HomeMy WebLinkAbout12/30/94�_ ,�. �_. , '' �
B A K E R S F I E L D
MEMORANDUM
T0: HONORABLE MAYOR AND CITY COUNCIL
FROM: ALAN TANDY, CITY MANAGER
SUBJECT: GENERAL INFORMATION
December 30, 1994
1. Good News! The second quarter sales tax distribution is up. It is at
about the same 59'o increase above last year's level, which the first quarter
was. That exceeds, considerably, our budgetary estimates.
2. There is always bad news to offset good news. The information from a
second engineering analysis we had done relative to the Convention Center
HUAC system is that it will be a very expensive project. We had initially
budgeted $500,000 for it. It appears now that the true cost will range
from $2 -$3 million. We are continuing to refine engineering work to see
if this could be minimized. We are in a positive position relative to one-
time capital improvements, as a result of a PERS rebate, and several items
which resulted in monies being accrued over and above budget estimates.
However, this is a very substantial expense and we will scrutinize it
before bringing forward a detailed proposal.
3. Questions were raised by Councilmembers relative to the issue of when we
redistrict boundaries, or change ward boundaries. A memo addressing some
of those questions is enclosed. Most of that relates to how it was done
last time. With respect to a question raised on whether a ward must have
all of its parts contiguous to one another, the answer seems to be that
this is a factor you should consider, as described in the Charter, but is
not an exclusive condition. A legal opinion done in 1991 is enclosed.
4. Our Water people tell me that the local rains have not been nearly as
positive in the South Sierra Water Shed, which is what forms the basis of
our water supply.
5. We got lucky and "landed" a business for our airpark which operates seven
airplanes in the pipeline inspection field. It is a relocation from a
coastal operation and from Meadows Field. We have them, at �east
temporarily, and are working on long-term arrangements.
6. A status report on the Coffee Road Bridge project is enclosed. Now that we
`� have overcome the first hurdle, it articuiates where we are on the next set
of steps. Also, on this same subject, enclosed is a copy of a thank you
letter I sent to Texaco for their assistance with the State Water Quality
Control Board.
7. I have attempted to call ali of you this week with respect to the major
industrial prospect for which we are submitting a proposal. We have been
gi�en an extension until Tuesday to submii. A draft copy of the proposal
�' • ---'-
HONORABLE MAYOR AND CITY COUNCIL
December 30, 1994
Page -2-
is enclosed. It is, of course, subject to future Council consideration and
approval. We are trying to be aggressive to land a major employer for the
Incentive Area without overdoing it or exposing you to public criticism.
It is 1,000 employees, we are told.
8. I have also tried to contact you, this week, on the status of the problem
we have encountered relative to the refinanced debt. An underwriter error
threatened our good name in the bond market with only a couple of days to
develop a plan and resolve the dispute. A copy of the letter sent to the
bond underwriter is enclosed. The disposition of that, as of noon on
Friday, is the underwriter refused to cover their error. We are protecting
our bond rating by advancing payment. We will ask you for authority to sue
at the next meeting.
9. We received the enclosed notice from the Governor's Office regarding a
seminar in Sacramento in March. This Executive Academy is designed to give
insight into the Wilson Administration, and allow you to develop
relationships with key people at the state level. They are asking for the
number of people who may be interested in attending this seminar.
10. An Executive Summary of a Wastewater Master Plan Milestone Report is
enclosed.
11. Enclosed is a detailed memo from the Police Chief on the COPS AHEAD Program
Grant. This will be on your next agenda for approval.
12. Cox Cable has informed us of an increase in their rates. A letter from
them on this subject is enclosed.
13. A nice letter from a local electrical firm commending our Building
Department is enclosed.
14. Enclosed, from Public Works, is a status report on Capital Improvement
Projects for Fiscal Year 1994-95.
15. Bakersfield Oiler Hockey Fans - best news of the week! We are actively
working on booking four more dates for this season. It may require moving
other events around, but we are trying hard!
This reminds me that, with the new Holiday Inn ballroom, our booking
policies need to be changed to have the Convention Center doing
conventions, theater and sports as top priority - historic dinners that the
private sector (Red Lion or Holiday Inn) can handle need to go there, with
us only doing open date, late bookings for those kinds of things. We are
preparing a new policy for your consideration.
AT.alb
Enclosures
cc: Department Heads
Carol Williams .
Trudy Slater
r.
I''"����i�i/' � iii...��
, IJ."�o
��i���,�:; � :�,.. ��1 =
,���� ��=
;,. ,,.:
� _ �� -:
_,�„' �N��uu,,,�
' `�. _ ,;
_ _�,1 ` �`,\�;
��=-:�-;.,���������
TO:
IOIIEMOR/1NDUM
December 28, 1994
ALAN TANDY, CITY MANAGER
FROM: PAMELA McCARTHY, ASSISTANT
SUBJECT: 1991 WARD BOUNDARY CHANGES
- ---=-�--�
� ���-ii����� ��
-U 1�'`,� � � v � �
� -- - - - ___ - ;
� DEC 2 � �
j; �..�i �t; r �
t.__ �
ITY CLER�
In response to your request, this date, regarding the formula and/or
criteria used in establishing the new Ward �oundary lines in June, 1991, I found the
following information:
2/ 13 / 91 - Council Meeting
Motion approved. Council to meet as a whole to deliberate the
reapportionment issue in public.
4/ 10 / 91 - Council Workshop
1. Presentation by Jack Hardisty introducing staff and
demonstration of new computer equipment. A copy of a
statement, (assumed to be that of Mr. Hardisty) in Clerk's file
indicates new populations totals would be used and "we are
shooting for 24,988 people in each ward or about 14.3$ each."
( Attached )
2.
�
Council discussed the recommendations given by staff in
Planning Director Hardisty's memorandum dated April 5, 1991.
( Attached )
Item No . 1. Motion approved . Precinct in which Councilmembers
reside should remain in their respective Wards .
4. Item No. 2. Motion approved. Ward boundary adjustments will
be based upon whole precincts, entirely within a Ward pursuant
to City Charter an� County will work with City where precinct
lines need to be adjusted.
5. Item No. 3. Motion approved, as follows:
"Populations of each ward
should be as equal as possible,
though variati�ns may occur. due
to geographic, topographic or
population diiference between
�ir�cincts . Neighborhoozl
cohesiveness may also be a
iac tor in some instances . r
�
�
MEMO TO ALAN TANDY
RE: 1991 Ward Boundary Changes
December 28 , 1994
Page -2-
6. Item No. 4. Motion approved. Wards may have noncontiguous
precincts, with intent to be as compact as possible.
7. Item No. 5. Motion approved. Boundary adjustments should
affect as few people as possible, gerrymandering for political
purposes should be mixiimized, and incorporating the concept
that communities of interest be kept together whenever possible .
8. Item No. 6. Motion approved. All Councilmembers should
participate in the reapportionment effort.
9. Motion approved. Setting hearing date for April 24, 1991.
4/ 24 / 91 - Council Meeting
Public hearing was held. Preliminary boundary lines were drawn and
ordinance to be brought back and given First Reading on May 8, 1991.
5/ 8/ 91 - Council Meeting
Motion Approved . To eliminate ( emphasis added ) the criteria adopted
at the last Council meeting regarding incumbency.
5/ 22 / 91 - Council Meeting
Ordinance given First Reading, with changes .
6/ 5/ 91 - Council Meeting
Ordinance No. 3370 regarding Ward Boundaries was adopted.
Also, the Clerk's Ward Reapportionment file contains all draft Ethnic
Population by Ward Reapportionment maps, charts and precinct information.
I hope this answers your question. Please let me know if you need
additional information, or want copies of the minutes on the above actions.
:pam
Attachment ( 2 )
cc: Gail Waiters, Assistant City Manager
Carol Williams, City Clerk
TANI7Y\1991WRD . MEM
�
�
Honorabl� Mayor and City Council
This evening I�aould like to take about ten minutes to intro-
duce you to the starz and �quipment available to assist you in
ward reapportionment, give you a quick damonstration of their
capability and thzn discuss the issues and policies which you
want to use in your reapportionment.
Staff working on this project are Bruc� D�eter, Civil
Engineer III of Public Works, Dave Dow, Associat� Planner and
�im Eggert, Principal Planner. The computer equipment we will be
using is comprised of HARDWARE: Compac 386-33 Memory �'�B RAM/320
MB Hard Drive; Mitsubishi 19" Color Monitor; CalComp Digitizer.
SOFTWARE: Generation 5(GIS Interface); Oracle (Attribute Data
Tables); Autocad (Graphics). PROJECTOR: In Focus Systems 480 cx
PC Viewer; BACKUP: Laptop: Toshiba 3200 20 MB Hard drive with
a lotus spread sh2et. It was iunded this year to evaluate the
usefulness of a geographic information system (G.I.S.). This is
our first opportunity to apply it to an actual city-wide project
and demonstrate it to the City Council. Even though a complete
GIS is several years away this program is easily adapted to solve
problems like this. As a back-up we will also use a Lotus �pread
sheet in a separate lap top computer. We will also supply you
with additional paper :naps for your personal use and any other
support within our ability to provid�.
Without this equipment it used to take two planners seven
weeks working full time to put the data together and another two
weeks for a drafter to prepare the map. Even with the problems
we had sorting out the census information this team working
alternately on the computer compiled the data in three weeks and
printed the map in three hours. At this point we are able to
restructure all the wards with some discussion in about one hour.
As you can see we are able to focus on all or any part of the
city as we work on it. The changes are indicated by bac�cground
color and the tabulation in the legend is automatically done
showing the new population totals, the amount over or un3er th�
av�rag� and percent ot total population. We are sracao,�Ag�..LOr
2�,8 peoolz in each warc�g�,.,aabq,ut 14�.�;�cn.
With that 3s an introducti�n we stand ready to an�wer any
questions you may have and look forwar3 to ��orking with you.
(.���m� %-� C , U��,�c.o' 1-'�L;J u� '
l�Jo��o - y�lo /� I
�
���tr�'t- t�1.�Jr� �rL(���
ll 0
~ ` �.
1�� �' ''
�.`���'+���::,.{y� -
,:; : ,, :
=�„• ��,,,� ,
� ,�;
..,;�:.��''
MEMORANDUM
APRIL 5, 1991
T0: HONORABLE MAYOR AND CITY COUNCILI
FROM: JACK HARDISTY, PLANNING DIRECTOR
SUBJECT: CITY COUNCIL WORKSHOP -- WARD RE
The Council requested a summary of various items regarding reapportionment. The
major points I recall that the Council may wish to consider are:
1: The precinct in which Councilmembers reside should remain in their
respective wards.
2. Ward boundary adjustments will be based upon whole precincts.
Precincts shall be entirely within a ward pursuant to City
Charter. However, the County has agreed to work with us where a
precinct line may need to be adjusted.
3. Populations of each ward should be as equal as possible, though
variations may occur due to geographic, topographic or population
C differences between precincts. Neighborhood cohesiveness may also
be a factor in some instances. It has been suggested that ward
populations differ no more than 200 persons (approximately 1/10 of
1%). Precincts tend to have 700 - 800 people in them.
4. A ward may have noncontiguous precincts; however, how the areas may
be related (ie. common geography, neighborhood cohesiveness, etc.)
should be noted. It is the intent that wards be as compact as
possible.
5. Boundary adjustments should affect as few people as possible.
Gerrymandering for political purposes should be minimized.
6. All Councilmembers should participate in the reapportionment effort.
The Council is reminded that a final decision for reapportionment is needed by
May 22, 1991 in order for the changes to be completed by the County Elections
Department for the next election.
Planning Department staff has completed compilation of the 1990 Federal census
data and has calculated populations of all voter precincts within the City.
These precinct populations have been combined to provide the Council with current
figures of each ward population. A map depicting these numbers with ward
boundaries highlighted in color, is enclosed in each Councilmember's packet.
Please let me know if my department can provide you with any additional
���' information for your review.
i ., _ �
' ` I'
Decembe �; 1994
TO: LARRY M. LUNARDINI, City Attorney
FROM: LAURA C. MARINO, Deputy City Attorney
LOUISE T. CLOSS, Assistant City Attorney
SUBJECT: REQUIREMENT OF CONTIGUOUS BOUNDARIES�FOR COUNCIL WARDS
ISSUE:
Is there any requirement that council ward boundaries
be contiguous?
CONCLUSION:
There is no requirement that council ward boundaries be
contiguous.
ANALYSIS:
The Constitution of the State of California contains only one
reference to district boundaries. Article XXI, Section 1, of the
Constitution states:
"§ l. Reapportionment
In the year following the year in which the
national census is taken under the direction
of Congress at the beginning of each decade,
the Legislature shall adjust the boundary
lines of the Senatorial, Assembly,
Congressional, and Board of Equalization
districts in conformance with the following
standards:
���
(c) Every district shall be contiguous."
This requirement, however, applies only to boundary lines of the
"Senatorial, Assembly, Congressional, and Board of Equalization
districts." It does not apply to local council wards.
Memo to Larry Lunardini
Re Requirement of Contiguous Ward Boundaries
February 12, 1991
Page 2
Reapportionment of city districts is covered by
Elections Code § 35100 et seq. Section 35101, which specifically
applies only to general law cities, states in part:
"...In establishing the boundaries
of the districts the council may give
consideration to the following factors:
(a) topography,
(b) geography, .
(c) cohesiveness, contiguity, integrity,
and compactness of territory, and
(d) community of interests of the
districts"
Based on this section, general law cities have discretion to make
their wards or districts contiguous. Such language is in
contrast with the language of � 35103, which requires that the
legislative body of a general law city annexing territory or
consolidating with another city adjust boundaries "so that the
districts shall be as nearly equal in population as may be ..."
(emphasis added).
The only Elections Code section which specifically
addresses charter cities does not mention contiguity at all.
Section 35150 requires that districts in charter cities be nearly
equal in population. The Elections Code contains nothing
concerning contiguous boundary requirements for charter cities.
Finally, neither the Government Code nor the Federal
Voting Rights Act were found to include requirements for
contiguous boundaries at the local level.
CONCLUSION:
Neither the State Constitution nor the Elections Code,
which addresses requirements for local election districts,
requires that local election districts be contiguous.
The Constitution mandates contiguity for districts for
state elections. On the other hand, the discretionary language
contained in the Elections Code for general law cities, and the
absence of any reference to contiguous boundaries for charter
cities for local elections indicates an intent to not impose such
requirements on cities for local elections.
LCM�meg
OPINION�
CONTIGWD.MEM
�a
^
e
B A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
MEMORANDUNI
�
il ( � .-, -
�{ �
; i�
�,' DEG
'' [__
�� ,ro --
P.�� ;,
DATE: December 21, 1994 '
TO: ALAN TANDY, CITY MANAGER
,
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
SUBJECT: COFFEE ROAD GRADE SEPARATION PROJECT STATUS
? � Iqg4
Immediately after the positive decision by the State Water Quality Control Board, we began
moving forward with the project. The three basic elements of the project are as follows:
1. Environmental work.
2. Right of way acquisition.
3. Design (development of plans, specifications and estunate, P.S.&E.).
The first two elements required Sunland Refining supply a"Right of Entry" to enter their
property and perform the necessary work. That "Right of Entry" has been obtained. The
only stipulation is that each sub-consultant must contact Sunland 48 hours prior to doing
work.
ENVIRONMENTAL WORK
The environmental consultant (Kennedy/Jenks) has been retained by the district and will
be proceeding with the work shortly.
RIGHT OF WAY ACQUISITION
Right of way acquisition will involve two separate appraisers. The first is a specialized
appraiser that is thoroughly knowledgeable in refinery operations. They will also work
closely with the en�ironmental consultant to determine what effects the contamination will
have on property value. The appraiser has been chosen (Steven Klien) and will have an
executed contract after the January 5, 1995 District meeting.
The two remaining parcels, P.G.&E. and Bartell, will be appraised by the District's usual
appraisal, Jerry Fisher.
The appraisals should be complete by May 1, 1995.
DESIGN
Preliminary design is complete. Prior to final design going forward, a design agreement
must be entered into. This agreement has been drafted and we should receive a copy for
our review within a week or so. In this agreement, we could stipulate our involvement in
the project with respect to design. Since the City is paying the lion's share of the project,
it would seem to be appropriate for us to have whatever degree of involvement that we feel
necessary.
SCHEDULE
We are about five (5) months behind schedule due to delays caused by the contamination
issue. Based on this delay, the project should begin construction in early April, 1996 and
take approximately one (1) year to complete.
� !
s
B A K E R S F I E L D
Alan Tandy • City Manager
December 27, 1994
Mr. Armand Abay
General Manager
Texaco Refiner�,�
6451 Rosedale Highway
Bakersfield, CA 93308
Dear Mr. Abay:
I just wanted to drop you a line to thank you greatly for allowing Anita Burke to help us
out of a difficult situation recently. As you know, she volunteered some time to help us
with the circumstance of an environmental problem which was hindering our ability to
improve access to the Rosedale area, including to the Texaco Refinery itself. Her
assistance allowed us to resolve the first phase of the problem.
