HomeMy WebLinkAboutRES NO 228-05
RESOLUTION NO.
"228;;05
A RESOLUTION OF THE COUNCIL OF THE CITY OF
BAKERSFIELD APPROVING THE UPDATED REPLACEMENT
HOUSING PLAN FOR THE OLD TOWN KERN MIXED·USE
PROJECT.
WHEREAS, the Old Town Kern-Pioneer Redevelopment Project Area ("Project
Area") was established by the Bakersfield City Council in June, 1999; and
WHEREAS, the Old Town Kern-Pioneer Redevelopment Plan was adopted by
the Bakersfield City Council at the same time; and
WHEREAS, one of the goals of the Old Town Kern-Pioneer Redevelopment Plan
is to eliminate blight and encourage development in the Project Area; and
WHEREAS, as such, the Agency and developers are proposing developing a
housing project and commercial development in the Project Area ("the Old Town Kern
Mixed-Use Project"); and
WHEREAS, if the Old Town Kern Mixed-Use Project is approved, a number of
low and moderate-income residential units will be eliminated from the housing stock;
and
WHEREAS, California Redevelopment Law (Health and Safety Code section
33000 et. Seq.) requires a redevelopment agency to ensure that any low and moderate
income residential unit which is eliminated from the housing stock as a result of a
project in which the Agency is involved is replaced within four years; and
WHEREAS, to ensure the housing stock is replaced, the Bakersfield
Redevelopment Agency and the City Council needs to approve a replacement housing
plan.
NOW, THEREFORE, BE IT RESOLOVED by the Council of the City of
Bakersfield as follows:
1. The above recitals are true and correct.
2. The updated replacement housing plan attached hereto as Exhibit "A"
meets all of the requirements of California Health and Safety Code section
33413.5 and is hereby approved to be implemented should the Old Town
Kern Mixed-Use Project be approved and proceed.
'< 'òÞ-.Kf,¡>
C) ó'
>- "'
f-- m
_ r-
o tJ
ORIGINAL
the
I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by
Council of the Çi!~ of Bakersfield at a regular meeting thereof held on
OCT 12 201J'j by the following vote:
GYW
NOES:
.-ßBSTAII\i:
'~D
,....-/ <---'"
----
L/
~
c-
COUNCILMEMBER CARSON, BENHAM, MAGGARD, COUCH. HANSON. SULLIVAN. SCRIVNER
COUNCILMEMBER
COUNCILMEMBER
COUNCILMEMBER ~"--VYf¥-.--''---'
APPROVED OCT 1 2 '2005
~.,. 4.ffiL~
PAMELA A. McCART Y, CMC
CITY CLERK and Ex Officio Clerk of the
Council of the City of Bakersfield
HA EY L. HALL
MAYOR of the City of Bakersfield
APPROVED as to form:
VIRGINIA GENNARO
City Attorney
By: ida. ~
ALLEN SHAW
Deputy City Attorney
X ,?¡,A_.I(~.(;
C) /0
.)... ..,.-,
I- m
.- ,..
o (J
ORIGINAl. .
EXHIBIT A
Updated Replacement Housing Plan
for the Old Town Kern Mixed-Use Project
Bakersfield Redevelopment Agency
and
City of Bakersfield
Old Town Kern-Pioneer Redevelopment Project Area
August 2005
Original Plan September 2002
<¿,M(,
« ';
O· ,.¡
.,
>-
--
Õ
ORl(,'f',"
,
:
,
OLD TOWN KERN MIXED USE PROJECT
REPLACEMENT HOUSING PLAN
August 2005
SUMMARY UPDATE
The replacement housing plan is being updated to reflect changes in the scope of
proposed Old Town Kern Mixed Use Development. In August 2005, the Bakersfield
Redevelopment Agency approved an agreement initiating negotiations with Baker
Street Village, LLC formed by The Triumph Companies (Triumph). As a result, the
proposed scope of the project has changed.
The revised development proposal for the Old Town Kem Mixed Use Development
Project consists of approximately 49,200 square feet of retail comprising five buildings,
rehabilitation of the existing "Coronet" Building, 14 loft units above two of the retail
buildings, 18 three bedroom/family-room townhomes, and 60 one and two bedroom
affordable senior units. As a result, the western boundary of the proposed development
has been extended to include three residential properties located on Kern Street north
of the alley.
