COUNCI
There was a story in The Californian on water rates, which contained a
great many errors and was very misleading. A copy of that, along with a
correction of the real situation from the Water Division is enclosed.
There is a letter enclosed on the Fire Department's meetings and
discussions with the BIA over roofing materials standards for northeast
Bakersfield.
3. This is to let you know that we are in something of a"cross fire" between
competing downtown interests. We are trying to get the "K" Street parking
lot and surrounding improvements finished. However, some groups want to
look at a parking garage. Some groups want us to hurry up with the surface
lot; other groups say, "hold up, in case the property owners are interested
in a garage." We felt that those looking for a garage would probably lose
their interest level when they saw some cost estimates, which we have
recently provided. If we continue to get conflicting input on that
subject, we will probably bring this before Council in the not-too-distant
future for a decision. '
4. Good news! Sales tax receipts are up in excess of 32�0 over last year on an
annualized basis. This is the second consecutive quarter with a positive
trend, and it is very favorable.
5. We had felt that we were in the clear lead position with respect to an 125-
employee dough company. We were notified by the KEDC, very late in the
process, that Delano had moved in front of us. This is one of two "hot"
prospects. If we do not land the second, we will throw up an old question
for your reconsideration, "Is the KEDC representing too wide a geographic
area, and are they unable to devote adequate attention to its core, which
is Bakersfield?"
6. The California Conservation Corp. is interested in doing some landscaping
work for us, whi ch coul d save us some money. A 1 etter i s encl osed as
background informa�ion for you.
7. With respect to the Hotel, the developers have given Local No. 12, the
Operating Engineers, every chance to come into line. The Hammons people
have recompromised their position several times. They have been willing to
accept, simply, a legal indemnification from the Operating Engineers,
knowing that there would still be pickets, as long as the other unions
. ' v •
HONORABLE NIAYOR AND CITY COUNCIL
March 25, 1994
Page -2-
agree not to honor the Operating Engineers picket lines. They also offered
union labor on the crane and lift. These were substantial concessions; it
is "going the extra mile." They do not plan to go any further and, if the
entire deal falls through because of the Operating Engineers, they are
sti1T proc2eding with the Hotei, but with not prevailing wage settlements.
This may break in the weekend paper.
They are going through design modifications on the Hotel. The two most
significant are that the atrium will not be as high as the original design,
but will be wider and deeper. They also are dropping off the top floor,
instead of shelling it out. That would still be in compliance with the
DDA, as they would still have 259 rooms. We expect to have the drawings
95% done by April 15, 1994, and we are awaiting confirmation from Mr.
Hammons on a possible celebration date in early May. I will let you know
as soon as we have it confirmed.
8. At your next regular Council Meeting, we will have a briefing on the
landscaping and park maintenance assessment districts, and the proposed
amounts to be assessed for next year. We always have a"chicken or egg"
problem on those districts. Because the statutes require that we bring
them in before the budget is adopted, we either have to notice the property
owners that we are going to assess more than what we will if we subsidize
the districts, or we have to ask for some sort of early Council commitment
on the amount of the subsidy. The documents which will be brought before
you at the next meeti ng wi 11 show the same 33% subsi dy 1 evel as was i n
place last year for the parks. You would be able to increase the amount of
that subsidy, but not decrease it if the notices are sent out on that
basi s. I wanted to gi ve you earl y warni ng of th i s so you wi 11 be i n a
position to let me know, or raise an issue at the Council Meeting, if you
want that 33% subsidy discontinued, or decreased.
9. We are in the midst of departmental meetings on the budget. It is going
well. We expect something of a stagnant year in terms of operations, but
without terrible hardship. We are also expecting a pretty good year in
terms of capital improvements due to a series of things that happened last
year giving us some "one time" revenue sources.
10. A permit for construction of a 115 foot to�der has been issued to Cellular
One, adjacent to the Bakersfield Niunicipal P►irport, just off South Union
Avenue. There may be some concern expressed by airport users and neighbors
who have opposed higher towers at this location in the past. There are
currently no restrictions preventing the permitting of a tower this size
adjacent to the Airport. There may be a need to restrict these types of
improvements in the future. The Planning Director is working on a method
to protect the air spaces around the airport.
11. The Kern Small Business Loan Fund Program is the recipient of the 1993
Avant-Garde Economic Development Activities Award. The award will be
presented on March 30, 1994, at the California Association of Local
E�onomic Development Annual Meeting. The City of Bakersfield facilitated
in the creation of this new private non-profit organization, provided
� " ♦ ` h
•
HONORABLE MAYQR AND CITY COUNCIL
March 25, 1994
Page -3-
"seed" money to the organization, which has since been reimbursed, and is
a participating lender in the amount of $25,000.
12. Streets which have been selected for the next "Looking Good Neighborhood"
Program are 9th and lOth Streets, between Lakeview Avenue and Owens Avenue
in Ward 1. The program is expanding into the east Bakersfield area, with
Pacific Street, between Gill and Miller. �leighborhood meetings will get
underway in early April. The program is a multi-department effort to
address, in a focussed manner, significant issues in the targeted
neighborhoods.
13. A status report on CDBG Funded Projects is enclosed, for your information.
14. A response to a Council Referral regarding the railroad fencing on
California Avenue is enclosed.
15. A memo from the Fire Department regarding the use of a defibrillator is
enclosed, for your information.
16. Enclosed you will find a copy of the Block Grant recommendations for next
year. This will be formally presented to you at your next regular m2eting,
along with some narrative material. This is to give you an early look.
17. We are working with the Kern County City Nianagers and Mayors from each
community to address LAFCO appointments, as well as to protest the new
County tax split policy.
18. Fire Department issues:
We are actively starting the recruitment process for Fire Chief, and will
compress the time schedule as much as possible. A committee of the
department has drafted a new program for new and higher educational
standards. It will be circulated in the department for comment and
consensus building. There is a memo enclosed on Fire Department
communication improvements done since the transition in Chiefs, for your
information.
AT.alb
Enclosures
cc: Department Heads
City Clerk
.+ � - - -
AKE
�o d�oawa,:�h',,$�C�
�
U
c � '�1
LIFO
TO:
FROM:
MEMO.RANDUM
ALAN TANDY, CITY MANAGER
FLORN CORE, WATER ESOURCES DIRECTOR
March 24, 1994
SUBJECT: MARCH 19, 1994 BAKERSFIELD CALIFORNIAN ART'ICLE ON
VVATER RATE INCREASE
An article appeared in the Saturday, March 19,1994 Bakersfield Californian concerning water rate
increases in Bakersfield. The article omitted severai factual bits of information, was confusing on
ownership and responsibilities of different water systems and, in short, did not accurately reflect the
information presented to the City Water Board at the March 16,1994 meeting. It was confusing in
the way the article intermingled the City owned domestic water system and operations, with other
water suppliers, purveyors and facilities that also serve water in the City of Bakersfield.
The article's opening paragraph states that all Bakersfield households will see an 8% increase in
their water bills. This is simply not true, as the City may only speak to its own domestic water
system. The "information" item that was brought before the Ciry Water Board was to inform the
Board of osp sible and (at this time), estimated cost increases that are to be imposed by others, on
the City's domestic water system and the potential effects on the City domestic water system rates.
Although it was stated an increase in City domestic water rates could occur, the two-step 4% and
4% increase is an estimate and could not be finalized until all budget information and fiscal impacts
were set.
The biggest omission from the article was the fact that the Kern County Water Agency (KCWA) is
projecting to raise the groundwater pump tax and the treated water price in their Improvement
District that covers the urban Bakersfield area. The groundwater pump tax is projected to be raised
by $10 per acre-foot, from $20 to $30 per acre-foot, a 50% jump, and the Agency proposes to
increase the cost of treated water from their purification plant from the present $25 to $68 per acre
foot, a 172% leap! The Water Board was presented in the March 16, 1994 agenda package, a copy
of the Resolution of Intent by KCWA to amend the original formation resolution and set the
groundwater charges at the new rate. The KCWA board will be moving ahead with the public
hearing process and is projecting to have the rates set by July 1, 1994. The article said the rates
have not been increased for 18 years and again implies this was a City water system decision, when
in fact, the rates and charges in question are those under the KCWA jurisdiction.
Since the City domestic system uses groundwater as its water source there will be additional costs
incurred from the pump tax increase and this could be up to $250,000 annually. Within other areas
of the Ciry of Bakersfield, California Water Service Co. and to a smaller extent, East Niles
Community Services District both receive treated water and use groundwater and will incur
significantly increased water costs. It was stated at the Water Board meeting that the KCWA action
will have a fiscal effect to the other water purveyors in the City, however, it will be up to those
rTM -�
Pg. -2-
CALIFOItNIAN ARTICLE ON WATER RATE INCREASE
entities staff and boards to decide when and how these cost increases will be passed on to their
customers.
Other factual errors in the story relate to ownership and operations of certain water facilities in the
City. The article states (twice) that the City's water system includes a treatment plant. The Kern
County Water Agency is the owner/operator of the plant alluded to in the story. Again, the Ciry
water domestic water system does not receive water from this plant. The article also leads you to
be�ieve the Ciry owns the Cross Valley Canal. This is another KCWA owned and operated faciliry.
The intent and purpose of bringing the matter before the Water Board was to inform the Board of
the potential action of the KCWA and possible impacts on the Ciry's domestic water budget and
rates. The Water Board agenda item (6C.) specifically named the Kern County Water Agency and
a�n agenda was given to the Californian, but in interpretation and translation to the published
Californian article, the KCWA name was left out.
I contacted Tracy Corrington, the article's author, on Monday, March 21, 1994. I explained that
the article was very confusing to the public and to those that were at the Water Board meeting.
After a lengthy discussion of the "facts", I suggested that it would be appropriate fot a correctory
article or retraction be published to un-do the mis-information and set the record straight. The
response to the suggestion was a hesitant agreement. I plan on a follow-up call by the end of the
week, if nothing is published on this matter.
cc: Gene Bogart, Water & Sanitation Manager
Gail Waiters, Assistant City Manager
THE
�����������
ca��FORN�aN
..............................................
SAT�RDAY
March 19,1994
............................................
