
7
6
o-~T'~
d-~l ~
ROAD
~
EI!jwd6G ...
OrCr
r:ti. '
STORIa ~ IlETER
CONT AllIER COVER£ßEPT,
STORN::£ IÆA
ÛII T ruct ,...J
P..-mg "'"
~
COMMERCIAL
WIBLE
-------r-----
..
3
2
1
c
USEDIRETLlHD
OIL -FILLED EQLIIP\(NT
STORAGE Nl.f.A NO.7
NJ water
Storage Tanks
T - -1- -
IT
~.I
de
!
¡
i
~ b
Sla< 1laler1all1
Nt.IR.f"biIhed age Bin.
Oil-Fled E .
Storage kecr:.
~,-,J;';" ,...---
.,,:,:,:,Þ:~~:;. -.-J
=-=..:>¡;: II . ) II Corx:, Pad
_ ___ I Or I
PARK ete Block WaI ~ - - - - - - - - - --
O(~~Ïo~)
Or
I
~!l7 V
~~
I_~
,
",....,
I
L.
w
~
...J
w'
!::I
:r: u
31
L
I
I
I
u
I
I
I
"IJ
E
o
~
~
~
:=e
8
c
!
, !
I
I
'I
AI
Wii
)
1
J
!
i
¡':
.'
t:
I
¡,
ì'
,
~
r,
t
i
I'
r-
-1:
w"
I'
,
"
r,
f :
1
~
:,
;
I'
¡
8
I
BAKERSFIELD
SERVICE
CENTER
~
EVACUATlON~ A
FIGURE 6-1
-
10
FACILITY
F' ACILITY! LAYOUT
I
BAKERSFIELD SERVICE CENTER
PACIFIC GAS ÞHJ ELECTRIC COMPANV
SAN F'RANCISCO. CALIF'ORNlA
9
FEET
¡
I
r
~
(
\
8
MAP
SITE
-
..
7
IlNIII PI1l STATION
fRST IIJ ICI1
EII£RCENCY £Y[ WASH
EIlERCEI«:Y SIiOWER
COII'RESSED CAS IHON-FLMllAll.E
COII'RESSED CAS (FLAllUll.EI
CORRœVE
REACTIVE
ICNTAIIlE
_ lATER SKIT-orf
IIAIN ELECTRIC SItIT ·orF
IIAIN CAS SltJT· or r
fl£l I CNC EIEIIŒNCY SKIT ·orf
MOIl IlNIII PI1.L
-,
EVACUATION ROUTE
ASSEIIIII. Y NlI.A
..--
IC" II ...
6
!!!!!!!.
!!!!lli2
\lDAJ(D
o
œ
(i:j)
181
~
o
e
()
iii
[]
mJ
iii
W
"-
Â
LEGEND
)[SCRPTION
(j' fIlE EXTINCUlSHER
III fIlE HYDRANT aI HOSE ST ATION
IõiII Sl'Ll CONTRa. EQ\.I'\IENT
-'- WIlK DOOR
-<=>- ROll -IJ' DOOR
"-- DllECTION or MET flOW
- DllEC110N or IJIAtWJ[ flOI
....- CHAf lNl mCE
- - PROPERTY llH£
-- STORII DRAH
-- SEWER lIN:
IôI CATCH BASIl
UG IH)[RGIIDIH)
AC ABOVECIIOlHI
IMM HAlAAOOuS WASTE ACCUU.ATION IÆA
HWSA HAlIfiDOUS WASTE STall« IÆA
1><1 WATER YIlVE
. TOWER
!:!!
!!!
""
~
---
If Trill 0..
..
MOBILE HOME
JG.I MlC
3
,
,
,
-\.--...
-- OUWatlf ~ __
, ~ 7arb, $oPO/Glor7 ... ,
'Dr... 51"'119' /.10 WCII~ ..
' kla '0iI To" ..
' ..
' \
'W.... Rodt, \
I Equi¡. ,
I \
I ,
I ,
' I
' I
I ,
, I
, I
,
\
B
1st Floor
, Ofe' RR I
\ ~F~ I
.. Br.akroom ,
.. ø ,
.. '
... '
.. '
.... "
.........-----.....'
2
CJP2J bokersfd.spc
1-15-94 CPW
-
,4347
1
A
f
I
I.
I
¡
,
"
,
1
I
e
l
t
,.
I
,
7. FACILITY EMERGENCY COORDINATORS
A. Emeraency Coordinator Notification:
·
1. In the event of an emergency, contact the Facility Emergency Coordinator or
alternate. If the Facility Emergency Coordinator and the alternate are not
available, contact the on-call supervisor at the listed 24-hour phone number.
Facility Emergency
Coordinator:
Title:
Work Telephone Number:
Work Location:
24-Hour Telephone Number:
Residence Telephone Number:
Residence Address:
Alternate No. 1
Title:
Work Telephone Number:
Work Location:
24-Hour Telephone Number:
Residence Telephone Number:
·
Residence Address:
B. Responsibilities:
Dennis White
Support Services Director
(805)398-5938
Bakersfield Service Center
(805)398-5785
(805)837-1490
3319 Bathurst Avenue
Bakersfield, CA 93313
Mike Kunz
Construction Supervisor
(805 )398-5842
Bakersfield Service Center
(805 )398-57 85
(805)832-0954
6249 Megaris Ave.
Bakersfield, CA 93313
1, Primary Facility Emeraency Coordinator
The Primary Facility Emergency Coordinator is the individual who is responsible
for coordinating all emergency response measures at the facility. The Primary
Facility Emergency Coordinator is familiar with all aspects of the facility's
contingency plan, all operations and activities at the facility, the location(s) of all
applicable emergency response records for the facility, and the facility layout.
