RESOLUTION OF INTENTION NO. 1472
A RESOLUTION DECLARING INTENTION
TO ESTABLISH THE SEWER PLAN FOR
THE VERDUGO LANE PLANNED SEWER
AREA AND PRELIMINARILY APPROVING
THE COST AND FEE SCHEDULE AND THE
BOUNDARIES OF THE AREA.
RECITALS
WHEREAS, Chapter 16.32.060.E of Title 16 of the Bakersfield Municipal
Code and Section 66483 of the California Government Code, provides for a procedure
by which the City Council may assess and collect fees for the purpose of defraying the
cost of constructing sewer facilities for local and neighborhood sewer areas, and;
WHEREAS, The City of Bakersfield desires to provide sewer facilities for a
rapidly developing area as shown on the map entitled "Verdugo Lane Planned Sewer
Area" attached hereto as Exhibit "A", and incorporated by reference, and;
WHEREAS, the City. has constructed the sanitary sewer line as shown on
Exhibit "A", and;
WHEREAS, the City desires to recoup the cost of constructing said sewer
line, and;
WHEREAS, the fees and charges set forth in Exhibit "B" attached hereto
and incorporated by reference, are based on the actual cost of providing the services for
which the fees are charged.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of
Bakersfield as follows:
1. The foregoing recitals are true and correct and are incorporated
herein.
2. The Council hereby preliminarily approves the boundary of the
"Verdugo Lane Planned Sewer Area" area of benefit and limits of improvements as
described on the map attached hereto as Exhibit "A", and the cost and fee schedule
attached hereto as Exhibit "B". Subdivision or development of property within such area
will require payment of fees per the attached schedule.
-o()o-
S:\PROJECTS\PSA,PDA\ROI\Verdugo Lane PSA_ROI.doc- 1 -
~ COp..K~-9
o ~
>- -
m
l;:: ,...
o (::)
ORIGINAl
I HEREBY CERTIFY that the foregoing Resolution was passed and
adopted by the Council of the CiW of Bakersfield at a regular meeting thereof held on
AUG 1 6 2006 , by the following vote:
cAY.ES:)
NOES:'
~
Q~
~ ......-- ..-- - --
COUNCILMEMBER: MAGGARD, CARSON, BENHAM, COUCH, HANSON, SULLIVAN, SCRIVNER
COUNCILMEMBER:
COUNCILMEMBER:
COUNCILMEMBER: S . L {} D~...... _
---
CITY CLERK and Ex ()fficio CI
Council of the City of Bakersfi
AUG 1 6 2006
APPR()VED:
HARVEY L. ALL
MAYOR of the City of Bakersfield
APPROVED as to form:
VIRGINIA GENNARO
City Attorney
By: ~~~
. ROBERT M. SHERFY ~
Deputy City Attorney
Attachments:
Exhibit "A" Boundary Map and Limits of Improvements
Exhibit "B" Cost and Fee Schedule
S:\PROJECTS\PSA,PDA\ROI\Verdugo Lane PSA_ROI.doc- 2 -
~ COP--KS'-2
o ~
>- -
m
I;;. t-
O (:)
ORIGINAL
J.
./
II !,
\ - i
i'--.."fi
'.
! CALLOWAY IJ>R
---"'----
~----------
...........
,0
a::
c:=
w
(!)
c:=
<(
co
:5
...J
W
J:
en
i II '" r r i
,,'C'
, ,
lD:::r
...J'("
: ...J i
, <II i
'J:
-(~ !
i (E'
,,', t"t'\ !
!_~"
III
'C
~
~
en
a.
Q)
c
m
-J
0 US
0) 0..
~ 0
"E CD
;:,
~ 'E
~
0
i, !-o~K~, "',,,6
_I~ I 7.
r11' ","'f\
.... ',i -
:-1 " m
'::t ! t-
o b
EXHIBIT A ORIGINAl.
EXHIBIT B
Verdugo Lane PSA
COST ESTIMATE - VERDUGO LANE PLANNED SEWER AREA
No. of Lots:
Acreage:
71 Residential
105.5 (Residential)
Item No. Map Ref.
Item Description
Qty Unit Unit $ Item $ TOTAL
1 LS 10,000.00 $10,000
1 LS 20,000.00 $20,000
1 LS 10,000.00 $10,000
1 LS 10,000.00 $10,000
70 LF 30.00 $2.100
850 LF 70.00 $59,500
3 EA 3,000.00 $9,000
$120,600
$24,120
$144,720
2% $2,894
6% $8.683
1% $1,447
2% $2,894
4% $5,789
$21,708 $21,708
$166,428
ESTIMATED COST PER LOT(RESID): $2,344.06
Trunk Sewer Improvements
1 . Mobilization
2, Maintaining Traffic
3. Trench sheeting and Shoring
4. Finishing Roadway
5. Asphalt Concrete Trench Patch
6. 8" Sewer Pipe
7. Manholes
Construction Subtotal
20% Contingency
Construction Total
Pre-Design Surveying
Engineering Design
Contract Administration
Construction Surveying
Construction Inspection
Total PSA Cost
S:\PROJECTS\PSA,PDA\Exhibits\Verdugo PSA estimate.XLS Page 1
~ tQp..KS'-2
o ~
>- -
l;:: ~
6/2~INA~
Exhibit B
Verdugo Lane Planned Sewer Area
Fee Schedule 1
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
$2 344
$2,414
$2 487
$2 561
$2 638
$2717
$2,799
$2 883
$2,969
$3,058
$3150
$3,245
$3,342
$3 442
$3,546
$3,652
Note 1: This fee schedule is based upon an inflation factor of 3% annually.
S:\PROJECTSIPSA.PDAlExhibitsIVerdugo PSA estimete.XLS
Page 2
~ COP--KS'J$>
o ~
>- -
I- ~
6/$006 t>
ORIGINAL
AFFIDAVIT OF POSTING DOCUMENTS
STATE C>F CALlFC>RNIA)
) ss.
CC>UNTY C>F KERN )
PAMELA A. McCARTHY, being duly sworn, deposes and says:
That she is the duly appointed, acting and qualified City Clerk of the City of Bakersfield;
and that on the 17th day of AUQust ,2006 she posted on the Bulletin Board at City
Hall, a full, true and correct copy of the following: Resolution of Intention No. 1472,
passed by the Bakersfield City Council at a meeting held on the 16th day of AUQust,
2006 and entitled:
A RESC>LUTIC>N DECLARING INTENTIC>N TC> ESTABLISH
THE SEWER PLAN FC>R THE VERDUGC> LANE PLANNED
SEWER AREA AND PRELIMINARILY APPRC>VING THE
CC>ST AND FEE SCHEDULE AND THE BC>UNDARIES C>F
THE AREA
PAMELA A. McCARTHY
City Clerk and Ex C>fficio of the
Council of the City of BakersHeld
....
By: ~ -:J-...:...J~
DEPUTY CI Clerk
S:\DOCUMENT\FORMS\AOP .ORD,wpd