RECITALS
WHEREAS, Chapter 16.32.060.E of Title 16 of the Bakersfield Municipal
Code and Section 66483 of the California Government Code, provides for a procedure
by which the City Council may assess and collect fees for the purpose of defraying the
cost of constructing sanitary sewer facilities for local and neighborhood areas, and;
WHEREAS, The City of Bakersfield desires to provide sewer facilities for a
rapidly developing area as shown on the map entitled "Panama and Union Planned
Sewer Area" attached hereto as Exhibit "A", and incorporated by reference, and;
WHEREAS, the City has caused to be constructed the sanitary sewer line
and lift station as shown on Exhibit "A", and;
WHEREAS, the City desires to recoup the cost of constructing said sewer
line, and;
WHEREAS, the fees and charges set forth in Exhibit "B" attached hereto
and incorporated by reference, are based on the actual cost of providing the services for
which the fees are charged.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of
Bakersfield as follows:
1. The foregoing recitals are true and correct and are incorporated
herein.
2. The Council hereby finds that, as to the Panama and Union Sewer,
as described in the plans (on file in the Public Works office), map and fee schedules
attached hereto and incorporated herein by reference, subdivision and development of
property within such area will benefit from the construction of said sewer facilities, and
that the fees provided are fairly apportioned either on the basis of benefits conferred on
property for subdivision or on the need for such facilities created by the proposed
subdivision and development of other property within such area.
3. The Panama and Union Planned Sewer Area is hereby adopted.
-000-
S:\PROJECTS\PSA,PDA\Estab\Panama Union PSA Adopt.doc
5<. <o/l.K~-9
o ~
>- -
I- m
_ r-
(.) (:)
ORIGINAL
I HEREBY CERTIFY that the foregoing Resolution was passed and
adopted by the Council of the City of ~~kerSfiEiI6b1t a regular meeting thereof held on
A 2 5 t. , by the following vote:
~
NOES:
ABSTAIN:
~
.........- ....--- v- l.-- L---
COUNCILMEMBER CARSON, BENHAM, WEIR, COUCH, HANSON, SULLIVAN, SCRIVNER
COUNCILMEMBER
COUNCILMEMBER
COUNCILMEMBER ~ \ ~.
Ir~
CITY CLERK and Ex icio Clerk of the
Council of the City of Bakersfield
APPROVED:
APR 25 Z007
HARVEY L. HALL
MAYOR of the City of Bakersfield
APPROVED as to form:
VIRGINIA GENNARO
City Attorney
By: ~/lh ~
Exhibit "A" Boundary Map and Limits of Improvements
Exhibit "B" Cost Estimate and Fee Schedule
S:\PROJECTS\PSA,PDA\Estab\Panama Union PSA Adopt.doc
~ <o/l.K~-9.
o ~
>- -
I- m
- r-
(.) (:)
ORIGINAL
ARVIN-EDISON CA AL
()
~
~
~
\
~
()
~
~
HOSKING AVE
Planned Sewer Area
PanamaUnion
t
<o(l.K~-9
Exhibitz( ~
I- r-
o 0
ORIGINAL
EXHIBIT B
COST ESTIMATE - PANAMA UNION PLANNED SEWER AREA
No. of EDU's: 4080
Item No. Item Description Qty Unit Unit $ Item $ TOTAL
Trunk Sewer Improvements
1. Maintaining Traffic 1 LS $18,000.00 $18,000
2. Pothole Existing Utilities 1 LS $3,000.00 $3,000
3. Connection to Existing Manhole 1 LS $2,000.00 $2,000
4. Relocate Existing Telephone Services 1 LS $5,000.00 $5,000
5. Power to Lift Station 1 LS $25,000.00 $25,000
6. 12" Sewer (Install in bore casing. Union Avenue) 100 LF $490.00 $49,000
7. 12" Sewer (install in bore casing .Arvin Edison Canal) 90 LF $490.00 $44,100
8. 12" Sewer, under 8' deep - in Berkshire 1200 LF $25.35 $30,420
9. 12" Sewer, between8' & 10' deep. in Berkshire 800 LF $26.85 $21,480
10. 12" Sewer, between 10' & 12' - in Berkshire 400 LF $28.60 $11,440
11. 10" Sewer, between 18' & 20' - in Madison 585 LF $36.75 $21,499
12. 10" Sewer, between 20' & 22' deep. in Madison 1003 LF $42.00 $42,126
13. 8" Sewer, between 12' & 13' deep. in Warwickshire 138 LF $23.90 $3,298
14. 8" Sewer, between 14' & 16' deep - in Warwickshire 127 LF $26.40 $3,353
15. 8" Sewer, between 18' & 20' deep. in Warwickshire 365 LF $33.35 $12,173
16. Sewer Manhole, under 8' deep 4 EA $1,500.00 $6,000
17. Sewer Manhole, between 8' & 10' deep 3 EA $1,800.00 $5,400
18. Sewer Manhole, between 16' & 20' deep 3 EA $2,400.00 $7,200
19. Sewer Manhole, between 20' & 24' deep 4 EA $2,800.00 $11,200
20. Lift Station 1 LS $193,563.00 $193,563
21. Lift Station Installation, including electrical 1 LS $95,000.00 $95,000
22. Mobile Generator 20DKAE, 20KW/230V, Manual 1 LS $18,180.00 $18,180
Construction Subtotal $628,432
Inspection 6% $37,706
Administration, Engineering, Surveying 10% $62,843
Contingency 5% $31,422
$131,971 $131,971
Total PSA Cost $760,403
S:\PROJECTS\PSA,PDA\Exhibits\Panama and Union Sewer Costs.xls
4/12/2007
~ <o/l.K~-9.
o ~
>- -
I- m
_ r-
Page 1 of ~
ORIGINAL
FEE SCHEDULE - PANAMA UNION PLANNED SEWER AREA
Panama and Union Sewer Construction Cost: $760,402.72
Equivalent Single Family Dwellings (SFD) 1639.12
$760,402.72 397.45 acres $1,913.20 Per Acre
$760,402.72 1639.12 Homes $463.91 Per Single Family Home
Panama and Union Planned Sewer Area
Fee Schedule*
YEAR
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
SFD
$463.91
$477.83
$492.16
$506.93
$522.13
$537.80
$553.93
$570.55
$587.67
$605.30
$623.46
$642.16
$661.42
$681.27
$701.71
$722.76
PER ACRE
$1,913.20
$1 ,970.60
$2,029.71
$2,090.61
$2,153.32
$2,217.92
$2,284.46
$2,352.99
$2,423.58
$2,496.29
$2,571.18
$2,648.32
$2,727.77
$2,809.60
$2,893.89
$2,980.70
* This fee schedule is based upon an inflation factor of 3% annually
S:\PROJECTS\PSA,PDA\Exhibits\Panama and Union Sewer Costs.xls
4/12/2007
EXHIBIT B
<oM~-9
~ %
>- m
I- r-
"0 0
Page ~~~'NAL