An Exclusive Negotiation Agreement between the Bakersfield Redevelopment Agency
and The Village at Baker Street, LLC was approved August 8, 2005. The agreement
covers a period of 120 days from the date of execution of the Agreement. The 120-day
limit may be extended sixty (60) days by written amendment. During the time Triumph
will complete their development planning, economic analysis and financial due diligence
and work with staff to draft the deal points required for the development to proceed.
The deal points will then be incorporated into a Disposition and Development
Agreement that will include the specific scope of the development, any Agency financial
participation requirements, a schedule of performance, evidence of private financing,
required insurance, and evidence of commercial leases for tenants that would also be
involved in the project.
1. Introduction
The Redevelopment Plan for the Old Town Kern-Pioneer Redevelopment Project Area
was prepared by the Bakersfield Redevelopment Agency ("Agency") and adopted by the
Bakersfield City Council on June 30, 1999 by Ordinance No. 3904. California
redevelopment law requires that whenever dwelling units located in a redevelopment
project area housing persons or families of low or moderate income are demolished by
the Agency or a project assisted by the Agency, the Agency shall, within four years,
rehabilitate, develop, or construct, or cause to be rehabilitated, developed or
constructed, for rental or sale to persons or families of low or moderate income, an
equal number of dwelling units or a number of dwelling units which contain an amount
of bedrooms equivalent to the amount of bedrooms that were demolished.
Baker Street Replacement Housing Plan
S:\Baker Street Revitalization\Updated Baker St Replacement Housing Plan. DOC
I' Î>p.i\~>\
, .,
<S '0...,_
>-
1-' P,'I
o c
ORIG!NAI
2
This document constitutes the updated Replacement Housing Plan for the Old Town
Kern Mixed Use Project. The Plan will guide and facilitate the Agency's efforts to
rehabilitate, develop, or construct, or cause to be rehabilitated, developed or
constructed, replacement housing for persons or families of IDW or moderate income in
accordance with the requirements of the Old Town Kern-Pioneer Redevelopment Plan
and California redevelopment law.
2. General Definitions
The following definitions will govern the construction of this Replacement Housing Plan
unless the context otherwise requires:
A. "Plan" means this Replacement Housing Plan.
B. "Redevelopment Plan" means the Redevelopment Plan for the Old Town
Kern-Pioneer Redevelopment Project Area.
C. "Project Area" means the area included within the boundaries of the Old Town
Kern-Pioneer Redevelopment Project Area.
D. "Agency" means the Bakersfield Redevelopment Agency.
E. "City" means the City of Bakersfield, Califomia.
F. "Replacement dwelling unit" means a dwelling unit rehabilitated, developed or
constructed in replacement of a dwelling unit destroyed or removed from the
low and moderate income housing market by the Agency and which is
decent, safe and sanitary and contains at least the same number of
bedrooms and other living areas as the dwelling unit destroyed or removed by
the Agency. The Replacement dwelling unit may be for rent or for sale.
G. "Affordable rent", "persons and families of low or moderate income" and "very
low income households" shall include, where applicable, senior citizens and
the handicapped, shall have the same meanings as set forth in the California
Health and Safety Code and regulations pertinent thereto.
H. "Moderate income", "Iow income", and "very low income" shall have the same
meaning as set forth in the Health and Safety Code §50093 - 50105.
I. "Project" means the Old Town Kern Mixed-Use Baker Street Project.
J. Legal Resident" pursuant to Public Law 105-117, aliens not lawfully present in
the United States are not eligible for relocation assistance, unless such
ineligibility would result in exceptional hardship to a qualifying spouse, parent,
or child. All persons seeking relocation assistance will be required to certify
that they are a United States citizen or national, or an alien lawfully present in « 'ò~~[:~,
the United States. o~,
>-. no
Baker Street Replacement Housing Plan 1- r-
S:\Baker Street Revitalization\Updated Baker 8t Replacement Housing Plan.DOC Õ t:.,
ORIG'NAL
3
,_____. ..__"'.____.__._n...._._,.
~~,-~.~-~.-_._.~..,-~-_.