�
� � , • �. �: ' � �: � ''
• 0
,wa�er rates c �
�l�lot E' o
By TRACY CORRINGTON
Calitom�an statf writer
Virtually every household in Ba-
kersfield will see an 8 percent in-
crease in its water rates by next
year, to help cover escalating costs
to operate Bakersfield's municipal
water system.
The increase would likely mean
about �2 per month more for homes
that receive city water through the
Ashe water system. The increase
will likely be about the same for
customers of other water compa-
nies, such as California Water Ser-
vice, according to city water
officiaLs.
The announcement was made at
this week's city Water Board meet-
ing, which is made up of three city
council members. That board has
the authority to raise city water
rates.
Two members criticized such
sharp rate increases.
"This showed a lack of fore-
sight," said Councilman Randy
Rowles, who suggested the city
should have been aware this in-
crease was coming. "I don't like
that we absorbed those costs (earli-
er ) and then slug people with this
increase."
The proposed increases come on
the heels of a 4 percent rate in-
crease for city water customers that
took effect July 1, last year.
About 18,000 Bakersfield homes
receive city water. However, the
city's water system includes a treat-
ment plant, which supplies water to
other water companies, and ground
water recharge programs.
That system also includes the
Cross Valley Canal, which carries
water from the California Aqueduct
to the Bakersfield metropolitan ar-
ea. That canal allows the city to
receive at least 77,000 acre feet of
water from the SacramentaSan
Joaquin Delta arinually.
An acre-foot of water is the
amount used by a family of five in
one year.
The rate increases will help pay
the roughly a4 million annual oper-
ating costs for the city's water
system. Without the increase, the
city would have to come up with
about a250,004 to pay for the system.
A 4 percent increase is proposed
to take effect this fall, with another
4 percent increase next spring.
The city's water system raises
money by selling its ground water
and its treated water from its Henry
Garnett treatment plant. The water
is sold to municipal water compa-
ties in the area, such as California
Water Service.
Those water prices have not been
increased for about 18 years, ac-
cording to Florn Core, the city's
water resources director. But when
they do go up, the water companies
will have to pass the cost along to
its customers, therefore, customer
rates will rise, Core said.
�
� f
• �
N
� _ '�
, oF e�Rs
�.ccm�Rareo �1
;,,� I
>U _ , � r �`,
8 �- -� � .
._'�
�Q���OR� �
FIRE DEPARTMENT
M. R. Kelly
Acting Fire Chief
CITY of BA��'RSI�Z�'LD
"WE CARE"
March 17, 1994
Barbara Don Carlos
Building Industry Association
6901 McDivitt Drive, Suite C
Bakersfield, CA 93313
Dear Barbara:
�,,...,__-
��x� �`��D F'� � �
�6y � � .mp1
�m �� yi,
: , ,�'
�. ,�
���F CARjii
�-�..i
2101 H STREET
BAKERSFIELD,93301
326-3911
My thanks to Chuck Tolfrey, Don Dozah, and yourself for taking the
time to meet with Chiefs Larry Toler, Gary Hutton, and myself to
discuss non-combustible roofing. As I stated in the meeting, I am
very interested in identifying a mechanism which will accurately
determine the required root coverings for new construction in the
Rio Bravo area. Hopefully, the recommendation will be agreeable to
the Building Industry and also from a life safety standpoint.
As I mentioned to you
effect on July 1, 199
roofing for all areas
wood will be allowed in
mandated in high risk
take effect for 3-�/2 t
area should take place
in earlier information, AB2131 will take
5 and will require a minimum of Class C
of the state. Although no more untreated
California and a minimum of Class B will be
areas, these requirements likely will not
0 4=1/2 years. Development in the Rio Bravo
much sooner.
�- The Rio Bravo area is unique to.the city because of its topography,
natural vegetation, and yearly experience of emergency situations.
I would like to propose that we create a joint policy agreement
designating an area in which roof coverings will be studied and
� recommendations made based on established criteria. This would
apply to all new construction. This area would be from Fairfax on
the west to the easterly city limits, and from the southerly city
limits to the northerly city limits between the eastern and western
boundary. Each tract and/or parcel will be evaluated on a case by
case basis. The final recommendation will be determined after all
pertinent information has been submitted as the development
continues through the planning process. The criteria would be
based on the Bates Bill which was designed to evaluate areas of
high risk. The rating factors are topography/slope, fuel type,
dwelling density, and weather. Other factors include available
infra-structure and past emergency experience.
I have included copies of the rating sheet to be used for specific
areas. An example of recommendations would be:
1. All new construction in this area must have a minimum of at
least Class B non-combustible roofing.
0
' Page 2
Non-CombustibJ.e Roofing
March 17, 1994
2. At least every other roof covering in this particular
development must be a rated non-combustible roof.
3. All new development in this area must contain at least Class
C non-combustible roofing.
There is a possibility that other options might be available which,
in fact, would give prospective buyers more of a choice as to roof
type. Because of the unusual terrain in the Rio Bravo area, some
adjustments in past roof covering regulations need to be addressed
to insure an adequate level of fire protection. I feel it is
incumbent on both your association and the Bakersfield Fire
Department.to take a proactive approach in identifying what
measures need to be taken to insure the safe development of this
unique area of the city.
I look forward to your response and my staff and I are available to
meet with you at any time to provide further information.
Sincerely,
� R.
��
Michael R. Kelly
Acting Fire Chief
cce Alan Tandy
Gary Hutton
Larry Toler
Chuck Tolfrey
Don Dozah
AGENCY
FIELD EVALUATION FORM
VERY HIGH FIRE SEVERITY ZONES
PLEASE CIRCLE THE POINTS THAT FIT THE FACTOR THAT REPRESENTS THE
RATING FOR THE ZONE. THERE ARE A TOTAL OF THIRTEEN (13) POINTS
THAT MAKE UP THE FOUR MAJOR FACTORS. MITIGATING FACTOR POINTS
FOUR (4) PLUS AND THREE (3) MINUS MUST BE FIGURED IN THE TOTAL
POINT CONFIGURATION. A VERY HIGH FIRE SEVERITY ZONE MUST FALL
INTO THE TEN (10) TO THIRTEEN (13) POINT SPREAD.
A. FUEL----
POINTS
l. SMALL, LIGHT FUELS (GR1�SS, WEEDS, SHRUBS) +l
2. MEDIUM FUELS (BRUSH, LARGE SHRUBS, SMALL TREES) +2
3. HEAVY FUELS (TIMBER, WO�DLAND, LARGE BRUSH
OR HEAVY PLANTINGS OF ORNAMENTALS) +3
B. TOPOGRAPHY-SLOPE----
1. FLAT TO MILD SLOPE (0-9.9�) +1
2. MILD TO MEDIUM SLOPE (10-19.9�) +2
3. MEDIUM TO MODERATE SLOPE (20-39.9�) +3
4: MODERATE TO EXTREME SLOPE (40% +) +4
C. DWELLING DENSITY----
1. LOW (LESS THAN 1 STRUCTURE PER 10 ACRES) +1
2. MEDIUM (1 STRUCTURE PER 5-10 ACRES) +2
3. HIGH (1 STRUCTURE PER 0-5 ACRESj +3
D. WEATHER----
l. MODER.ATE
2. HIGH
3. VERY HIGH
+1
+2
+3
0
MITIGATION �OINTS
MINUS POINTS
1. INFRASTRUCTURE---- MET OR EXCEED MINIMUMS OF (ISO 8
NFPA 1231, PUC 103, PRC 4290) —1
2. HOUSING OR ROOFING ORDINANCES CLASS "B" OR BETTER ROOF,
SPRINKLERS REQUIRED, FIRESAFE CONSTRUCTION, FUEL
MODIFICATION, LOCAL OPTION. —1
3. PRC 4291 ORDINANCE OR BETTER AND BEING ENFORCED —1
PLUS . POINTS
1. ROUGH TOPOGRAPHY-- WITH STEEP CANYONS OR DRAWS THAT
WOULD IMPEDE RESPONDING PERSONNEL AND EQUIPMENT. +1
2. FIRE HISTORY--- AN AREA WITH FIRE HISTORY OF HIGH
OCCURRENCE, RELATING TO SURROUNDING AREAS, BECAUSE
OF HEAVY LIGHTNING,�RAILROAD FIRES, DEBRIS BURNING,
ARSON ETC... , +1
3. SEVERE FIRE WEATHER--- AREAS SUBJECT TO STRONG WINDS, -
LIGHTNING, AND HAVE CONSTANT SEASONAL WEATHER PATTERNS
WHICH CONTRIBUTE TO INCREASING FIRE ACTIVITY. +1
4. OTHER-- HEAVY CONCENTRATION OF FLAMMABLE ORNAMENTALS
OR VEGETATION HUMAN INTRODUCED +1
TOTAL POINTS..........
VERY HIGH FIRE SEVERITY.ZONE YES.NO..
DESCRIPTION OF ZONE:
1. LATITUDE AND LONGITUDE........00 ..................
2. TOWNSHIP, SECTION, RANGE......em ..................
3. NARRATIVE OF ZONE
...............................o..................
..................................................
..................................................
....... .......................................
...............................a..................
.......................... .o.............. .....
............................:.....................
DATE..:.........
RATER'S SIGNATURES .........................................
RATER INSTRUCTION GUIDE
VERY HIGH FIRE SEVERITY ZONE
THE FIRST STEP OF EVALUATIONS BY THE RATERS IS TO DECIDE THE
AREAS THAT COULD FIT THE VERY HIGH FIRE SEVERITY ZONE CRITERIA
' WITHIN THEIR AREA. THIS CAN BE ACCOMPLISHED IN THE FIELD OR
' OFFICE ATMOSPHERE. SELECTING THE POSSIBLE ZONE AREAS IS A
PRIORITY STEP THAT MUST BE ACCOMPLISHED BEFORE STARTING ACTUAL
' GRADING PROCESS. THE RATER MUST BECOME FAMILI.AR WITH SECTION
51184, WHICH ALLOWS FOR CERTAIN EXEMPTIONS FROM SECTION 51182
I (BATES BILL} THAT COVERS CLEARANCES. ONCE THE ZONE HAS BEEN
SELECTED, A DESCRIPTION OF THE ZONE MUST BE DOCUMENTED ON RATER'S
EVALUATION FORM. THE DESCRIPTION OF THE ZONE MUST SET ON
GEOGRAPHY BOUNDARIES, SUCH AS ROADWAYS, RIVERS AND SECTION LINES.