Please accept the grateful thanks of the City of Bakersfield for your dedicated community
spirit. Our thanks to Anita Burke, also, for the excellent quality of her assistance and
enthusiasm.
Sincerely,
i —� �
an Tand�
City Manager
AT. al b
cc: Ms. Anita Burke
Honorable Mayor and City Council
City of Bakersfield � City Manager's Office • 1501 Truxtun Avenue
-Baker.sfield-�-C-al:ifornia� �-93301
�Qn�t ��� ���� . G�., iQn�� ��n � Qcn
�
B A K E R S F I E L D
Alan Tandy • City Manager
December 29, 1994
Ms. Virginia L. Horler
Rauscher Pierce Refsnes, Inc.
One Market Plaza
1100 Steuart Street Tower
San Francisco, CA 94105
Dear Ms. Horler:
Yo�ar firm serve� as underwriter in conjunction with the City of Bakersfield 198s Certificates of
Participation. The majority of the certificate proceeds were used in the refunding of the City's
1985 Leasehold Mortgage Revenue Bonds. The refunding calculation which was prepared by your
firm as underwriter, which is customary in the business, was in error as it related to the bond call
premium required to be placed in escrow in order to facilitate the bond call. Our decision to move
forward with refunding the $15 million outstanding was based upon the savings realization after
taking into account the undetwriter's discount paid to your firm. Had we known the true savings
was other than presented by your firm, the City might have chosen other options such as
negotiating a different fee, contacting other underwriters or canceling the proposed refunding all
together.
Your firm's failure to perform on what is a fairly routine calculation has placed the City's ability
to issue debt in the future and the City's standing in the municipal finance arena at great risk. The
City cannot accept your proposal of December 28 to advance the $126,812.50 in the City's behalf
since all contracts above $20,000 require Ciry Council approval. Additionally, the e�enditure of
City funds also require City Council approval. Due to the short time frame in which some action
is required, noticing and holding a legal City Council meeting during this holiday season is not
practical.
If your firm is not willing to pay the shortfall, I will authorize the City to do so and I will
immediately seek authority to sue your firm for malfeasance to recover damages and to rectify this
wrong. If I authorize payment of these funds, I must notify the City Council in writing at which
time the purpose and circumstances surrounding the payment will become public information.
I would prefer that you make the payment now, keeping open the potential for negotiation,
arbitration or litigation of this matter when the time pressure for a potential payment problem is
removed.
Please advise me no later than 10:00 a.m. on Friday, December 30, 1994 as to your intentions
regarding this matter.
Since el --"
i" �
Alan Tandy
City Manager
AT/GJK/krc
LGJK.20
City of Bakersfield � City Manager's Office • 1501 Truxtun Avenue
Bakecsfield _! California! _9_3301
IRFI�:I���Z7�-:1�m7-�1;:.s�-C%c�=-�'�`klC��:�='1A -1�Q�[-•`n=
DEC-30-94 FRI 8�53 RAUSCHER PIERCE REFSNES FAK N0, 4158960205
�;; -
,:!-,s.
':j
RAUSCHER PIERCE RE�Sr1�5, INC.
December 29, 1994
Mr. Alan Tandy
GYty Man�er
C,ity of BskersSeld
ISQI Tncxcnn Ave.
Hake[Sfield, CA 9330L
R�: Ciiy oP Hakerstield Public Facilitiee Corporatioa
1985 Leuschold Mort�ago Rovonue Bands
Dear Mr. Taudy:
P, 02
Yru P'Qastmlle Na (80S} 3i3-3780
ia respunso ta paur le�ter of Docember Z9 regerding iha above capdon�d bomis (t1w °Bonds'�. we advise Y� ��
will n� w1� any fun8a to Hf�nk af Amerlae (�scrorv Agent'y to satis� the Cib''s redem9�n Paymertt oBllgadous comin�
dus on Febnw�y 2, 1995. In order to avoid a patential def8utt, wC sUgge� that the Chy bArior it6legdl obligation �nd, jYdy
wt�stever amrnnus tbe F.sc�aw Agem determi�s the City owes.
Wtile we appreciate xour concern re�rding the ultimata sou�e of money to �y ihe City's debt, and wiWe we
wlt! eontinue W di9cuss Wat marier with You next week, Qur:eview of the docutnents relating to We 1988 COP issue and our
com�ersations with tha City's boad counsel (Frl�z 5tradlinp� all eonFum to us tLat the legal obIIgstion m pay the Bonds rests
anty with tt�e City and tl�at a psyment ftom an}r uthar soarce would uNustly �rich the Cily.
I will oontacx yon next wcck to di�cuss tbis issu� further and to evaluate acYy posslble manetary damag,es suffered by
t}►e Cily as a resuit of We six year deferlal afpour payment obllgation.
Sit�cerely,
RAUS p1IItCE RE�SNES, WC.
� � ��
irginia .�
Setliv�' Vice P'residenllManaging Director
'VI,H:acnm
One Ma�icet Plaza, 1104 Steuart S�ree� Tower •$an kraaoiaw. Califomia 94105 •(d I S) 979-0380 • FAX (415) 596-0210
Membar New York SfOek EzC11rt1IgC, fn�-
� __1�21/94 14:29:36 -> Bahersfield Page BB2
DEC-21-'94 WED 12:26 ID:INTER GOV AFFAIRS TEL N0:916 323-3749
C3�V�1tNOFt'S OFi�ICE
December 24,19�4
To: cow�y Supavisare, M�Yo and City Cous�il Mamber's
Prom: ��rol Whi r of Lrtargovermnental Afl�ir�
R�: �XXECtl�TT1�E 11�ADEMX
�503 P02 �
The Gavemor's Office o�Ir�ergavBrmnental A�ire i� planning s aeminac in Sar�ramento for boEh
nawly e�cted a:►d vatoran lacal officiala 'i'hts aam�rence w�1 enable you ta gtX an in�de look
in#o the 1�V'il�pn Ad�doA and h�lp you de�velop beneRcial relationship� witb loey people at
the steL� level. The Aoademy wiU also allow us the oppartunitY to Set to imaw you batter a� we
work to�eth+e�' � the txurrin$ manths to f�ce tha ch�ll�� von$anting etatn and lo�l
S�v�ameat.
The Sxa�tive A�ademy w�ll have pres+�te�s 8ram variou� atate agendea ae�d departmentsk
includi� �al EPA, Housing and Community Deveiopmart, �nci Trede �d Commerca�e, ta speak
sbout thmr respeotive ,areas of ir�uence and how thCy work with cit[e� aad anunties acxo� the
atate. The progem will aisa include digcusaians about the Governor's budget �nd poticy
priocities for 1993. Since thi� ia a�rst-of-its-kind �vent, I am e�kin8 you to camplete the �trv�cy
belaa► aad raturn i# by 7�►uary 5, 1993 so w� cann get sn eatimate of the numbar of p�ple who
pl�n to at�en�d� �d id�tify �peciflc topics or ieauea whioh ar� a pdority fbr you and y�nuf
cvbst�tuants.
Tent�dve dat,�s Rar the two-day oonfe�nnce at� Wedn�sday, March 29 and T�c$day, Nlamh 30,
1995. The �veat shouid ooat about 5150 P�' P�o4 Plua hot�l and tcavd caet�. Yaur
cooge�ion will c�suro th�t this event is a eua�a. I look �orward to �earing �om yau soon.
Pleue c�t or tr,� �
----.--�..........�.____��_......_....---�-�—__��---��..r..e...�.,._�
Please m�il or fax this farm by 7anuary 5, 1995 to: (3ov�rnor' � O�ce of Imeigt�vernmentst
Affiirs� 14QO lOth Stro�t, Rown l09, SaGramento, CA 95814; Fax; 91G!'323-3749
Attemtion:llQ'ilae Placxntias
!� ��e Tit1e _ -
C�ty or County ' Phone Number
2) Are you i�erested ia this aeminar7 Ye� Na . Ifyeo� would you attand: ala��
� e��'�
9) Are tlbere ar�y sp�al topica or issuas whic� s�re oFiuterest in y�ut juri�diction?
Thi� t� not a tormai re�istrQtion; it u onty an indtcatiou a�' intersat�
�V&RNOR FBT� WILSON • SacxnNtsrrrv. C�.FOxrr� 9: 814 •(91b) 445 2841
�--- _.
�
�
EXECUI'IVE SUMMARY
This executive suinmary presents the re�ommended improvement program and tinancial
plan/revenue pro`�ram for the City of Bakersfield, through the Year 2O40. Details of this
suminary are pre�ented in this milestone report.
Backgr��und
Brown and Caldwell was retained by the City of Bakersfield in August of 1�)��3 to develop
a�vastewater master plan and supporting tinancial plan to guide the wastewater �ollertion,
treatinent, and disposal improveinent5 well beyond the turn of the century, and to prepare the
reyuired environmental impact report (EIR) in a��ordanc:e with California Environmental Quality
A�t (CEQA) ��uidelines.
This project has been conducted in pha�es, and periodic milestone reportti have been
submitted to the City. Initially, a progress report, submitted in November of 1y93, set forth the
fundamental elements needed to develop the master plan, such as population projection5, waste
dis�harge reyuirements, proje�ted wastewater c:haracteristics, study area boundaries, and an
evaluation of the exi�tin�� City Plants 2 and 3. Milestone Report No. 1 summarized the various
alternatives considered and evaluated for the City on a cursory level, and re�ommended three
re��ional wastewater alternative� for detailed evaluation. Milestone 2 pre�ented the detailed
evaluation of three regional alternatives, and the recommended of the proposed regional
wastewater alternative for detailed plannin`�. Milestone Report Nos. 3 and 4, combined into this
sin�Tle report, su►nmarize the detailed plan and the supporting financial plan/revenue pro��ram.
Recummended Impruvement Program
By evaluatin�� variou5 e�onomic and non-economic e;riteria, ei`�ht re`�ional wa�tewater
a(ternative� were evaluated; three of �vhich were evaluated in turther detail. From this detailed
�valuation, Browil and Caldwell ha5 recommended a regional wastewater alternative to best tierve
the �ommunity through the Year 2040. This overall plan proposes to:
• Keep and upgrade existing Plant 2, which serves the east portion of the City;
• Maintain operations at Plant 3 through the Year 2021, and subsec�uently
decommission the plant to allow further development in this fast growing area of
the City;
• Develop and implement a new Plant 4 in the southwest Bakersfield area, to ,erve
the growing Western Rosedale area, west Bakersfield and southwest areas of the
community. Plant 4 is proposed to be constructed by the turn of the century;
• Construct new trunk sewer� which will support the proje�ted wastewater tlows,
and convey the wastewater to the new Plant 4 in the most economic manner
(maximize gravity tlows).
I =-='�1`.HPdtqKkSFLU`AtILG�TU\l\11L@ST(IN.NUc
HPL:�ssrlll �/
,
�
Fr
• Develop a long-term effluent disposal/reuse plan, with built-in tlexibility to
-accommodate future changes.
Plant 2. Plant 2 will be upgraded in Year 1997, to accoTnmodate future growth in the
eastern Bakersfield area, particularly from the northeast area of the City. Additional flows are
anticipated from the Northeast Trunk Sewer construction project. The prior design for the Plant
2 upgrade should be iinplemented, with modifications, as follows: construct new headworks,
modify the grit re�noval system, upgrade the septage station, add one primary clarifier, two new
trickling filters, one new sludge digester, and upgrade the sludge drying beds. The construction
cost for these improvements i5 estimated at approximately $17 million. This recommended
upgrade will be flexible enough to accommodate future flows up to 28.5 mgd, the rated capacity
of the original Plant 2 upgrade package.
Plant 3. Plant 3, due to the continued development of the City in the southwest, will
continue operation at present capacity until the Year 2021. In the meantime, the City should
consider purchase of developrr►ent rights along the north and east plant site boundaries, to restrii;t
residential development i�nmediately adjacent to the plant site. No expansion of Plant 3 is
recommended due to the rapid City growth surrounding the plant site. The Gist-brocades yeast
plant waste should be re-considered for treatment at Plant 3, if feasible. When the new Plant 4
opens by the turn of the century, this yeast waste should be treated at Plant 4.
Plant 4. A new Plant 4 is recommended to serve the west and southwe�t area of
Bakersfield. With the anticipated growth in Western Rosedale, hook-up to the sewer system and
abandonment of septic systems, and rapid development in the southwest area of the City, Plant 3
will reach its present capacity by Year 1999. In addition, the rural southwest is expected to grow
substantially during the planning period. With this in mind, a new Plant 4 is recommended i�1
the extreirie southwest area of Bakersfield, west of I-5 on Bear Mountain Boulevard. This
location allows the best use of gravity flow to the plant, is in close proximity to potential
reclaimed water users, and is remotely located away from present ar future urban development.
Approxiinately 45 miles of new trwlk sewers, phased in as needed, will be required to convey
sewage to the new plant.
Effluent Disposal/Reclamation Plan
We recommend that the City continue to reuse secondary effluent to the extent fea5ible
through the planning period. The City should also pursue a long-range plan for groundwater
recharge in the southwest Bakersfield area. Details of the plan, including phasing in storage
ponds, identified reclamarion sites, and discussion of future groundwater recharge are included
in this report.
Projected Cunnection and User Fees
It is essential to for�nulate a viable financial plan to ensure implementability in the future.
We prepared a detailed financial plan as part of the detailed analysis of this recotnmended
improvement program.
1 ?/^_?/9NiAEiAKRSFLD\�11LESTON��7ILESTON.NO3
HPLascrlll V�1
. :•
��' ^
�
Information in this report is a forecast of user charges and connection fees, at cun-ent
dollar levels, over the neYt 46 years, until the year 2040. The suinmary table below list5 the
estimated user charge and connection fee levels over this period, as a percent of the curreiit fee
level (for service charges), and in dollars at current 1994 cost levels for connection fees. The
forecast set forth below is sensitive to assuinptions, and the recominendation concerning how
connection fees are established is important. It is estiinated that the probable sewer service fees
and the new connection fees through the year 2040 at 1994 cost levels:
Year
1995
1996
2000
2010
2020
2030
2040
Percent of current
Sewer Service Fee
100
100
100
70
60
40
35
Connection Fee
$ y00
1,200
1,800
3,000
2,000
1,300
1,000
Over the next five years, it is forecast the weighted average construction and operational
intlation rate which will apply to the economic forecasts set forth in the tables in Appendix C
will be 4.5 percent annually. Therefore the estimated fees are expected to be as follows, in
current dollars:
Year
1996
1997
1998
1999
2000
Percent of current
Sewer Service Fee
1 U4.5
109.2
114.1
119.3
124.6
Connection Fee
$1,254
1,420
1,600
1,900
2,250
Connection fee levels are recommended to increase in 1994 dollars from the current level
per equivalent service unit of $900 to in FY 1995-96; to $1,800 in FY 19)9-2000; to `1�3,000 in
FY 2009-10, decrease to $2,000 in FY 2019-20; and then decrease to $1,000 in 2037.
1:J??191W :�EtAK RS FL DV.11 LE STOMM I L ESTON. NO3
HVLascrlll V 11
-.
i_ w,�
i� ;,• � _�„�y
'� �FERSII('�D .
C�'� �
��n�_.�#' .�'f�,
�ULI��"
. '�
\ .��
,1 j� �,
•
.�
MEMORANDUM
Honorable Mayor Price and Council Members
S. E. Brummer, Chief of Police
December 28, 1994
SU BJECT C.O.P.S. AHEAD Police Supplemental Hiring Grant
On November 1, 1994, the Bakersfield Police Department submitted a
letter of intent to participate in a program entitled, C.O.P.S: AHEAD
(Accelerated Hiring, Education and Deployment) under the Violent
Crime Control and Law Enforcement Act of 1994. C.O.P.S. AHEAD
provides $225 million for cities over 50,000 population in their
efforts to hire and fund sworn police officers. The attached "Fact
Sheet" outlines the requirements and funding provision of the grant
program.
On December 22, 1994, our department received correspondence from the
U.S. Department of Justice authorizing our agency to hire six
officers under provisions established by the grant. We received a
Grant Application Kit to complete and return by March 3, 1995. A
copy of the application kit is attached for your information.
Police department staff have begun the application process, however
an important element of the application is an assurance that the
police department is legally and officially authorized by the
governing body, City Council, to apply for the grant. The grant
application states that, "If a C.O.P.S. AHEAD application is
submitted and approved, funding will begin once the new officers have
been sworn." The program authorizes eligible agencies to initiate
officer,recruitment and hiring efforts now, prior to submission and
approval of the Grant Application Kit. However, all obligations that
may be incurred should an application be denied are the sole
responsibility of the applicant. I am sure you have read news
reports suggesting that our department has been "awarded" this grant
funding. In fact, we have been designated only as an eligible agency
and must complete the application process.
Originally, the C.O.P.S. AHEAD Grant Program allowed eligible
departments to increase their sworn complement by 3$. The
Bakersfield Police Department, then, was authorized to add 7 sworn
positions under the grant. Due to an extraordinary response,
jurisdictions are being authorized to hire a maximum of 2.5 percent,
reducing the number to be added by our department to six positions.