3. PurDose of the Plan
The implementation of the updated Old Town Kern Mixed-Use Project implementation
will result in the destruction and/or removal of approximately five (5) residential dwelling
units, all of which are assumed, for the purposes of this Plan, to be housing persons
and families of low and moderate income.
Comparable dwellings in are available throughout the City. Functional equivalency will
be the objective standard to find suitable comparable housing. Decent, safe and
sanitary exist throughout the City of Bakersfield. The Agency may consider reasonable
trade-offs for specific features when the replacement unit is equal to or better that the
displacement dwelling. The following factors will be considered: adequate size to
accommodate occupants; in an area not subject to adverse environmental conditions; in
a location not less desirable than the location of the displaced person; in a typical
residential development.
The following chart outlines the actual number of units to be destroyed or removed and
the replacement housing to be provided:
A. Dwellina Units to be Removed
Number of Bedrooms
Number of Units
6
2
2
3
1
1
Total Units to be Removed
5
B. ReDlacement Units to be Constructed or Rehabilitated
As a direct result of the Old Town Kern Mixed Use project, the Agency shall
rehabilitate, develop or construct, or cause to be rehabilitated, developed or
constructed, for rental or sale to persons and families of low or moderate income not
less than an equal number of replacement dwelling units at affordable housing costs
consistent with the following requirements:
1. Income: All replacement dwelling units shall be affordable to persons and
families of low or moderate income. At least 40% of the Replacement dwelling
units shall be affordable to persons and families of low income, but the Agency
shall use its best efforts to assure that at least 10% of the Replacement
dwelling units shall be affordable to very low income households.
2. Size: The replacement dwelling units shall contain at least the same number of
bedrooms and other living areas as the dwelling units destroyed or removed by
the Project.
4
, ~~K¡::»
¿j '\J~
>- m
¡- r-
·ó <::
m,IGINAl
Baker Street Replacement Housing Plan
S:\Baker Street Revitalization\Updated Baker 5t Replacement Housing Plan.DOC
._._._.~~_. - ....,~""_. "--"'---"-'-'~'-'--'--'-'-""-"---'---"---'-'---+..,
3. Preference for Displacees: Those persons and families of low or moderate
income who were displaced as a result of the Project shall be provided with
preferences in renting or purchasing the Replacement dwelling units.
4. Timing: Replacement dwelling units: replacement dwelling units shall be
completed by December, 2007.
Additionally, the Agency has completed and set several goals for developing other new
housing projects totaling more than the required number of replacement dwelling units.
This larger number will ensure that sufficient units are produced in appropriate locations
even if some of the projects listed are deleted, modified in scope or are not completed
on schedule.
The Park Place senior housing complex consists of 80 units (64 one bedroom, 15 two
bedroom and one unit for an on-site manager). It is located on "R" Street, north of 24th
Street. This complex has been completed and is open for rental.
The California Avenue Senior Housing Project consists of 180 units (147 one bedroom,
33 two-bedroom and one unit for an on-site manager). It is located south of Califomia
Avenue, between "M" and "0" streets. This complex has been completed and is open
for rental.
The Parkview Cottages Project is currently under construction consisting of 74 detached
single family units, between 1,280 -1,820 sq. ft. It is located north of 21 st Street, east of
"R" Street and west of the Kern Island Canal. The project is affordable housing with 35
of the units priced to be affordable at 80% median income. Thirty nine (39) of the units
are considered to be affordable at 120% median income. Anticipated completion date is
November, 2006.
The South Mill Creek Project located along California Avenue, south of 13th street,
between Q Street and on the east side of the canal from the rail tracks to Union Avenue
is currently being proposed and planned by the Lennar Corporation. This fifty plus acre
site includes 65,000 sq. ft. of commercial space to include retail, restaurants, community
events and neighborhood service space and recreational areas and a residential
component that will include 100 units of affordable rental housing and 600 units of
various types of affordable and market rate urban style for-sale housing.
The revised Old Town Kern Development Project includes three different housing
components. Fourteen (14) loft, rental units will be constructed above two new Baker
Street retail buildings. Eighteen (18) three bedroom/family-room, for sale town homes
will be constructed south of Lake Street, west of King Street. The Senior Housing
component of the project will consist of 60, one and two bedroom units, with an on-site
manager. The senior housing is to be located east of Kern Street, south Lake Street
and north of the alley.