I A MINIMUM SIZE HAS BEEN SET FOR ZONES. THE CRITERIA IS THAT NO
', ZONE WILL BE UNDER ONE (1) SQUARE MILE, A SECTION 640 ACRES, OR
AN AREA THAT HAS THE SQUARE FOOTAGE OF A MILE. BUT A ZONE CAN BE
AS LARGE AS REQUESTED BY THE AGENCY A5 LONG AS IT FITS THE
� CRITERIA. THE RATER MUST BE ABLE TO NEGOTIATE THIS SECTION, IF
THE ZONE IS OFF FROM THE REQUIRED SIZE BY A SMALL AMOUNT BUT IT
DOES FIT THE ZONE CRITERIA, THE RATER HAS THE RIGHT TO MAKE A
JUDGEMENT CALL.
THE RATER WILL HAVE TWO COUNTY MAPS SUPPLIED BY CDF. THE ZONES
' WILL BE MARKED ON BOTH MAPS. UPON COMPLETION OF THE ZONING FOR AN
AGENCY, BOTH MAPS WILL HAVE TO BE SIGNED OFF BY THE LEGAL ENTITY
� FOR THE AGENCY THAT HAS BEEN RATED, ALONG WITH A SIGNATURE OF THE
LOCAL RANGER OR HIS DESIGNEE. ONE MAP WILL STAY WTTH THE AGENCY
AND ONE MAP WILL BE SHIPPED TO SACRAMENTO TO BE FINALIZED BY
D.V.I. BY LEAVING A LEGAL MAP WITH THE AGENCY, SIGNED OFF BY BOTH
i PARTIES, WE HAVE MET OUR OBLIGATION OF THE BILL. THIS WHOLE
PROCESS HINGES ON WHETHER OR NOT THE AGENCY ACCEPTS THE ZONTNG
FOR ITS AREA. THIS IS THE REASON THAT THE BLENDED METHOD FOR
ZONING MUST BE ACCOMPLISHED (CDF AND AGENCIES WORKIPiG TOGETHER TO
ACCOMPLISH THE ZONING PROCESS). IF AN AGENCY DOES NOT ACCEPT THE
ZONES WITHIN 120 DAYS AS PER THE BILL, AND MITIGATION CAN NOT BE
ACCOMPLISHED, A LETTER FROM THE AGENCY WILL BE REQUESTED BY CDF
AND NO FURTHER ACTION WILL BE NECESSARY. SOME AGENCIES HAVE
ADDRESSED THIS SUBJECT AND HAVE SET HIGHER REQUIREMENTS FOR FIRE
HAZARD ZONES WITHIN THEIR JURISDICTION WHICH ELIMINATES THE �
REQUIREMENT OF BATES. THE AGENCY WTLL HAVE TO SUPPLY OUR
DEPARTMENT WITH AN OFFICIAL LETTER STATING THAT THEY DON'T WANT
TO PARTICIPATE AND THAT THEIR AGENCY HAS AN ORDNANCE THAT MEETS
OR EXCEEDS THE BATES REQUIREMENTS.
EQUIPMENT NEEDED:
l. MAPS
2. CLIPBOARD
3. WRITING INSTRUMENT
4. FELT PIN, NARROW POINT
5. RULER
6. EVALUATION FORMS
7. COPIES OF LAWS AND ORDINANCES TO USE AS REFERENCE FOR
0
0
d
FACTORS.(PRC 4290, PRC 4291., ISO 8, NFPA 299, NFPA 1351
PUC 103, IN5TRUCTIONS FOR'ZONING FIRE HAZARD SEVERITY IN
STATE RESPONSIBILITY AREA IN CALIFORNrA),
8. ABNEY--FOR SLOPE
GUIDE FOR EVALUATION FORM:
REGISTER THE AGENCY IN WHICH THE ZONE IS SET.
CIRCLE THE POINTS THAT FIT THE FACTOR THAT REPRESENTS THE RATING
FOR TNE ZONE THAT IS BEING EVALUATED.
A. FUEL----
FUEL HAS THREE (3) EVALUATION AREAS. IN EACH ZONE A FUEL HAZA.RD
RATING SHALL BE ASSIGNED. WHERE FUEL TYPES VARY WITHIN A ZONE,
THE RATING ASSIGNED FOR THE ZONE SHALL BE THAT WHICH BEST
REPRESENTS THE PREDOMINANT FUEL TYPE.
B. TOPOGRAPHY—SLOPE----
TOPOGRAPHY—SLOPE HAS FOUR (4) EVALUATION AREAS. IN EACH ZONE A
TOPOGRAPHY—SLOPE SHALL BE ASSIGNED. WHERE SLOPES VARY WITHIN AN
AREA, THE RATING FOR THE AREA SHALL BE THAT WHICH BEST REPRESENTS
THE PREDOMINANT SLOPE RANGE. TO FIGURE AN ACCURATE SLOPE THE
UTILIZATION OF AN ABNEY IS REQUIRED.
I~ C. DWELLING DENSITY---A PLACE WHERE PEOPLE LIVE
DWELLING DENSITY HAS THREE (3) EVALUATION AREAS..THE DWELLING
DENSITY FIGURES CAME FROM THE 1991 CENSUS LOCATED AT CDF
STRATEGIC PLANNING. THI5 FACTOR AREA SHOULD BE RESEARCHED WITH
LOCAL BUILDING AND PLANNING OFFICIALS DUE TO 50ME AREAS HAVING
ORDINANCES WITH HIGHER REGULATION5.
D. WEATHER----
WEATHER HAS THREE (3) EVALUATION AREAS. THE CRITERIA FOR WEATHER
IS FOUND IN THE INSTRUCTIONS FOR ZONING FIRE HAZARD SEVERITY IN
STATE RESPONSIBILITY AREAS IN CALIFORNIA. THIS SECTION HAS BEEN
DONE BY USING THE CLASSIFICATION CHART OF EACH COUNTY WITHIN THE
STATE.(EXH 1)
0
0
MITIGATION POINTS------
THE MITIGATION POINTS WERE DEVELOPED TO WORK WITH EACH LOCAL
AGENCY TO ALLOW THE AGENCY TO HAVE AN OPPORTUNITY TO LOWER OR
RAISE THE POINTS DUE TO ITS EXPERIENCE AND KNOWLEDGE OF ITS LOCAL
AREA. THIS IS A NEEDED PHASE TO INVOLVE THE LOCAL AGENCY INTO THE
FINAL OUTCOME OF ITS LOCATION AREAS. TAKE NOTE THAT THE
MITIGATION POINTS ARE BROKEN INTO MINUS (-) AND PLUS (+) RATINGS.
TO UTILIZE THE FOLLOWING MITIGATION POINT SYSTEM AN AGENCY
REPRESENTATIVE MUST HAVE IMPUTE INTO THE EVALUATION SYSTEM FOR
EACH ZONE.
MINUS
1. INFRASTRUCTURE
POINTS
MEET OR EXCEEDS MINIMUMS OF (ISO 8, NFPA 1231, PUC I03.
PRC 4290). -1
2. HOUSING OR ROOFING ORDINANCES
CLASS "B" OR BETTER ROOF, SPRINKLERS REQUIRED, FIRESAFE
CONSTRUCTION, FUEL MODIFICATIONS, LOCAL OPTION. -1
3. PRC 4292
THERE MUST BE A LOCAL ORDINANCE IN PLACE AND ENFORCED,
EQUIVALENT TO PRC 4291, OR BE USING PRC 4291. -1
PLUS . POINTS
l. ROUGH TOPOGRAPHY
STEEP CANYONS OR DRAWS THAT WOULD IMPEDE RESPONDING
PERSONNEL AND EQUIPMENT TO THE MAJORITY OF THE ZONE. +1
2. FIRE HISTORY
AN AREA WITH FIRE HISTORY OF HIGH OCCURRENCE, RELATING
TO SURROUNDING AREAS, BECAUSE OF HEAVY LIGHTNING,
RAILROAD FIRES, DEBRIS BURNING, ARSON ETC. +1
3. SEVERE FIRE WEATHER
�
AREAS SUBJECT TO STRONG WINDS, LIGHTNINGP AND HAVE CONSTANT
SEASONAL WEATHER PATTERNS WHICH CONTRIBUTE TO INCREASING
FIRE ACTIVITY. +1
4. OTHER-- THIS SECTION WILL ALLOW A LOCAL AGENCY TO
DECLARE A PLUS POINT DUE TO A CONCENTRATION OF FLAMMABLE
ORNAMENTALS OR �EGETATION THAT HAS BEEN INTRODUCED
BY HUMANS.
+l
WITH THE COMPLETION OF THE EVALUATION OF THE FOUR (4) MAJOR
FACTORS AND THE MITIGATION POINTS, THE RATER MUST COMPILE THE
NUMBER OF POINTS AS A TOTAL AND LOG THIS INFORMATION ON THE
EVALUATION FORM. IF THE TOTAL POINTS FALL INTO THE TEN (10) TO
THIRTEEN (13) RANGE, THE RATER WOULD CIRCLE THE "YES" ON TH�
FORM. A RATING OF LESS THAN TEN (10) THE RATER WOULD CIRCLE THE
"NO" ON THE FORM.
DESCRIPTION OF ZONE----
THIS IS A VERY CRITICAL S�ECTION. THERE ARE THREE (3) AREAS IN
THIS PORTION OF THE FORM THAT CAN BE UTILIZED TO ACCOMPLISH THE
SECTION NEEDS. IT WOULD HELP IF ALL THREE AREAS COULD BE
COMPLETED BUT IF ONE AND TWO CAN NOT BE OBTAINED, THEN THE
NARRATYVE MUST BE COMPLETED IN GREAT DEPTH. THE NARRATIVE OF THE
ZONE IS PROBABLY THE MOST CRITICAL OF THE AREAS THAT IS LISTED.
