Loading...
HomeMy WebLinkAboutRES NO 265-05 RESOLUTION NO. '265-05: RESOLUTION APPROVING GENERAL PLAN AMENDMENT NO. 03-1528, AN AMENDMENT TO THE LAND USE AND CIRCULATION ELEMENTS OF THE METROPOLITAN BAKERSFIELD GENERAL PLAN, GENERALLY BOUNDED BY PANAMA LANE TO THE NORTH, OLD RIVER ROAD TO THE EAST, SOUTH ALLEN ROAD (UNIMPROVED) TO THE WEST, AND TAFT HIGHWAY (STATE ROUTE [SR] 119) TO THE SOUTH. WHEREAS, the Planning Commission of the City of Bakersfield in accordance with the provisions of Section 65353 of the Government Code, held a public hearing on MONDAY, OCTOBER 3, 2005 and THURSDAY, OCTOBER 6, 2005 on General Plan Amendment No. 03-1528 of the proposed amendment to the Land Use and Circulation Elements of the Metropolitan Bakersfield General Plan, notice of the time and place of hearing having been given at least twenty (20) calendar days before said hearing by publication in The Bakersfie/d Californian, a local newspaper of general circulation; and WHEREAS, PB Ventures LLC made application for a general plan amendment for property bounded by Panama Lane to the north, Old River Road to the east, South Allen Road (unimproved) to the west, and Taft Highway (State Route [SR] 119) to the south, as shown in attached Exhibit "A," to allow development of a master-planned community on approximately 1,833 acres, more specifically stated as follows: General Plan Amendment No. 03-1528: PB Ventures LLC has applied to amend the Land Use Element of the Metropolitan Bakersfield General Plan from R-IA (Resource - Intensive Agriculture) to LR (Low Residential) on 1310.08 acres, to HMR (High Medium Residential) on 86.31 acres and to GC (General Commercial) on 86.36 acres; and from R-MP (Resource - Mineral and Petroleum) to LR (Low Residential) on 320.22 acres, to HMR (High Medium Residential) on 23.22 acres and to GC (General Commercial) on 6.77 acres: and An amendment the Circulation Element ofthe Metropolitan Bakersfield General Plan is requested to change the alignment of the Circulation Element collector roads within the west half ofthe project boundaries to deviate from the current grid pattern; and WHEREAS, for the above-described project, an Initial Study was conducted and it was determined that the proposed project would have a significant effect on the environment and, therefore, an Environmental Impact Report (EIR) for the project was prepared in accordance with the California Environmental Quality Act (CEQA); and WHEREAS, Policy No. 14 ofthe Conservation/Soils and Agricultural Element ofthe Metropolitan Bakersfield General Plan requires the City of Bakersfield to evaluate ten (10) factors when considering projects that propose to convert designated agricultural land to non-agricultural uses; and WHEREAS, the Planning Commission and City Council have evaluated the ten (10) factors provided under Policy No. 14 of the Conservation/Soils and Agricultural Element of the Metropolitan Bakersfield General Plan and found the following: 'òA/í,l:- J ''lcr >- ;::' I- fT, - f- o C> ORIG!NAl 1) Soil aualitv According to the U.S. D.A. Soil Conservation Service's Soil Survey of Kern County, California, Northwest Part (1988), 94 percent of the project area soil types meet the soil requirements for prime farmland if water for irrigation is available. 2) Availabilitv of irriaation water There are approximately 15 on-site agricultural water wells presently being used for irrigation and no restrictions regarding the continued use of this water supply are known to exist. 3) Proximity to non-aaricultural uses With the exception of lands to the north and northeast, the majority of the surrounding area is currently planned primarily for agricultural uses. However, a major portion of the northern project boundary is contiguous to the City of Bakersfield and the owners of other properties to the north have requested to annex into the City in order to develop urban uses. Properties to the north both presently within the City limits and proposed to be annexed are planned and proposed for urban uses. 4) Proximity to intensive oarcelization Several tracts have been recorded or are have been proposed to the north of the project site within the City of Bakersfield, Additional tracts are expected to be proposed on surrounding properties upon annexation into the City. The project site is clearly within the path of urban development. 5) Effect on orooerties subiect to Williamson Act land use contracts 316 acres of the project site as well as other properties to the north, east, and south are currently under Williamson Act land use contracts, In addition to the project site, cancellation of contracts on other properties in the immediate surrounding area have been requested in order to annex these properties into the City and to develop urban uses. It is anticipated that the owners of surrounding properties will request contract cancellations independent of what occurs on the project site because those properties are currently contiguous to the City limits or will be in the near future and are in the path of urban development. For further discussion of this issue, see "Williamson Act Land Use Contract Cancellation" below. 6) Ability to be orovided with urban services (sewer, water. roads. etc,) The project site could be served by urban services upon annexation into the City, The project site would be served by Taft Highway to the south, Panama Lane to the north and other major existing and planned roadways. The site could be connected to the City's Wastewater Treatment Plant No.3, which is planned to be expanded in the near future, via a 48-inch trunk sewer in Buena Vista Road. Based upon a water supply assessment prepared by the City, a sufficient supply of water will be available to serve the proposed development. 7) Abilitv to affect the aoolication of aaricultural chemicals on nearbv aaricultural orooerties Development of the proposed urban land uses in close proximity to agricultural uses would likely result in the placement of restrictions on the use of agricultural chemicals on portions of these properties by the Kern County Agricultural Commissioner. However, such restrictions may result with or without the proposed project due to other urban development proposals in the immediate vicinity. \:>ÂK~ J 1JtP "- ~ I- m 2 - ~ o C> ORIGiNAL 8) Abilitv to create a precedent-settina situation that leads to the premature conversion of prime aariculturallands As stated above, urban development is occurring within the City in close proximity to the site and the owners of other properties to the north have requested to annex into the City in order to develop urban uses. Despite the fact that most of the land surrounding the project site is currently planned for agricultural uses, due to the close proximity of the site to planned urban development within the City limits and other proposals for annexation and urban development, the project is not considered to be precedent-setting. 9) Demonstrated proiect need Between 2005 and 2015, the City's population is projected to increase by approximately 38 percent, signaling the need for a substantial additional supply of land that is designated and zoned for urban development and which can be adequately served by essential public services. The proposed project would provide a mix of low and high-medium density residential development as well as support commercial, recreational, and educational uses that can be serviced by the City of Bakersfield. 10) Necessity of buffers such as lower densities. setbacks. etc. Buffer zones between urban development and agricultural uses are often necessary. Portions of the project site would be separated from agricultural uses by major roadways and perimeter masonry walls. Despite these buffers, additional buffers may be necessary due to the effects of agricultural chemical use in close proximity to sensitive land uses, such as residences and schools. The need for such buffers may negatively impact agricultural uses if adequate buffers are not provided on development sites. Because the area surrounding the project site is anticipated to urbanize ultimately, other than the standard building setback requirements of the Bakersfield Zoning Ordinance for development adjacent to lands designated or zoned for agricultural uses no on-site buffers are proposed. WHEREAS, the applicant for the property owner has indicated the purpose of the request is to develop a new master planned community in southwest Bakersfield featuring a balance of residential, retail, employment, recreation, and public facilities within the City of Bakersfield; and WHEREAS, the project site lies within the path of development with approved urban development projects in progress; and WHEREAS, adjacent urban development projects as well as local government agency efforts have extended or will extend supporting utilities and infrastructure adjacent to the property; and WHEREAS, the Council has considered and concurs with the following findings made by the Planning Commission as set forth in Resolution No, 150-05, adopted on October 6,2005: 1. The laws and regulations relating to the preparation and adoption of Environmental Impact Reports as set forth in CEQA, the State CEQA Guidelines, and the City of Bakersfield CEQA Implementation Procedures, have been duly followed by city staff and the Planning Commission; and 2. All required notices have been given; and 3. The provisions of CEQA have been followed; and 3 '< <QAK",1' o % >- - I- m -' t- o ORIGINAIt> 4. Based on the initial study and comments received, staff has determined that the proposed project could have a significant effect on the environment. An - -~.-""P"._- -_._.._--~--_...~.--.~~--~-_. Environmental Impact Report was prepared for the project in accordance with CEQA; and 5. The public necessity, general welfare and good planning practices justify the amendment to the Land Use Element of the Metropolitan Bakersfield General Plan, subject to the recommended modification of the General Commercial area; and 6, The amendment to change the Metropolitan Bakersfield General Plan Land Use designations from R-IA (Resource - Intensive Agriculture) to LR (Low Residential) on 1310.08 acres, to HMR (High Medium Residential) on 86.31 acres and to GC (General Commercial) on 86.36 acres; and from R-MP (Resource - Mineral and Petroleum) to LR (Low Residential) on 320.22 acres, to HMR (High Medium Residential) on 23.22 acres and to GC (General Commercial) on 6,77 acres is consistent with the Metropolitan Bakersfield General Plan; and NOW, THEREFORE, IT IS HEREBY FOUND AND RESOLVED as follows: 1, The above recitals and findings incorporated herein by reference are true and correct and constitute the Findings of the City Council in this matter. 2. The report of the Planning Commission, including maps and all reports and papers relevant thereto, transmitted by the Secretary of the Planning Commission to the City Council, is hereby received, accepted and approved. 3. That General Plan Amendment No. 03-1528 to the Land Use Element is hereby approved from R-IA (Resource - Intensive Agriculture) to LR (Low Residential) on 1310.08 acres, to HMR (High Medium Residential) on 86.31 acres and to GC (General Commercial) on 86.36 acres; and from R-MP (Resource - Mineral and Petroleum) to LR (Low Residential) on 320.22 acres, to HMR (High Medium Residential) on 23.22 acres and to GC (General Commercial) on 6.77 acres as requested by the applicant and as recommended by the Planning Commission and shown on the attached map in Exhibit "A", subject to the "Mitigation Monitoring and Reporting Program" adopted in the Final Environmental Impact Report as shown in Exhibit "F" and the "Mitigation/Conditions of Approval" for the project as shown in Exhibit "C". That General Plan Amendment No, 03-1528 to the Circulation Element is hereby approved to change the alignment of the Circulation Element collector roads within the west half of the project boundaries to deviate from the current grid pattern as requested by the applicant and as recommended by the Planning Commission and shown on the attached map in Exhibit "B". 4. Attached Exhibit "D" containing the "Statement of Facts, Findings, and Mitigation Measures" are appropriate and incorporated into the project. 5. Attached Exhibit "E" containing the "Statement of Overriding Considerations" related to significant unavoidable impacts to agricultural resources, noise, and transportationltraffic are appropriate and incorporated into the project. 6. That the infrastructure exists or can easily be provided to accommodate the types of density and intensity of the development. 7, Based on the absence of evidence in the record as required by Section 21082,2 of the State of California Public Resources Code (CEQA) for the purposes of documenting significant effects, it is the conclusion of the Lead Agency that this project will result in impacts that fall below the threshold of significance with regard to wildlife resources anq, Î\ Ií therefore must be granted a "de minimis" exemption in accordance with Section 71~Y 'f1'<J' :::..... -'('\ ~ IT: 4 Õ G ORIGINAL the State of California Fish and Game Code. Additionally the assumption of adverse effect is rebutted by the above-referenced absence of evidence in the record and the lead agency's decision to prepare an Environmental Impact Report for this project. ---------000-------- I HEREBY CERTIFY that the foregoing Resolution was passed_and adopted by the Council of the City of Bakersfield at a regular meeting thereof held on ~OV 1 6 ·2Df'1.'j by the following vote: ~ NOES: ABSTAIN: ABSENT: COUNCILMEMBER COUNCILMEMBER COUNCILMEMBER COUNCILMEMBER v v COUCH, CARSON, BENHAM, MAGGARD, HANSON, SULLIVAN, SCRIVNER /' l-' ~ v ¡.-- PAMELA A. McCARTHY, C CITY CLERK and Ex Officio lerk of the Council of the City of Bakersfield APPROVED NOV 1 6 '2005 APPROVED as to form: VIRGINIA GENNARO City Attorney BY~Î!!, ~ EXHIBIT A B C D E F Land Use Element Amendment Map Circulation Element Amendment Map Mitigation/Conditions of Approval Statement of Facts, Findings, and Mitigation Measures Statement of Overriding Considerations Mitigation Monitoring and Reporting Program PH - S:\GPA 3rd 2005103-1528 Old River EIRIResolutionslCC GPA.doc 5 X %Mf1' () ~ >-.. - I- m - ,.... :.J C> 0Rif>INAl «. 'QóAf1' () ~ >.... m ':::: r- '..) C> ORiGINAL Exhibit A Land Use Element Amendment Map '< 'l:>M./,':9 () ~ ).. - 1- m _ r- ,) 0 'lRIG!NAL Panama Lane LR 89.7Ac. 25-' LR 36.9Ac ,,-3 ~ ~:.-I SCHOOL // LR 33.6Ae. ".. LR 3!I.1A<:. 25-12 LR 35.9Ac. 25-13 ~ OC ~ 12.6Ae. 3&-' LR 46.4Ae. HMR 3&-3 26.1Ac. ..-3 LR MUAc. 3&-14 J.Ðgm LR low DemlIIy R~I HMR HlgtI-Medium Def1sJty ReaidÐf!liaI GC Gen_1 ComIl'l8ldeI ;l ~ J LR U.8Ac. "., LR 36.3Ac. 30-, OVTPARCEL rJ:AJ 30·8 I I LR 29.5Ac.. ".. LR 6O.2A.c.. ".. McCutr.i1enRd. HMR GC 18.8Ac. LR LR 31-3 LR 4O.1Ac. 48.6Ae. 38.6Ac. 39,OAc. 31-7 31-1 .... ! LR HMR 31.. ~.oAc 17.2Ae. ;l i31-2 31.. HOft ~ 2O.0Ac. ~ 31·16 .... OUTPA-RCEl ..-. 39.9Ac. 31-8 -- - r LR 2O.0A.c:. 31-14 OUTPARCEL HMR 2HIAc. 35-12 LR 43.8Ac. ..." Old River Ranch PB Ventures ~ ..........- ,. ~' ---F -~ .G General Plan-Land Use ,.~~~,~~~.'" fC/::=~~"- ReviMd Sept. 9, 2005 ~ CQNflULTINB '< 'òA/(,f1> () ~ >- - I- m - r- o C> OI<If>'NAl Exhibit B Circulation Element Amendment Map ~ 'òAkÆ'1' () <f> "- -<I I- m - ,.... o()rlIGINAC' r-- I I I .......... AI -~:;'I ~ I I !.II1Bd .....,..-- -- I I I I t---- I I I I I I L____ Source: ReF Consulting m Jones & Stokes I ìl I I II --- I r l I II ¡ II I I I I JII' ~-.......=. ...I-....,¡_...I- ....---., I f:::1 II! L-L. -I --::I I I -- L_ 00_ i I I : 1-- I -- I I L_ L__-I I -- I ____~_____ ____a ....- a ". - W r-: ...; '< \)A!\t'1' Proposed Circulation P&n <; I- m - r- '.) C> !")QI(.;INAL EXHIBIT C MITIGATION I CONDITIONS OF APPROVAL GENERAL PLAN AMENDMENT I ZONE CHANGE 03-1528 MITIGATION MEASURES: Aesthetics 1. During the installation of lighting standards, luminaries shall be provided with filtering louvers and hoods to minimize spill light to adjacent properties. Aariculture 2. Upon cancellation of the Williamson Act contracts, the applicant shall pay a fee of 12.5% of the full-assessed value of the parcels for cancellation of Williamson Act contracts. This fee, when collected, shall be transmitted by the County Treasurer to the State Controller. 3. Prior to occupancy of any residential units, if any adjoining properties are still in agricultural use and have not received entitlements for development, then prior to issuance of certificates of use and occupancy, the applicant will demonstrate that future residents will be informed about adjacent agricultural use. This demonstration shall take the form of a covenant filed on the project site (which would be disclosed to future residents through the purchase process). The covenant will provide that each resident acknowledges that he/she is moving into an area where there is active agriculture, and understands that such agricultural use, including all activities necessary to support agriculture-such as pesticide use, dust generated by plowing, and slow-moving agricultural vehicles-will continue. Air Qualitv 4. The project applicant shall comply with SJVAPCD Regulation VIII and implement additional construction vehicle emissions reduction measures. To control the generation of construction-related PM10 fugitive dust and exhaust emissions, the project applicant shall comply with SJVAPCD Regulation VIII and the measures summarized below, SJV APCD Regulation VIII Control Measures for Construction Ernissions of PM- 10: . All disturbed areas, including storage piles, which are not being actively utilized for construction purposes, shall be effectively stabilized of dust «. 'òAKf1' (J ~ ;>.. I- m - c- o C> nRIG!NAL Exhibit C Mitigation / Conditions of Approval GPNZC 03-1528 emissions using water, chemical stabilizer/suppressant, covered with a tarp or other suitable cover or vegetative ground cover. · All onsite unpaved roads and offsite unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizer/suppressant. · All land clearing, grubbing, scraping, excavation, land leveling, grading, cut and fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking. · With the demolition of buildings up to 6 stories in height, all exterior surfaces of the building shall be wetted during demolition. · When materials are transported off site, all material shall be covered, or effectively wetted to limit visible dust emissions, and at least 6 inches of freeboard space from the top of the container shall be maintained. · All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited except where preceded or accompanied by sufficient wetting to limit the visible dust emissions. Use of blower devices is expressly forbidden.) · Following the addition of materials to, or the removal of materials from, the surface of outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient water or chemical stabilizerlsuppressant. · Within urban areas, trackout shall be immediately removed when it extends 50 or more feet from the site and at the end of each workday. · Any site with 150 or more vehicle trips per day shall prevent carryout and trackout. Page 2 of 24 ,. I/JM¡:; , 0' '1,-, .:>- ~' I- rr - f""- o " ORIGINAl S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation I Conditions of Approval GPAlZC 03-1528 SJV APCD Control Measures for Construction Equiprnent Exhaust Emissions: · Use alternatively fueled or catalyst-equipped diesel construction equipment. · Minimize idling time (e.g., 10 minute maximum). · Limit the hours of operation of heavy-duty equipment and/or the amount of equipment in use, · Replace fossil-fueled equipment with electrically driven equivalents. · Curtail construction during periods of high ambient pollutant concentrations; limiting construction may include ceasing of construction activity during the peak hour of vehicular traffic on adjacent roadways. · Implement activity management (e,g., rescheduling activities to reduce short- term impacts). · Properly and routinely maintain all construction equipment, as recommended by manufacturer manuals, to control exhaust emissions. · Encourage ride sharing and use of transit transportation for construction employee commuting to project sites. 5. The URBEMIS2002 model identifies several measures that can be used to minimize emissions associated with residential projects. These measures that are included as part of operations of the proposed project include: · Increase energy efficiency measures in all buildings to ensure that they are 10% more efficient that the energy requirements established by California Title 24, · Ensure that 50% of all landscape maintenance equipment used in commercial applications is electrically powered, 6, Prior to the issuance of the first building permit, the project applicant shall enter into an agreement with the SJVAPCD for the mitigation of NOx, ROG, and PM10 such that the net increase in regional emissions of these pollutants will be zero. Page 3 of 24 ~ 'òMf1' O' ~ >- - I- m _ r- o C> nRIG'NAL S:\GPA 3rd 2005\03~1528 Old River EIR\Conditions Ex C.doc -.--. .--...~-..~'..------.~.---.---~~-... Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 This agreement may include, but is not limited to, the payment of fees to the district, for the purpose of offsetting project emissions. Examples of such a program would be the purchase of new diesel engines for heavy-duty trucks and agricultural equipment, retrofitting diesel engines with controls (e.g., oxidation catalyst, diesel particulate filter), and conversion of city-owned vehicles from gasoline and diesel to compressed natural gas engines. This emissions offset program would be coordinated with and approved by the SJVAPCD and based on estimates of achievable emissions reductions. This offset program would reduce emissions in sufficient quantities such that the net increase in regional emissions would be zero. With implementation of this mitigation, the impact would be reduced to no impact. 7, The project applicant shall enter into an agreement with the SJVAPCD in which the applicant will pay a fee to the SJVAPCD to be used to offset the project's average annual construction emissions. The emissions to be offset include 15.5 tons per year ROG, 25.5 tons per year NOx, and 10.2 tons per year PM10. Implementation of this condition will reduce construction air pollutant impacts to zero. 8. Require that, prior to the sale of all new residential units, that prospective buyers be notified of potential dairy odors. Prospective buyers should be required to sign a statement acknowledging that they are aware of the potential for odors from nearby dairies, and the disclosure shall be included in covenants for new development within the site. Bioloaical Resources 9. The San Joaquin kit fox is a covered species within the MBHCP. The payment of development impact fees is considered adequate mitigation under the MBHCP to minimize impacts to sensitive species. Upon application and approval of future tract map phases within the proposed project area, the applicant shall pay the required mitigation fee or fees, Upon the payment of this fee and receipt of City project approval, a development applicant would become a sub-permittee and would be allowed the "incidental take" of the species in accordance with state and federal endangered species laws and mitigation requirements of all parties, state, federal, and local (MBHCP). Payment to the plan would reduce impacts to less-than-significant levels. 10. To avoid impacts to nesting birds, including the Swainson's hawk, no ground disturbance, site clearing, or removal of any potential nesting habitat shall be Page 4 of 24 , \1>11./(1:", cY -''if> >-. ~ I- m _ r- o C> ORIG:NAl $:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation I Conditions of Approval GPAlZC 03-1528 conducted within the typical breeding/nesting season for birds (February 15 to August 30); 2!, Prior to any ground-disturbing activities, a qualified biologist shall conduct surveys for nesting birds, including raptors, The surveys shall occur at a minimum of 3 days prior to the clearing, removal, or trimming of any vegetation. Surveys shall include areas within 200 feet of the edge of the project boundary and the entire project site, If active nests are found, a 50-foot (minimum) fence barrier shall be erected around the nest site. A 200-foot barrier shall be required for any raptor-nesting site. No habitat removal or any other work shall be allowed to occur within the fenced nest zone until a qualified biologist confirms that the young have fledged and have left the nest. 11. Prior to ground-disturbing activities, a qualified biologist shall conduct surveys for burrowing owls in accordance with the Staff Report on Burrowing Owl Mitigation (CDFG 1995) and the California Burrowing Owl Consortium guidelines. The survey will be conducted over the entire site and, where possible, 150 feet around the project site. If no burrows or burrowing owls are identified, then no further action is required, If burrows or burrowing owls are identified, then the following mitigation should be implemented. If possible, when burrowing owls are detected during the breeding season, impact should be avoided, A no-disturbance buffer zone should be delineated in a 75-meter radius around the occupied burrow. No ground disturbance would be permitted in the no-disturbance buffer zone until a qualified biologist has determined that the young have fledged. Cultural Resources 12, Prior to tentative tract map approval for affected parcels, a qualified archaeologist shall be retained by the developer to perform a subsurface test-level investigation for the identified sites, and surface collection as appropriate, The test-level report evaluating the site shall include a discussion of significance (I.e., depth, nature, condition, and extent of resources), final mitigation recommendations, and cost estimates. Any resource identified shall be recorded, excavated, and curated, as appropriate. Prior to the issuance of a grading permit and based on the report recommendations, final mitigation shall be carried out. Page 5 of 24 '< 'QÞ.K.t1' () <f> >.- ~ 1-- m -' r- f_) f:::J 'lRIr,1NAL S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 13. If buried cultural resources, such as chipped or ground stone, historic bottles or ceramics, building foundations, or non-human bone are inadvertently discovered during ground-disturbing activities, work will stop in that area and within 100 feet of the find until a qualified archaeologist can assess the significance of the find and, if necessary, develop appropriate treatment measures. Treatment measures typically include development of avoidance strategies, capping with fill material, or mitigation of impacts through data recovery programs such as excavation or detailed documentation. Sites discovered having relevance to Native Americans shall be made known to the appropriate individuals/agencies/groups as determined by the archaeologist in consultation with the Lead Agency. If archaeological sites are discovered on site during construction, and an archaeologist is contacted to determine the significance of the find, the developer shall provide written evidence to the City Planning Department that a qualified archaeologist has been retained, shall be present at the pre-grading conference, shall establish procedures for archaeological resource surveillance, and shall establish in cooperation with the project developer procedures for temporarily halting or redirecting work to permit the sampling, identification, and evaluation of the artifacts as appropriate. 14. Prior to final tentative tract map approval for affected parcels (parcels adjacent to the A.T. & S.F. rail line), a qualified architectural historian/historian/historical archaeologist shall be retained by the developer to conduct an evaluation of line for eligibility to federal, state, and local historical registers as an individual resource and/or a component of the rural historic landscape. 15. If buried cultural resources, such as chipped or ground stone, historic bottles or ceramics, building foundations, or non-human bone are inadvertently discovered during ground-disturbing activities, work will stop in that area and within 100 feet of the find until a qualified archaeologist can assess the significance of the find and, if necessary, develop appropriate treatment measures, Treatment measures typically include development of avoidance strategies, capping with fill material, or mitigation of impacts through data recovery programs such as excavation or detailed documentation. Sites discovered having relevance to Native Americans shall be made known to the appropriate individuals/agencies/groups as determined by the archaeologist in consultation with the Lead Agency, Page 6 of 24 x 't,~/(f.:'1' o ~ "- - I- m - r- o C> ORIGINAL $:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 If archaeological sites are discovered on site during construction, and an archaeologist is contacted to determine the significance of the find, the developer shall provide written evidence to the City Planning Department that a qualified archaeologist has been retained, shall be present at the pre-grading conference, shall establish procedures for archaeological resource surveillance, and shall establish in cooperation with the project developer procedures for temporarily halting or redirecting work to permit the sampling, identification, and evaluation of the artifacts as appropriate. 