HomeMy WebLinkAbout11/07/97 BAKERSFIELD
CITY MANAGER'S OFFICE
MEMORANDUM
November 7, 1997
TO: HONQEABLE MAYOR AND CITY COUNCIL
[~\
FROM: ~ALAN TANDY, CITY MANAGER
SUBJECT: GENERAL INFORMATION
1. We have begun the process of removing the canopy from the front of the Convention
Center in preparation for construction of Centennial Plaza. The removal operations
will be coordinated around any day time events being held at the Convention Center.
Also, about half of the old corporation yard at 515 Truxtun has been demolished and
converted to surface parking, providing an additional 150 parking spaces for
Convention Center events.
2. The Police Department and Public Works coordinated a third neighborhood clean-up
day on October 25th in the Gorrill/Robinson area of southeast Bakersfield. We
appreciate the assistance of numerous volunteers from PAL and State Farm in
making it a successful effort.
3. Per the enclosed memo from Public Works, Bakersfield reached a 36% recycling rate
in 1996. The 3% gain from the previous year is due to phasing in the greenwaste cart
collection and additional volume at the Mt. Vernon facility.
4. Also enclosed is the October 1997 CIP Status Report.
5. Responses to Council referrals are enclosed, as follows: · Traffic control and analysis for possible 4-way stop at Benton Street and Holden
Way (joint response - Public Works and Police);
· Removal of trash in alley at 900 block of Collins Way;
· Investigation of traffic diversion through alley at 202 S. Milham;
· Additional study for a 4-way stop sign at 8th and T Streets;
· Clarification of report relating to traffic concerns at Fairview Road and Camp
Street.
Honorable Mayor and City Council
November 7, 1997
Page 2
6. As a reminder, the City offices will be closed Tuesday, November 11th, in observance
of Veteran's Day. Also, I will be taking next Thursday and Friday off. Dolores
Teubner will be in charge during my absence.
AT:rs
cc: Department Heads
Pamela McCarthy, City Clerk
Trudy Slater, Administrative Analyst
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
October 28, 1997
To: Alan Tandy
City Manager
From: Raul Rojas
Public Works Director//t~ z.,/~,~._.f_
Subject: NEIGHBORHOOD CLEANUP EVENT
Another successful neighborhood cleanup event was held on 10/25/97 as a joint effort
between the Police Department and Public Works, this time in the Gorrill/Robinson area.
Five large truckloads of debris were disposed of and 17 lots were cleared with help from
dozens of volunteers from PAL and State Farm.
/KB/mmm
S:\WPDATA\C LEAN U P.MEM
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Raul Rojas, Public Works Director ~
. ~_
DATE: November 3, 1997
SUBJECT: PROGRESS TOWARD AB 939 RECYCLING GOAL
The Annual Report on AB 939 Recycling has been completed, and it shows that Bakersfield
reached 36% recycling in 1996. This is a 3% gain over last year, and is attributable to phasing in
greenwaste cart collection and 16% more volume received at the Mt. Vernon Recycling Facility.
KB:stop
S:\WPDAT^\R_PROGRE. M EM
· B A K E R S F I E L D
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: ALAN TANDY, City Manager
.FROM: THEODORE D. WRIGHT, Civil Engineer IV ~
THROUGH: RAUL M. ROJAS, Public Works Director /
DATE: October 31, 1997
SUBJECT: CIP STATUS REPORT - OCTOBER, 1997
Attached is the latest status report for the Capital Improvement Program. This CIP status report is
comprised of the following sections:
1. Notices of Completion filed and Plans and Specifications approved.
2. Status of all FY 1997-98 and pre-FY 97-98 carried-over CIP projects.
3. Construction Inspection Status Report.
Should you have any questions or suggestions for improving this report, please feel free to contact me.
The following plans have been approved since the last CIP status report:
T6K073 Street Widening, California Avenue at Oak Street
T6K076 Street Widening, Truxtun Avenue at Oak Street
P7C016 MLK Center Improvements (Lobby)
Q7K015 Corporation Yard Wash Rack Upgrade
E6K004 Wastewater Treatment Plant 2 Upgrade
T6K066 Miscellaneous Chip/Slurry Seal 97-98
TSK039 Street Improvements, White Lane - Mountain Vista Drive to Saddle Drive
T8K082 Signal, New - Endeavor School
TSK054 Signal, New - Hageman Road at Riverlakes Drive
The following projects have had Notices of Completion filed since the last CIP status report:
T7K001 Signal, New - 28th Street at F Street
T5K056 Sidewalk Reconstruction Project, Phase II
T7K002 Signal, New - Brimhall Road at Harvest Creek Road
P7K001 Installation of Restrooms, Annex Basement
T7K004 Signal, New - Hageman Road at Calloway Drive
T7K005 Signal, New - Harris Road at Stine Road
T4K052 Coffee Road Grade Separation
T8K082 Signal, New - Endeavor School
ORIGINAL
,, City of Bakersfield Public Works Department
1997-98 Capita~ Improvement Program Schedule - 10120/97
~; : I September1997 I October1997 [ November1997 December1997 I January1998 February1998 II March1998 ~ April1998 ri May1998 1131 June1998 I July1998 I AUgUl
Ward_L_Proj. No. TaskName 3117 114121 1281 5 112 191261 2 19 116123 30 7 ~4121 1281 4 Ill 116125 1 I 8 115122 i 18 1151221 91 5 112119126 3 1101~7i24 17 1~4121 1281 5 1121191261 219
2,5 T6K071 STREET IMPROVEMENTS - ALTA VISTA AREA
Design
: Bid Request/Award
I Construction
i to Proceed <~ .. aaaa~ar"~i./ Notice of Completion
2,5 T6K073 STREET IMPROVEMENTS- CALIFORNIA/OAK Project bid 9/16. Bids received exceeded budget. Project will rabid I
Design 'Plan Approval I November/December pending plan and specification modifications.
: Bid Request/Award "~'~' Award of Bid
[I Construction Notice to Proceed /, ~ ",~ ' -,~ /~ ' Notice of Completion
2,5
T6K073
/STREET IMPROVEMENTS - TRUXTUN/OAK i Project bid 9/16. Bids received exceeded budget. Project will rebid ~
i' Design Plan Approval I November/December pending plan and specification modifications.~ ' i/ ·
! Bid Request/Award ~'~ Award of Bid
i ,,
Construction Notice to Proceed <"~, ~-- --=~%,~,, Notice of Completion
2,5 T6K066 STREET IMPROVMENTS - MISC. CHIP/SLURRY
! Design ~roval
~ Bid Request/Award ~ Award of Bid
Construction Notice to Proceel~ ~ ~' ~';~i Notice of Completion
" 4 i TSK039 1STREET IMPROVEMENTS - WHITE/MTN. VISTA Project awarded at City Council meeting of September 10,
' ' ' 1997. Construction start pending utility pole relocation/ '
! Design ~roval scheduled for mid-October.