THE MAJOR THOUGHT THAT THE RATERS MUST REMEMBER IS THAT WHAT THEY
ENTER IN THIS SECTION WILL BECOME THE LEGAL DESCRIPTION OF THE
ZONE. THE DESCRIPTION MUST BE A TOOL FOR ANYONE TO USE TO NOT
ONLY DESCRIBE THE AREA, BUT A GUIDE TO WHERE THE AREA IS
PHYSICALLY LOCATED. CAN USE ADDITIONAL PAGES FOR DESCRIPTION.
DATE----
THE RATER MUST DATE THE EVALUATION FORM. THE DATE TO BE RECORDED
IS THE DATE THAT THE EVALUATION WAS COMPLETED. � -
SIGNATURES----
ANYONE THAT HAS TAKEN A MAJOR ROLE IN THE FIELD EVALUATION SHOULD
SIGN THE FORM. THIS WAY IT HELPS MAKE THE FORM BECOME A CREDIBLE
DOCUMENTATION.
MAR-22-94 TUE 1 4: 1 9 ,,..�...�.�-
YPos4-It"" brand fax transmittal memo 7671 � of pagea ►
�om �
Co. -c Co.
W �
ept. � }Z e �
`�, /,.,%'s'"�-�
Fax # .► ax �
' crrY o� s�RSr�o�L�
�to��►s�n
DOwlvrtrUwN PAxKIl�IG A��������[' D�,STRI�T
P _ 0 1
It is not possib�e to estimate what indivi�itxal praperLies might be assessed fot a par�Cing Structure
itt ihe praposed distriet until a preliminary strueture design and cost estinzate are available and
a costlbenefit �ssessment formula which is fair and equi�abie for thd district is derived and
app�ied to each property. Ic is che pucpos� of the assessment district peritlon co determine if
tbere is enough interest in the project fox the City to finance the prelimi�ary deSign, cost
estiznate. and prelfminary enginccrs report for the assessment district foztllatiOII.
However, for the purpose of illustration only. we have furnished exampfes of possib�e
assessments for lhre.e propetties thai eoutd be present In a similar district. Uutil bene�t fo�tnu]as
are dc;rived, and aetual caunts are made of pazucia�� rec�uuirements and paztctag defieieneies for
each iadivi�ual property wichin the District, individual assessments cannot be determined. Ii �
must be enlp�asized tba.t the examples grovideQ are ►�qS the assessments fot this proposed
district. The examples ace provided to show the range of costs that occur einder the assumptions
indicated,
Ii The petition indirxies sufflciern imterest by property owners, the city witl approve a boa�dary
map and pass a resolution af intention �to form the Disttict. At that time and Engineers Repart
will be prepared and individual assessmeuts will be determaned,
�7CA.MPLES OF POTEIV�'lAL ASSESSME�'�
ASSUMPTIONS:
1. Total cost for a 400 spaee parking garage, including assessment district fuiancing costs,
is $3,204,004. Ttus cvst ;s assutned to be imauced through bonds with a 20 year term
at 8 peicent interes�
2, Clty of Bakerstield, anflloc the Ces�tral �istrict Dev�tapment Ageacy {CDDA), witl
cont�ribu�e the Iand pIus wll1 fund the Cost of lOQ paxking spaces to be made avai�able to
the public,
3. Ass�s�rnents are assumed ro 6e apportioneQ on the followin� basis.
a. 5ome benefit occurs to �1_ properties withi,n the District by tlie presence of
adequat6 paYking faci�ities. '[�.is benefit euis�s for ali properties regardless of
whether or nat individu�l propertics have provaded adequate parking for th�ir own
ne�ds. This benefit may range from 10 to 2S percent of tataI costs and arc
assumed to be i5 percent €or parposes of the fotlowing exam,p]es.
- p _ 02
M��—�R�7 TUE,.....� �..n�_Q--
, �� � �� `J `� �� _...
b. Bene�ts derived from the parking stiucture will vary to some degree in accord
with their �oCatiOII with respeci to t�1e prop4sed parking scructure toc:ati0n. (The
tollowing examples Qo not, however� eonsider tt�s factor.)
c. Benefits wi�i be as�essed to propemes in propunion to the i�dividual pro�erties
pazki�g deficiencies, as measured by the C�ry'x dawncown zozaing orctina�ce, A
praperty with all pazkYng requirements currenCly met would not 6e asscssed under
this category nf benefit. A property with 50 percent of its parkin� requiremeuts
currentIy met wo�ild be assessed at � rate �qua1 to SO percent of the rate for a
similar pro�erty with no on-site parldn,�.
a_ 'Tt�e ass cotal parktng de�cfen,cy within the assessmcnt district beneiit azea is 800
spaces, The s 2e totai paricing requirement within the benefit �rea i3 2000 spaceS.
L7�AMPL�S
1. Prope A is a 4,000 square foot retail store �n+luch ha� provided 100 percent of aoc�it�
ardinance required axltin s aces and is ioGatec� wit4�in a relativ� close pxoximiry to
parking structure, Th�is pr�perry is assumeQ to acc�unt or one pezcent of the parki,ng
requuements within the assessment district ben;e�t �rea. 'I'he assessm�nt for this exampPe
wi�l be $3,400. The annual assessmeni to l�e callected through property taxes wilt be
approximately $3'l0.
Z. Frope $ is an 18 000 s uace foot office buiic9ing vuith a zonin� ord'
requ�ceme t of 40 sDaCeg, The buil as on- � e r n ox s a�es (50 percent af
e required spaces), The buildin� parkirig deficiency of 20 spaces is assumec! to
represent 2.5 perceut of tbc parking deficiency within the �isuict. ihis propecty is
assumed to represeat two percent of the parkl�ag requiremer�ts of the District. The
assessxnent fdr this example will be $5�,20tD. ihe annual assessment to be callexced
through property taxes is approximacely $5,930.
3. Property � is sinnilar u+ propert except that ao parkAn� is
zotvn arainance pacxmo aencienc i u s aces wnicn �s assumed to rcpreseut flvr
reent within t�e Di�trict. 'i'his praperty is a o assu,�z�d to
repres�nt two percent.of the parking requirements of the Distr�ct. The assessment fUr
this example would be $1Q9�200. The annua.t assessm�nc to be collected through
property taxes is appmximately $11,100.
Fach property owner will have the opporcunity to pay off th�u assessment in cash. Bonds will
be 1sSued to pay all unpaid assessments, Property owners will be assess�d an aznount �nnualty
for the cezm of the bonds, sufficle� io pay principal and iait�ge,se on tHae bunds. An additional
amnunt may be colleeted to pay for operatioII and rataintet�ce costs of the pa�kin� struCture.
8ased on che city•s existing parking structuze, maintenance costs ar� a roximatel $200
space annually, This maintenance cost will ba o-set by par&ing revenues recelved.
p�pi,iQ�1`� I.� :
1�� V
� � _ �1� ���s1,
=na!i�Hplu��� �
�
��;,, kP .�;y11p`�h
,� li,rli',1�'j�illll
""�ii;;i„~
•
� �r l
ALAN TANDY, CITY MANAGER
NlARCH 22, 1994
FROM: GREGORY J. KLIMKO, FINANCE DIRECTOR �C
SUBJECT: SALES TAX UPDATE
The information regarding Sales Tax for the Quarter Ended, December
31, 1993 is very positive. The revised estimate is a 3.85�
increase for this fiscal year over last year. Our adopted budget
included a$24,750,000 estimate which is now revised to
$25,400,000. The 1992-93 Sales Tax was $24,458,571 down from
$26,466,506 in 1991-92.
krc
MGJK.15
ij==---` -__-- --_---_=-- --,�
il I� G�(zC��G�/��
� �� �
� , � . '� � ������ ��
I �e/��-J �
� I
� `_—_
_. .
f �V`� l�Ga��Q���e� ���9���
City af Bakersfield
General Fund
Sales Tax Analysis
1986/87 - 1992/93
Fiscal
Year July - Sept _ Oct - Dec Jan - Mar Apr - June
1987-88
Quarterly 5,250,914 5,076,688 5,556,392 4,826,267
Cumuiative 5,250,914 10,327,602 15,883,994 20,710,261
96 Of Tot2tl 25.35% 49.87% 76.70% 100.00%
1988-89
Quarterly 5,580,455 6,167,002 6,048,610 5,826,454
Cumulative 5,580,455 11,747,457 17,796,067 23,622,521
96 oi Total 23.62% 49.73% 75.34% 100.00%
1989-90
Quarterly 5,600,542 6,591,992 6,006,652 5,911,802
Cumulative 5,600,542 12,192,534 18,199,186 24,110,988
% af Total 23.23% 50.57% 75.48% 100.00%
1990-91
Quarterly 6,398,078 6,677,371 6,428,163 6,102,981
Cumulative 6,398,078 13,075,449 19,503,612 25,606,593
X of Tot�l 24.99% �1.06% 76.17% �00.00%
1991-92
Quanerly 6,733,130 6,889,525 6,558,221 6,285,630
Cumulative 6,733,130 13,622,655 20,180,876 26,466,506
% af Total 25.44% 51.47% 7625% 100.00%
1992-93
Quarterly 6,289,311 6,283,919 6,106,472 5,778,869
Cumulative 6,289,311 12,573,230 18,679,702 24,458,571
96 of Tota) 25.71 % 51.41 % 76.37% 100.00%
1993-94 Estimated
Quarterly 6,172,560 6,687,938 6,539,020 6,000,482
Cumulative 6,172,560 12,860,498 19,399,518 � 25,400,000
96 of Yotai 24.30% 50.63% 76.38% 100.00%
Sales tax for a month is received about the 20th of the following month (i.e, sales tax for Sept. is received in Oct.),
Exhibit B-1
Increase
305,595
1.50%
2,912.260
14.06%
488,467
2.07%
1,495,605
6.20%
859,913
3.36%
(2,007,935)
-7.59%
941,429
3.85%
�.. �
��,;
� �
i
: I
F� the
month of**
Ju�
July
August
September
October
November
December
.l�n�ry
Febrteary
Nlarch
April
nnay
Totals
City of Bakersfield
Sales Tax Revenues
1991-92, 1992-93 and 1993-94
�� L� I
� 3
�
�
.
