Loading...
HomeMy WebLinkAboutRES NO 74-87RESOLUTION NO. 74-87 A RESOLUTION OF THE COUNCIL OF THE CITY OF BAKERSFIELD DETERMINING TO UNDERTAKE PROCEEDINGS PURSUANT TO SPECIAL ASSESSMENT AND ASSESSMENT BOND ACTS FOR THE ACQUISITION OF IMPROVEMENTS WITHOUT PROCEEDINGS UNDER DIVISION 4 OF THE STREETS AND HIGHWAYS CODE CITY OF BAKERSFIELD ASSESSMENT DISTRICT NO. 87-2 WHEREAS, all of the owners of more than 60% in area of the property subject to assessment therefor have signed and filed with the City Clerk of the City of Bakersfield a written petition for undertaking proceedings pursuant to special assessment and assessment bond acts, and to assess the costs thereof upon the properties benefited by said improvements, and waiving proceed- ings under Division 4 of the Streets and Highways Code, for the acquisition of improvements as set forth in Exhibit "A" attached hereto and by reference incorporated herein; and WHEREAS, the costs and expenses of said contemplated improvements are to be chargeable upon an assessment district, the exterior boundaries of which are the coterminous exterior boundaries of the composite and consolidated area shown on the map thereof on file in the office of the City Clerk to which reference is hereby made for further particulars; and WHEREAS, the public interest and convenience will be served by the taking of said proceedings. NOW, THEREFORE, IT IS HEREBY FOUND, DETERMINED AND ORDERED that all of the owners of more than 60% in area of the property subject to assessment for said proposed improvements have filed with the City Clerk of this City a written petition for the acquisition of improvements assessment and assessment bond acts, the provisions of Division 4 of the pursuant without Streets to appropriate specia! further compliance with and Highways Code. IT IS FURTHER FOUND, DETERMINED AND ORDERED that said proceed- ings for the acquisition of said improvements shall be had pursuant to the Municipal Improvement Act of 1913, the Charter, and the Municipal Code of the City of Bakersfield, and the bonds upon the unpaid assess- ments thereof shall be issued pursuant to the Improvement Bond Act of 1915. IT IS FURTHER FOUND, DETERMINED AND ORDERED that the provi- sions of Division 4 of the Streets and Highways Code be, and they are hereby, dispensed with., .......... o0o .......... 2 I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on May 6, 1987 , by the follow- ing roll call vote: AYES: COUNCiLMEMBERS: CHILDS, CHRISTENSEN, SMITH, RAT[Y, MOORE, DICKERSOn, SALVAGGIO NOES: COUNCILMEMBERS: ~.,~ ABSENT: COUNCILMEMBERS: ABSTAINING: COUNCILMEMBERS: CITY CLERK and Ex Officio Clerk of the Council of the City of Bakersfield APPROVED May 6, 1987 MAYOR or' the City of Bake~rsfield Bakersfield 4ressig 3 ENGINEER' S REPORT EXHIBIT GENERAL DESCRIPTION OF WORK AND ACQUISITIONS CITY OF BAKERSFIELD ASSESSMENT DISTRICT NO. 87-2 - ACQUISITION OF GATEWAY INDUSTRIAL PARK PUBLIC IMPROVEMENTS (TENATIVE PARCEL MAP 7744) The individual Projects comprising the Works of Improvement, hereinafter the "Improvements", eligible for acquisition pursuant to Assessment District proceedings for City of Bakersfield Assessment District No. 87-2, hereinafter the "Assessment District", are described below. The descriptions of the Improvements and the termini of the work proposed for acquisition do not necessarily extend for the full length of the description thereof. The plans and profiles of the work to be acquired shall be controlling as to the correct and detailed description thereof. The individual Projects comprising the Improvements that are to be acquired and their locations are: Sanitary Sewer Pipeline and Lift Station Project including sanitary sewer pipelines complete with manholes, fittings and property service laterals and a Lift Station Facility complete with all mechanical and electrical equipment and controls and also including a 15 inch diameter discharge pipeline running from said Lift Station Facility to connect with an existing 36 inch diameter City pipeline in Mount Vernon Avenue, together with all appurtenances and incidental work necessary to complete the same in the following locations: Sanitary Sewer Pipelines to be installed in the following streets proposed for development pursuant to Tenneco Parcel Map PM 7744 (PM7744) which includes proposed Gateway Drive, Gateway Court and Enterprise Way, and in new dedications of rights-of-way for East Belle Terrace from Washington Street east to Mount Vernon Avenue and in Mount Vernon Avenue from East Belle Terrace north to proposed Gateway Drive. The Sanitary Sewer Lift Station is to be installed at the southwest corner of proposed Parcel 16 of PM7744, with the discharge line running from said lift station site easterly to