16. If human remains of Native American origin are discovered during project construction, it is necessary to comply with state laws relating to the disposition of Native American burials, which fall within the jurisdiction of the Native American Heritage Commission (Pub. Res. Code Sec. 5097). If any human remains are discovered or recognized in any location other than a dedicated cemetery, there will be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until: . the coroner of Kern County has been informed and has determined that no investigation of the cause of death is required, and . if the remains are of Native American origin, a. the Native American Heritage Commission was unable to identify a descendant or the descendant failed to make a recommendation within 24 hours after being notified by the commission, or b. the descendants of the deceased Native Americans have made a recommendation to the landowner or the person responsible for the excavation work for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98. According to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 8100) and disturbance of Native American cemeteries is a felony (Section 7052), Section 7050.5 requires that construction or excavation be stopped in the vicinity of discovered human remains until the coroner can determine whether the remains are those of a Native American. If the remains are determined to be Native American, the coroner must contact the California Native American Heritage Commission, Page 7 of 24 «. 'òA/í,ç- o 'fr >- -<I .... - _ m o ,.... 0RIG!NAC' S:\GPA 3rd 2005\03~1528 Old River EtR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 Hazards and Hazardous Materials 17. Asbestos-Containina Buildina Materials (ACBMs): Prior to tentative tract map and grading approvals, all areas containing structures that have the potential to contain ACBMs shall be inspected and evaluated by an asbestos specialist to determine the potential to contain such materials. These include structures built before the 1970s, as well as debris piles containing remnant concrete irrigation pipe. All materials determined to contain asbestos or have a high likelihood to contain asbestos shall be abated and shall be disposed of at an appropriate hazardous materials disposal site by a qualified hazardous materials specialist. 18, Tanks. Drums. and Associated Soil Contaminants: Prior to issuance of grading permits for the each subsequent development phase within Project Areas 1, 2, 3, or 4 (as delineated in the Hazards and Hazardous Materials section of the PEIR for GPAlZC 03-1528), soil sampling and analyses shall be conducted in the vicinity of aboveground and underground storage tanks, particularly the three 1,000-gallon and one 10,000-gallon diesel fuel. ASTs associated with three existing water wells on site. Such testing also shall occur at selected locations in the equipment storagelmaintenance yard to define the vertical extent of diesel fuel contamination. Should the analysis of stained soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 19. Soil Samplina and Remediation at Eauipment Storaae/Maintenance Yard: Prior to issuance of grading permits for the subject areas, soil sampling and analyses at selected locations in the equipment storagelmaintenance yard shall be completed to define the vertical extent of diesel fuel contamination, Should the analysis of stained soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 20. Remove Diesel-lmDacted Soil Near Soil Borina 5: Prior to issuance of grading permits for the area near Soil Boring 5, located on the south side of the fenced equipment storage and maintenance yard, approximately 150 feet west of Buena Vista Road (associated with the 1,OOO-gallon diesel AST serving an irrigation well), the contaminated soil shall be removed, A backhoe or excavator shall Page 8 of 24 «. <õAK~ () ~ "- - I- m - r0- o C> ORIG!NAL S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 remove the diesel-impacted soil at the location due to the unknown depth of the contamination. The walls and floor of the excavation shall be sampled when the diesel-impacted soil appears to be removed based on visual observation. Samples shall be sent to a state-certified laboratory for analysis. Contaminated soil shall be stockpiled or containerized in 55-gallon sealed drums and labeled as to the contents and disposed of according to State and local guidelines. Following remediation, the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 21, Conduct Soil SamDlinc and Remediate Near Acricultural Water Well: Prior to issuance of grading permits for the proposed project, soil sampling and analyses shall be conducted in the vicinity of the 1,000-gallon diesel fuel AST associated with an agricultural water well located in the northeastern portion of the subject site to define the vertical extent of diesel fuel contamination, Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required, However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 22. Remove Oilv Waste Drums and Containers: Prior to site development, the two full/partially full 55-gallon drums and one 5-gallon container of oily waste located northwest of the barn shall be removed from the subject site by a licensed contractor and properly disposed of off site. 23. Sample/Analvze and Remove/Remediate Soil Near Abovecround Tanks in Central Storace Yard: Prior to issuance of grading permits, soil samples shall be collected from under the 550-gallon AST and 1,000 gallon diesel AST within the southeastern portion of the storage yard in the central portion of the site. These samples shall be analyzed to determine the presence or absence of concentrations of petroleum fuel constituents. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 24, Sample/Analvze and Remove/Remediate Soil Near 1,000-Gallon Low Sulfur Dved Diesel Tank: Prior to issuance of grading permits, soil sampling and analyses shall be conducted beneath the 1,OOO-gallon AST labeled "low sulfur Page 9 of 24 «. 'òM¿:?> o ~ ~ iiÏ Q r; ORIGiNAL S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc - .-. ----...-,-,-..,-..,--,,-,--.-.----..--.-.. '."--~-'''''''---''------'----~'~'--'~~'--'-'- --.,. Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 dyed diesel" on the unpaved ground surface in the central portion of the subject site to assess the extent and concentrations of diesel fuel impacts, Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to the Central Valley RWQCB requirements prior to site development. 25, Sample/Analvze and Remove/Remediate Stained Soils: Prior to issuance of grading permits, soil samples shall be collected and analyzed at two areas of stained soil in the northwestern and central portions of the site to assess the extent and concentrations of subsurface impacts by related constituents of concern. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required, However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 26. Secondarv Containment Structures Beneath All Abovearound Tanks: For all ASTs that do not contain secondary containment structures, secondary containment shall be placed beneath all onsite ASTs until the removal of the AST occurs for the redevelopment of the subject site, in order to minimize potential unauthorized releases of hazardous materials from potentially impacting the site. 27. Assess and Remove/Remediate Near Metal Pipe: Prior to issuance of grading permits, the approximately 3-inch diameter metal pipe that is protruding from the ground in the northeastern portion of the subject site shall be assessed with a backhoe to determine evidence of subsurface soil impacts by gasoline fuel constituents. Following the subsurface excavation, if soil sampling and analysis is necessary to further assess the concentration and extent of potential impacts, soil samples shall be collected and analyzed to determine the extent and concentrations of subsurface impacts by related constituents of concern. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 28. Remove Waste Oil Drum: Prior to grading of the site, the existing 55-gallon drum of waste oil located in the northern portion of the site adjacent to the onsite Page 10 of 24 'òfIKf.» ~ ~ >- ñi I- r- Q " ORIG!NAL S:\GPA 3rd 2005\03-1528 Old River EJR\Conditions Ex C,doc ,. -~.....-~---,._,_._-------_..,~--_._".._,,- '..-.---.-"-.--"-'.- Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 agricultural water well shall be transported off site for proper disposal by a licensed contractor as soon as possible so that the potential threat of a release to the site is minimized. 29. SamDle/Analvze and Remove/Remediate Soil Near Abovearound Tanks at the Gosford-Coulter Tank Farm: Prior to issuance of grading permits, soil samples shall be collected from beneath the three onsite ASTs without secondary containment features at the Gosford-Coulter Tank Farm facility in the central portion of the subject site. The soil samples should be analyzed to determine the presence or absence of concentrations of total recoverable petroleum hydrocarbons, solvents, and hazardous constituents of antifreeze, Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required, However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 30. SamDle/Analvze and Remove/Remediate Soil Near Abovearound Drums: Prior to issuance of grading permits, soil samples shall be collected and analyzed in the location beneath the onsite, stand-mounted, 55-gallon drum labeled as lube oil and the steel-rack-mounted 55-gallon drum labeled as gear oil at the tank farm facility to determine the presence or absence of concentrations of petroleum hydrocarbons, Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 31. SamDle/Analvze and Remove/Remediate Soil Near Abovearound Crude Oil Tanks: Prior to issuance of grading permits, soil sampling and analysis shall be conducted for the locations of the four former crude-oil ASTs in the east-central portion of the tank farm facility to determine the extent of crude-oil impacts and to determine the presence or absence of concentrations of petroleum fuel constituents. Should the soil analysis reveal that contamination is below toxic limits, no further action would be required, However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. Page 11 of 24 «. 'ò!\Kt'1' G ~ "- - I- m - r- o 0 ORIGiNAL S:\GPA 3rd 2005\03·1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 32. Abandon/Close/Destrov Water Wells: Prior to issuance of any grading permits, all existing water wells shall be properly abandoned/closed and/or destroyed in accordance with state and local guidelines and shall be evaluated and verified by the Water Section of the Kern County Certified Unified Protection Agency. 33. Evaluate and Abandon Former Oil Wells. and ProDerlv Close. Clean. and Re- Abandon. as Necessarv: Prior to issuance of grading permits, inactive or previously abandoned oil wells in the proposed project area defined by the corresponding set of tract map(s) shall be evaluated to ensure that the existing abandonment conditions meet or exceed current DOGGR standards. If not, they shall be properly closed, cleaned, and abandoned or re-abandoned in accordance with all applicable state and local guidelines prior to any ground disturbing activities. All existing inactive oil wells, abandoned oil wells, or shut-in oil wells shall be required to implement a closure plan to render all wells inert and to conform to DOGGR oil well abandonment or re-abandonment procedures. The applicant shall be required to file a Notice of Intent to Abandon Well form with DOGGR. The notice shall include all required abandonment procedures on a well-by-well basis in accordance with Article 14, Chapter 3, Sections 1723 through 1723.9 of the CCR. Abandonment of wells shall be performed and verified to the satisfaction of DOGGR. 34, Test and Remove/Remediate Soil Near Buried Oil Wells: At the time grading operations proceed, an excavator shall be used to remove soil overlying and surrounding each of the buried abandoned oil wells that were discovered on site at their staked locations. When safe access has been provided at each location, each well shall be tested for methane emissions. This testing will verify the integrities of the abandonment plugs, Once the wells have been exposed, further geophysical testing may continue in order to locate, insofar as possible, the mud pits and/or production sumps associated with the wells, These pits and sumps might be expected to be located within a 75-foot radius of each well. Once the pits and sumps are located, analytical samples shall be collected in order to determine their contents. Upon analysis of the collected samples, a determination shall be made regarding subsequent remedial actions, Prior to commencement of any construction activity in these areas, final confirmation and a closure statement shall be obtained by the City of Bakersfield Fire Department ESD. If the City of Bakersfield Fire Department ESD is not satisfied that all potentially hazardous materials have been removed to acceptable concentrations, a remedial action plan shall be developed and implemented to the division's satisfaction. Page 12 of 24 í'JiI/(t~ ~ ~ >- - ~ ~ o C> ORIGINAL S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 35, Fence All Oil Wells: Prior to occupancy of any residence within the project area, each area containing (an) oil well(s) (either active, abandoned, or shut-in) shall be made inaccessible with chain-linked fence until such time that they have been closed and abandoned to the satisfaction of DOGGR. 36, Evaluate and Remove/Remediate Oil Mud Pits: Prior to the approval of final tentative tract maps and grading plans, all areas surrounding former or current oils wells that contain oil mud pits or residues thereof shall be evaluated through subsequent sampling and testing to determine their characteristics and vertical and lateral extent. All areas contain drilling muds and such residues shall be excavated, and the removed soils shall be disposed of at an appropriate hazardous materials disposal site according to state and local guidelines. All work shall be completed to the satisfaction of the DTSC and DOGGR. 37. Remove Oil and Gas Pipelines and Associated Contaminated Soils: Prior to the approval of grading permits, all abandoned oil and gas pipelines shall be removed, and the soil conditions shall be monitored by a qualified hazardous materials specialist. If soil staining is evident, removal actions shall cease in the vicinity until the nature of the stain is determined. All areas containing petroleum- stained soils shall be excavated, and the removed soils shall be disposed of at an appropriate hazardous materials disposal site according to state and local guidelines to the satisfaction of DTSC and DOGGR. 38. Test and Remove/Remediate Petroleum-Stained Soils: Prior to final tentative tract map and grading approvals, all areas in the project boundaries showing evidence of petroleum-stained soils shall be evaluated through subsequent testing to determine the vertical and lateral extent of any such spill. All areas contain spilled oil or other petroleum products shall be excavated, and the removed soils shall be disposed of at an appropriate hazardous materials disposal site according to state and local guidelines, All work shall be completed to the satisfaction of the DTSC. 39. Remove Potential PCB-Containina Transformers: Prior to the approval of grading permits, power poles containing transformers suspected of containing PCBs shall be removed by a qualified hazardous materials specialist as coordinated by PG&E to the satisfaction of the City of Bakersfield Fire Department ESD. These items shall be disposed of at an appropriate hazardous materials disposal site to the satisfaction of DTSC, Page 13 of 24 «. 'òM(1' a <!;, >- - ,..... m _ r- o 0 ORIGiNAL S:\GPA 3rt! 2005\03~1528 Old River EIR\Conditions Ex C.doc ~ '-'- '-"-"'-'~'-'~---'-'---'------~-"'-"-'--r--"'''''--.-----.---,~---~--.-~. -,. _'~'W"___""_'__"", Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 40. Delineate and Remove/Remediate Soil with PCB Content: Prior to the approval of grading permits, the location of the former transformer fire and subsequent release of PCBs in 1990 near the intersection of Buena Vista and McCutchen Roads shall be completely delineated and remediated as necessary. Soil samples shall be collected from the northeastern corner of the subject site and analyzed for PCB content. Should the soil analysis reveal that the soils are clean, then no further action would be warranted. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to development of the site, 41, Remove/Abandon/Close Septic Tanks: Prior to the approval of final tentative tract maps and grading approval, all septic tanks shall be removed/abandoned/closed in accordance with applicable state and local guidelines. Hydrology and Water Quality 42. Prior to final approval of tentative tract maps and authorization of grading plans, a SWPPP shall be prepared by the project contractors and be made available to the City Engineer for inspection and comment. The SWPPP shall identify erosion minimization and control provisions, pollution detection provisions, and pollution elimination/minimization provisions, The SWPPP shall include best available technology, engineering, and design solutions such as the use of silt screens, hay bales, modern trash screens, energy dissipaters, and/or absorbent devices. Stormwater runoff water quality monitoring procedures shall be clearly detailed in the SWPPP. Land Use and Plannina 43. Refer to Biological Resources condition #9 regarding payment of the Metropolitan Bakersfield Habitat Conservation Plan development impact fee. Noise 44. Construction activity located within 1,000 feet of residences shall be limited to the hours between the hours of 6 a.m. and 9 p.m. on weekdays, and between 8 a,m. and 9 p,m. on weekends. Page 14 of 24 «. 'òAKÆ'1' () <f> ;,.. ~ I- 111 - r- o C> ORIGINAL S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex Codoc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 45, Outdoor activity areas of residential areas shall be designed such that noise from traffic does not exceed 65 dB CNEL. The project applicant for each tract map shall retain a qualified acoustical consultant to design treatments for residences located adjacent to roadways in and around the proposed project area such that exterior noise levels under 2030-with-project conditions does not exceed 65 dB CNEL at outdoor activity areas. Treatments may include methods such as construction of a soundwall or earth berm between the new residences and the roadway or placement of building structures between roadway and outdoor activity areas. The acoustical consultant will prepare and submit to the City a report detailing the acoustical treatments to be used for compliance with this performance standard, The report must be reviewed and approved by the City before a building permit will be issued, The design of project buildings will reflect the approved report. 46. Interior areas of residential units shall be designed such that noise from traffic does not exceed 45 dB CNEL. The project applicant shall retain a qualified acoustical consultant to ensure that interior noise levels at residences does not exceed 45 dB lcJn under 2020 with-project traffic conditions. If treatments are necessary, treatments may include installing acoustically rated doors and windows, and blocking sound transmission paths through vents or other openings in the building shell, The acoustical consultant will prepare and submit to the City a report detailing compliance with the interior noise performance standard or, if necessary, the acoustical treatments to be applied to the building for compliance with the interior noise performance standard. The report must be reviewed and approved by the City before a building permit is issued, 47. Commercial and industrial uses shall be designed such that noise from operations does not exceed City noise standards for non-transportation sources. The project applicant shall retain a qualified acoustical consultant to design treatments for commercial and industrial uses such that residences located adjacent to these uses will not be exposed to noise exceeding City standards for non-transportation uses. Treatments may include methods such as: · limits on hours of operations · use of enclosures or localized barriers around equipment noise sources · placement of barriers between the residences and commercial and industrial uses Page 15 of 24 '< 'òMt1 () ~ >- - I- m _ r- o C> ORIGINAL S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 · use of mufflers on equipment exhaust The acoustical consultant will prepare and submit to the City a report detailing the acoustical treatments to be used for compliance with this performance standard. The report must be reviewed and approved by the City before a building permit will be issued. The design of commercial and industrial uses will reflect the approved report. 48. Residential uses shall be designed such that noise from oil well operations does not exceed City noise standards for non-transportation sources at residences on the project site, The project applicant shall retain a qualified acoustical consultant to design treatments for the oil wells or the residences such that residences located adjacent to oil wells would not be exposed to noise exceeding City standards for non-transportation uses. Treatments may include methods such as: · conversion of oil well diesel motors to electric motors, · limiting hours of oil well operation, · use of enclosures or localized barriers around the oil wells, and · placement of barriers between the residences and oil wells. The acoustical consultant will prepare and submit to the City a report detailing the acoustical treatments to be used for compliance with this performance standard for each tract map. The report must be reviewed and approved by the City before a building permit will be issued. The design of residential uses will reflect the approved report. Public Services and Utilities 49. Prior to the issuance of any building permit, developers within the proposed project site shall submit to the City for review and approval a plan to separate recyclable/reusable construction debris. The plan shall include the method the contractor will use to haul recyclable materials and shall include the method of and location of materials disposal. The builders shall be responsible for hauling their own construction debris to the Mount Vernon Facility or entering into a contract with a licensed hauler for disposal of construction debris. Page 16 of 24 '< 'ò1\K~1' o <.r ~ ~ ~_ m ~..... r- ~) C> ~WAL $:\GPA 3rc12005\03-1528 Old River EIR\Conditions Ex C,doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 Recreation 50. Prior to approval of each Tentative Tract or Vesting Tentative Tract, the applicant shall provide public parks, as deemed necessary by the city, in conformance with Title 15,80 of the Bakersfield Municipal Code, In the event a city wide master trails plan is adopted prior to approval of each Tentative Tract or Vesting Tentative Tract that reduces the public park requirement, the adopted ratio will be used to calculate the public park requirement. Proposed greenbelts and private recreational facilities shall be maintained by the homeowners association. TransportationlTraffic 51. Prior to approval of improvement plans for any portion of the proposed project, the project applicant shall develop and implement a Traffic Control Plan. The Traffic Control Plan shall be implemented throughout the course of project construction, and shall include the following elements: · Contain a plan for communicating construction plans with transit providers, emergency service providers, residences, and businesses located in the project vicinity, and anyone else who may be affected by project construction, · Identify roadway segments or intersections that are at or approaching level of service that exceeds local standards, and provide for construction-generated traffic to avoid these locations at the peak periods, either by traveling different routes or by traveling at non-peak times of day, · Contain an access and circulation plan for use by emergency vehicles when lane closures and/or detours are in effect; if lane closures occur, provide advance notice to local fire and police departments to ensure that alternative evacuation and emergency routes are designed to maintain response times. · Maintain access to existing residences in the area at all times. · Provide for adequate parking for construction trucks and equipment within the designated staging areas throughout the construction period. · Provide adequate parking for construction workers within the designated staging areas. Page 17 of 24 «. 'ò1lK~1' o ~ >- - I- 111 - r- '.J C::> ORIGiNAL $:\GPA 3rd 2005\03-1528 Old River EIR\Condiüons Ex C.doc _...~.. .'~.._.....,._.,-..._-_.__.._. .~..-~._-- Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 · Restrict delivery of construction materials to between the hours of 9:00 a.m. and 3:00 p.m. to avoid more congested morning and evening hours, · Require traffic controls on roadways adjacent to the proposed project, including flag persons wearing bright orange or red vests and using a "Stop/Slow" paddle to control oncoming traffic; construction warning signs should be posted in accordance with local standards or those set forth in the Manual on Uniform Traffic Control Devices (FHWA, latest edition), in advance of the construction area and at any intersection that provides access to the construction area. · Require that written notification be provided to contractors regarding appropriate routes to and from the construction site, and the weight and speed limits on local roads used to access the construction site. · Specify that a sign be posted at all active construction areas giving the name and telephone number or email address of the City staff person designated to receive complaints regarding construction traffic. 52a. Prior to approval of each Tentative Tract, Vesting Tentative Tract, or Parcel Map (except Parcel Maps for financing or conveyancing purposes only that require further subdivision prior to development) for residential projects and PCD or Site Plan applications for other uses, the map or project applicant shall confirm the specific traffic circulation improvements that will be implemented with that tentative map, PCD or Site Plan as identified in the Traffic Impact Study (Ruettgers & Schuler 2005) to: 1) Provide the traffic circulation improvements necessary to serve the immediate map area; and 2) Maintain the City's adopted minimum level of service standard (currently LOS C) on the roadway network that will be impacted by the project traffic, or, for those eight (8) intersections and seven (7) roadway segments that cannot be improved to the minimum level-of-service standard or better, with or without the project, to provide the project fair-share contribution to the improvements, Note 1 The necessary improvements are identified in Tables 30- 16 and 30-17 of the PEIR for GPAlZC 03-1528. Page 18 of 24 «. 'òA/(Æ'1' () <f> ~ -<I I- - ,_ 111 o r- OR¡(;'NAC> S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 Note 1: The fair-share improvements for the 8 intersections and 7 roadway segments that cannot be improved to the minimum level of service standards shall include acceptable engineering solutions, approved by the City Engineer, to provide improvements beyond standard. Said improvements could include but not be limited to, a super-arterial concept greater than 6-lanes, higher capacity limited access facilities, non-standard high-capacity intersection designs and contributions toward the capacity relieving beltway system. 52b. To demonstrate that appropriate mitigation is being provided with each Final Map (except Parcel Maps for financing or conveyancing purposes only that require further subdivision prior to development), the process will be as follows: · The applicant will provide confirmation of the traffic analysis (based upon updated data at the time, where applicable in consultation with the City Engineer) for each tentative map, PCD or Site Plan based on current information on the status of RTIF and local improvements at the time of approval processes for each tentative map, PCD, or Site Plan Review, . The applicant and the City will identify the incremental improvements applicable to the tentative map, PCD, or Site Plan to be implemented through one or more of the following methods: o Build the improvements (if all necessary rights-of-way are available) and, if applicable, receive reimbursement credits for any percentage share not attributable to impacts caused by traffic generated from the map, PCD, or Site Plan. o Pay the City per unit mitigation fee. o In the event all necessary rights-of-way are not available at the time the applicant confirms the specific traffic circulation improvements to be implemented, the applicant shall pay the City the per unit mitigation fee in lieu of constructing the improvements for those portions where rights-of- way are not available. . The project applicant and the City will verify the timing of the improvements to be constructed by the applicant for recordation of each Map, PCD or Site Plan, and shall establish the threshold at which the improvements shall be constructed, The threshold shall depend on the particular improvement, the project fair-share contribution to the improvement and the nature of the particular Map/PCD/Site Plan, and may be tied to the number of lots within the Map area that may be recorded as part of a Final Map or Partial Final Page 19 of 24 'ò~Kf?