,
1991-92 1992-93 1993-94
Mordhly Quarter�y Cumulative Mordhly Quarteriy Cumulative Monthly Quart�ly Cumulative
Advar�ce Residual To�al Advance Residual To�i Advar�ce Residusl Total
$ 2,327,100 S $ 2,327,100 $ 2,496,300 $ a 2.496,300 $ 2,239,100 S $ 2,239,100
1,762,900 880,230 (A) 4.970.230 1,866.400 60,211 4,422,911 1.683,200 567,060 4,489,380
1,762,900 6,733,130 1.866.400 6,289,311 1,683,200 6,172,560 �
1.997.900 8.731.030 2,488.500 8.777.811 2.244.200 8.416.760 I
t,812,500 1.266,625 11,810,155 1,984,000 (101,281) 10.660,530 1,828,600 786,538 11,031,898 �I
1,812,500 13,622,655 1,912,700 12,573230 1,828,600 12,860,498
i
2,4i 6,�0 16,039255 2.550,�0 15, f 23,430 2,438,100 f 5,298,598
1.612,700 916.221 18.568,176 1,624,100 365,872 17.113,402 1,513.7� 1,073,520 17,885,818
1,612,700 20,180,876 1,566,300 18,679,702 1,513.700 (� 19,399,518 �
2,150,�0 22,331,176 2,088,40U 20,768,102 2,018,�0 (E) 21,417,818
1.903.�0 359,830 24.594.306 1,679.300 331,869 22.779271
1,872,2()0 26,466,506 1,679.� 24,458.571
$ 23.043,600 $ 3.422.906 $ 26.466.506 $ 23.801.900 $ 656.671 $ 24.458.571 $ 18.990.700 S 2,427.118 $ 21.417.818
**Paid to the city the 15th — 20th of the sec:orxl morrth followi� the monih of sale.
(A) Received $261,364 less dus to over receipt in prior year.
(E� Estimate
� 3
STATE OF CALIFORNIA—RESOURCES AGENCY PETE WILSON, Governor
CALIFORNIA CONSERVATION CORPS
1530 GAPITOI AVENUE, SACRAMENTO, CA 95814 �-��'� •
(916) 445-8183 ` \ , .
California Conservation Corps
Sequoia Service District
1406 South Hillcrest Street
Porterville, CA 93257
(209) 782-2912
March 16, 1994
Mr. Allen Tandy
City Manager
City of Bakersfisld
1501 Truxton Avenue
Bakersfield, CA 93301
Dear Mr. Tandy:
G°3�C����%�(;�
--_ --
��i;',R � I i9Q.�
�O�f�T1 Cv�Q�qC�C�°� ���P�f�
The California Conservation Corps is very interested in assisting the City of Bakersfield
with the landscape work on Stockdale Highway. I saw an article in the newspaper that
states the city will landscape the patch of the road with coastal redwoods, liquid amber,
trees, shrubs, other plants, and an irrigation system. Our crews are familiar with this type
of work. I am sure you would find our work satisfying. I may also be able to save the
city money by doing the work at a cheaper price than a contractor may charge.
I am interested in meeting with you to discuss this further. You may call me at the
number below our address on this letter. Also, enclosed you will find a brochure with
information about the California Conservation Corps.
Sincerely,
Juan Salazar
Conservation Supervisor
JS/sbr
�/ V LI ULr-�l LI ��
��IL� C�C���
'�'he �alifornia �onservation �orps
was created in 1976 to protect and
restore �alifornia's natural resources by
employing �alifornia residents between
the ages of 1� and 23. �T+le give young
people the opportunity to learn while
working on public service conservation
projects. lProject sponsors are an essen-
tial component of the ���. It is
through the ���/sponsor partnership
that the opportunity is realized to
complete valuable public service
projects and promote youth develop-
ment.
po���oa� GGC ppop�f�e
'The ��� completes a wide
range of projects including:
Trail Building
Tree Planting
Fisheries & Wildlife Habitat Enhancement
Pazk Development
Campground Improvement
Wildlife Enclosures
Landscaping (Xeriscaping)
Erosion Control
Forest Improvement
Wildland Fire Prevention
Energy Conservation
Historic Restoration
Recycling
Wetland Restoration
Construction
Water Audits & Leak Detection
CAL FO' I � SER ATIC•� CO' P
��Q� I��� ���
� � � �QO�O��
��� ���
A��� crew averages 13 corps-
members and a civil service staff
supervisor. Each crew is an organized,
hard-working group of people trained
in the safe use of basic hand tools.
Staff at many districts are highly
skilled in areas ranging from energy
auditing to wetland restoration. 'The
CC� provides transportation to the
work site and basic hand tools.
�U V LI �LI� ��U � I � Ll
��Ll��
��� crews are legislatively
mandated to respond to emergen-
cies such as forest fires, earth-
quakes, floods, and oil spills.
�T+Ihen this occurs your project may
be postponed. 'The I'roject �oordi-
nator will work with you to re-
schedule your project work. .
If you are anticipating using
��� crews for emergency work,
contact your local center to receive
additional details.
C LIF I A I CO ' PS
Q�MO��
�G�O��C �
�✓OG�G�
��� crews can work almost
anywhere in the state. However,
project work that is more than one
hour traveling time from a���
center may require crews to be
temporarily housed on or near the
job site. It may be necessary for
you to make arrangements with
your local Project �oordinator to
provide food, housing and/or
support services.
V ll LI LIG=�1 LI Ll LI LI �
�pO��OQ
��o�a���
As the project sponsor, you will
be asked to provide:
1. 'Technical plans and speciiications
2. On-site technical supervision
3. All project materials and special-
ized tools
4. An on—site environmental aware-
ness presentation
5. Time for "work—learn" activities
during the wark day
j ��F• � � c�NSE��AT�o C�RPS
�Q�OG�C� �OQ
��� ��G��
The ��� is required to raise a
portion of its annual budget by
asking project sponsors to pay for
��� labor.lVot all projects require
payment for �C� labor. I�owever,
projects that include labor pay-
ments from the sponsor receive a
higher priority over projects with
no charge. 'The Project �oordinator
will provide the current ��� labor
rate and discuss your ability to pay
far the work.
G��� �� o �C�O�� Q
G�QO���-�� ���G��O�o
Doc�� �o�� p�o�c�c�� �c�c�� ��c� C�C�C� ��o�r�oaa
�'g'he project must have environmental or resource benefits.
0'�'he project must provide public benefit and/or public use.
�'�'he project must give corpsmembers an opportunity for on—the job
training in a variety of basic skills.
0� ��c� a����c� �o ��c� abodc� o� �c��o
��equest that the �roject �oordinator at the nearest CCC center
review the project.
��ive the completed sponsor request card (enclosed) to the Project
�oordinator.
l L F�? A� E` � TI �{+3 ` PS
��QC� ��c� p�o�c�c�� G�a� bc�c�� �c�eoc��c�c�o
�'I'he Project �oordinator will complete a project evaluation form.
� IVew project sponsors will enter into a cooperative agreement with the
CCC by signing a sponsor agreement form.
� I'our project will be scheduled as soon as CCC resources are available.
���
Project Coordinators try to schedule projects two to six months in
advance so maximum lead time is desirable. A phone call to the
Project Coordinator will give you an indication of crew availability.
�°�°°�
�A���� • � • O'E
�1 ��� � � � ��� �' ROJECTS ?
.�� ��
��i� � � � iJ � •
�ontact the Project �oordinator at the nearest ��� center. You may also
call the �lanning and �evelopment I�ivision at the ��� headquarters in
�acramento for questions or referrals.
�ALIF��I�A ��IVSEl��1A'g'I�IV �OI�PS
1530 �apitol Avenue
Sacramento �A 95�14
(916) 445-6330
or
(916) 445-0307
��L����l�\�1.1�J�� ���1�.J�L�����1J��1`J ����"�
�
�� PRIf�lTED Of�! RECYCLED P�,PER ss 2000s
�
; .-, ,�
�� �
���
�,''� _..�
�
MEMORANDUM
Jake Wager, Economic Development Director
FROM: Vince A. Zaragoza, Principal Planner `�
SUBJECT: STATUS OF CDBG FUNDED PROJECTS
�� v _�
��� �
March 18, 1994—�;��' " '
RECEIVED
MAR 2 3199d
CITY MANAGER'S OFFICE
This memo will serve as an update on the status of the following funded CDBG projects.
CAPTI'AL IMPROVEMENT PROJECTS
1.
�
Bakersfield Senior Center Phase III - Services Buildin� Proiect.
Acrivity has been amended from new construction to acquisition of three buildings
containing 4,713 square feet of classroom, office and storage space adjacent to the
Bakersfield Senior Center. The Bakersfield Senior Center will operate and own the
facility. Project Agreement approved by City Councii on 12/15/93. Appraisal is
underway. Acquisition to be completed by June of 1994. Acquisition budget is
approximately $110,000.
Union Avenue Median Landscape Proiect (PH. I/II)
--�nstallation of approximately 23,068 sq. ft. of landscaping in the median between 20th
Street and Brundage Lane. This project was delayed due to additional demolition
costs for removal of asphalt paving to accommodate the landscaping. A separate
agreement with Cal Trans for median asphalt removal was approvecl by the City
Council on April 14, 1993. This budget is approximately $80,000. Removal of
median asphalt was completed 11/23/93. The estimated cost to install the
landscaping/irrigation is approximately $75,000 of which the County of Kern has
agreed to contribute up to $25,000. The City-County agreement outlining the cost
sharing arrangement was approved by the City Council on November 10, of 1993.
Construction began late November, 1993. Completion of landscaping is estimated by
April, 1994.
� - fi 'i
•' �, '
3. Bakersfield Homeless Center Improvements
Bethany Services applied for State Federal Emergency Shelter Grant funds March 1,
1994 including $92,000 for the 500 sq.ft. addition to the family dorm area, energy
retroiit improvements and other rehab work on the facility. T'he announcement of
grant awards is expected within the next 30 days. CD staff will provide technical
assistance in its implementation.
4. Dolores Area St. Curb and Gutter Proiect
Installation of approximately 1,830 lineal feet of infill curb and gutter to serve a
portion of Census Tract 15. This project will improve the drainage of the
neighborhood. Design for the project is scheduled to be completed in April, 1994.
Estimated completion date is August of 1994. Construction budget is approximately
$68,852.
5. Dobruskv Drive Area Curb and Gutter Project
Installation of approximately 935 lineal feet of infill curb and gutter. This project will
alle�- iate localized drainage problems in the area. Design for the project azea is
scheduled to be completed in April, 1994. Estimated completion date is August 1994.
