HomeMy WebLinkAboutRES NO 084-07
RESOLUTION NO.
084-07
RESOLUTION ADOPTING THE ALLEN
ROAD II PLANNED SEWER AREA AND
MAKING FINDINGS RELATIVE THERETO.
RECITALS
WHEREAS, Chapter 16.32.060.E of Title 16 of the Bakersfield Municipal
Code and Section 66483 of the California Government Code, provides for a procedure
by which the City Council may assess and collect fees for the purpose of defraying the
cost of constructing sanitary sewer facilities for local and neighborhood areas, and;
WHEREAS, The City of Bakersfield desires to provide sanitary sewer
facilities for a rapidly developing area as shown on the map entitled "Allen Road II
Planned Sewer Area," attached hereto as Exhibit "A", and incorporated by reference,
and;
WHEREAS, the City has constructed the sanitary sewer line as shown on
Exhibit "A", and;
WHEREAS, the City desires to recoup the cost of constructing said sewer
lines, and;
WHEREAS, the fees and charges set forth in Exhibit "B" attached hereto
and incorporated by reference, are based on the actual cost of providing the services for
which the fees are charged.
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of
Bakersfield as follows:
1 . The foregoing recitals are true and correct and are incorporated
herein.
2. The Council hereby finds that, as to the Allen Road II Planned
Sewer Area, as described in the plans (on file in the Public Works office), map and fee
schedules attached hereto and incorporated herein by reference, subdivision and
development of property within such area will benefit from the construction of said
sewer facilities, and that the fees provided are fairly apportioned either on the basis of
benefits conferred on property for subdivision or on the need for such facilities created
by the proposed subdivision and development of other property within such area.
3. The Allen Road II Planned Sewer Area is hereby adopted.
-000-
~ fQ~K~-9
<:> ~
;).. -
I- ~
o 0
ORIGINAL
I HEREBY CERTIFY that the foregoing Resolution was passed and
adopted by the Council of the City of Bakers-fiel&at a regular meeting thereof held on
APR 2 5 2007 , by the following vote:
~
NOES:
ABSTAIN:
~
...,/
L---- L-- ~
COUNCILMEMBER CARS(;"N, BENHAM'I' (0.j.AA.. ,COUCH, HANSEN, SULLIVAN, ~~I\...
COUNCILMEMBER
COUNCILMEMBER
COUNCILMEMBER ~~, ~
APPROVED:
ft~~'r CITY CLERK and Ex cio Clerk of the
Council of the City of Bakersfield
APR 2 52007
HARVEY L. HALL
MAYOR of the City of Bakersfield
APPROVED as to form:
VIRGINIA GENNARO
City Attorney
By: ~ln-~
Exhibit "A" Benefited Area
Exhibit "B" Cost Estimate Fee Schedule
S:\PROJECTS\PSA,PDA\Estab\Allen II PSA.doc
mps
~ fQ~K~-s>
<:> ~
;).. m
I- r-
Q 0
ORIGINAL
REINA ROAD ,--__"______________________
,
,
,
,
,------------____J
,
,
,
,
,
,
,
,
,
,
,
,
,
,
,
...
,
,
,
,
,
,
'......
....
.....
---------------::~
r NORIEGA ROAD
,
+
,
! ~a
j/ .
,
I r-
r ./b i
~.=' ~G !
I ~~Iv I
~ ' L___________h_
I
" :
\ ,
t 1
C ,----------,
o~__________, f~J
~ I' 1 N'OT A PART '''''... , j
UJ , ' ,
:J , : I
<(, , ,i', I
I ,------------------.. , ... ,.... ,
---I t l,... '.._,-' .....-J
, ~~',
1 ~,
1 19~"',...
T ~"'...
, ~,
I ",
, ...
f ''''...
I l' """"''''
..______1
,
NOT TO SCALE i I "",
, ' "
i 1 "'"
-------------..., ROSEDALE HWY (STATE ROUTE 58) "
DATE: 9/28/05 FILE: d -____It_____~____'__r-.f-----------------r---------:----------..
PSA-EXHIBITDWG I !< <Q~K~?>
Allen Road II Planned Sewer~rea ~
'= r-
o c;:,
ORIGINAL
-----, ~~
, is'.<-
....... ~~ 19t
1_.,\ "1~ ,
, ~
, '1-
,
,
1
1
,
---------
EXHIBIT "A"
LEGEND
.------
!._____: PSA BOUNDARY
--- SEWER LINES
4080 EDU IN DISTRICT
Zo
w<(
:Jo
<(a:
...------------
EXHIBIT A
Allen Road II Planned Sewer Area
Major Components
Map Reference
a
b
c
d
Description
2707 LF of 12" Sewer@ 0.14%
Pump Reconstruction in Existing Lift Station
7207 LF of 18" Sewer @ 0.10%
Connection to Existing 15" Sewer
~ <QAI(~Jil
<:) ~
~ --
I- m
- r-
U c;:,
OAIQINAi.