connect with an existing City pipeline fn Mount Vernon Avenue. Storm Drain Pipeline and Lift Station Project including manholes, fittings, catch basins with connecting pipelines and a Lift Station Facility complete with all mechanical and electrical equipment and controls and a discharge pipeline to connect with existing storm water disposal facilities, together with all appurtenances and incidental work necessary to complete the same in the following locations: Storm Drain Pipelines and Catch Basins installed in the following streets proposed for development pursuant to PM7744 and including proposed Gateway Drive from proposed Enterprise Way east to Mount Vernon Avenue, in proposed Gateway Court north to proposed Gateway Drive, and in new right-of-way dedications for Mount Vernon Avenue pursuant to PM7744 and running from East Belle Terrace north to the proposed Storm Water Lift Station site in proposed PM7744 Parcel 1. A-1 B. The Storm Water L~' Station is to be constructed ~ ~g the east boundary of proposed Parcel . in PM7744, adjacent to HounU Ve~on Avenue. Water Distribution System P{peline Project including pipelines, flutings, valves, fire hydrants, separate 2 inch diameter domestic and 6 inch diameter fire service laterals for each proposed PM7744 parcel, together with all appurtenances and incidental work necessary to complete the same in the following locations: Water Distribution Pipelines and appurtenances in Washington Street from Feliz Drive north across Highway 58 to connect to an existing water main in Brundage Lane; in proposed Gateway Drive, Gateway Court and Enterprise Way, all said roadways to be developed pursuant to PM7744, and in new rights-of-way dedications also pursuant to said PM7744 for Mount Vernon Avenue from proposed Gateway Drive south to East Belle Terrace and in East Belle Terrace from Mount Vernon Avenue west to Washington Street. Street Construction and Reconstruction Project including street grading, sub- grade preparation, asphalt concrete paving, concrete curbs and gutters as required for construction of proposed Gateway Drive, Gateway Court and Enterprise Way, all to be developed pursuant to PM7744; the construction of the north half of East Belle Terrace in new right-of-way to be dedicated pursuant to said PM7744; the reconstruction of portions of existing Mount Vernon Avenue and the construction of the west half of said street including outside lane concrete curb and gutter, median curb, street grading, subgrade preparation and asphalt concrete paving between East Belle Terrace on the south and the Highway 58 right-of-way on the north; the construction of the east half of Washington Street in right-of-way to be dedicated pursuant to PM7744 from the Highway 58 right-of-way south to East Belle Terrace, and also including the construction of concrete sidewalks ~1ong the perimeter of said PM7744 in said rights-of-way to be dedicated for said Washington Street, East Belle Terrace and Mount Vernon Avenue, together with all appurtenances and incidental work necessary to complete the same. Street Safety Lighting Project to include street safety ligkts, controls~ conduits and wires, light poles and bases installed where required along the east side of Washington Street, the north side of East Belle Terrace, the west side of Mount Vernon Avenue and along proposed Gateway Drive, Gateway Court and Enterprise Way, all within proposed PM7744, together with appurtenances and incidental work necessary to complete same. The doing of all incidental work and payment of expenses therefor as required to complete the foregoing work including but not limited to labor and trans- portation costs incurred by Property Owner, Tenneco Realty Development Corpor- ation, to purchase and deliver equipment and materials to be installed by Property Owner's contractors and which equipment and materials shall become a part of the completed Improvements; interest on funds advanced by Property Owner for construction of the Improvements; Property Owner's cost for design of the Improvements, including soils testing and analysis related to design and construction of the Improvements, consUruction inspection and contract administration costs; assessment engineering consultant costs incurred by the Property Owner; all associated district formation administration costs and expenses as authorized by the Streets and Highways Code of the State of California. A-2 The acquisition of ea ~nts and rights-of-way, if s other than those described above or alre~uy held by the City of Bakersf~=zd and required for the construction and installation of said facilities, together with the construction and installation 'of all improvements auxiliary to the above and necessary to complete the same. A-3