Construction budget is approximately $34,000.
6. "O" Street Curb and Gutter Proiect
Installation of approximately 100 lineal feet of infill curb and gutter between 38th and
40th Streets. This project will improve the drainage along "O" Street. Design for the
project is scheduled to be completed in April, 1994. Estimated completion date is
August of 1994. Construction budget is approximately $2500. .
7. Panama #10 Area Curb and Gutter and Sump Reconstruction (Phase I)
Expansion of a sump and design of approximately 6,120 lineal feet of curb and gutter
(no curb and gutter currently exists in this recently annexed neighborhood). Design is
underway. Completion of design is anricipated by May, 1994. Construction budget is
approximately $30,173.
2
>> ,
8. Panama #10 Sewer Proiect (Phase I)
Design only of about 4,200 lineal feet of sewer main and approximately 2,1001ineal
feet of sewer laterals for the Panama #10 area. Approximately 81 residences will be
served. Design is anticipated to be completed in May 1994. Design budget is
approximately $25,500. Construcrion funds for this project are anticipated in a later
funding year.
9. Ralston Cul-de-Sac
Design and construction of a cul-de-sac on Ralston Street at its intersection with
Lakeview Avenue (part of the City's Looking Good Neighborhood program for the
Lakeview area). The activity will benefit approximately 50 residences by creating a
more aesthetic and safer street. Design is scheduled to be completed in March of
1994 with construction completion by summer of 1994. Construction budget is
approximately $23,173.
10. Union Avenue Annexation #10 Street Li�htin� Proiect
Installation of approximately 30 street lights in Union Avenue #10 Annexation azea
(residential streets only). LAFCO annexation hearings are anticipated to take place by
May 1994. Union Avenue is the primary gateway to the low and moderate income
residential area to be annexed. Project implementation subject to approval of
annexation. Street light budget is approximately $30,100.
11. Union Avenue Street Li�htin� Proiect
Installation of approximately 14 street light poles in the street median to illuminate the
west side of Union Ave. from llth Street to Brundage Lane. Design will start after
the completion of the Union Avenue Median Landscaping project. Completion is
estimated by May 1994. Street light budget is approximately $33,979.
12. Architectural Barrier Rernoval Program - Parks
Installation of handicap (ADA) improvements in eleven City parks to provide greater
mobility to handicapped citizens. Implementation is completed. Budget was
approximately $33,173. ,
. `'• ;,
n�
13. Architectural Barrier Removal Pro�ram - Public Buildin�s
Installation of handicap (ADA) improvements in the Bakersfield Convention Center to
provide greater mobility to handicapped citizens who use the facility. Implementation
is underway with completion by June 1994. Budget is approximately $36,823.
NON-PROFIT PROJECTS
Community Development Staff is assisring various non-profit organizations in making certain
improvements to their facilities. Those projects are as follows:
1. Clinica Sierra Vista Medical Facility.
Acquisition assistance to acquire a 60,000 sq. ft. site for the construction of a 10,000
to 15,000 sq. ft. medical facility at 823 Lakeview Avenue. Acquisition was completed
in December (assistance was $100,000). Additional request for assistance for real
property medical equipment has been budgeted in the CDBG FY 93-94. Design is
underway and anticipated to be completed in the spring.
2. Livin� Connections, Inc. (LCI)
Acquisition of the property on Cedar Street is complete ($106,000) and rehabilitation
of the 6 unit board and care facility for the chronically mentally ill is underway.
Complerion of rehab is expected in about 60 days. Funding for this project is from
the HOME program.
NEIGHBORHOOD REVITALIZATION AND HOUSING
Graffiti Program
Since the first of the year, staff and volunteers have processed approximately 600
work orders. Hundreds of these cases of graffiti vandalism were removed by citizen
volunteers who were supplied with City paint. The graffiti Hotline is receiving
approximately 12 calls per work day. Staff is currently working with the Mayor's
Youth Council regarding their May 14th, TAG DAY. Staff has also been tazgeting
severely blighted areas for graffiri eradication through one-on-one neighbor contact.
The new Graffiti Program Software has been installed in the Graffiti Office and will
be operating to its full potential shortly. The Graffiti Reward/Information Hotline is
online and receiving information. One VISTA Volunteer has been hired and assigned
to assist with the Graffiti Program.
C!
a� �' � -�.�.
�.}
2. First Time Home Buyers Pro�ram
Thirty-four loans for mortgage assistance have been approved since July 1, 1993.
Four Lenders have been added to the participating pool increasing our tota.l to seven
lenders. Because lender participation has doubled within the past six months, there
has been a corollary increase in applicarions and subsequent approvals of city
assistance to iirst-time homebuyers.
3. Lakeview Nei�hborhood Improvement ProQram.
This program has been renamed the Looking Gaod Neighborhood tLGN) Pro�ram to
correspond to the expanded areas in which the program will be focused. In addition to
the ongoing efforts in the Lakeview area, the Task Force has branched out to the
Baker Street area. A new street will be identified in the coming month with
appropriate support activiries to follow. The Lakeview LGN project has been
expanded to include East 9th and lOth streets. This brings the program north to the
boundaries of the public housing recently rehabbed by the Housing Authority. Street
meerings and neighborhood clean-ups are scheduled for the months of April and May
for both areas. .
4. Vista Volunteer Pro�ram
The renewal application has been approved by Action for 11 VISTA "slots".
Recruitrnent and interviews resulted in four new volunteers who in April will join the
six VISTAs currently in the program. We have submitted an application for the
"Summer of Safety" program to utilize 35 summer VISTAs in various programs for
two months. We anricipate a response by the end of month,
5. Mulri-family and Single Rehabilitation Projects
An award of $140,000 was made for a multi-family rehabilitation project on 1500 -
1512 Gorrill Street. The project consists of 16 units. Construction is 95% complete.
The $60,000 rehab at 1304 Monterey (6 units) was completed in February, 1994. It is
anticipated that 32 additional apartment units will be under construction by May 1994.
The cost is estimated at $178,000 and nine are under construction.
Ta date approximately 10 single family rehab projects have been completed in various
city neighborhoods. Four rehab projects will begin in April, 1994. Tota1 funds
`
v,:,_'i:�
,., P - ��
:�:..
obligated to date is $282,850 and another $100,000 will be set aside for pending
projects.
6. Home Accessibilitv Pro�
Approximately 34 home access grants have been approved for persons with home
accessibility problems. Approximately 20 additional applications await approval for
work to be performed.
7. URM Incentive Pro�ram
Three workshops have been held for owners of unreinforced masonry (URM)
buildings. The workshops, mandatory requirement for participation in the incenrive
program, outlined the incentive program, compliance with seismic,safety standards,
and demolition waste management. The program is being implemented by this
department and funded with approximately $270,000 of CDBG funds from three FY94
CDBG acitivities. Of the approximately 175 properties designated URM, we have
received 67 applications. Of the 67 received, only 50 have completed the mandatory
seminar. We are awaiting further information from interested applicants and a future
workshop will be scheduled for URM owners who could not attend the previous
workshops.
8. Business Loan Pro� am
Approximately $270,000 for economic development activities has been set aside. A
brochure outlining financial assistance to businesses who create jobs for low and
moderate income persons has been developed for promoting this program.
xc: George Gonzales, CD Coordinator
lm:v l 1/GC8/updau3.v l l
�
. �i
�:
�
i
�: 'O ':��__'_ ._-�
�� ,
•
B A K E R S F 1 E L D
PUBLIC WORKS DEPARTMENT
MEMORANDUM
RECEIVED
M�� 2 �
CITY MANAGER'S C?FFlCE
TO: ALAN TANDY, CITY MANAGER
FROM: FRED L. KLOEPPER, ACTING PUBLIC WORKS DIRECTOR ��fCT
DATE: MARCH 17, 1994
SUBJECT: CITY COUNCIL REFERRAL RECORD #12990
Railroad fencing on California Avenue (Ward 2)
Attached is a copy of the Street Division's
investigation report relating to the above
subject matter.
.mro
Attach.
REF12990
�
�
\\`1,�1''�1 \ �IJ.
� -'� �.{j`_
;�- - -=
; � w_
\� _,,� � �INlluw, • �
Q�
_�. ly � `��`
.
-� � ., �•��"'
�-„� ';,a���
MEMORANDUM
`,-¢{! .ii.'L.��. ��j �-,�"� t ,VI i:�'� 'r
' `4'.- .1"1+! � ' .
r„�:� R 1 � 1�4�
���ul�:.:'LR!(C L�^u.rTSr,Li��
. ._i4 �
March 17, 1994
T0: Fred L. Kloepper, Actinq Public Works Director
FROM: Luis Peralez, Assistant Street Suverintendent
SUBJECT: Council Referral #12990 Railroad Fence - Ward 2
3/17/94 - I contacted Joe Mejia, Roadmaster for Santa Fe
Railroad Company regarding the fence located on
California Avenue.
Holes in the fence wi11 be repaired and work will be
completed Friday, March 25, 1994.
--...�.��....;
sii ;��'
�� � �
•
� ' ��"` � .�'� � �;� ]�r�'•
. � � � � ��
. CITY--COl1NCIL'-RE-FERRAL—�____-:_:_ ___ _---.---.�.�.s_.. __ � I
- _ FEB 1.:� 1994
MEETING OF: 02/09/94 : PUBLIC WORftS CEi'ARTPVIF(yi
REFERRED TO: PUBLIC WORKS E SCHULZ �-
ITEM: RECORD# 12990
Railroad fencing on C;alifornia Ayenue. (�DeMond)
ACTION TAKEN BY COUNCIL:
DEMOND REQUESTED STAFF TRY TO RESOLVE THE ISSUE
OF HOLES IN THE RAILROAD FENCING ON CALIFORNIA
AVENUE WITH THE PARTY RESPONSIBLE: '
BACKUP MATERIAL ATTACHED: NO
DATE FORWARDED BY CITY CLERK: 02/11/94 I
a
� �- ;=.
��
�;
��1%,, �
,_ ,�
T0:
FROM:
DATE:
SUBJECT:
M E M O R A N D U M
"WE CARE"
Alan Tandy, City Manager
M. R. Kelly, Acting Fire Chief
March 24, 1994
Defibrillator Program
.� .