In monetary tenns, the grant provides $450,000 over three years to
augment the salaries of the six additional positions.
One of the significant aspects of the grant is the funding
requirement and funding level. Grant funding provides up to 75% of
each officer's salary and benefits over three years, up to $75,000
total. The remainder to be paid by state and local sources.
Page 1 of 4
COPS AHEAD Grant Program
Honorable Mayor and Council Members
December 28, 1994 - continued ...
The following graph illustrates how grant funds are applied to
officers' salaries and how we recommend allocation of the funds.
Crime Prevention Bill, Three Year Grant
Salary
Holiday Pay
Fringe Benefit
Subtotal
Federai Grant *
Equipment
Vehicle (Rent Payments)
Total Cost to City by Year
Per Officer
36,674
2,690
14,297
53,660
40,245)
4, 950
7, 008
$25, 373
38,487
2, 825
14, 728
56,040
(34,755)
7, 008
$28, 293
40, 395
2,968
15,182
58,545
0
7, 008
$65,553
*The Federal Grant provides $75,000 per officer for salaries and fringe benefits for a
three year period but only 75% of the cost of salaries and benefits may be charged
to the grant in any one year. The city must fund equipment and vehicle expenses.
Page 2 of 4
COPS AHEAD Grant Program
Honorable Mayor and Council Members
December 28, 1994 - continued ...
Because the grant application process does not coincide with our
fiscal year budgeting cycle, funding for the grant program can
reasonably be calculated for the period between actual grant funding
and the end of fiscal year. Given February 1, 1995 as the earliest
date of hire for officers under the grant, funding for the five month
period ending June 30, 1995 would be as follows:
The $100,620 represents the amount reimbursed to the City's General
Fund as a result of the 75� maximum funding in the grant.
Based on the funding formula for the C.O.P.S. AHEAD Grant, after
three years, the cost to the City for the 6 sworn positions will be
$715,314, while the total funding provided by the grant will be
$450,000.
Page 3 of 4
COPS AHEAD Grant Program
Honora6le Mayor and Council Mem6ers
December 28, 1994 - continued ...
Should the grant program materialize, the additional six (6) sworn
positions will bring the police department's funded sworn complement
to 258, including five authorized overhire positions resulting in a
total sworn complement of 263. Based on current estimates provided
by the City Planning Department, Bakersfield's population is 211,000.
The additional six officers will bring police staffing per capita to
1.24 officers per 1,000 population, comparable to our 1993 level.
In the very near future, police department
grant application process, at which time I
Council authorization to participate in the
Program.
SEB/vrf
attachments
staff will complete the
will formally request
C.O.P.S. AHEAD Grant
Page 4 of 4
U.S. Department of Justice
U. S. Department of Justice
F
act S eet
Community Oriented Policing Services �
Accelerated Hiring, Education and Depioyr�ent
(COPS AHEAD) for Populations of 50,000 anc� Over
Program Information
COPS AHEAD is one of several approaches developed
by the Department of Justice under the Violent Crime
Control and Law Enforcement Act of 1994 to speed the
deployment of new officers devoted to community polic-
ing on the streeu and rural routes of this nation. COPS
ANEAD permits interested agencies to begin recruiting
and hiring ne��� officers now in anticipation of later COPS
grant funding, without compromising the qualiry and
thoroughness of officer training and the cateful design of
communiry policing programs. COPS AfIEAD wiil ben-
�efit jurisdictions with populations of 50,000 and over,
while COPS FAST will be used to expedite the applica-
tions of aeencies serving smaller populations.
Funding Provisions
❑ Law enforcement agencies intendine to participate in
COPS AHEAD ma�� select and train new officers now,
prior to submission and approval of a formal erant appli-
cation. Fundin= �vill besin once the new officers have
been sworn and a satisfactory grant application has been
submitted and approved. Grants will be made for up to
75 percent of the total salary and benefits of each officer
over three years, up to a maximum of $75,000 per officer,
with the remainder to be paid by state or local funds.
❑ Grant funds mav be used to enable each agency to
hire new officers to increase its actual sworn force up to a
maximum of 3 percent over actual October 1, 1994 force
level.
0 Up to S2?5 million in grants will be made under
COPS AHEAD to state, locai and other public law en-
forcement aeencies which serve populations of 50,000
and over. If requests exceed the funds available, the
amounc or starting date of grants may be adjusted to ac-
commodate demand.
0 COPS grant funds must not be used to replace funds
that eligible agencies otherwise worild have devoted to
future officer hiring. In other words, any hiring under the
COPS AHEAD program must be �uA addition to, and not in
lieu of, officers that otherwise would have been hired.
0 In hiring new officen, agencies may not reduce the
scope of their customary screening and rraining proce-
dures, and must include communiry policing principies
and methods in the'v training curricula. In addition, to the
extent practicable, COPS AHEAD grant funds should be
used to increase the representation of women and racial
and ethnic minorities within the ranks of sworn officers.
❑ All agencies serving a population of 50,000 and over
will receive an invitation to participate in COPS AHEAD.
In response, an intecested agency must send a letter of
intent to the COPS Office, to be received no later than
November 10, 1994. The COPS Office expects to con-
firm the eligibility of applicants and proposed funding
levels no later than November 21, 1994. Officers pro-
posed to be funded under COPS AHEAD must be hired
no later than the agency's first class staning in 1995.
0 At the time that proposed funding leve(s are con-
ftrmed, a formal grant application will be sent requesting
information conceming the agency's strategic communiry
policing plan for the use of the o�cers that have been
approved to be hired, budget plans and projections, and
other information to enable the COPS Office to confirm
compliance with grant conditions.
0 An award under COPS AHEAD will not affect the
consideration of an agency's application for a grant under
any other COPS program. An agency that received fund-
ing under COPS Phase I. is eligible to receive additionai
funding under COPS AHEAD if the combined hiring un-
der both programs does not exceed 3 percent of the actual
October 1, 1994 force level.
October 15, 1994
: _ : i� �
U.S Deparr�nenr oJJusrrcc
Offtce ojComnnmiry Orienred Poficing Scrvrcea
COPS AHEAD:
Accelerated Hiring, Education and Deployment
Overview
The Attorney General has established the -Office
of Community Oriented Policing Services
("COPS") within the United States Department of
Justice to implement the "Cops On the Beat" grant
provisions of the Violent Crime Control and Law
Enforcement Act of 1994, signed into law by Pcesi-
dent Clinton on September 13, 1994. Under this
law, the COPS Office wiil provide grants and tech-
nical assistance to law enforcement agencies and
members of their communities to develop new and
innovative approaches to solve their community
crime probtems. A wide variety of policing pro-
grams will be supported under this law through
the year 2000.
This application kit is only jor jurisdictions that
have received a Go AHEAD letter from the COPS
Ojfice authorizing them to hire a specific num-
ber ojojficers under COPS AHEAD.
COPS AHEAD will make grants to the law en-
forcement agencies of state, local and Indian tribal
jurisdictions to hire and/or rehire additional swom
law enforcement officers as part of an overall plan
to address crime and related problems through
communiry policing. Grants will be made under
COPS AHEAD to jurisdictions which serve popu-
lations of 50,000 and over. This program allows
eligible jurisdictions to initiate their officer recruit-
ment and hiring efforts now, prior to submission
and approval of this application. If a COPS
AHEAD Appiication is submitted and approved,
funding will begin once the new officers have been
swom. All obligations that may be incurred should
an application be denied are the sole responsibil-
ity of the applicant.
A further description of COPS AHEAD require-
ments is contained in the COPS Program Guide-
lines, which will be Qublished shortly in the Fed-�
eral Register and are available from the COPS
Office.
Community Policing
Community policing is an integrai part of achiev-
ing the goals of combatting crime and improving
the quality of life in the nation's cities, towns and
rural areas. Community policing stresses the
importance of police-citizen cooperation to con-
trol crime, maintain order and improve the qual-
ity of life in America. The community is an ac-
tive partner with law enforcement in defining the
problemsto be addressed, the tactics to be used,
and the measurements of success.
Community poiicing brings the police and the
community into a closer working relationship. It
calls for greater citizen responsibility, and the op-
portunity for citizens to contribute individually
and collectively to public safety. At the same
time, it enhances police professionalism by giv-
ing officers the skills, technology, authority and
motivation to act innovatively to solve commu-
nity problems. Community policing in many
cases also calls for a restructuring of law enforce-
ment agencies and the refinement of their man-
agement techniques to allow the fullest use of de-
partment and community resources.
This approach is dependent on an effective flow
of information, from sources both inside and out-
side of the law enforcement agency. To be suc-
cessful at community policing, the law enforce-
ment agency should use this feedback to become
more effective and equitable in its service deliv-
ery. This informed flexibility should allow law en-
forcement agencies to become more responsive
to members of the community and their represen-
tatives, and to officers and their representatives.
Community policing can change the way crime
control is accomplished. The ultimate goal is to
maintain public safety in communities through
better police work, while increasing the public's
interaction and satisfaction with police services.
- - 1
Eligibiiity Requirements
Only those jurisdictions that have received a Go
AHEAD [etter from the COPS Office authorit-
ing them to hire a specific number of officers
under COPS AHEAD should submit this appli-
cation.
2
Failure to forward a letter of intent by the Novem-
ber 10, 1994 deadline, a decision not to complete
this application orto participate in COPS AHEAD
does not preclude departments from applying for
grants under other COPS programs.
In addition, those departments which complete a
satisfactory COPS AHEAD Application and are
funded under COPS AI-IEAD still will be eligible
for other COPS programs. T'hese other programs
will be announced in the late fall of 1994.
Permissible Uses for Funds
Grants funds may be used by each agency to hire
new officers to increase its actual sworn force up
to a maximum of 3 percent over actual October l,
1994 force level. A jurisdiction's force level for
these purposes is based upon the actual number of
officers sworn, and not an agency's authorized
strength level. The actual number of officers
should include only those personnel performing
law enforcement functions at the line or supervi-
sory levels. For example, sheriff s departments
should exclude deputies assigned to court secu-
rity and jailing duties. The exact number for which
an agency may receive a COPS AHEAD grant is
set forth in the Go AHEAD letter.
For those agencies who received COPS Phase I
funding, the combined total number of officers
awarded under Phase I and AHEAD may not ex-
ceed three percent of sworn personnel. For ex-
ample, if an agency received 20 new officers un-
der Phase I, and three percent of the agency's
sworn force on October 1, 1994 was 25, the agency
may receive funding for an additional 5 officers
under COPS AHEAD.
COPS AHEAD grants are restricted to the hiring
or rehiring of additional sworn career law enforce-
ment officers for deployment in community pa
licing. "Career law enforcement officers" are de-
fined as those persons hired on a permanent basis
who aze authorized by law or by a State or local
public law enforcement agency to engage in or
supervise the prevention, detection, or investiga-
tion of violations of criminal laws. Funds may be
used to support officers hired after October 1,
1994, but funds may only be spent for obligations
incurred on or after the date of award and may not
be used retroactive[y for any salary paid prior to
the grant award. In addition, grantees may not
draw any grant funds until a hired officer is actu-
ally sworn. Rehired officers must have been sepa-
rated from the force prior to October 1, 1994 due
to budget reduction.
COPS AHEAD grant funds may- not be used for
any purpose other than ojficers'salaries and ben-
efits COPS AHEAD funds may not be used to
purchase equipment, support systems, or for the
payment of overtime costs, but applications for
these purposes may be made under juture COPS
programs.
Officers hired under COPS AHEAD must begin
their training no later than the first available train-
ing class beginning in 1995. In hiring and ttain-
ing new officers, agencies may not reduce the
scope of their customary screening and training
procedures. In addition, all officers hired in an-
ticipation of COPS AHEAD funds must receive
training in communiry policing.
The officers hired with COPS AHEAD funds may
be assigned to training and probationary assign-
ments, if this is the customary practice of the
agency, provided that there is an equal and.con-
temporaneous transfer of current officers to com-
munity policing. For example, new officers hired
under COPS AHEAD may be given control du-
ties, so long as an equivalent number of experi-
enced officers are deployed in community polic-
ing.
COPS grant funds may not be used to replace funds
that eligible agencies otherwise would have de-
voted to law enforcement. The supplanting of non-
federal law enforcement funding is strictly pro-
hibited by law. That is, any hiring by a depart-
ment under COPS AHEAD must be in addition
to, and not in lieu of, a department's other hiring
plans and must serve to increase the total number
of funded officer positions on a law enforcement
agency's force above the sworn leve( on October
1, 1994. For example, if a jurisdiction has com-
mitted to fund 5 officers for this year, COPS
AHEAD funds may be used to fund officers above
this level only. A more complete discussion of
supplanting is found at page S.
In addition, law enforcement agencies may hire
former members of the Armed Forces that have
been involuntarily separated, particularly in the
cases of communities that have been adversely af-
fected by recent military base c(osings.
Length of Award, Grant Amounts
and Local Mafich
The duration of COPS AHEAD grants is three
years.
The federal share of an officer's salary and ben-
efits may not exceed 75% of the costs of a new or
rehired officer's salary and benefits over the three
year period of the grant. Also, a maximum of
$75,000 per new or rehired officer is available over
the three year period of the grant.
In addition, the amount of the federal match must
decrease each year, looking towards the complete
assumption of funding by the applicant following
the completion of the COPS AHEAD grant. The
amount of this yearly decrease in the federal per-
centage, and the reciprocal yearly increase in the
local share, should be proposed by the app(icant.
At the end of the grant period, the applicant is
wholly responsible for funding of the.officers hired
under the grant.
There will be no waivers of the minimum ZS%
local match or the maximum federal share of
$7S, 000 per oJftcer hired under COPS AHEAD.
Departments are encouraged to contribute local
shares in excessofthe minimum amounts required.
States and local units of government may use as
matching funds assets received through the As-
sets Forfeiture Equitable Sharing Program, the
Housing and Community Development Act of
1974, the Appalachian Regional Development Act,
and other funds contributed from state, local or
private sources or otherwise authorized by (aw.
Funds appropriated by Congress for the activities
of any agency of an Indian Tribal government or
the Bureau of Indian Affairs performing law en-
forcement functions on Indian lands may be used
as matching funds. Federal grant monies received
from other federal agencies may only be used as
local matching funds if specifically authorized by
the other federal grant program.
�n�,a����_ -. ;�r:�_..� ._ .. �. . . .. "�:
How to Apply
Departments with Go AHEAD (etters wishing to
formally apply to COPS AHEAD need to follow
the instructions contained in this kit and submit a
jully executed application to the COPS O„�'ice post-
inarked no later than February 1 S, 1995. A sum-
mary of the steps to foilow in filing a complete
application can be found at the beginning of this
application kit. An original application and two
copies are required. Copies of the standard re-
quired forms.and assurances are included in Ap-
pendix A and B of this application kit, and the
required certifications are included in Appendix
C.
If an application is submitted on behalf of more
than one agency, the relationships between agen-
cies must be fully described in the application. In
addition, one agency must be designated as the
payee to receive and disburse funds, and to be re-
sponsible for the supervision and coordination of
grant activities.
A fully executed application should be prepared
in the following manner: all applications must be
submitted on 8 trz x 11 paper; all of the required
materials should be stapled together and not oth-
erwise bound, and should be printed on one side
of the paper, all applications must be typed and
double-spaced where applicable. Video presen-
tations are not permitted.
3
4
U.S Dcparrnrent ojJusrice
Officr ojComn�w�iry Orienred Pollcing Servicu
. ,
THE COPS AHEAD AP�PLICATION �
A complete application should contain the fol-
lowing:
❑ Standard Application Form — All appli-
cations for federal assistance must include a
Standard Form 424, provided in Appendix A.
An example of a completed SF424 is also in-
cluded in Appendix A. If an application is
submitted on behalf of more than one juris-
diction, each co-applicant must sign the
SF424.
0 Assurances — Follow:ng the Standard Form
is a page of assurances which seek the
applicant's commitment to abide by several
provisions of federal law applicable to this
grant program. Read and sign the Assurances.
_ ,
� Legal Certitications — Applicants must o
provide the appropriate legal certifications
which are contained in Appendix B. Read
and sign the Certification form.
❑ Application Summary — A brief summary
of the application should immediately follow
the Standard Form, Assurances and Certifi-
cations. Please submit three paragraphs in
the following format: �
1) "The City/County/Municipality of (legal
name and state of app(icant jurisdiction),
proposes to hire/rehire (number of pro-
posed hires) law enforcement officers un-
der COPS AHEAD. The geographic lo-
cation of this department is (describe).
The current size of the department is
(give department strength, listing num-
ber of officers sworn and number of of-
ficers budgeted), and it provides the fol-
lowing services (list major police ser-
vices)."
2) "The total federal funds requested under
this proposal are $ for three
years. These officers will be hired no
later than the first available training ses-
sion after January 1, 1995, which is cur-
rently scheduled for (date). Actual de-
ployment of these officers is scheduled
for (date)."