Bid Request/Award
I ~ Award of Bid ,,
'=Construction ~ ,.
i i e to Proceed ~ --- ;~' Notice of Completion
4 T8K082 SIGNAL, NEW- ENDEAVOR SCHOOL
.
Design proval '
i , Construction ~ Notice ~fcomPletion
ALL TSK0$6 SIDEWALK RECONST. PROJECT - PHASE III
Design j,,-' >
iL ,. Plan Approval
i Bid Request/Award Advertise for Bid.,; ~~~ Award of Bid
Construction Notice to Proceed ~ '! I I '~,
, ~ Notice of Completion
4 TSK054 ! SIGNAL, NEW - HAGEMAN/RIVERLAKES
'
i 'Design , , , /,
~? i ~ ,~ > Plan Approval
Bid Request/Award Advertise for Bie s ~ I i, ,% Award of Bid,
Construction
i Notice to Proceed ~ - - · ~ Notice of Completi~on
aaboil01 Page I of Design I
City of Bakersfield Public Works Department
1997-98 Capital Improvement Program Schedule - 10120/97
March1998 ~
September 1997I October 1997 I November 1997, December 1997 I January 1998I I I February1998 I April 1998 i'] May 1998 ]131 June 1998 ] July 1998 ] AlUU/
~Ward Proj. No. TaskNarne 3,171,412~128151~21~912612191,6123130171,4f2,128]41~11~8125 * 18115t22 * 181~51221 9i51~21~9F26131,01,7124 171~412,128151,21,912612 ~9
2,3 P$C002 MEDIAN IMPROVEMENTS - NORTH/NORTHEAST
I Design ---,~i~.> Plan Approval
Bid Request/Award Advertise t )r Bids i'~.'1~~ ? Award of Bid
i Construction Notice to Proceed ~"~ . ~..~.; Notice of Completion
~-~Ko ---
68 SIGNAL, NEW - RIDGEVIEW HIGH SCHOOL ! '
1 : Design ~i~' ". Plan Approval
I i Bid Request/Award tise for Bids ~.~ ~../ Award of Bid
[Construction
i Notice to ~roceed ?~~'> Notice of Completion
2 PSH003 i ROOF REPLACEMENT FIRESTATION 2
Design F'--~ i i'2 Plan Approval
i i Bid Request/Award Adve'tise forBids ~/~ I r~2 AwardofBid
Construction Notice to Proceed ~/~~. Notice of Completion
-"2 , T4K005 i LAKE STREET AREA IMPROVEMENTS
[ ! Design ~a~,~~.('~ Plan Approval
~ Bid Request/AWard Advertise forbids ~"~='-="'"~"~1~."~ Award of Bid
i Construction Notice to Proceed ~:~i.,a~a~r, - - - ~?~r~'~'~ Notice of Completion
2 PSH005 1 REPLACE RAMP - STATION 1
Design ~~ Plan Approval
. Bid Request/Award Advertise for Bids F, ii.~ . ~;~ '~ Award of Bid
! Construction
_____[ Notice to Proceed ./' --
.~. --, .... Notice of Completion
4 i T8K053 SIGNAL, NEW-HAGEMAN/FRUITVALE
l! Design I '.'i~ Plan Approval
. Bid Request/Award ~ '.
I Advertise forBids ? ..... Award of Bid
Construction Notice to Proceed ~/;...~ r~. ~ ~? Notice of Completion
4 TSK029 ; SIGNAL, NEW - COFFEE/OLIVE
Design t . '"" Plan Approval
Bid Request/Award Advertise forBids ~.~i~ .... ~ Award of Bid
I Construction ,',~ ·
· i Notice to Proceed ~.,_ I · ,,? Notice of Completion
-~-- E8K027 i Si:WER REHAB., PUMP STA. - PLANZ/BENTON
Design I '"~ Plan Approval
~ Bid Request/Award Advertise for Bids '~i.'. I i~ Award of Bid.i ·
Construction
I Notice to Proceed ":~i. I I ;ii? Notice of Completion
aaboi[01 Page 2 of Design 1
City of Bakersfield Public Works Department
1997-98 Capita~ Improvement Program Schedule - 10/20/97
Task September 1997 I October 1997 I November 1997 I December 1997 I January 1998 February 1998 March 1998 I April 1998 ,, I May 1998 I June 1998 I July 1998 I .Augu
Ward Proj. No. Name 3117 114121 1281 5 1121191261 2 19 116123130] 7 114121 1281 4 Ill 118125 1 18 115[22 1 I 8 1151221291 5 1121191~6,1 3 11011712413117 114121 1281 5 1121191261 2 19
~ E7K009 i SEWER REHAB., PUMP STA.- 19TH STREET '
;, i Design I_~ ,~~";~ Plan Approval
] Bid Request/Award Advertise for Bids ,~"J~.~ '*., Award of Bid
Construction Notice to Proceed "
- , Notice of Completion
5 ESK037 STORM DRAIN REHAB., PUMP STA.~-TRUXTUN
! Design ~ '~ Plan Approval
i Bid Request/Award Advertise forBids ~' '*'~ Award of Bid
i Construction
~_ i Notice to Proceed '~,ii ' - ~' ':~ Notice of Completion
s ,~ EsK038 ]SEWER REHAB., PUMP STA.- OFF~CE PARK DR.
Design ~ ~= I ~" Plan Approval
i i uest/Awar A e se forbids , Award of Bid
!--- i!C°nstructi°n NoticetoProceed ~/~;,,,, ,.i~; Noticeofiompletion
--~'- TSK002 BRIDGE IMPROV.-WHITE LANE/99 (PSR)
i Consultant Procurement I ' ~.~. -- - ,~m~~ '~ Award of Contract
i iStudy ''-- .... ~,','? SI dyApproval
-~-' K008 SEWFR CONSTRUCTION, TELFMI=TR¥ - PH II
i ~ Design I~m~ - - · ~"~ Ptan Approvat
Bid Request/Award Advertise for Bids /' ' ~ Award of Bid
I Construction Notice to Proceed ~ I ~%"~? Notice of Comp etlon
' i i SEW R.E.AB,L,TAT,ON. MA,.-STOC .ALE
Design I II ~ ~ii/~ Plan Approval
i Bid Request/Award '~¥
'i i Advertise for Bids ~i ~ Award of Bid
i ', Construction Notice to Proceed ~ I1'1 I I[ ri~;~;~, ~'i~ Notice of Completion
6 i ESK039 STORM DRAIN CONST., MAIN-WILSON RD
Design -~-" ,~ ' "~ Plan Approval
,I Bid Request/Award Advertise for Bids ~,. "/ Award of Bid
Construction Notice to Proceed ,'" ' ~...' I I I I '" Notice of Completion
~ ESK039 i STORM DRAIN CONST., MAIN - STINE/WiLSON
Design I ~ I I ~'~ Plan Approval
Bid Request/Award Advert/se forBids /' i~'? AwardofBid
i ', Construction "~- Notice of Completion
i I Notice to Proceed ~,.~. I ~,~;
aaboil01 Page 3 of Design 1
City of Bakersfield Public Works Department
1997-98 Capita Improvement Program Schedule - 10/20/97
I rd~ September 1997 I October 1997 I November 1997 } December 1997 I January 1998 I February 1998 March1998 ~ April 1998 May 1998 I June1998 I July1998
Wa Proj. No. TaskName 31171141211281511211912612191161231301711412112814]11118125 1181~5122 1181~5122] 91511211912el311o[171241311711412112815]12[19[2612 99
? I TSK001 BRIDGE IMPROVEMENTS -WHITE LANE
Design ~ ~'~.,'.' Plan Approval
I Bid Request/Award Advert/se forbids ':~i~i~ 17 Award of Bid
Construction Notice to Proceed..ii. ~~~'i ;~ Notice of Ct'ompletion
4 T8K043 1 STREET IMPROVEMENTS - HAGEMAN SUMP
I Design II --- ' '~.