This person has the authority to commit the resources needed to carry out the
contingency plan and the responsibility to respond to emergencies as described
in Section 5, Response Procedures.
The Facility Emergency Coordinator will perform or direct others to:
a. Train all employees in fire suppression and spill response procedures and
the use of related equipment.
·
7-1
b. Assess incident:
·
i. Identify hazardous materials or wastes involved.
ii. Assess effects to human health and the environment.
c. Activate alarm to evacuate facility personnel, if required, and if the alarm has
not yet been sounded.
d. Develop a plan of action to isolate incident.
e. Assemble emergency response team.
f. Use appropriate emergency response procedure from Section 5 of this Plan.
g. Notify PG&E Media Representative of incident details.
h. Record incident information on the Scene-Management Checklist (Section 8).
i. Follow up with reporting, recording, and monitoring review of the incident and
incident response.
j. Revise Facility Environmental Emergency Response Plan as necessary.
2. Alternate Facilitv Emeraency Coordinators
In addition to the Primary Facility Emergency Coordinator, there are several
alternate people who are responsible for coordinating emergency response
measures at the facility.
·
The Alternate Facility Emergency Coordinators will coordinate with the Primary
Facility Emergency Coordinator or act on his/her behalf. The Alternate Facility
Emergency Coordinators are familiar with all aspects of the facility's contingency
plan, all operations and activities at the facility, the location{s) of all applicable
emergency response records for the facility, and the facility layout. These people
have the authority to commit the necessary resources needed to carry out the
contingency plan and the responsibility to respond to the emergency as
described in Section 5, Emergency Response Procedures.
3.
Employee at the Scene
The responsibilities of an employee arriving at the scene of a fire, explosion, or
spill are:
a. To immediately report the emergency to an Emergency Coordinator.
b. To provide the following information to the Emergency Coordinator:
1) Caller's name, telephone number, identification.
2) Location and type of emergency.
3) Source of spill, if known.
·
c. To remain at the scene to prevent other people or vehicles from entering the
emergency area until relieved by the Emergency Coordinator. Barricade the
area, if possible.
d. To initiate action to stop the source of the spill, if possible.
7-2
b. Assess incident:
.
i. Identify hazardous materials or wastes involved.
ii. Assess effects to human health and the environment.
c. Activate alarm to evacuate facility personnel, if required, and if the alarm has
not yet been sounded.
d. Develop a plan of action to isolate incident.
e. Assemble emergency response team.
f. Use appropriate emergency response procedure from Section 5 of this Plan.
g. Notify PG&E Media Representative of incident details.
h. Record incident information on the Scene-Management Checklist (Section 8).
I. Follow up with reporting, recording, and monitoring review of the incident and
incident response.
J. Revise Facility Environmental Emergency Response Plan as necessary.
2. Alternate Facilitv Emeraency Coordinators
In addition to the Primary Facility Emergency Coordinator, there are several
alternate people who are responsible for coordinating emergency response
measures at the facility.
.
The Alternate Facility Emergency Coordinators will coordinate with the Primary
Facility Emergency Coordinator or act on his/her behalf. The Alternate Facility
Emergency Coordinators are familiar with all aspects of the facility's contingency
plan, all operations and activities at the facility, the location(s) of all applicable
emergency response records for the facility, and the facility layout. These people
have the authority to commit the necessary resources needed to carry out the
contingency plan and the responsibility to respond to the emergency as
described in Section 5, Emergency Response Procedures.
3.
Employee at the Scene
The responsibilities of an employee arriving at the scene of a fire, explosion, or
spill are:
a. To immediately report the emergency to an Emergency Coordinator.
b. To provide the following information to the Emergency Coordinator:
1) Caller's name, telephone number, identification.
2) Location and type of emergency.
3) Source of spill, if known.
.
c. To remain at the scene to prevent other people or vehicles from entering the
emergency area until relieved by the Emergency Coordinator. Barricade the
area, if possible.
7-2
d. To initiate action to stop the source of the spill, if possible.
·
4. Hazardous MaterialslWaste Coordinator
The responsibility of the Hazardous MaterialslWaste Coordinator is to ensure
that waste and debris are disposed of according to applicable state and federal
regulations.
·
·
7-3
8. SCENE-MANAGEMENT CHECKLIST
.
If there is a release of a hazardous substance that threatens, or could potentially threaten
human health, property or the environment, certain timely notifications will need to be
made. At a minimum, contact the California Office of Emergency Services (800-852-7550)
and the administering agency as noted on the Environmental Emergency Telephone List
on page i. See Appendix F of the Hazardous Waste Manual for more details or contact the
appropriate Corporate or Division Environmental Coordinator/ConsultanUSpecialist.
1. Checklist information documented by:
Name/telephone number:
2. Facility name or location of event:
Time and date of incident:
3. Person first on scene: [J Witnessed incident [J Arrived after incident
Name:
Title:
Telephone number:
4. Event is:
. [J on-site spill [J bomb threat
[J off-site spill [J flood
[J transportation-related incident [J earthquake
[J fire [J toxic cloud
[J emergency excavation [J natural gas release
0 explosion
5. Gather the following information:
Description of material spilled:
Source of identity information:
Approximate quantity:
Location and source of spilllfire/leaks:
Vehicle operator:
Personal injuries or casualties:
.
8-1
6.
Contact the following Emergency Coordinator:
Name: Dennis White
·
Telephone number: (805) 398-5938: PG&E 874-5938
Time of notification:
7. If outside assistance is needed, document the time called and name of person
contacted. See page i for telephone numbers.
o 911 (time):
Name of person contacted:
o Administering Agency (time):
Name of person contacted:
(telephone)
o Fire Department (time):
Name of person contacted:
(telephone)
o Police/Sheriff Department (time):
Name of person contacted:
(telephone)
·
o Environmental Contractor (time):
Name of Company:
Name of person contacted:
(telephone)
8. Samples taken? 0 Yes 0 No
By whom:
Time:
Date:
Number of samples:
Specify sample type:
Show location where samples where taken and specific distances on map (see
item 11).