3) "The jurisdiction's five year community
policing plan includes (list major ele-
ments of the plan). These new officers,
and/or others assigned to community
policing will contribute to this plan by
engaging in the following activities (list
major activities). This plan was devel-
oped in consultation with (list other pub-
lic or private agencies or groups within
the community). The major public safety
needs. that will be addressed through the
hiring of these new officers are (list ma-
jor public safety needs of area)."
Budget Summary — A two to three-page
description of the appiicant's proposed bud-
get should follow the Application Summary.
The budget summary should describe clearly:
• The proposed amount of federal expen-
ditures over the three year grant period.
• 1fie proposed amount of non-federal (in-
cluding state and local) expenditures over
the three year grant period, including how
the applicant's local match will be made.
• An explanation of the sources of the
applicant's local match.
• An exptanation of how the federal shaze
will decrease each year.
• A list of specific budget items, includ-
ing: salary for the officers expected to
be funded (including entry level or re-
hired officers salary if applicable), fringe
benefits (including health, FICA, social
security, vacation, sick leave, retirement,
and worker's compensation; excluding
cost of equipment, uniforms, vehicles,
overtime), and any expected cost of liv-
ing increases.
An explanation of how the amounts of
these specific budget items amounts were
determined.
• If and by how much the local share will
exceed the minimum required.
• The starting date of the applicant's fiscal
year.
❑ Community Policing Strategy — Follow-
ing the Budget Narrative, applicants should
provide an overview of their community po-
licing strategy, addressing the following top-
ics in order. Please number and begin each
section on a new page, and limit the length
of the entire strategy to 18 pages.
1. Describe your agency's long term commu-
niry pol rcing sirateg� and its implementation
plan.
• Does your agency currently have a com-
muniry policing plan? [f so, describe this
plan, and your expectations for iis con-
tinuation and expansion in the future.
Describe the steps that you have taken to
consult with community members and
groups (e.g., schools, civic, neighborhood
and tenants' associations, current em-
ployees and organizations of employees
of your agency) in the development of
your long-term plan. You may attach any
Ietters of support for your plan from these
groups.
[f there is an organization which acts as
the legally authorized bargaining repre-
sentative of the law enforcement offic-
ers employed by your agency, describe
the steps that you have taken to consult
with that organization in the formulation
of this application and attach any corre-
spondence or other documentation re-
flecting that consultation.
• How does your plan fit in with state-wide
and local crime prevention and control
plans, including any state-wide Byrne
Grant strategy?
• When do you intend to hire, train and
deploy officers funded under this pro-
��
• What will be the community policing
activites of these and/or other officers in
your department, in both the short term
and over the next five years?
• What are your projections of additional
officers to be added in the next five yeazs
to support this community policing plan?
• Explain how the grant will be utilized to
reorient the affected law enforcement
agency's mission toward community-ori-
ented policing or enhance its involvement
in or commitment to_ community-oriented
policing. �
2. Describe how hiring new o�cers will serve
a local level public safety need.
• What unique public safety needs do you
LL have that require hiring of new officers?
• Are there any unusual public safery prob-
lems that your agency has experienced?
• How will these new officers contribute
to filling the needs that you have?
3. Ezplain why your department has been un-
able to address the public safety need, de-
scribed rn section 2 above, without federal
assistance:
• Describe any fiscal, budgetary or other
limitation on your department's ability
to hire additional officers without federal
assistance.
What has been the average change in your
force strength over the past three years?
5
6
If there has been an increase, do you in-
tend to maintain the same average annual
increase over the next three years (ex-
cluding officers funded under COPS
AHEAD)?
4. Identify related governmental and community
initiatives which complement or will be co-
ordinated with the proposal.
• What other governmental crime control
programs exist in your jurisdiction?
• What other community crime prevention
and control programs exist in your com-
munity?
• How will the hiring of new officers for
community policing complement these
other programs? �
S. Describe initial and anticipated levels of
community suppor.t, including ftnancial and
other tangible contributions to commurriry po-
licing efforts. , _
• What programmatic, financial or other
support do you currently have for com-
munity prob(em solving and crime con-
trol?
• What will be the specific levels and types
of communiry support that your agency
is lihely to receive over the next five
years?
• Have you sought and/or obtained any
sources of private fnancial support?
6. Describe how you plan to retain the new of-
ficers jollowing the end oJfederal grant sup-
port.
• How do you plan to assume a progres-
sively larger share of hired officers' sala-
ries over the course of the grant, leading
to full-time retention ofthe officers at the
conclusion of the grant?
• What assurances do you have from�your
local government that these officers wiil
be retained?
• What specific plans do you have for the
retention of these officers at the conclu-
sion of federal support?
7. Describe the impact that increasing the num-
ber of offrcers in your department will have
on other criminal justice agencies in the ju-
risdiction. �
• Whaf will be the impact of, and your re-
sponse to, increasing the number of of-
ficers in your department on the prosecu-
tor? Public defense? Courts? Local and
state corrections? Other public and pri-
vate criminal justice agencies?
8. Describe cmy additional factors for consid-
eration.
• Does your agency intend to recruit and
hire members of the military involun-
tarily separated? If so, how?
• Is your agency proposing yearly cash
matches in excess of the minimum re-
quired? If so, how much is being
matched per officer?
Monitoring and Reporting
Requiremenfs
All successfui grantees will be required to
participate in grant monitoring by the COPS
Office. "I'he monitoring process may include the
submission of written reports, and telephone and/
or on-site reviews concerning the financial
administration of the grant and the progress
towards achieving the application's community
policing plan.
Evaluation Requirements
A national evaluation, as well as a number of lo-
cal level evaluations, will be conducted of the
COPS AHEAD program. The purposes of these
evaluations will be to assess the process of imple-
menting this program, as well as examining the
possible impacts of hiring new officers. Evalua-
tors may visit grantee sites to collect data for these
evaluations. All selected applicants must be will-
ing to cooperate in such evaluations and partici-
pate in providing the necessary information that
may be requested. In addition, grantees are en-
couraged to coilect information regarding the
achievements and successes of community ori-
ented policing in their area, as well as responses
from members ofthe public to the grantee's plan.
Paperwork Re.duction Act Notice
The public reporting burden forthis collection of
information is estimated at 22 hours per response,
including the time for reviewing'instructions,
searching existing data sources, gathering and
maintaining the data needed, and completing and
reviewing the collection of information. Send
comments regarding this burden estimate or any
other aspects of this collection of information,
including suggestions for reducing this burden to
the Office of Community Oriented Policing Ser-
vices, U.S. Department of Justice, P.O. Box
14440, Washington, DC 20044; and to the Pub-
lic Use Reports Project, 1103-0015, Office of In-
formation and Regulatory Affairs, Office of Man-
agement and Budget, Washington, DC 20503.
Technical Assistance
Technical assistance is available to applicants at
no cost. Assistance on completing the necessary
application documents may be obtained from the
Department of Justice Response Center at: 1-800-
421-6770. Assistance regarding the formulation
of community policing plans and practices may
be obtained from the COPS Office at: 1-202-
514-2058. Written inquiries may be sent to:
COPS Office, U.S. Department of Justice, P.O.
Box 14440, Washington, DC 20044.
Guidance regarding financial and administrative
aspects of the grant process also may be obtained
by consulting the Office of Justice Programs' Fi-
nancial and Administrative Guide for Grants
(M7100.1), which is availabie at no cost from the
Department of Justice Response Center.
7
8
U.S Depmnnent ojJusrice ,
Offce ojComnnmity Orienred Polieing Serviee.r
ADMINISTRATIVE REQUIREMENTS
FOR APPLICANTS
Grant Funds Must Supplement
and Not Supplant
Grant funds may not be used to replace state or
local funds (or where applicable, provided by the
Bureau of Indian Affairs) that would, in the ab-
sence of Federal aid, be available or forthcoming
for law enforcement. Instead, COPS AHEAD
grant funds must be used to increase the total
amount of such other funds used for law enforce-
ment.
A grant recipient may not use federal grant funds
to pay salaries of police officers that the recipi-
ent already is obligated to pay. For example, if a
grantee, prior to submitting a Letter of Intent to
participate in COPS AHEAD, had committed to
hire ten new officers, then the grantee must hire
those officers in addition to those requested un-
der COPS AHEAD. Funds currently allocated to
pay law enforcement officers may not be reallo-
cated to other purposes or refunded should a
COPS A.HEAD grant be made. Non-federal funds
for police hiring must remain available for and
devoted to that purpose, with COPS AHEAD
funds serving as a supplement to those non-fed-
eral funds.
In addition, without including officers hired un-
der a COPS grant, all grantees will be expected
to proceed with new hiring at a level consistent
with historical practice, and to take positive steps
to fill all vacancies resulting from attrition. Fail-
ure to do so may be considered to be evidence of
supplanting.
Finally, the non-federal funds used as matching
funds for a COPS grant must be in addition to
funds that would otherwise be available for law
enforcement. For example, funds previously bud-
geted for the hiring of one new officer may not
be reallocated to provide local matching funds
for the hiring of COPS AHEAD o�cers.
The possibility of supplanting will be the subject
of careful application review, and possible pre-
award review, post-award monitoring and audit.
Any supplanting of non-federal funds by COPS
grant funds is a ground for potential suspension
or termination of grant funding, recovery of funds
already provided, and other civil or criminal sanc-
tions.
As part of this application, an agency must sign a
certification that no supplanting of non-federal
funds will take place should a grant award be
made. This certification shall be treated as a
material representation of fact upon which reli-
ance will be placed in the Departrnent of Justice's
determination whether to award this grant.
Single Point of Contact Review
Executive Order 12372 requires applicants from
State and local units of government, or other or-
ganizations providing services within a State, to
submit a copy of the application to the State S ingle
Point of Contact (SPOC), if one exists, and if this
program has been selected for review by the State.
(Indian tribal governments are exempt from this
review.) The State Single Points of Contact aze
listed in Appendix D of this application kit. Ap-
plicants must contact their State SPOC to deter-
mine if the program has been selected for State
review. If the SPOC requires a copy of the COPS
AHEAI� Application, the applicant should still
send the original application and two copies to
the COPS Office.
Audit Requirement
The Single Audit Act of 1984, issued in OMB
Circular A-128, "Audits of State and Local Gov-
ernments," establishes the requirements for or-
ganizationat audits that apply to COPS grantees.
The required audits aze to be on an organization-
wide, rather than a grant-by-grant basis, and must
be arranged for by the grantee in accordance with
the requirements of the circular.
Certification Regarding
Lobbying; Debarment,
Suspension, and Other
Responsibility I�latters; Drug-
Free Workplace Requirements;
Coordination and Non-
Supplanting Requirements
Applicants should refer to the certification form
in Appendix C to determine the certification(s)
to which they are required to attest. Applicants
also should review the instructions for certifica-
tion included in the regulations refecred to in the
certification form. Signature of this form pro-
vides for compliance with certification require-
ments under 28 CFR Part 69, "New Restrictions
on Lobbying," and 28 CFR Part 67, "Govemment-
wide Debarment and Suspension (Nonprocure-
ment) and Government-wide Requirements for
Drug-Free Workplace (Grants)," and with the co-
ordination and non-supplanting requirement of
the Public Safery Partnership and Community Po-
licing Act of 1994. Tne certifications will be
treated as a material representation of fact upon
which reliance will be placed by the Department
of Justice in awarding grants.
Civil Rights
All recipients of federal grant funds are required
to comply with nondiscrimination requirements
contained in various federal laws. All applicants
should consult the assurances to understand the
applicable legal and administrative requirements.
Suspension or Termination of
Funding
The COPS Office may suspend, in whole or in
part, or terminate funding for, or impose other
sanction on, a grantee for the following reasons:
Failure to substantially comply with the
requirements or statutory objectives of
the Public Safety Partnership and Com-
munity Policing Act of 1994, program
guidelines issued thereunder, or other
provisions of federal law; or
• Failure to make satisfactory progress to-
ward the goals or strategies set forth in
this application; or
• Failure to adhere to grant agreement re-
quirements or special conditions; or
• Proposing substantiai plan changes to the
extent that, if originally submitted, would
have resulted in the application not be-
ing selected for funding; or
• Failure to submit reports; or
• Filing a false certification in this appli-
cation or other report or document; or
• Other good cause shown.
Prior to the imposition of sanctions, the COPS
Office will provide reasonable notice to the
grantee of its intent to impose sanctions and �vill
attempt informally to resolve the problem. Hear-
ing and appeal procedures will follow those in
Department of Justice regulations in 28 CFR Part
18.
9
. .
+ � °'� U.S. Depantmenr ojJustrce
OBee oJCommunity Oriexted Polreing Suvices
ASSURANCES �
Several provisions of federal law and policy apply to all grant programs. We (the Office of ��
Community Oriented Policing Services) need to secure yo� assurance that you (the applicant) _w_
will comply with these provisions. If you would like further information about any of the
matters on which we seek your assurance, please contact us..
By your authorized representative's signature, you assure us and certify to us that, if the grant is
awazded, you will comply with all legal and administrative requirements that govern the
acceptance and use of federal grant funds. In particular, you assure us that:
1. You have been legally and officially authorized by the
appropriate goveming body (for example, mayor or city coun-
cit) to apply for this grant and that the persons signing the
application and these assurances on your behalf are autho-
rized to do so and to act on your behalf with respect to any
issues that may anse during processing of this apPiication.
2. You will comply with the provisions of federal law which
Iimit certain political adivities of your employees whose prin-
cipal employment is in connection with an activity financed
in whole or in part with this grant: These restrictions are set
forth in 5 U.S.C. § 1501, et sea.
3. You will coF�ply with the minimum wage and maximum
hours provisions of the Federal Fair Labor Standards Act, if
they apply to you.
4. You will establish safeguards, if you have not done so
already, to prohibit employees ftom using their positions for
a purpose that is, or gives the appearance of being, moti-
vated by a desire for private gain for themselves or others,
particularly those with whom they have family, business, or
other ties.
5. You will give the Dapartment of Justice or the Comptrol-
ler General access to and the right to examine records and
documents related to the grant.
6. You will comply with all requirements imposed by the
Oepartment of Justice as a condition or administrative re-
quirement of the grant, with the program guidelines, with
the requirements of OMB Circul2rs A-87 (goveming cost cal-
culations) and A-128 (goveming audits), with the applicable
provisions of the Omnibus Crime Control and Safe Streets
Act of 1968, as amended, with 28 CFR Part 66 (Unifortn
Administrative Requirements), with the provisions of the
current edition of the Office of Justice Programs Financial
and Administrative Guide for Grants, and with all other ap-
plicable laws, orders, regulations, or circutars.
8. You wiil not, on the ground of race, color, rel'�gion, na-
tional origin, gender; disability or age, unlawfully exdude
any person from participation in, deny the benefits of or em-
ployment to any person, or subject any person to discrimi-
nation in connection with any programs or acbvities funded
in whole or in pa�t with federal funds. These civil rights re-
quirements are found in the nondiscrimination provisions of
the Omnibus Crime Control and Safe Streets Ad of 1968,
as amended (42 U.S.C. § 3789(d)); TiUe VI of the Civil Rights
Ad of 1964, as amended (42 U.S.C. § 2000d); the Indian
Civil Rights Ad (25 U.S.C. §§ 1301-1303); Section 504 of
the Rehabil'�tation Act of 1973, as amended (29 U.S.C. §
794); TiUe II, Subtitle A of the Ameriqns with Disabil'�ties
Act (ADA) (42 U.S.C. § 12101, ��.); the Age Discrimina-
tion Ad of 1975 (42 U.S.C. § 6101, �,gq.); and Depart-
ment of Justice Non-0iscrimination Reguiations coMained
in Title 28. Parts 35 and 42 (subparts C, 0, E and G) of the
Code of Federal Regulations.
A. In the event that any court or administrative
agency makes a finding of discrimination on grounds of race,
color, religion, national origin, gender, disabilit�r or age against
you after a due process hearing, you agree to forvvard a
copy of the finding to the Office of Generat Counsel, C�PS,
P.O. Box 14440, Washington, OC 2D044.
B. If you are applying for a grant of 5500,000 or
more and Department regulations (28 CFR 42.301 SLS�.q.)
require you to submit an Equal Opportunity Employment
Plan, you will do.so at the time of this application, if you
have not done so in the past.
9. You will insure that the facilities under your ownership,
lease or supervision which shall be utilized in the aocom-
plishment af the project are not listed on the Environmental
Protec�ion Agency's (EPA) list of Yolating Faalities and that
you will notify us if you are advised by the EPA indicating
that a faality to be used in this grant is under consideration
for listing by EPA.
7. You will, to the extent practicable and consistent with 10. If your state has established a review and comment
applicable law, seek, recruit, and hire members of reaal and procedure under Executive Order 12372 and has seleated
ethnic minoriry groups and women in order to further effec- this program for review, you have made this appliption avait-
tive law enforcement by increasing their ranks within the able for review by the State Single Point of Contact
swom positions in your agency.
! hereby certify compliance with the above assurances that govern the application qnd use oJFederal fu»ds.