Bid Request/Award Advertise for Bids :; i ~~'~' Award of Bid
Construction ,
Notice to Proceed /~ ' ....... :~ -~'f'i~ Notice of Completion
~Design ,, ~ r' ,
~ ' ~ ..' Plan Approval
Bid Request/Award Advertise for Bids ~ 'i~ii"~, Award of Bid
i Construction Notice to Proceed ",i'~
~ ~; Notice of Completion
1 ETK00$ 1 SEWIng. ~-HABILITATION, MAIN - S. CHESTER
I i Design ~' · ~:~=~-~'i;' Plan Approval
Bid Request/Award ,
i Advertise for Bids ~ '~i. Award of Bid
Construction Notice to Proceed ~'~:~-*---~ ,; ,, -~ ~ Notice of Completion
~.R. ~ T8K072 i STREET RESURFACING
~ Design ~ ~ _-~.a~_- - , · ~.~.+:~ ~ -~v~i~. Plan Approval I,
Bid Request/Award Advertise for Bids ~:ii." ,I.;'.~ Award of Bid
. Construction Notice to Proceed ~'"' ~; :i II I ,-~. "~ ~,,, '~'; Notice
3 P7H002 REPAVING FIRESTATIONS
i Design II I ,,~ Plan Approval
quest/^ward Adve, se forBids Awardo Bid
Construction Notice to Proceed ~i I ~;~'~; ~ '~. Notice of Completion
---5 , P8C009 , MEDIAN ISLAND LANDSCAPING -STOCKDALE
Design ~t ~ Plan Approval
Bid Request/Award Advertise for Bids ~i~ II ~;'* Award of Bid
i Construction Notice to Proceed~.../' ~;~, ,i'i~' Notice of Completion
4 T8K057 SIGNAL, NEW- WHITE/MOUNTAIN VISTA
., Design [ .~ III ~i~~ Plan Approval
Bid Request/Award Advertise forbids ~i~i .... *~ : Award of Bid
I Construction Notice to Proceed :~" =~ i ~ ".~ Notice of Comp~
aaboil01 Page 4 et' Design 1
City of Bakersfield Public Works Department
1997-98 Capital Improvement Program Schedule - 10/20197
TdK05$ September 1997 October 1997 ] November 1997 I December 1997 I January 1998 February 1998 March 1998 I April 1998 I' May 1998 I June 1998 I July 1998 u u
LProj. No. TaskName 31 17 114121 1~815 1121191261 2 19 ]16123130] 7 114121 12814 Ill 118125 1 18 !15122 1 18 11512212915 11211912613 110117124131 17 114121 12815 ]12119126] 2~g9
S GNAL, NEW - PANORAMNRIVER
I
Design ,
I~ - --~----~ ...... ....~ Plan Approval
! Bid Request/Award Advertise forBids :.i'~.i' Award of Bid
I Construction
i Notice to Proceed ~..., ~ '~;., II II ......... --' _ ..... .1.7 Notice of
~ - TdK00~ SIGNAL, NEW-CALIFORNIA/N
Design f-- t~i'~ I'll '" Plan Approval
~ I Bid Request/Award Advertise forbids ~,i.~~i~:' Award of Bid
I Construction
; Notice to Proceed ~;~i~--' ;.~.:~: I -~ ...... :=~;~,~ ~..~ '~ Notice of
' 6~-- TdK03$ I STREET IMPROVEMENTS - PANAMA LANE
~ Design I -- ~; -- ....~. Plan Approval
Bid Request/Award
Construction Advertise for Bids ' ~~ ~ Award of Bid
i i Notice to Proceed ~' ----.-~" I ..... !_.,,a~,~-~ ';- Notice of Completion
~'] PdD001 ; REPAIR PARKING GARAGE
! Design ~~~ '~ Plan Approval
: i Bid Request/Award Advertise for Bids ~~~;~, Award of Bid
I Construction Notice to Proceed ~'i:r~.~',~ ','#~¥~¢"'~ Notice of Completion
! TdK049 CORRIDOR STUDY - WHITE LANE--
~ Study ~.~'~;'~.*.-~'"~'.~'~~~i~~ Study Complete
i Design ~%~- I ~, , ~'? Plan Approval
$ i TdKO4O iSlG. MOD. (CHANNELIZATION)-WHITE/AKERS
Design ' '1 i,i~~ Plan Approval 't
i : Bid Request/Award Advertise for Bids /'..~, r l ~, I 'i~~ Award of~Yd
i I Construction /' ~ ........ '^' Notice of Completion
i ' Notice to Proceed ..... ;) J- ..........
---3--[ TdK06S SIGNAL, NEW-COLLEGE/FAIRFAX
~ i Design .
i Bid Request/Award t~:'~ · ~ Plan Approval
i Advertise forBids ~.'~"~~i~ Awar; of Bid
I Construction
, ..... Notice to Proceed
2,5 T8K081 SIGNAL, NEW-BEECH/24TH
Design _ I ' I II I ' · Plan Approval
'
aaboil01 Page 5 of Design 1
City of Bakersfield Public Works Department
1997-98 Capital Improvement Program Schedule - 10/20/97
Wa~d p Task September 1997 I October 1997 I November 1997 December 1997 I January 1998 February 1998 March 1998 I April 1998 [. May 1998 [ June'1998 I July 1998 I Augu
roj. No. Name 311 7 114121 1281 5 112119126I 2 J9 116123 307 1421 281 4 Ill 1181251I 8 115122 1 18 1151221291 5 11211912~[ 3I10J171241311 7 1~4121 1281 5 1121191261 2 19
T8K0$$ ! SIGNAL, NEW EB SR 58/MT VERNON
Design Advertise forbids' ri
i Bid Request/Award :i'i;~ ;, Awe of Bid
I
I ~ Construction
I Notice to Proceed :~ r~-
~ ESK004 ! W V~'P #3 -REPLACE WELl-- I--
, t Design I ~'-"~?PlanApproval
Bid Request/Award Advertise for Bids ~ii~~ ii Award of Bid
Construction Notice to Pr?ceed '(~' - ~'-~. - ,' ~,') Notice of Complet
4 TSK0$0 SI~, NEW - WHITE/BUENA VISTA - --
Design ·
~,~_ I I I "~ Plan Approval
BidConstruction Request/Award
Advertise for Bids .~~1[~;, Award of Bid
Notice to Proceed -~'~r~;~
4 I TSK052 . SIGNAL, "~-~ ~-~[JENA VISTA/MING
I
,' Bid Request/Award Advertise for Bids ..~~Awar¢ofBid
I '; TSK079 [ STREET IMPROVEMENTS -CASA LOMA#6
i !Design
i C°nstructi°n } Notice to Proceed ~ ~. ........