·
8-2
·
9. Check response procedure(s) used:
D 5A. On-Site Fire - Hazardous Substances Not Involved
D 5B. On-Site Fire - Involving Hazardous Substances
D 5C. On-Site Spill (Not Oil) - Inside Building
D 5D. Spill, Non-Transportation Related - No Water Contact
D 5E. Spill, Non-Transportation Related -Involving Water Contact
'D 5F. Spill, Transportation Related -Involving Company Vehicle
D 5G. Spill, Transportation Related - Involving Non-Company Vehicle
D 5H, Spill, Oil and/or PCBs
D 51. Bomb Threat
D 5J. Flash Flood/Flood/Extremely High Tide
D 5K. Earthquake
D 5L. Responding to News Media Inquiries
D 5M. Natural Gas Releases
D 5N. Toxic Clouds
D 50. Respiratory Hazards
D 5P. Underground Tank Leak
D 5Q. Emergency Excavation at Manufactured Gas Plant Sites
10. Action(s) taken to immediately contain and isolate spill ONLY IF IT CAN BE
DONE SAFELY.
Containment:
D Absorbent 0 Booms DSpill pads
Other:
·
Isolate spill:
o Booms D Barrier tape D Stanchions
Other:
11. Document specific location of spilllincidenVsamples:
D Markup on attached Facility Layout Map, Figure 8-1.
D Other (describe):
12. Actions taken to prevent further release:
·
8-3
13. Telephone notifications made:
·
a. Date and time:
Name:
Affiliation:
Telephone number:
Address:
Information provided:
Instructions received:
b. Date and time:
Name:
·
Affiliation:
Telephone number:
Address:
Information provided:
Instructions received:
·
14. Written notifications required (attach letters when completed):
a. Agency:
o Completed - date:
b. Agency:
o Completed - date:
c. Agency:
o Completed - date:
8-4
FIGURE 8-1
FACILITY LAYOUT MAP
.
.
.
8-5
E
o
c
10
USED/RETURt£D
oø.. -fillED EQUIPIotENT
STORAGE AREA NO. 7
Oil-Filed E~t
Sloroge Ino No. 1
ÞIJ woler
Slorage To".
~
è3
a:
~
ð
<J
9
I
~~-~
I
I
I
I
I
I
I
I
I
I
sr-
Ihl'"
!"
4 ~ 6 7
3 .
- -
- -
COMMERCIAL
WIBLE ROAD
---.-------
---- I
- - - - - t:- -=. ç. - ::t -=. -=- -....=- -±: "+ -....=- -=. t- r - : ~..::.: ;
I ~ ~'" r ~
, ~
i1 E [
~- J ~ ~
e ~ I I
'&-~,-; ! ~ 1
\\\\\\\\\~ J~ ~ 1
5[1 5 i
' '/, ~ I
I/////~ /1 ~~ I
_.HOOSE .....:z: (' I
aoo g r I
--w- - - ... -
STfi- , Dru II
rage
,
I
~/ ~I
/ / / o-If':tT~~ I Wood
/ r ~ Zri
r " "r.::;' ~ l..... J1
Woste Wood Bin _ ~
.......E3.-.___----_----_§_
---~
1lull1Io'''IoIø~
,~. ~ ::J
Cone. Pod
I Gr I
/
No.lRellRished
L OH)led EqLÏp.
SIo<0ge keo ..
~,~~;;;;;_ ,.,"',;0;__'
tt~ '~". '." :,."",..""..','..
~J'..' ...") U
- ----
HOME PARK onere'" Blade Wdl
'1
OI~:'oWi::1
2
;"1
"
, ,1
-
Or
SeI!POQ4I ,
PII Q ¡)
~=
1__ ',.._
...
~
1
w
~
..J
wi
!::I
:r: û
~I
L
I
I
I
û
I
I
I
I'IU
I
L
~
~
~
~
E
o
c
8
A
FIGURE 8-1
FEEP
10
I
BAKERSFIELD
SERVICE
CENTER
¡
iÍ
I
.
FACILITY I LAYOUT
BAKERSFIELD ~ERVICE CENTER
PACIFIC GAS AND ELECTRIC COUPM1Y
SAN FRANClsdo. CALIFORNIA
8
9
FEET
SITE MAP
-..0
BY
7
""",,
AlNIII PUll STATD/
FIRST IÐ KIT
EllERCENCY Ey[ WASH
E!l:RCENCY Sl()WU
COIoI'AESSED GAS (OIH!.AIIIAII.£I
COIoI'AESSED GAS CrLAIIVa[)
CORROSIVE
REACTIVE
QlT ABlE
IUoN WA1ER 5I«IT -IFF
IUoN ELECTRIC SKIT -orF
IUoN CAS 5I«IT -IFr
rlU I CNC E!l:RCENCY !HIT-IFF
HAl. ON Al HIlI PUlL
~
IX""'"
11""0.'
6
œ
e
(i:i)
IZ
:;:
C
e
<D
!II
[]
[C]
00
I!I
MOBILE
LEGEND
)[SCIa'TION
~ nl: EXTIlCUSl£R
m rl!£ HYIIRNH OR HOSE STATION
:;¡ SPlL CIINTRCl. EQUPIlENT
-- WALK DOOR
-<=>- ROlL -IJI DOOR
"-- DRECTION or Sll:E1 FlOW
- IllRECTD/ or Df!.tjHJtC( now
---- CHAN LINK rENŒ
- - PROPERTY lit:
-- STIIRI/ lIRA'll
-- Sl:WER LII£
;; CATOI BASoN
IJ( IH)ERGROl.tÐ
iii ABOVEGROI.HII
HWM HAZARDOUS WASTE ItCQNJ.ATD/ 111£0\
HWSA HAZARDOUS WASTE STORAGE NO
!><] WATER VAlVE
II TOWER
4
I
IX.-....