Signature D�b
Appendix B• Legal Assurences
Cox Cable Bakersfield
820 22nd Street
Bakersfield, CA 93301
�� ,
Cox Cable
Bakersfield
December 23, 1994
Mr. Alan Tandy
City Manager
1501 Truxtun Avenue
, - - - --- - - -6aker�iield; Ca6i#'cer:9a 933^�'! --- -
Dear Alan:
A Subsidiary of
Cox Communications, Inc.
�-_— _. -- - - _ _ :
�;�'��' ti .~i C , �' �. ; :�' �,
� _.-_.__ _. __ - _
f
! � ��C Z 7199�
I—.—_:= - -- —
�a°� ���������°� '
I'm writing to inform you about changes in our prices. Effective with our February,
1995, billing cycle, the rate for Broadcast Basic Cable will increase from $6.95 to
$8.75, and Complete Basic Cable will increase from $21.45 to $22.95. In addition,
there wiil be a small increase on our premium channel packages and Music Choice
service .(new rates enclosed).
s- .�_ .�.
As.,`yo,u m;ay..i;ecall, last January we lowered our rates $1.00 on Basic. In addition,
we eliminated all additional outlet charges of $4.75, reduced the price of remote
controls by $1.00 and siashed the cost of Music Choice by $6.00. The average
cabie bill actually decreased by more than $2.A0.
Although� we have done a good job holding down our controllable costs through
improved operating efficiencies and reductions in expenses, other uncontrollable
costs such as programming; insurance and utilities continue to climb. For
example, our basic programming costs (the fee we pay to programmers such as
ESPN and CNN) has increased 87% in the past 2 years. However, our rates for
Basic Cable Service have only increased 2% in the same time frame.
We wilf continue to look for w�ays to further reduce our costs without sacrificing
- `fne Kind' of s"e�ve� ou� cusiomers deserve and expeci: -" � - � � � ��-- - � � �
We are notifying our customers of this increase in their January billing statements.
I wanted to give you advanced notice shou�d you get any questions from your
constituents, our customers.
As always, please feel free to call me at 327-3463 should you have any questions.
Sincerely, ' � . . . . .. . . .
• '' • ,.. _ .� _., . , .. ,�...
..�.� , , . _ .. . �:._ . ,
J�iil C'a,mpbell �' r . _, , �
Vice �Presidentl � ' . . . . . ` � `
General Manager . _
.' . ., .-_..._�
... . • ...�. .
___-_ �
�
d
�
� � �,
. ��:�
COX CABLE BAKERSFIELD
February 1, 1995 Monthly Rate� Changes
(Prices Do Not Include Applicable Taxes & Fees)
2/1/95 Current
Rate Rate
2/1/95
Rate
Chan e
Basic Cable Services: ,
Basic Broadcast $ 8.75 $ 6.95 $ 1.80
Limited Basic 7.95 8.00 (0.05)
- - --- -E�anded.Basic _ _ _ __ - `_ .625 _ - - - . 6.50 - , _ - (0.25) _ - - _ - -
Complete Basic (Residential) 22.95 21.45 1.50
(Business) 26.95 24.95 1.70
0
Music Choice
HBO, Showtime, Cinemax & The
Movie Channel:
First Premium Channel
Second Premium Channel
Third Premiutn Channel
Fourth Premium Channel
Multiplexing (HB02 &
Showtime2) will be introduced
2/1/95 in certain areas and
will be available to all
subscribers by the end �
of 1996
Equipment Maintenance Service
Contract (new service)
6.25
10.50
9.50
8.00
7.00
4.95
10.50
8.50
7.50
6.50
0.99 N/A
1.30
1.00
0.50
0.50
N/A
December 27, 1994
�
t �
�7esign/�uild • Residential o Commercial
C=Z'Y BUILD=NG =NSPECT=ON 8r. PER.MITS
DEPAR'I'NIENT
1715 Chester A�enue
Bakersfield, C� 93301 ,
Att�ntion :
Mr. Fiddler,
D�nnis Fi.ddler
I just wanted to take a moment to alert you to •a situation -7at
happened recently, and let you know that the efforis of -our
department was appreciated.
This past week, on a Friday morning,.we were called b�� Creekside
Apartments on an emergency call. They had suffered a fire rhe
night before, and power was down in twelve of their units. -hey
asked us to do whatever we had to do, in order for the power tL be
back up that day. Not only would the tenants need to �ove
elsewhere for the weekend if we could not get the power up, ��ut
Creekside was also afraid that they might lose their tenants for
good. �
:�lthough we had five men on the ,job that day, we couldn't fii-:ish
pulling all of the necessary wiring before our goal of :ive
o'clock. Had `1r. Highfield not been willing to work late himself,
we would not ha�-e been able to have power back in these units u�til
sometime Monda3 morning, which we all felt would have been too �_ate
to meet the needs of the tenants.
We c:ant to extend our appreciation to Mr. Highfield and -our.
inspection depart,ment for all of your hard work, and willingness to
go the extra mile when it was truly needed�. We believe 'hat
through this extra effort, we saved Creekside Apartment tc:elve
tenants, and the loss of potentially thousands.of dollars. T':ank
you for your commitment to the community.
Sincerely,
C-���-� ��-����
ftand� W. Rankin
� _Y �-� ' . '` _ _ -`��,;
�bl���� y''� � .i
� i - � i
�� � � • u
i
� ; DEC 2 9 1994 ; �
� � _�
���'Y �A6�{�.����'� �":=��r�� �
_. _ __ .�-. ��_m.�
' �30 2�?th �:reei. Suite A� Bakersfield, California 93301 a(805) 325-8658 — FAX 32�-�042 ��_ _:nse n40��75
�
B A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
MEMORANDUIvi
December 21, 1994
TO: ALAN TANDY, CITY MANAGER
FROM: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
SUBJECT: 1994-95 CIP STATLTS
Attached are two versions of the 1994-95 CIP program. Both schedules are intended to be
executive summaries. The first schedule shows all projects by order of design schedule
within the fiscal year. The second is grouped by project engineer with each engineer's
schedule in order of design schedule. Also enclosed is a construction inspection status
report of CIP projects as well as the detailed financial monthly CIP status report.
If you have any questions, I am available at your convenience.
� ;,- - --
�
��' DEC 2 2 i�q�
� �
�� �
; � ,� c;�-,r .:�.: � �� ,
cc: G. Waiters
T. Slater
�
I: � � � ������
TRAFFIC ENGINEERING MEMORANDUM
To: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
From: STEPHEN L. WALKER, TRAFFIC ENGINEER ��• ,��J
Date: December 20, 1994
Subject: 1994-95 CIP STA1'LTS
Attached are two variations of the 1994-95 CIP schedule. The first shows all projects by
order of design schedule within the fiscal year. The second is grouped by project engineer
with each engineer's schedule in order of design schedule. As shown all projects are either
ahead of schedule or on schedule. Following are projects of special interest:
PROJECTS BEHIND SCHEDULE
No projects are behind schedule.
PROJECTS AHEAD OF SCHEDULE
1. New Signal - Ashe Road at South Halfmoon Drive.
This project was scheduled for approval of plans and specfications in January. They
were actually approved on December 14,1994. Bids will be opened January 11, 1995
with contract award anticipated for the January 25, 1995 Council meeting.
2. New Signal - 4th Street at Chester Avenue.
This project was scheduled for approval of plans and specfications in January. They
were actually approved on December 14, 1994. Bids will be opened January 11, 1995
with contract award anticipated for the January 25, 1995 Council meeting.
3. New Signal - Gosford Road at North Laurelglen.
This project is scheduled for completion of plans and specifications in April but
design is proceeding ahead of schedule. Expected completion will be no later than
February and possibly late January.
PROJECTS ON SCHEDULE
All other projects are on schedule.
�
B A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
MEMORANDUM
DATE: December 20, 1994
TO: RAUL M. ROJAS, PUBLIC WORKS DIRECTOR
FROM: JACQUES R LaROCHELLE, CIVIL ENGINEER IV-DESIGN
SUBJECT: 199495 CIP STATUS
Attached are two variations of the 1994-95 CIP schedule. The first shows all projects by
order of design schedule within the fiscal year. The second is sorted by project engineer.
As shown the majority of projects are on schedule. Following are projects of special
interest:
PROJECTS BEHIND SCHEDULE
1. �el Tank Replacement at corporation yard and
Project behind schedule approximately 1 month.
the January 25, 1995 Council meeting.
2. Westchester sewer rehabilitation.
Project behind schedule approximately 1 month.
the January 25, 1995 Council meeting.
3. Rosedale Hwy median landscaping.
police station.
This project should be awarded at
This project should be awarded at
Project delayed due to our Landscape Architect overseeing Rosedale interchange
tree planting project. We are currently developing an RFP for landscape work and
will include this project in the scope to insure its timely completion.
PROJECTS AHEAD OF SCHEDULE
1. Stockdale Hwy at Cross Valley Canal sewer reconstruction.
Project completed early due to emergency need for construction.
2. Convention Center reseal of arena fioor.
Research and specifications done early to accommodate hockey. Convention Center
however requested postponement due to scheduling �conflicts. We are currently
working on scheduling this work in late spring or early summer depending on
Convention Center bookings.
3. Group picnic area playground equipmen�
Plans completed early. Parks will install by force account.
4. Iand fencing in Section 4.
Project ahead of schedule. Currently applying for state grant to clean site of trash.
PRO.iECTS ON SCHEDULE
All other projects are on schedule.
CONSTRUCTION INSPECTION
PROJECT STATUS
CAPITAL IMPROVEMENTS
� 2/os�sa
START EST. COMP %
PROJECTS TYPE CONTRACTOR WSPECTOR DATE DATE COMP
ASHE RD. @ SOUTH HALFMOON pR. TRAFFIC SIGNAL BRADFORD ELECTRIC �
BA}�RSFIELD AIfiPARK TAXIWAY,APRON & FENCE GRIFFITH COMPANY BOLAiVOS 10/17/94 11 J29/94 7096
BROWN ST: �u EASTSIDE CANAL BOX CULVERT GRiFFITH CO. BOLANOS 11/15/94 01/18/95 5°k
BUENR VISTA ROAD @ STOCKDALE HIGHWAY TRAFFIC SIGNAL — INSTALL A—C ELECTRIC �°�
CAl1FORNIAAVE — STOCKDALE/REAL MEDIANS & RESURFACING GFiIFFITH COMPANY ALLEN 09I06/�4 Q4/14/95 45°�6
CALJFORNIA AVENUE @ H. STREET SIGNAL MODIFICATION McI�E ELECTRIC MAHAFFEY 01/03/95 02/23/95 � 0°�
CALLOWAY DRIVE MEDIAN i.ANDSCAPE & IRRIGATION GRIFFITH COMPANY FICK 11/3/94 . 12/16/94 60°%
FIRE STATtON #2 STRUCTURAL REHAB. GEfdERAL DEV. & CONST. CHOATE �°�
KERN RIVER PARKWAY LANDSCAPE & IRRIC�ATION KERN SPRINK�ER FlCK 10/26/94 12J30/94 90%
MONTEREY STREET Q HALEY STREET TRAFFIC SlGNAL — INSTALL CRAFTON ELECTRIC �°'o
NORTHEAST BAKERSFIELD SEWER TRUNK LJNE SPIESS COtVSTRUCTION MILLWEE 10/10/94 06/29/95 8°�6
PANAMA LANE Q STINE ROAD TRAFFIC SIGNAL INSTALL. BRADFORD ELEC7RIC �°�
PARK STOCKDALE RESURFAGNG GRANITE CONST. SHAMSHOIAN Sl1SPEND 0°,6
TRUXTIiN AVE. — QAK TO "A" ST. SIGNAL INTERCONNECT BRADF�RD ELECTRIC 0%
VARIOUS MAJOR STREETS PAVEMENT MARKERS IPS SERVICES � �%
I VARIOUS STREETS CURB & GUTTER GRIF�ITH COMPANY I_McNEILL ; 10/17/94 , 01/27/95 't 10%
j VARIOUS STREETS — PHASE II RESURFACING SULLY — MILLER I MAHAFFEY . � 10/19/94 SUSPEND 1, 20%
WIBLE RD: — PANAMA TO HARRIS LANDSCAPE MEDlAN ALPHA OMEGA BUILDERS 0°�
�
f
I
�
, I
,. � �, �
' I � I i
1 I I f
i � ►
�
CONSTRUCTION INSPECTION
PROJECT STATUS
SUBDIVISION
19/05/94
P.M. OR DEVELOPER/ %
TRACT #'S LOCATION CONTRACTOR INSPECTOR COMP.
TR 4957-3 S/O HARRIS RD. — E/O ASHE RD. JUDKINS CHOATE 20%
7R 5084-3 RENFRO — N/O STOCKDALE MURPHY LESH 50%
TR 5292 MOUNTAIN VISTA & GRAND LAKES CASTLE & COOKE CHOATE 0%
TR 5372-2 VERDUGO & REINA CENTEX REAL ESi'ATE LESH 55%
TR 5464 MING & HAGGIN OAKS CHOATE 95%
TR 5489—B ALLEN RD & BRIMHALL RD CASTLE & COOKE LESH 90%
TR 5552—A,B RENFRO RD. & STOCKDALE FiWY. WEST KERN DEVELOPMENT LESH 30%
TR 5594—B HAGEMAN RD. — E/O ALLEN RD. HARDT DEVELOPMENT LESH 70%
TR 5600 McKEE RD. & AKERS RD. DANDY & ASSOCIATES CHOATE 85%
TR 5644-1 CAMPUS PARK DR. — E/O BUENA VISTA LESH 60%
TR 5646-2 FAIRFAX RD @ VALLEYVIEW DR W.D.J. CORPORATION PIERCE 50%
TR 5666-2 CAMPUS PARK & OLD RIVER RD. COMMUNITY CONSTRUCTION LESH 40%
TR 5670-3&4 STINE RD. 8� SEASONS DR. STINE ROAD DEVELOPERS CHOATE 80%
TR 5675-3 MEACHAM RD. & MAIN PLAZA DR. DeWALT CORP LESH 95%
TR 5678—A WHITE LN. & GOSFORD RD. CASTLE & COOKE CHOATE 95%
TR 5688—A HARRIS RD — E/O ASHE RD BOB MAHAN CHOATE 90°%
TR 5688—C HARRIS RD. — E/O ASHE RD. EPCO VENTURES CHOATE 50%
TR 5686—E&F HARRIS RD, — E/O ASHE RD. KYLE CARTER CHOATE 35%
TR 5702 W/O STINE RD. — S/O HARRIS RD. KAUFMAN & BROAD CHOATE 95%
TR 5767 MOUNTAIN VISTA & CAMPUS PARK CRT INVESTMENT LESH 55%
TR 5775 COFFEE RD. & OLIVE DR. LESH 10%
17/05/94
CONSTRUCTION INSPECTION
PROJECT STATUS
SUBDIVISION
P.M. OR DEVELOPER/ %
TRACT #'S LOCATION CONTRAGTOR INSPECTOR COMP.
CESAR E. CHAVEZ SCHOOL NICKELS DEV. PIERCE 99%
EARL WARREN JR. HIGH SCHOOL B.V—PANAMA SCH. DIST. LESFi 99%
GREENF�ELD JUNIOR HIGH S.C. ANDERSON CHOATE 85%
KERN HI#3 STINE & McKEE COLOMBO CHOATE 85%
HAGEMAN RD EXT. —E/O MAIN PLAZA RIVERLAKES RANCH LESH 100°�
PM 8337 COFFEE RD. & DOWNING RD. SOUTHWEST CONT. LESH � 75%
� -----
GENERAL GOVERNM ENT
40101 Building, Remodel — Remodel Risk Mgmt upon TrafGc
move to Annex '
�
40201 Building, Remodel — Remodel Mnex, Second Floor
40202 Building, Remodel — City Hall Mnex, Rule 9001
Compliance, Rideshare
40302 Fuel Fazm, Construction — Under�gound Fuel System,
15,000 Gallons
40401 Signal, Modification — Opticom Traffic Signal
Emergency Vehicle Preempting Devic�s
40402 Building, Remodel — Architectural Barrier Removal
Program
40403 Computer System, G. 1. System — Street & Utility
Mapping Project
40404 Building, Remodel — Architectural Barrier Removal
System, Cfty Hall
90101 Computer System, Replacement — Prime Central
Computer and Applications Software
90101 Computer System Replacement
_.. ........._ ..................__..... - - :::::::::::::::::::::. : :.:.:
��NEE31!�:: ���FiI�iE�1�1'�:'!'#lT�AL:::::::>::»>::>::::::> :::::::::::::::>::::>::::>::>:;:::;;?:: :
............:...................:.............................................. .
�
i
�
ClPsummary 21—Dec-94 i
,
�
$26,000 $8,186 JAMISON
$27,000 $5,005 SADOWSKY 6-30-94
$20,000 $19,918 SADOWSKY 9-16-94
$200,000 $200,000 MORENO 10-28-94
$50,000 $50,000 CAPRELLI
$100,000 $100,000 STARNES ON=GOING
$100,000 $100,000 DEETER
$75,000 $75,000 STARNES ON—GOING
$154,W0 $154,000 KENNEDY
YES $558,000 $558,000 KENNEDY
;;:.: ; ;;- - ; :.: :..::,;;...;..; :: :.... ::: ........