---~---- STREET
TSK080 IMPROVEMENTS -CHESTER #3 ANNEX.
i Design Pla~ '
I I I I I 1 III '~ ~" n Approval
! Bid Request/Awardj
i Construction Advertise for Bids ~ 2 i I ,, '~ Award of Bid
· Notice to Proceed ..~
6 T8K049 I CORRIDOR STUDY - MING AVENUE
iI Study
~ - - ~ '¥ Study Complete
Design 1 I I ~i' Pl~nApproval
A~i~,0-~3. T0~ INTERCONNECT ---
Bid, ' '" AwardofBid
Request/Award Advertise for Bids !_
, Construction { "~
_ I I 1 Notice to Proceed ~,,~, '--
aaboil01 Page 6 of Design 1
City of Bakersfield Public Works Department
1997-98 Capita~ Improvement Program Schedule - 10/20/97
d~ Task I September1997 I October1997 I November1997 I December1997 I January1998 February1998 [ March1998 I April1998 J;, May1998 I June1998 I July1998 I ~u
War Proj. No. Name 3117114]2112815112119126]219116]23130]7114]21]28]4]11118125 1181~5122 1 18115122]2915]121~9126113110117124]3~[7]14]21]2815]121~9126]2 ggU
4 TSK077 ~ STREET CONSTRUCTION - MTN VISTAJSJVRR
Design ~ ~,? (~i: Plan Approval
4 I T8K076
I STREET CONSTRUCTION.- OLD RIVER/SJVRR
4 TSKO78 SIGNAL, NEW-ALLEN/BRIMHALL '--
4 TSK059 SIGNAL, NEW-BRIMHAL~JEWETTA
, .... ~;~, ~:~? Plan Approval
Bid RequesFA~rd A~e~se for Bids ~~~'~ Award of Bid
Construction
~ Notice to Proceed '.~z~
5 TSK064 ~ BRIDGE CONSTRUCTION - MOHAWK STREET
~ Design ~ . ' .... ~~~ '-, '~~ Plan Approval
~ [ Bid RequesFA~rd Adverse ~r Bids ~' '
Construction ~ Notice to Proceed .~'~ ,:
2 T7K006 'SIGNAL MODIFICATION - DOWNTOWN
Gonstrucfion I ~ot~c, to Procoo~
6 TSK040 SlO. MOD. (CHANNELIZATION)~TOCKDALE
~ [ Study ~ ~'~ Study Complete
~ ; Design ~ ~ ~ ~' ~ Plan Approval
aaboil01 Page 7 of Design 1
City of Bakersfield Public Works Department
1996-97 Capital Improvement Program Schedule - 10/20/97
~-'~.~ No. I July 1997 August 1997 J September 1997 October 1997 I November 1997 December 1997 January 1998 February 1998 I/larch 1998 April 1998 May 1998
Ward Description 29] 6 ]13120]27I 3 1017 24 31 7114]21 1281 5 112 19 28 2 9 1181231301 7 114121 12814 Ill 118 25 118 145122 1 '81151221591 5i12 19 26 3 1017 24
~ TSK038 Bridge Widening - Panama Ln. at SR 99
Design
Bid Request/Award
Construction
-- . ...... ~'. Notice of Completion
~" T6L001 Chester Avenue Streetscape
Design
Bid Request/Award Bid
Construction
Notice to Proceed ~ . ' ' Not/ce of Completion
E6K018 Sewer Rehabilitation - Main (Buena Vista Ph I)
I Notice to Proceed to be issued upon arrival
Design [of Contractor ordered materials (Pipe).
Bid R~-=quest/Award
Construction
1 E7K011 Wastewater Treatment Plant No. 2 Reservoir
J Project was suspended temporarily due to irrigation
Design Iflows. Anticipate project completion late November.
Bid Request/Award
Construction ~,. 2 Notice of Completion
3 T6K008 Channelization SR 178 - Fairfax Rd. to 1000' W.
Design
Bid Request/Award
Construction
Notice to Pro~ :eed ~, = ' '-- i~? Notice of Completio~
1 ETK005 Sewer Rehabilitation - Main (S. Chester/Planz)
Design
Bid Request/Award
Construction 'i ~ Notice of Completion
--2~$ E6K013 !Sewer Rehabilitation- Main (VVestchester)
Design
Bid Request/Award
Construction Notice tc Proceed .......' IIII
· .... .:. Notice of Complet/o~
TTK012 Resurf~cing Streets (ISTEA & Gas Tax)
Project temporarily suspended due to weather
I
J TTK013 Design cons derat ons. Project to restart early spr ng of 1998. II
Bid Request/Award lid
I Construction r~roceed ~' ~'i~, Notice elCo lotion
mul~Og7 Page 1 of Design 2
City of Bakersfield Public Works Department
1996-97 Capita~ Improvement Program Schedule - 10/20/97
July 1997 August 1997 I September 1997 October 1997 November 1997 December 1997 January 1998 February 1998 Mar(~h 1998 Apr 1998 I May 1998
Ward Prpj. No. Description
29I 6 1131201271 3 11O117124 3117 114121 1281 5 112]19 26 2 9 16 23 30I 7 114121 1281 4 114 118128 1 8 15 22 158 115122129 5 121191261 3 110117124
$ E6K015 Sewer Rehabilitation - Red Lion Area Project was temporarily held pending review of potential I
annexations and resulting impacts to sewer service for
Design area. Project Pans now being prepared.
~ Bid Request/Award
~,.,':. Notice of Completion
Construction
All QTK003 Pavement Management System
Consultant Procurement
Contract
Implementation - ,~, I i~.. Notice of Completio~
Construction
1,5,6 QTK014 Removal of Fuel Tanks - Stations 3, 6 & 9
Design
Bid Request/Award
Construction Notice to Proceed ~ ~, ~ ~ ~'~, Notice of Completion
7 T7K023 I Street Widening (Panama Ln - Wible to SR 99)
Design
Bid Request/Award
Construction Notice to Proceed ~ .~~,~,~'* Notice of Completion
$ ETK010 Storm Drain Construction - Main (Ashe Road)
Design
Bid Request/Award Bid
Construction Notice to Proceed --~a~a~,.,.' Notice of Completion
"--~-- E6K012 Sewer Rehabilitation - Lift Station (Bank St.)