�. -.• _��
------------------------------------------------------------------
On March 11, 1994 at 1:30 a.m., the Bakersfield Fire Department
responded to a report of a full arrest medical aid call at 4916
Scorpio. This is the residence of Mr. Maurice Higgins, age 65.
As you will notice from the attached fire incident report, upon our
arrival Mr. Higgins was not breathing and did not have a pulse.
The defibrillator unit carried on Engine 7 was attached to Mr.
Higgins. After assessing Mr. Higgins, the unit shocked him one
time. Fire personnel began CPR after the shock was delivered. Mr.
Higgins began to breathe sporadically. The patient was then
transferred by ambulance to Mercy Hospital. I have checked with
Kern County Emergency Medical Services and have been told Mr.
Higgins was released from the hospital on March 20th. Dr. Barnes
is the Medical Director of Kern County Emergency Medical Services.
He considers this the first save from the Defibrillator Program.
A critical factor in the success of this emergency call is the fact
that Mrs . Higgins was administering CPR to her husband upon the
arrival of Fire personnel.
As of this date a total of 96 shocks have been delivered by the
Bakersfield City and Kern County Fire Department personnel involved
in the Defibrillator Program. Our records indicate the first shock
was delivered on November 15, 1991.
A report from Max Burdick of the Kern County Emergency Medical
Services will be available in the near future.
Il�
r
�� - `
BAKERSFIELD FIRE DEPARTMENT
FIRE INCIDENT REPORT
FDID: 15005 Incident No: 94-003550-000
Date: 03/11/94 Multi-Agency:
Dispatch: 0125 Arrival: 0129 End: 0143 Days: 0 Response: 0 04
First Co: E7 District: 12303 Temperature: 000 (F)
Situation(s): 32 EMERGENCY MEDICAL CALL
Aid: 8 ' NO FIRE SERVICE ASSISTANCE RECEIVED OR PROVIDED
Alarm Method: 7 TELEPHONE TIE-LINE TO FIRE DEPARTMENT
Weather: 1 CLEAR.
Property Mangmnt: 1 PRIVATE TAX-PAYING PROPERTY
Address/Location: 4916 SCORPIO DR
Room/Apartment: Zip: 93309
City/State: ,
Hazard Zone: 5 Census Tract: 000000
Personnel Paid: 0003 Volunteer: 0000
Apparatus Engine: 001 Truck: 00 Medical: 00 Other: 00
General Use: 41 ONE OR TWO FAMILY RESIDENTIAL USE
Specific Use: 411 ONE-FAMILY DWELLING: YEAR-ROUND USE
Bldg Occupancy: R1 HOTEL, APARTMENT HOUSE FOR MORE THAN 10
Struct. Type: 1 BUILDING WITH ONE SPECIFIC PROPERTY USE
Struct. Status: 2 IN USE WITH FURNISHINGS IN PLACE, ROUTINELY U
Occupied?: 1 YES
- - - - - - - - - - - P E O P L E I N V 0 L V E D - - - - - - - - - -
Code: PT PATIENT
Name: HIGGINS, MAURICE Phone: ( ) 832-8544
Address: SAME
City: ST: Zip:
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
_ _ _ _ _ _ _ _ _ _ _ = C A 5 U A L T I E S = _ _ _ _ _ _ _ _ _ _ _
Fire Service Casualties: ' .
Injuries: 000 Fatalities: 000
Non Fire Se�vice Casualties:
Injuries: 000 Fatalities: 000
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
.
I�
BAKERSFIELD FIRE DEPARTMENT
Incident Number: 94-003550-000
Incident Date: 03/11/94
�
Alarm Time: 0125
_ _ _ _ _ _ _ _ _ _ _ _ _ _ COMPLETE FOR E . M . S = _ _ _ _ _ _ _ _ _ _ _ _
#Patients: 001
Maximum Level of Care Capable of Being Provided at Scene
Fire: 5 BASIC EMERGENCY MEDICAL TECHNICIAN
Other: 6 ADVANCED LIFE SUPPORT
Maximum Level of Care Provided at the Scene
Fire: 5 BASIC EMERGENCY MEDICAL TECHNICIAN
Other: 6 ADVANCED LIFE SUPPORT
Situation(s): 72 CARDIAC RELATED
No. of Patients Transported by
Fire: 000 Non-Fire.Amb: 001 Other: 000
INCIDENT REPORT OFFICER IDENTIFICATION
Member making report: BLAIR, K. W.
Officer in charge: BLAIR, K. W.
Shift: C
Report Dates 03/11/94
Member Signature:
Officer in charge:
�'i
'I�
Coroner: 000
I
.�
` � .
BAKERSFIELD FIRE DEPARTMENT INCIDENT REPORT NARRATIVE
Page 1 Date: 03/11/94 Incident: 94-003550-000
Upon arrival found 65yr old male lying on bedroom floor not
breathing and pulseless. His wife was directed through CPR by ECC. We
placed defibb unit on patient. It assessed the patient and delivered.a
shock of 200J. We began CPR after that. The unit assessed the patient
a few more times after that without giving a shock. The patient
started infrequent spontenous breathes prior to ambulance arrival
(approx. 4min. after us). Paramedics arrived, we assisted in loading
patient and hooking up their heart monitor. Our firefighter went to
Mercy Hospital with the ambulance. We reassured wife and got her to
call her daughter to give her ride to the hospital. No further action
required.
� .. .. ;
. '�i
BAKERSFIELD FIRE DEPARTMENT
Page 1
03/25/94
STAFF DETAIL REPORT
��
� INCIDENT #: 94-003550-000
�# Staff Act Name PTS HRS $$
�
1 0008 O1 BLAIR, K. W. 0.00 0.0 0.00
�` 2 0110 O1 MOFFATT, T. 5. 0.00 0.0 0.00
ii
3 0209 O1 CRAWFORD, C. C. 0.00 0.0 0.00
#1
r�
� o :�
�- ' — -..
CDBG AND HOME APPLICATIONS
TIMELINES
FY 94-95
FAST-TRACK
SCHEDULE
DATE ACTION COMMENTS
4/6 Oral Report to Council, Council Request pernussion to publish
acrion - 10 days for public review
4/21 Submit both applications to Request approval,
Council authorizarion to sign
4/25 Publish Fina1 Notice CDBG only
4/30 Submit CDBG and HOME
applications to HUD.
WORST CASE SCHEDULE
DATE ACTION COMMENTS
4/6 Ora1 Report to Council
4/21 Submit both applications to Request pernussion to publish
Council - 10 days for public review
5/4 Request Council approval of If not approved - one more
applicarions chance.
5/18 Final opportunity for Council
approval
5/25 Publish Fina1 Notice CDBG only
5/31 Submit CDBG and HOME Final due date.
applicarions to HiJD.
time2/HOMF�jf
� Aliocations
L�
� FY 93-94 FY 9495
CDBG (Inciudes Program Income) $2,525,000 $3,000,000
HOME $534,000 $891,000
Total $3,059,000 ' $3,891,000 '
Housing Programs
I Sources
i',�, FY 93-94 FY 9495
i ii
CDBG (Carryover) $468,457 $97,719 "
HOME (Carryover) $472,304 $288,493 "
CDBG $438,393 $405,000
ii HOME $480,600 $794,900
Total $1,859,754 $1,586�112
Uses
Programs FY 93-94 FY 9495
�;
Single Family Rehabilitation $751,304 $435,000
'I
Multi Family Rehabilitation $636,153 $493,393 4R
�I
1st Time Home Buyers $176,119 $232,719"
Home Accessibility Grants $59,537 $50,000
Paint Program $7,500 $10,000
i New Construction $0 $151,250
Housing Development Assistance $27,541 $0
Community Housing Oevelopmt Org. (CHDO) $201,600 $213,750 "
Total � $1,859,754 $1,586,112
Estimated expenditures to 06/30/94 $1,473,542
Estimated Balance @ 06/30/94 $386,212'*
" Please note this item does not relect carryover amounts
II;
���
I'
k '.
Community Development
Operating Budget FY 9495
Admintstrat(on - SP 651
Description
Personnel Cost
{D. Bates (100%), G. Gonzales (95%)}
{V. Zaragoza (50%�, L. Moton (50%)}
{M. Randail (35%), J. Wager (20%)}
{ Temporary, Overt(me }
Office Supplies
Printtng
Duplicatlon
Legal Advertising
Telephone
Equipment Maintenance
Outside Services
Consuiting Services
Reimbursable Services
Cost Ailocations
Insurance Ailocations
Audit Fees
Vehicle Rental
Communication Equtp. - Rental
Minor Equipment
Computer Equipment
Total
$241,375
$3,000
$5,OOQ
$5,000
$5,500
$8,700
$1,800
$8,161
$2o,Q00
$5,000
$101,950
$975
$2,045
$4,992
$2,300
$1,580
$18,OQQ
$435,378
��
�
Community Development Program
Status of Projects FY 93-94
February 25,1995 M. Randail
Revised
.:......:::::::::.::.:.::.::::.:::...::::::.:..::..::..................... ,.:.::.:
• 03/25/94
........... ..:::::::.......::::::::. ... v,.,.... . ....:.,:::::: ::...:..,.
::: ..:... . :...:....:: ..... ...... :. .:......... � ..,:::::::>:.,:;..::��.::::....
..:::<.:::.;:�;::::.::. ,.;,.,:..::......
.:::::; �. : :: .;:.:.: :.:,...;::.:;;::.::;:..;;;; ..:....:..:..:..:.:.:..:::::.;:..::.;�<.>;::;:.:.;:..�.::::.:::::::::::::..::::..,
............. i�i::4Y: . «.•rwi'�.;� :. ........
�.y�, . t........n....n ........... ...�.
... �., . . .... .......r:� ::::................n...... :n...... . • .
... . .......................... ......: ..:.... ...f....� ...... .f.. . . ..5..
... .. ......................... ......�.. f... �:::..f,.:.... �:::.,............... ......::.. ..•:::.::.;::.:.>:.:.;:�::•..�>+•..,:�
. .•.. . . .................... ....f.... ....... ......... . .. . .......... . .. �:.....:..: ....:..:..:..,�...