>::: �:;:�1�i �tl�
>::; :#> >�:�:
<:.... _�.........
�.. �
_ ...�::.•.- :.::::.•..:..... _ ............. _............
1
11/94
H WORK PERFORMED BY CITY FORCES
10-31-94 H PROJECT COMPLETED 10-31-94.
H DESIGN COMPLETE, BIDS RECENED.
PROJ�T SHOULD BE AWARDED BY 12-14-94
M DESIGN COMPLETE. APPROVALOF P.S.&E. 12-14-94
FIRE DEPARTMENT LEAD AGENCY; TRAFFIC ENGINEERING ASSISTING
NOTHING FURTHEA TO REP�RT THIS HEPORTING PERIOD.
M CONSULTANT PROCURED. BEGINNING SURVEY PROCESS OF CITY
HALL BUILDING. SURVEY SHOULD BE COMPLETE BY 12-1-94
M JOINT P�JECT WITH DEVELOPMENT SERVICES DEPARIMENT
M CONSULTANT PROCURED. BEGINNING SURVEY PF�CESS OF CITY
HALL BUILDING. SURVEY SHOULD BE COMPLETE BY 12-1-94
H DATA PROCESSING DIVISION IS THE LEADCITYAGENCY
H DATA PROCESSING DNISION IS THE LEADCITYAGENCY
�
POLICE DEPARTMENT
40501 Building, Up�ade — Install new carpet, Police
Building Basement
40502 Computer System, New — Install Mobile Data
Terminals In Police Vehicles
40503 Building, Expansion — Construct Wing on Police
Building
90501 Police Cooling Tower Replacement
90502 Police Recorcis Management System
........, ..........:............................_.............. .._..........
P� E3�E::E�PA�7�fEEAk�': �TA�:::;:: :=::>:;:<:;:;>;;::: <:::::«:::> <:>::::::>::;::::>:< <:::::::»
....... . : .
FIRE DEPARTMENT
40601 Buiiding, Design andConstruction — New Fre
Station — 6915 Stine Road
40602 Parking Lot, Hesurtacing — Paving — Olive Drive
Training Facility
40603 Fre Equipment, Hose Tower — Hose Towers—Station 2
40604 Professional and Consulting — CitylCounty Fire
Study
40605 Automated Electronic Weather S�tion — Haz Mat Van
90601 Building, Upgade — Seismic Retrofit S�tion #2 —
718 E. 21 st St.
90802 Building, Upgrade — Diesel Exhaust Removal
System—Stations 2, 4, 6, 11, 13' I
�
Rerooi of Tower Building at Fire Station #1 ;
ClPsummary 21—Dec-94
i
$13,000 $13,000 JAMISON
$1,700,000 $1,694,962 COMM.
$1,300,000 $1,203,813 ARNOLD 1-31-94
YES $13,633 $13,633 ARNOLD COMPLETE
YES $92,958 $92,958 POLICE
><:;: : .;:: :: -: . :; .... : ..............................
;::<: 3<:1 f�>�t::<:>: �:{�`ti�� �>
::.:. .�...i........h..........?/Y�........�.........
$650,000 $850,000 DeWAYNE 1-15-95
536�000
$15,000
550�000
$36,000 PACHECO
$15,000 DeWAYNE 1-15-95
$50,000 PACHECO
$11,000 $11,000 PE4CHEC0 11-16-94
$440,000 $439,970 DeWAYNE 9-1-94
$40,500 $40,500 PEVCHECO
$4,500 $4,500 JAMISON
�
H CONSULTANT PROCURED. PROJECT INVOLVES PARI4NG LOT
RECONSTRUCTION AND COMMUNICATIONS TOWER REPLACEMENT.
PLANS PROGRESSING ON SCHEDULE
CONSTRUCTION COMPLETED IN F.Y. 1993-94.
H PLANS FOR STATION ARE COMPLEfE. CONSULTANT MUST BE
PROCURED TO DEVELOP SITE PLAN. CURRENTLY REVISING
COST ESTPVIATES AND SECURING PROPERTY.
WORK BY FIRE DEPARIMENT. INVOLVES COU NTY PARTICIPATION.
M TO BE COORDINATED WITH SEISMIC RETROFIT PFiOJECT
H PLANS, SPECIFICATIONS AND CONTRAGT DOCUMENTS ARE
COMPLETE. PROJECT AWARDED i t-4-94.
WORK BY GENERAL SERVICES.
i
_ ......:...........: :.:. ..:. ::::::::::::::::::.: :::::. :::::::. ::::::.::
FlAE::�E#>JkE3`i�EE7�tT;TL�'E�iL::«::::<:::»::>:::;:::>::::>::::>::::>:<:>::::::>::::::>::::>::>:::>::>::::>::>:
PUBLIC WORKS DEPARTMENT
7084 15,000 Gallon Under�gound Fuel System
? 30 Street Light Acquisition
18715 Purchase 500 Street Light Photo Cells
30201 Baker Street Landscaping
1 41001 Signal, New — East &undage Lane at Oswell Street
4 41002 Signal, New — Gosford Road at North Laurelglen Blvd
4 41003 Signal, New — Jenkins Road at Stodcdale Highway
1 41004 Signal, Up�gade — 4th Street at Chester Avenue
5 41005 Signal, Up�ade — Mohawk Street at Tru�dun Avenue
4 41006 Signal, New — Calloway Drive at Meacham Road
8 8 7 41007 Signal, New — Akers Road at Panama Lane
ALL 41008 Channelization, Signing & Marking — Various
ClPsummary 21—Dec-94
1
YES
YES
YES
YES
$95,000
$18.000
$5,000
$9,378
$95,000 CONCHITA 10-28-84
$18,000 JAMISON N/A
$5,000 JAMISON
$9,378 FABBRI N/A
$154,000 $147,019 DEETEF;/
CONSLTNT
$123,000 $68,813 GILLBURG
$114,000 $107,083 TABUT
$101,000 $101,000 TABLIT
$45,000
$102�000
$45,000 TABLIT/
GILLBURG
$95,019 DEETEW
CONSLTNT
$109,000 $102,083 TABl1T
$60,000 $58,100 BRAD ONGOING
3
M DESIGN COMPLETE. APPROVAL OF P.S.&E. 12-14-94
WORK TO BE PERFORMED BY PARKS DEPARTMENT
M ENVIRONMENTAL REVIEWS DONE AS SCHEDULED.
CONSULTANT SELECTED. CONTRACTS BEING PROCESSED
M ENVIRONMENTAL REVIEWS DONE AS SCHEDULED. BASE MAP
COMPLETE, UTILITY INFORMATION STILL BEING RECENED 8
INCORPORATED INTO ONGOING DESIGN.
M ENVIRONMENTALREVIEWSDONEASSCHEDULED.SURVEYRECV'D
11-7-94. NOTHING FURTHER SCHEDULED THIS REPORTING
PERIOD.
H SURVEY AND ENVIRONMENTAL REVIEWS DONE AS SCHEDULED,
DESIGN 95%COMPLETE, AWAITING UTILITY INFORMATION. PS8�E
TO CITYCOUNCIL PLANNED FOR 12-14-94.
H ENVIRONMENTAL REVIEWS DONE AS SCHEDULED.
NOTHING FURTHER SCHEDULED THIS REPORTING PERIOD.
M ENVIRONMENTAL REVIEWS DONE AS SCHEDULED.
CONSULTANT SELECTED. CONTRACTS BEING PROCESSED
M ENVIRONMENTAL REVIEWS DONE AS SCHEDULED. SURVEYS
RECEIVED. NOTHING FURTHEA SCHEDULED THIS REPORTING
PERIOD.
M ONGOING AS NEEDED FOR OPERATIONAL PURPOSES.
4 41009 Signal, New — Coffee Road at Hageman Road
4& 5 41010 Signal, Interconnect — TOC Arterial Inirastructure
Conduk — 5 Locations (MING AVE, NEW STINE — CASTRO;
COFFEE RD, STOCKDALE — TRUXTUN; WHITE LANE,
WILSON — WIBLE; STINE/NEW STINE RD, WHITE —
STOCKDALE; STOCKDALE HWY, GOSFORD — CALIF.
ALL 41011 Signal, Upgade — Traffic Count Detector
Insfallation, Vario�a Locations
ALL 41012 Channelization, Signing & Marking — Speed Control
Features, Vazious Locations
4& 6 41013 Signal, New — Ashe Road at District Blvd
5 41014 Channelization, Median Construction — Ming Avenue
at Fwy 99, Southbound On—Ramp
2 41015 Street, Guardrail — Chester Ave. at AT&SF G�ade
Seperation.
4 41016 Signal, New — Flashing Beacon on Pin Oak Park Bivd
at Tevis ,k. High
ALL 41017 Channelization, Signing & Mazking — Bike lane
Installation on Stree� City Wide
41301 Street Reconstruction — Stodcdaie Hwy.— 1400' E/O
ClPsummary 21—Dec-94
$128,000 $73,749 DEETER/
CONSLTNT
$562�300 5562�300 BRAD
$25,000 $25,000 BRAD ONGOING
550�000 $50�000 BRAD
$101,000 $93,802 GILLBURG 11-28-94
$10,000 $10,�0 BRAD
$25,W0 $25,000 BRAD/
CONSLTNT
$22,000 $22,000 BRAD/
GILLBURG
$155,000 $155,000 DEETER
$421,300 $421,300
4
M ENVIRONMENTAL REVIEWS DONE AS SCHEDULED.
CONSULTANT SELECTED. CONTRACTS BEING PF90CESSED
M FIELD REVIEWS COMPLETED WITH CALTRANS OFFICIALS.
VERBALAUTHORIZATION BYCALTRANS GIVEN TO BEGIN DESIGN.
SURVEY REQUESTED & BEING PROCESSED BY SURVEYOR.
M DESIGN TO BE INCLUDED WITH NEW SIGNALATCALLAWAY DRIVE
AND MEACHAM ROAD SIGNAL DESIGN BYCONSULTANT.
H ONGOING AS NEEDED FOR OPERATIONAL PURPOSES. WORK
BY ANNUAL CONTRACTOR AND CITY CREWS.
H SURVEYS AND ENVIRONMENTAL REVIEWS DONE AS SCHEDULED.
DESIGN COMPLETE. PLANS & SPECIFICATIONS TO COUNCIL
FOR APPROVAL, ON 12-14-94 AGENDA.
H INSTALLATION OF RAISED PAVHuIENT MARKERS BY
GENERAL SERVICES COMPLEfED.
M ENVIRONMENTAL REVIEWS DONE AS SCHEDULED.
NOTHING FURTHEA SCHEDULED THIS REPORTING PERIOD. TO
BE DESIGNED AND INCORPORATED INTO ENGINEERING DIVISION'S
SEISMIC RETROFIT PF�JECT.
H ENVIRONMENTAL REVIEWS DONE AS SCHEDULED. BASE MAP
COMPLETE, PROJECT UNDER DESIGN. LOCATION CONFIRMED BY
SCHOOL DISTRICT 12/1/94. DESIGN BEING PROCESSED
PER RBC�UESTED LOCATION. UTILJN INFORMATION R6QUESTED.
M FIELD REVIEWS COMPLETED WITH CALTRANS OFFIC IALS. VEFiBAL
AUTHORIZATION BYCALTRANS TO BEGIN DESIGN. BASE MAPS
2096 COMPLETE.
Old River Road to Coffee Road
41302 Street, Resurfa�ing — 21 st Street —'F" To Chester
41303 Street Resurtacing —'N° to Golden STate
41304 Street, Resurfacing — Akers Road — Panama to Harris
41305 Street, Resurfacing — Fairview Road — Gwendolyn to
Monitor
41306 &idge, Construction — South H Street at Arvin
Edison Canal
41307 Street, Resurtacing — South HaH Moon Drive — Olympia
to Ashe
41308 Street, Resurfacing — Kaibab Avenue — Pasadena to
Harvard
41309 Street, Resurtacing — Monterey Street — ARa Vista
to Beale
41310 Street, Resurtacing — P Street —&undage to 4th
41311 Street, Resurtacing — P Street — 8th to California
41312 Street, Resurfacing — Pacheco Road — Wible to Hughes
41313 Street, Resurfacing — Q Street — California to Truxtun
41314 Street, Resurfacing — Wible Road — Planz to Ming
41315 Street, Resurfacing — Wible Road — 600' N/O Belie
Terrace to &undage
ClPsummary 21—Dec-94
$69,000 $69,000 JARRETT 2-15-95
$51,700 $0 TECH I 2-28-95
$79,400 $79,400 LEAL N/A
$178,400 $178,400 JARRETT 2-15-95
$247,500 $247,500 ARNOLD 4-15-95
$56�400
$37,600
$82,100
$93,000
$51,000
$0 TECH I 4-15-95
$0 TECH I 2-28-95
$82,100 JARRETT 2-15-95
$93,000 JARRETT 2-15-95
$51,000 JARRETT 2-15-95
$118,000 $118,000 JARRETT 2-15-95
$84,000 $84,000 JARRETT 2-15-95
$309,300 $309,300 JARRETT 2-15-95
$171,800 $171,800 JARRETT 2-15-95
5
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALE.
PROJECT COMBINED WITH OTHER GROUP 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO R�ONCILE GAS TAX FUND
PROJECT TO BE DONE BY STREETS DNISION.
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALE.
L COMBINED WITH OTHER A.E. CANALCROSSINGS.
PROJECTCOMBINED WITH OTHERGROUP2 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO R�ONCILE GAS TAX FUND
PROJECT COMBINED WITH OTHER GROU P 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALF.
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALE.
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALE.
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALE.
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALE.
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALE.
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
OF SCALE.
41316 Street, Resurfmcing — White Lane — Madison to Cottonwood $65,800 $0 TECH I 2-28-95 PROJECT COMBINED WITH OTHER GROU P 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
41317 Street, Resurtacing — University Ave. — Wenatchee $89,600 $89,600 JARRETT 2-15-95 PFiOJECT COMBINED WITH OTHER S.T.P. PROJECTS FOR ECONOMY
to Columbus OF SCALE.
41318 &idge Construction — Akers Road Widening at Arvin
Edison Canal
� 41319 &idge, Construction — Panama Lane Widening at
Arvin Edison Canal
41320 Bridge, Construction — Panama Lane Widening at
Fazmer's Canal
41321 Bridge, Construction — Stine Road Widening at
Arvin Edison Canal
41322 &idge, Construction — Wible Road Widening at
Arvin Edison Canal
41323 Bridge, Construcdon — Panama Lane at Freoway 99
Interchange
41324 Land, Acquisition — Freeway 178—Mesa Mazin to
Rancheria Road
41325 Bike Path, Construction — Freeway 99 to 2400' West
41328 Channelization, Median Narrowing — White Lane —
Wible Road to South H Street
ClPsummary 21—Dec-94
$184,500 $184,500 ARNOLD
$247,500 $247,421 ARNOLD 4-15-95
$90,000 $90,000 ARNOLD 4-15-95
$247,500 $247,500 ARNOLD 4-15-95
$247,500 $247,500 ARNOLD 4-15-95
$250,000 $250,000 DeWAYNE ON—GOING
$50,000 $50,000 MARIAN ON—GOING
$54�000 $54�000 DON N/A
$186,000 $188,000 CONCHITA 2-15-95
8
DESIGN BYCONSUI.TANT
L COMBINED WITH OTHER A.E. CANAL CROSSINGS — CONSULTANT
L COMBINED WITH OTHER A.E. CANAL CROSSINGS — CONSULTANT
L COMBINED WITH OTHERA.E. CANALCROSSINGS — CONSULTANT
L COMBINED WITH OTHER A.E. CANAL CROSSINGS — CONSULTANT
M AWAITING DECISION ON CONSULTANT SELECTION
BY MID DECEMBER, 1994.
M CURRENTLY IN THE PROCESS OF OBTAINING AERIAL PHOTOGRAPHY
DETERMINATION OF HORIZONTALAND VERTICALCONTROL
L AWAITING DECISION ON LOCATION AND POSSIBLE FUNDING SOUFiCE
FOR GRADE SEPARATED CROSSING OF PARKING LAT ACCESS.
L PROJECT TO BE COMBINED WITH WIDENING OF WHITE LANE (a�
WIBLE ROAD.