Notice to Proceed to be issued upon arrival
Design of Contractor ordered equipment (pumps, etc.).
Bid Request/Award
Construction Notice to Proceed .~/~¢ ' ~i'~ Notice of Comp[letion
1 P7C01~'-, MLK Center Improvements Door replacement and lobby remodel complete. I
Design '~ 'lan Approval J Park ng lot bdd ng anticipated November.
I
Bid Request/Award Advertise forBids ~. I I~' ~*~. AwardofBid
Construction Notice to Proceed ,~.~.~ I ~,.'*'~- Notice of Completion
5 QTK01$ Corporatio~ Yard Wash Rack Upgrade
I Proposals received 8/27. Equipment staff and
I
Design
Iconsultant reviewing submittals and funding availability. [
Bid
Request/Award
rtise for Bids '"* I I ,~."~ Award of Bid
Construction Notice to Proceed ~ ~ ~i~ Notice of Completion
mult9697 Page 2 of Design 2~
City of Bakersfield Public Works Department
1996-97 Capital Improvement Program Schedule 10/20/97
j July 1997 Au~lust 1997 September 1997 October 1997 November 1997 December 1997 January 1998 February 1998 iMarch 1998 April 199§ May 1998
.No. Description 29 6 113120127i 3 110117124 i 31 7 lA 21 281 5 121491261 2 9 16123 30 7 14 21 28 4 1~ 181251 1 8 15 2211 18 115i221291 5 1~211g1261 3 Ilo 17 24
7 ! ~7K006 Sewer Rehabilitation - Panama Lane Lift Sta.
I Notice to Proceed to be issued upon arrival of
I
Design I Contractor ordered equipment (pumps. etc.).
Bid Rec uestJAward
Construction No ice to Proceed /'' - i~ ~ Notice of Completion
~ TSK057 ', Downtown St. Improv. Phase II (Fox Theatre)
Awaiting maintenance agreement ~
i Design from Fox Theatre Group.
Bid Request/Award
Construction
4 E7K001 Sewer Construction - Main (Allen Road)
Design I i~i:; Plan Approval
Bid Re~ uest/Award Advertise for Bids,~',,~.'~ I '" ~ Award of Bid
Construction Not/ce to Proceed
4 E7K002 Sewer Const. - Main (Buena Vista Phase Il)
! Design rr ----=~,~ ..... ~'~" Plan Approval
[I Bid Rec uest/Award Advertise for Bids .~,~ ' ,~; ~ '~. Award of Bid
Construction Notice to Proceed
--'~-- ~3-' Sign~l,~nW- Flower St at Owens St
--~.U--Bid Rec uest/Award
Construction Notice to Proceed ~ ..... ~ ........ ~ii~,~ Not/ce of
Completion
· -ETK009 Storm Drain Rehab. - Lift Station (Beach Park)
J Notice to Proceed to be issued upon arrival of
Design
I Contractor ordered equipment (pumps, etc.).
Bid Re¢ uest/Award
ward of Bid
Construction N~ t/ce to Proceed ~'~ I .... ~ Notice of Completion
~ --~K008 Sewer Construction - Telemetry City Wide
Notice to Proceed to be issued upon completion of review by
1
Design C ty staff and consultant of Contractor equipment submittals. I
Bid Re¢ uest/Award
Construction ¢otice to Proceed ~',~ I ~ ¥ Notice of Completion
I E6K004 WWT Plant 2 Upgrade/Expansion
Design
Bid Request/Award
Construction Notice to pr~ )ceed ,,,,,., I r~' ' I I
muir9697 Page 3 of Design 2
City of Bakersfield Public Works Department
1996-97 Capital Improvement Program Schedule - 10/20/97
' ~ July 1997 August 1997 September 1997 October 1997 November 1997 December 1997 January 1998 February 1998 M~rch 1998 April 1998 May 1998
Ward Pro'.J~_~.o. Description 29I 6 113120la71 3 1~01~712413~17 11412~ 1281 5 l~2[~9 26f a 9 16 23130I 7 114121 I28f 4 lll {18 25 1 18 15 22 1 I~ 15122 29 5 12119 26 3 10117J24
6 E7K012 WWT Plant 3 Upgrade/Expansion
Design
Bid Request/Award '~ Award of Bid
Construction Notice to Proceed ~ ' I I II II I,~ I
muir9697 Page 4 of Design 2
CONSTRUCTION INSPECTION
PROJECT STATUS
SUBDIVISION
0/06/97
~.M. OR DEVELOPER/
TRACT #'S LOCATION CONTRACTOR INSPECTOR COMP.
BUENA VISTA RD. RECONSTRUCTION CASTLE & COOKE LESH 5%
COFFEE RD. LINEAR PARK FRUITVALE PROPERTIES LESH 99%
VALLEY PLAZA STORM DRAIN GILLIAM & SON CHOATE 15%
PM 9329 STOCKDALE HWY, CSUB - OLD RIVER CASTLE & COOKE I LESH 100%
PM 10191 AUBURN STREET PIERCE 30%
TR 5290 GRAND LAKES & CHAMBER-OFFSITES CASTLE & COOKE LESH 99%
TR 5369 MONITOR & PACHECO AMERICAN HOME ALLIANCE CHOATE 30%
TR 5372-111 VERDUGO & REINA CENTEX LESH 85%
TR 5386-D S/O BRIMHALL, E/O CALLOWAY TURMAN LESH 55%
TR 5418-3 VERDUGO & NORIEGA KYLE CARTER LESH 70%
TR 5418-6 VERDUGO & NORIEGA KYLE CARTER LESH 5%
TR 5425 C GRANDLAKES - N/O MING AVE. CASTLE & COOKE LESH 99%
TR 5426-A HOWELL & OLD RIVER CASTLE & COOKE LESH 99%
TR 5426-B&C S/O STOCKDALE, W/O OLD RIVER CASTLE & COOKE LESH 70%
TR 5427 OLD RIVER & MING AVE. CASTLE & COOKE LESH 10%
TR 5489-C BRIMHALL & OLD FARM CASTLE & COOKE LESH 90%
TR 5528-5 S/O PANAMA - E/O AKERS DELFINO DEV. MITCHELL 95%
~R 5544-D(3) BRIMHALL ROAD & VERDUGO LANE CASTLE & COOKE LESH 99%
--~ ~ 5552-A&B RENFRO RD. & STOCKDALE HWY. WEST KERN DEVELOPMENT LESH 30%!