> ~ ~ >- ííí ~ t; ')"wW"',JNlIl S:\GPA 3rd 2005\03-1528 Old River EIR\Conditíons Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 Map. 52c. For those improvements to be constructed by the City using mitigation fees paid by the project applicant and other sources of financing, the applicant's obligation will be satisfied by payment of the fees, 53. Prior to approval of tentative tract maps for subsequent phases of the proposed project, construction plans shall be approved by the Fire Marshall or appropriate representative to ensure that all fire code requirements are incorporated into the proposed project design, All development within the proposed project area shall conform to codes and access requirements established by the Uniform Fire Code and City of Bakersfield Municipal Code Sections 15.64.010 to 15,64.480, 54. During design of tentative tract maps for subsequent phases of the proposed project, adequate parking shall be provided in accordance with City of Bakersfield Municipal Code standards. Construction plans shall be reviewed and verified by the Planning Department that the project components provide appropriate parking to minimize offsite parking impacts or neighborhood intrusion, CONDITIONS OF APPROVAL: Public Works Conditions 55. Prior to approval of any development plan, improvement plan, or application for a lot line adjustment, the following shall occur: a. Provide fully executed dedication for Allen Road, Panama Lane, McCutchen Road, Buena Vista Road and Old River Road to arterial standards; and Mountain Vista Drive, Windermere Street, Berkshire Road and McKee Road to collector standards for the full frontage of the area within the GPA request. Also, provide dedication documents in a form acceptable to CalTrans for Taft Highway (The width of dedication required by CalTrans is different from that required by the City of Bakersfield; the applicant must verify their proposed section with CaITrans). Dedications shall include sufficient widths for expanded intersections and additional areas for landscaping as directed by the City Engineer. Submit a current title report with the dedication documents. If a tentative subdivision map over the entire GPAlZC area is submitted, dedication can be provided with the map. Because this GPAlZC Page 20 of 24 " 'ò1\l(~1' () ~ >- - I- 111 - r- o 0 0"1f';;NAL $:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc --' --- ...._--~" ,-.-.... ~,"-.,",_..~,--_.." -,......-----.-..--....-..,.--.-. Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 area is so large, the applicant can phase his dedications provided he presents a dedication phasing plan acceptable to the City Engineer. b. Submit a comprehensive drainage study to be reviewed and approved by the City Engineer. No more than 1 sump per 80 acres may be utilized to serve this area; these sumps should be located so that they may be available to serve adjacent areas as they develop. The study shall be approved and any required retention site and necessary easements dedicated to the City. c. Sewer service must be provided to the GPAlZC area, The developer shall be responsible for the initial extension of the sewer line to serve the property. The developer shall submit for the City's review a comprehensive program to provide sewer service to the entire GPAlZC area. This plan may address the timing of development of various areas within the GPAlZC request and how sewer service will be extended to these areas. This sewer system must necessarily be sized to serve a much larger area that the project area. The City is willing to aid the developer in the formation of a Planned Sewer Area and/or an Assessment District to provide a mechanism for the reimbursement of oversizing costs to the developer. 56, Developer shall pay median fees for Taft Highway and all arterials within the boundaries of the GPAlZC area, The payment of these fees may be phased to match the construction phasing of the project. 57, For orderly development and for improved circulation, the commercial frontages shall be constructed at the earliest opportunity. The Planning Commission shall have the authority to require full improvements in front of a commercial parcel with the development of an adjacent parcel. Full improvements shall include, but not be limited to, full paving, curb, gutter, and sidewalk, interconnect conduit, street lighting, storm drainage system, sewer mains and utilities. Inasmuch as commercial areas are usually located at intersections, said improvements may include the frontages of the intersecting streets, The Planning Commission shall also have the authority to require full improvements in front of an intervening "outparcel" if a gap is created between areas of full improvements along a road. (Added by the Planning Commission) 58. If it becomes necessary to obtain any off site right of way and if the developer is unable to obtain the required right of way, then he shall pay to the City the up- front costs for eminent domain proceedings and enter into an agreement and post security for the purchase and improvement of said right of way. Page 21 of 24 '< 'òAKf5' () ~ "- - t-- m - c- o C> "DI!;'NAL $:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 59. The entire area covered by this General Plan Amendment shall be included in the Consolidated Maintenance District. The applicant shall pay all applicable fees for inclusion in the Consolidated Maintenance District with submittal of any development plan, tentative subdivision map, Site Plan Review, or application for a lot line adjustment for any portion of this GPA area. (Ordinance and Policy) 60. Pay the standard residential and commercial Regional Transportation Impact Fees as adopted at time of development. Fees shall be computed by special study in compliance with City policy. Said study shall be completed prior to recordation of the first map or approval of the first development. (Ordinance and Policy) Recreation and Parks Conditions 61, Prior to the approval of the first tentative subdivision map within the GPAlZC area, a Master Parks and Trails Plan for the entire GPAlZC area shall be approved by the Planning Commission following a public hearing. The owners of all properties affected by the proposed trail alignment within and east of the GPAlZC area shall be provided notice of this public hearing. 62. Prior to submittal of any subdivision, owner shall enter into an agreement to pay a park development fee not to exceed $1,275 per unit to be used for the acquisition and development of an urban park, This fee is to be in addition to the current park development fees required by ordinance. Police and Fire Services Condition 63. Prior to submittal of any subdivision, owner shall enter into an agreement to pay a fee to provide for the purchase of equipment and apparatus required for police and fire services. Said fee will be imposed and collected at the time of issuance of a building permit in an amount not to exceed $234 per unit. Community Facilities District Condition 64. Prior to submittal of any subdivision, owner shall enter into an agreement to support the establishment of a Community Facilities District to include an assessment on all property covered by the proposed Old River Ranch Project. The intent of the district is to provide financing for the operation and maintenance Page 22 of 24 'ò f.I~ ¿~ ~ <f' v ...' >- -" I:: J!I o C> ORiG!NAL S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 of public facilities and services for Police and Fire services required to support the project. Golden EmDire Transit District Condition 65. Specific bus turnouts and shelters shall be located as necessary at appropriate locations to serve residential, commercial, and school sites within the project area in consultation with the Golden Empire Transit District. The bus turnouts and shelters shall be planned by developers in the project area and local transportation coordinating entities to encourage the efficient and practical use of public transit entities servicing the project area, (Added by the Planning Commission) Photovoltaic Systems Condition 66, Prior to issuance of the first single-family residential building permit, the developer shall demonstrate to the satisfaction of the Planning Department that photovoltaic systems will be offered to all single-family homebuyers as an optional feature. (Added by the Planning Commission) Street Liahtina Condition 67. Prior to recordation of final maps, the Public Works Department shall verify that all associated improvement plans specify that all street lights are to be zero cutoff fixtures, (Added by the Planning Commission) Williamson Act Contract Cancellation Fee 68. Prior to the recordation of a subdivision map creating parcels less than twenty acres in size or the issuance of a building permit for any urban or non-agricultural uses on Assessor Parcel Numbers 497-031-32, 497-031-37, 497-040-02, 497- 040-03, 497-040-11, 497-040-18, 497-040-19, and 497-060-01, the applicanUdeveloper shall provide proof to the City of Bakersfield Planning Department that the required Williamson Act Land Use Contract cancellation fee of $3,560,625, or as calculated by the Kern County Assessor's Office, has been paid to the Kern County Treasurer. Page 23 of 24 «. 'òf\l(Æ'1> () ~ ;:: r£¡ Q <:> ORIG'NAl S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc Exhibit C Mitigation / Conditions of Approval GPAlZC 03-1528 City Attornev Condition 69. In consideration by the City of Bakersfield for land use entitlements, including but not limited to related environmental approvals related to or arising from this project, the applicant, and/or property owner and/or subdivider ("Applicant" herein) agrees to indemnify, defend, and hold harmless the City of Bakersfield, its officers, agents, employees, departments, commissioners or boards ("City" herein) against any and all liability, claims, actions, causes of action or demands whatsoever against them, or any of them, before administrative or judicial tribunals of any kind whatsoever, in any way arising from, the terms and provisions of this application, including without limitation any CEQA approval or any related development approvals or conditions whether imposed by the City, or not, except for CITY's sole active negligence or willful misconduct. This indemnification condition does not prevent the Applicant from challenging any decision by the City related to this project and the obligations of this condition apply regardless of whether any other permits or entitlements are issued. The City will promptly notify Applicant of any such claim, action or proceeding, falling under this condition within thirty (30) days of actually receiving such claim. The City, in its sole discretion, shall be allowed to choose the attorney or outside law firm to defend the City at the sole cost and expense of the Applicant and the City is not obligated to use any law firm or attorney chosen by another entity or party . Page 24 of 24 X ~Þ<Kt"-9 () ~ >- - I- m _ c- o C> nRiG~NAL S:\GPA 3rd 2005\03-1528 Old River EIR\Conditions Ex C.doc - ---- -_...-.<----'-----_.._-~--~--"--_..._--- Exhibit D Statement of Facts, Findings, and Mitigation Measures x¡¡,ÁKf,9 () ~ "- - I- m _ r- o 0 OR!G!NAl Statement of Facts, Findings, and Mitigation Measures Introduction To support a decision on a project for which an Environmental Impact Report (EIR) is prepared, a Lead or Responsible Agency must prepare written findings of fact for each significant environmental impact identified in the EIR. Pursuant to Section 21081 of the Public Resources Code and Section 15091 of the State CEQA Guidelines, the City of Bakersfield, as the Lead Agency, has prepared these Findings of Fact for the Old River Ranch project. These Findings of Fact must be adopted by the City Council after certification of the Final Program EIR (pEIR) and at the time of approval of the proposed project. Section 15091 of the CEQA Guidelines provides that no public agency shall approve or carry out a project for which an EIR has been certified which identifies one or more significant environmental effects of the project unless the public agency makes one or more written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each finding. The possible findings are: · Changes or alterations have been required in, or incorporated into, the project, which avoid or substantially lessen the significant environmental effects as identified in the Final EIR. · Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adopted by such other agency or can and should be adopted by such other agency. · Specifir. economic, legal, social, technological, or other considerations, including provisions of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the Final EIR. After considering the Final EIR in conjunction with making findings, the Lead Agency must not approve the project if it will have a significant effect on the environment unless it finds that the benefits of the project outweigh the unavoidable adverse environmental effects. CEQA requires decision makers to Old River Ranch Project (GPAlZC #03-1528) September 200~ ~Ak'¡:-1' J&S~ ~ I- m - r- o C> ORIGINAL City of Bakersfield Statement of Facts, Findings, and Mitigation Measures balance the economic, legal, social, technological, or other benefits of a proposed project against its unavoidable environmental risks when detennining whether to approve a project. Pursuant to Section 15093 of the CEQA Guidelines, a St¡,tement of Overriding Considerations has been prepared for the proposed proje~t. Project Objectives The project applicant and the City have both developed objectives for the proposed project, each of which are presented below. Applicant's Objectives · To develop a high quality master planned community with its own identity, incorporating a range of housing types; recreational features including parks, greenbelts, trails, and playing fields; and shopping, employment, and educational facilities. · To proyide a mix of uses that would be mutually supportive linked by trails and greenbelts, reducing automobile dependency and encouraging pedestrian activity. These design features are expected to reduce air emissions related to transportation. · To create an ecologically sound development that incorporates a comprehensive program of resource protection and conservation. · To develop a self-contained community focused on a mixed-use Village Center that serves as an entertainment and service center, and a gathering place for a wide range of community activities and special events. · To create a public and private system of parks, trails, and community recreation facilities integrated into the physical plan of the community. · To implement comprehensive streetscape and landscape standards throughout the community, creating a unique identity and sense of place. · To implement a comprehensive road and infrastructure improvement phasing program assuring adequate capacity for buildout of the planned development. · Provide a mix of housing for various economic levels of the community. City of Bakersfield's Objectives The City has identified in its MBGP goals and objectives guiding future urban growth, including the fast-growing southwest Bakersfield area. The general plan represents the official statement of the community's physical development goals as well as economic, social, and environmental goals. Pertinent City goals and objectives for the proposed project include: 2 'òMf-9 September 20J- ~ >- - rn J&S04~ r- o <::J ORiG~NAL Old River Ranch Project (GPAlZC #03-1528) ~..~ _.-- .,------ City of Bakersfield Statement of Facts. Findings. and Mitigation Measures Chapter II, land Use Element · Accommodate new deyelopment which captures the economic demands generated by the marketplace and establishes Bakersfield's role as the capitol of the southern San Joaquin Valley. · Accommodate new development which provides a full mix of uses to support its population. · Accommodate new development which is compatible with and complements existing land uses. · Accommodate new development which channels land uses in a phased, orderly manner and is coordinated with the provision of infrastructure and public improvements. · Accommodate new development that is sensitive to the natural environment, and accounts for environmental hazards. · Establish a built environment which achieves a compatible functional and visual relationship among individual building sites. Chapter III, Circulation/Streets · Provide a safe and efficient street system that links all parts of the area for movement of people and goods. · Provide for safe and efficient motorized, non-motorized, and pedestrian traffic movement. · Minimize the impact of truck traffic on circulation, and on noise sensitive land uses. · Provide a street system that creates a positive image of Bakersfield. · Provide a local street network that contributes to the quality and safety of residential neighborlloods and commercial districts. Chapter IV, Housing · Provide an adequate supply of sites for the deyelopment of sound, affordable new housing. Chapter V, Conservation/Biological Resources · Conserve and enhance Bakersfield's biological resources in a manner which facilitates orderly development and reflects the sensitivities and constraints of those resources. 3 M September 20~ 'ò ¿:?'~ J&So.ffg1 ñí '::: r- o C> ORIGiNAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures Chapter VI, Open Space · Conserve and enhance the unique aspects of open space within the planning area. · Create an integrated system of open space amenities in the planning area. Chapter X, Public Services & Facilities/Utilities · Maintain a coordinated planning and implementation program for the provision of public utilities to the planning area. · Coordinate the planning and implementation of planning area municipal-type utility facilities and services. Chapter XI, Parks · Provide parks and recreation facilities to meet the planning area's diverse needs. Proposed Project The proposed project is GPA, Zone Change, and Annexation of approximately 1,853 acres to the City to allow for the new master planned conununity. The design of the proposed project includes a mixed-use development defined by various land use concepts, including low- to high-medium density residential, recreation, general conunercial, school, and public service infrastructure. More specific descriptions of the proposed uses within these areas are described below. The proposed project will be subject to a Development Agreement with the City. Proposed GPA As discussed above, the project applicant is proposing a GPA to change the existing MBGP land use designations. The proposed GPA would change the land use designations from Intensive Agriculture (R-IA - minimum 20-acre parcel size) and Mineral and Petroleum (R-MP - minimum land use designation size 5 acres), to a mix of the following: · LR - Low Density Residential, which is less than or equal to 7.26 dwelling units per net acre (du/ac) (single-family detached housing, typical of tract deyelopments); · HMR -- High-Medium Density Residential, which is greater than 7.26 dulac and less than or equal to 17.42 dulac within the City, and less than or equal to 17.42 dulac in the County of Kern; and 4 September 200~ 'òA kt1'<f> J&S04~ : - r- o 0 ORIG:NAL Old River Ranch Project (GPAlZC #03-1528) -----~_.- ...---- --".--------.---"... ----...-.-,...-----. City of Bakersfield Statement of Facts, Findings, and Mitigation Measures · GC - General Commercial, which is a maximum floor area ratio (FAR) of 1.0 and 4 stories (for retail and service facilities that provide a broad range of goods and services, which serve the day-to~y needs of nearby residents). In addition, as part of the proposed GP A, the applicant is proposing to change the cir<:ulation, which would require amending the Circulation Element of the MBGP. The proposed project would alter the existing Circulation Element in the vicinity of this project to provide a more efficient circulation network to serve the proposeá project. As part of the Circulation Element Amendment, the major perimeter and internal arterials would remain in their current alignments as Arterial roadways. The proposed Major Collector roads in the western half of the site would be reconfigured to eliminate the existing grid pattern within the site. Zone Change The proposed project also includes prezoning by the City, which would change the zoning from Kern County's existing zoning classification of A (Exclusive Agriculture) to a mixture of residential and commercial zones, consistent with the GPA. Figure ES-7 shows the proposed zoning, which would consist of the following zoning classifications: · R-1 (One-Family Dwelling Zone)- typically characterized by single-family subdivision. However, other allowable structures and uses such as accessory buildings (Le., garages, greenhouses, and swimming pools), home-based daycares, and home occupations can be incorporated. · R-2 (Limited Multiple-Family Dwelling Zone)-characterized by all uses pennitted in an R-I zone, as well as limited multiple-family dwellings and accessory buildings not exceeding 12 % of the area. · R-3 (Limited Multiple-Family DweUing Zone}--characterized by all uses pennitted in the R-1 and R-2 zones, as well as multiple-family dwellings and apartment houses, and accessory buildings or structures necessary to such use located on the same lot or parcel of land. · C-1 (Neighborhood Commercial Zone)-medium-sized commercial development. The collection of stores in these locales would typically be small shopping centers or strip malls. Allowable uses include, but are not limited to any use pennitted for a CoO zone (Professional and Administrative Office Zone), apparel and accessory stores (excluding large-scale chain department stores), automobile service stations, drugstores/pharmacies, grocery stores, beauty salons, pet and pet supply stores, and restaurants. Public utility structures and water pump stations also are allowed pursuant to planning director review and approval. · C-2 (Regional Commercial Zone)-typically associated with larger commercial centers that may contain a number of larger-scale stores as well as a mixture of smaller retail outlets, which can include any use pennitted for CoO Zone (Professional and Administrative Office Zone) and C-I Zone, apparel and accessory stores, automobile dealerships, computer software 5 'òI<K ~ September 2005 ¿¡ C"~..;, "- -- J&S 041911::: g! o C> ORiG'NAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts. Findings, and Mitigation Measures stores, department stores, fanners markets on weekends, hardware stores, hotels, restaurants and other eating-related places, sporting goods stores, theaters, and public or commercial parking. . C-C (Commercial Center Zone}-intended for those areas in the city that are planned for large-scale mixed-use development centers consisting of conunercial and high-density residential uses consistent with the center's concept as described in the general plan. The C-C zone is also intended to allow a mix of commercial and residential uses that support businesses within the commercial core of the city, providing a hannonious transition from the commercial areas to residential areas. Allowable uses include, but are not limited to any use permitted in the R-3, R-4, C-Q, C-l, and C-2 zones, except those uses permitted in the R-l and R-2 zones as referenced. In connection with the commercial zones, a Planned Commercial Development (PCD) overlay would also be required, The PCD zone would be used in combination with the proposed commercial zones when assigning a base zone that defines allowable uses and ensures future site development would be compatible with surrounding development andlor recognizes unique site characteristics. Development Plan Concept The proposed project involves a new master planned community in southwest Bakersfield featuring a balance of residential, retail, employment, recreation, and public facilities. A mixed-use Village Center is proposed as the focal point of the new community, linked to residential neighborhoods by a system of multi-purpose trails and local streets. The proposed project features a variety of residential densities, with trails, retail facilities, schools, and parks to encourage a more walkable community. A description of the concepts for ultimate development of the site is provided below to outline a broad guide to the related entitlements that may be requested in the future. The following is conceptual, not detailed. Detailed design would occur as future entitlement applications are submitted for review by the City at a tract map level. Table 1 provides a summary of proposed land use acreages. Tabl!! 1. Acreage Summary of Proposed Land Uses Land Use Zone R-t PUD (One-Family Dwelling Zone with Planned Unit Development) R-2 (Limited Multiple-Family Dwelling Zone) C-C (Community Commercial Zone) C-2 (Regional Commercial Zone) Gross Acreage l,630.34 109.53 61.38 22.09 6 s.Pt.mb~&Jt Kç-1'<f> -<I J~04191 ñí - r- o C> OR'r>'''JAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures C-I (Neighborhood Commercial Zone) 9.66 ___...__._______.___.___.______.__._____.___________n_.__.__.__.__.__"_.__n___.__...._._.__·__n___...___.____---.....-.- Total Project Acreage 1,833 Acres The site would be developed in phases and divided into four sections, which would consist of several land uses, including low-medium and high-medium density residential, commercial retail and office uses, and parks. Additionally, public service uses such as schools would be included within the plan area to accommodate future students generated by the proposed project. The locations of the schools are yet to be detennined. The main design goal of the proposed project is to create a walkable community, which is accommodated by incorporation of design features to increase pedestrian accessibility to the various project components. Specific design features to accomplish this increased accessibility include use of pedestrian pathways as well as roadway designs aimed at calming traffic. The proposed project also has been designed to encourage pedestrian traffic by placing destination points such as parks and commercial centers within walking distance of most residences. Perimeter walls would be placed around the project boundary along Taft Highway, Old River Road, Allen Road, and Panama Lane primarily because of traffic noise from these arterial roadways. The majority of residential units would be single-family and would total approximately 5,979 units. The community would be divided into four sections, which would be generally delineated by the quadrants created by Buena Vista an" McCutchen Roads that would fonn the perimeters. Each section is proposed to contain four neighborhoods for a total of 16 neighborhoods throughout the proposed project. At the center of each section would be a community park within walking distance of residents. Higher density multi-family residential areas would include approximately 1,058 units, and would be located in three general areas: two would be adjacent to the southern right-of-way of McCutchen Road and the third would be at the northeast comer of Allen Road and Taft Highway. All three would be within an approximate 5- to 10-minute walk of the retail centers located near the intersection of these main roadways. A central park and 34.7-acre commercial center would be located at the center of the proposed project and would be within a 10-minute walk of most residences within the project. Retail centers would range in size, from 2 to 3-acre conyenience centers to the 34.7-acre commercial center. The smaller retail centers would be located throughout the project area at locations designed to be easily accessible to the various smaller villages. The combination of commercial areas is planned to serve most needs of future residents to promote a self- contained deyelopment theme. Village parks are located at the tenninus of major collectors, and mini-parks are located within most neighborhoods. The applicant would provide public parks according to the City's standards (general plan calls for a minimum of 2.5 acres of neighborhood park space per population of 1,(00). At the heart of each neighborhood would be a mini-park located within a 5-minute walk from most 7 M~ September 2 1'<f> '" J&S~91 ñí - r- o C> OF1IG!NAl Old River Ranch Project (GPAlZC #O3-1528) .n ____.._____~_.._____..,._~__._._--.--. City of Bakersfield Statement of Facts, Findings. and Mitigation Measures residences within that neighborhood. The minimum sized 1.5-acre mini-park is intended to serve as a gathering place or focal point for residents within each neighborhood. Components of these parks would include areas with playground areas for small children, benches, picnic tables, walkways, shade trees, and landscaping. Two regional highways are proposed within close proximity to the project site. The west beltway is planned more than 0.5 mile west of the site, and SR-119 is planned for expansion as the south beltway along the southerly boundary of the site. The project site is divided by a series of planned circulation elements that include arterial roadways and major collector streets. Collector roadways would serve as parkways and would be built with landscaped medians. The proposed pruject includes requests for modified collector standards within the project area. Additionally, one residential area south of McCutchen Road and west of Buena Vista Road would be a guard-gated community and would have private street standards. The circulation system will include landscaped parkways and bicycle lanes. The minimum curve radius would be planned according to street design standards. Existing oil wells and production facilities would remain integrated within the project site until such time the production value diminishes. Oil drilling islands will be identified on the tentative maps during future phases of the proposed project, with the underlying land use and zoning designations remaining residential or open space as required by the MBGP. Phasing The proposed project would be developed in about four phases, extending to the year 2020. The phasing plan generally involves the following: · Phase I (To Be Completed By 2008) would involve construction of 1,306 low-density residential units in the northeastern and central portions of the site, and approximately 191,660 square feet of commercial office uses on 17 acres at the northwest comer of Buena Vista Road and McCutchen Road; · Phase IT (2012) would involve construction of an additional 1 ,987 single-family residential units in the northwest portion of the site, 454 multi-family high-medium density residential units in the northeast portion of the site, and approximately 431,530 square feet of commercial retail uses on approximately 332 acres at the southeast comer of Buena Vista Road and McCutchen Road, and 5.6 acres in the northwestern portion of the site; · Phase III (2016) would involve construction of an additional 489 single- family residential units and 270 multi-family high-medium density residential units in the central-western portion of the site, 210 single-family residential units in the central-eastern portion of the site, and approximately 153,550 square feet of commercial retail uses on approximately 14.1 acres at the central-eastern portion of the site along Allen Road; and 8 ~ ~MÆ'1' September20~ ~ :>- - J&S04if; C 0Pif>'NAL Old River Ranch Project (GPAlZC #03-1528) . ---..