II'" 11 0111
,
,
8 ,
...L_.....
...... ~wot" ... __
'" ,¡; T crt.. .perolor I ... ..
'Dn.m Slorage ~~J.Q~
.. klO ,
, ,
, ,
"OIh Rod< ,
, EoM>- \
, \
- , \
, \
, ,
I I
I I
, ,
, ,
\ 01 to" ,., Floor ,
A \ 1ttmu
\ .eId <D e 2nd Floor "
\ shop [I(~aom
\ Or ,
, ,
, ,
... ..
... '"
... '"
CJP2] bokersfd.spc ....... .,.'
------
11-15-94 CPW I
. -
F4347 1 2 J
I
\
1
¡
,
l
!
I:
[i
-¡,:
"
"
Ii
¡ ~
!i
"
I:
¡
¡:
i ¡;
¡:
t,
,
"
>,
¡
t'
~;
[:
¡,
¡
!
¡
r
I
~
I,
~1
¡
,
.
.f
¡
,
,
;
I
\
\
,
,
,
,
I
¡
.
·
·
·
9. EMERGENCY ASSISTANCE AGREEMENTS
A. ADMINISTERING AGENCY AGREEMENTS
This section will contain a copy of any negotiated agreements with the local
administering agency or statements from the agency regarding Business Plan due
dates for this facility.
B. EMERGENCY ASSISTANCE AGREEMENTS
This section contains copies of the letters requesting an Emergency Assistance
Agreement for this facility with the local law enforcement, fire, health, and other
emergency response agencies and all subsequent correspondence.
These agreements are in addition to the backup support immediately available from
other nearby PG&E facilities, and the emergency response, cleanup and testing firms
under contract to PG&E. These firms are listed in Section 4E of this plan.
The facility is responsible for follow up with the appropriate agencies if signed
agreements are not returned. The facility must either have a signed agreement on file
or a documented telephone conversation between the facility and agency concurring
to provide emergency services. If the agency will not sign the agreement, this must
be documented and retained in this section of your FEEP. Maintaining a signed
agreement is a regulatory requirement.
9-1
·
A. ADMINISTERING AGENCY AGREEMENT
(BUSINESS PLAN DUE DATE)
·
·
9-2
·
m
·
·
September 19. 1995
Mr. Ralph Huey
City of Bakersfield Fire Dept.
Hazardous Materials Division
1715 Chester Avenue
Bakersfield, CA 93301
Dear Mr. Huey:
This letter confirms my conversation with Esther, of your staff, regarding due dates for
Hazard Material Business Plans for Pacific Gas and Electric facilities located within the
City of Bakersfield. The due dates for PG&E facilities are typically April 1 annually, but
since plans are required to be updated on your printouts, the date may vary depending
on when printouts are sent out by City of Bakersfield staff. PG&E facilities affected by
this are listed below:
Bakersfield Service Center
Kern Power Plant
Bakersfield Substation
Carnation Substation
Columbus Substation
Panama Substation
Stockdale Substation
Westpark Substation
Thank you for your continued cooperation. If you have any questions, I can be reached
at (209) 263-5208.
Sincerely t
Gü~dÌì~. \) ~~~
Patrick Mayfield 0'
Environmental Specialist
hm
bcc Loretta Altshuler
Don Hicks
Mike Harbick
Jerry Ezell/Dennis White
·
·
·
B. EMERGENCY ASSISTANCE AGREEMENTS
9-3
·
AGENCY AGREEMENT LETTER FEEP
M{~ tEf.- IQ L
TITLE 22 (CCR) HAZARDOUS ~ONTINGENCY PLAN
AGREEMENT BETWEEN PG&E AND
LOCAL EMERGENCY RESPONSE ORGANIZATION
PG&E and City of Bakersfield Hazardous Materials Division hereby agree to the
following arrangements with regards to Pacific Gas and Electric Company's
(PG&E's) Bakersfield Service Center located in Bakersfield, California.
·
1. PG&E will familiarize the above-named local organization with the
layout of tÞpté391lity, ~e properties and associated hazards of the
hazardous ~i1ãnaíed at the facility, places where facility
personnel would normally be working, entrances to and roads
inside the facility and possible evacuation routes.
2. The above-named organization will provide customary and
appropriªte~~m0erg~cy assistance to the facility in the event of a
hazardoJ~eniergency which requires the service of the City
of Bakersfield Hazardous Materials Division.
,/)
\.. Ie.. 7 .7{..
Sign~re
Jerry Ezell
Name
'---z- .
~J '- " ,/
-" ' -/
-~~/
Si atur:
Mr. Ralph Huey
Name
Support Services Director
Title
Title
·
(P~~
(ý)..Gu-t ~
Pacific Gas & Electric Company
Organization
4101 Wible Road,
Bakersfield CA 93308
Address
7J1cC~' 3~ /7 y,r
Date
City of Bakersfield Hazardous Matis Div.
Organization
1715 Chester, Suite 300
Bakersfield. CA 93301
Address
/1- 12- f~
Date
tfud- ~ ~ ~ #'~~
~ ~ #~~
~~
~
~. /
~/:b
.
.
'.
AGENCY AGREEMENT LETTER FEEP
TITLE 22 (CCR) HAZARDOUS WASTE CONTINGENCY PLAN
AGREEMENT BETWEEN PG&E AND
LOCAL EMERGENCY RESPONSE ORGANIZATION
PG&E and Bakersfield Fire Dept. hereby agree to the following arrangements
with regards to Pacific Gas and Electric Company's (PG&E's) Bakersfield
Service Center located in Bakersfield, California.