TR 5600-B E/O AKERS, S/O HOSKING J.L. DANDY MITCHELL 90%
TR 5646-2 FAIRFAX RD (~ VALLEYVIEW DR W.D.J. CORPORATION MITCHELL 75%
TR 5650-B I HARRIS & RELIANCE CASTLE & COOKE MITCHELL 95%
TR 5664 PANAMA & RELIANCE NORMAL DEVELOPMENT CORPI MITCHELL 90%
TR 5670 SEASONS SUMP STAINER MITCHELL 95%
TR 5673-3&4 HARRIS & RELIANCE CASTLE & COOKE MITCHELL 75%
TR 5680-A&B BRIMHALL & CALLOWAY CASTLE & COOKE LESH 90%
TR 5688,I-J N/O HARRIS, ASHE - STINE KYLE CARTER MITCHELL, 60%
TR 5699-A PANAMA (~ FARMER'S CANAL COLEMAN MITCHELL 90%
~TR 5728-2 JEWETTA & HAGEMAN DEWALT LESH 40%
TR 5762 WIBLE & BERKSHIRE SKIP HARDY MITCHELL ' 100%
ITR 5804-1 MESA MARIN NICKEL/MARTIN PIERCE 95%
TR 5835 HARRIS & SPRING CREEK CASTLE & COOKE MITCHELL 75%
TR 5836-A CALLOWAY S/O BRIMHALL CASTLE & COOKE LESH 70%
TR 5838-A&B OLD RIVER & HOWELL CASTLE & COOKE i LESH 95%
TR 5841-A BROOKSIDE & N. LAURELGLEN TURMAN MITCHELL 100%
TR 5846-A HARRIS & ASHE CASTLE & COOKE MITCHELL 40%
TR 5861 AKERS & HoSKING DANDY & ASSOCIATES MITCHELL 90%
TR 5863 BUENA VISTA & MING AVENUE CASTLE & COOKE LESH 20%
TR 5872 WHITE LN. & MOUNTAIN VISTA MIKE SOPER LESH 20%
R 5873 PANAMA LN. & MONITOR ST. ALMOND TREE DEVELOPMENT MITCHELL 0%
' CONSTRUCTIO~SPECTION
PROJECT STATUS
CAPITAL IMPROVEMENTS
10/06/97
START EST. COM %
PROJECTS TYPE CONTRACTOR INSPECTOR DATE DATE COMP
ALTA VISTA AREA CURB AND GUTTER KERN ASPHALT VIAHAFFEY 10/06/97 0%
ASHE ROAD, S/O STOCKDALE HWY STORM DRAIN PACIFIC RESOURCES DICKERSON 09~02~97 10/15/97 50%
BANK STREET SEWER LIFT STATION PATSCHECK ELECTRIC 0%
BEACH PARK STORM DRAIN LIFT STATION W.M. LYLES 0%
BRIMHALL RD. (~ HARVEST CREEK R INSTALL SIGNAL A-C ELECTRIC CO. !TABLIT 09~08~97 10/20/97 40%
BUENA VISTA ROAD REPLACE TRUNK SEWER UTAH PACIFIC CONST. 0%
CHESTER AVENUE HARDSCAPE CONSTRUCTION GRANITE CONSTRUCTION FICK 09~22~97 12/31/97 0%
CHESTER AVENUE LANDSCAPE CONSTRUCTION !ELITE CONSTRUCTION FICK 09/22/97 01/15/97 0%
FIRE STN. NOS. 3, 6, 9, 13 REMOVE & REPLACE FUEL TANKS ~LUTREL SERVICES MOORE 10/06/97 12/10/97 0%
FIRE STN. NOS. 4, 5, 6, 7 & 8 PAINTING S.K. PAINTING PATTERSON 09/09/97 11/05/97 15%
FLOWER STREET (~ OWENS STREET INSTALL SIGNAL A-C ELECTRIC CO. MAHAFFEY 09~29~97 11/18/97 0%
MARTIN LUTHER KING CENTER RECEPTIONIST ENCLOSURE MARCUS HACKLER CHOATE 10/15/97 0%
OLD CORPORATION YARD BUILDING DEMOLITION IRWIN EXCAVATION ALLEN 10/01/97 10/22/97 0%
PANAMA LANE (~ SOUTH "H" ST. REPLACE SWR LIFT STATION PACIFIC RESOURCES 0%
PANAMA LN., HVVY 99 TO WlBLE RD. STREET WIDENING GRANITE CONSTRUCTION CHOATE 10/01/97 12/05/97 0%
PANAMA (~ HWY 99 BRIDGE WIDENING RASMUSSEN, INC. HUMMEL 02~25~97 12/23/97 60%
SEWER TREATMENT PLANT NO. 2 STORAGE RESERVOIR STURGEON & SON ALLEN 08/01/97 10/20/97 90%
SOUTH CHESTER AVENUE - PHASE I SEWER REHABILITATION W.M. LYLES DICKERSON 06/16/97 10/20/97 93%
STATE RTE. 178 (~ FAIRFAX RD. ROAD WIDENING GRANITE CONSTRUCTION DICKERSON 10/20/97 0%
TRUXTUN AVE., EMPIRE DR. TO OAK TRAFFIC SIGNAL INTERCONNECT TIDWELL EXCAVATING HACKNEY 11/17/97 0%
VARIOUS LOCATIONS SWR LIFT STN. IMPROVEMENTS FLO-SYSTEM, INC. 0%
VARIOUS STREETS BIKE LANE STRIPING SAFETY STRIPING ALLEN 07/14/97 12/01/97 90%
VARIOUS STREETS i CHIP/CAPE SEAL FRANKLIN CONSTRUCTIO BURNS 10/13/97 0%
VARIOUS STREETS SIGNAL INTERCONNECT TIDWELL EXCAVATING HACKNEY 07/15/97 11/06/97 70%
VARIOUS STREETS RESURFAClNG GRIFFITH COMPANY BOLANOS 08/18/97 11/30/97 5%
WESTCHESTER AREA - FINAL PHASE !SEWER REHABILITATION .' INSITUFORM SOUTHWEST ALLEN 10/15/97 0%
WHITE LANE !STREET WIDENING STURGEON & SON 0%
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Raul M. Rojas, Public Works
DATE: October 31, 1997
SUBJECT: TRAFFIC CONTROL ~ BENTON STREET & HOLDEN WAY
Council Referral Record #WF0017794/001 (Public Works)
Council Referral Record #WF0017794/003 (Police Department)
Councilmember Math Salvaggio requested Public Worhs look into the possibility of placing a 4-
way stop at Benton Street and Holden Way and requested the Police Department conduct radar
chechs at this location. (Ward 7)
Traffic Engineering will perform a 4-way stop warrant check of the intersection of Benton
Street and Holden Way. The results should be available in about two weeks, subject to
delays caused by weather or vandalism. We will issue a report with the results and any
recommendations.