--.,..------ City of Bakersfield Statement of Facts, Findings. and Mitigation Measures . Phase IV (2020) would involve construction of an additional 1,469 single- family residential units and 334 multiple-family high-medium density residential units in the southwestern portion of the site, 518 single-family residential units in the southeastern portion of the site, and approximately 110,000 square feet of commercial retail uses on 5.5 acres in the southwest portion of the site and on 4.6 acres in the southeastern portion of the site. Entitlements and Approvals The applicant's specific entitlement objective under this environmental document is to obtain the City's approval of a GPA, Zone Change, Vesting Tentative Tract Map (financing map), and a Development Agreement. The Draft PEIR would also be used to support the proposed annexation of the site under separate action by Kern County LAFCO. Related future approvals include a vesting tentative tract map, a parcel map for non-residential components, PCD submittals, Williamson Act Contract Cancellation, possible Conditional Use Pennits (CUP), and possibly other pennitting actions from other responsible agencies. A development agreement with the City is being proposed to assure a balance of public and private benefits, and to protect the applicant's substantial investment in quality community planning and development. The applicant will prepare detailed design guidelines to govern implementation of the master plan concept. Findings of Fact Findings of Fact are based on infonnation contained within the Draft and Final PEIR for the proposed Old River Ranch project. The Draft PEIR addresses the potential effects on the environment that are associated with the proposed project, and was made available for public review from July 13,2005, and ended on August 28, 2005. Comments were received from a variety of public agencies, organizations, and individuals. The Final PEIR contains copies of the comments, provides responses to those comments, and includes Errata for the Draft PEIR with changes that were made as a result of the comments received on the Draft PEIR. This section provides a summary of the significant enyironmental effects of the project that are discussed in the PEIR, and provides written findings for each of those significant effects, accompanied by a brief explanation of the rationale for each Finding. Environmental Impacts Summary of Impacts The Final PEIR indicated that potentially significant impacts to the following environmental resources would occur if the proposed project is implemented: . aesthetics, 9 September 200~ 'èAk~~<f> J&S04Ø ~ - r- o C> ORIG!NAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts. Findings, and Mitigation Measures · agricultural resources, · air quality, · biological resources, · cultural resources, · hazards and hazardous materials, · hydrology and water quality, · land use and planning, · noise, · public services and utilities, · recreation, and · transportation/traffic. Other environmental impacts were identified and disclosed within the Draft PEIR. Impacts that were deternñned to be less than significant and that would not require the implementation of mitigation include: · geology and soils, · mineral resources, and · population and housing. These findings are presented by environmental resource and are presented separately for enyironmental impacts that are potentially significant but mitigated to less than significant levels, and significant unavoidable environmental imryacts. Where mitigation measures are proposed, these mitigation measures are included in a Mitigation Monitoring Plan, which has been prepared separately from these Findings of Fact. In addition to the mitigation measures that have been incorporated into the proposed project, several alternatives were identified in order to attempt to reduce significant environmental impacts associated with the proposed project. Environmental Impacts That Are Mitigated to Less Than Significant Levels The following environmental impacts were found to be potentially significant, but could be reduced to less than significant levels through the implementation of appropriate mitigation measures. 10 oot '?JME'.f September 2 <J;, "- - JOS 04~ G ORIGiNAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures Aesthetics Impact AES-l. Implementation of the proposed project could result in impacts from an increase in nighttime lighting. New lighting would be introduced throughout the proposed project, including lights within and around the proposed residential neighborhoods, commercial areas, parks, and within parking lots. Most of the lighting for the proposed project area would not substantially affect views in this area, as the light generated would be typical of suburban development. In accordance with these standards, a lighting plan would be required for the proposed project in accordance with as detailed in the Zoning Ordinance. Mitigation MM AES-l.l. During the installation of lighting standards, luminaries shall be provided with filtering louvers and hoods to minimize spill light to adjacent pn,operties. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the form of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Air Quality Impact AQ-l. The proposed project would generate temporary construction emissions through each phase of project construction. The San Joaquin Valley Unified Air Pollution Control District (SJVUAPCD) has requires implementation of effective and comprehensive control measures. Construction emissions would consist of particulate matter (PMlO), reactive organic compounds (ROG), and nitrogen oxides (NOx). SJVUAPCD, compliance with Regulation VIII would mitigate construction emissions. Mitigation MM AQ-l.l. Comply with Regulation VIII to Minimize Construction Emissions. The project applicant shall comply with SJVUAPCD Regulation VIII and implement additional construction vehicle emissions reduction measures. To control the generation of construction-related PMlO fugitive dust and exhaust emissions, the project applicant shall comply with SJVUAPCD Regulation VIII and the measures summarized below. SJVUAPCD Regulaiion VIII Control Measuresfor Construction Emissions of PM] 0: 11 September 20~5\)A 4(.;9 J&S~91 '~ I- m - r- o C> ORIG!NAL Old River Ranch Project (GPAlZC #03-1528) - ..-...--.-,---. ~----- .._----..-- City of Bakersfield Statement of Facts. Findings. and Mitigation Measures · All disturbed areas, including storage piles that are not being actively utilized for construction purposes, shall be effectively stabilized of dust emissions using water, chemical stabilizerlsuppressant, or by covering with a tarp or other suitable cover or vegetative ground cover. · All onsite unpaved roads and offsite unpaved access roads shall be effectively stabilized of dust emissions using water or chemical stabilizerlsuppressant. · All land clearing, grubbing, scraping, excavation, land leveling, grading, cut and fill, and demolition activities shall be effectively controlled of fugitive dust emissions utilizing application of water or by presoaking. · With the demolition of buildings up to 6 stories in height, all exterior surfaces of the building shall be wetted during demolition. · When materials are transported off site, all material shall be covered or effectively wetted to limit visible dust emissions, and at least 6 inches of freeboard space from the top of the container shall be maintained. · All operations shall limit or expeditiously remove the accumulation of mud or dirt from adjacent public streets at the end of each workday. (The use of dry rotary brushes is expressly prohibited except where preceded or accompanied by sufficient wetting to limit the yisible dust emissions. Use of blower devices is expressly forbidden.) · Following the addition of materials to, or the removal of materials from, the surface of outdoor storage piles, said piles shall be effectively stabilized of fugitive dust emissions utilizing sufficient water or chemical stabilizerlsuppressant. · Within urban areas, trackout shall be immediately removed when it extends 50 or more feet from the site and at the end of each workday. · Any site with 150 or more vehicle trips per day shall prevent carryout and trackout. SJVUAPCD Control Measures for Construction Equipment Exhaust Emissions: · Use aqueous diesel fuel, particulate filters, and lean NOx catalysts in all diesel powered off-road construction equipment. · Minimize idling time (e.g., 10 minute maximum). · Limit the hours of operation of heavy-duty equipment and/or the amount of equipment in use. · Replace fossil-fueled equipment with electrically driven equivalents. · Curtail construction during periods of high ambient pollutant concentrations; limiting construction may include ceasing of construction activity during the peak hour of vehicular traffic on adjacent roadways. 12 'ò1\K~ September 20~ '1'<f> "- ~ J&S~1 m - r- o C> ORiG'NAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures · Implement activity management (e.g., rescheduling activities to reduce short- tenn impacts). · Properly and routinely maintain all construction equipment, as recommended by manufacturer manuals, to control exhaust emissions. · Encourage ride sharing and use of transit transportation for construction employee commuting to project sites. Additional Control Measures to Reduce Architectural Coating Emissions: · Use architectural coatings that average 100 grams volatile organic compounds (VOC) per liter or less for residential indoor, 50 grams VOC per liter for residential outdoor, and 250 grams VOC per liter for non-residential applications. Finding Changes or alterations have been incorporated into the project that avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact AQ-2. Operational air quality impacts would occur from emissions related to vehicle traffic and from stationary and area emission sources. Area source emissions include those from natural gas combustion for water and space heating, landscaping equipment, and personal household product use. The emissions that would be reduced by the retirement of the fanned portion of the property were credited to the emissions created by the proposed project. The resulting emissions equal 0.8 tons ofROG per year, 8.9 tons of NO x per year, and 13.9 tons of PM 10 per year. These emissions exceed SJVUAPCD thresholds. Mitigation MM AQ-2-1. The URBEMIS2oo2 model identifies several measures that can be used (0 minimize emissions associated with residential projects. These measures that shall be included as part of operations of the proposed project include: . increasing energy efficiency measures in all buildings to ensure that they are 10% more efficient than the energy requirements established by CalifofiÚa Title 24 and . ensuring that 50 % of all landscape maintenance equipment used in commercial applications is electrically powered. URBEMIS quantifies the effectiveness of these mitigation measures. This mitigation measure would reduce building energy consumption-related emissions 'òi'.i(f0> Old River Ranch Project (GPNZC #03-1528) September 20Q) . <!::, 13 >- - J&Sa+;!1 f!! '-.) v OR!G'NAL City of Bakersfield Statement of Facts, Findings, and Mitigation Measures by 10 %, and landscape emissions would be reduced by 50 %. After mitigation, the residual emissions would still be greater than the SJVU APCD significance thresholds because the majority of operational emissions are from motor vehicle trips. MM AQ-2.2. Prior to the issuance of the first building pennit, the project applicant shall enter into an agreement with the SJVUAPCD for the mitigation of NOX, ROG, and PMlO emissions. This agreement may include, but is not limited to, the payment of fees to the district for the purpose of offsetting project emissions. Examples of such a program would be the purchase of new diesel engines for heavy-duty trucks and agricultural equipment, retrofitting diesel engines with controls (e.g., oxidation catalyst, diesel particulate filter), and conversion of City-owned vehicles from gasoline and diesel to compressed natural gas engines. This emissions offset program would be coordinated with and approved by the SJVUAPCD and based on estimates of achievable emissions reductions. This offset program would reduce emissions in sufficient quantities such that the net increase in regional emissions would be zero. With implementation of this mitigation, the impact would be reduced to less-than- significant levels. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Bioloaical Resources Impacts BIO-2. Development of the site could result in direct or indirect impacts to the federally listed endangered and state-listed threatened San Joaquin kit fox. While habitat features and other signs for this species are not present on site, the species is known to occur in the vicinity of the site. Therefore, there is potential for this species to occur on site, and impacts to this species could be significant. 14 'òAK~ September 200~ 1'<f> "- ~ JaS 041,* m - r- o 0 'ìRIr,!NAL Old River Ranch Project (GPAlZC #03-1528) .-..--.."....-..----"- City of Bakersfield Statement of Facts, Findings. and Mitigation Measures The presence of native trees and shrubs on site provides suitable nesting and roosting habitat for migratory bird species, including the state-listed threatened Swainson's hawk, protected under the Migratory Bird Treaty Act. Development of the site could result in impacts to these species. Development of the site could result in direct or indirect impacts to the CDFG species of concern burrowing owl. 11Iis species was observed on site on McCutchen Road and along a drainage ditch canal in the southeast quarter of Section 36. Impacts to this species would be significant. This species is not covered under the Metropolitan Bakersfield Habitat Conservation Plan (MBHCP). Mitigation MM BIO-2.1. Pay Development Impact Fees Pursuant to the Metropolitan Bakersfield Habitat Conservation Plan. The San Joaquin kit fox is a covered species within the MBHCP. The payment of development impact fees is considered adequate mitigation under the MBHCP to minimize impacts to sensitive species. The fees are placed in an account for habitat acquisition and management to be used by the MBHCP Trust Group. Upon application and approval of future tract map phases within the proposed Old River Ranch project area, the applicant shall pay the required mitigation fee or fees. Upon the payment of this fee and receipt of City project approval, a development applicant would become a sub-pennittee and would be allowed the "incidental take" of the species in accordance with state and federal endangered species laws and mitigation requirements of all parties, state, federal, and local (MBHCP). Payment to the plan would reduce impacts to less-than-significant levels. MM BIO-2.2. Construction Shall Be Conducted Outside of Breeding Season for Birds. To avoid impacts to nesting birds, including the Swainson's hawk, no ground disturbance, site clearing, or removal of any potential nesting habitat shall be conducted within the typical breedinglnesting season for birds (February 15 to August 30). or, MM BIO-2.3. Conduct Preconstruction Survey for Nesting Birds. Prior to any ground-disturbing activities, a qualified biologist shall conduct surveys for nesting birds, including raptors. The surveys shall occur at a minimum of 3 days prior to the clearing, removal, or trimming of any vegetation. Surveys shall include areas within 200 feet of the edge of the project boundary and the entire project site. If active nests are found, a 50-foot (minimum) fence barrier shall be erected around the nest site. A 200-foot barrier shall be required for any raptor- nesting site. No habitat removal or any other work shall be allowed to occur within the fenced nest zone until a qualified biologist confinns that the young have fledged and have left the nest. 15 September 2~~ÀKÆ'1' () <f> J&SÞ4191 ~ I- m - r- <.) C> nRlr,INAl Old River Ranch Project (GPAlZC #03-1528) -'"~_.- City of Bakersfield Statement of Facts, Findings. and Mitigation Measures MM BIO-2.4. Conduct Preconstruction Survey for Burrowing Owls. Prior to ground-disturbing activities, a qualified biologist shall conduct surveys for burrowing owls in accordance with the Staff Report on Burrowing Owl Mitigation (CDFG 1995) and the California Burrowing Owl Consortium guidelines (Santa Cruz Predatory Bird Research Group 2(05). The survey will be conducted over the entire site and, where possible, 150 feet around the project site. If no burrows or burrowing owls are identified, then no further action is required . If burrows or burrowing owls are identified, then the following mitigation should be implemented. If possible, when burrowing owls are detected during the breeding season, impact should be avoided. A no-disturbance buffer zone should be delineated in a 75-meter radius around the occupied burrow. No ground disturbance would be permitted in the no-disturbance buffer zone until a qualified biologist has determined that the young have fledged. Finding Changes or alt~rations have been incorporated into the project, which avoid or substantially lessen the significant enviromnental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact BIO-3. There are no migration corridors or wildlife nurseries on site. However, because the site contains a number of tall trees, the site has the potential to be used by nesting birds and to provide resting and foraging habitat for migratory birds, including the Swainson's hawk. Mitigation Implement either Mitigation Measure MM BIO-22 or MM BIO-2.3 (as detailed above). Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant enviromnental effects. These changes are identified in the form of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact BIO-5. The proposed development does not conflict with any City ordinance or policies and complies with the MBGP and the MBHCP. Payment of development impact fees would reduce impacts to species covered under the MBHCP. 16 'òP-.KÆ' September ~5 1'<f> -<' >- - J&S~91 ~ Û C> '!P!G!NAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures Mitigation Implement Mitigation Measure MM BIO-2.1 (as detailed above). Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the form of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Cultural Resources Impacts CR-l. Four prehistoric archaeological sites, one historical archaeological site and seven prehistoric isolated artifacts were located within the proposed project area. No further work is necessary for the seven prehistoric isolated artifacts as recordation is considered sufficient mitigation. However, ground-disturbing activities, typically associated with construction, could impact the four potentially significant prehistoric archaeological sites as well as the one potentially significant historical archaeological site. Mitigation MM CR-l.l. Perform Subsurface Test-Level Investigations for Identified Prehistoric Sites. Prior to tentative tract map approval or recordation of final map for affected parcels, a qualified archaeologist shall be retained by the developer to perform a subsurface test-level investigation for the four prehistoric archaeological sites (Destefani-3, PM#I, PM#2, and PM#3), and one historical archaeological site (PM#H), and surface collection as appropriate. The test-level report evaluating the site shall include a discussion of significance (i.e., depth, nature, condition, and extent of resources), final mitigation recommendations, and cost estimates. Any resource identified shall be recorded, excavated, and curated, as appropriate. Prior to the issuance of a grading permit and based on the report recommendations, final mitigation shall be carried out, which may include recordation, excavation, and curation. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact CR-2. Buried cultural resources that were not identified during field surveys could be inadvertently unearthed during ground-disturbing activities, which could result in the demolition or substantial damage to significant cultural resources. 17 ( 'òAKt: SePtember20~( é9ur >- ~ J&S04'.!:1 J!} o C> ORIG!NAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings. and Mitigation Measures Mitigation MM CR-2.1. Contact a Qualified Archaeologist if Buried Cultural Resources Are Inadvertently Discovered during Ground-Disturbing Activities. If buried cultural resources, such as chipped or ground stone, historic bottles or ceramics, building foundations, or non-human bone are inadvertently discovered during ground-disturbing activities, work will stop in that area and within 100 feet of the find until a qualified archaeologist can assess the significance of the find and, if necessary, develop appropriate treatment measures. Treatment measures typically include development of avoidance strategies, capping with fill material, or mitigation of impacts through data recovery programs such as excavation or detailed documentation. Sites discovered having relevance to Native Americans shall be made known to the appropriate individuals/agencies/groups as detennined by the archaeologist in consultation with the Lead Agency. If archaeological sites are discovered on site during construction, and an archaeologist is contacted to detennine the significance of the find, the developer shall provide written evidence to the City Planning Department that a qualified archaeologist has been retained, shall be present at the pre-grading conference, shall establish procedures for archaeological resource surveillance, and shall establish in cooperation with the project developer procedures for temporarily halting or redirecting work to pennit the sampling, identification, and evaluation of the artifacts as appropriate. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the form of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact CR-3. Bu:ied human remains could be inadvertently unearthed during excavation activities, which could result in damage to these human remains. Mitigation MM CR-3.1. Treatment of Human Remains Inadvertently Discovered during Ground-Disturbing Activities. If human remains of Native American origin are discovered during project construction, it is necessary to comply with state laws relating to the disposition of Native American burials, which fall within the jurisdiction of the Native American Heritage Commission (Pub. Res. Code Sec. 5097). If any human remains are discovered or recognized in any location other than a dedicated cemetery, there will be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until: 18 " 'òAK~ September 21105 1'<f> >- ~ J&S~91 g! o <::> 0RIG!NAl Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures . the cornner of Kern County has been infonned and has detennined that no investigation of the cause of death is required, and . if the remains are of Native American origin, a. the Native American Heritage Commission was unable to identify a descendant or the descendant failed to make a reconunendation within 24 hours after being notified by the commission, or b. the descendants of the deceased Native Americans have made a reconunendation to the landowner or the person responsible for the excavation work for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98. According to California Health and Safety Code, six or more human burials at one location constitute a cemetery (Section 81(0) and disturbance of Native American cemeteries is a felony (Section 7052). Section 7050.5 requires that construction or excavation be stopped in the vicinity of discovered human remains until the coroner can detennine whether the remains are those of a Native American. If the remains are detennined to be Native American, the coroner must contact the California Native American Heritage Commission. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a rnitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Hazards and Hazardous Materials Impacts HAZ-4. The proposed project site is not listed in a state or federal database of sites known to have experienced a hazardous materials spill or incident, other than those databases that list known oil and water wells. However, there is a potential that hazardous materials have contaminated isolated portions of the proposed project site as a result agricultural and petroleum-producing activities as well as associated infrastructure such as pipelines, storage tanks, equipment use, wells, etc. Accordingly, the site contains a number oflocations that could pose a health risk to future workers and residents if not appropriately characterized and appropriately remediated prior to development of the proposed project. These risks could occur from: . Materials containing asbestos . Hazardous materials stored onsite in aboveground storage tanks (ASTs) and drums 19 . <¢AKÆ'", Ö' ''(r September 2905 ~ I- m - r- J&S0Û91 t) nRI!::INAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures · Subsurface impacts from unauthorized release(s) of fuel and other constituents from the onsite ASTs · Stained soil from uses associated with the operation of agricultura1 equipment, oil wells, pump stations, storage tanks such as those in the various storage yards, and fertilizer/pesticides, and through spraying and application of these materials. · Fertilizers, pesticides, herbicides, and petroleum residues · Groundwater impacts from the above materials if leached into the ground · Dangers associated with groundwater wells (i.e., children falling into wells) · Improper abandonment of oil wells · Potential oil-based, toxic, drilling muds (containing hydrocarbons andlor methane) associated with the onsite oil wells · Existing natural gas pipelines and oil pipelines that may be breached or could have experienced leaks · Power poles and transfonners that could potentially contain polychlorinated biphenyls (PCBs), and potential soil residues · Potentially septic tank(s) Mitigation MM HAZ-4.1. Evaluate and Abate Asbestos. Prior to tentative tract map and grading approvals, all areas containing structures that have the potential to contain ACBMs shall be inspected and evaluated by an asbestos specialist to detennine the potential to contain such materials. These include structures built beìore the 1970s, as well as debris piles containing remnant concrete irrigation pipe. All matt'rials detennined to contain asbestos or have a high likelihood to contain asbestos shall be abated and shall be disposed of at an appropriate hazardous materials disposal site by a qualified hazardous materials specialist. MM HAZ-4.2. Conduct Soil Sampling at Aboveground Storage Tank Locations and Remediate as Necessary. Prior to issuance of grading pennits for the each subsequent development phase within project Areas 1,2,3, or 4 (as delineated in this Hazards and Hazardous Materials section), soil sampling and analyses shall be conducted in the vicinity of aboveground and underground storage tanks, particularly the three I ,OOO-gallon and one 1O,OOO-gallon diesel fuel. ASTs associated with three existing water wells on site. Such testing also shall occur at selected locations in the equipment storage/maintenance yard to define the vertical extent of diesel fuel contamination. Should the analysis of stained soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. 20 September 20~ ~Mf?> () ~ J&S~1 - I- m _ c- O a '"\PI!::'NAL Oid River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures MM HAZ-4.3. Conduct Soil Sampling at Equipment Storage/Maintenance Yard and Remediate as Necessary. Prior to issuance of grading pennits for the subject areas, soil sampling and analyses at selected locations in the equipment storagelmaintenance yard shall be completed to define the vertical extent of diesel fuel contamination. Should the analysis of stained soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed andlor remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. MM HAZ-4.4. Remove Diesel-Impacted Soil Near Soil Boring 5. Prior to issuance of grading pennits for the area near Soil Boring 5, located on the south side of the fenced equipment storage and maintenance yard, approximately 150 feft west of Buena Vista Road (associated with the 1 ,ooo-gallon diesel AST serving an irrigation well), the contaminated soil shall be removed. A backhoe or excavator shall remove the diesel-impacted soil at the location due to the unknown depth of the contamination. The walls and floor of the excavation shall be sampled when the diesel-impacted soil appears to be removed based on visual observation. Samples shall be sent to a state-certified laboratory for analysis. Contaminated soil shall be stockpiled or containerized in 55-gallon sealed drums and labeled as to the contents. Disposed of according to State and local guidelines. Following remediation, the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. MM HAZ-4.5. Conduct Soil Sampling Near Agricultural Water Well and Remediate as Necessary. Prior to issuance of grading pennits for the proposed project, soil sampling and analyses shall be conducted in the vicinity of the l,ooo-gallon diesel fuel AST associated with an agricultural water well located in the northeastern portion of the subject site to define the vertical extent of diesel fuel contamination. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed andlor remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. MM HAZ-4.6. Remove Oily Waste Drums and Containers. Prior to site development, the two full/partially full 55-gallon drums and one 5-gallon container of oily waste located northwest of the barn shall be removed from the subject site by a licensed contractor and properly disposed of off site. MM HAZ-4,7. Sample and Analyze Soil Near Aboveground Tanks in Central Storage Yard, and Remove/Remediate as Necessary. Prior to issuance of grading pennits, soil samples shall be collected from under the 550-gallon AST and 1,000 gallon diesel AST within the southeastern portion of the storage yard in the central portion of the site. These samples shall be analyzed to detennine the presence or absence of concentrations of petroleum fuel constituents. Should the 21 September 2001\( 'òAKÆ'1' () <f> J&S041:Qj :..