41327 Street, Curbs & Gutters — Miscelianeois
Improvemenls at Various Locations
41328 Channelization, Widening — Intersection—Tru�dun
Ave at Oak St (Right ot way only)
41329 Channelization, Widening — Intersection—White Lane
at Wible Road
41330 Channelization, Widening — CaliforniaAvenue—Oak
St to A St (Right of way only)
4133t Channelization, Widening — Calloway Drive—Rosedale
Plaza to Meacham Road
41332 Channelization, Widening — Hageman Road—Otd Fazm
Road to Jewetta Avenue
41333 Channelization, Widening — Stodcdale Highway—
Jenkins Road to Allen Road
41334 Street, Resurtacing — Ashe Road — S.P.RR. to
White Lane
41335 Street, Resurf�cing — Auburn Street — Redlancis to
Oswell
41336 Street, Resurtacing — Blade Avenue — Pasadena to
Boise
41337 Street, Resurtacing — Boise Street — Redlands to
University
ClPsummary 21—Dec-94
$100,000 $99,513 CONCHITA ON—GOING
$100,000 $100,000 CONCHITA 6-30-95
$115,000 $115,000 CONCHITA 2-15-95
$100,000 $100,000 CONCHITA 6-30-95
$152,200 $152,197 CONCHITA 3-15-95
$74,000 $74,000 CONCHITA 4-15-95
$184,000 $184,000 CONCHITA 5-15-95
$126,900
$40�400
$16,900
$32,000
$0 TECH I 4-15-95
$0 TECH I 2-28-95
$0 TECH I 2-28-95
$0 TECH I 2-28-95
7
M CURRENTLY WORKING ON CONTRACT TO PEFiFORM AERIAL
OF INTERS�TION/ROADWAY FOR RIGHTOF WAY DETERMINATION.
L PROJECT TO BECOMBINED WITH MEDIAN NARROWING PF�JECT
ON WHITE LANE BETWEEN WIBLF ROAD AND SOUTH H STREEf.
M CURRENTLY WORKING ON CONTRACT TO PERWRM AERIAL
OF INTEHSECTION/ROADWAY FOR RIGHTOF WAY DETERMINATION.
L REQUIRES DEDICATION OF RIGHTOF WAY AND RELACATION OF
POWER POLES.
PROJECT COMBINED WITH OTHER GROUP 2 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJ�T COMBINED WITH OTHER GROUP 1 PROJECTS FOH
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJ6CT COMBINED WITH OTHER GROUP 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONC ILE GAS TAX FUND
PROJECT COMBINED WITH OTHER GROUP 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONC ILE GAS TAX FUND
41338 Street, Resurtacing - Colgate Lane - Bo'se to
Kaibab
41399 Street, Resurtacing - Gosford Road - Pacheco to
District
41340 Street, Resurtacing - Harvard Drive - Pasadenato
Kaibab
41341 Street, Resurfacing - Manning Street - Mingto
Outingdale
41342 Street, Resurtacing - North Half Moon Drive -
Scenic to Ashe
41343 Street, Resurtacing - Oswell Street - Auburn to
Redlands
41344 Street, Resurfacing - Panama Lane - 400' East of
Colony to South H
41345 Street, Resurtacing - Vazio� Streets in Pazk
Stodcdale
41346 Street, Resurtacing - Pasadena Street - Renegade
to Kaibab
41347 Street, Resurfacing - Purdue Drive - Pasadena to
Oswell
41348 Street, Resurfacing - Redlands Drive - Wenatchee
to University
41349 Street, Resurtacing - Renegade Avenue - Wenatchee
to Boee
ClPsummary 21-Dec-94
$51,700
$52,900
$59�200
$57,300
$84�900
$55�500
$0 T6CH1 4-15-95
$0 TECH I 2-28-95
$0 TECHI 4-15-95
$0 T�H I 4-15-95
$0 TECHI 2-28-95
$0 TECHI 4-15-95
$405,300 $83296 JARRETT 9-16-94
$13,200
534�800
$57,300
$26,300
$0 TECHI 2-28-95
$0 TECH I 2-28-95
$0 TECH I 2-28-95
$0 TECHI 2-28-95
8
PROJECT COMBINED WITH OTHER GROUP 1 PROJECTS FOH
ECONOMYOF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJ�T COMBINED WITH OTHER GROUP 2 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJECT COMBINED WITH OTHER GROUP 1 PROJECTS FOR
ECONOMYOF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJBCT COMBINED WITH OTHER GROUP 2 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJBCT COMBINED WITH OTHER GROUP 2 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJ�T COMBINED WITH OTHER GROUP 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJECT COMBINED WITH OTHER GROU P 2 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PF�J�T CURRENTLY UNDER CONSTRUCTION, SUSPENDED
DUE TO COLD WEATHER CONDITIONS
PROJECT COMBINED WITH OTHER GROUP 1 PF�JECTS FOR
ECONOMYOF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PHOJBCT COMBINED WITH OTHER GROU P 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJECT COMBINED WITH OTHER GROU P 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PF�JECT COMBINED WITH OTHER Gf�UP 1 PF�JECTS FOR
ECONOMY OF SCALE. DEFERRED TO R�ONCILE GAS TAX FUND
41350 Street, Resurtacing — South Hatf Moon Drive — Ashe
to Scenic
41351 Street, Resurtacing — Stine Road — Harr's to
Pacheco
41352 Street, Resurtacing — Truxtun Avenue — Oak to'Q°
41353 Street, Resurtacing — Wible Road — Panamato
Harr's
41354 Street, Resurtacing — Oak Street — Tru�dun to 24th
41501 Land, Acquisition — Off Street Parking
41601 WTP, Improvements — Glass Vned Pipe for Sludge
Lines, Plant 2
41602 WTP, Expansion — Metro Bakersfield 1NW�P
Construcdon
41701 Land, Fencing — Fencing of Ciiy Property Neaz
Cottonwood Road and Panama Road
41702 Sewer, Construction — Abandon Old McCutchen
TruNc—Ashe Rd to Stine Rd
41703 Sewer, Rehabilitate — Upfyade Lift Station—Sandra
at Falcon
41704 Sewer, Rehabilitate — Modily Lift Station—Monitor
S/O White
41705 Sewer, Rehabilitate — Modity Gosford Road L�it
Station
ClPsummary 21—Dec-94
$51,700 $0 T�H I 4-15-95
$94,000 $0 TECH I 4-15=95
$141,000 ($905) TECH I 2-28-95
$58,300 $0 TECH I 4-15-95
$125,000 $0 TECH I 2-28-95
$550,000 $305,837 ANDERSON
$60,000 $60,000 DeWAYNE 4-15-95
$3,200,000 $3,200,000 KLOEPPER
$50,000 $50,000 KLOEPPER
$40,000 $40,000 TECH I 1-31-95
$72,000
572,000
$80,000
$72,OOOCONCHITA 12-15-94
$72,OOOCONCHITA 12-15-94
$50,737 AHNOLD ON—GOING
9
PROJECT COMBINED WITH OTHER GROU P 2 PROJECTS FOR
ECONOMYOF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJECT COMBINED WITH OTHER GROU P 2 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJBCT COMBINED WITH OTHER GROUP 1 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJECT COMBINED WITH OTHEfi GROUP 2 PROJECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROJECT COMBINED WITH OTHER GROUP 1 PF�JECTS FOR
ECONOMY OF SCALE. DEFERRED TO RECONCILE GAS TAX FUND
PROPERTY MANAGEMENT
L
M
L
M COMBINED WITH OTHER UFT STATION MODIFICATION
M COMBINED WITH OTHEH UFT STATION MODIFICATION
H PHASE I MEASURES HAVE BEEN IMPLEMENTED. PHASE II
IMPROVBuIENTS ARE CURRENTLY BEING INVESTIGATED BY
CONSULTANT
41706 Sewer, Construction — Eliminate Kern Island Canal
Sewer Crossings
41707 Sewer, Construction — Stodcdale Hwy Force Main at
C. V. Canal
41802 Fuel Farm, Construction — Fuel Fazm and Removal of
Existing Tanks
41804 Building, Construction — Construct restroom
facility @ Bakersfield Municipal Airport
41805 Land, Development — Airport Improvmen�,
Undergound Utilties, Perimeter Fencing
42003 Building, Up�pade — Install new carpet at Refuse
42203 Landscaping, Medians — Rosedale Highway—Oak Street
to Camino Del Rio
42205 Landscaping, Medians — North and Northeast Medians
— Stamped Concrete
42206 Pazk, Improvement — Saunders Pazk (Area2)—Picnic
Nooks
42207 Landscaping, Medians — Stodcdale Hwy—Gosford Road
to 1400' E/O EI Rio
42209 Building, Remodel — Construct Women's Shower
Facilities
42210 Park, improvement — Patrio� Park—Pump
Inatallation in Basin Area
42401 Building, Repair — Chiller Replacement atthe
Convention Center
$54,000 $54,000 JARRETT 4-15-95
$36,800 $0 TECH I N/A 9/94 10/94
$200,000 $200,000 MORENO PENDING
$35,000 $34,000 TECH I 3-15-95
$30,000 $19,065 JAMISON
$13,500 $13,500
$25,000 $25,000 DON 1-15-95
$150,000 $150,000 DON 1-31-95
$20,000 $20,000 FABBRI
$59,800 $59,800 DON 2-28-95
$21,000 $21,OW TECH I 3-31-95
$60,000 $60,000 JARRETT 12-1-94
$500,000 $500,000 DeWAYNE 2-28-95
ClPsummary 21—Dec-94 ip
L POSTPDNED PERCANAL DISTRICT RC-0UEST
L PROJECT COMPLETED UNDER EMERGENCYCONDITIONS IN
SEPTBNBER 1994.
M AWAITING AIRPORT DECISION ON LOCATION OF FUEL FARM
L
M
M
PARKS DNISION IS THE LEAD AGENCY
M COORDINATE WITH STOCKDALE HIGHWAY RECONSTRUCTION
ALONG CAL STATE FRONTAGE.
M APPRDVALOFP.S.&E.AT12-14-94COUNCILMTG
H FEASIBILJTYSTUDYCOMPLETE. CONSULTANTTOBEPROCURED.
4c�n,z esuuamg, nepair - convention Center-Reseal Arena
Concxete Floor
42403 Building, Remodel - Convention Center-Replace
Arena Acoustic Ceiling
42404 Building, Repair - Repair Arena Floor Expansion
Gasket
42405 Land, Acquisition - Convention Center Parking
42601 Street, Curbs & Gutte►s - Oleander-Sunset Area
Project - Part A
42602 Sewer, Construction - Panama #10 Project
42603 Building, Remodel - Architectural Barrier Removal
Program
42604 Street Lights, Upgrades - Census Tract 20 Llght
Improvement
42605 Building, Remodel - Roof replacement, 515 Tru�Qun
42606 Building, Up�gade - InsffiII new carpet, 515
Tru�Run
42607 Street, Curbs & Gutters - Oleander-Sunset Nea
Project - Part B
42608 Street, Curb§ 8� Gutters - Oleander-Sunset Area
Ro ject - Part C
50505 Acq. Property 8 Paving / Fence (Betw PD & RR)
ClPsummary 21-Dec-94
110,000 $110,000 DeWAYNE 11-
$25,000 $25,000 DeWAYNE 2-28-95
$20,�0 $20,000 DeWAYNE 11-1-94
$206,000 $206,000 ANDERSON
590,000 $90,000 JARRETT 12-31-94
$150,000 $150,000 JARRETT 6-30-95
$78,000 $78,000 DeWAYNE ON-GOING
$37,000 $37,000 KUEHN N/A
$16,000 $16,000 JAMISON N/A
$30,000 $30,000 JAMISON N/A
$26,W0 $26,000 JARRETT 12-31-94
$74,500 $74,500 JARRETT 12-31-94
YES $186,000 $186,000 ANDERSON
it
RESEARCH COMPLETE. AWAITING APPROPRIATE WINDOW TO
PERFORM WORK. COORDINATING WITH CONVENTION CENTER STAFF.
RESEARCH COMPLETE. AWAITING APPR�PRIATE WINDOW TO
PERFORM WORK. COORDINATING WITH CONVENTION CENTER
STAFF.
PHOJECT HANDLED BY REAL PROPERTY AGENT
M
L CONSTRUCTION POSTPONED UNTIL REMAINING FUNDS ARE
FOR CONSTRUCTION IN FY 1995-96 BUDGET.
H
COMMUNITY DEVELOPMENT BLOCK GRANT FUNDS AVAILABLE
PROJ6CT MATERIALS TO BE PURCHASED WITH UNION NO.10
ANNIXATION.
11/94 1/95 CONTRAGTAWARDEDTO SANJOAQUIN ROOFING. CONSTRCTION
TO BEGIN IN LATE NOVEMBER.
CARPET TO BE INSTALLED AFTER ROOF IS COMPI.ETE.
BIDS ARE CURRENTLY BEING OBTAINED.
M
M
5ts5o3 Kern River Parkway — Bikepath/Pazking Con"structi�
86701 Plant #2 Expansion, Phase I& II Design
68306 Land, Fencing — Fencing at Landfill
68303 Landfill, Improvements — Methane Gas Project at
Landfill
88503 Kern Hiver Landscaping 8. Development
68503 Kern River Landscaping & Development — Phase 11
71004 Medians on New Stine at Sazazen
73007 Coffee Road &idge Q Kern River 8 Rd Widening
73009 Coffee Road Widening Fl/W — Brimhall to Rosedale
77201 F Street Storm Drain — Tr�ctun to 21 st Street
78502 Kern River Landscaping and Development
78505 Bike Path, Construction — Manor Street to City Umits
i
80501 K Street Parking Mall and Parking L,ot
4 81005 Medians on White Lane,Cernan Way to Arvin Edison Canal
YES $73,656 $73,656 DON ON
YES $160,080 $138,800 KLOEPPER
$25,000 $25,000 SHAW
$50,000 $50,000 SHAW
YES
YES
YES
YES
YES
YES
YES
$73,686
$40�460
$20,000
$73,686 HOGGATT
$0 HOGGATT
$20,000 N/A
N/A
$100,000 $100,000 STARNES 1-31-95
$50,800 $20,800 ARNOLD 8-7-94
$12,154 $12,154 GEORGE 10-1-94
$98,619 $47,245 HOGGATT
PARKS DIVISION IS THE LEAD AGENCY ON THIS PROJECT
PARKS DNISION IS THE LEAD AGENCY ON THIS PROJECT
COMPLETE.
M PROJECT COMBINED WITH STOCKDALE WIDENING AND MEDIAN
CONSTRUCTION IN FRONT OF CAL STATE.
H AGREBuIENT FOR RIGHT OF WAY HAS BEEN IX6CUTED AND
DOCUMENTS DEWERED TO CITY. PROCESSING PAYMENTS PER
H FUNDS TO BE USED TO FACILITATE WIDENING OF F STREET
BETWEEN TRUXTUN AND 17th AND MISCELLANEOUS DRAINAGE
IMPROV9NENTS.
$234,800 $234,800 DeWAYNE 5-18-94 H AWAITING RIGHTOF WAY FROM PROPERTYOWNERS. CURRENTLY
WORKING WITH PROPERTYMANAGEMENTTO NEGOTIATE
NECESSARY RIGHTOF WAY.
YES $39,385 $39,385 MARIAN 5-18-94 7-2-94 11-2-94 H PROJBCT COMPLETE
YES $10,000 ($106) DEETER 8-14-94 10-19-94 11-2-94
ClPsummary 21—Dec-94 � 2
PROJECT COMPLETE, NOC 11 /18/94 BY CITY COU NCIL
�
6 810t6 Upgrade Signal —
2 81018 Upgrade Signal — F Street and Truxtun Avenue
2& 5 81019 Upgrade Signal — Oak Street and Chester Lane
6& 7 81020 Upgrade Signal — Ptanz Road and Wible Road
83011 &idge, Replacemerit —&own Street at Eastside Canal
83013 California Avenue Median Modfication and Street
Resurtacing between Stodcdale Highway and Real Raod
83014 California Avenue Resurfacing — Stodcdale to Oak
83016 Median Narrowing Stodcdale — Gosford to E. City Limit
83017 &idge, Replacemerrt — China Grade Loop at
Bearckley Canal
83019 Coffee Road Widening —&imhall to Rosedale
83025 Land, Acquisition — Freeway Right of Way
83032 Lakeview Avenue Resurfacing —�rginia to Wilkins
83033 Lansing Drive Resurfacing — So. Montclair to Hurrter
YES $31,000 $31,000 TABLJT 10-3-94
YES $52,729 $52,664 GILLBURG 10-12-94
YES $91,000 $90,822 TABUT 11-7-94
YES $85,870 $85,624 TABLIT 10-3-94
$140,000 $6,638 ARNOLD 10-31-94
$264,681 $0 STARNES
$310,000 ($61) STARNES
YES $20,586 $20,586 STARNES 2-28-95
$410,W0 $410,000 STARNES 12-15-94
YES $349,781 $278,760 ARNOLD 3-31-95
$250,000 $250,000 MARIAN ON—GOING
YES $51,988 $890 ARNOLD 5-18-94
YES $13,302 $13,302 STARNES
ClPsummary 21—Dec-94 13
TO BE AWARDED 12-14-94. CONSTRUCTION SCHEDULED TO BE
DETERMINED BYCONSTRUCTION DIVISION SUBJECT TO POLE
DEIJVERY; 35CONTRACT WORKING DAYS. COMBINED WITH PLAN2
ROAD AT WIBLE F90AD SIGNAL PROJECT #81020
H DESIGN COMPLEfE, ENGINEER'S ESTIMATE EXCEEDS AVAILABLE
FUNDS. PROJECT BEING REEVALUATED BY TRAFFIC ENGINEER
TO BREAK UP PROJECT INTO PHASES OF CONSTRUCTION.