Attached is the Police Department's response concerning the radar survey conducted at
the above location.
BAKERSFIELD POLICE
MEMORANDUM
October 29, 1997
To: S.E. Brummer, Chief of Police
From: A.L. Zachary, Traffic Commander
Subject: City Council Referral - 4-Way Stop Sign Burton and Holden Way
Assumptions: True location to be Holden Way and Benton Street (Burton Way is a county
residential roadway in East Bakersfield).
Description: Benton Street is a north/south residential roadway, posted 25 miles per hour
uncontrolled at Holden Way.
Holden Way is an east/west residential roadway, controlled by stop signs in both directions, at
intersection with Benton Street.
History: A check with S.W.I.T.R.S. (California Statewide Integrated Traffic Report System)
indicates no collisions at the intersection 1996 and 1997 to date. In 1996 (3) citations were written
at the intersection. 1997 to date, (4) citations have been written at the intersection for sign or right
of way violations. For the same period (10) citations have been written for excessive speed on
Benton Street, between Ming Avenue and Wilson Road. On October 29, 1997, a radar survey was
conducted on Benton Street at intersection with Holden Way. (See attached memo by Officer
Hayes.)
Recommendation: Not problematic, low enforcement priority, ~o ch~j/
Traffic Commander
ALZ/ik
P:\TRAFFIC\holden.wpd
Copy: Raul Rojas, Public Works Director
BAKERSFIELD POLICE · . :?:i~,:-.~
MEMORANDUM ,..
October 29, 1997
TO: LIEUTENANT A. ZACHARY, TRAFFIC
FROM: OFFICER P. HAYES, #716
SUBJECT: TRAFFIC PROBLEM AT BENTON AND HOLDEN STREETS
On 10/29/97, between 0700 and 0800 hours, I monitored traffic on Benton Street at
Holden Street. During that time, 176 vehicles traversed that intersection. The average
speed for the vehicles was approximately 30 miles per hour. The highest speed
recorded was 40 miles per hour and a citation was issued to that violator. No other
citations were issued.
Respectfully submitted,
OFFICER P. HA/~ES, #716
PH:dgw
(memo.716)
,~ City of Bakersfield *REPRINT*
WORK REQUEST PAGE 1
~Q/J6B: WF0017794 / 001 PROJECT: DATE PRINTED: 10/24/97
REQUEST DATE: 10/22/97
CREW: SCHEDULE DATES
START: i0/22/97
LOCATION: COMPLETION: 11/03/97
GEN. LOC: WARD7 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL ~T~T~
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - SALVAGGIO ORIGIN: CITY COUNCIL REFERRAL
WORK TYPE: REFERRAL
DESCRIPTION: TRAFFIC CONTROL/BURTON ST AND HOLDEN WAY
REQUEST COMMENTS
'***DUAL REFERRAL TO PUBLIC WORKS AND POLICE;
PUBLIC WORKS AS LEAD***
SALVAGGIO REQUESTED PUBLIC WORKS LOOK INTO THE
POSSIBILITY OF PLACING A 4-WAY STOP AT BURTON ST
AND HOLDEN WAY***SALVAGGIO REQUESTED POLICE
CONDUCT RADAR CHECKS AT THIS INTERSECTION.
Job Order Description: TRAFFIC CONTROL/BURTON ST AND HOLDEN WAY
at~gory: PUBLIC WORKS
as~: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
City of Bakersfield *REPRINT*
WORK REQUEST PAGE
F~EQ/J. OB: WF0017794 / 003 PROJECT: DATE PRINTED: 10/.23/.97
CREW: SCHEDULE
STAR'r: £0/.22/.97
LOCATI ON: COMPLETI ON: 11/03 / 97
GEN. LOC: WARD7 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCI ~.
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - SALVAGGIO ORIGIN: CITY COUNCIL REFERRAL
~ __~~*/ WORK TYPE: REFERRAL
~ DESCRIPTION: TRAFFIC CONTROL/~ ST AND HOLDEN WAY
REQUEST COMMENTS
***DUAL REFERRAL TO PUBLIC WORKS AND POLICE;
PUBLIC WORKS AS LEAD***
S VA IO REOUESTED PUBLIC WORKS LOOK I TO m --
POSSIBILITY OF PLACING A 4-WAY STOP AT ~ ST
AND HOLDEN WAY***SALVAGGIO REQUESTED POLICE
CONDUCT RADAR CHECKS AT THIS INTERSECTION.
Job Order Description: TRAFFIC CONTROL~ S~~r AND HOLDEN WAY
Cat.egory: PUBLIC WORKS '
TasK: RESPONSE TO REFERRAL
Assigned Department: POLICE SERVICES
START DATE / /__ COMPLETION DATE /
BAKERSFIELD
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Raul Rojas, Public Works Director/~2~~
DATE: October 29, 1997
SUBJECT: COUNCIL REFERRAL ~rWF0017792/001 - CARSON
ALLEY/900BLOCK OF COLLINS WAY
On October 23, 1997 staff removed a small pile of refuse that had been illegally dumped
in the alley at this location.
KB: smp
City of Bakersfield *REPRINT*
-' ~ WORK REQUEST PAGE 1
REQ/JOB: WF0017792 / 001 PROJECT: DATE PRINTED: 10/24/9
REQUEST DATE: 10/22/9~
CREW: SCHEDULE DATES
START: i0/22/97
T-OCATION: COMPLETION: 11/03/97
_~N. LOC: WARD1 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - CARSON ORIGIN: CITY COUNCIL REFERRAL
WORK TYPE: REFERRAL
DESCRIPTION: ALLEY/900 BLOCK OF COLLINS WAY
REQUEST cOMMENTS
***REFERRAL TO PUBLIC WORKS***
CARSON REQUESTED STAFF TAKE CARE OF THE TRASH
BLOCKING THE ALLEY IN THE 900 BLOCK OF COLLINS WAY
Job Order Description: ALLEY/900 BLOCK OF COLLINS WAY
at~gory: PUBLIC WORKS
as~: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
B A K E R $ F I E L
PUBLIC WORKS DEPARTMENT
M EMORA N DU M
TO: Alan Tandy, City Manager /// //
FROM: Raul M. Rojas, Public Works Director ~/,L~~
DATE: October 31, 1997
SUBJECT: ALLEY ~ 202 S. MILHAM
Council Referral Record #WF0017790/001
Counciimember Irma Carson requested staff contact Mr. Jennings at 202 $. Milham regarding
individual(s) directing traffic through the alley behind his hous~ (Ward 1)
The request was forwarded to Traffic Engineering for investigation and response. We
have been unsuccessful in making contact with Mr. Jennings to this date. No telephone
number for Mr. Jennings is available.
Construction activities were known to have taken place in the area of South Milham
recently and the traffic direction by an individual may have been related to that
construction activity. It is normally inappropriate to direct construction traffic to an alley
since they are not designed for through traffic flow.