{\ I- m - r- (.) (:) "IO!r,INAl Old River Ranch Project (GPAJZC #03-1528) City of Bakersfield Statement of Facts. Findings, and Mitigation Measures analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then tht contaminated soil shall be removed andlor remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB rt"quirements prior to site development. MM HAZ-4.8. Sample and Analyze Soil Near 1,OOO-Gallon Low Sulfur Dyed Diesel Tank, and RemovelRemediate as Necessary. Prior to issuance of grading permits, soil sampling and analyses shall be conducted beneath the 1,OOO-gallon AST labeled "low sulfur dyed diesel" on the unpaved ground surface in the central portion of the subject site to assess the extent and concentrations of diesel fuel impacts. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed andlor remediated according to state and local guidelines, and the site shall be properly closed according to the Central Valley RWQCB requirements prior to site development. MM HAZ-4.9. Sample and Analyze Stained Soils, and RemovelRemediate as Necessary. Prior to issuance of grading permits, soil samples shall be collected and analyzed at two areas of stained soil in the northwestern and central portions of the site to assess the extent and concentrations of subsurface impacts by related constituents of concern. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. H('wever, if remediation is recommended, then the contaminated soil shall be removed andlor remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. MM HAZ-4.10. Place Secondary Contaimnent Structures beneath All Aboveground Tanks until Removal. For all ASTs that do not contain secondary contaimnent structures, secondary contaimnent shall be placed beneath all onsite ASTs until the removal of the AST occurs for the redevelopment of the subject site, in order to minimize potential unauthorized releases of hazardous materials from potentially impacting the site. MM HAZ-4,l1. Assess and RemovelRemediate Near Metal Pipe. Prior to issuance of grading permits, the approximately 3 inch diameter metal pipe that is protruding from the ground in the northeastern portion of the subject site shall be assessed with a backhoe to determine evidence of subsurface soil impacts by gasoline fuel constituents. Following the subsurface excavation, if soil sampling and analysis is necessary to further assess the concentration and extent of potential impacts, soil samples shall be collected and analyzed to determine the extent and concentrations of subsurface impacts by related constituents of concern. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed andlor remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. ~P.Kt Old River Ranch Project (GPAlZC #03-1528) September 2~ 1'<f> 22 >- "" J&S04'I91 ñí Õ r; "r1I""IIJAl City of Bakersfield Statement of Facts. Findings. and Mitigation Measures MM HAZ-4.12. Remove Waste Oil Drum. Prior to grading of the site, the existing 55-gallon drum of waste oil located in the northern portion of the site adjacent to the onsite agricultural water well shall be transported off site for proper disposal by a licensed contractor as soon as possible so that the potential threat of a release to the site is minimized. MM HAZ-4.13. Sample and Analyze Soil Near Aboveground Tanks at the Gosford-Coulter Tank Fann, and RemovelRemediate as Necessary. Prior to issuance of grading permits, soil samples shall be collected from beneath the three onsite ASTs without secondary containment features at the Gosford-Coulter Ta;ù( Fann facility in the central portion of the subject site. The soil samples should be analyzed to determine the presence or absence of concentrations of total recoverable petroleum hydrocarbons, solvents, and hazardous constiruents of antifreeze. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed andlor remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. MM HAZ-4.14. Sample and Analyze Soil Near Aboveground Drums, and RemovelRemediate as Necessary. Prior to issuance of grading permits, soil samples shall be collected and analyzed in the location beneath the onsite, stand- mounted, 55 gallon drum labeled as lube oil and the steel-rack-mounted 55- gallon drum labeled as gear oil at the tank fann facility to determine the presence or absence of concentrations of petroleum hydrocarbons. Should the analysis of impacted soils reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed andlor remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. Ml\1 HAZ-4.1S. Sample and Analyze Soil Near Aboveground Crude Oil Tanks, and RemovelRemediate as Necessary. Prior to issuance of grading permits, soil sampling and analysis shall be conducted for the locations of the four former crude-{}il ASTs in the east-central portion of the tank fann facility to determine the extent of crude-{}il impacts and to determine the presence or absence of concentrations of petroleum fuel constituents. Should the soil analysis reveal that contamination is below toxic limits, no further action would be required. However, if remediation is recommended, then the contaminated soil shall be removed and/or remediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to site development. MM HAZ-4.16. Abandon/CloselDestroy Water Wells. Prior to issuance of any grading permits, all existing water wells shall be properly abandonedlclosed andlor destroyed in accordance with state and local guidelines and shall be evaluated and verified by the Water Section of the Kern County Certified Unified Protection Agency. 23 September KÆ'1' , ~ J&$J>4191 m - t- ) C> "'''''''I-HI Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings. and Mitigation Measures MM HAZ-4.17. Evaluate and Abandon Fonner Oil Wells, and Properly Close, Clean, and Re-Abandon, as Necessary. Prior to issuance of grading pennits, inactive or previously abandoned oil wells in the proposed project area defined by the corresponding set of tract map(s) shall be evaluated to ensure that the existing abandonment conditions meet or exceed current DOGGR standards. If not, they shall be properly closed, cleaned, and abandoned or re-abandoned in accordance with all applicable state and local guidelines prior to any ground disturbing activities. All existing inactive oil wells, abandoned oil wells, or shut- in oil wells shall be required to implement a closure plan to render all wells inert and to confonn to DOGGR oil well abandonment or re-abandonment procedures. The applicant shall be required to file a Notice of Intent to Abandon Well fonn with DOGGR. The notice shall include all required abandonment procedures on a well-by-well basis in accordance with Article 14, Chapter 3, Sections 1723 through 1723.9 of the CCR. Abandonment of wells shall be perfonned and verified to the satisfaction of DOGGR. MM HAZ-4.18. Test and RemovelRemediate Soil Near Buried Oil Wells. At the time grading operations proceed, an excavator shall be used to remove soil overlying and surrounding each of the buried abandoned oil wells that were discovered on site at their staked locations. When safe access has been provided at each lochtion, each well shall be tested for methane eDÙssions. This testing will verify the integrities of the abandonment plugs. Once the wells have been exposed, further geophysical testing may continue in order to locate, insofar as possible, the mud pits andlor production sumps associated with the wells. These pits and sumps DÙght be expected to be located within a 75-foot radius of each well. Once the pits and sumps are located, analytical samples shall be collected in order to detennine their contents. Upon analysis of the collected samples, a detennination shall be made regarding subsequent remedial actions. Prior to commencement of any construction activity in these areas, final confinnation and a closure statement shall be obtained by the City of Bakersfield Fire Department ESD. If the City of Bakersfield Fire Department ESD is not satisfied that all potentially hazardous materials have been removed to acceptable concentrations, a remedial action plan shall be developed and implemented to the division's satisfaction. MM HAZ-4.19. Fence All Oil Wells. Prior to occupancy of any residence within the project area, each area containing (an) oil well(s) (either active, abandoned, or shut-in) shall be made inaccessible with chain-linked fence until such time that they have been closed and abandoned to the satisfaction of DOGGR. MM HAZ.-4.20. Evaluate and RemovelRemediate Oil Mud Pits. Prior to the approval of final tentative tract maps and grading plans, all areas surrounding fonner or current oils wells that contain oil mud pits or residues thereof shall be evaluated through subsequent sampling and testing to detennine their characteristics and vertical and lateral extent. All areas contain drilling muds and such residues shall be excavated, and the removed soils shall be disposed of at an appropriate hazardous materials disposal site according to state and local 24 'í?M¿o: September 20e 1'<f> '"" J&s04't9, m >::: r- ,J t:> 0n!r:!NAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures guidelines. All work shall be completed to the satisfaction of the DTSC and OOGGR. MM HAZ-4.21. Remove Oil and Gas Pipelines and Associated Contaminated Soils. Prior to the approval of grading pemùts, all abandoned oil and gas pipelines shall be removed, and the soil conditions shall be monitored by a qualified hazardous materials specialist. If soil staining is evident, removal actions shaíl cease in the vicinity until the nature of the stain is determined. All areas containing petroleum-stained soils shall be excavated, and the removed soils shall be disposed of at an appropriate hazardous materials disposal site according to state and local guidelines to the satisfaction of DTSC and OOGGR. MM HAZ-4.22. Test and RemovelRemediate Petroleum-Stained Soils. Prior to final tentative tract map and grading approvals, all areas in the project boundaries showing evidence of petroleum-stained soils shall be evaluated through subsequent testing to detemùne the vertical and lateral extent of any such spill. All areas contain spilled oil or other petroleum products shall be excavated, and the removed soils shall be disposed of at an appropriate hazardous materials disposal site according to state and local guidelines. All work shall be completed to the satisfaction of the DTSC. MM HAZ-4.23. Remove Potential PCB-Containing Transfonners. Prior to the approval of grading pemùts, power poles containing transformers suspected of containing PCBs shall be removed by a qualified hazardous materials specialist as coordinated by PG&E to the satisfaction of the City of Bakersfield Fire Department ESD. These items shall be disposed of at an appropriate hazardous materials disposal site to the satisfaction of DTSC. MM HAZ-4.24. Delineate and RemovelRemediate Soil with PCB Content. Prior to the approval of grading pemùts, the location of the former transformer fire and subsequent release of PCBs in 1990 near the intersection of Buena Vista and McCutchen Roads shall be completely delineated and remediated as necessary. Soil samples shall be collected from the northeastern comer of the subject site and analyzed for PCB content. Should the soil analysis reveal that the soils are clean, then no further action would be warranted. However, if remediation is reconunended, then the contaminated soil shall be removed andlor rernediated according to state and local guidelines, and the site shall be properly closed according to Central Valley RWQCB requirements prior to development of the site. MM HAZ-4.25. Removel Abandon/Close Septic Tanks. Prior to the approval of final tentative tract maps and grading approval, all septic tanks shall be removed/abandoned/closed in accordance with applicable state and local guidelines. Hydroloay and Water Quality 25 'òM;: September 2005~ o?'<f> -<I J&S 041~ ¡;:¡ - r- o C> ORIGINAL Old River Ranch Project (GPAlZC #03-1528) Impact LUP-3. The project area is within the Metropolitan Bakersfield Habitat Conservation Plan (MBHCP) that contains both City and County of Kern jurisdiction. Development of the project area could impact species covered under the Plan. Upon payment of required mitigation fees and receipt of City project approval, a development applicant would become a sub-pennittee and would be allowed the "incidental take" of species in accordance with state and federal 'ò~"~f?> September 2005::i< <f> '"" T] r- ) C> ...."!~ N}\l City of Bakersfield Statement of Facts. Findings, and Mitigation Measures Impacts WQ-3. Construction and placement of residential units, landscaping, roadways, and other impenneable surfaces would alter the existing drainage patterns of the site by preventing precipitation from entering the soil column. Water that was to drain off site would be required by the County of Kern and the City to be directed into stonn drainage infrastructure (i.e., catchment basins in project streets and onsite stonnwater distribution pipes) that would collect and transport water to onsite sumps where it would percolate the soil and drain into the substrata. Construction would create bare ground that would be exposed to potential erosion; any erosion would create a significant impact because it could potentially flow into downstream waterbodies if not properly contained during construction. Compliance with a general NPDES pennit is required for direct or indirect discharges of stonnwater runoff to waters of the United States from construction projects that cause soil disturbance and potential runoff. Adherence to the NPDES pennit requires that the applicant develop and implement a SWPPP. The SWPPP specifies that BMPs be used in order to prevent construction PQllutants from contacting stonnwater and to stop all products of erosion from moving off site into receiving waters. Mitigation MM WQ-3.1. Minimize Erosion Effects on Water Quality. Prior to final approval of subsequent individual tentative tract maps and authorization of grading plans, a SWPPP shall be made available to the City Engineer for inspection and comment. The SWPPP shall identify erosion minimization and control provisions, pollution detection provisions, and pollution elimination/minimization provisions. The SWPPP shall include best available technology, engineering, and design solutions such as the use of silt screens, hay bales, modem trash screens, energy dissipaters, andlor absorbent devices. Stonnwater runoff water quality monitoring procedures shall be clearly detailed in the SWPPP. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant enyironmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City heæby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Land Use and Plannina Old River Ranch Project (GPAlZC #03-1528) 26 >- J&S 0419~ City of Bakersfield Statement of Facts, Findings, and Mitigation Measures endangered species laws. Payment of development impact fees would reduce im'Jacts to species covered under the MBHCP. Mitigation MM 810-2.1. The San Joaquin kit fox is a covered species within the MBHCP. The payment of development impact fees is considered adequate mitigation under the MBHCP to minimize impacts to sensitive species. The fees are placed in an account for habitat acquisition and management to be used by the MBHCP Trust Group. Upon application and approval of future tract map phases within the proposed Old River Ranch project area, the applicant shall pay the required mitigation fee or fees. Upon the payment of this fee and receipt of City project approval, a development applicant would become a sub-pennittee and would be allowed the "incidental take" of the species in accordance with state and federal endangered species laws and mitigation requirements of all parties, state, federal, and local (MBHCP). Payment to the plan would reduce impacts to less-than- significant leyels. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Noise Impact During the construction of the proposed project, noise from construction activities would potentially impact noise-sensitive land uses in the immediate area. Activities involved in construction would generate noise levels at 50 feet. Noise levels will typically drop off at a rate of 6 dB per doubling of distance. Construction noise could result in annoyance or sleep disruption for nearby residents if nighttime operations were to occur or if equipment were not properly muffled or maintained. Mitigation MM NOI-l.l, Limit Hours of Construction Operations. Construction activity located within 1,000 feet of residences shall be limited to the hours between the hours of 6 a.m. and 9 p.m. on weekdays, and between 8 a.m. and 9 p.m. on weekends. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified ill the fonn of a mitigation measure as presented above. The City 27 September 2005 '6Mf-$> J&S 041'¡;' ~ "- - I- m _ r- o C> ORIG'NAL Old River Ranch Project (GPfVZC #03-1528) City of Bakersfield Statement of Facts. Findings, and Mitigation Measures hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact NOI-3. Traffic noise exposure on proposed noise-sensitive land uses within the project site was analyzed. Traffic noise exposure at new residences could exceed the City's 65 dB CNEL noise compatibility threshold for residences. Residences along the perimeter of the proposed project site could be exposed to interior noise exceeding 45 dB CNEL. Because exterior and interior areas of residences could be exposed to traffic noise exceeding 65 dB CNEL and 45 dB CNEL respectively, this impact is considered to be significant. Mitigation MM NO"3.1. Minimize Outdoor Noise Levels from Traffic. Outdoor activity areas of residential areas shall be designed such that noise from traffic does not exceed 65 dB CNEL. The project applicant for each tract map shall retain a qualified acoustical consultant to design treatments for residences located adjacent to roadways in and around the proposed project area such that exterior noise levels under 2030-with-project conditions does not exceed 65 dB CNEL at outdoor activity areas. Treatments may include methods such as construction of a soundwall or earth benn between the new residences and the roadway or placement of building structures between roadway and outdoor activity areas. The acoustical consultant will prepare and submit to the City a report detailing the acoustical treatments to be used for compliance with this perfonnance standard. The report must be reviewed and approved by the City before a building pennit will be issued. The design of project buildings will reflect the approved report. MM NOI-3.2. Minimize Interior Noise Levels from Traffic. Interior areas of residential units shall be designed such that noise from traffic does not exceed 45 dB CNEL. The project applicant for each tract map shall retain a qualified acoustical consultant to ensure that interior noise levels at residences does not exr:eed 45 dB Ldn under 2030-with-project traffic conditions. If treatments are necessary, treatments may include installing acoustically rated doors and windows and blocking sound transmission paths through vents or other openings in the building shell. The acoustical consultant will prepare and submit to the City a report detailing compliance with the interior noise perfonnance standard or, if necessary, the acoustical treatments to be applied to the building for compliance with the interior noise perfonnance standard. The report must be reviewed and approved by the City before a building pennit is issued. Impact NOI-4. Commercial uses that could be allowed under the general plan and planned zoning include a wide range of commercial retail, office uses, service uses, and restaurants, to name a few. Noise sources commonly associated with commercial property include air conditioning units, trash compactors, fans, compressors, and truck deliveries. Noise from these types of equipment and 28 'òf>.Kt September 200f!f 1<!;, J&S04~ ñi _ r- Ù C> ORIG'NAL Old River Ranch Project (GPÞJZC #03-1528) City of Bake-sfield Statement of Facts. Findings, and Mitigation Measures activity could result in noise at residences that exceeds City noise standards for non-transportation noise sources. Mitigation MM NOI-4.I. Minimize Noise from Commercial Sources. Commercial uses shall be designed such that noise from operations does not exceed City noise standards for non-transportation sources. The project applicant for each tract map shall retain a qualified acoustical consultant to design treatments for commercial and industrial uses such that residences located adjacent to these uses would not be exposed to noise exceeding City standards for non-transportation uses. Treatments may include methods such as: · limits on hours of operations (in accordance with Noise Standards in Table 3K-3), · use of enclosures or localized barriers around equipment noise sources, · placement of barriers between the residences and commercial and industrial uses, and · use of mufflers on equipment exhaust. The acoustical consultant will prepare and submit to the City a report detailing the acoustical treatments to be used for compliance with this perfonnance standard. The report must be reviewed and approved by the City before a building permit will be issued. The design of commercial and industrial uses will reflect the approved report. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the form of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact NOI-5. Several oil wells are located between Barlow Road and the Allen Road alignment. They are powered by diesel or natural gas internal combustion engines. At a distance of 25 feet, the engines typically produce an energy av~rage (Leq) noise level of 75 dBA and an L50 noise level of 74 dBA. Residences within about 225 feet of an oil well would be exposed to noise exceeding the City's daytime standard of 55 dB L50 . Residences located within 400 feet of an oil well would be exposed to noise exceeding the City's nighttime standard of 50 dB LSO. Mitigation MM NOI-5.1. Minimize Noise from Oil Wells. Residential uses shall be designed such that noise from oil well operations does not exceed City noise standards for non-transportation sources at residences on the project site. The 29 September 2005 II>AKf «. :f J&S 041SÇ) ~ "- - I- rTI _ r- o 0 ORiG'NAL Old River Ranch Project (GPAlZC #03-1528) -----'----,---. City of Bakersfield Statement of Facts. Findings. and Mitigation Measures project applicant shall retain a qualified acoustical consultant to design treatments for the oil wells or the residences such that residences located adjacent to oil wells would not be exposed to noise exceeding City standards for non- transportation uses. Treatments may include methods such as: · conversion of oil well diesel motors to electric motors, · limiting hours of oil well operation, · use of enclosures or localized barriers around the oil wells, and · placement of barriers between the residences and oil wells. The acoustical consultant will prepare and submit to the City a report detailing the acoustical treatments to be used for compliance with this perfonnance standard for each tract map. The report must be reviewed and approved by the City before a building pennit will be issued. The design of residential uses will reflect the approved report. Finding Changes or alterations have been incOIporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the form of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Public Services and Utilities Impact PS-6. Constmction of the proposed project would generate debris that would require disposal at area landfills. Construction debris would be recycled, which would further reduce debris in the waste stream. Mitigation MM PS-6.1. Recycle Construction Debris. Prior to the issuance of any building pennit, developers within the proposed project site shall submit to the City for review and approval a plan to separate recyclablelreusable construction debris. The plan shall include the method the contractor will use to haul recyclable materials and shall include the method of and location of material disposal. The builders shall be responsible for hauling their own construction debris to the Mount Vernon Recycling Center or entering into a contract with a licensed hauler for disposal of construction debris. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the form of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. 30 September 200\ 'òMf1 J&S 041d1) ~ "- - ,- '" ,- r- Q 0 ORIG'NAl Old River Ranch Project (GPA/ZC #03-1528) ,...---- ..-.-------,.,---.-.-.- City of Bakersfield Statement of Facts, Findings, and Mitigation Measures Recreation Impact REC-l. The MBGP sets forth a requirement that all new residential developments dedicate 2.5 acres of parkland for every 1,000 future residents. At maximum buildout, the proposed project would need to provide approximately 50.8 acres of parks, trails, greenbelts, open space, and other recreational facilities in order to comply with the current City standard, based on an average of 2.891 people per household for all 7,037 homes included in the project. Mitigation MM REC-l.l. Provide Parks in Accordance with City Standards. Prior to approval of each Tentative Tract or Vesting Tentative Tract, the applicant shall provide public parks, as deemed necessary by the city, in conformance with Title 15.80 of the Bakersfield Municipal Code. In the event a city wide master trails plan is adopted prior to approval of each Tentative Tract or Vesting Tentative Tract that reduces the public park requirement, the adopted ratio will be used to calculate the public park requirement. Proposed greenbelts and private recreational facilities shall be maintained by the homeowners association. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Transportation and Traffic Impact TR-l. Temporary increases in traffic because of project construction have the potential to worsen level of service on study area roadways. Mitigation MM TR-l.l. Develop and Implement a Construction Traffic Control Plan. Prior to beginning construction of any portion of the proposed project, the contractor shall develop and implement a Traffic Control Plan. The Traffic Control Plan shall be submitted to the City Engineer for review and approval and shall be implemented throughout the course of project construction. The plan shall include the following elements: . contain a plan approved by the City for communicating construction plans with transit providers, emergency service providers, residences, and businesses located in the project vicinity, and anyone else who may be affected by project construction; . identify roadway segments or intersections that are at or approaching level of service that exceeds local standards, and provide for construction-generated 31 «. 'òMt-5' () ,)0 September 2005 "- ~ I- m J&S04191- r-" o C> ORIG'NAl Old River Ranch Project (GPI>JZC #03-1528) City of Bakersfield Statement of Facts. Findings, and Mitigation Measures traffic to avoid these locations at the peak periods, either by traveling different routes or by traveling at non-peak times of day; · contain an access and circulation plan for use by emergency vehicles when lane closures andlor detours are in effect; if lane closures occur, provide advance notice to local fire and police departments to ensure that alternative evacuation and emergency routes are designed to maintain response times; · maintain access to existing residences in the area at all times; · provide for adequate parking for construction trucks and equipment within the designated staging areas throughout the construction period; · provide adequate parking for construction workers within the designated staging areas; · restrict delivery of construction materials to between the hours of 9:00 a.m. and 3:00 p.m. to avoid more congested morning and evening hours; · require traffic controls on roadways adjacent to the proposed project, including flag persons wearing bright orange or red vests and using a "Stop/Slow" paddle to control oncoming traffic; construction warning signs should be posted in accordance with local standards or those set forth in the Manual on Unifonn Traffic Control Devices (FHW A 2(01), in advance of the construction area and at any intersection that provides access to the C()nstruction area; · require that written notification be provided to contractors regarding appropriate routes to and from the construction site, and the weight and speed limits on local roads used to access the construction site; · specify that a sign be posted at all active construction areas giving the name and telephone number or email address of the City staff person designated to receive complaints regarding construction traffic. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact TR-2. The maneuvering of construction-related vehicles and equipment among the general-purpose traffic on area roadways could cause safety hazards. Mitigation Implement Mitigation Measure MM TR-l.l (as detailed above). 32 September 2005 «. 'òMl:-9 () <f> J&S04191.>- ~ ~ m ',.- r- '.) 0 'ìP!~INAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact TR-3. Emergency access to the proposed project area could be affected by project construction, specifically, road closures, detours, and construction-related traffic could delay or obstruct the movement of emergency vehicles. Mitigatior. Implement Mitigation Measure MM TR-l.l (as detailed above). Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact TR-4, The parking needs of construction workers and for heavy construction equipment would increase the demand for parking on the proposed project site and possibly on nearby roadways off site. Mitigation Implement Mitigation Measure MM TR-l.l (as detailed above). Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a mitigation measure as presented above. The City hereby finds that implementation of the mitigation measure above is feasible, and is therefore adopted. Impact TR-7. Emergency access would not be precluded during long-term operations of the project. Adequate circulation is provided within the project site, and the detailed tract maps will be reviewed by the Bakersfield FD prior to approval at a tract map level. All fire department standards would need to be complied with during final design to minimize impacts to emergency access. Mitigation MM TR-7,1. Construction Plans and Development Shall Confonn to All Applicable Fire Codes. Prior to approval of tentative tract maps for subsequent 33 September 2005 «. 'ò~,i\€,,,, J&S 04191 () ~ >- - '::: JI! o C> ORiG'NAL Old River Ranch Project (GPNZC #03-1528) City o.f Bakersfield Statement o.f Facts, Findings, and Mitigation Measures phases of the proposed project, construction plans shall be approved by the Fire Marshall or appropriate representative to ensure that all fire code requirements are incorporated into the proposed project design. All development within the proposed project area shall confonn to codes and access requirements established by the Unifonn Fire Code and City of Bakersfield Municipal Code Sections 15.64.010 to 15.64.480. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a ßÙtigation measure as presented above. The City hereby finds that implementation of the ßÙtigation measure above is feasible, and is therefore adopted. Impact TR-8. All residential, commercial, and other land uses would be required to provide adequate parking in accordance with the City's Municipal Code. Miligation MM TR-8.1. During design of tentative tract maps for subsequent phases of the proposed p~oject, adequate parking shall be provided in accordance with City of Bakersfield Municipal Code standards. Construction plans shall be reviewed and verified by the Planning Department that the project components provide appropriate parking to ßÙnißÙze offsite parking impacts or neighborhood intrusion. Finding Changes or alterations have been incorporated into the project, which avoid or substantially lessen the significant environmental effects. These changes are identified in the fonn of a ßÙtigation measure as presented above. The City hereby finds that implementation of the ßÙtigation measure above is feasible, and is therefore adopted. Significant Unavoidable Environmental Impacts Aaricultural Resources Impact AGR-l. The proposed project site contains 1,853 acres designated as "Prime Farmland." Subdivision of land such as this results in substantial prime agricultural acreages being taken out of agricultural production. Conversion of farmland 011 the proposed project site is considered a significant impact for the following reasons: . approximately 94 % of the site consists of prime soils; . water for irrigation is readily available on site: 34 September 2005 0. "/í ^ X v' ''1> J&S0419~ ~ r- m - ,... o C> ORIGINAL Old River Ranch Pro.ject (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings. and Mitigation Measures · the majority of areas surrounding the site are currently actively fanned; · the majority of the project site, as well as many surrounding parcels, have a zoning designation of A (Exclusive Agriculture); · the MBGP designated neighboring lands as R-IA (Intensive Agriculture); · the site is immediately adjacent to the north, east, and south to some Williamson Act-contracted lands; · the project could affect the application of agricultural chemicals on other agricultural properties; and · residential deyelopment is proposed adjacent to agricultural uses. Finding No mitigation is available that would feasibly reduce environmental impacts associated with agricultural land conversion to less than significant levels. Mitigation measures were considered in an attempt to reduce impacts from agricultural conversion, including the purchase of agricultural conservation easements and mitigation banking. Agricultural conservation easements are voluntary, legally recorded deed restrictions that are placed on specific property used for agricultural production that prohibit practices that would damage or interfere with the agricultural use of the land. Agricultural conservation easements are held by land trusts or local governments, which are responsible for ensuring that the teons of the easement are upheld. In order to place an agricultural conservation easement on a property, a landowner would seek an appropriate easement holder, which could be a land trust or a local government. Th~ easement holder would then decide whether to pursue an easement on the prop<>sed property and proceed to negotiate teons with the landowner, including price and restrictions. As of 2002, easements were located within only 19 of California's 58 counties, with approximately 80% used as grazing land and 20% used as cropland of the 120,000 acres of Califomia famùand within easements (Sokolow 2(02). While some land trusts have been fonnulated and funded because of local government's requiring mitigation of famùand loss, the City and Kern County have not developed any comprehensive program through which conservation easements could be implemented in mitigating the conversion of prime agricultural land. Without such programs in place, these types of mitigation measures are not practical or feasible for a property owner to pursue on a project-by-project basis. Therefore, because of the lack of programs in place that require easement funding or that provide oversight for the teons of an easement, mitigation would be infeasible. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the Final PEIR. A Statement of Overriding Considerations is required, which is attached to this Findings of Fact. 35 J&S 04191 '< 'ò~K¿:-1' () <f> >- ~ I- m -- r- Û C> 0R!r"NN Old River Ranch Project (GPAlZC #03-1528) September 2005 City of Bakersfield Statement of Facts, Findings, and Mitigation Measures Impact AGR-2. The majority of the proposed project site is currently zoned for agricultural uses, with a zoning designation of A (Exclusive Agriculture). The current MBGP land use designations for the project site include Intensive Agriculture and Mineral Petroleum. The proposed project includes a General Plan Amendment and Zone Change. Upon approval of the project, the Williamson Act contracts would be cancelled before their expiration in 2014. Therefore, the project would conflict with existing Williamson Act contracts, which would represent a significant impact. Mitigation MM AGR-2.1. Pay Penalty Fees for Premature Conversion of Williamson Act Ccntracts. Upon cancellation of the Williamson Act contracts, the applicant shall pay a fee of 12.5 % of the full assessed value of the parcels for cancellation of Williamson Act contracts. This fee, when collected, shall be transmitted by the County Treasurer to the State Controller. Finding Cancellation of the Williamson Act contracts prematurely represents a significant impact because the Williamson Act contracts are a mechanism to encourage long-term preservation of agricultural lands. The mitigation would not reduce impacts to less than significant levels. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the Final PEIR. A Statement of Overriding Considerations is required, which is attached to this Findings of Fact. Impact AGR-3. Other changes in existing environment could have an effect on adjacent agricultural land by limiting the agricultural feasibility of the land. The following types of effects from agricultural conversion could generally reduce agricultural feasibility. · Conversion of farmland may impact nearby growers by placing restrictions and limitations on pesticides, fungicides, and herbicides used on the crops. Restrictions could also be placed on noise, burning, and dust. · Vehicle emissions from adjacent transportation routes and increased roadways could impact the health and survival of the crops. · As urbanization proceeds in the City, land prices may increase above the land's value for agricultural production. · Increased traffic congestion reduces the efficiency and increases the hazards of moving crops and farm machinery along rural roads. Road congestion also increases the amount of time required to transport crops, which in turn increases shipping costs and risk of spoilage. 36 J&S04191 x 'ò1\K-!'-9 C) <f> >. ~ I- m .- ,... 'J 0 0RIr.INAL Old River Ranch Project (GPAlZC #03-1528) September 2005 _"'_'~"""'___"""~h. __'_M'·"~"'. ___________.....-.~ City of Bakersfield Statement of Facts. Findings, and Mitigation Measures . Croplands and nearby agricultural lands that support fanning are important sources of food, water, and cover for some native plants and animals. These resources are largely eliminated when farmlands are converted to urban use. Because of the proposed project's proximity to primarily agricultural uses, buildout of this proposed project would most likely result in many of the above- mentioned impacts. Based on the MBGP designations and deyelopment patterns, it is likely that parcels to the north, south, east, and at least some to the west would remain agricultural in nature and would continue to be affected by this type of development. In addition, because many of the outparcels located throughout the project site are slated for development, the potential for the above-mentioned effects would be increased, making continued agricultural production on these lands more difficult. Thus, impacts would be considered significant. Mitigation MM AGR-3.1. Provide Disclosure Statements Regarding Agricultural Operations. Prior to occupancy of any residential units, if any adjoining properties are still in agricultural use and have not received entitlements for development, then prior to issuance of certificates of use and occupancy, the applicant will demonstrate that future residents will be informed about adjacent agricultural use. This demonstration may take the form of a covenant filed on the project site (which would be disclosed to future residents through the purchase process), 01 through disclosure fonns to be signed by new residents. The covenant or disclosure form will provide that each resident acknowledges that he/she is moving into an area where there is active agriculture, and understands that such agricultural use, including all activities necessary to support agriculture-such pesticide use, dust generated by plowing, and slow-moving agricultural vehicles- will continue. Finding Buffer areas are already provided in the form of perimeter walls and major arterial roadways that separate the site from nearby agricultural operations. However, because of the level of urban development proposed for the site, the proposed project would not be compatible with surrounding agricultural land uses and operations, until such a time those lands are converted to urban and developed uses. Therefore, no other feasible mitigation is available. The mitigation measure identified would not reduce impacts to less than significant levels. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the Final PEIR. A Statement of Overriding Considerations is required, which is attached to this Findings of Fact. Impact AGR-4. The MBGP provides goals and policies to guide development within the City's Planning Area. Implementation of the proposed project would be 37 September 2005«. 'òII,KIS9 o ~ J&S041~ rñ r-- r- 'ó C> ORIGINAL Old River Ranch Project (GPAlZC #03-1528) --".--- -,-,,---_._~-~~~..._----- City of Bakersfieid Statement of Facts, Findings, and Mitigation Measures generally inconsistent with established goals and policies developed to minimize impacts on agricultural resources, While the ultimate detennination regarding overall consistency is left to the City Council, the proposed project is not consistent with many of the policies designed to protect the conversion of prime farmland. Thus, impacts are considered significant. Finding No mitigation is available to reduce impacts to less than significant levels. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project altematives identified in the Final PEIR. A S:atement of Overriding Considerations is required, which is attached to this Findings of Fact. Air Quality Impact AQ-4. The proposed project would be located approximately 2 miles north of three dairies: Borba, Riverbend, and Wilgenburg, The predominate wind direction much of the year- spring, summer, and fall- is from the northwest. During winter periods with southern and southeasterly winds, odors from the dairies would be detectable at the proposed project development site. Mitigation MM AQ-4.1. Notify Concerning Potential Odors. Require that, prior to the sale of all new residential units, prospective buyers be notified of potential dairy odors. Prospective buyers should be required to sign a statement acknowledging that they are aware of the potential for odors from nearby dairies, and the disclosure shall be included in covenants for new development within the site. Finding Even with the proposed mitigation measure, the odor impacts associated would placing a large residential development in close proximity to dairies would be significant. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the Final PEIR. A Statement of Overriding Considerations is required, which is attached to this Findings of Fact. Transportation and Traffic Impact TR-S. The Kern COG traffic model estimated that a total of 68,439 trips per day would be generated by the proposed project at buildout with 45,430 external daily trips, yielding a capture rate of 34 %. This capture rate was applied to the total ITE project trip estimate of 73 ,780 trips per day, yielding 48,975 external daily trips. Future peak hour traffic volumes are estimated for each of the project phase buildout years (2008, 2012, 2016, and 2020) with and without the proposed project. 38 'òM(: September 2005 é1- 1'<f> -<I >- - J&504191 I- m ~ r- o 0 ORIG'NAL Old River Ranch Project (GPAlZC #03-1528) ~---.-- __._~._._..... '·'~·_'___'..'U___ City of BakecsBeld Statement of Facts. Findings, and Mitigation Measures Traffic operations on the existing street system are acceptable at most locations. In the interim conditions, increases in traffic, both with and without the project, will cause an ever increasing number of facilities to operate below level of service C. By the year 2030 it is anticipated that almost all of the unsignalized intersections and over half of the signalized intersections would operate below level of service C if left in their existing conditions. The project lies in an area, which will require significant improvements to the existing street system over the next 15 to 20 years in order to provide adequate capacity to accommodate traffic generated by this project and anticipated other development in the western Bakersfield area. Mitigation MM TR-5.1. Confinn and Analyze Incremental Traffic Improvements. a) Prior to approval of each Tentative Tract, Vesting Tentative Tract, or Parcel Mr,p (except Parcel Maps for financing or conveyancing purposes only that require further subdivision prior to development) for residential projects and PCD or Site Plan applications for other uses, the applicant shall confinn the specific traffic circulation improvements that will be implemented with that tentatiye map, PCD or Site Plan as identified in the Traffic Impact Study to: 1) provide the traffic circulation improvements necessary to serve the immediate map area and 2) maintain the City's adopted minimum level of service standard (currently LOS C) on the roadway network that will be impacted by the project traffic, or, for those intersections and roadways that cannot be improved to the minimum level-of-service standard or better, with or without the project, to provide the project fair-share contribution to the improvements. b) To demonstrate that appropriate mitigation is being provided with each Final Map, the process wiU be as foUows. . The applicant will provide confinnation of the traffic analysis for each map, PCD or Site Plan based on current infonnation on the status of RTIF and local improvements at the time of tentatiye map, PCD, or Site Plan consideration. . The applicant and the City will identify the incremental improvements applicable to the tentative map, PCD, or Site Plan to be implemented through one or more of the following methods: IJ Build the improvements (if an necessary rights-of-way are available) ana, if applicable, receive reimbursement credits for any percentage share not attributable to impacts caused by traffic generated from the map, PCD, or Site Plan. o Pay the City per unit mitigation fee. o In the event all necessary rights-of-way are not available at the time the applicant is required to construct the specific traffic circulation 39 September 200~ 'òMÆ'1J o tP J&S04~ ~ I- 111 .- r- o C> ORIGINAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures improvements to be implemented, the applicant shall pay the City the per unit mitigation fee in lieu of constructing the improvements. . The project applicant and the City will verify the timing of the improvements to be constructed by the applicant for recordation of each Map, PCD or Site Plan, and shall establish the threshold at which the improvements shall be constructed. The threshold shall depend on the particular improvement, the project fair-share contribution to the improvement and the nature of the particular MaplPCD/Site Plan, and may be tied to the number of lots within the map area that may be recorded as part of a Final Map or Partial Final Map. c) For those improvements to be constructed by the City using mitigation fees paid by the project applicant and other sources of financing, the applicant's obligation will be satisfied by payment of the fees. Finding Almost all of the deficiencies can be improved to an LOS C through the project build-out year of 2020 with a combination of signalization and roadway widening. Even with the mitigation, it is anticipated that by the year 2030, more than two-thirds of the study intersections and more than one-third of the roadway segments will operate below LOS C if left in their present configurations. Of these, eight intersections and seven roadway segments will operate in this condition with or without the project. The following intersections are expected to op.:rate below LOS C, or current year LOS (if below an LOS C), in the year 2030 even if fully improved to current standards: These facilities are as follows: Intersections · Coffee Road and Rosedale Highway, · Coffee Road and Brimhall Road/Westside Parkway WB, · Coffee Road and Truxtun Avenue Extension, · Coffee Road and Stockdale Highway, · New Stine Road and Stockdale Highway, · Old River Road and Ming Avenue, · Gosford Road and Ming Avenue, and · Ashe Road and Ming Avenue. Roadways · Buena Vista Road: Stockdale Highway to Ming Avenue, · Calloway Drive: Brimhall Road to Stockdale Highway, · Coffee Road: Brimhall Road to Stockdale Highway, 40 September 2001!<. 'òF\l\f,ç> () cJ> J&S04~ ::;. m r- <J C> f)RIGINAl Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures · Gosford Road: Stockdale Highway to North Laurelglen Boulevard, · Rosedale Highway: Calloway Drive to Fruitvale Avenue, · Ming Avenue: Ashe Road to Stine Road, and · White Lane: Stine Road to Wible Road. 1bis study also shows the improvements, beyond current standards, needed to bring these facilities to an LOS C, or current year WS (if below an WS C). It is noted that most of the facilities listed above would operate below LOS C in their ultimate configurations. Provided that the regional transportation improvements and the RTIF and local mitigation improvements are constructed, the street system should have adequate capacity to operate at an acceptable level of service with the exception of the facilities stated above. Additionally, the seven signalized intersections that would exceed thresholds in the PM peak hour, and the five signalized intersections that would exceed thresholds in the AM peak hour may be mitigated with additional measures beyond current standards. However, the feasibility of these mitigation measures has not yet been determined. Therefore, it must be concluded that not all impacts would be reduced to less-than-significant levels and impacts would remain significant and unavoidable. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the Final PEIR. A Statement of Overriding Considerations is required, which is attached to this Findings of Fact. Alternatives to the Proposed Project Alternative 1, No Project Alternative Agriculture operations would continue onsite with the cultivation and harvesting of'iimonds and row crops. Under a reasonably foreseeable future land use scenario, the alternative would be similar to a no build scenario above because the site is currently designated for agricultural and mineral production land uses under the MBGP. Thus, If the project were not approved, the reasonably foreseeable land use would be continued agricultural and mineral production. Therefore, under this alternative, no aspect of the proposed project would be constructed and the project area would remain in its current condition. This alternative would involve no action on the part of the City. The project would not be constructed, and the site would remain in agricultural and petroleum production until such a time that a development proposal is approved for this developing portion of the City. Finding 41 ~ 'òAK$1' September20Ö§ ~ >- J&S04~ J!! ':J C> nRIG!NAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures This alternative does not meet any of the project objectives. This alternative would realistically only be an interim use of the site. The site is in the path of City growth, and there has been no indication that any group desires to purchase the site for open space preservation or use other than that allowed by the General Plan. Thus, while this alternative is rnarginally feasible as an interim use, it is not a feasible long-tenn alternative. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the FInal PEIR. A Statement of Overriding Considerations is required, which is attached to this FIndings of Fact. Alternative 2. Reduced Development Density This alternative would involve the development of fewer residences, and less dense commercial uses. This alternative involves a more "dispersed" development configuration to provide more open space between units and commercial centers on site. This alternative would provide home sites on generally larger lots (approxirnately 1O,OOO-square-foot lots) with a greater amount of square footage for each home. This alternative would also eliminate the High Density Residential Uses proposed under the project. Thus, this alternative would include approximately 3,962 single-f8DÙly residential units (3,075 fewer than the proposed project). Alternative 2 would involve development of the site similar to the project configuration, but a reduction in the density proposed by the General Plan Amendment. Finding This alternative most likely meets all of the project objectives, but it does not fulfill those objectives to the same leyel as the proposed project for the following reasons: I) since this alternative has fewer dwelling units, it does not help the City to meet its housing goals, and 2) the lower density of development, overall, may not provide for the achievement of goals for a self-sustained community to the level of the proposed project. It is assumed that this alternative is feasible. Although no marketing study has been prepared, for the purposes of this EIR, the alternative can be considered feasible. However, because this development does not provide the same density as the proposed project, this alternative will not provide the City with the same type of project; opportunities for unique and creative solutions to urbanization, based on a lesser critical mass will likely result in a more traditional development that the City may consider "more of the same." This reduced density would lik.~ly not include the diversity of housing types or support the recreational community amenities that the proposed project would offer. Additionally, the lower density alternative is inconsistent with the anti-sprawl principles of Smart Growth, efficient use of infrastructure and walkable communities. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the FInal 42 AIi September 200S «. ~ t.ì;> o ~ J&S04191>- ñï t;:::. r-- " 0 ORIG!NAl Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts. Findings, and Mitigation Measures PEIR. A Statement of Overriding Considerations is required, which is attached to this Findings of Fact. Alternative 3. Verv Low Densitv DeveloDment Alternative with Aaricultural Preservation This alternative would substantially further reduce the overall number of units constructed, and permanently preserve portions of the site in agricultural production. This alternative would result in a minimal amount of development at the Rural Residential (RR) land use designation of 2.5 acres per unit, and would preserve half of the site (approximately 926 acres under agricultural production). This alternative would retain the option for individuals on larger lot parcels to maintain small agricultural areas. This would result in approximately 370 rural residential units onsite, and retention of the remaining project site in agricultura1 production under an agricultural preserve or conservation easement. Alternative 3 would involve 370 residential units, and approximately 926 acres of the site to remain under agricultural production. Finding This alternative marginally meets most of the project objectives, but it does not fulfill those objectives to the same level as the proposed project. With the low intensity of development, it will be difficult to achieve the critical mass and site design necessary to support a self-contained community, a range of housing types, and a fiscally sound mixed-use development. In particular, the residential unit count is likely to result in a very limited range of housing types and affordability . It is assumed that the residential portion of this alternative is feasible. Similar to Aternative 2, the development portion would likely be a typical development and not include creative strategies. The agricultural component is likely infeasible because of the difficulties in continuing to farm with adjacent development. Furthennore, once the surrounding area develops, it will create substantial pressure to convert remaining farmland on the site. No group or agency has indicated a desire to purchase the land in order to continue famùng it, and it is not expected that such a proposal would be forthcoming on even a portion of the land, given the substantial remaining fannland in the area. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the Final PEIR. A Statement of Overriding Considerations is required, which is attached to this Findings of Fact. Alternative 4. Hiah Densitv Alternative This alternative would include a higher density development pattern with additional open space and agricultural land surrounding the developable area. The overall plan for the site would shift the developable area toward the center of 43 September 2005 «. 'òM.~'1> o <f> J&S 04191 >- ~ r- m _ r- V 0 ORIGINAL Old River Ranch Project (GPAlZC #03-1528) City of Bakersfield Statement of Facts, Findings, and Mitigation Measures the site, with the boundaries and space between planned residential units being decreased. This would have the affect of increasing residential and commercial densities. This alternative would eliminate the proposed units designated as Low Density, and all units would be constructed at densities consistent with Low Medium Density, High-Medium Density, and High Density. This alternatiye would provide for development on 750 acres and continued agricultural production on the remaining acreage within the site. Ultirnately, the same number of units- 5,979- would be construction on half of the space. This alternative would also include mixed-use neighborhoods, such as additional apartments, townhomes, and smaller single family units. This alternative would involve the same amount of commercial development as the proposed project would. Finding This alternative is feasible to develop, although it would increase impacts to some environmental issue areas. Additionally, it is highly likely that the surrounding undeveloped areas would succumb to development pressure after the interim years following development of the project. Therefore, it is likely that the overall densities within the project area would ultimately be much greater than those for the proposed project. Due to the high demand for housing and development within the City, it is likely that all areas within the Bakersfield sphere of influence (including the project site) would ultirnately be developed with urban land uses. Under this alternative, it can be speculated that additional land beyond the project area would be developed at similar high densities in the near future, rnaking the larger area more dense over time, thereby exacerbating environmental impacts. More importantly, this alternative does not avoid or substantially lessen any significant impacts. Therefore, it is not a feasible alternative. Specific economic, legal, social, technological, or other considerations make infeasible the mitigation measures or project alternatives identified in the Final PEIR. A Statement of Overriding Considerations is required, which is attached to this Findings of Fact. 44 September 2005 ~ 'ò Þ<k f", () ~ J&S 04191,)... -- I- m _ c- O C> ORiG:NAL Old River Ranch Project (GPi>JZC #03-1528) ---..- '.--'-r-o--.