1, PG&E will familiarize the above-named local organization with the
layout of the facility, the properties and associated hazards of the
hazardous waste handled at the facility, places where facility
personnel would normally be working, entrances to and roads
inside the facility and possible evacuation routes.
2. The above-named organization will provide customary and
appropriate emergency assistance to the facility in the event of a
hazardous waste emergency which requires the service of the
Bakersfield Fire Dept..
/)
[ '/"'j'-../~,'-
" ~/"'" --\,- ~' /). c__~-,/
Si~tíature / '
i/
v~~ Q. ~QJ-\}..
Signature
Jerry Ezell
Name
Chief Kelly
Name
Support Services Director
Title
çl-~C~- ~+aI. Ft~ ~
Title
Pacific Gas & Electric Company
Organization
4101 Wible Road
Bakersfield CA 93308
Address
Bakersfield Fire Dept.
Organization
2101 "H" Street
Bakersfield. CA
Address
Of~ is /1Ps
Date
""")..-"')/1 -
//¿~Á/ 3/;/995-
"
Date
.
.
'.
,j
"/
AGENCY AGREEMENT LETTER FEEP
TITLE 22 (CCR) HAZARDOUS WASTE CONTINGENCY PLAN
AGREEMENT BE1WEEN PG&E AND
LOCAL EMERGENCY RESPONSE ORGANIZATION
PG&E and Citv of Bakersfield Police DeDartment hereby agree to the
foilowing arrangements with regards to Pacific Gas and Electric Company's
(PG&E's) Bakersfield Service Center located in Bakersfield, California.
1. PG&E will familiarize the above-named local organization with
the layout of the facility, the properties and associated hazards
of the hazardous waste handled at the facility, places where
facility personnel would normally be working, entrances to and
roads inside the facility and possible evacuation routes.
2. The above-named organization will provide customary and
appropriate emergency assistance to the facility in the event of
a hazardous waste emergency which requires the service of
the City of Bakersfield.
~
~
.1£: I--."..<~
Slg ature
-
Tom O'Brien
Name
Steve Brummer
Name
SUDDort Services Director
Title
Chief of Police
Title
Pacific Gas & Electric ComDanv
Organization
City of Bakersfield Police DeDartment
Organization
1601 Truxton
Bakersfield. CA 93301
Address
4101 Wible Rd.. Bakersfield CA
Address
5· '3. '14
Date
Yì;(~ ,~
Date
" ,,' ,
....'J~
.
.
.
10. WASTE CONSOLIDATION SITE
A. HAZARDOUS WASTE CONSOLIDATION SITE:
This facility operates as a consolidation site as defined in Health and Safety Code Section
25110.10. The contingency plans for fires, explosions, or any unplanned release of
hazardous waste as laid out in this Plan will also serve at the remote sites. Remote sites
utilizing this consolidation facility include: [Select from the list below]
1) Unstaffed Customer Support Facilities
PG&E has numerous types of equipment distributed throughout its service territory.
Installation and maintenance of this equipment can generate wastes. Examples of
gas support equipment are pipelines, regulator stations, control valves, and meters.
Examples of electric support equipment are utility poles, street lights, transformers,
switches, capacitor banks, service shops, and meters.
While some of this equipment may be located on PG&E property, much of it is sited
in rights of way owned by others.
2)
Unstaffed Substations
PG&E owns and operates numerous substations located throughout PG&E's service
territory. The substations serve as control, monitoring, and protection points which
enable PG&E to operate the electrical system.
Most of the substations are located on land owned by PG&E. The substations
range in size from a few hundred square feet to several acres, Each PG&E
substation is surrounded by a security fence with a locked gate to restrict access.
3) Unstaffed Natural Gas Facilities
PG&E owns and operates numerous unstaffed compressor, dehydrator, drip,
regulating and valving facilities throughout its service territory. The stations serve
as the control points for the gathering, transmission or distribution of PG&E's
natural gas.
Most of the stations are located on land owned by PG&E. The sites range in size
from a few square feet to several acres. Each station is surrounded by a security
fence with a locked gate to restrict access.
4)
Unstaffed Hvdroelectric Powerhouses
PG&E owns and operates numerous powerhouses that are used to generate
hydroelectric power. Hydroelectric power is generated at a powerhouse when water
falls a vertical distance and powers a turbine generator.
10-1
.
.
.
Each powerhouse site is surrounded by a security fence with a locked gate to
restrict access.
5)
Unstaffed Water Conveyance Systems
PG&E owns and operates water conveyance systems utilizing dams, gates, weirs,
and other operating equipment used in the transportation of water.
B. WASTE CONSOLIDATION SITE NOTIFICATION LETTER
PG&E has notified the Department of Toxic Substances Control (DTSC) of its intent or
operate under the Health and Safety Code (sections 25110.10,25121.3 and 25163.3)
exemption allowing small quantities of non-RCRA hazardous waste to be transported
without a manifest from a remote location to a consolidation site.
This facility has been listed in the DTSC letter as a consolidation site. A copy of the
current notification letter is included in this section and will be updated annually.
10-2
u5þ R~/~
\
~
(1-/101 uJ~ ')
Pacific Ga:; and Electric Company
77 Beale Str8et, Room 2437
S3fl Francisso. CA
415/973-77 46
Fax 415/973-9201
,\f.lllttlg A../dn'SJ
April 22, 1996
PO, Box 7640
San Francisco. CA 94120
State Water Resources Control Board
Division of Clean Water Programs
P. O. Box 944212
Sacramento, CA 94244-2120
Sirs:
Financial Responsibility Requirements Under
40 CFR Parts 145, 271, and 280
\/¡ct':;r c. FLJr~2U~I. Pi;.O.
