RESOLUTION ADOPTING THE VERDUGO
LANE PLANNED SEWER AREA AND
MAKING FINDINGS RELATIVE THERETO.
RECITALS
WHEREAS, Chapter 16.32.060,E of Title 16 of the Bakersfield Municipal
Code and Section 66483 of the California Government Code, provides for a procedure
by which the City Council may assess and collect fees for the purpose of defraying the
cost of constructing sanitary sewer facilities for local and neighborhood areas, and;
WHEREAS, The City of Bakersfield desires to provide sanitary sewer
facilities for a rapidly developing area as shown on the map entitled "Verdugo Lane
Planned Sewer Area," attached hereto as Exhibit "A", and incorporated by reference,
and;
WHEREAS, the City has constructed the sanitary sewer line as shown on
Exhibit "A", and;
WHEREAS, the City desires to recoup the cost of constructing said sewer
lines, and;
WHEREAS, the fees and charges set forth in Exhibit liB" attached hereto
and incorporated by reference, are based on the actual cost of providing the services for
which the fees are charged,
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of
Bakersfield as follows:
1 . The foregoing recitals are true and correct and are incorporated
herein.
2. The Council hereby finds that, as to the Verdugo Lane Planned
Sewer Area, as described in the plans (on file in the Public Works office), map and fee
schedules attached hereto and incorporated herein by reference, subdivision and
development of property within such area will benefit from the construction of said
sewer facilities, and that the fees provided are fairly apportioned either on the basis of
benefits conferred on property for subdivision or on the need for such facilities created
by the proposed subdivision and development of other property within such area.
3. The Verdugo Lane Planned Sewer Area is hereby adopted.
-000-
~t>.KS'1>
~ ~
>- m
~ r-
i:> ~lQIN4l::1:)
I HEREBY CERTIFY that the foregoing Resolution was passed and
adopted by the Council ofJhe CitY-,ot Bakersfield at a regular meeting thereof held on
JUG ~ 0 l006 , by the following vote:
,,--
~
NOES;
ABSTAIN:
ABSENT:
v--- ~
COUNCILMEMBER CARSON, BENHAM, MAGGARD, COUCH, HANSEN, SULLIVAN, SALVAGGIO
COUNCILMEMBER
COUNCILMEMBER
COUNCILMEMBER
1..---
1---
J..-
....--
~
AUG 3 0 2006
~
1k>-6. CITY CLERK and Ex 0 c Clerk of the
Council of the City of Bakersfield
APPROVED:
HARVEY L. HALL
MAYOR of the City of Bakersfiel
APPROVED as to form:
VIRGINIA GENNARO
City Attorney
By: fi~ fYh ~-
Exhibit "A" Benefited Area
Exhibit "B" Cost Estimate Fee Schedule
S:\PROJECTS\PSA,PDA\EstabWerdugo PSA.doc
mps
~ ~~K~~
c ~
.':).. ~
I::: ~
v C)
ORIGINAL
.-------.----
__...J ;
/
'l'
~,i
1""'.(1'
i I'
'"
Iii ! I : '
CALLOWAY DR
--~-~
o
a::
a::
w
(!)
a::
<(
m
:5
.-.oJ
W
J:
en
Nl/OE) -~3^-\
I
J
!
I r' I
11
In
'C
l!l
a:
<(
en
a..
Q)
c
co
..J
0 ~
0) a.
::J 0
"C Cl
::J
L.. "E
Q) ~
>
D
_J
'x
E ...
EXlaJBIT AG
ORIGINAL
EXHIBIT B
Verdugo Lane PSA
COST ESTIMATE - VERDUGO LANE PLANNED SEWER AREA
No. of Lots:
Acreage:
71 Residential
105.5 (Residential)
Item No. Map Ref.
Item Description
Qty Unit Unit $ Item $ TOTAL
1 LS 10,000.00 $10,000
1 LS 20,000.00 $20,000
1 LS 10,000.00 $10,000
1 LS 10,000.00 $10,000
70 LF 30.00 $2,100
850 LF 70.00 $59,500
3 EA 3,000.00 $9,000
$120,600
$24,120
$144,720
2% $2,894
6% $8.683
1% $1,447
2% $2,894
4% $5,789
$21,708 $21,708
$166,428
ESTIMATED COST PER LOT(RESID): $2,344.06
Trunk Sewer Improvements
1. Mobilization
2. Maintaining Traffic
3. Trench sheeting and Shoring
4. Finishing Roadway
5. Asphalt Concrete Trench Patch
6. 8" Sewer Pipe
7. Manholes
Construction Subtotal
20% Contingency
Construction Total
Pre-Design Surveying
Engineering Design
Contract Administration
Construction Surveying
Construction Inspection
Total PSA Cost
S:\PROJECTS\PSA,PDA\Exhibits\Verdugo PSA estimate.XLS Page 1
X COAK~1>
6/28~06 ~
>- -
l- m
- T-
V (:)
Ol'llAINAL
Exhibit B
Verdugo Lane Planned Sewer Area
Fee Schedule1
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
$2 344
$2,414
$2,487
$2,561
$2 638
$2717
$2 799
$2 883
$2,969
$3,058
$3150
$3,245
$3,342
$3 442
$3,546
$3 652
Note 1: This fee schedule is based upon an inflation factor of 3% annually.
S:IPROJECTSIPSA,PDAIExhibits\Verdugo PSA estimete.XLS