----".' Exhibit E Statement of Overriding Considerations ,<'òM~ () ~ >- - I- rn - ,.... o t:J ORIG!NAL Statement of Overriding Considerations Pursuant to Section 15093 of the CEQA Guidelines, the City must balance the benefits of the proposed project against unavoidable environmental risks in detennining whether to approve the project. The proposed project would result in significant unavoidable impacts to agricultural resources, air quality, and transportation and traffic. Findings of Fact have been developed, which provide that mitigation measures andlor alternatives to the proposed project that would substantially reduce or avoid these significant impacts are infeasible. The proposed project offers seyeral benefits that outweigh the unavoidable adverse environmental effects of the project. These benefits are described in detail in the PEIR, and include the following: · The proposed project provides a high quality master planned community with its own identity, incOlporating a range of housing types; recreational features including parks, greenbelts, trails, and playing fields; and shopping, employment, and educational facilities. · The proposed project provides a mix of uses that would be mutually supportive linked by trails and greenbelts, reducing automobile dependency and encouraging pedestrian activity. · The proposed project provides an ecologically sound development that incorporates a comprehensive program of resource protection and conservation. · The proposed project provides a self-contained community focused on a mixed-use Village Center that serves as an entertainment and service center, and a gathering place for a wide range of community activities and special events. · The proposed project provides a public and private system of parks, trails, and community recreation facilities integrated into the physical plan of the community . · The proposed project proyides a comprehensive streetscape and landscape standards throughout the community, creating a unique identity and sense of place. · The proposed project provides a comprehensive road and infrastructure improvement phasing program assuring adequate capacity for buildout of the planned development. · The proposed project provides a mix of housing for various economic levels of the community. · The pre>posed project provides a new development which captures the economic demands generated by the marketplace and establishes Bakersfield's role as the capitol of the southern San Joaquin Valley. Old River Ranch Project (GPNZC #03-1528) September ",,%if'K/ò-9<f> 1 0 '" J&9-Ð4191 iíÏ I-" r- Õ t:J nRIr,INAL City of Bakersfield Statement of Overriding Considerations · The proposed project provides new deyelopment which provides a full mix of uses to support its population. · The proposed project provides new development which is compatible with and complements existing land uses. · The proposed project provides new development which channels land uses in a phased, orderly manner and is coordinated with the provision of infrastructure and public improvements. · The proposed project provides new development that is sensitive to the natural environment, and accounts for environmental hazards. · The proposed project provides a built environment which achieves a compatible functional and visual relationship among individual building sites. · The proposed project provides a safe and efficient street system that links all parts of the area for movement of people and goods. · The proposed project provides for safe and efficient motorized, non- motorized, and pedestrian traffic movement. · The proposed project provides minimum impact of truck traffic on circulation, and on noise sensitive land uses. · The proposed project provides a street system that creates a positive image of Bakersfield. · The proposed project provides a local street network that contributes to the quality and safety of residential neighborhoods and commercial districts. · The proposed project provides an adequate supply of sites for the development of sound, affordable new housing. · The proposed project conserves and enhances Bakersfield's biological resources in a manner which facilitates orderly development and reflects the sensitivities and constraints of those resources. · 1 he proposed project conserves and enhances the unique aspects of open space within the planning area. · The proposed project provides an integrated system of open space amenities in the planning area. · The proposed project maintains a coordinated planning and implementation program for the provision of public utilities to the planning area. · The proposed project coordinates the planning and implementation of planning area municipal-type utility facilities and services. · The proposed project provides parks and recreation facilities to meet the planning area's diverse needs. 2 ~M<::: September 200~ ?'~ J&S041.-r rr1 >-;; r- V 0 ORIGiNAL Old River Ranch Project (GPNZC #03-1528) City of Bakersfield Statement of Overriding Considerations The City hereby finds that the benefits of the proposed project are considered to outweigh the unavoidable adverse environmental effects to agricultural land conversion, noise, and traffic and circulation, which are therefore considered acceptable. 3 'ò i\K Æ'1' September 200~ <!:;, >- -- J&5041t.!: J!! <.) C> i)P!r;'NAL Old River Ranch Project (GPAlZC #03-1528) Exhibit F Mitigation Monitoring and Reporting Program x~Mt:'..9 () ~ ;:... iíi I;:: r- o C> ORIGiNAL .--<" -" -.--,--.,.-------.. ---_...,.--~._- l- II) :J ~ u ~ !I! ~o u U A. (!) ww z a~ ~ ~~ 0 A.4( Ib :J: A. ex: U:::E c z- z ~~ ~ ~z ~ Ww - ~:::E g ~z z c~ 0 6> : Z 0 w ~ (!) ¡:: ~ 8 c 01 Ï ~ o 0 U ~ 'S .sæ IS :z¡ B ~ ~ ~ >. .0 I 8 < t;' ã! ê ~ 8 8 ! ::I 01 I ::E c o 1ii CII ¡¡ ::E ~ Ii j. : r!æ I ~ ; i :i! 'S J! g :! _ .~ ~ ~ e ~ .;-,Sa 'Ii 811~8~ .2 eq 0 ·5iê.. '2 !! I!! ~Ð..-=·",=ª : ~cJ!~ ~!II!Š -зa~ 1L~~'t=~~ ~ E !J! ..~~.g ii1~ ~ S1!os "&=111 _¡.. W ¡'j. e OS!!" 2;!"'1J:g J!u~"1 J!þ ~ s.:iŠ- ~¡¡.:= ~..§~ ~ j 1S.8 2.s:Ë 8§ l .i l~'õ ~ it, = i - 0(;:3 0 ,! ¡.. a·- 0 '" 1:: .11 ~ = :;;: I ï f å ~ J! ~ :i ~ ~!! ~ ~] !1..!Ë ~ 8 ~ 110> cE~os!10 =~~:?Jag¡i"!!"" i'B~'1 ~:!!'õ~~B8~ ji~1!~ã!~~i1!~~ .5S1!· .1=:;;... ¡;¡ c ¡¡:¡¡¡¡eæl_=..¡¡¡.. :lEi-' 1L'õ·f!i 0 tl·,. ~i:IE<I) "-sÿ ~.. B.;¡ï3 ,5 :2 ... ~ -< t: - c 51 - '¡i .:= .§' :!!' '" 0 ~. "'B ;;¡g~BõI=!g~fu¡t1 1!",'¡;;~=:f: J. # ¡! '~i l~ ! I ~ ï i j ~ 8 ~ ~~ ~] ~ l~ ] ~ ~ 1~~~iI8~~~~~~I;§~æ~~~. . ~ .~ I! ¡g !! 0 c ';: .- .. ë~ ~~ ~~ ~m 'õ8-¡ bI!.5.. °ãi~ ~f1 8. t1=~ ·ê&·~ e·- ~ a &_ .. .. .. 11 :¡¡¡ 1 u '" = ;! ! ... i III c j I g i '" ¡e ::Ii ¡;j õ ~ .. I , £ c .. a: Iii~"tífó f 0,,; ;'ð j!' Q C> ORIG!NAl ! ¡;:: :I c .!! ã. ~ E 0 j u '5 Ja S J5 ! ::I II. ~ ~ III C "ë c . ¡¡: j;- 'i I 8 .., J! ~ II II!! 1111~ljJIII~ M 1 Ij~'¿¡'~ ~ bi!~d II ~Jiihit. '~¡!f¡J¡" ! i i~' J.jJ.j m.. i '. ,; J J.j ~ II 1r ßitiJl'IJ1¡1. I bUIIU I" 8~ "I" Ki' ~ Htl :IE g I illl'lli): 1i;¡JI~: I II r!~~lj ~ & r ~B I! ~s ~ Ii = ~¡li~f 11¡J!' ~¡11 ~ce :IE f~ ~ 1 'ã "" . i-~ .. 'P'S e¡' a! CI ,¿¡oJ.j ..~.J ø.:-š ~ g r'¡" ~ ;1 l..ll: 1 :II u ~J.jJ~~ ~ J.j ai . 1; ~ .I: U ~ ~ I 1 I!' I I g J . !i! "Is N I , J :'< 'òfc-5' () ~ "- ~ I- rn _ r- o 0 ORiGiNAL 2! ü: 3 c ,!!! Q. III E of 0 ~ u 'õ .!:! c :is 0 ;.:. B ::I Q. "" ¡¡ ¡¡: > .¡: 8 GI Q. 8 > ~ CI c ¡i: c III ¡:¡: ;.:. "" ~ 8 ~ 8 .9 ~ ~ ~ u _, I bO .... t::: p., c:J 8 0 ''::: .J:. bO ë <=: ..¡: ci c::1ZI OO_I~ ë Q)-.... d' - = c,) Q).- 0 Q. ~ -'0 u g(j c:: .~ ~.- ¡:::¡. "i ..¡: .- .... ..;; E := .- S i ~ ~ Ê ''§ §.]- j ~'~ £ ~ ~ ~ -; ~ B E ~ ~ tI)::E '"0 U ( J U ~ 8 ~::1 Q) t:1 ..d ~ .... ~ ~ .- C 0. t;:; g ~ 15"3] g ¡ >. ~ ;>. ~ ~ " .- ~ gp:3 :B 'S § ~ ~.,!. <¿j";:; ~ ¢:: ca :5-8=~ Q.)ü~[ ~ E ti =g.&~B~"j~1G~lj~e8e "0 - .- ,- ~ oS.... ~ Q) 0 '" 2! ~ o-æ8=~~u ~ "ao<=:O rn Go) .- ~ rI) >.... 8 ~ > . .- 0 ~ ';'¡'J:: i!J g ~~~t~t;:;~o~Y_¡o]es~<=:~~ 2! 8 è~ ~ õj f- to ~ " ::I CJ f- ~·û u ~ > ~ ...: ~ CJ ~ ; !Bi..;;,,§~0~llg.~u1ee~~i III c( ~ 'iä ,,~.... a ..¡: ~.w ~ 0 ~ -'" B·...u~¡¿a ;>.'" =-=a.... III c .- e.... u 0. ~ - - ~ ð 5. .... ~ 'iä 8 . ~ " ~ -g s ª' ~ .5 § 13 ;:. GI .- !§-5j~o~ft=~.g~ë ca U Q; .0!5.c c:: p., Õ oS ...Vl ~.- 0 \:I oS .... ~- :E ,g¡ <=: § ~ 0 <=: 0 ~ .- 0. > 0 ~ ~"'Ico·~~"'''~þ "=1-§'-6 c ... U ã<X! Q).... ;s U '¡::..d ..c:: ~.- 0. - 0...;; _ = ~ u ~ u ~ 0 C. f-i;! ~ ~ ~ 1[£ 0." "0 u_~§¡¿~""e·~B0g=~".... ~ c "''' _ u > > ...... a ~ .-..c:: 0 ~ ..;; ¡ IS) -5 p., fI) QJ U .¡:: ..:: ~ £ '"0 .s "'~"~;>.~..;;=a=u I~~£-£..c::·~ '1:1 cug.uo;::.s~á'j....~;~ CI ._ Q.) U .- "t:I CIS - ~ êc! EI~~ª'~'~~ ~I~~i~~~ ~ > ....,,~f-.s£>o.g.'!J..;; o 0e £ ....uõj-" ¡¡:GI"'....o ."'-£ BIg~" - - :E .. õi ..;; . 0. 0 ,- B <=: c¡eou=ü~=_~öuc::tI)~o>g~Q.)O 11. .. > ~ ~ .~ .g ~ -:E u <=: 's 0> ~....tI)u_ocuu_~·_8~.se -~~ . "'CI CJ U ;s 0 Q) u p., u 0 .... .~ v)'':: -s .s --. {/) ë ~.... ~! ~ VJ "': ¡ ~ e " 8 u . eo..; ~.s . e go e I~ 0. 11] .!S ..c:: <=: 8 d .~ - 0 '8" s -"0 0. f- ~ ~ _ .- f- " ~ bO g __ a. ~ _ ;s .... ._ u --. u ~ .-.... 23 .&J c)C",,,. ~~,,£::s.,,; ~EB"~aõi=ei~NSN~<=:~"oo.<=:'" w.f! o.~ '" .- í5.'~ 8 B !;! B ~-~>~ ¡~.~ ~~~~~o~1u~~ D::fI -~ ·o.u ~ 0 ~~I¡~~~ts]~~I~~lii £~~ :IE ~~ <=: ~ "2 § ~ c::.g = l'iä :IE c 0"- .... C <=:..c:: ª' '" " '" 1! § ~ a";; :IE u ~ ~ 8 ~ g ~ e'~ -51 ~~~~~~~~~~~~.~~]8_u~·~~~ ~ :¡¡ u ., J: U '" c 1: o a. ., II:: ." c:: '" '" C "C .s '" o ::Ii c:: o ¡ '" ., :¡¡ g õ '" Q) g> a. , J: U c:: '" ~ r¿1k~-9 ().2: (f' ;... II:: "" I- ~ ¡T¡ - 0 f- o C> OR~G NAL i ~ " .s:: I) '" c i2 0 g, CD :. .. ¡¡ "tI C .. '" c ." S .¡: 0 ::Ii 6 ¡ CD '" U .. c i .!! ã. ~ E 0 .. 0 0 3: 'õ .~ c :E 0 .. ::I co IL u ¡¡: .¡: ~ f ::I III co CD ::E c o i IJ .. i CII C 'c c co ii: - - 'Ii Q) = d -"''''..... 0 U') ~ -.:;I s:: 0 ~..::: .- Q) I.¡..o 0 e:! .S¡ e § ~ ~ .~ ~ -;¡ Q. .- ~ U') - ~ :§~ ~o.fj.fj 8 1::_ ¡¡:Ul::~¡; ( ,)~ =~oU')- .~~ 8¿§ë!~ 0.!S -8Š·"'S,... e .= '> ..c:: ê " ~ !~ ~ ~ ~ ici -'"' ~ := ..9 ~ .- ¡¿ -.:;I ';I St: r/) =- " .- ~.¡¡; ~ ¡:¡ ¿, ~~ ~~B.9 ë ¡g-8";:.=~,,'9,, o·-St:8:~o~> Ee.9",u>1~·'" -8 ",::Š 1! IE ~ ¡:: ~ OOÐU')~~~~~ E-< " '" :2],B. '" ~ .i:::~ ~ 1!~"'Q Q)~ Co) :::s ~ tJ .- ë! .c e:! ~ ~ ~.~ ~~ '" ~ ~ ::S:£':o8!Ë.,';! J!J~~e¡..rJ:> ,,:::.S.! ::1 ::; !! ~ e¡ '" » . ¡:;ctI( ,)Q)~O ~ e¡.~ E~ ¡¿ e '" u " :0 . ¡;¡'iõ'e¡~¡:¡1i .S 'f ..!i " fJ 8 ~~ ~ c.. Co) Q) ",0"'»"'-5 :g~~;~e 'S 'Éb ê: .. .- :Q'I:: ctI ~ .s ~ " .fj-5 ,,¡:;..9 .fj .:= ~ ! ~ = ~ 0 0 -8~-~ .-.- I:: g :::::: õ..~ -= 'S: c..~ 1-0 .. '" " 0 ~~.-;:: Q) .- = tr.I =: u "8 .. 0 " 0..c:: -S~ci~;,; ~ ~~ ~ ~ ë·- c.."O ë .~ ~ ~ ~ -a. S ~ S .~ Ii e¡ .~ ..!! ~ 0 1! U I:: f!= ~.5 ~._ t.S: . ___'._ ____._____.______.___. _._'m_'_____-.---------- ,,¡ ~ " o ~~ ~ 'ë ~ "is :0 .. 8- þ U .fj iõ' p,. o -= Q)~ iõ' '" -5 0 ~~ .B»¡¡ c.¡.!,. c.. Co) 0 ss!:.= 9 o.¡¡: ~ - S i~l~~~~ .¡: " '" E c; " e i:"§.fj ~ "'.S;¡ " ~ - _ e·5:a ~ > ~ .fj ë ~"8::~ S. ¡¡ ~ ~'" ~ ë.§ "..!!8°-'"'·~§" -,r:> .",'" -5 ë;~o~'¿ .....:=-=4.)~Ëf ~ ~ ] ·íJ ¡ ~.~ "o:Ou,,-5~ .s " ""IE - Þ ¡g =~e¡~f!·-o _ ~.~ _ ._ U Co) o .fj~o ~ . :E~¡¿~]:' ~~ff~~] S¡g::2;~¡g-g ~8-5!!!8'" .€,B¡¡ 1: ,B.fj uo~-5_= .fj ¡ .S¡ ~ :g ~ ~~~.!!~& §>o~S~ .~ e ~ '" ~ ~ -a.f!::;-ge", c..'-~ i:d Q.."tj ctI 4.)..... ... =_ ts -5 ¡; ¡;.I:: .8 Q) I.¡..o Co) _ CU en .= 0:'= p,. -5 e¡ S. co ê:.,';! -5 -5 CU .~ ctI tI):a CU ¡5.~.fj::;~¡5 . o '"' õ .... " g> D.. .<: <) C to ex: ! "6"kê1' ~. '!.;, "º m - ,- o t::J ORIG:NAL i :¡¡ " .. .c 0 '" C 'E f 8- .. ü: ex: ." C '" .. .c '" ¡¡ C 'C j .s ë ð 0 ::Ii c 0 3 ¡ '" c :e .!! ::Ii Q. (II E of 0 0 <J 3: OS .!:! c :Q 0 ~ ::I IL u r¡: .¡: ~ f ::I (II .. GI 2 c o i !:II :¡: i !:II C ï: c .. ii: B 0:: '2» ~ .~ ë 2 ;~-; 'E ...,t:J.s'1:: §-s¡;-..¡f 04-0 t:: ~ ~ !:! 0 .. 0 ..ae!13§'!ä' ",a~=::E .~ a ;; ... .. :! !! ¡¡: .,s .S - -;:: B 0:: ¡¡. ~ "S! '~:s .. '8';¡ ~.~.... ~ëQ~~ ..1!~~.9¡l i ~ ª"~ ~ " e::E ~ "" . ~~~]§~!ä' >'~::I o::E eQ.)O_U_ .,s'- ~ e! $ ~o;¡~"·,, ._ ~ ~':¡;;¡ J:J ~ i ¡¡ e ~ ð .... - o c ~ Q.) I!! " _.. $ ".,s .~ .;:; 0:: E -;::.;:; s"" ¡¡. È 13 ~ .. .§ Š B:€! ;; ë ~ "'0 Ü Q.) ~ CD CD ~ ~ ~.5 at á1 ..s õ B'!!,e';:; 0. ~'8,£....1! """ Q"";:U ¡¡ ~"È Q(.)~~....B~veö::--.. .s 0. ." CD ~.~ ~ e 0 Q.) '" "'u '2 c.!: $ e ,t:J ~ I< 0. - .;:; .eo " .;:; "o¡:: .. Ll.. !: 0. '2'¡: t:<..s 0:: .~ 8»$'" ...._"">~o"J::È" ],t:J~i i~~~ª5J¡t""lg "04-0tn _ca~p._V,I 011> "'It Bio~ 1L~~e!ä'!:!e!~ui~~ ~ tn ~ = § Q.'~ p..B rt :: ~ = :ö ~ ~ =Q.)~'- ·_Q.SI1> ~ 'J~~~ el1>~~~ õC=~=B5~tn~Q.)- "o::~c ::I=B......a..e-.."~o >0 0 bC~Otn·C~~~tn~~ e 'i ~ .~ !.s ~ á1 ~ å"'~ ~ ~ ~ E :=: ~ bJ) 'ß .!:P 0 J: ~ v.I ;; ~ 5- 0 ~ = 0 q J¡",,~ uc~..a~!ä'!:!~~Q)þ~ I:: co. 0 c: 0. C e e·:;·~ . ~ ~ "tn "": ë 8: ë= .9 ti -8 ~ ~ is- u ~ iJQQ~~B~gU2~8'21e!131!! ~~~5Q.)- ~O" .J::~rn tn~o o ~~~~~~!!~~o¡::8.8.~~~ ~8~~..1!lææª8~~~~~8~ .... '" o Q.) ~ B § 0';:;. §.¡;; 1ft'';:: ~~~ '.=,Q.) ãiJ! .!9 ",£,. u';:; >.-"E :I., ca-Q.) CDcnO ..9o=~~=§s ..J U ~ Q.) .- B·¡:: 0 . "-~11>~tno 1;:j 1;; 0 ~ u:: ~ ~ð ~ 8.2 ~1ã~;.:: Q.)'~-:Ect! ~ CD:E~~.s~~Q.)~Q.) .~ f. e ~ È·5 .~ ã "'0 t 1:-15: __""c ¡ ¡: ~ ~"8 ~.~ ~ ~ I!! ,Q c¡: 0. ~ .- - CQ .. s 4) ~~~~~~.9M:!i> ..!:o.C:Bo~;;:!i~ ~:5!~~.B 8~~~~ ~.2<;;.M~<£! ~2!.ª<;; CD >~.c='o"dtn.d Q. Ift._ ~ v.I v.I.t:: .. - ~ C~~~~ON~ ...: .2 1::1 .P·~ ~ .... ~.- u ._..._CQ tn~CQ..¡;;¡ _caBp.o~:E~O~ Ii: ,g> B ë g ë e! . g 'J:: ~ ~.8 ~ ..a.g ~§..a e ~.Eø..o¡::~8.'£ø..~.. o '" õ '" " OJ '" Il. .c: " " '" ct ~ " ." 'i>AKro: ~ '9<f> ;:0 ~ I- m - t- o 0 ORIG!NAL - .!! =5 . .c C,) '" c 1: 0 I!! ... . ¡¡: III: ... >. c .. .c '" 1! c 'I: e 0 - ~ "2 ã 0 -< :IE c 0 8 'i '" c: '" .!! i ã. .. E ~ 0 0 u 3: Õ .!:! c :ã 0 Þ .. ::I I.'! IL 1! c¡:: ~ 'C II ã > -< CI) c ë: c 1\1 ¡¡; !!! ::I .. 1\1 II ::E c o ~ CI) .. i ... «I - ..... ---!::! "O~ "0 >. "';0...... := i Bo -cC:& þt! 'ê5~....8 ~;::.oo.s~ Q.) . ca Q) Q) ~ 16 OðÛ ~ ~... ~ 4)= ~ = - «I "C ..... (I'). "S! """'ª¡¡¡;;~ 'Ed :> ..= ~- .>." ~.. ..~'=!!"õI~. '" ~¡g ~~~H~ ~I i i1~~~1Jfl;~! iil~J;~¡IJJo ~~~~.~ .8~ . .~Oð-~8~·~~(I'}~o~ ~~~t&S8~ca~ ~8...Q)~~;J=1\I~ t; ]õ..2 '\:I5~CJca~rI)"O "bQ..c~ U}cni::u«l '" '" ¡:¡ '¡:¡ '" "iIi ." c,r¡ ..¡ ~ .:¡; '" ~ '5 ÍJ! ." < 5 '¡:¡ C III ".!:! _ > " ~ ~ 8 0 a 8. ~ =: :a:: ~ .S ~ 5 ~ -;¡: g..£ ~"fã 8 ~ Q):.o ~ .; -; ~ .~ =< J! ~ .~ 'ä I!! -g ~ .~ ~.§.g ~ g..;'! 1:; ª ,g ~.g ~ ~ ~'> "" ~~] ~ .;¡ .~] . ~ ] ê .;¡; 'õ .. B if ..s õi .:g .0.._ ~ § " c .. = i ,..s: E -8 i!P p..; or( "S3 õi ¡{ E! " ".~ cs ~ ~g ..... ,£ - co -~ ~ .s "0 ().~ o· >;s ..... 'r:: ~ " ;;.s ~.Y rI.I "'=' Q....... 0 ~ijl~§¡~ ~ !ªêltl· ;1t!l~ ~t~J-8~!jJJ" ~~õi""~]-,, . c""B=I~' Ble~g~s~a!s .~õi~~~ ~ "E -g ~ ê ~ ~ ~ ·E~ ~;; = .g c c '= U ';5 rl'..c t:: ~ ~ t) g = t.: ..; ~ ,SbO.5 5 ~ " .. ~" ,:! """" _"'ü ._ ð ¡g.jg "8.'S: s:.s: -g -8"õ1 ~ þ"" ¡;; ~ 5]:.; 'c: ~.- !'!'.. 'õ (I'}.. .... Q., = ~ t""! C ::j ~ fI} r.n '_ ..... _ ..c C;.= ~ > (/.) (I'} w CL) ....., 1:1 ~ '6 = "...." ,;0 .- "" I:i "" 8" ~ \I "" ~ ~.;o W " .. '" .¡¡ - '" ::: c = '"11 ...g 8:s! ~qi·g ~ :E g. _ "" .13 " '§ ·ã·Oj ~]' -g "" 1i .·~.5::E IS. ë 12 I!! " 8 ~. ~ ~ e ~ -ô 1:: ~ = ...: -;¡ Y & !5 è 0...:=;:::: bÍ) .. è'CI "'":;:: "": 5 .S I:Q fI1 ..= ~ ~ sa s ~ ]§="B8.~fi.~ ~S~~i~~I~c:~cill~ig~§g"8""~~~ uu~@e e~~ø v ~~o=~ ~£~~~ 0 fI1f11~_ ~ !i.~BJS",i~I!~~J=~I""~~I~~~!~tl~~~· !! II¡fll~~~I~~illlii¡.'I~~I~~~¡li~I~1 ~-~.._-_._._..._..-..,--,-_._--,--_.._-~"_-~ o '" õ CD ( ) g> Q. -5 c: ., D:: æ ' .2: ~ 'òJ>.k/;"" f ~ - ;-. :..) C> ()RIG'NAL CII ... ¡¡: i >. .c -¡¡ -¡¡ e i ~ 8 8 .( CII U c .!! 'ii. II) E of 0 0 u ~ 'õ ,~ c :¡:¡ 0 :;::; :I III 0- u q: '¡: ~ CI C 'c C III ¡¡: VI = '+-o.S::iI g¡ - C':S . = .!! 0 Þ< 0) "' Q) 01!"'" ~~ i § J ~~s ~ ~O* 11'~_'£!:=8 '" u .. CI) _o;I. ~ = .'-v.¡ F -- ~ .. t 'a C\S.....1~1+-o "o~o ~~o -š ü~s " ;:>_J5!]2J~ c UU ~ov.¡- S . - ~._~ C t.fJ tI.) 4.) . " _ '" ..1! .~ 9 Þ ~" .. = € ~ 1! -d .....ª'"'E! 0 -'" .s~"'E!:a.~.ª~ '".. - e"Ê '- '5 5 § ~ §' ~ !o! ".'" ~ ~ ~ 0 .§. ca." ~ C':S '+-0 - > J c::n c ""' Q., ~ 13 ... .- _ (,) CD ... ""' _ >. 0 tI).5=! Q."I CII cO 0 . Q."I~'-' ~Q."I == =C':Su ,æ>'! .£5!~1O"õ~~ ... 'i -~ &la"~~=~~~~"0~i"8"; :I ~ ~ ~v.¡>eœ~_~Q."I=~~ ~_~u ~.. .2J"!!!~.~~;:¡:: .. S E 1- :=..1!0= ~"9°1 "i e III ca .3 ~ ;§ .~ - ~ =ª.~ g .š tt ~. ~ 0 ª cu..2 ~ ~i Il~iî]1 CII 1 :::Ii I/) .... 8. 5! . 5"'§ .. ~ <:I)" " ~ u '= =ä c bO ~ .5 g:.c '7Ð VI "S S = = g en 12 ~ ~ t::r C .. 1/)~~9~,,=£e§"Jg¡"'E!~8~-1!I8.~ oë~~~ë",,·~~ 0 ;>, 1/).- . _>~= :g .c ca~-.!!~UbO Cl)v.¡ - = ~ _caca~"t:)CI) 0 g 3o:: ~ ~ ~ '" ~ t:!;; §.~ ~'i ~.g.~ ~ ~ ~U g ~.. f! ;¡ ~.s".::: 1! CI .ª " =~ f! =2!" :;::; '" ..: -g~ § "õ §'';:¡:<Õ 8 ~"':~.9 ~ .. á!:a_' 1!f? CQ~ 'õ ff~ ä.8·~= i - '" ...- 8 I/) Z 1j -.¡ " 5 1! 'g ] ~ 'i !!! 8 !o! ~ ~'õ ~ ] p:: 8fz 1j'-1O,",<:I) 0 ",- &'G .~= ct~I_C':S~ ~~.!! æ~~~8 ~. ,S..=~~-8d=~ :å~ N ~- - -_uC-v.¡ CUVl_- ...I/),"~ 008= ..¡ i!'; ~ = ... '" J "'§ ~ 5! nrg .Ë := :-=: £ 'i £ .. ~ . _ C» V,I Q.,-'- 0 ., c '" .- 'i '@ - .::: '" '" ... '" "";:> '" 8 "" " ¡;¡ 0 ""I .- >- ~ CD" .~ ~ & .š ~ ë;"; i f1 .~ 8~"ª !~] ~ .Š~ ~] ~ ~. ~ ¡"ª ~ E·-.s u ã:) 'ë ""' ·C·C ::t.e-~ "" "'.s~5"~ " " :::Ii~~æI~a]~~~~gg~I]~§~'g5~ ªª ::& = 0 C':$ C U :::Ii<~ ~_::t:....~~"g~o",~::t:u~..u" :::Ii ¡[ &. if ~ .9 8 8 ~,£! __._...___._'.'._._. "__.M"__.._··· ._...___.."......-___ ,"_'.__,_,___ i 1i .. .c U '" c 'E o a. .. II:: ." c .. '" c "I: S 'c o :::E c o ¡ '" '" i g õ .... Q) 0) .. 0.. .c " c .. 0:: Ii; .~ \\M(' \ ;- '>J' .Q ~ \- Œ! Q 6 ORiG'NAl ~ .!! ~ .. .c (.) '" c ;: CII &. .. &! ¡¡: .., c » » II .J:> .J:> '" ¡¡ ¡¡ C 'I: j e B ~ "ë 8 8 0 ::E Ii CII ;¡¡ U '" C "" .!!! i ã. III E "'" 0 .. 0 u ~ Õ .!æ c :E 0 :¡:: :I f D- c¡: .¡: ~ '" c Î:! c ft ii: CII .. :::I III ft .. == c o :¡:: ft '" :¡:: i 0=:1 ... ""'-"'º bO "'0 c.' ~ Q) ãš- u tV ~ö 53 Q) = o~:-= ~ ~ -:=.-=: '@ .!f i? ~ ; Jj ] '¡: ß ~ ,; -š ¡ ~ ;.. ] ~ 8. .~ ~ : '§ ~ ß ~ 'õ I:!" ~ ~ = ¡; " .. .. 1! " .!! ,§ -8 8. .. .. ~ "CI!i ]. ~ ~ = g ~ ~ æ "~ ~ ~ ~ ~ ~ ~ ~ ~.13 ~ f~ ~ ô :i: -š ß ~ ~ æ _ j1~~~i ~~!~]~]~~]~]I~~]~~~II ~~~]~~ ~ 1 ] i ~ ~ .~ ~ ~ ~ ] ]1 ~ .g '-IS¡ i 1! ~ ~ 1 ~ i ~ g ~ ~ ~ .~ ~ § ],5j ~ . I:! >! U ~ -= 8. 55 " "õ :¡ä' ~ rJ' E $a ~.¡;; 1;! 9 .!! .~ ~ ~ ~.., 8. 1!i -Š ~ 8. "õ "'g E: ; g -8.! bO~.Š ~ t¡IJ = ~ .!:! = ~] ~'§ ~ £5 : - -8 'õ 55 bO ;; ~ 5 ~ -g~" ~ ~.!f.~ ~ ~ § ! ! § ~ ~ ~ 8 ~ ~ ~ ~ 8] ~ ~ t~ ~:¡ ~ ] .~:€ ~ ~ "CI :- "E 0 0> .."CI.. ¡¡ - -'" ., " " 0 "en ~ .... ., .. ° ð ° -= 3: .. ...= ~ ,,_ d) C J 0 _ .£ Cd ~ ':¡:¡ 0 _ .s .- - 0 .c .- "::I _.... e u "0 iU œ 8 ~ ~ 8 ~ i "õ 13 ,,~-Š --=::fi .~ 'õ ~.~ d i:' ~ -]" "E .$ $a ~ 5 Š "õ 'ë.'S: 2 '€i .g I:! 0; .. ",¡: IX 8 ° ~ - .s 'ii <.) ;I " "CI 9 9 - R 11 ...¡: U co ,,=.,.$ ° " ~ I:! - ~ c:>. . on .. -: ¡j ».~ ~ 1! :!.s ~ " '1;J ~]. ~ o;.S c:>. . 3: g ¡¡¡ .s g .. !t ~ßgJ~~",~~·¡~§<~I:g¡:igª'õI:!~~~~~~~~~-Š1 1:¡ä¡;~;I~t¡JJi~J~æJI~·i¡J~~;~=~31~~~ 11 .¡;¡ " ~ ,!:j :t: III ~ ¡:!:¡ c:>. ~ \I·ë ~ i; io ~ i; .. 5 ~ ãi 8. ~ ;I ,!:j :t:.ª ~ ';:: ¡¡ .g <: ] ~ ~:-=Bð~~=.O:-=·g.-~~'-~~ O~~t~~~=~~2"'¡'O'~=~~"O I:! 55 ~ So I:! ::E J¡ æ.¡¡ ., ª,$ ;¡ I:! '6 .g '6'S: 8'¡;¡ 11! b & 'û I:! ::E ~z æ So 8..a ~ $a o '"' õ co ., 0> .. 11.. .c " c '" " £~,id,(~~ ç . .<1;, >-J:! -- H) m _ r- <.) <::> ORIG'NAI ! ¡¡: i ;.:. .0 -¡¡ ¡¡ e i ~ 8 8 « GI u c .!! 'Q. 1/1 E "" 0 .. 0 (.) ~ 'õ .2 c :g 0 ~ :s II. I¡: 'i: ~ aI C ï: c III ii: .... ~ 0 :Q 'a "8 0 .... ._ "'C... U c:: CI:S 1+00 ~ CIJ Q.) '" I (\)u0'E ~ 8 ~.~ QI fa 0'- U} Q) ..., ~§ -= -= í!! <j ~~ ]~e~ ~~~~~ ~g~ c ] . "i3'E ~ .. '" ~ ." õ .S .; :: Ii ~« ~.~ ~ Uj.~ ~ :¡¡ gp s '" . _o=ë u.:i~ o.!~ GO"" ..¡j";:lt!-;.. Z >- ".. S ~ ;:I "".- .... z" 11) ~ 0 . o CIJ.. ......... 0 =~ -= -¡¡.- 1:!.... §':.... ~ " ..]..!! = GO '" = ~ 8. ã! ~.- if ã! 0 6\, 'E .¡:: o;IJ tI:I t:: ~ 0 ;.... ,,¡ ~ 8 ã! '" -;;; ... 0'" "'g¡, - 0" - 8"" 0_ '" -= .~ 8. .~ ! oÞ<oQ)-u>= wE ~,~a~<jI~J¡1-;;;~~ WGO ~"""-8l: :s CIJ g~.s.$.;j-a ~ ClIO .0 ,,-õ ~""~ g 1:1 GO:: ~ .! "" J:! - 1/1 .- ~ " ã! S~~t~~8~vjl~ ¡¡i)~ ~õ ::I .~ J ~ f~ ~ III ~ ,v e~ 1:! "" co,,! CfJ Q.) Q) U t.n 0 > 0 GI -..9 '"0 -5 4)..9 .:i -:: 8. -= .s -= J ~ .,; ~ ~ ~ ª .. û .~ .:iIB 8.~~~~~ ~ ~ J.~ . e! "" U ~ "Ii! ....-="-.c~,, V;..;:I c ~.~ 5-:g ~ ¡¡¡ S .g 'a CD bQ ~ .- ..... c; t'd 5 8.S;;: U} ~ E"t:: t:r ...,0 "";:1;:1 .."" 0 -="e!":t';.,.~v c: u Z.s ~ ] ~ .... a - t) .- J '" 8. e! c: ~ z .s 1! ~.s v ~ :¡:¡ :g .,8 J ~ ¡¡¡.~' .r;; '" " 1/1 "" f- 0 '-.s .." 0 ~ ca.... 1ft "t:) 0 CI) CL) 0 III GO';¡; '" ~ Ei '" ;.. ¡'¡ 8 ii .... .S ] - e U .!!:;"'~<j..9~-=.s:: aI ;:I~"" ",,-"§o 'Q."" s "" e « v is. ,:: -;;; v 1;1 "" "" QI "'w GO "" J' 'ti '" '" .. j'ë~~~~<j: Ec:"'Õ....-¡¡&Ei~8~~1"'~J~ E~'t;j 1+00 "0 u}. i '" - o_Q)~Q)~ '" :I ~ ª 6\,..·8 3J ~] ~] ~ s ~ 5.] e!..e '§ 0] p:: ..., ~~~§~.; W...lCII d 1:1 '" e! -) "" ..., :" '" v '" 8 e! '" <j ;.. . " E o 0 =.... ~ !1 ~cE ~~=( )~( )§~ ~~U}I1)~ cu CI} - e .s .~ ~ .g §.E .9 ..9 = ~:s~ '§o-=¡::-= ~"'~£ãJv~¡:¡ «!oG» ;:I~f- . ~ .s <j.- <j ~ e- (/}u::='+-< Q)(\)'"O,§~~ '~>e "'t=!!; ~ >.00 bO..~õj . cu ~="é...... CD'- cu 0 _ ... C,I) !;¡!"'GO ..... - <"0 Vl.,e .....-.2 "-¡:: e! ~f~!Ji§~igft:....E~~~¡J CI> S~,,~¡¡_ :I -;;; v "" '" .. 8.'- :toO :::IIi 0 E 0 = '-6 '" £ 8. !..,¡ ~ 1:! ~ "" 1:1 ~ :::IIi0E .... cu 0 cu Q.) 1:I~'Ë~"'£e5- .0 ¡ = §':õ' '" 8 e!..e e! ~ iì! "" e! :::E~&æ~~8.I.gõj¡~8e!ªð.g :::E~~ C cà :::s.$:! ~ cu 01) VJ"O - .!! :;¡; u .. s: o '" c: ;: o '" GO II: ... c: .. '" c: .., S ï: o :Ii c: o ¡ '" "" i o '" õ '" " OJ (\ Q. s: " c (\ a: I;; .?: 'òAk¿: ~ ~<f> :>0 ~ I- m - ,- ù 0 ORiGiNAL :i :g " .<: () ... c t! ! 8. ¡¡: ~ ... ;.:, c ;>, .. "" "" ... ¡¡ ¡¡ c 'C i e .e ~ c 8 8 0 -< :& c 0 .. ¡ u ... r:: '" .!! i 'i5. <II E ...: 0 .. 0 (J ~ 'õ .~ r:: :E 0 .. ~ III a.. u ¡¡: '¡: ~ œ r:: i: r:: III ¡¡: .. .. ~ <II III .. ~ r:: o ¡ œ .. jj .. _ 0... t; o~ "º U .'" rJ') 'oo.J -- en r.r.¡ ~ u = ~ rJ') -o:S ...~ 'ã B.. ;:: § 0 > ¡¡ 0 " '0 0 ,," .. ",:=..'@ 13'" "'8 =:<;:: ~.5 '¡'j 0 ~ ,- l!J e¡ .<:; ';:J.c = -" 1;j ... -"" 0 = -"" "'" . "'"2 ;>. en - 1:::0 rJ')t:~-C'dUe'- --e::53rJ')o-5Sc::.&:i__ :;:; ~ 5 8 ~ ~ ~"i ê' ~ ~.~ 'õ ~ ..e 1 ~ ~ £.§ ~ .s " ~ 8 ~ ;0.9 ~ 5 ~~=~~~~~ ~~S,,~'Og -"'8.&.. 8.~]~~iE",~ '; ~ 8 ¡¡ ~ "E ~ ~ ~ ~ '" = 8 5 ~ Ii .: .~ B ~ e¡ !!: -š ~'€! ~ j ~ ~ g .!ì -š .Q . -š ~ .~ ~ oS ..:: '" Æ 8 8·g ã-:!§'~].~ l! e ~ Ii ~ g ~ ¡¡¡ ä 'Q. 5 ~ ~ ~ ] 5 !! "u.ª ~!II 'ã .. ] '0 í!J .5 -;:; ¡>; j 'E8 ;:: 0 E '8 e !II " 'õ !II " ~!'! ' _ .- -'" t: -S " '" .... ¡: = 0.....·- _. '" ". .. I:: '::I .c j:! '" -_ '=0 & ": e¡ '0 -S B .s z ,,¡¡ e ~ <> 0 ~ ~ <>'" .¡¡¡ ~ II:: ".... -"';:J" oS .- ,,_ § ~..~_,,='O"'_~ _... ~.S~=u~:=~~~. ._ .. -.... 0.... " .. .. .- " - ..c c .. _ -- iUO __O"aClbO;>'rJ')Q)__rJ')~ =ãš'S>' C ff8"OrJ')Q)8 u}'''O 1~-g~1"!~it~I!!fl~~~¡~~; ~~~1]1~~i~ 5= '"O-j:j="'S."aO¡¡"O -o:S.&:i rJ')6~Q) I:::CÞ OI)..c:/)Q--Q)I¡;;¡O<l.)~dJ ~ ~ 8 ~ ~ § ~ ~ ¡ 'õ ~ ~ ¡:J ~ -Š.§ W j ~ ¡ ] ~ J 'õ ,~ -Š j'~ .~ .~ ~ ~ i - § Ì:! I:i ..~ e¡ (/) & 8 " -S ~ ~ ~';:J l! .... '" ¿p 8. § '" e ¡¡¡ "~5 .~ § ª .~.~ ~ § ~ .~ ø!} ~ ~ ; .9 .!3 ~ .~ :!2 ~ ~ JJ B ~ ~ ~ ~]',g -š .g .. ~ ~ B8. "S! «:I 1-0 0 ..c _ Ü ,. 0 ~ 0 Or:> d1 Q) r.f.) = = ~ -8 /)Q -- ,. ca ~ ~ OI)~ S >. <I.) ~ t:d !! " ';:J ;:: '0 '" ø:¡ N E .- <> "'.f! ~ . 5 ~ "¡¡ '0 .- ='¡¡; N" .- 5.5 0 ,,"" .¡;¡ ....... '0 e¡ '€! :6 .2 § 1i u ~ & B l! ¡¡ ~ g ~ =8 = !! 6'o'Ë! B ~::Ii B'~ '5! § ~ ~ 1i "'g ~= ~ rJ') ~ 9i! rJ') <I.) c.. 0' 1-0 - 5 oS rJ') Q 0 0 - 0 1-0 ... 1-0 j:j .E 0- ,.!:¡¡: c\:I fj) Q) := 0 I:i := .. I< ~ ~ -g ·8 -¡;¡ '", ....."" c .. ';:J 8 E t'j (j·8 ~ :I ·8 8: I< 1::8. ~ S<"" ~ ;:: ~ = e¡ ~ 1;] ~ ø:: ::Ii .. ¡o,.'¡¡¡ 1;] 0 ¡¡¡ 8 -S ~ Ì:! e¡ .Q '" ~ ~ z ¡o,. '" ~ "".5 ¡¡¡ .~ " 8 o '" 'õ o ~ .. 0> ~ {i c .. a: ~¡'ííé;~ (JZ: ~ ~ >-:2 .-.. 1-0 n-i _ r- o t, OR:Gt"JAt- . ... ¡¡: È >, ~ '¡¡ '¡¡ e e ~ 8 ~ 8 ~ c .!! 'i5. .: E 0 ... 0 (.) ~ Õ .!:! c :ã 0 :;:¡ ::3 ft Q. u II: '~ ~ CD c 'ë c ft ã: .... ~ ~ '+-- 0 ~.9 Ô g¡ " - " C <I) "'" 0 2J ~ ,-5 ~ 0·<;; ~~ ~< ~~" =~g I~ 0 ~ GI ~ ~ "3~o"O= . ~V,) .. ~ ~.!o!.!! _ ..8 g ~:= - . 13 ~ ca16 .!! 0Jj¡g" -bOO ~!..t-~~~~~=~~~ 8B~ GI- t = ';j~'£ ~=- z"i 0= -'- =- .- .... _-....¡!J <)~.o ¡!J]§"': -'" ~.- 0 ~ V,¡ en C" ........... 13 0 õ~=~o~~~~~o ~~§~]~ =e ~= "'.- ~ ~ 0 !;1, 0 'C .gGl :=8111 "'1i = - <) "" 0Y~-J·-5~08<)~<)"<)]." . ! ~=.g~ i-¡~~ P z ~ § .= g '& g §'~ ~ ~ .$ .~ ~ ¡¡ a:: 0_ I I» - rn V) ::3 i~r~~].š]~ ~~ i~"'.. en .~:B"~È~~.!o!~~~ cl·~~ ~ ~ '§ ,=] ft .§~~~8ª].§.¡g co. £~:= ~.o~oo~~ ~=o . c( C):! 8. ~ I ~ ~ "" ~ .¡;; Jj,~ . ~ ] ð ~ ~& 8.~g ::E "..80§~~.!!"'g. -g £"i gj! ~ ë. ~ ~"ª j.~ g. ~.e . B ~ c <) <) ':;. .5 -c:: ~ c"CI bO '" S 0 <t! <I) - <).- B . 8. .. E'-B' ..,,~~ =~=-g.bO.!! .. æ .=], :; ,.s"= 0 ~ GI -;; . ~ .5 p:,. .<;; .. .. 0 B ~ .. ~.= ,- GI "CI "CI ª e .... .9 = .... e u - £II:: e= fI). -_cu'.;j "2r.1.1 ã.1IÌ f!-g.§ CD .0 ,,- " - .a bO ""0 ~':ãibO.g8~¡j .5~-5~"CI ¡¡'õoB EE bO . :;:¡ ~ g ~ ]'$ ..= B ~ i ~~~]]¡~1~~~]]]~ª1!.~ II =- 'õ CG ... 'õ8~ 1:=~=~ 06 ,,].~ ......g~~t!..'" =0:-;::1 "O~-£Q.)""; =-g&=~o~"B¡!Jd~§=~~~~2J ..t-g g<)§ o ~ 0 "'I+-; G) - :: ~="CI~=<)8£"CI~i <)~cBg~c ..... ~~ 'J::: rJ:I:3'-..-"O.s(;11) ~=~.-" ~ ~ "CI '§ ~ ~ .!! .¡;;:> S e c.~ 8 ~ I 'õ ~ ~ ~ ~ t) .g _ - U ( J !;¡! e ...~ 8-5 ~.ª~:.- ¡;ï3oå~~ g. !;¡!f~BB9~Cbg~~!~~]"ª~~ ::J:f=BB~ ut:jCl: C,)~ca~ _~ ::J: E~_Oa~~g8"""i1· 8.- o§~- = c ~.~ 0 -= "0 5 > 2o~.o-¡5VJt "O~~ QBe~ ::E... æ] = 88. E:z::8e;u-8 ::E ~ : æ "5j .~ t3 8. B 8 È ¡;¡ ~ ~ ~ ;¡ "" ~ ::Ec(Z . B :! ii .. .c o '" C 'E o a. " It: .., C .. '" C 'C o '" 5 :Ii C o ¡ '" :e :Ii ~ 'õ ~ ~ " ~ a. .c <) " '" It: Ii; ·~"bMi.': ~ 1'<f> >0 ~ I- m - ,- <.) t) nRiG'NAL - .!! :s II .c (,) '" c 1: I!! &. ü: ~ ... c » .. ,Q '" ¡¡ c "C e s f5: .¡: 8 0 < ~ c 0 .. i u '" c '" .!! i 'ii ~ E 0 .. (.) 0 õ ~ .!:! c :¡:¡ 0 ;.:, <æ :J 0. ,Q u I Ii: '1: ~ 8 aI c '2 c 01 ¡¡: I!! :J ) .. .. ::E c o ~ aI :¡:; i = ~ ~d ~ "'d.sa ~ CI) 'õ 8 't:i .sa ~ l3 .r! -.š o ~o ¡ ~1~s ...... J~¡,,_~~¡ ~1~= ...... - ~~ ..=~~ __..<)~ -~--5!-" __..<)~ I~J~ ~~~~ J~¡~~¡¡ ~ ~~~""gtJ~¡~b....~ ¡ ,,-~~ Q~u. ~OCl)~ .~ _ ~~~§~~~~OCl)g.= ~ =~~c §~=~ a=",-8.g ~ ·H.~· ~.a==~8.g ~ ~<),,= ª¡g!~~o~~g~¡¡ III ~~~""~~8~~g~¡¡ i ~]~~ ~I~~~~~]!~Ô J1~d!IIIJ§d~]~~Ô ~ ~ii~~ Ei - " e ~'a "'I'" = QI .. -"'13..9 13 g 0 - -'13 "'I 'E - QI 0:: ~ ;¡ i; .= ~ ~ ¡¡.5 ~' 8] ~ .:f'=:: ~ "0'", þ';; ~·Š·5 ~. 8 ¡ ~ :: ..~ ~ Q)'õ ~..= VJ ~..: ~ r.I) ~ Ii 9! c.. 8 ~ ~ == 4) u ~..: ~ VJ ¡:t: .S! ~:.. ¡ ~ u~~a~'~~="'d8~ ~~¡~g~'G~g~'~~d"'d8~ 0 ~~8. ~> ~~c..ê~_o~8£·~s~m=z.5~_~~o"'do~8£·~S~~ ~ ':¡:J OJ) - "Ó ~ ~ iU - = . 0 en "'Ô ........ -.." U - ....... ~ u - = 0 >. e 8 " ~~lg~~~I~.,g>~~,,"~8Z8~~S~~I~.,g>~] ~~~~ ;¡"O~8."~ =el¡ªE~S~~"O.:!~NI~ =61¡ª~ ~~ - =~~~~~~~¡¡"_~III......!!o_e~=~ .~~~¡¡~_~_ 0 ~~ o ~ ¡:: o.S.~ !j '" .... '" = ~ (,) ~ 8 ¡ ~ = 'i' ~ ~.~ !j '" .... '" = ~ .. 8 = ~ -5J ~~.!!~~§.~jo~ð-8~]Eã-~~-8i5=.ijO~ð-8~ ã]~-g S~~~.~~e~ =B~,.~~.~.~EB2~j~e"Ó =s~,.~ ~~gœ CI:I ~ CI) œ = -8 C.I).-e 0 I!: Vol O!+-o U 0 ...~ = -M 2!),-e {/.) _ fJ'} rIJ .. "0 g ¡:; b.= ~ ~ ~ '::; .13 - !::I 1;."'- b¡:: 0 ~ 8 ~. ~ ~ ~.- .!:I - N ._" -8 ~ ~=È5$~"'Os>~~B%~~B~6§~~8~"'06>~~a~œa~o~~ !O-U~_~Oª~O~ oE~ ~._~~ -~8ª~o~ -~~~~ ~~~8~8~~¡¡~~'gl~&æ~~&~~]8~e¡¡~~'gl~æ~;'~ o '" õ '" ~ " ~ .c " c: ¿}, ~ " «.~ilKÆ'.-s> 0:2 ~ >·0 - r- rn - t- o 0 ORIG~NAL ~ .!! :g " .<: (,) III C 'E 0 I!! Q. ü: :. ... ~ ;.:, c .. .0 III ¡¡ ¡¡ C "C e J s ~ .¡; ã ã 0 :Ii Ii CD ¡ U III C ,., .! i is. ~ E 0 .. 0 (,) ;= 'õ .~ c :g 0 :;:: =' .. IL u r¡: '1: CD > œ c '2 c .. ¡¡: CD .. =' III .. CD :& c o :;:: .. CI :;:: i - _ Is: 1: ~__ is 6 N~ 5 ~~ ëg: ~~Io S.. u::... .c..t:J >-,' iU=«so 3- rJ'J~Q.)= ~ ~ S1'õ~SI] '~sl.g~ 11~~t ~ is ~~ 1&1~~ii1¡~~~j¡t~;i~1 E r¡: c ... 0 8 '1P" '" - 00 '0 -§' "'.~ ~ :if ~ CI) g <¿;j &! '-2 0 c ~ Q.:å '$ ";! j! ~ "'8.5!! "2 ~ g. ~ " -'. . ä '" } Q.) ~G . Q.)~~~_ I~~O. ~ e~=~~oQ.) 0 ~ j~ ·~~~~~~~~{~;~~j!~i¡t~~ i ~ ~_ c"'c~o",";!",'O",e¡' u=~_p~~'O ~ o ~~ &iou.I~~'O§~~I~.a?°!3"'O<~ ... u .. CD ~ ,. 0 0 u 0 ~'" - <::r 11 0 '" ~. ~ ...;.~ c e III Pu~!3~"2 oue¡p'O~o-o~~~ .. u S,g ~'c := 05 is 8",:!:! ~ ~ =" ª"2] '" - U ~ .:! :..: .. u .. !'! 0 '" <¿;j ~.... ~ 8: ",:= j! '" 1!.50! "' '" ~ ~ U "2 .. Q.) ~~=~~~=.~-~«s=O=~«S~~iU~.~iU~ ~ o5~~~CD""~'O~~~"'8="'~.a"'8=Q.<]U~o51 ~ ~ ~w 8.oz¥ ~~~ (; =8'2 c.:~ :"B: ~ ~.c: = 8 ë~ ~ w !!-\' - "' u j! $ is" 0 ~ - 0 - ~ u Q." 0\ . §~~~=ª~'O_sð~¡~~1·~~s~s¡~~ ~~ = ~... ª ",~!!5",uQ.00 ªp::~! g~~ ~- !J~~'~~~t~~~~~I~~~~'õ~äa-&~~~ ~i~~]:li~i~~1i¡~~ 11~it§1!8~~ "'8:&CD~~e¡8~'" 00--=0 ~o '" 8"'0:&- ~p..:&¡Cc(¡:", Q.Q.I:i~ <:J ~ &,:;;;:-S¡<:J B Q.Z ~ ",05-510:&6 "d='õ _ ª ~ ~ 1 .~ .a ~B.sco~= ~S¡'j:Ê>eu ~ ~.g ¡;,"2 '1Po5 ë ~.~ ¡ ~;E! "'d ~ce¡"'rJ'E¡¡¡ Q.)~ ~ = '.;:I "d "' .=: bQ 0 Q)·19 5 ~ :;: 5 lJ g. <u '", ~ i:!~·-Q.)'Biš~ s=Q."'f!o'" 8"'8.g '" " ~ ~ce"'-5~u ~ ª:= "§.I:i ~ j! ~t;lJo....G) _ 0"'5805-- ~~'505u:;;;:"ª 8 = § is ·13 ...; '" 8:",0<¿;j13&i¡J "'~·.g~;:>S1<:'5! -;; Q) Q) rJ:I !!!_ >'0_ e¡ i:i ø.~ <U 0 is ..c o 00- u ~ <u 0 -d~~b.I)f;= ....._ .... _ d _ rJ:I .g~,g¡]'~ "2"'8 ~ b.I) 0 rJ:I B ¡: ~ o '" õ '" " '" '" c.. .<: " c: .. ~Mf.» ~ ~ ;... - 1-32 m _0 r- o C> OP!"'NAl .!i :¡¡ .. .<: (.) '" c 'E I! 8. ¡¡: &1 ." c >. » È It .c .c '" -¡¡ -¡¡ -¡¡ c 'C e i e s ~ ~ "ë 8 8 8 0 ...: :& c 0 B ¡ '" c .. .!! i is. ~ E 0 ... 0 u ¡¡: 'õ .~ c :g 0 :¡:¡ " " D.. u ¡¡: .¡: .. > I! " 1/1 " .. :E c o :¡:¡ " I: :¡:¡ i I: c ï: c " ii: o " Q) ~ " ... c ~" ... ~ "C" .. "¡:¡..c "C It) .¡:! jS.! .. ¡¡ .S 1 = 1I!'1;; is' "'" ~ 15 It == II! ~ &- .. ~s- = ~i~' ~.~~Q) ~ ~gp~~! ::¡;¡~~:::8.! :g~&-5 :¡ c-ugD.. . !! ·-,,~,c~S E ~'E" .. ~l!o~~~~-~", . 8,c a-...-~",~-",,, ~ ~u::¡;¡O~ ~~~o3~~~I~~~~ ~~"'o ..&~ uc~jS c-~> ~.! "'~~= ",S&~jS,~.! ~~o 1I!3t;¡~~JJl!;;;~1ël ~ Q~~U-.,,~-=~-~"~"'_ ~ tt (I) ¡;> tI) 0 . e ~.¡:: ~ I+-; - Q) ;::i CI:I _&=~.~""J~.! >ªoa>og~.,,~ ~"'~~> ~Q. ~ "...O~_CCo l!:¡;........o.E ° "'¡(j = "'&S;~~"I/ _ ~ ri ~ E i ~ ~.g '" !!. a "" !! ~ ;¡ ~ -;; à! ]~~'õ&~~"8iJi~I~".! ~~~ (l}Q)~ o~~=~-~·- -5~ " "''''ë''C§~U~~O~~~S¡·e(l}~~- = ·-._N.,,~oUN>==~_oONm o :::s tJ.. 4) - C':S !U ... 0 -... = .-{ ",,,,,,,,~~.~~~,,,,,,§u~a_o~E ¡¡"-~N~~"~¡¡- "',,~--N" O>i~t~I~J~sJi~I~IJ~~ C':S-~ .o~ -5~C':SC':S=O(l} ~ ~~~~:E..~!-g$~~=~~Hi:E~ "'''' a~:E<~ ~ '" &~ >< '" oS oS ",:ED.. gp ~ _ .s 'õ g> ~ ." ~ oS jS"'S1 . - '" ~-.gc8 ¡j!.~..I4~:~ &""",-5 '5~t Q)2'=~~ '"-is=S ÞO ~ Q) > rJ ~ .~ ~ ~ Q ~ ~ 's "ª .s .¡:: l! ~ !! ~ ~ & = ~ ~ ~. '~o ¡:¡ ~ ~ .¡J = oS ~ l! .~ -< ~ III ... ~ ! ii. 1§IJ~tJ=~~~~ ~~¡¡t §.8~ ~="ª¡jl~~.g ii ~~s~ ... 0 ... .- fI) CL) '"" 0 ë ~ d) - Q) ~¡¡~~~Q.'8!!í:g.:!'- """'J~!!í S "5' ~~ ° '" " ~ = ª,.~ Õ· .s "" .!:i ~ -U¡;;¡"Or.I.:I_~ "0 ~"t:1 t> 0., gp ª " " " ~ '" D.. e¡ » '" ~~~·tJ»~ 15i.9~ ~ ~~,c 8 .~.s § .! ~ ! ~ ~ "8 s ~ ~!!] ~ -fnuëo....v.ècu"C. >t::ª~ ~~ë!!ë1!-5.! .! £~ e.s,,~ .! oS ... "" '" ... ~ oS jS.! . 0. ~ '" .- - & II! Þ< ° c'¡: '" g. ... I!! 0. '" ¡¡ -;";j__..cQ.)!5C':SQ..OE:~.CU ..c~ tË ~ ~ ª "2 == ~ ~;., 8 ~ Ë ~ g¡>~ '" s ~ ~ fø ~ ~ ~ ~~ ~ ~ ~ S:5 : ~ '-'ç.¡-8=-..2C':SClo- c'-'f!~Q) ·8 Q..- a ~ == u oS u ~ :E ..·8 c U !!í ø.. ~(;.s ~ ~~!û ~~ 2E~ø.. 8~ I:: o '" õ .. ~ Q) '" '" 11. "6 c: oS c:: elM,,?> >-.:2 ~ >- 0 iT. -- r- o C> ORV"NM - .!! :;;: u .. .c 0 '" c :e 0 I! a. ¡¡: ~ " >. c co .