5
'QÄI(-ô,
c:J. '>~,
>- "'
I- m
- r-
Ù D
ORiGINAL
Baker Street Replacement Housing Plan
S:\Baker Street Revitalization\Updated Baker St Replacement Housing Plan.DOC
-.. .._---- - - --- ------~---"'-_._-_......--.__.__._-------_._.
The City borrowed the funds tD provide low interest construction loans to selected single
family home builders. The builders construct infill housing on vacant lots located
throughout the Southeast Redevelopment Project Area for new affordable single family
housing. The two, three, and four bedroom homes will have 2 car garages and entry
level amenities. Affordable to 80% median income households, prices are estimated to
be in the $170,000 - $190,000 range based on home size. Down payment assistance is
provided by the city.
While the number of bedrooms constructed in these five housing projects exceeds the
number of bedrooms displaced by the Old Town Kem Mixed-Use Project, the Agency
shall continue to cooperate with housing developers to ensure the City's low and
moderate-income housing needs are met.
The Agency shall encourage the development of in-fill housing to be located on vacant
residential lots and the rehabilitation of existing, but substandard, housing located in the
Old Town Kern-Pioneer Redevelopment Project Area.
4. Method of FinancinQ
The Agency is authorized to finance projects developed under the Redevelopment Plan
with the assistance of the United States government as a part of the Community
Development Program through the U.S. Department of Housing and Urban
Development (HUD) and with financial assistance from the State of California, the City
of Bakersfield, or other available sources. Funding of housing development may
include but is not limited to Community Development Block Grant (CDBG) funds, other
federal grant and loan funds such as Brownfield Economic Development Initiative and
Section 108, HOME Investment Partnership, tax increment and proceeds of tax
allocation bond sales, FHA insured loans, Section 202/Section 8 elderly housing
assistance, Section 17 housing grants, HUD Rental Rehabilitation Program and private
financing.
The Park Place senior apartments and the California Avenue senior apartments were
financed by a combination Df Agency assistance, a City of Bakersfield loan of HOME
funds and tax credits. The Parkview Cottages are being financed with a CalHFA loan,
Agency assistance and private financing.
5. FindinQ that the Replacement Housina Plan does not Reauire Approval
under Article XXXIV of the California Constitution
It is hereby found and determined that the Replacement dwelling units under this Plan
do not require the approval of the voters pursuant to Article XXXIV of the California
Constitution.
By its terms, Article XXXIV is not applicable if the Agency acts as a conventional lender
on a low-income housing project.
6
'Ô M <"I>
'< 'ú'
() >c.
)- -
m
I- r-
Õ 0
ORIGINAL
Baker Street Replacement Housing Plan
S:\Baker Street Revitalization\Updated Baker St Replacement Housing Plan. DOC
.-- ....-.-.-- - -' -~...-,.,--~_.~--,.~--~-~._._-_.._-,.._,----,-.
6. Timeframe for Development of the Replacement Housina
The Agency anticipates the following approximate construction and completion dates for
the proposed Replacement dwelling units:
Park Place Senior HDusing
California Avenue Senior Housing Project
Parkview Cottages
Old Town Kern Project
Completed December, 2000
Completed December, 2004
Anticipated completion, 2006
Anticipated completion, 2007
Thus, the Agency has, of December, 2004, rehabilitated, developed, constructed or
cause to be rehabilitated, developed or constructed for rental or sale to persons and
families of low or moderate income, a number of units at least equal to the number of
low and moderate income units to be removed or destroyed. Additional replacement
units will be completed in 2006 and 2007. The replacement dwelling units shall meet all
of the requirements of the Old Town Kern-Pioneer Redevelopment Plan, including those
related to unit size, location, level of affordability, number and completion dates.
7. Reportina
Annually, the Agency shall publish a report on the progress of implementing the
Replacement Housing Plan. The report shall include any additions, deletions or
modifications to the list of replacement housing projects as well as any changes in the
timeframe for development or rehabilitation.
7
;¿,1>.Kf'
~ ^':r
-<'
>- -
1- m
- ,...
o ()
ORiGINAL
Baker Street Replacement Housing Plan
S:\Baker Street Revitalization\Updated Baker St Replacement Housing Plan.DOC