~:~~~'~,]e~
:~·,'...í:ün':!::n~_1; S:~·.;!i~::S
RECEIVED
,MAr 2 3 1996
HAZ. MAT. DIV.
Pacific Gas and Electric Company hereby submits the following documents in support of
the use of the financial test to demonstrate financial responsibility for taking corrective
action and compensating third parties for bodily injury and property damage caused by
sudden accidental releases in the amount of at least $1 million per occurrence and $2
million annual aggregate and nonsudden accidental releases in the amount of at least $3
million per occurrence and $6 million annual aggregate arising fÌ'om operating
underground storage tanks:
1. Letter dated April 22, 1996, fÌ'om PG&E's chief financial officer;
2. PG&E's 1995 Annual Report including Report of Independent Public Accountants;
3. PG&E'sFORM 10-K; and
4. Report of Arthur Andersen LLP.
If you have any questions on this matter, please call me or Michael Krone of my staff at
(415) 973-6904.
Sincerely,
Enclosure
'e
e
~
MAKrone(3-6904 ):mak
bee: Larry L. Beagle
John W. Busterud
Kathy A Burnett-Jones
John E. Ford
Nick G. Goltas
John F. McKenzie
Lee G. Taft
Departmental Environmental Coordinators
Power Plant Environmental Coordinators
e ARTHUR ANDERSEN LL'
-
REPORT OF INDEPENDENT PUBLIC ACCOUNTANTS
To the Shareholders and the
Board of Directors of
Pacific Gas and Electric Company:
We have audited, in accordance with generally accepted auditing standards, the consolidated
financial statements and the schedule of consolidated segment information of Pacific Gas and
Electric Company (a California corporation) and subsidiaries for the year ended December 31,
1995, and have issued our report thereon dated February 12, 1996. We have not performed any
auditing procedures since that date.
At your request, we have read the letter dated Apri122, 1996, from your Senior Vice President
and Chief Financial Officer to the State Water Resources Control Board, Division of Clean Water
Programs, and compared the data therein that are specified as having been derived from the
audited consolidated financial statements for the year ended December 31, 1995, referred to
above, with the corresponding amounts in those consolidated financial statements. In connection
with this procedure, no matters came to our attention that caused us to believe that the specified
data should be adjusted.
This report is furnished solely for the use of the Company and the State Water Resources Control
Board, Division of Clean Water Programs, and should not be used for any other purpose.
~/Pt~L-l-P
San Francisco, California
Apri122,1996
e
e
Pacific Gas and Electric Company
77 Beale Street
San Francisco, CA 94105
.\Jllilil/g .,Ie/e/ress
Mail Code B32
P.O, Box 770000
San Francisco, CA 94177
415í973-2155
Gordon R. Smith
Senior Vice President and
Chief Financial Officer
April22, 1996
.~.~~~'
l. ,.., .:.. ,.', ,,~;¡.
f;Æ;,:â:.i,~~.l, r.!~
ïJ'<l,:" ,:)
I ~3 (lJ ~
State Water Resources Control Board'
Division of Clean Water Programs
P. O. Box 944212
Sacramento, CA 94244-2120
Sirs:
I am the chief financial officer of Pacific Gas and Electric Company (PG&E). Our
business address is located at 77 Beale Street, San Francisco, California. This letter is in
support of the use of the financial test of self-insurance to demonstrate financial
responsibility for taking corrective action and compensating third parties for bodily injury
and property damage caused by sudden accidental releases in the amount of at least $1
million per occurrence and $2 million annual aggregate and nonsudden accidental releases
in the amount of at least $3 million per occurrence and $6 million annual aggregate arising
from operating underground storage tanks,
~
Underground storage tanks at the following facilities are assured by this financial test or a
financial test under an authorized State program by this owner or operator.