<> '" ¡¡ c "C i B d ·c 0 0 ::Ii c 0 .. ¡ U '" C '" .!! i ã. 1/1 E i! 0 0 tJ ~ Õ .!:! c :g 0 B ::J a.. r¡: 'C ~ I! ::J 1/1 .. .. :IE c o :¡:; .. CI :¡:; i CI C C c .. ii: ~ .. d~5] _ t§~ ~ 00 ~ .9~·~~BH=~·-~~~~ ¡¡~ ~ ~]>~_p~~~]c~5 &~ ~ -ëß~~~£g1~;;~ '" -¡;; .. lo! ~;:I '" -S ~ = ....- 5 t·- !!:a'" I!: ..§.~.i:>~ -~,,~"''''§. ~.2!& ~ ri~õ~iõg-S~~Be!! I-~ ~ 11Ji~~~ø~IJiô I~~ ~ 8.i~B~BI~~11=O. ~êE "" ~"~.2!~e=~~~g~~~ ..~~ ¡ :a!!~_~~0", 8"~ ~ ~~~... ~r¡:B-¡;;..~u=~ ¡¡_~I ~~=Um_~~~~~~Ô~S~~~~~ ò~O~G~o~ ~8~~u~=~~>O O~~~~--0~1~gw-S ~g~-= ~ ·~""-o"ã~~~~",~'£~~-S¡¡...ê! -S~.a0 o"~2="-S~-;:; af" .=1:: õ~~J~~I:!!]el¡!1iJði cë~a~a..~gs~I!~t~~§~B> .S¡ ~ ø.~N.c:::.s E'CfJU 9;!'"Ó ~ ~ 0 "'CJ:9 bI)~ a e .= c(:tO 0'£ ~ u I:: <> ~.~ ~ ~ 51,.5 0 ~ ~~%~~VU~~~;~88>_~: ~ø.~v~=.o~~~"'CJ=B~~e~~8.o ~~~-S:E~æõõ~~8~~~~!!~~c >. .<> ¡¡ e ~ 8 00 ~'Ê .~ ~ "' or> c -š~~Oò "0 co·~ ëf'= ,-:.. ã .5 <ú'- ¡¡ ~ O~~!ä~ßt; iZ' -cor>--ª' _ .., !:.!1! r!;:I - ~ u1 ~ - .- -< ~ .2 ~.~ 5 p. 0 UJ c ..... "0 Õ a - ~S~"O~~~ 'fi :3·Ë g ~.s ~ "II) ~ !;¡¡.... -S !!! '- OJ c:: 0 0,- i:: 1;;co=oo::::~-ß c- - .. ~ µ.. o¡:~~~d)- U CD C) ~ 0 - v.! ...~~ç;g'E NIII ~..c !!~.- . ~ tf.I I-! =:.c ('III O· .. 00,- I "0 = .. CJ 0 o ...- 0 00.2! ... -",,0"'= c ID-¡>.5·c_o ::E "5 cu ro ~:ã 1;1) :EO?:~~",~ .: o .. .2 ,.. ~ cu ~ ;:, en en II) ., .- '" c .~ ê: o .-::s it t>~ =' ~ ü .. 00;:1 ø .S '8 § .¡: 8 g ~= <; .- ~ a.. ~ '" ~ §.113 ceo o 00- o III >..9 cor> . '1:1 ~ "0 ~.!:: 0 Q.) Nm -¡,¡:: Ó Q~;::: iii~æ ¡:¡ ::Ii III ::Ii~. o C') õ '" ~ " '" '" <l. ~ <.> c &. I;; x ~líf-9 () õ ~ "- - ~ f!-¡ o 0 ORIG!NAI GI U c .!! 15. E o u Õ c o ~ ;¡: .¡: ~ I!! ¡¡: I/) ... ... o == ,2 :ã :I II. '" c '2 c ., ii: I!! :I I/) ., GI ::E c o :; '" :e ::E ." ~"" !5~ g 05 - .1:J OJ. _ ~ ..1j.,: .... 8 ::> > .~ '" ~.. 50 "7' 8 º':;;q~ g>..c "£"<¡)!!o"'!::"....-"'S! ~ .... ~".., or> "" " !! ::>.9 :;¡ ::so>~c::«I!!'O.....u.o '" .¡: 0"." _ 5 " "" ¡¡ c. ÌÕ' ° """ !! OJ.- 0 " "" ~(/JCdN.g§Q.)~~.s5~ '":~'õ:.ê-g.s1!¡¡-;¡¡]..: ~ "".": '" !! = '8 z at 0''' o~·lat¡:.",.!", ...sa",~ ë..o ~ ~tI.).c.æ";j:-=.c e Ei !! ~ ¡'j ¡¡ Õ'01 " _§ ""§ "" ::>. '" § "'8 .s ?3' or> Q.) Q,) I :::: 0 .S .s .... "" .8 > '" 0._ '" !! >. "" ~ 0 ::> _ ,_ or> 0 "'..c 0 .s. "":--"ü"",,,,,,,,..1j " "'''''''''' "...-.. .5 «I ~ ~ .~:== Û ~ S 8 ~ !9 ..: v.í ~ e - Q.. . <.,¡;;o Go) P.. ~ 't:I VJ :g!3 !!~~'~§''BJ e ¡¡] gj!! or> " .. "'.... _I 1;; >.05 " Ei !!! OJ} g .ê t' ~ frl· ~; 0 ~ "ã ~ .§ = '" ~ "" '=8' ".... ÌÕ' ..1j 0 '!í (/J«Iu::s"'O £~C':S-;¡u_ 2:! ~ u IZ) Q.) c..__ i ¡¡ > ~ < 8 .... S ~ ...0 . ~ !::i >. 0_ ~O ¡::"!! " :¡¡ ~ ¡¡~!1!> U~..1!8¡¡ -5. ... ¡¡:: !1!>'= ~ ,. .... -5 "" ;¡ = .... = ~ «I «I ~ .... - .. i ~ ~ ]'~ ê ï§ ~ '": -g B ¡¡ .,: ~ o O"ê=S~'-:"Cd'r;j5 5cu . ~=¡:Q:=f!::!V'¡iU....._ "'0- 'ii '" or> " "':Ei 8''BJ ¡¡¡ ¡¡ .- ft 2 Q.) M 0 u -8 N .~ "0 12 ._ .... :E.s 1:: ..1!.- _ !! 8';;; "''' > 0 .. ::> _.- C. '" '" or> "·"~c."§""::>8="'" ;;:"" 8 U Q.) Q.) ~ 11) --d (/J ...._ I!! "'~~ §(:J,,"~ ,05 D. ?3'¡¡¡it:ç;-'¡:¡..c-5"§ 0] g!'~ 't! :e ü JJ ~ 9 ~ ~ 8 g!' '-g. '~ê "0 = ~ = - ~ ùj 0 «I'''' " ~ 'S! ~ rlol 8 Q.) - ... ~ e '.g c .--.."" ~~"8 ::>"" o .!!.!"9 8 -5 p., - tJ ~ :;'~ or> .., U ~ "'S! = .- 8 ~ :g ::> ° ..c g !5'š . 0 :3 «I ~ __ 0 ¡:Q 'g lor) M.... V,I ~"'8fjJ~" = ""s :>-o-:o~ at g!' I C OJ}..... o. ~. u Q.) VJ 1-0 ê'''' º"i £'S, 'i ~ ~ 1! ;§ at§ ..1! ::> ~ IDOI-oOo._t::"'O_~ t::.o= ::IE ~ .§] 8 ~ ~ £ ~ 8. or> .E :::: .s ::IEaH'" or> '" '" "" '" .! '§ 00( .S 0 6 .'Ø "" . ¡¡ z " "" "'0 "0..... . ( J.s B ~ "'~ ~ -5 .9 ".- p S or> B o. c "~-¡¡::>:"''''''''' "'0 "0 .c IU Q.) !!1!1!¡¡.~~] "';s¡",,·-êE!..: ~::>=§'"C'" ~..8 0 u c.. «I > o",~g1!=-=.! .?3'~!!~~§g¡ ~ft¡¡:;¡0!!5 c .-: ¡¡ i3 ~ 0 ~ ~~~~~~~ ~1;!8.a-e.s.s ,. !1!>" "" a 8"" .i .= .ë ~:å ¡; ."~ :eiaB"".o w w u -¡;;¡ '" .- e § E " o or> "9 '8"'- ø. u 0 Ir') ._ u ~ o:S ë r--- bl)"'O "'0 ~ ~ .. .c U ... c ;: 8. .. a: ... Ii ... c ;:: :!! c o :E Ii ¡ '" '" i o '" õ CD " ~ .c " c i2. Ii; > ~Äkt?~ Ç)o (~ )... - >-- m r- o b ORIG'NAL - WI :;æ " " .c (,J '" c 1: 0 I!! ... &! ¡¡: ... i c :>. ~ .. þ '" ¡¡ ¡¡ ¡¡ c 'C i e e .s 'ë 8 ¡¡; 8 ~ 8 0 -< ::!! c 0 ~ 1ii '" c '" .!! i ii ~ E 0 ... CJ ~ 'õ .!! c :is 0 $- .. :I .. A. ¡¡ u ¡¡: e 'i: ~ ~ 8 01 C "æ c .. ii: I!! :I '" ftI .. ::!! c .2 - .. 01 .. i -0 _ _ =>.~ ; ~ë; .a:¡q-o 1;§ "'~ 13 >.'+-< d); CD f.Ð C = ~ ,g =e«.... E'" ~e" '" ~ .... (),) 0 C '+-<- 't! 1I).c Ü .5 co ~ Q,) 0 _ ,CI:S '" .5 = f! .I! I- ..$' -S =.$ ¡¡ :ê"~.!c: c~ ~å:aoc!9 J!8"'8 8g 88§§',! :; ec::~-¡¡ ~.. ~~",..s8.::I ~ ,g.r; (?¡ ~ i' .5..$ ¡;; !i.¡¡"ª ., gj,£" . c ~ ~ ~ -< ~ Ë! '" .,¡ -S ' .... .>! .!! 0... 8 8 .!! e .~ ~.~ ... V1 0 - 'ë;j ¥ 01( ~ ..... u' "t:; V1 5 § 1;; :':tCl):¡ õ 00 §.s 0 "'õ-š e ~.co. ¡::e ....-VJbÐ ~ ~1~Æ~~i ~a~~~~~ CD ä:) 1:;r.n"t:)Q.ø .....Q..c~"E( )(.) a: ~e~¡¡~ci:¡¡ .s~~§~]§. cø ...... e ..... Fe..... .c v.¡ 0 ..... "0 ::I . f B "0 ~ ::I'~ . en ~ c: ..8 E-- Û 0 . ~!~§g:~~f~~~~~~~~ c:( - 0 - - .s ~ ct ~ > _ 5 t) -< ..... ~ .~ ~m-~B b%~o-'~~ou~c ::!!11~~~~::!!2~~1O~-S!@,! ::!!(,J~~~~~::!!ø~~8~~ªs8. ... c .. III E 2 c .. ii .. ~ ~ õ ~ = . CL) .... 'õ4.}~ "0 -s ~"COJ: § c:: ~ È ! .1 ~ 1! .5,! ¡5 _0...._.;:1 ~o~= m,ï::~¡jJ!i' §~iS~g¡= ,e~e-::l .__",!:Ie E""o. 0.'13 t:.,¡,;¡þ.2';::". ::I "" 13 "E'~ ¡;¡ "," 8. ¡; f-< Ü 0. ~ !!) c ~..8 2 ~ ~'š ë >. ~ J:! u·5 ..... 5 .~ t:"3 8.:9.- "e C ; .P- oS 1! ì!!e ~ o ..... 0 t) 0 I;/} V1 I'll ~..= . 0 _ - >< c::·c « ~ ., .. - 0 '" c:: _ = u ., .! 4) 0 bl) c.. o....a ø.D. = .... éd ~ ~ ~ 00 :I .š >5 ~ ~ CIJ 0 E Õ .S! ~ ~ E ~ .~.s ~ .ú'S'~.!! ~ ~ :; 1! g f! -g ï3 1! §. ~ ~ "C ¡:¡..... 2 ~ c 0 ~ Q ,..Q C':S - ~·~.20~~~ caO¡O§:lc;t;;:§ E £ g £ 0 rd ~ 8'ë 8 ~ ~ ~ e ~ £ .~-o~... ... -;¡¡;¡:::::: ~= a:: o:=+->-e.S:C,¡..; >..c.o~...;-t+-i=Q.,o~ ""o1Oou~"I-' ¡-,f!1!",u-g N S,! ., 0. f! ~ Q c ''='> f-< '" -0 j¡ - -:.cVol~!ë .0' 8cu=;';J~ !;¡!' f!~~"8 '":'fi~o.1O..$,.'S:.. c.o cu:::l --:J..o"'S<!Bø..~o- .S: t5 .2 ~ ",ª.~ ~ J: .S: ~ t:: -g 'S: ~~ % ... S 'üj - e = I- ! 1-0 8. ~ e:l Vol ::!! .g e j¡] 8 ~ ! o·g 8 ~ § ~ 8 ..@ :E ø.. "0 '¡;;¡ 00:'= ~ IIC 0 ~ Q.,._ U ~ -= ~ o '" õ "" ~ " C> '" a. -5 C '" a: ~ " æ" ?.AIí<;"..¡.> ::r!ÙJ' 0. ~ r:: J!! c.) (::) nRrr.!NAL - .!!! ~ CD .c (,,) CO C ;: e 8. ¡¡: ~ ." C .. CO c 'C S i: 0 ::Ii g GO ¡ U CO C '" .!!! i ã. ~ E 0 .. 0 (.) 3: 'õ .~ c 2i 0 :; ~ IL u ¡¡: 1: ~ CI c ';: c .. ¡¡: :>-. "' :>-. c .. "8 tj.o - gj''' .0.. 8.9 S !! .9 .;,: .91., 1! 11 :.:::.5 ~ ~ ~ .- ~ .~ .. c .¡:: oè.. 8 '"' ..... ~ a,) .... .s .g"'2 & ;,; e "":!j §-..~~~ ;:: ~ ~ 8. ¡¡ .S .. - . ~ '"'2c c ~ "' "". - ." ,:::.£j.£'O:>-.~ .£",¡¡'g>~ .S 2 .9 ° ~~~ "-5~<5" .- !! ° " - .£ ._" .B "' - ..- '"' .. ~ ( ) .-.t. = ;¡ :::I C/. ~ ~ a g ~'¡¡J g 2 .S ,,«) " þ ~ "S!.S ~ .~.g ~ ¡; g ~~~ e ,_ ~.!§ '0 ~ ( ) ~.... ~ -s. ¡g !! § .::: "'2 ê ~ ~ !15' - §"'ûíi!::ë§, ~ u ~ ~ š,,!§o:€" ~ 4) - Q.. ~ . rn .... G.) bl) "soSg o '" c '.. III -5 ~8~,g ... C,¡..o 0.. CJ "' C .... 8.9: œ CI.).... '" ~"'2 .g ~.~ .. ..... (.) g"'" 1;1} !! !"S" CD :>-.0'- ~ ° °'giE "':.::: .g.s~_c;~ .. . -5 oS .£1 '"' .. ::E .0',= t: ~ ~ ~ ": g~ !i ~=cuo~~ .S ~~ ª ~~~~~ ._iU--.s œ'~ = C ~.£"''O&t1 u..c'+-o!U œ - l- g "' ""--ä ' '" 0 > »=(1) ,. :gj'~~~È '0 ~.- '"' ~ '" '¡:( ~-8 0.... '0 Õ :¡:; 8 ~ g'¡¡J i!! c = .....- ( ) " " c o 0 ~ .. 8: 8 ~.s ~.g ca fß ~ Õ ::¡ .9 ~ ~ :s """ "S ~ :: IX) CI ;':§..i!!&i5 ",_~c 8 £<5 en to) ( ) CI) <:T""~ ~6gj' :¡:; .. ~ 11 c '"' ! ~ ~ r.s ~ 8:E "~ :>-. ;,; "' ".- g.~ ., i ¡L~ .;~ CI) = .s CI) "' '05- C> ~ " .c ° .. ¡¡ > .- > $¡ ~ e cv Q) ~ > '"' c.. --a. cu (1) .. = ë!ä'g·9'õi8 c :>-.~'O C ~.::: ;,; cŠi= -8 .- :,:::.s!! cQ '§ ri 8 œ.. 8 --~ cQ ~ «I Q) iU ( ) ,S ~ .. ~ -8 c ª .c è.... fI} (,) = -8 ~ " .S ~ -8 ¡:¡.Þ tj .. .S ~ ~ -8 € e ~ s ',:j ~~.~ c .- :: "'2 .5.g !! :>-. .- ~ ·E ~:s! g .. ~ ·>:s!.5.9I., ë"8~""~ 5 .- "8- .5 ~ a: = ~ ~ e &¡ fI} >8" > .. 00 8 rJ';¡ 8 -8!!Þ<og~.... g 'õi 8 5 ~~ '" _ 0 ~ .B > 0 (,)00. >c.. ._ cQ CI) U _ "C 0 8,,'0""'0 !! ""- '" !! .. .c ¡;:: «. 'òt\kf'1' . . . . . . . :Eo <f> 0>- 0( 1-- n lJ r C:J ORIG~NAL "---_..__...,._~--, -..-.--... --......-.--- .._-'-~.--.--..~-..-.-.-..~....---..'~---.---. .. u c .!! ã. E o o Õ c o ~ u ¡¡: "\: ~ .. .. ü: III .00: .. o ~ .~ :ã ~ II.. DI C ·c C " ii: e ~ III " .. ::E c o 1i DI .. i .. "€ .s ~ Ë .S ~ .... "º"f!"'- $ "~'=-£~D"t:í ~~g¡OJ)"'8." : £C", '6'~",.5 ðc.....s¡~ "'''"C 5 "£Uo ot) 0: We.QC':So.c Q)~= ~~ ~ § ~ ~ æ ~ ~ 'B '" ~>õi!"E! f!~,5 e ë"o"'j::"'~"""'¡:'1¡j c .E ~ § ~ § ë ,5 0: is o g ~ u.~ ¡I) 0 ,...::,. ~ u "'.- " 0 '" - ~ õ '" l! - -~-bOCU¡;;¡OC::';I g ¡¡ ~ ,5 g ;::> '" '" 0 t::.~ "'C e - = __ cu ..... °So-g"'£o.....~'" U Co."'" c.. ~ .... _ ~ '" ¡'¡ ¡¡",.g¡,. ~E! c" IE ~·c·~ § "c .S¡ ~ f! 8..0 0 '.::= ~ Cd --..... ..... OOël5uC':S~;G2.8 ~ S ·ã Ci. Ë "E! l! .¡¡ 1¡j .;: '3 "" '" B ~ 8 ., > C e [ .£ ~ 'f' 8 ~ .5 ~ 8 "" B"ª"8 " ;¡ '" -S :-Š~i~ 8 £.¡¡ § ¡:,.=~'" " S " 0 .cQ,).s- §'~"Oci ..= c. to ;:::S '" S . '" ~ ~'~1 8 OJ) c_ co", <='''' : " " "E! " 0 .. .~ ~Ë=.~ ~~~~~ !š 5 13·"Ej.g -=uJj;:ë .~ ~ s 11 ~ [g.f! ~13 . ~...- - --- -- - - -- -~- -_._._._.---.."~ . !! <= -ê.§ ~ 8. º" d) .9!t=.Eì .~"E~"B ""'þOJ) ~ ~.- ~ - U2j ~ .!!.~ -.;1"-- £ £.... e. VJ Ol) ~ E 8. <= '" 0 .- e C) " .::: "'!;! . .c co "0.... CJ C"''''''~ bIJ «1_ UI,j..; .- ~ '-ë ~ f! '" .. - C':S.... .9 = ..... 1-0 Q.) 0 J!!.S¡ ... "" : ':¡:;¡..... 0.£ (,) <Þ2~~e .- t1 ~ OJ) ~ ~ c 3 .- c ~g=.g8 . i :¡¡ " .. .c o III C 1: &. .. III: ... c .. III C "r:: o - ï: o :E c o 1ð III :;0 i 8 ¡¡: .,; 0 ~ ~'" 0] s ~ ~.Ë£~~ ~o ~l~l~{1 .- '.:= ..... Y: VJ CZI -.. ~.- g c'§ '" l~i~"ª~~~!! CDfAt:'ê: 0[1) ::I &!.~ 8 ¡3.~ ~ ~ i ~ =w=~~=Q)oe 1i c 11 ~ 13 .S¡ '" " l! Oc.f.l _=_.. >.- ...... ( J ~ C':S ~ ã.¡¡ ¡¡j"8~ "c ~~"8 E ¡: u Cú.u :::s C':S ....:.= :a QJ "t:I .....c o rn c..= Q) 00 = u c ,,"-> > l! !;! ~ t"' .0 cu = ,:¡:;¡._:,=? 'l""°Ü=o_·1::c..c . .. " 0'- 0 OJ) ¡:,. 0 "':' N .~.- t) ß ~ «I '.0 a'-S1;iec t).!S oc(E,,""3~13S,,ª, ::E :5 1! ~ is 0 ~ .§' .!:J ::E::E,...~ ",...¡:>.. ¡:,.... o o '" 'õ 0> " '" II> "- -5 " II> 0:: ~ " ~ 'òÞ.K¡:- ~, -?o 51 '-;"\"\ ,:>.. iT! r- r-~ 'õ I::> ORIG:NAL ,.--.-----'-.-.-'.,--.------..-.--.". :! :;¡; .. ., .c (J '" c 'f 0 I!! a. ., ¡¡: II:: ." C .. '" c "C ~ c 0 ::E c 0 GI 1; U '" c :e .!!! ::E ã. 1/1 E ... 0 .. 0 u ~ Õ .!:! c :ã 0 .. :I III D.. u r¡:: 't: ~ g, c Î: c III ¡¡: ! :I 1/1 III .. :I: c o .. III g, .. i ~ ~ e- -š .~ .g ; § v.¡ü,+-< -:S ~ EO .- "'- <!J ¡¡ ~ 8 Q.)ç::¡ CObO ë 8~ 'S ~ 'ë; '. 9 ~ ~ .. !!'~ ,þOrn4=OVJ(JOQ.) c:'" 00;:1 >"- " 00 8 ~ ,g .S ~ 5 È !i -... =:= .... fl .. .. ~o-=õ .,00 --- VJ s.!: Q.)......;... c: c: .i:O "Qif: .!! c ~ 00 r.ñ Q.) 4) ~ Cú 0 ~1;i cu.ï::;.8 ~ ~ u ';.!!! ~~:= ~Ë.~ 2'JJ I ~~.~ §',~ lI::ã l!",1!!~¡¡J Q:.z::¡ Q.)o~'" (,,) b .Vi Õ v.¡.¡;;.~ 1! t-: Q. i.!:a '" ª,.~] õ ~ ~-=I!!=c5....o ::s.~<CUP'Q)v.¡ou -.0 C/)(.J . .è ~ j ~ .g "'.... " 0 ¡:;'" ¡¡..~ s:= ~~ ...c __ Iê"'~ o ~"ë! 'Ç!.~ J ;; ~ (.) ~if:~ C':S Q.).... . 8~! ~ ~=~~ ¡:; 1! 00 I!! ¡¡. ~.5 8: 3 ~ :g œ Q)«1r.1.1J::¡ :=: e § Q) ~ v.¡.~.!:::I o ~.~] ::::= 8 8 C'Ø -< cu tU t5 . ¿ ,$0 ~ .~ ~ .!:::I Þ< >,:= ~i~=bÕ ~ .·P ¡:j~ .... - ~ 0 ~ta 1f: 'e 0 ¡¡! '" "13 ~ .. 5i ~ " ~ t=!--->. .;;¡ ¡¡.. ¡1,j ~ ~ ...d-e.... !:S bQ rn !IJ 0 ¡:¡ = (/j > .... bQ;.a.~'::: .£ bÔ ~ .~ 'co C':I '" bI).~ .., ~ .¡:::: - ~ '- C'ØbÔ~t)O .!!.5 c _ " u - 0 'oJ 0 "O~''=~';::: C Q.).... - cu ~ - õ e .~ _-gs¡:"õ. <~.ggg. . ~ " ·c bI) a.s ~'" \0:= BiI "'-l:! ::s "" . "'.... ¡;: ~ o.g o;¡ v.¡.... ÌjQ,)- -,,º .- «I E3 ß't:~ .... ¡¡J o .... gp C 0'2 .g ' is =' ._ _"0 -"'", ê " " Q.) = t: ","''' Q)";~ .;;.g¡,~ oS '¡) - ._..c ] ~.5 ~ . .s :¡ .... ~..c~ _ ".~·5 n;~\C)š IÚ>'~U .. _ C':I Q) .- " ,,-" U':»_';I ¡;::''=êð~ o ¡¡ 0 ¡p: 11 !5' 1: Q,) C'O ..., 8,Ë: ¡i~ ~ ~.~ 5 ~ ~'§,g . I!!g",,¡:¡ cu _ (,);:: tI.I q,) v.¡ cu._ -.0="'-5 C'Ø _"0 en :3 .~ ] .!! -e .~ 2ilrJ'J.c~Ej <= õi :¡¡¡ .8 " = 'J:: > Q) .c ~ .!!''êj.!j= ~g:.='õ~ . " ¡; '" s ¡:~.ª 1!!1:!~.e ~ ~ ..Q ~ -:.a"~e.o~ ~",,ª,,,-¡¡.g .$0 S -8 "Q,:; " '~ct°~æ:ë ¡t~ ~~:¡¡¡ 1>(.- t) I>( 8 > (1,)"'0 cu OJ CJ (1,) ........Q)U)~-B o 0 __._ .... '~"O°JjO·§ ]ª]~~;... ]g~]1j.9 ~o~ï=>e.~ 1!!'- '" 5 "'- to ·gi~8~~ e=~~~1j 8. u U 4..0 ...... .- o áJ:.= 0 8'iŠ ~~"8.~:1¡¡J . g õ o N " C> .. 0- , .c " c co '<.tf>.Ké1 C).2: ~ >- 11::- r- "C en QÕ ¿; ORIG'NAl !i ~ .. .<: (.) '" " :e 8- .. 2! a:: " ¡¡: " .. '" " c 0 :to " 0 :& " 0 i '" B '" c ¡¡¡ .!! is. 1/1 E ... 0 .. 0 u 3: 'õ .~ c :ë 0 ~ ::I II. c¡: 't: ~ 2! ::I 1/1 III GI ::Ii c o :¡:; .. g¡ :¡:; i g¡ c ë c .. ¡¡: » -¡¡; '" e ~ " .~ '" " U ~ .... ~ .9 ,Q .... ° " '" ~ .... ° ° ,,~ '1!> .;; ° ».= ~ ~ 4) .~ o >:-;:::: Ô CL)',c 'S _ U U "'~~~ :¡!! " ".9 .... '" " '" .!! 4.) ~.~ s.;;-e_ I:: .}!" oS 4.- e ¡n t5.g 0" '" = = ~ ~ 't:I CL) . ° - -=ë .- r.n._ Q) CJ œ .~ ";; Po.::: ~ V, :g·t:::g...o¡-j _ CL) œ tIQ.... ~ '"~ - c:I1 ~ CL) P. "s .... _ ~ .s=v.lI+-o~S' '+-o~O~v.I 00 0 .- "0 - "'i:¡ S _ 1:>." = " '> oS " ~ " ~ po- > bO:':: "ü·· ,gªE!:Ei:E:E &~~~ª~ -'=' £ .$ e -g,g ~- " . .f¡» ]e] =ªt5 ~....~ "'0-= =0 á! ° '" " ..14"'.... ~-go . ~ -g '" " " oS " e·" .;; oS =_ ;¡.! oS -e~-g "'"0 oS .5 ~.ª :€ª~ ~ !hS . - .....- ,.-.- ..._--------_.._~--_.._.__.....,.,.,,"- -.-...--..-.....--..... ~ ~ d o~ "c;j '"0 '" .- 'ë -e ",.9 . » ~ .... 8. '" I:>. 'B . - .£'" :å~ ~ ~ e-g ª ~ .... 5 ~~ '" oS - U 3= ~ ~ £ e "r¡) p.. »= ~~ . " o ;:, i 1 .S ~ à= ë ~ ~ £ ~.~ ''''ê ~ go -=.... .... 0 o 0_ - § § '.: ª E! oS §.-š .... .... 00 ¡!¡:t; '" = ° oS -=ë -š~ -I:>. :§ 'g.1/i ....¡,,'" -g ~~ ¡!¡ 0 £"0 iE !! ã .!! ~ U .$ 8. .. '" .e ¡,¡ .S¡ 11 g¡ ã ~.~ 11;,..... P. "C bO ::s eft "'- . v m·!!!]'"ë~ ~ .fi a¡'~ ~ .~ "õ.". ~ 1;;'S - ..;.=~t:r bO - .. "0 s" .S C::.c: CI) ~ = ::a.~ 0)(:1 0 ~ UIij 0 U.~ " ~ ie ~~ i :1 ~ en ~ 0 ~ ~,~~.£u"" ;;¡.z. . . ----.-..,.-..------ -'=' '" U .¡:: ¡¡ a¡ .;; .¡; ë ~ I:>. .~ " "0 " . - '" ~= , " :-;:"; '" > "'.~ ~g. " " U = .$ " 1:>.> ~:ä . = U ..§}S U E! -= cog-· .!!!',.., "':;¡ ..c.:=¡ c_ ....·ã 8 ß o !:j 1+-0'- Vol:"'" oi -g"'if> '- ¡g .... .... o'CfJ 0 8.'::: i'! !3 coE!uo '§ ë ~-= "O~.a~.; =8 II 8.¡;- ° .!:i" > .J::=>-.s.... Us$ -g 2",1::§8 -- = ~-8.0· ë 0,.:06" U_CJ ~ := 5 2 .~~ ca._ _ > ~ 1::,Q ~._ oS 8~8'g§ . o '" 'õ ~ N " g> c.. .<: " c: to tt: c!~¡dít~ ?'-õ iT, I- ,... Q C;¡ QRIG!NAI - .!! :¡¡ .. .c U II> c ;: 0 ... ~ ... e c .. ¡¡: II> c "C 0 '" c 0 :Ii c 0 i II> ,., GI i u c .!! ë5. III E i!! 0 0 (J ~ 'õ .!:! c j:i 0 B ::I 11. c;:: 'C ~ e ::I III ft GI :E c o :¡:¡ ft CI :e :E CI C ·C c ft ¡¡: 8 ~ :- t: b9""ª ð~ ;: " š~ ~~ ¡! B ~ .iJ Ò'~ .;; ',c .;:: ~ áj "" =:Ê . "'::I~ Š"" i!J QJ .8 ~ i~~ - ~.- . . " .9 I-i - !! ~~ í!J.f! . o ::I~ í!J u 0 :::: "VJ '" ~ .5 £ï3 ¡:!""" .5 ~ 1;] !,,~ _ e " Š=- .': ~ g 8 ~ 8 "" '" " - 0 c..s ë....... »!!!~ ï::t::"';i 8,,9< ~ £ i 8 .~ iU ~~ 'õ~ " " ~ " ::I 0 -g 'E ~ eã 2.~ Ol)~ 00 j13,i 00 ~ 8 ".... "" """0 ,¡:: 0"'" Q,) '.0 ~ "" ~ ,- ~ 8. ~ 8 í!J e " e1 0 ¡¡;¡_u . >. ,0 ¡¡ e ~ 8 ~ ..... ... !! 0 ê ¡s ",,»~-g ",,5! §~ E! t; I-i > Ü; I .S ';::! ~ l+:: .s ~ .;:: c..s "" 8, .-... """'" "8 '"-= 8BUê 8' § ~'3~.~-5,,>_ '~g ~ -~0e1~1 ~ 1~~~'õe~~~I~ = "8,>""0," C) I>.r¡""''=-~i:;>§~....¡s :Z! ~ ~ ¡!J O·'=.c II> :a ï3.~ áj J! ~ ¡¡¡ ,"'õ o. ë! d ~ U to ;(j.~ I:! .5 u e1 !! g >8 r.¡ i! ¡¡ ~ '¡;j "".g .9 ~!:2~;¡§:~ ~ r.¡8'":ë-¡¡¡"~'õ·.§s.~~ 1= cu-o::acue ~ ..c....~!""Ic::uc:::v.I ~>..~'" : -5~~~_~lIIj gOo~~~~!!=ë~ ~ ~s~lt~~~ ~1~~¡I~~Š~ð8¡ .~ ~"ª g ~ ~ ä 8 ~ Ë § § -g ] ~ š ~"€ ~ ~ ~ 130~'¡;j~-:~III~u-=8:]~=>~¡:!~i "E <.).E ',= <= :i! a:: o:! ... '§ <= "" !! g " !II ~ :=!' ~ '5 -= aU" " 8 - - ;>,.- .. - 8 "" '" '" -5 S ~ .. .g ¡ " "" ~ .~~ ~ ~ 8 ~ i .<~] ~ ~'§ ~ ~ 'õ ~ -5 .~~= ~ ~ J:! ...- ¡¡ !!.... - 1:: ,,- "" ._ 8 ... "u "0 :a~........~~a"II>]§í!J""B'¡;j,,~~~ ~~ ~ ~ '3 02 02 === ~... ~ .5 "" 1;].g !! "" g. ¡:¡ '0 B.!! i!J '1;1 :.a US~~I-i~~!€'~¡~~~cu~~~r~~v.I ~ !: .J,! := 8, () ~ ã; ,i! ,g :; § ~ = '3 ~ 8:'p, e1 ê' ~ .~ :& CD ~.m "'"'" e 0 ;a '¡¡¡ § 'VJ Cd .G' t;.;.t::I Q,) CI1 '11'. :E=<O_"".... ,.... g 'õ '" '" .. C) '" a. .c " c ~ I;; > x~¡\Ií[1' () õ ,!;, >- - "= J!! o 0 ORIG!NAL ~ .!! ii " .s:; " '" c 'E 0 CD '" ~ " ¡¡; iii: ... c ;>-, .. ,0 '" -¡¡ c 'c e ~ ~ c 8 0 :E c 0 B i g c .. .!!! :E is. en E ... 0 ~ 0 ~ 'õ .!:! c :ã 0 ~ ::I II.. u Ii: "C . > '" c 'ë c ca ii: f ::I en ca CD :& c o :;:0 ca '" :;:0 i ~ ... f/.I e:! ¡...¡ ... .9" rn~§:a~ .. IC'OQ) ~ " ~gp ~oo= ~ Õ =o·:;E-'g....!!= 01">","'8 " ~u~.coo.=Q) &~ ø ~ u·_~ ~U~O ~~ouu ~ ~OS~i;~~.8 =sB1 S ~ ~BJ~0IJI];~B!1~B [~~Æ~~~J ~¡y~ ~ ~ ·s~~·~1~s~~~~¡~~.g~ p., 13 " '" 5 " ?f ... "":= 0 CD .. 1 ã! ìiS ". '" ..0 "" :¡¡ ¡:: p.,'- " u ';¡; ..0 ¡:l. .~. : .13 j g 8 oS.8 .~ ~ .s ] ¡¡ ~ '.g ~ ~ .¿" § ~ ~ ~ " ~ "'8 E' ~ ~ : ~ .?;o = .'g oS e Go) "'d rn "0 ..9 OJ) ê ....~... ~'C 0:: 8:?f "0 f/.I ~ IU .š & 0 .Q l:! ~.~ 8 ~ ~ ~ ~ o £ oS e·:.§ ~ ¡¡ è i g ~ ~'.g ~.. e £. ] .~ ~ 51 "õ ~ .~ ] ¡... g ~ .8 ~ ~'fl .§ ~ ~:ë ~';'.,g.9 11 p., 1J ~ ",= " p., ~ p., :¡¡ "oS ;: -5 '" = := '" .,; - oS - 8..9 " 'ð ~~~ ~s~"~~e¡OS'~iE ~~13~e~!JB~i.81J]Q-;3e 9 '" =0 :.= 0 0 ¡;!" p., i:: oS -= 00 '" CD 0 - 'C " p., ... 'C 1::"" ~ 0 ¡; '" '"" ~ ..t: ø. ......... 1111) ( ,) Go) "0 -= _ ;:::::1'- >. 53 ~ a:: '';::·S::I..-;;o = 0 OJ) ~ 0::1; ..... 0 rn cI.Ï g s:; :::s..... It) ~ "t;I cD - Vl ~ - CI} "a CI:I v.!,&)'r;; CIJ ~.!it U d Q) "t:I U -=: t= 8 ~ e ~ ;¡ ~ õI .;: ~ 1:: ~ = .~ ~ tl c'" = .8 "" = 11 >. " oS £ . ~ - .!! ê~~ £ §~ ~ ~~'§ ~.~ ~~~ ~i ~~~~] ri~ !~~ ~~: §~.;! ~.~ 0 'fij .~ ß C'; Co ~ ~ u Er IU ~ ~ ~.s ~ ..c ~ ~ Q,) rè ~ .5 _..0" ~ Q) 't) ëü.!:: ~ 6- 0 =í!~~~_"C-.8=ep.,£OS.,g -""ou>"..o_~~_ ",,~,,~~- C'; Q)..... U ~ en ~.s .! 'iI 0 ... ..... +:J cO 0 a ... ii 8 8:;; t 't:ì !t ~ C'; .D ~ ~.s ª,,1.S ~ .;; ~.!3 .~ ¿ £ -8 ..... ~ ~.5:! 8 ~ ·ê t: ~ "CD bE) "º bE)'~ ~,.c:; > ~ _ 0 ._~ 1:: 0 -~ ~ ;¡ ::s t:: ~~bE)-O ._=,.c:;~bE)~~~_'" ~~d~~'~=~~~ -~~ ~~§ ,,~o o~~>""'uo~"p.,- ~e~~ c _=u'" ~~ ~ ~ õ g u, e e .¿ " õ .¡¡¡ !3 o·g :¡!.;.:; " 'g e ~ i ~ 0 .;¡; " ~'= '6 .' 13?f "C~,,-=e p.,c~~~:,=""_~~m,,..o:=I=~~'~~"''''~~.!!'ð~~ ~ :ã 11 ~ 'gj £::;¡ ~'5 'Ë 11 '§ 1J ~ ~ :Ii ;; oS = ê - " -=·Ë ¡;¡. §''£ ~ ~ - ,,~ ~ " e <.s ~ :::: 8 ~ .¡¡¡ ~ e 8 ~ ~ ~ ~ ~ :Ii:l -< ~ ¡¡¡.s ~ ~ £ .g, ~.S ¡¡¡ ¡¡¡ ~ J .9 8 ff 8 o '" 'õ '" N " g> Q. .s:; " <: /2. Iii ~'òi\Kf0> ~,\p >ð '::'. I- m - t- o b ORIG'NAl ~ .. ~ .. .c 0 '" c 'E I!! 8- ¡¡: &! " c .. '" c '!: S C 0 ::E c 0 .. ¡ u '" C .. .!! i ã. .f E 0 0 <.J := 'õ .!:! C :ã 0 ¡,:, :¡; ~ .. D- .c u ¡¡ c¡: ~ 'C ~ 8 -< œ c ï: c .. ¡¡: ¡,:, .c } 8 .. ... ~ VI .. ... :IE c o i œ .. :¡¡ - j¡ ~ .Q~ ,,- Co 1:! = .sg " ë 4. 1:! t! ..!! '" B '" B .. - '", 5 .ê ] R B ~ .9 In ~ ~ = '0 VJ.~ !!;gß~!:¡ä,~ ,,"'O! !!! 0_'" ~'t;¡:Q-;: e Co] 'ü~~'O~§- ~~O~C''=O '0 ~ ~¡,¡:::; aJ U - ,,¡:Q._.~..!! .. '" ~I+-oU~ -s = 0 aJ {/} U> .~ = o ò-S ~ '" '" ·+::iJ....g1!ë~ ~ '" - .~ "*! !! "E. ..c:: ci O'¡:: .. e - C).- oÈ[J[J~~"O :!j ~ ¡¡ 1:! 1:! ë.Si lii .: .; ~,'B~~]~l~~VI v.¡.r.~~¡;;'Q)-!+:¡%:Ji&: ~ 0 ~ c.. ~ ~ ~ .~ ::& c ~..!!~~1!8~~:E~ '" ~ .... " ~'" >._0.",,, .. ",.51 '" lii:;= B "-S ~ -S ~ ~'1;1 -S ~ 13 : '¡;j .£ ë 'S I::'~ "'.13 : ~.S ~;:!:< 1· 1! 4! 1; .g '" .... C bl).- .- oS m +:;I > .=:1 g ¡;! '" '" '¡:'C ~ '" .:;: ."" ,...:, . ''õ 0 '" 't;j B~g ::I o·-...ov;>J::r- ~ S (1)00 ",=~, ~ ¡ä§-S~~~8Bg ..!!~ .~ ~ .~ rI} c! u '.= B ~ = V) æ ~ ~] rI} tU ~ ; ~ ~ ~ ~ .~ ~ .gp l~ ~ ~ 8 ~ & ~.5"§ B]s~~8:<~]~ë~~~~ª~",8~ ~CJ~~.~E"'B!!~<¡~I....>.1:!8"~!! .:= ',= aJ _ 0 c .~ .::: ~ VJ c; .., U >0 .~ 0:ë = -;:: 'S - c. '" .. - >. 1; ~ ~ ~'C - '" '" .. '" C' ~ £ ~ 8 ¡ ~ <C ~ .~ ~ ,g'~ :i.~ -8.g 6 '; Ë ~ ~ -¡;¡ ~ ;t¡ ~ S" "''õ Co B '" Z ¡:.: '" .. ~ gj I:: ~ '", .~ e..:!!.. :¡.!3!!J0IIt!~"'..c:i~ª~!!!!'õ¡::-s c.~~"'I-....>€~S~~ë-sæ!!J-;:~"I....B~ c..ð=~ ~::I~~~ 1+-o_~~aJ~ ~~'O as ¡::; as.µ .:! 1ft i::: '0 .~ 0 c'~ aJ ~ as e '+-0 4! ~ ~ ~ ;;¡ õi q !! 1! .Q -:; .§.~ ~ ~ "€I €..c:: 8 ~ 0 .9 OIls ] ~ lI':u' .f¡¡ -g ª !: ê' .~.. ] .~'" '" .§.E ~ ¡¡ 11 '2 ~ k' 0'- E=~ºO ~ ~_o=u~~u .0 '" e -s.::E O..c:: ~ CJ Z .¡:: .. " >. ,ª' æl!!i:E&~;:!:<~B'õ~8..c::J"!!¡ä1. u 'S. .. II) .. .. o Õ - c o 'a C .. .Q ~ > o E & ___..._...,..._-.-..--.---.----------.-.M--------.. .51 .§ OIl '" .¡:: '" 4! ~ .~ ~ .~ 8 ~ ~ ~ c ·Ë ~ ~ Q.) Go) ".= ::z:: "'0 .. ª.. ~ .~~ o ...." ~ J ~ š Go) g . >" ë .~:õ ¡¡ Z § 4!4!~ ~ ~ ~ . g õ .,. '" " ~ D- "" " " C\ tr «.~i\K¿:-.<) C) ~ '0> >-:!2 ..", I- 0 iÍÍ - r- c) C:J ORIG'NAL B c .!! is. E o u 'õ c o ~ u r¡:: .¡: ~ GO .. ¡¡: 1/1 ... .. ~ .!:! :is :J a.. 1:11 c '2 c I'll ¡¡: .. .. :J 1/1 I'll GO :Ii c o ¡ ~ - i " o .- '" 'õi-5 13» ~¡ 8 'jj ~ 8 .. 01) ~ .S ~~ g~ ~ .. :-= ~ :5 c:! 5 . .....= 5 =.q- .- ~ N ~ "E .- ~ ~ ~ ·~n 8 " .fI ~ .s(1) ..= ¡n 5 Q.) = oS .... ~ ca,,::: >o,"",o-:¡;;;¡~(.) .~.~~ bOÞð~ z'O,!¡'.§'::1 OI)Q) "" =..C) .. .. ","" ~ Ë'~ !J:.a ... ð .. So..... '" i! 00 8o~OêûOl)Q) Q) U ~ ¡(J'="" ¡¡ "" ~ .. ""~ " ] .. § Q) 8.- ~ C:::~~~8:~~ o !!I 8.0"00 .r!3= ~.sca~ " "'.fI ~.- »..C) .g]c;~~~æ 800 .... C 0 C.S V} = Q) 0 Ol) ca "'é . Q)"=·-"~,,oo "O.to) ~ ~.ª !::j "'é 0": .fI ~= .g 10 8.'~';> ~ . ;¡ ¡;!.~ '" 8 0 .0 _ Q) "0 M Cl.1rI £ i! I " ~ g g ] ¡¡ '00. ...~, 11 .[:!·fJ "õ;:] ~ ~ Z~ ~ ~ .Q;)~ ë !! ~ C '¡) ¡¡ U .- .. , 0 Of!! ~ < .- .æ ~ 13 --.... .... 'õi 0 §"... >-I!!or-o. ",,,,Z" ..p ...·0 Q) t::: s:: "0 ~ ;>.::: ~ (l) .~ C) 0 0 0"'" O).o-j """' ~ ::::J ~ ~ >. 1; S '.= ..= 0 "'d 't; œ.;::: .b ..... =' ~ "'§.¡:¡:rlSpczZ§ .. ~~,.IiI 13~a~.]~:..8~dO~ _~~ ' "ooo»"uQ)oo..o ~;"'''' ..d -:.a c: 8 '> = C1) ... u .¡¡; 'õ "0 0 = "8 ~"'""~ ~8°o~",,,, "'_o~ ¡:¡§;¡.æ1~8al-5~~ .~~'" ~.~.. S"'~Süë~ g]~~ 1~ª~~~-5"£ø8~ ¡=~" a~00~~11.!~8"'~ ¡..81~ =!§8~S~ ê~s~ ~= .~ -'" .- '" 00 ~ .." .= .. .. S u "~ 1:$ e or¡ "'.1:1 ~ ~ e ",. ".c. ~ o Q)I1)O.o~ ~ ::C-.o(l)ca ... ~u~=~~·~t ~C~~~"'é 00 -coo +:Jt::~=.ouQ)I.t-IC ~.c~..r-=~""~8~Õ;g~0~ 1~ltj~~.fI"'8¡Z~¡(Jt;~ uSeS1:$u~]-5",S:li~o~o" <c;8<~~.c~~-5<:liou .coo i :s ., .c (,) '" c 'E o a. :. ... c .. '" c 'C S ï: o :Ii c o ¡ '" '" i o '" Õ LO '" " C> .. a. .c <.> c: .. c:: ~ " « íif>X f,ó> C):s! .~ "- 0 _ r- ::: -0 0 ORIGiNAL .. ... ¡¡: .. u c ,!! Q. 1/1 E i!: 0 0 CJ ~ 'õ .!:! c :ã 0 ~ :I I!.. U o¡:: ;: .. > CI c ·2 c 01 ii: >. ~ ã! e 8 ~ 8 ].~ ~ E 1, w~t= & . ~_... ~ e - ,g .~~ w -š ~ -s f '~'ê] ~] "'.5Ja ~ tI} ..2"'O-.~ 8 ~.B "@].š ]] ~~ ~ g.s ~ ~~ 1/1 lu·~I.~~]~¡'& ']1 ~ _ ~~~ ~tI} ~~~ ._> 1 J~II 1~t§¡i1~1~~ . .E.~ . "" l! 5 i <;> ~ "".È:E e g] ".!! ~]~ 1-~-"8 § u~ ó~~~"u-" ~~ u - ~- ~= !!'¡j~.o" 'E [ .-š'Ei z·~ " 0 ~ E !!:;:; Þ it: ¡¡ '" e! - ~ . 0:: .. >, ~ .- .~ 0 > ~ bI)" "3 0:: '" ~ i11~~1~~II~~~~.ÈJd ... ~ ~~'~~~~i~ ~ ~ ~~ ~:~ ~.~~ :I Z "'~;¡,>,~~ WW ~] ã!i'J~ 1/1 11~¡1111Ijl!JI~lfI ~ u '~;'~8~co~s~ ~ 01 .. g ]RII~lllir~~~le~ã! ::E ._ 11) o·~ e CC e = u "'0 rIJ 0 = fI.) rJ} ~ =. &e" ~~~U&~ > c lil:I~lj~1~'~~11!~ ~ ~~~~&~~~~B~~~~f~~ 0 ~ .. ~~~ 8.o0~£" ~. ~_ se&J_u,,~ ~ ~¡0i'J N 'Ei5~~8~S~.-S~or-s~." CI ~ >"tj "" - 0:: '" ~ e "2'" 0::- :;:: ~ !~~.~§~5~~-J~.s.9~S ~ .g&o& 1 'Ei1J~~I~]-S i & ." it: .0 bI) "" bI)' "š .~ bI) 5 ~ ~ ~81~~~8 = u~"~-I Q~~ogO::~d~IÆ~1u~~o::B i e._~~ nÞ~~~~~~>1= ~o "''-v.lQ)C''--S: gr :;j°SiU:;j þ~-~s-,,-ul §~. ~-~ _iU ~~.~> 0-' ~so~i"~œe"8Q1~' e~ ..: :~ '§ ~ ~ g'§' ~ '¡:¡ ~ ._ g . ~ ~ J h <- "0 -8 8 -""~ 's ~ - "e! " - u U 's - - ~ õ _u- I~ ~ O-&~ ~ " .B g.J!:;:; a 8 1;; ':;; I] ~ § " ~ ~] ~ ~_g~~~~...o~~~~uª v.I o W.s '=ã! ¡;! ~.~ ~ u .. Þ w .. ~ ~9]i~I~~]~]~~J~j¡~ z ë 8 h I ~ ~ g¡ ~.s . U ~ 1:: .8 . 'E.o' o=.o=~i ã!~~ () Q)~_ucc ~ ~~ 0 §"'O-·-o ~~8u~l~ ~o~,,= " == ~~8~~~~¡!~~.~,,~~~. ~I- ~ O'~~¡;¡:;¡ -s.Ë -s¡g.Ë.Ë ~ - ~ .!! =5 .. .c U '" c t! 8. .. I.: ... c .. '" C 'C S 'c o ::Ii 8 i '" ¡¡¡ ::Ii g õ '" N .. C> III a. .c u c i}, (.'~\Kf.() :'ã: .'<!;, ~ - ë5 m r- o C> ORIG'NAl :! :;¡ u " .s:; u '" c :e GI 8- ... " ü: 0:: " C It '" c "C g '2 0 ::E c 0 GI i u '" c '" .!! i 'ii. UI E ... 0 ... 0 U ~ Õ .!:! c :ã 0 .. ~ co 0. u q: 'C ~ 1:11 C 'c C co ii: >. >. .ro .ro ¡¡ ¡¡ i 8 i 8 e ~ III co GI :Ii c o .. co 1:11 :;::; i E =_tr¡'- 1::: _ "C U1~ rJ'5 o:S ,g ""¡g~.s~--: '§~]~.g ~"i .1!!i,g]'§'@ ~ .~ i .~ ~ ª ~ ~:I ~ ~ , ~ þ § ~ ~ ãi·~ ~ ~ ~ ~ ~ % .g ] ~ ~ ~ 'i> " ~ "8 .= ]1 ~ ~ û 1;! .. ... ê "" =' E .s 1;! ¡¡ ~ ~ "" 1;! i! .1:: .. 1! ~ £j g 8 8 i'~ § ~ ~ '8 ~ ~ 0 ~.~ 6 'ß'8 .§' ¡¡ [3 ~'8 8. ~ § ~ ="~~~I "8.;:; o"'~~I"~u ªÞ~~8go~fi" ; J~~t¡~liit¡I~~llll 1~~!~jil~i~ j ~",,~8~~~""C5ool~';:;"'.8~~ ~~~t5~~~1¡2 _c ÕÎ,~ ." ~.;; ~ ~ ¡¡ .13 "" """ -" ~ 0 .Oc ~.5 Zo ,," =' " " ¡¡'¡ ,,"" I:i " .¡¡¡ .+=1 -..::: ~ I!:! I ... - U1:= ':¡;:J'" - U1 "C .c - @ ¡;;, .:::I ¡;;, .c U1 ~~ .§ .8 ~ ~.~ ~ @ i ~·ê .5 ~.~ t) ~.~ §].~ ~ ê = = ~ ~ g "2 .g ~ .s ~ ~!llli~¡ltiJI!!li~ 1~lli1~1!il ° 1;! ~ ¡¡:: - N e! =' § . = §' . .ro'~ ,,"" =' " 8. I:i "" . ~ Þ ë.c " ~ ~1.8jll:g~f!8~~R¡5~~ ¡I~¡!~~ÛB§~ . .. ~ E-< t:r' C C ~ ~ 8. c ¡!! ~" ..~ .., .. ~ 8. ~ .:; c ÕÎ =' i!!' " B 1;! ~~I!~~lj~~f;iIJHi]~~~~¡~1t1JjD]~ ~e~uzs~~~~o~=~~~=~ ~OOD~~c"C':¡;:Jue ::E~SªUe!B~!~z~8~8.!8~~::EøU~~~8BS~E-<. § e .. ~ " '8 .. .c "" .~ ÕÎ'-; ~ ~ ~ ~ ~ 1;! =' .~ . 8 .9 ,,~ 5 ~ ~.~ " g. ~ " . o M Õ I'- '" " g> D.. .s:; " c: .. ex: ~ fk€'lí'. () 31 ø;, "- 0 f¡\ I- ro Q (:, ORIGiNAL GI ... ¡¡: GI U I: .!!! Õ. ~ e 0 ... u 0 õ := .~ I: :g 0 .. :I !J II. I;: .¡: ~ CI I: ·c I: OJ ¡¡: >- ,Q ¡¡ e ~ 8 ] 0 is ¡ß VJ ¡ß .s C £ -g o B o ~ 1;! 2!'s 1:1 2! .g u _ v.I >. .. ~Ë ~ .- ~ e"'g a 1;!'-~ ~ ~~] ~ ..·s § ~ " ë" 15: Œ ~ .!! 13 8 .¡;;:::: ..'¡;; 8. 8. ~ j¡ " ] ~ .8 ~ ~sl ~~ ~ ~ ~ ª Cà (à._ ~ .~.~e1!!J e ~ ~'fì" Œ"I~ .¡;; 1i -o!J ~.8" ~-šu~=~«í ª.8 I!J .¡;; -g!J ~ e] ~ ~_ cu;::::::_ :: .<:: ] ¡'j ;'¡;j -s ~ 6 ~ I!J .: " e .. õI t: .. "0'- Ë 'S f ~~ !! .g.g ~ ~ '", ~~~~~.gggg~~ 0 .5 !!·iJ ~ ~ .... os ::I ë! ~ .. rg 8. i!! III <= ~ So rg 8. " 'ë ] e"'d~~g:s::Sõ~e = OJ 1:1 e:! 0 VJ 'S: & -0 " ¡to",,, I! " ...~o<= ~8 ... - " ~ GI ë c.. ~..... i!! 8.:':' CD =o'¿jË<=~-E,,1;! .t:J ;:-;!:gF! :2 tõl - -s 0 Ift·- VJ';::: Q.) "0 iU - - .8 ·C .s. :;:::£-s.8 005 . 'õ ::J ~ ~ '=] ~ ,!!¡ ~ .a :; i .. .8 :;::: £.,g ë I: u ~ g. ~ .- ~ .S _ t: Z "CI "0 5. 'r;5 Ø) = (,);:::::: .£ ~ .- 0 5-6 _ bO ~ en "'d Cà ..8¡g8."oe~5.s~ I!J 1:1.6' ~ Ë! .. <=.S " ê :;:::.¡¡ 8. - .... OJ 'õ 0 " ,ª:;:::~'¿j 'S = <= ,ª:;:::~ .s~e .!!-o¡gF!~":;:::~i 'S CI .- 0 E]'=£1 ,,-Sop:;::: .... ~ .. "-0 "5 t:.. -0 0 e .. ~~:=£1 ~ = I!J ¡g ~.- 8. " .- e U 0 .- 0 ~ i .... .. " 8t:ª,e]8e .SVJ =.!!'¡S_u c..., I!J Œ] .... 8 1:: ~"5 o- lE ::E ~ & 0'- " ~ 1:1 00 i! 0 " .£ 0 =.~ 1;!o<=~o:::: <=~<= ..8 ~ ~ ]~8~.8~15: .,.;. = = ~ ~ ~ CI) ~:.a .~"' 2! . <= . õl8.o~ " f::! .6' a)~ ë~ .~ ~ ~ ~ g ~ .... ~ .... p 6h .. ,,; õI ~ ... .S' is ~ :¡j' I! .. I!J I!J .... " ~ o..e 0 ~ cu cS .._ ~ ...... VJ :-:: u ~ CL) .s ] o ~ B ~ "..... ~ U'- Õ 1:1 :;::: 'E ",I;: 0 .. .. E-< ë= ~.~]~ ..$ 0 1;! ~ .~] " .8 '¿j Q) 0 i .- Q.) "0 iU 0 ~:= ..- "'u " "u" -S,," Z:ge £",ª-S~1;!.;8e " 0 'a,'õ "u" F!£.8ìì!ÈF!] :E ::J,g5 <= 0'.... U'- ~ F!£.8ìì! . . ::E~ ~0....s.£8 . . . . - -."..--- - .!! :;¡ u CD .c (.) '" c ;: o ... &! "0 c co '" c 1: S C o :E IS i '" ., i o '" õ IX) CO< .. 2' Il. -5 c co cr: ~ .. > ~i\1í€"1 00 ~ >- - 1::: J!! o 0 ORIGINAL :!! :;¡ u .. .c U '" c 1: e 8. ¡¡: ~ "D C 10 '" C ;: 0 - 'ë 0 :& c 0 .. ~ u '" c ,., .!!! i ã. ~ E 0 ... 0 ~ õ .~ c :g 0 .. ::I ." D.. u ¡¡: "t: ~ DI c 'ë c ." ii: >. » .J:> .J:> ¡¡ ¡¡ > ~ e ~ 8 8 < e ::I UJ ." GI :IE c o .. .. DI .. i ""'" 1!" .,- C¡ .S ~ 9 ~ ~ OÐ .c '2 5 .g . :9= _='_VIU ª1 U.=bO 'S :<" '" ~ .~ 'š' -5 ¡:¡ ~ ~ ~ -g g'... § :9 "" ~.:::! ...c:::: _.... '"'- ... ø:5ij -. ~c ~J"'~i~~~~~8 ~Si~~~~~1 !:! ~ oS '§ .~ ~ ~ ~.E! ¡)! -5 ~;: .; "D (/) : Q. þ U ~ Q. ~ ~ ~ ~ & ~ §.·B i ~ .~ ª ~ ~ ~ ~ B ~ ~ û ~ £ ~ ,~ þ ~ .~ .~.§' ¡¡. Ë 8 ] ~ ª ~ .~ ~ ILl! ~ [i.8~.@j Jj C~~ ¿ ._.... _ "C Q. \U v, . ,..1::;.......... 0 CD : ~ .... c - 0 U .31' ti g:="O 11 ~ -5"'9 5 i5 § ¡;J '¡:: .. C 1:) -,,:!'5 1'0; ""0"]" u"O~""'0¡::ulD:¡¡e!1!~U"'>13' e -5"O~~»~I~O",~~~§Ë="§-~ ~"O-' ~ >. Q) ¡;;, C C p..... .0 oS c; '+-0 .0 t) ca Q) e cs c ~. . ~ ¡:¡ "0 R. ~ e 1; 1J! !II'O 0'0; 1! '" cg13.c .:: Q. R U ~.= § "'9 "0 "~"'Q.";::¡=~c"''''' (/)IO-"Oö_¡¡e <5 ~-g e ~ 8~~.ê.s ë·g ~.9.~t) ~: ~ ~ ~.~~ ~~-e ~.~ ~ ~ ~ ~ 'u£ ~ .g ž ~ ] ~ .§ ~ ~ f ~ ~ ~ l~ -5-5-1 ! " " a: "'.~ u _ "'"0 "0" Q. IL - c Q."O "" '" .~ -g .o..s .'~ ~ Q) >. U Û c ;:: c ~.~ . c ~ IU ';> ,e::; ! ..... c.. ~ cQ == t) ~ ~ ~.£j ë·5 ~~ ~ 0 C1) "C """: ¡ '~..s e :s! - = ~ ~ "C.~ a.> C9 +J 8. 0 == I!:: 0 f,f)"'5 ~ ö cp CL "'d t; c.. ~ ] Ë.t! 0 ~ ,- 11 f B .sa .; ~ ~ -S "8 E e :ü ':: ~ oS! "" ~ ~ ~ '" 1:: g. tJ "a ~"c~ ~-5"O."" "i.-".~"~ ';> t S ::E ,g ¡; i Q. ~ .c ,,'§ g ¡¡ ª ::E ~ ~ ~ ] fJ "ª ~ 8: ¡;¡. !:! Q. ~ ::E ~"O '" ~ Q. B 5 ~ u U.c ::E Q Q Q. '" ~ Q. Q ~.5 -...,........--.. » .J:> ¡¡ j 8 c >. 1I~~r! ª i §.~ 11! ~ ~ ~ ~ '0;": ",- Q. ° !:! e! ·ã~.sa1J!:!a ='-~~.a'Ei .. f! '" 8 ~ ~ ..s .u ~ 0 ,.;::.t:: .... ;::I..... ::J.-t:::Cbo~~œ .,o1â..2cQ~o-=1:: ... >oJ ... v.I v.I .... - . 'r¡;.= .w Q) 8 Q."I ~ 00. ~ E! 55 ~ ~ .~ Q ». ICcg"O .. ¡;¡ c " ".¡:: ~ _... éd ;;j 0;::1 ... 05- ... ::s 1./-0 œ·... Q."I :::s >.:!::Ov.l=~Q).8 o::s ;>,. Q."I Q."I 0"0 œ &:;.!:! !:!'€¡¡"S"O ~~&>U~" "':c(§'e,¡5-ê <?""uQ.~¡¡¡;¡o a:.5 g ~ _ .:!i .>! :s C) 'E .9 ï3 g .9 Q.'Q) c( '" ...._ Q) ... ~~ ::E i' ·8 ~ ~·8 "S ::Ea: ~~.c Q.-5 ~ o '" 'õ en N " '" 10 <l. .c U '" '" CI: J'òÄ1íf7 q; ó' ....."" '" ~ r~ - ,... û v ORIG!NAl :! ~ .. .c U '" c :¡: Q 8. .. ... II: ¡¡ ... c >. .. .0 '" "t:J C " 1: i s c 8 0 :I! c 0 Q 11 u '" c :¡:¡ .!! i ã. ~ E 0 ... (.) ~ Õ .2 c ::ï:i 0 :¡ ~ a.. u ¡¡: .¡: ~ CI c '2 c .. ¡¡: ! ~ .. .. Q ::liE c .2 - .. CI ;> i =.8 J:! ~ "g ... '" 'E };' I Q;li.l:JO -Ø:> ~t:::_VJ >0..-:;. :;:::.c:: .wo.....Q) 8-¡;¡¡:j~~~ "3p.~:§ ~._ Q) ~ ~ ~ Go) u 9- J-o .c ~ ~ c ~ > .~ ~ 0 0 t) ~ š.£cS ¡.~ ~ B ~.:: Ê-o ,,1<!!-o ",..c >-~ ~ o -a r.I) ë :::s .£.- g 1-0- CIJ .a ....o~""~~!!"'~.g"3 ~ ~ ~.¡;; -¡;¡ 8 ~ !!í ~'" ".~ ..c " ".-..14 -= '" ~ ~" :ao c."c "C u ~ VJ = a'" Q)o~«IG.)]"''''''' ~-s-0i:i'= Q,):-s!s [;' :; ~ § 1:i ~ ~ ~:~.g'¡; ".¡;; ".s ~.¡;; ~ ~.'" ~ 5 =_8: ~~cc ~o.l .g .~ -5 Š 8 ..c;¡ = -5 g "'e="'''' u -0"'::0- J: ~=oQ)~o=bOV)U'.:I·cD ",p.,,-'c-~"'= 1-0"_ = ":5! .~ ~ !!í.5 - '6 " § "5 .¡ ª-5 "'-o.ò-;; ""!!"!3 .'~ " = !! ~ 1:i ".5 .Ê Ü..c i!!' = !:ì! -0 ° !! " ~:5! ¡; 8.5 8'- 8 :J: .~ ] a e·¡;; e 5 'J:: 1i'§¡ g S :::E ¡: ¡¡: .a -5 !! p..~ ~ " .. i5. ~ :::E " " ~~.~ Q) ~==.c-S '" "2 g ° = St VJ- ._ _=_ "'0 -5 ,- ...- " ._ O..c § = ~'2-=- .g .!! !!$.5 1J;¡ .ëoo.!..=.c ~"=.E.£" ~:ª",-o-g õ !! ~ ~~.. < ~8]:"]øi 3t1~.g]-§8 i>.cc=uc ... ~]~:Ë28 0. u .. ~ C ) I,¡..o :::Scé~Q»o 8~·.=:a~§ o «I ~ '¡;5 >. '.c .s_~fI}Q.)O ,,",~C )8-S~ ° ·e= -5 u ~ .~ 'J:: 'ü!!l!!l <¡ 0.. 0._.= '±::i fI) ~ ¡¡ ~ < 8 a " r!- 1<!!-5 .!!i ~.. -g "" o ë '(;.- i:I; èd .... ... ".", g. '" .!! 0-0="""',,, ¡¡ '¡;5 8 ~ ~.~ ..s :¡:¡ !! 8. 2 ».- '" ¡~....-o~-ðŠ õ!!°"3"'»a D.=].8~~~ ~.:: ,'" ~ ""!! 8 c ~ 8 ~ ·ê. 5.5 . '"-",,-e-o 3~.c.c"g1,j..iQ.)."ª c,,~,,¡¡:~-g'" 0-5".~s;¡o-~ uo!;>u,¡;¡-g~ ~ ';:: ,l:J 8. u ... ';:; .5 Õ ,0 ~ fl)e ~ ..s .c@ Z §..", Q.. ¡¡ -:;;¡ ~ . u 5'~..ëi ~ ..-: 1'j ~ ~ £ ¡¡ '" ~ ""-;;eo",~!!" O!!p.-g1iJ8.¡¡¡g. II('S u] ¡, «I ~ ..9 4) :::Eg'·ã·-!;b ~> :IE ø:: s ~ ';J 'ë: :.a .g ~ 'õ o CO) '" '" '" D.. .c " c '" a:: JòAK£.f: c::iõ ~ "-õ ... I- m - r- o C> ORIG~NAL