Exhibit B
COST ESTIMATE - ALLEN ROAD II PLANNED SEWER AREA
No. of EDU's: 4080
Item No. Item Description Qty Unit Unit$ Item $
Trunk Sewer Improvements
\. Chain Link Fences 1110 LF $31.50 $34,965
2. Maintaining Traffic 1 LS $222.600.00 $222,600
Reset Mailboxes 3 EA $441.00 $1,323
Sawcut Asphalt Concrete 3708 LF $0.00 $0
Remove Concrete and Paving 1 LS $8.400.00 $8.400
Relocate Roadside Signs 8 EA $236.25 $1,890
Earthwork 1 LS $42,000.00 $42.000
Finishing Roadway 1 LS $65,940.00 $65,940
Aggregate Base 1866 CY $69.30 $129,314
Asphalt Concrete 2871 TON $75.60 $217,048
Minor Structure (Catch Basin) 6 EA $4,725.00 $28.350
Minor Structure (Outlet Structure) 1 EA $5.460.00 $5.460
Minor Concrete (Curb and Gutter) 2652 LF $14.18 $37,605
Minor Concrete (Drive Approach) 1017 SF $7.35 $7,475
Minor Concrete (Wheeichair Ramp) 413 SF $8.40 $3.469
Remove Existing Catch Basin 1 LS $3,835.65 $3,836
Storm Drain Manhole 8 EA $4,200.00 $33,600
Connection to Existing Manhole 1 LS $10,500.00 $10,500
18' Reinforced Concrete Pipe 2165 LF $96.00 $207,840
Concreted-Rock Siope Protection 5.2 CY $525.00 $2.730
Relocate Existing Water Services 1 LS $1,050.00 $1,050
Relocate Existing Fire Hydrant 1 LS $4,200.00 $4,200
18' Sewer (Install in bore casing) 370 LF $46.00 $17,020
18' Sewer, between 4' & 7' deep 1878 LF $74. 00 $138,972
18' Sewer, between 7' & 10' deep 2800 LF $84.00 $235,200
18' Sewer, between 10' & 13' deep 1765 LF $104.00 $183,560
18" Sewer, between 13' & 16' deep 394 LF $168.00 $66,192
Sewer Manhole. Lined, between 4' & 7' deep 7 EA $3.150.00 $22,050
Sewer Manhole. Lined, between 7' & 10' deep 11 EA $5.250.00 $57,750
Sewer Manhole. Lined. between 10' & 13' deep 5 EA $7,350.00 $36,750
Sewer Manhole. Lined, between 13' & 16' deep 3 EA $8.400.00 $25,200
8' Sewer Stubs and Plugs 40 LF $37.00 $1.480
15" Sewer Stubs and Plugs 5 LF $26.00 $130
28" Bored/Jacked Pipe 405 LF $714.00 $289,170
6" Sewer Laterals 36 LF $122.85 $4,423
Power Pole Down Guy Removal and Replacement 5 EA $1,050.00 $5.250
Tie-in to existing lift station, 14' Force Main and 8" duct 1 LS $23,339.40 $23,339
Waterline Vertical Offset 1 LS $0.00 $0
Storm Water Pollution Prevention Plan 1 LS $4,200.00 $4,200
Lift Station Modifications 1 LS $208,950.00 $208,950
Construction Subtotal
Trunk Sewer Improvements - Constructed by Lennar $260,600
Construction Total
Pre-Design Surveying 2% $52,997
Engineering Design 6% $158.990
Contract Administration 1% $26.498
Construction Surveying 2% $52,997
Construction Inspection 4% $105,993
$397.475
County Contribution
Total PSA Cost
ESTIMATED COST PER EDU:
TOTAL
S:\PROJECTS\PSA,PDA\Exhibits\Allen Road II PSA_fees.xls
$2,389,231
$2,649,831
$397.475
-$500,000
$3,047,305
$746.89
!< <Q~K~?>
<:) %
)., -
C 3nt200i,!!
~ c;:,
ORIGINAL
EXHIBIT B
Allen Road II Planned Sewer Area
Fee Schedule 1
2006 $746.89
2007 $769.30
2008 $792.37
2009 $816.15
2010 $840.63
2011 $865.85
2012 $891.82
2013 $918.58
2014 $946.14
2015 $974.52
2016 $1,003.76
2017 $1,033.87
2018 $1,064.88
2019 $1,096.83
2020 $1,129.74
2021 $1,163.63
Note 1: This fee schedule is based upon an inflation factor of 3% annually.
S:\PROJECTS\PSA,PDA\Exhibits\Allen Road II PSA_fees.xls