FACILITY NAME
ADDRESS
NUMBER FEDERAL CLOSURE
OF TANKS ASSURANCE'AMOUNT
Angels Camp
1108 Murphy Grade Road
Angels Camp, CA 95222
2 $67,000
Antioch Field Office
Nerdly Rd and Hwy 4
, Antioch, CA 94509
1 $33,500
Antioch Se1VÎce Center
2111 Hillcrest Avenue
Antioch, CA 94509
4 $134,000
Auberry Hydro Center
33755 Old Mill Road
Auberry,CA 93602
3 $100,500
Auburn SeIVice Center
343 Sacramento Street
Auburn, CA 95603
4 $134,000
e e
-----
~ akersfield Service Center 2 $67,000
4101 Wible Road
Bakersfield, CA 93309
3 $100,500
1970 Industrial Way
Belmont, CA 94002
Burney Service Center 4 $134,000
Black Ranch Road near Hwy 299
Burney, CA 96013
Camp 1 1 $33,500
15449 Humbug Road
Magalia, CA 95954
Camp 5 Hydro Service Center 1 $33,500
Hwy 50 at Fresh Pond
Unincorporated, CA
Caribou Camp 1 $33,500
Caribou Road
Caribou, CA 95954
Chico Service Center 2 $67,000
11~39 Midway
Chico, CA 95926
Cinnabar Service Center 3 $100,500
308 Stockton Street
San Jose, CA 95119
Colma Service Center 3 $100,500
450 Eastmoor Avenue
Daly City, CA 94015
Colusa Service Center 1 $33,500
2nd and Main Streets
Colusa, CA 95932
Concord Service Center 3 $100,500
1030 Detroit Avenue
Concord, CA 94524
e
e
Cottonwood Substation 2 $ 67,000
Tree Foil Lane
Cottonwood, CA 96022
Cupertino Service Center 3 $100,500
10900 N. Blaney Ave
Cupertino, CA 95014
Davis Service Center 3 $100,500
316 L Street
Davis, CA 95616
Diablo Canyon Nuclear Power Plant 2 $67,000
Near Avila Beach, CA 93401
East Geysers Gen. Const. Garage 1 $33,500
John Kingcade Road
East Geysers, Geyserville, CA
Edenvale Service Center 6 $201,000
6402 Santa Teresa Blvd.
San Jose, CA 95119
El Dorado Service Center 3 $100,500
4636 Missouri Flat Road
Placerville, CA 95667
Eureka Service Center 2 $67,000
2475 Myrtle"Avenue
Eureka, CA 95501
Fairfield Computer Center 2 $67,000
425 Beck Avenue'
Fairfield, CA94533
Fremont Materials Dist. Ctr. 2 $67,000
42105 Boyce Road
Fremont, CA 94538
Fremont Service Center 3 $100,500
41800 Boscell Road
Fremont,CA 94538
e e
-
Garberville Service Center 2 $67,000
1328 Redwood Drive
Garberville, CA 95540
Gas Compressor Stations #21 & 22 1 $33,500
Third Street
Rio Vista, CA 94571
General Office Complex 4 $134,000
77 Beale Street
San Francisco, CA 94106
Gerber Compressor Station 15B 1 $33,500
Interstate 5 and Chard Avenue
Proberta, CA 96076
Geysers Power Plant Administration Center 4 $134,000
26 miles NE of He aids burg
Healdsburg, CA 95448
Geysers Power Plant East Operations Center 2 $67,000
26 miles NE of He aids burg
Healdsburg, CA 95448
Geyserville Service Center 2 $67,000
20880 Geyserville Avenue
Geyserville, CA 95441
Grass Valley Service Center 3 $100,500
788 Taylorville Road
Grass Valley, CA 95945
Hayward Service Center 3 $100,500
24300 Clawiter Road
Hayward, CA 94545
Hinkley Compressor Station 2 $67,000
22999 Community Boulevard
Hinkley, CA
Helms Pumped Generation Plant 2 $67,000
6725 Helms Circle
Shaver Lake, CA 93664
e
e
Hollister Service Center 2 $67,000
150 7th Street
Hollister, CA 95023
Jackson Service Center 3 $100,500
1630 Jackson Gate Road
Jackson, CA 95650
King City Service Center 1 $33,500
404 N. 2nd Street
King City, CA 93930
Livermore Service Center 3 $100,500
3797 First Street
Livermore, CA 94550
Livermore Training Facility 2 $67,000
3797 First Street
Livermore, CA 94550
Los Banos Service Center 1 $33,,500 ~
940 "I" Street
Los Banos, CA 93635
Los Medanos Underground Storage Facility 1 $33,500
4800 Evora Road
Concord, CA 94520
Martin Service Center 4 $134,000
731 Schwerin Street
Daly City, CA 94014
Marysville Service Center 3 $100,500
4th & A Street
Marysville, CA 95901
Merced Service Center 2 $67,000
560 W. 15th Street
Merced, CA 95340
Milpitas Gas Terminal 2 $67,000
66 Ranch Drive
Milpitas, CA 95035
e
e
Monterey Service Center 3 $100,500
2311 Garden Road
Monterey, CA '93940
Moss Landing Power Plant 1 $33,500
Hwy 1 & Dolan Road
Moss Landing, CA 95309
Napa Service Center/Substation 3 $100,500
300 Burnell Street
Napa, CA 94558
North Valley Materials Dist. Ctr. 2 $67,000
3736 Rancho Road
Marysville, CA 95901
Oakhurst Service Center 2 $67,000
Country Road #426
Oakhurst, CA 93644
Oakland SelVice Center 3 $100,500
4801 Oakport Street
Oakland, CA 94601
Orland Office 1 $33,500
810 4th Street
Orland, CA 95963
Oroville Service Center 1 $33,500
2226 Veatch Street
Oroville, CA 95965
Petaluma Service Center 1 $33,500
210 Corona Road
Petaluma, CA 94952
Poe Dam 1 $33,500
Hwy70 10 miles SW/O Storrie Road
Unincorporated (Butte County), CA
Point Arena Service Center 1 $33,500
Windy Hollow Road at Lake
Point Arena, CA 95468
-
e
Pratt Mountain Repeater 1 $33,500
End of Pratt Mountain Road
Unincorporated, CA
Red Bluff Service Center 2 $67,000
515 Luther Road
Red Blu~ CA 96080
Redding Service Center 2 $67,000
3600 Meadowview Drive
Redding, CA 96001
Richmond Service Center 5 $167,500
1100 South 27th Street
Richmond, CA 94804
Ridgecrest Service Center 2 $67,000
530 S_ China Lake Blvd.
Ridgecrest, CA 93555
Rio Vista Service Center 2 $67,000 '
Hwy 12 & Virginia Drive
Rio Vista, CA 94571
Rock Creek General Construction . 1 $33,500
1649 Canal Street
Aub~ CA 95603
Rogers Flat Hydro Headqùarters 2 $67,000
Highway 70
Storrie, CA 95980
Sacramento Gas Load Center 2 $67,000
2001 Front Street
Sacramento, CA 95818
Sacramento Service Center 3 $100,500
5555 Florin-Perkins Road
Sacramento, CA 95828
Sacramento Valley Regional Office 1 $33,500
2740 Gateway Oaks Drive
Sacramento, CA 95818
e e
.