We will attempt to contact Mr. Jennings by mail or in person to discuss his complaint and
possible solution, if any.
? City of Bakersfield *REPRINT*
~ - ~ WORK REQUEST PAGE 1
REQ/JOB: WF0017790 / 001 PROJECT: DATE PRINTED: 10/24~97
REQUEST DATE: 10/22/97
CREW: SCHEDULE DATES
START: i0/22/97
LOCATION: COMPLETION: 11/03/97
GEN. LOC: WARD1 FACILITY NODES
FROM:
F~CILITY ID: TO:
REF NBR: COUNCIL ~TMT~
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
R~QUESTOR: REFERRAL - CARSON ORIGIN: CITY COUNCIL REFERRAL
WORK TYPE: REFERRAL
DESCRIPTION: ALLEY AT 202 S. MILHAM
REQUEST COMMENTS
***REFERRAL TO PUBLIC WORKS***
CARSON REQUESTED STAFF CONTACT MR. JENNINGS AT 202
S. MILHAM REGARDING INDIVIDUAL(S) DIRECTING
TRAFFIC THROUGH THE ALLEY BEHIND HIS HOUSE.
Job Order Description: ALLEY AT 202 S. MILHAM
at~gory: PUBLIC WORKS
asK: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
', gO'V - 5 1997
B A K E R S F I E L D .:?~,,;.~,-. ·
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager //~ /
FROM: Raul M. Rojas, Public Works Direct
DATE: October 31, 1997
SUBJECT: TRAFFIC CONTROLS ~ 8TM AND T STREETS/,I..q.4 ~ .
Council Referral Record/¢WF0017791/001
Councilmember Irma Carson requested staff look into the possibility of placement of a STOP sign
at the intersection of 8~ and T Streets. (Ward 1)
Traffic Engineering conducted a 4-way stop warrant study earlier in the year in response
to a previous request. The intersection was far from meeting any warrants then.
Since several months have passed, they will conduct another study to verify the warrants
for this intersection and a report created. The study results should be available in about
two weeks, subject to delays from weather or vandalism.
REF17791.001
~ City of Bakersfield *REPRINT*
, ~' WORK REQUEST PAGE 1
REQ/JOB: WF0017791 / 001 PROJECT: DATE PRINTED: 10/24/97
REQUEST DATE: 10/22/97
CREW: SCHEDULE DATES
START: 10/22/97
LOCATION: COMPLETION: 11/03/97
GEN. LOC: WARD1 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL ~'£~'£~
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - CARSON ORIGIN: CITY COUNCIL REFERRAL
WORK TYPE: REFERRAL
~ESCRIPTION: TRAFFIC CONTROLS AT 8TH AND T STREETS
REQUEST COMMENTS
***REFERRAL TO PUBLIC WORKS***
CARSON REQUESTED STAFF LOOK INTO THE POSSIBILITY
OF PLACEMENT OF A STOP SIGN AT THE INTERSECTION OF
8TH AND T STREETS.***2ND REQUEST***
Job order Description: TRAFFIC CONTROLS AT 8TH AND T STREETS
atggory: PUBLIC WORKS
asK: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
B A K E R S F I E L D -
PUBLIC WORKS DEPARTMENT
MEMORANDUM
TO: Alan Tandy, City Manager
FROM: Raul M. Rojas, Public Works Director~
DATE: November 4, 1997
SUBJECT: TRAFFIC CONCERNS ON FAIRVIEW ROAD
Council Referral Record #WF0017793/001
City Council meeting of October 22, 1997
Councilmember Salvaggio requested staff provide him with clarification of the report he received
regarding "stop sign placement at Fairview Road and Camp Street". (Ward 7)
Council Referral Record # WFO017778/001
City Council meeting of October 8, 1997
"Traffic concerns on Fairview Road between South "H" and Monitor; and consider placement of a 3-way
stop at Fairview and Camp."
The Traffic Engineer has reviewed the road segment for improvements. The Police
Department is enforcing speed limits on Fairview. The intersection of Fairview and Camp
does not meet a warrant for 3-way stop controls based on traffic volume. The Traffic
Engineer is considering other justifications for installing a 3-way stop as it would be
beneficial for traffic entering and leaving Camp Street and provide a break in traffic. A
recommendation on this matter will follow.
REF17793.001 '
" 997
. City of Bakersfield *REPRINT*
· ~ WORK REQUEST PAGE 1
REQ/JOB: WF0017793 / 001 PROJECT: DATE PRINTED:
10/24/97
REQUEST DATE: 10/22/97
CREW: SCHEDULE DATES
START: i0/22/97
LOCATION: COMPLETION: 11/03/97
GEN. LOC: WARD7 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL ~'~m'~'~
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
~EQUESTOR: REFERRAL - SALVAGGIO ORIGIN: CITY COUNCIL REFERRAL
WORK TYPE: REFERRAL
DESCRIPTION: TRAFFIC CONTROL/FAIRVIEW ROAD
REQUEST COMMENTS
· **REFERRAL TO PUBLIC WORKS***
SALVAGGIO REQUESTED STAFF PROVIDE HIM WITH
CLARIFICATION OF THE REPORT HE RECEIVED REGARDING
STOP SIGN PLACEMENT AT FAIRVIEW RD AND CAMP ST.
Job Order Description: TRAFFIC CONTROL/FAIRVIEW ROAD
at~gory: PUBLIC WORKS
as~: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /
~y. City of Bakersfield *REPRINT*
° WORK REQUEST PAGE 1
REQ/JOB: WF0017778 / 001 PROJECT: DATE PRINTED: 10/13/97
REQUEST DATE: 10/08/97
CREW: SCHEDULE DATES
STAR~: i0/08/97
LOCATION: COMPLETION: 10/20/97
GEN. LOC: WARD7 FACILITY NODES
FROM:
FACILITY ID: TO:
REF NBR: COUNCIL
REQ DEPT: CITY COUNCIL REFERRAL PRIORITY: HIGH
REQUESTOR: REFERRAL - SALVAGGIO ORIGIN: CITY COUNCIL REFERRAL
WORK TYPE: REFERRAL
DESCRIPTION: TRAFFIC CONCERNS ON FAIRVIEW ROAD
REQUESTCOMMENTS
***REFERRAL TO PUBLIC WORKS***.
SALVAGGIO REQUESTED STAFF LOOK INTO TRAFFIC
CONCERNS ON FAIRVIEW RD. BETWEEN SO. H & MONITOR;
AND CONSIDER PLACEMENT OF A 3-WAY STOP AT FAIRVIEW
RD. AND CAMP ST.
Job Order Description: TRAFFIC CONCERNS ON FAIRVIEW ROAD
at~gory: PUBLIC WORKS
as~: RESPONSE TO REFERRAL
Assigned Department: PUBLIC WORKS
START DATE / / COMPLETION DATE / /