H BIDS OPEN 11-30-94. ACTION ON BIDS SCHEDULEO FOR
12-14-94.
H TO BE AWARDED 12-14-94. CONSTRUCTION SCHEDULED TO BE
DETERMINED BYCONSTRUCTION DNISION SUBJECT TO POLE
DEWERY; 35CONTRNCT WORKING DAYS. COMBINED WITH PLANZ
ROAD AT WIBLE ROAD SIGNAL PROJECT #81020
H PROJECTCURRENTLYUNDERCONSTRUCTION
H PROJECT CURRENTLY UNDER CONSTRUCTION
PROJECT CURRENTLY UNDER CONSTRUCTION
M TO BE INCLUDING WITH STOCKDALE HIGHWAY LANDSCAPING.
DESIGN UNDER WAY BYCONSULTANT
H AWAITING RIGHT OF WAY FROM SUNLAND REFINING COMPANY.
SUNLAND HAS GNEN TENTATIVE APPROVAL FOR TRADING RIGHTOF
WAY FOR IMPROV9IAENTS BUT HAS NOT FOLLOWED THROUGH YET.
M
PROJECT CURRENTLY UNDER CONSTRUCTION
PROJ�T COMPLETE
I
83043 Planz Road Overcrossing — Drainage Improvemerds
83049 Stodcdale Hwy Reconst — Old River Road to A—E Canal
83058 Channelization, Widening — Intersection —
Stockdale 8 Cal'rfornia
83058 Widen Intersection — Sbockdale at Cal'rf (Phase 2 8� 3)
85001 K Street Pazking Mall & Parking Lot �
87001 Northeast Sewerline
87002 Stine Road Sewer Repiacement Pacheco to Harr's
88501 Park, Improvement — Beach Park—Improvements
88502 Wible Road Lan�caping
90503 Call Boxes on Kern River Bike Path
1,2,3 91001 Reflectorize Major Streets Citywide
5,6,7
4 91002 New Signai — Ashe Road at South Hal} Moon Drive
4 91003 New Signal — Buena �sffi Road at Stodcdale Hlghway
6 91004 New Signal — Panama L.ane at Stine Road
ClPsummary 21—Dec-94
ifQi'.��L�
YES $60,000 $60,000 STARNES
YES $20,100 $20,100 STARNES 1-31-95
YES $422,000 $421,335 ARNOLD 1-31-95
DESIGN COMPLETE.
COORDINATE WITH DEVELOPMENT PROJECT.
H CURRENTLY NEGOTIATING RIGHTOF WAYAC�UISITION WITH
PROPERTY OW NERS.
YES $85,275 $55,009 ARNOLD 1-31-95 H CURRENTLY NEGOTIATING RIGHTOF WAY ACQUISITION WITH
PROPERTY OW NERS.
YES $211,200 ($6,172) MARIAN COMPLETE
YES $3,717,290 $3,717,290 STARNES 6-30-94 H CURRENTLY UNDER CONSTRUCTION.
YES $67,829 ($27,04�LaROCHELLE PROJECT COMPLETE
YES $150,000 $147,210 FABBRI BY PARKS.
YES $74,955 $74,936 DON 8-24-94 M TO BE AWARDED 11-16-94
YES $22,250 $22,250 ARNOLD N/A 10-1-94 10-31-94 H CONTRPGTS FOR SERVICE AND INSTALLATION BEING PROCESSED.
YES $45,000 $45,000 BRAD 9-14-94 M AWARDEDI1-16-94.CONSTRUCTIONSCHEDULETOBE
DETEFMAINED BY CONSTRUCTION DIVISION. 15 CONTRACT
WORKING DAYS.
YES $102,129 $5,504 TABLIT 5-25-94 H AWARDED 7-13-94. CONSTHUCTION SCHEDULED TO BE DETER—
MINED BYCONSTRUCTION DIVISION SUBJECTTO POLE DEUVERY.
35CONTRAiCT WORKING DAYS.
YES $56,450 $0
YES $54,000 ($15,679) TABLJT 6-15-94
14
H AWARDED 8-10-94. CONSTRUCTION SCHEDULED TO BE DETER—
MINED BYCONSTRUCTION DNISION SUBJECTTO POLE DELIVERY.
1& 2 91005 Upgrade Signal — Cal'rfornia Avenue at H Street
,
VAR. 91006 Channelization Vario� Locations
ALL 9t007 Upgrade Signal — Various Locations
4,5,&6 9t008 Signal Interconnect — Southw�t Arterial (STOCKDALE,
MONTCLAIR to REAL; MING, GOSFORD to NEW STIN�
3 91010 Guarctail — China Grade, City Limits to Panorama Drive
ALL 91011 Signal, Operations — Traffic Operations Center
6 9t 012 Upgrade Signal — Akers Road at Wilson Road
2& 5 91013 Signal Interconnect — Truxtun Avenue, Oak to A Street
2 91014 New Signal — Haley at Monterey Street
92001 Convention Center Baliroom
92002 Convention Center Meeting Rooms
93002 Channelization Median Nazrowing — Calitornia Avenue
ClPsummary 21—Dec-94
YES $72,985 ($11,810) TABLIT 7-15-94 1-3-95 2-23-95
YES $47,436 $45,860 ALL 10-12-94
YES
YES
YES
$8,807 $6,603 BRAD ONGOING
$201,000 $201,000 BRAD/ 1-3-95
GILLBURG
$9,000
$80�000
YES $81,635
$9,000 DEETEH/
COUNTY
$79,989 BRAD/
CONSLTNT
$25,606 TABLJT 2-11-94 7-18-94 9-2-94
YES $27,000 $26,958 BRAD/ 9-14-94
DEEfER
YES $91,859 ($308) TABLJT 3-25-94
YES $1,863,000 $1,719,714 R. ROJAS
YES $537,000 $498,441 R. ROJAS
YES $209,858 ($998)
15
35CONTHA�CT WORKING DAYS.
H AWARDED 8-24-94. PRE—CONSTRUCTION MTG. HELD ON
12-2-94, CONSTRUCTION SCHEDULED TO BEGIN 1-3-95.
M USED FOR MINOR CHANNELIZATION, REMAINDER BEING COMBINED
WITH F STREET AT TRUXTUN AVENUE SIGNAL UPGRADE PROJECT
# 81018.
H WORK PERFI�RMED ON AS NEEDED BASIS
H ALL3SEGMENTS85%COMPLETEPLANCOMPLETIONEXPECTED
IN DECEMBER FOR SUBMITTALS TO CALTRANS FOR APPROVAL TO
ADVERTISE. UTILITYMAPPING NEARLYCOMPLETE.
M CITY SHARE OF COUNTY DESIGNED PROJECT. DCPECTED
SPRING OF 1995.
M RFP/RFQ TO BE COMPLETED BY END OF DECEMBER. OUTLINE
COMPLETE, UNDER REVIEW.
H AWARDED 4-6-94. NOTICE OF COMPLETION 9-28-94.
H AWARDED 11-16-94. CONSTRUCTION SCHEDULED TO BE DETER—
MINED BYCONSTRUCTION DNISION.2000NTRACT WORKING DAYS.
H AWARDED 06-15-94. CONSTRUCTION SCHEDULED TO BE DETER—
MINED BYCONSTRUCTION DNISION.35CONTHAICT WORKING DAYS.
H PROJBCT CURRENTLY UNDER CONSTRUCTION; SCHEDULED FOR
COMPLETION BYMAY 1995.
H PI�JBCT CURRENTLY UNDER CONSTRUCTION; SCHEDULED FOR
COMPLETION BYMAY 1995.
Pi�J6CT CURRENTLY UNDER CONSTRUCTION
I _ . _
!l�u3 SII88i, F18SURdCl�9 - r SV662 - 14V1 SO G4V1
93�04 Rancheria Avenue at Kern River &idge Repairs
93005 Bike Path, Widening — Beach Park to SPRR
93007 Lakeview Avenue Resurtacing — California to Virginia
93008 Panarama Drive Resurfacing — Monte vsta to River
93009 4th Street Resurfacing — Chester to P Street
93010 8th Street Resurfacing — Chester to P Street
93013 Cal'rfornia Avenue Resurtacing — Baker to Lakeview
93014 Cal'rfornia Avenue Resurtacing — Stodcdale to Mohawk
93015 Street, Widening — California Ave. — Oak to Real
93015 California Avenue Widening — Oak to Real Road
93018 Chester Aven� R�urfacing — 34th to Gazces Circle
93018 H Street Resurfacing — Tru�dun to 18th Street
93019 Monitor Street Resurfacing — White Lane to Pacheco
93024 Tru�dun Avenue Resurtacing — Mohawk to AT 8� SF Railroad
ClPsummary 21—Dec-94
$177,000 $177,000 JARRETT 2-15-95
YES $45,000 $45,000 CONCHITA 1-31-95
$85,000 $85,000 DON 6-30-95
YES $109,666 $29,962 ARNOLD 5-18-94
YES $276,605 $253,525 ARNOLD 5-18-94
YES $95,677 $88,813 ARNOLD 5-18-94
YES $79,682 $16,834 ARNOLD 5-18-94
YES $254,669 $230,987 ARNOLD 5-18-94
$127,580 $0
YES $285,000 $285,000 STARNES 11-15-94 3-1-95 8-31-95
YES $1,385,609 $1,209,414 STARNES 11-15-943-1-95 8-31-95
YES $70,682 $84,623 ARNOLD 5-18-94
YES $18,882 $7,903 ARNOLD 5-18-94 �
YES $108,682 $101,068 ARNOLD 5-18-94
YES $187,882 $113,910 ARNOLD 5-18-94
16
PROJECT COMBINED WITH OTHER S.T.P. PROJECTS FoR EcoNOnn�
OF SCALE.
M WILL AWO INCLUDE BRIDGE RAILINGS.
L R6CEIVED PARTIAL FUNDING APPROVALTHROUGH 9-9-94
LETTER FROM KERNCOG. REMAINING FUNDING WILL BE GRANTED
IN THE 1995-96 FUNDING CYCLE. PLANS READY BY 6-30-95.
PROJECT CURRENTLY UNDER CONSTRUCTION
PROJ�T CURRENT�Y UNDER CONSTRUbTION
PROJECT CURRENTLY UNDER CONSTRUCTION
PROJECT CURRENTLY UNDER CONSTRUCTION
PROJECT CURRENTLY UNDER CONSTRUCTION
PROJECT CURRENTLY UNDER CONSTRUCTION
H DESIGN 9996 COMPLETE AWAITING CALTRANS APPROVAL
H DESIGN 9996 COMPLETE. AWAITING CALTFlANS APPROVAL
PROJECT CURRENTLY UNDER CONSTRUCTION
PROJECT CURRENTLY UNDER CONSTRUCTION
PROJ�T CURRENTLY UNDER CONSTf�JCTION
PROJ�T CURRENTLY UNDER CONSTRUCTION
I -
93026 District Boulevazd Resurtacing — Grissom to Stine
93027 Ming Avenue Resurfacing — Wible to Hughes
93029 Bike Path, Construction — Truxtun Avenue Tunnel at
Quailwood
93030 &idge Construction — Coffee Road at AT 8 SF
i
93031 Chester Aven� Underpass &idge Seismic Retrofd
93033 Median Construction — Vazious Locations
93035 Equestrian Trail Along Kern River @ Route 178
94001 Calloway &idge Construction
83015 Calloway Bridge Construction — New Signal — Calloway
at Cross Valley Canal, &imhall Rd. Modfication Q
Stodcdale
95001 Coffee Road Overcrossing Construction
96701 Design of Metro Wastewater Treatrnerrt Plant
96702 Sandblast & Repaint Clazifiers, Plant #2
967p4 RehabiliTate &undage Lane — Real to Oak
9g7p5 Sewer Construction — GuB Street
ClPsummary 21—Dec-94
YES $117,682 $53,248 ARNOLD 5-18-94 PF�JECTCURRENTLYUNDERCONSTRUGTION
YES $67,570 $20,027 ARNOLD 5-18-94 PROJ�T CURRENTLY UNDER CONSTRUCTION
YES $230,619 $230,619 ARNOLD 5-18-94 PROJECT CURFiENTLY UNDER CONSTRUCTION
$50,000 $50,000 HOGGATT 4-15-95 L R�EIVED FUNDING APPROVAL THROUGH 9-9-94 LETTER FROM
KEHNCOG.
YES $100,000 $39,618 ARNOLD 8-3-95 10-15-95 10-18-96 H PROJECT THROUGH GRADE SEPARATION DISTRICT.
YES $32,000 $31,780 MARIAN 12-15-94 H STRATEGYPLANCOMPLETEBYCONSULTANT.ONCEAPPROVED
BYCALTRANS, FINAL DESIGN WILL BEGIN. PROJECTON SCHEDULE.
YES $367,801 $177,801 HOGGATT 5-15-95 M WILLCONSTRUCT WHITE LANE MEDIANS BETWEEN
BUENA VISTA ROAD AND MT. VISTA ROAD THIS F.Y.
YES $38,693 $1,615 BRAD 7-15-94 L PROJECTCOMPLETE
$B4O00,000 $5,807,680 STARNES/ 12—t —94 2-1-95 12-31-95 H APPROVAL OF P.S.&E. AT 12-14-94 COUNCIL MTG
TABLIT PS &E COMPLETE FOR BRDuIHALL & CANAI SITES, AWAITING
SOME UTILJTY SERVICE INFORMATION. AWAITING DATA FROM
MARTIN—MCINTOSH FOR STOCKDALE INTERSECTION TO BE
INCORPORATED INTO OUR PLANS.
YES
YES
YES
$8,250,000 $8,250,000 ARNOLD 8-3-95 10-15-95 10-18-96 H PROJECT THROUGH GRADE SEPARATION DISTRICT.
$2,057,500 $1,900,000 KLOEPPER H AWAtTING COMPLETION OF MASTERPLAN
�
$40,000 $40,000 STARNES 4-15-95 L
$99,200 $99,200 MORENO 11-30-94 M DESIGN COMPLETE. WILL HAVE P.S.&E. APPROVED AT 12-14-94
COU NC IL MTG.
$89,980 $89,980 MARIAN 9-16-94 H DESIGN COMPLFTE. CURRENTLY BIDDING. WILL AWARD AT
17
/ __ _ _
97001 Sewer, Rehabili�te — Westchester Area Easements &
Alleys �
97001 Rehabilitate Westchester Area Easemen� & Alleys
97003 Rehabilitate &andon Lift Station Modification
97004 Sewer Rehabilitate —&undage Lane — Real to Oak
��
97005 Sewer Construction — Gulf Street
97202 &edceruidge Drainage Basin I
97203 Storm Drain Construction — Akers Road — Thoreson
97402 Land Developmerrt — Apron Construction and
Perimeter Fencing
97403 InsffiII Sewer Line and Electrical Conduit
98101 Land, Development — Wood Recycling Faciliiy —
Asphaft Paving
98504 Pazk, Improvement — Kern River Pazkway—Play�ound
Equipment
98508 Rosedale Hwy lanc�caping & Irrigation Improvementa
97010 Stine / Hazris Assessment District
�A�'�Ai:;::��'AU1��NT::i+F�A�iR1�::'��i�A3:::<:>: >::>::>:::<:>::::::::::>
ClPsummary 21—Dec-94
YES
YES
YES
YES
YES
YES
YES
YES
$276,000 $276,000 MORENO 11-30-94
$252,653 $252,653 MORENO 11-30-94
$99,877 $44,887 LaROCHELLE5-18-94
$99,200 $99,200 MORENO
$69,980 $69,866 MAFiIAN
$90,000 $90,000 STARNES 5-15-95
$8,860 $703 LEAL 9-7-94
$147,135 ($28) �OLANOS 10-17-9411-29-94
$8,512 $8,512 B�LANOS 10-17-9411-29-94
$250,000 $250,000 ARNOLD 12-15-94
YES $21,500 $21,495 HOGGATT 2-1-95
I
YES $40,000 $22,174 FIOGGATT 5-18-94
YES $975,730 $975,730 MARIAN
18
M DESIGN COMPLETE. WILL HAVE P.S.B�E. APPROVEDAT 12-14-94
COUNC IL MTG.
M DESIGN COMPLETE. WILL HAVE P.S.&E. APPROVEDAT 12-14-94
COUNCIL MTG.
L PROJECT COMPLETE
M DESIGN COMPLETE. WILL HAVE P.S.B�E. APPROVED AT 12-14-94
COUNCIL MTG.
H DESIGN COMPLETE. CURRENTLY BIDDING. WILLAWARD AT
12-14-94COUNCIL MTG.
L
PHOJECT COMPLETE
M PROJECT CURRENTLY UNDER CONSTRUCTION 70°6 COMPLETE
M PROJ�TCURRENTLYUNDERCONSTRUCTION70%COMPLEfE
H CONSULTANTCURRENTLY DESiGNING FACILITY IMPROVEMENTS.
PROJECT ON HOLD PENDING LONG RANGE PLANNING
H
M PROJECT CURRENTLY UNDER CONSTRUCTION