Salinas Service Center 3 $100,500
356 E. Alisal Road
Salinas, CA 93901
San Francisco Service Center 4 $134,000
3235 18th Street
San Francisco, CA 94110
San Luis Obispo Service Center 1 $33,500
4325 S, Higuera Street
San Luis Obispo, CA 93401
San Rafael Service Center 2 $67,000
1220 Andersen Drive
San Rafael, CA 94901
Santa Cruz Service Center 3 $100,500 ,
615 7th Avenue
Santa Cruz, CA 95062
Santa Maria Service Center 1 $33,500
2445 s. SkyWay Street
Santa Maria, CA 93454
Santa Rosa Compressor Station 1 $33,500
1820 Piner Road
Santa Rosa, CA 95404
Santa Rosa Headquarters 1 $33,500
111 Stony Circle
Santa Rosa, CA 95401
Santa Rosa Service Center 2 $67,000
3965 Occidental Road
Santa Rosa, CA 95401
Santa Ynez Valley Service Center 2 $67,000
55 Easy Street
Buellton, CA 93427
Selma Service Center 2 $67,000
2139 Sylvia Street
Selma, CA 93662
-
e
Serpa Junction Compressor Station 1 $33,500
Hwy 120.5 miles W/O Amerada Road
Rio Vista, CA
Sondra Service Center 2 $67,000
326 North Washington
Sondra, CA 95370
Sonora Service Center 3 $100,500
14550 Tuolomne Road
Sonora, CA 95370
Stockton Service Center 4 $134,000
4040 West Lane
Stockton, CA 95204
Taft Service Center 2 $67,000
550 Gardner Field Road
Taft, CA 93268
Templeton Service Center 2 $67,000
160 Cow Meadow Place
Templeton, CA 93465
Tracy Maintenance Station 1 $33,500
P.O. Box 270
Tracy, CA 95376
Ukiah Service Center 3 $100,500
2541 North State Street
Ukiah, CA 95482
Vacaville Service Center 3 $100,500
158 Peabody Road
Vacaville, CA 95688
Vallejo Service Center 2 $67,000
303 Carlson Street
Vallejo, CA 94590
Walnut Creek Service Center 3 $100,500
1232 Boulevard Way
Walnut Creek, CA 94595
.. e e
.
-
Willow Creek Service Center 1 $33,500
Willow Creek, CA 95573
Woodland Service Center 3 $100,500
50 Kentucky Avenue
Woodland, CA 95695
A financial test is also used by this owner or operator to demonstrate evidence of financial
responsibility in the following amounts under other EPA regulations or state programs
authorized by EPA under 40 CFR Parts 271 and 145:
EP A Regulations
Closure (Sections 264.143 and 265.143).............................··........
post-Closure Care (Sections 264.145 and 265.145).......................
Liability Coverage (Sections 264.147 and 265.147).......................
Sudden. ...,.... .......,...,...
Nonsudden......,.............. ,..
Corrective Action (Section 264,10 1(b »,..,........,..,.........,.....,.........
Plugging and Abandonment (Section 144.63)........,......,.....,.........,
Closure.,......,............ ........... .............. ,........ ................,..................
post-Closure Care...... .......,.........,. ............. .......,..,.....,..................
Liability Coverage..................,..... ...... ...........,.........,.,......,..,.........
Corrective Action..... ....................... ..................,..,..............,.........
Plugging and Abandonment.........................,......,·····,··,··· ..,...........
Total.. , :'..,.......,.............. ......................... .......... .........,..,.....,.......,..
Amount
$7,069,000
N/A
$2,000,000
$6,000,000
N/A
N/A
$7,069,000
N/A
$8,000,000
N/A
N/A
$15,069,000
TIlls owner or operator has not received an adverse opinion, a disclaimer of opinion, or a
"going concern" qualification ftom an independent auditor on his financial statements for
the latest completed fiscal year_
e
Alternative II
1. Amount of annual UST aggregate coverage being
assured by a test, and/or guarantee..........................................
Sudden,... .... ...
Nonsudden.... .
2. Amount of corrective action, closure and post-closure care
costs, liability coverage, and plugging and abandonment costs
covered by a financial test, and/or guarantee............................
3. Sum of lines 1 and 2................................................................
4. Total tangible assets....................................... .........................
5. Total liabilities [if any of the amount reported on line 3 is
included in total liabilities, you may deduct that amount fÌom
this line and add that amount to line 6]..............................,......
6. Tangible net worth [subtract line 5 fÌom line 4]......,.................
7. Total assets in the U.S. [required only ifless than 90 percent
ofa:ssets are located in the U.S.]...............................,..............
8. Is line 6 at least$10 million?..........,..,......................................
9. Is line 6 at least 6 times line 3?.................................................
10. Are at least 90 percent of assets located in the U.S.? [If "No,"
complete line 11.].....
11. Is line 7 at least 6 times line 3?...............................................
12. Current assets....,."".".....,.",... ,... .... ........ ...... ......... ....',..........
13. Current liabilities.."..,...". ........... ..............................""..........
14. Net working capital [subtract line 13 fÌomline 12]..................
15. Is line 14 at least 6 times line 3?..............,...............................
16. Current bond rating of most recent bond issue.................,......
17. Name of rating service............................................................
e
$2,000,000
$6,000,000
$7,069,000
$15,069,000
$26,793,861,000*
$17,849,101,000*
$8,944,760;000*
Not required
Yes
Yes
Yes
Not required
Not required
Not required
Not required
Not required
A2
Moody's
..
e
e
18. Date of maturity of bond........................'................................. December 1, 2023
19. Have financial statements for the latest fiscal year been filed
with the SEC, the Energy Information Administration, or the
Rural Electrification Administration?.........,.............................
Yes; SEC
* Based on 1995 Annual Report
I hereby certify that the wording of this letter is identical to the wording specified in 40
CFR Part.280.95(d) as such regulations were constituted on the date shown immediately
below.
~
GO ON R SMITH
Seni r Vice President and Chief Financial Officer
April 22, 1996
cc with attachment:
Regional Water Quality Control Boards
USTLocal Implementing Agencies