.....
: .. . .... .. ............................ ... ..... .r.... ... ..,... ... .�... .......,.............. ..,. . .. .. .. ... ..... ::::::. . ,.�::�>:: :.: :...
.. .. .. . . ..::::::. ....� .... .. .... .. .......
.. . . . . . . . ......... .. ..:... ....... ... . ........ ..... . .. ...:.: ..:. ....
���.r�........: :: :.:.>•::.:'.x::.r::.�.:: ::•.� r::•::}: �•: :•.�.:
.. . . ...... ................. . . ......... . .. ..... .r... :... ;..: ..... f... .. �: . .>:ax:�::�•.:�`.::.:;:.;;.::::::.::::>:•:::..::::•:;t;:.;;.>•::.:�:: :.:. :.:.:'.::a>:::.:�:::::.::�:.::.:.�:::::::
:� .
... f..... � n:..f..::: �:: • ....t ..
�: ��..
�R:•::: :, .
. ... . . .. � . � . . . ., � . _ .:•:.::: :•:::..:•::::::::::::.::•>••::::%•`•::':.::, � �.. � :•. .. ....:..... ..7{ti�V.�:•:;:•.::•.c>':s•':,.::: • :�•:.� . .- ::.:..•:..•:. •.:::: :..,:.:: �..•
...... ........... . . . . .. .................... . . . . ..... ....�iX.:R�� .. .:.:.....:::.. . . . . .��s::;�:�;��:;;:•.::;:•;:�::;p:•::::.�>._::<.r:•<:;•::•:::.:•:::::..::s::»:::i::::�>::;•i>:::;:;;>::;:�:;2:;:;::;+::::•:;�:::�:•:
......... ...... . . ............. .:......... .. . .... . .... .. .. . . ...., . .. . ... ................. ... . . . . ... • >.
OPERATING BUDGET
FY 92-93 Salary Savings (HOME FUNDS)
FY 91-92 Le�keview NeighbOrttood Revit.
FY 92-93 Salary Savings
FY 92-93 Commerclal Facade Program
FY 92-93 Cost Allocattons
FY 92-93 Kem County Alcohol CeMer
FY 92-93 First Time Home Buyers
FY 92-93 Ciinica Sierra Vista
FY 92-93 GraNtti Removal Program
FY 92-93 Housing Developmertt Assistance
FY 92-93 Neighborhood improvemt. Program
FY 92-93 Friendship House
FY 92-93 Various Curb Cuts
CAPITAL IMPROVEMENTS BUDGET
FY 91-92 Tulare St. Curb and Gutter
FY 91-92 Priscilia St. Curb and Gutter
FY 91-92 Central Park Concrete
FY 91-92 Jefferson Park Restroom
FY 91-92 MLK Community Center Additlon
FY 92-93 Architecturat Barrler Removal Program
FY 92-93 Bakersfield Sr. Center Project
FY 92-93 Union Ave. Street Improvemts.
FY 92-93 Unton Ave. # 10 Lighting
FY 92-93 Union Ave. Landscape
FY 92-93 0 St. Curb and Gutter
FY 92-93 Panama # 10 Sewer ProJect
Total Funds Available for Reprogramming
$1,862
$a�,2s2
$4,722
$95
$16,038
$11,500
$76,229
$73,342
$7,270
$27,541
$60,671
$15,676
$30,000
$1,734
$7�483
$1,508
$18,515
$11,607
$79,190
$115,928
$47,018
$36,000
$52,230
$3,000
$26,357
�102,964
NO
Yes
Yes
Yes
Yes
No
NO
No
No
No
No
NO
NO
Yes
Yes
Yes
Yes
Yes
No
No
No
No
No
NO
NO
Only avallable for Home Program
Agreement Is being rev�wed by Ariorney's Offioe
On-gotng program
AwaRing acquisitlon ot f(nal parcel
On-going program
Agreement is being revlevved by staft
Annual Program
Change Order No. t pendtng
Funds are reserved for City's ADA Improvements
Funds are reserved for City's ADA Improvements
Awaiting Appraisal and Phase 1 Evironmental
CurreMty under oonstructton
Awaiting Annexatlon into the City
Currentiy under oonstruction
Per Public Works design to be completed Feb. 94
Per PubUc Works design to be oompieted March 94
x�
�
�, _.:
Communtty Development Program
Proposed Use of Re-Programmed Funds
Funds Available
Public Service
Weili Institute - Small Business Development Center
Technical Assistance to micro-businesses
CIP Projects
Inyo Street Curb & Gutter
Census Tract 14, Ward 1
Jefferson Park Basketball Court Replacement
Ward 2
Oleander-Sunset Area Curb & Gutter
Part C, Ward 1
reprog.doc/ty94-95 budgeU�t
$102,964
$16,445
$22,600
8,355
55,564
Total Proposed Projects $102,964
k� II __
-, ,.
t �� _ _ ._ . �: ..
,�' I , ,
� �
, I,I
,I��
Entidement
Program Income
CDBG FY 94-95
Preliminary Budget
$2,512,000
488,000
Total $3,000,�0
I. Administration - 651
0 CD Admin Delivery Cost
0 Consultant (HUD Consolidation Plan)
0 Admin Cost Allocation (other depts.)
IL Housin� - 652
0 Housing Programs
Single Family Rehab Loans
Multi-family Rehab Loans
1 st Time Homebuyers Assistance
Home Access
Paint Program
0 CD Housing Delivery Cost
III. Nei�hborhood Revitalization - Part 1- 653
0 Demolition Acdvities
0 Code Enforcement (Staff only)
0 Non-Profit Assistance
Clinica Sierra Vista
Society for Crippled Children
Part 2 (Public Services)* - 653
0 Fair Housing Program*
0 Graffiti* '
0 Looking Good Neighborhood (LGI�*
O CD Staff for Graffiri & LGN*
0 C.O.P.S.*
0 CD N.R. Delivery Cost
* See Section N, page 2
cdbgbud9.docnJ4-95 budget2/jf/3-1A-94
$313,428
20,000
101,950
Total $435,378
(14.5%)
$135,000
135,000
75,000
50,000
10,000
Sub Total $405,000
$159,468
Total $564,468
(18.8%)
� 111
111
11 111
', � 111
77,000
70,000
25,000
53,700
216 000
Sub Total $646,700
$ I49,193
Total $795,$93
(26.5°l0)
il
� ,,;, _ . ��;. . ;_
. , -
IV. Economic Development Assistance - 672
0 Incentive Area Economic Assistance
0 Commercial Rehab (URM) Assistance
0 Economic Incendve Area*
O ED Delivery Cost Allocarion
270,000
60,000
8,300
15 000
Total $353,30Q
(11.8%)
* Public Services from both 653 and 672 total $450,000
(max Public Service eligible under HUD is IS% of allotment -$450,000)
V. Capital Improvement - 765
O CIPs
Panama #10 Sewer Line Improvement Phase I- Ward 7
Census Tract 20 Street Light Improvement Program -
Ward 1
Improvements to 515 Truxtun
Oleander-Sunset Curb & Gutter Project,
Part A- Ward 2
Oleander-Sunset Curb & Gutter Project,
Part B- Ward 2
Oleander-Sunset Curb & Gutter Project,
Part C- Ward 2
**
VI
0 ADA Improvements
This amount includes Design, and non-CD Costs.
CDBG Debt Service - 894
0 Section 108 Repayment
cdbgbud9.doc/94-95 budgetufl3-24-44
2
Sub Total
Total
$150,000
53,500
25,300
1 ill
29,500
91,b00
$451,300**
$ 82,500
$533,800
(17.8%)
$317,161
Total $317,161
(10.6%)
-------------------------
-------------------------
Grand Total $3,000,000
, _�
, �'_ - �
✓' b,4 .i.�-�? . � �
�t}��i%UIU �
\
�� �
�pA'�f�
,. ..
TO:
FROM:
DATE:
SUBJECT:
M E M O R A N D U M
"WE CARE"
Alan Tandy, City Manager
M. R. Kelly, Acting Fire
March 18, 1994
Communications
/
Chief �''
.,
... �.,. �
------------------------------------------------------------------
The following measures have either been instituted or are ongoing
or are in the process of being instituted to promote better
communications within the department.
1. Weekly newsletter that is circulated to all personnel.
2. Committee to study proposed educational requirements for
promotional advancement. This committee is comprised of
interested people from all ranks of the department as well as
Union representatives.
3. Apparatus Committee to study future recommendations for
apparatus specifications and purchase. This committee is
comprised of interested people from all ranks of the
department as well as Union representatives.
4. Monthly Pyromedia newsletter. This letter has been in
existence for quite some time and is published by the Womans'
Auxiliary. I understand that there seems to be somewhat of a
problem as far as the ability to continue this publication.
I will look into it right away and see if we can resolve the
problems. �
5.
6.
r�
:�
We will begin to distribute minutes from staff ineetings,
battalion chief ineetings, and captains' meetings to all
personnel.
An effort is being made to keep all personnel up-tc-date about
ongoing significant issues in the Fire Department such as the
Fire Fund issue and the budget process.
The staff Chief Officers have been encouraged to initiate
visits to all fire stations on a regular basis in order to
share information and solicit feedback.
All Suppression battalion chiefs will visit each station they
are responsible for at least once during each four shift duty
cycle. These meetings will be scheduled in advance and allow
;
�t. ' ��i
,., '�,. N
Communications
Page 2
all personnel to ask questions and provide input concerning
ongoing activities. The information gathered from these
battalion chief ineetings will be used in many different areas.
This information should be very useful for weekly or monthly
newsletters for identifying concerns in the department that
have not yet surfaced and feedback to be used for identifying
areas of concern for setting priorities.
For quite some time we have had Departmental Relations
Committee (DRC) meetings. These meetings are scheduled once
a month and give interested employees the opportunity to
discuss a variety of issues within the department which are
either ongoing or new. To understand in the format of these
meetings that it is unlikely a resolution to the concern or
question will be identified in a single meeting, but the issue
will be researched and a decision or answer will be forwarded
to the appropriate person or the entire department which
is appreciated. These meetings have been noticed recently but
the level of interest has been very low. I intend to
encourage participation throughout all levels of the
department in this meeting process so this informal forum will
continue.