Loading...
HomeMy WebLinkAboutRES NO 225-06 RESOLUTION NO. 225-08 RESOLUTION ADOPTING THE VERDUGO LANE PLANNED SEWER AREA AND MAKING FINDINGS RELATIVE THERETO. RECITALS WHEREAS, Chapter 16.32.060,E of Title 16 of the Bakersfield Municipal Code and Section 66483 of the California Government Code, provides for a procedure by which the City Council may assess and collect fees for the purpose of defraying the cost of constructing sanitary sewer facilities for local and neighborhood areas, and; WHEREAS, The City of Bakersfield desires to provide sanitary sewer facilities for a rapidly developing area as shown on the map entitled "Verdugo Lane Planned Sewer Area," attached hereto as Exhibit "A", and incorporated by reference, and; WHEREAS, the City has constructed the sanitary sewer line as shown on Exhibit "A", and; WHEREAS, the City desires to recoup the cost of constructing said sewer lines, and; WHEREAS, the fees and charges set forth in Exhibit liB" attached hereto and incorporated by reference, are based on the actual cost of providing the services for which the fees are charged, NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Bakersfield as follows: 1 . The foregoing recitals are true and correct and are incorporated herein. 2. The Council hereby finds that, as to the Verdugo Lane Planned Sewer Area, as described in the plans (on file in the Public Works office), map and fee schedules attached hereto and incorporated herein by reference, subdivision and development of property within such area will benefit from the construction of said sewer facilities, and that the fees provided are fairly apportioned either on the basis of benefits conferred on property for subdivision or on the need for such facilities created by the proposed subdivision and development of other property within such area. 3. The Verdugo Lane Planned Sewer Area is hereby adopted. -000- ~t>.KS'1> ~ ~ >- m ~ r- i:> ~lQIN4l::1:) I HEREBY CERTIFY that the foregoing Resolution was passed and adopted by the Council ofJhe CitY-,ot Bakersfield at a regular meeting thereof held on JUG ~ 0 l006 , by the following vote: ,,-- ~ NOES; ABSTAIN: ABSENT: v--- ~ COUNCILMEMBER CARSON, BENHAM, MAGGARD, COUCH, HANSEN, SULLIVAN, SALVAGGIO COUNCILMEMBER COUNCILMEMBER COUNCILMEMBER 1..--- 1--- J..- ....-- ~ AUG 3 0 2006 ~ 1k>-6. CITY CLERK and Ex 0 c Clerk of the Council of the City of Bakersfield APPROVED: HARVEY L. HALL MAYOR of the City of Bakersfiel APPROVED as to form: VIRGINIA GENNARO City Attorney By: fi~ fYh ~- Exhibit "A" Benefited Area Exhibit "B" Cost Estimate Fee Schedule S:\PROJECTS\PSA,PDA\EstabWerdugo PSA.doc mps ~ ~~K~~ c ~ .':).. ~ I::: ~ v C) ORIGINAL .-------.---- __...J ; / 'l' ~,i 1""'.(1' i I' '" Iii ! I : ' CALLOWAY DR --~-~ o a:: a:: w (!) a:: <( m :5 .-.oJ W J: en Nl/OE) -~3^-\ I J ! I r' I 11 In 'C l!l a: <( en a.. Q) c co ..J 0 ~ 0) a. ::J 0 "C Cl ::J L.. "E Q) ~ > D _J 'x E ... EXlaJBIT AG ORIGINAL EXHIBIT B Verdugo Lane PSA COST ESTIMATE - VERDUGO LANE PLANNED SEWER AREA No. of Lots: Acreage: 71 Residential 105.5 (Residential) Item No. Map Ref. Item Description Qty Unit Unit $ Item $ TOTAL 1 LS 10,000.00 $10,000 1 LS 20,000.00 $20,000 1 LS 10,000.00 $10,000 1 LS 10,000.00 $10,000 70 LF 30.00 $2,100 850 LF 70.00 $59,500 3 EA 3,000.00 $9,000 $120,600 $24,120 $144,720 2% $2,894 6% $8.683 1% $1,447 2% $2,894 4% $5,789 $21,708 $21,708 $166,428 ESTIMATED COST PER LOT(RESID): $2,344.06 Trunk Sewer Improvements 1. Mobilization 2. Maintaining Traffic 3. Trench sheeting and Shoring 4. Finishing Roadway 5. Asphalt Concrete Trench Patch 6. 8" Sewer Pipe 7. Manholes Construction Subtotal 20% Contingency Construction Total Pre-Design Surveying Engineering Design Contract Administration Construction Surveying Construction Inspection Total PSA Cost S:\PROJECTS\PSA,PDA\Exhibits\Verdugo PSA estimate.XLS Page 1 X COAK~1> 6/28~06 ~ >- - l- m - T- V (:) Ol'llAINAL Exhibit B Verdugo Lane Planned Sewer Area Fee Schedule1 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 $2 344 $2,414 $2,487 $2,561 $2 638 $2717 $2 799 $2 883 $2,969 $3,058 $3150 $3,245 $3,342 $3 442 $3,546 $3 652 Note 1: This fee schedule is based upon an inflation factor of 3% annually. S:IPROJECTSIPSA,PDAIExhibits\Verdugo PSA estimete.XLS Page 2 ~ fQAKS'1> C> ~ ~8/2006 m - t- V <::> ORI~INAl